newcastle gas storage facility
TRANSCRIPT
The world’s leading sustainability consultancy
Newcastle Gas Storage Facility
www.erm.com
For AGL Energy Limited
February 2013
0169504
1st Quarter Audit - November 2012
Environmental Resources Management Australia
Suite 3/146 Gordon Street PO Box 5711
Port Macquarie, NSW 2444 Telephone +61 2 6584 7155 Facsimile +61 2 6584 7160
www.erm.com
FINAL REPORT AGL Energy Limited
Newcastle Gas Storage Facility 1st Quarter Audit – November 2012 February 2013 Reference: 0169504rp1
This disclaimer, together with any limitations specified in the report, apply to use of this report. This
report was prepared in accordance with the contracted scope of services for the specific purpose stated
and subject to the applicable cost, time and other constraints. In preparing this report, ERM relied on: (a)
client/third party information which was not verified by ERM except to the extent required by the scope
of services, and ERM does not accept responsibility for omissions or inaccuracies in the client/third
party information; and (b) information taken at or under the particular times and conditions specified,
and ERM does not accept responsibility for any subsequent changes. This report has been prepared
solely for use by, and is confidential to, the client and ERM accepts no responsibility for its use by other
persons. This report is subject to copyright protection and the copyright owner reserves its rights. This
report does not constitute legal advice.
Approved by: Megan McLachlan
Position: Project Manager
Signed:
Date: 28 February, 2013
Approved by: William Ellis
Position: Partner Director
Signed:
Date: 28 February, 2013
Environmental Resources Management Australia Pty Ltd Quality System
Quality-ISO-9001-PMS302
Newcastle Gas Storage Facility
1st Quarter Audit - November 2012
AGL Energy Limited
February 2013
0169504 1st Quarter Audit Report Final
www.erm.com
CONTENTS
1 INTRODUCTION
1.1 PROJECT DESCRIPTION 1 1.2 AUDIT OBJECTIVE 1 1.3 AUDIT SCOPE 2 1.4 AUDIT CRITERIA 2 1.5 LIMITATIONS OF THIS REPORT 3
2 AUDIT METHODOLOGY
2.1 METHODOLOGY AND PROCESS 4 2.2 CLASSIFICATION OF AUDIT FINDINGS 5
3 AUDIT FINDINGS
3.1 PREVIOUS AUDIT FOLLOW-UP 6 3.1.1 PRECONSTRUCTION AUDIT 6 3.1.2 AGL ENVIRONMENT AUDIT 6 3.2 COMPLIANCE ASSESSMENT 7
4 CONCLUSION
ANNEX A AUDIT TABLE - CONDITIONS OF APPROVAL
ANNEX B AUDIT TABLE - STATEMENT OF COMMITMENTS
ANNEX C AUDIT TABLE – ENVIRONMENT PROTECTION AND BIODIVERSITY CONSERVATION
LIST OF TABLES
TABLE 3.1 SUMMARY OF NON CONFORMANCES 8
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/01 MARCH 2013
i
EXECUTIVE SUMMARY
Environmental Resources Management Australia Pty Ltd (ERM) was commissioned to perform a quarterly audit for the Newcastle Gas Storage Facility (NGSF) on behalf of AGL Energy Limited (AGL). The primary purpose of the audit was to satisfy the Department of Planning and Infrastructure (DoPI) Ministers’ Conditions of Approval (MCoA) B54a which requires a Compliance Tracking Program that includes:
“(a) provisions for periodic reporting of compliance status to the Director-General including at least prior to the commencement of construction of the project, prior to the commencement of operation of the project and within two years of operation commencement”.
The audit included a review of:
DoPI MCoA;
Statement of Commitments (SoC); and
approval conditions from the Department of Sustainability, Environment, Water, Population and Communities (DSEWPaC).
The Contractor has established the control systems generally required for a project of this nature, and all staff interviewed demonstrated an understanding of requirements and a commitment to the application of the management systems.
Overall a high standard of compliance was noted against the requirements of the MCoA, SoC and approval conditions from the DSEWPaC, however a number of issues have been identified for review and action by AGL and its contractors.
The audit raised three non-conformances identified in the documentation. Fifty-one improvement opportunities were identified primarily correcting administrative errors in the Construction Environment Management Plans (CEMP) and supporting Sub Plans.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/01 MARCH 2013
ii
Abbreviations and Glossary
Term Description AGL AGL Energy Limited AQMSP Air Quality Management Sub Plan ASSMSP Acid Sulphate Soil Management Sub Plan CB&I Chicago Bridge and Iron CEMP Construction Environment Management Plan CHMSP Cultural Heritage Management Sub Plan DGHMHMSP Dangerous Goods & Hazardous Materials Handling Management Sub Plan DoPI Department of Planning and Infrastructure DSEWPaC Department of Sustainability, Environment, Water, Population and
Communities EPBC Environment Protection and Biodiversity Conservation Act 1999 ERM Environmental Resources Management Australia Pty Ltd ERSP Emergency Response Sub Plan FERMSP Flood Emergency Management Sub Plan FFMSP Flora and Fauna Management Sub Plan GMP Groundwater Monitoring Program GMSP Groundwater Management Sub Plan MCoA Ministers Conditions of Approval NGSF Newcastle Gas Storage Facility (the ‘Project’) NVMSP Noise and Vibration Management Sub Plan SMSP Soil Management Sub Plan SoC Statement of Commitments SWMSP Surface Water Management Sub Plan TMSP Traffic Management Sub Plan VRMSP Vegetation Rehabilitation Management Sub Plan WMSP Waste Management Sub Plan
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
1
1 INTRODUCTION
Environmental Resources Management Australia Pty Ltd (ERM) was commissioned to perform a quarterly audit for the Newcastle Gas Storage Facility (NGSF) on behalf of AGL Energy Limited (AGL).
The primary purpose of the audit was to satisfy the New South Wales (NSW) Department of Planning and Infrastructure (DoPI) Ministers’ Conditions of Approval (MCoA) B54a which requires a Compliance Tracking Program that includes:
“(a) provisions for periodic reporting of compliance status to the Director-General including at least prior to the commencement of construction of the project, prior to the commencement of operation of the project and within two years of operation commencement”.
1.1 PROJECT DESCRIPTION
AGL Energy Limited (AGL) is developing the Newcastle Gas Storage Facility in Tomago New South Wales to meet AGL’s peak gas market requirements over winter and to provide additional security of gas supply during supply disruption events. New South Wales currently has no reliable gas storage capacity.
Construction of the Newcastle Gas Storage Facility by Chicago Bridge & Iron (CB&I) includes the gas storage facility site, access road and utility corridor and gas pipeline access corridor (the Project). Additional works by others include construction upgrade and gas pipeline connection to the existing Jemena Gate Station at Hexham and lying of the pipeline to connect to the gas storage facility.
1.2 AUDIT OBJECTIVE
The primary project objectives for the 1st quarterly compliance audit include the following:
to confirm implementation of CB&I’s CEMP and supporting sub-plans;
to determine the extent that AGL and its subcontractors are in compliance with the relevant MCoA and Department of Sustainability, Environment, Water, Population and Communities (DSEWPaC) conditions as they relate to the construction phase of the Project; and
to identify the areas for potential improvement for environmental management.
This audit represents a snapshot of performance on the days of the audit.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
2
1.3 AUDIT SCOPE
The audit scope is limited to the activities that have undertaken at the site during the previous quarter and includes the following:
establishment of site compounds and ancillary facilities
clearing and grubbing works; and
earthmoving and sub soil removal.
1.4 AUDIT CRITERIA
The audit covered the following specifications and standards, with a particular focus on activities associated with the current stages of construction. The following documents were used to audit compliance of the environmental management system:
DSEWPaC Approval DoPI, Ministers Conditions of Approval MP10_0133 issued 10 May 2012; and
EPBC 2010/5752 issued 18 July 2012;
Statement of Commitments from the Preferred Project Report CR 6023_1-_v3 issued September 2011;
Construction Environment Management Plan and the following sub plans;
Flora and Fauna Management Sub Plan (FFMSP);
Soil Management Sub Plan (SMSP);
Surface Water Management Sub Plan (SWMSP);
Groundwater Management Sub-Plan
Air Quality Management Plan (AQMSP);
Noise and Vibration Management Sub Plan (NVMSP);
Traffic Management Sub Plan (TMSP);
Waste Management Sub-Plan;
Cultural Heritage Management Sub Plan (CHMSP); and
Vegetation Rehabilitation Management Sub Plan (VRMSP); and
Environment Protection Licence (EPL) 20130 Issued 20 July 2012;
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
3
Pollution Incident Response Management Plan (PIRMP);
Groundwater Monitoring Plan; and
Environmental Representative Site Inspection Reports: 30/08/2012 – 27/11/2012
1.5 LIMITATIONS OF THIS REPORT
The findings of this report are based on the Scope of Work described above. ERM performed the services in a manner consistent with the normal level of care and expertise exercised by members of the environmental auditing profession. No warranties, expressed or implied, are made.
This report is not intended to be used for the purposes of tendering or programming of works unless used in conjunction with a specification detailing the extent of the works. To ensure its contextual integrity, the report must be read in its entirety and should not be copied, distributed or referred to in part only.
This report is based upon information obtained from the client in compilation with information from regulatory agencies. While normal assessments of data reliability have been made, ERM assumes no responsibility or liability for errors in any data obtained from regulatory agencies, statements from sources outside of ERM, or developments resulting from situations outside the scope of this project.
ERM is not engaged in environmental auditing and reporting for the purpose of advertising, sales, promoting, or endorsement of any client interests, including raising investment capital, recommending investment decisions, or other publicity purposes. The client acknowledges that this report is for the exclusive use of the client, its representatives and advisers and investors, lenders, underwriters and financiers who agreed to execute a reliance letter, and the client agrees that ERM’s report or correspondence will not be, except as set forth herein, used or reproduced in full or in part for such promotional purposes, and may not be used or relied upon in any prospectus or offering circular.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
4
2 AUDIT METHODOLOGY
2.1 METHODOLOGY AND PROCESS
The audit comprised a site inspection, interviews with key personnel and review of records and other related documentation during the period 27th November 2012 to 14th December 2012. The audit process included the following primary components:
Terms of Reference developed which included:
audit scope and objectives;
date and location of audit;
members of audit team;
list of people audited; and
list of reference documents and audit criteria.
opening meeting at the site office to confirm audit objectives and scope. Attendees included:
Megan McLachlan (ERM Auditor);
Aaron Clifton (AGL Environment Manager – Audit Observer);
Craig Rivera (CB&I Environmental Manager); and
Keith Hughes (CB&I Environmental Manager);
a site inspection was undertaken on 27th November 2012);
any identified gaps/issues were documented and followed up with site personnel and additional information was requested as required;
a closeout meeting was held 27 November 2012 to discuss initial findings and recommendations. Attendees included:
Megan McLachlan (ERM Auditor);
Craig Rivera (CB&I Environmental Manager); and
Keith Hughes (CB&I Environmental Manager);
preparation of this report.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
5
2.2 CLASSIFICATION OF AUDIT FINDINGS
Findings resulting from an assessment of audit evidence were divided into four categories as follows:
Conformance (C): Adequate and appropriate implementation against audit criteria.
Non-conformance Category 1 (NC-1): Failure to meet the requirements of the audit criteria in terms of legislative requirements, failure to achieve the management performance outcomes identified in documentation, or ineffective environmental management of the activity that represent an immediate risk to the environment or reputation of the company.
Non-conformance Category 2 (NC-2): Failure to achieve the management performance outcomes identified in documentation, or ineffective environmental management of the development that does not represent an immediate risk to the environment. These will generally be associated with documentation, records or administrative requirements.
Improvement Opportunity (IO): A finding which does not strictly relate to the scope of the audit and which could lead to performance improvement.
Not Applicable (NA): requirement was not applicable to project operations during the audit and therefore adequacy and appropriateness of implementation against audit criteria was not considered necessary.
In addition to the above, the status of the item or approval condition is divided into the following categories:
Open – item has yet to be completed with actions continuing.
Closed – item has been completed and the audit criteria satisfied with no further actions outstanding.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
6
3 AUDIT FINDINGS
3.1 PREVIOUS AUDIT FOLLOW-UP
3.1.1 Preconstruction Audit
The preconstruction audit completed 27 August 2012 raised 14 improvement opportunities which have since been addressed with the exception of the following:
B32: the Pre-Construction Road Inspection Report required consultation with Roads and Maritime Services (RMS) and Port Stephens Council (PSC). Evidence of consultation with PSC will confirm this condition has been met;
B49: requirement for a website or dedicated pages which includes an electronic copy of each plan, report or monitoring plan required by the approval. The sub plans required as part of the CEMP are not currently uploaded onto the website;
B57f: requirement to include an Out of Hours Works Protocol as part of the Noise Management Sub Plan. The protocol is under development with procedures created. The protocol and procedures will be sent to the DoPI and the NSW Environment Protection Authority (EPA) for approval before implementation.
3.1.2 AGL Environment Audit
AGL completed an audit on 27 September 2012 raised six non-conformances and 12 improvement opportunities. These have been addressed with the exception of the following:
Improvement opportunity – ensure topsoil stockpiles are clearly demarcated to avoid mixing with subsoil stockpiles. As there is only one sub soil stockpile this was not considered necessary. In addition, all topsoil has since been moved to the gas pipeline access track where only topsoil is stored therefore removing any confusion;
Improvement opportunity – consideration for the placement of vents inside vegetation mulch stockpiles to prevent combustion. The excess mulch has now been removed from site with the remaining mulch placed in windrows at a maximum height of 2-3 metres. It is unlikely that the size of the remaining stockpiles would be large enough to generate enough heat to self-combust;
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
7
Non-compliance – review of sub-contractor SWMS and approve against corresponding EWMS Matrix to fulfil the requirements of the CEMP. A table cross referencing the EWMS matrix with the sub-contractor SWMS is to be completed and include in the CEMP. Consider the development of EWMS for future planned works to set a minimum standard for inclusion in the sub contactor SWMSs.
3.2 COMPLIANCE ASSESSMENT
Compliance against the requirements of the MCoA, SoC and DSEWPaC Approval conditions were achieved with all requirements’ met with the exception of one non-conformance with the MCoA and two non-conformances with the SoCs.
Only areas of non-conformances are summarised in this section of the report. A full review and discussion of audit findings is included in the annexures as follows:
Assessment of compliance with MCoA (Annex A);
Assessment of compliance with SoC (Annex B); and
Assessment of compliance with DSEWPaC Conditions (Annex C).
A summary of the non-conformances is included in Table 3.1 below.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013 2013
8
Tab
le 3
.1
Sum
mar
y of
Non
Con
form
ance
s
Item
N
o A
sses
smen
t Req
uir
emen
t C
omm
ent
Au
dit
C
lass
ific
atio
n
Min
iste
rs C
ondi
tion
s of
App
rova
l MP
10_0
133
B49
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt s
hall
esta
blis
h a
ded
icat
ed w
ebsi
te o
r m
aint
ain
ded
icat
ed p
ages
wit
hin
its
exis
ting
web
site
for
the
prov
isio
n of
ele
ctro
nic
info
rmat
ion
asso
ciat
ed w
ith
the
proj
ect.
The
P
ropo
nent
sha
ll pu
blis
h an
d m
aint
ain
up-t
o-d
ate
info
rmat
ion
on th
is w
ebsi
te
or d
edic
ated
pag
es in
clud
ing,
but
not
nec
essa
rily
lim
ited
to:
(d)
a co
py o
f ea
ch p
lan,
rep
ort,
or m
onit
orin
g pr
ogra
mm
e re
quir
ed b
y th
is
appr
oval
A c
opy
of th
e C
EM
P is
incl
uded
on
the
web
site
- no
t all
plan
s re
quir
ed u
nder
th
e M
CoA
hav
e be
en l
oad
ed o
nto
web
site
. P
lans
not
upl
oad
ed i
nclu
de
the
FFM
SP,
CH
MSP
, SW
MSP
, FE
RM
SP,
NM
SP,
ASS
MSP
and
TM
SP.
Web
site
in
dic
ate
thes
e ar
e av
aila
ble
on r
equ
est.
NC
-2
Stat
emen
t of C
omm
itm
ents
21
3 A
n em
erge
ncy
plan
will
be
prep
ared
in a
ccor
dan
ce w
ith
clau
se 1
74Z
C o
f th
e O
ccu
pati
onal
Hea
lth
and
Saf
ety
Reg
ula
tion
s 20
01 (
NSW
) an
d t
he D
P&
I gu
idan
ce n
ote
HIP
AP
1, E
mer
genc
y P
lann
ing.
CB
&I's
P
ollu
tion
In
cid
ent
Res
pons
e M
anag
emen
t P
lan
(PIR
MP
) or
E
mer
genc
y R
espo
nse
Pla
n (E
RP
) d
oes
not
curr
entl
y re
fer
to e
ithe
r d
ocu
men
t th
eref
ore
it i
s un
clea
r if
thi
s pl
an i
s co
nsis
tent
wit
h th
ese
guid
elin
es a
nd
proc
edu
res.
C
onsi
der
in
clu
din
g d
iscu
ssio
n in
P
IRM
P
or
ER
P
on
the
com
plia
nce/
non-
com
plia
nce
wit
h th
ese
doc
um
ents
.
NC
-2
215
The
pro
pose
d e
mer
genc
y tr
affi
c ar
rang
emen
ts w
ill b
e re
view
ed a
nd a
sses
sed
to
ens
ure
com
plia
nce
wit
h th
e st
ated
Em
erge
ncy
Veh
icle
Acc
ess
Pol
icy
No.
4.
CB
&I’
s P
RIM
P o
r P
RP
doe
s no
t cur
rent
ly r
efer
to th
is r
equ
irem
ent -
con
sid
er
revi
ew a
nd a
sses
smen
t of e
mer
genc
y tr
affi
c ar
rang
emen
ts i
nclu
din
g re
quir
emen
t int
o C
B&
I's P
RIM
P o
r P
RP
NC
-2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
9
4 CONCLUSION
A quarterly audit against the DoPI MCoA and the DSEWPaC Approval was completed by reviewing the relevant documents to identify whether AGL and its contractors are meeting current requirements of the approval conditions relevant to the current phase of the AGL NGSF Project.
Three non-conformances were identified. Fifty-one improvement opportunities were identified primarily correcting administrative errors in the Construction Environment Management Plan and supporting Sub Plans.
Annex A
Audit Table - Conditions of Approval
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A1
Tab
le A
1 C
ompl
ianc
e A
sses
smen
t –
Min
iste
rs C
ondi
tion
s of
App
rova
l MP
10_0
133
(dat
ed 1
0 M
ay 2
012)
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
TE
RM
S O
F A
PP
RO
VA
L
PA
RT
A –
AD
MIN
IST
RA
TIV
E C
ON
DIT
ION
S
A1
The
P
ropo
nent
sh
all
carr
y ou
t th
e pr
ojec
t ge
nera
lly
in
acco
rdan
ce
wit
h th
e:
(a)
Env
iron
men
tal
Ass
essm
ent;(
b)
Pre
ferr
ed
Pro
ject
R
epor
t;(c)
St
atem
ent
of
Com
mit
men
ts;
and
(d)
cond
itio
ns o
f th
is a
ppro
val.
Not
e: t
he g
ener
al l
ayou
t of
the
proj
ect i
s sh
own
in A
ppen
dix
1
All
AG
L
CB
I
Ope
n N
oted
A2
If
ther
e is
an
y in
cons
iste
ncy
betw
een
the
doc
um
ents
in
co
ndit
ion
A1,
the
mos
t re
cent
doc
umen
t sh
all
prev
ail
to t
he
exte
nt o
f th
e in
cons
iste
ncy.
How
ever
, th
e co
ndit
ions
of
this
ap
prov
al s
hall
prev
ail t
o th
e ex
tent
of a
ny in
cons
iste
ncy
wit
h th
e d
ocum
ents
list
ed u
nder
con
dit
ion
A1.
All
AG
L
CB
I
Ope
n N
oted
A3
The
P
ropo
nent
sh
all
com
ply
wit
h an
y re
ason
able
re
quir
emen
t(s)
of
th
e D
irec
tor-
Gen
eral
ar
isin
g fr
om
the
Dep
artm
ent’
s as
sess
men
t of:(
a) a
ny r
epor
ts, s
trat
egie
s, p
lans
, pr
ogra
mm
es,
revi
ews,
au
dit
s or
co
rres
pond
ence
tha
t ar
e su
bmit
ted
in
ac
cord
ance
w
ith
this
ap
prov
al;
and
(b)
the
impl
emen
tati
on o
f an
y ac
tion
s or
mea
sure
s co
ntai
ned
in
thes
e d
ocu
men
ts
All
AG
L
CB
I
Ope
n N
oted
LIM
ITS
OF
AP
PR
OV
AL
A4
Thi
s pr
ojec
t ap
prov
al s
hall
laps
e fi
ve y
ears
aft
er t
he d
ate
on
whi
ch i
t is
gra
nted
, un
less
any
wor
ks t
he s
ubje
ct o
f th
is
appr
oval
hav
e ph
ysic
ally
com
men
ced
bef
ore
that
tim
e.
All
AG
L
Ope
n P
roje
ct a
ppro
val d
ate
10 M
ay 2
012
A5
The
gas
pip
elin
e co
mpo
nent
for
the
pro
ject
sha
ll fo
llow
co
rrid
or o
ptio
n 2
as s
how
n in
Fig
ure
1.2
– C
once
ptu
al P
roje
ct
Lay
out i
n th
e E
A. T
o av
oid
any
dou
bt, o
ther
cor
rid
or o
ptio
ns
show
n in
that
figu
re a
re n
ot a
ppro
ved
.
Des
ign
AG
L
Com
plia
nce
Clo
sed
Opt
ion
2 ha
s be
en a
dop
ted
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A2
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
STA
GIN
G
A6
Con
stru
ctio
n of
the
pro
ject
may
be
und
erta
ken
in d
iscr
ete
wor
k pa
ckag
es o
r st
ages
. Whe
re th
at o
ccur
s, th
ese
cond
itio
ns
of a
ppro
val
need
onl
y be
com
plie
d w
ith
to t
he e
xten
t th
at
they
are
rel
evan
t to
tha
t d
iscr
ete
wor
k pa
ckag
e or
sta
ge.
Pri
or
to
the
com
men
cem
ent
of
rele
vant
co
nstr
uct
ion
or
oper
atio
n ac
tivi
ties
, th
e P
ropo
nent
sha
ll su
bmit
a S
tagi
ng
Rep
ort t
o th
e D
irec
tor-
Gen
eral
whi
ch:
(a) d
escr
ibes
the
stag
es; a
nd
(b)
iden
tifi
es t
he r
elev
ant
cond
itio
ns o
f ap
prov
al f
or e
ach
stag
e an
d h
ow t
hese
will
be
add
ress
ed a
cros
s an
d b
etw
een
the
stag
es o
f the
pro
ject
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
Stag
ing
Pla
n
(Doc
um
ent N
o: N
GSF
-WP
OE
-NA
S-P
M-P
LN
-000
1).
Cor
resp
ond
ence
to D
G s
ubm
itti
ng r
epor
t
a)
10 s
tage
s d
escr
ibed
(Sec
tion
3)
b)
App
end
ix 1
inc
lud
es s
prea
d s
heet
whi
ch i
den
tifi
es
whi
ch a
ppro
vals
app
ly to
eac
h st
age
A7
Wit
h th
e ap
prov
al o
f th
e D
irec
tor-
Gen
eral
, th
e P
ropo
nent
m
ay s
ubm
it a
ny s
trat
egy,
pla
n or
pro
gram
me
requ
ired
by
this
ap
prov
al
on
a pr
ogre
ssiv
e ba
sis
for
dis
cret
e w
ork
pack
ages
or
stag
es.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L &
CB
I O
pen
Not
ed –
upd
ate
on s
ubm
issi
ons
to b
e ob
tain
ed f
rom
A
GL
as
they
occ
ur.
STA
TU
TO
RY
RE
QU
IRE
ME
NT
S
A8
The
P
ropo
nent
sh
all
ensu
re
that
al
l ne
cess
ary
licen
ces,
pe
rmit
s an
d
appr
oval
s ar
e ob
tain
ed
and
m
aint
aine
d
as
requ
ired
thr
ough
out
the
life
of t
he p
roje
ct.
No
cond
itio
n of
th
is a
ppro
val
rem
oves
the
obl
igat
ion
of t
he P
ropo
nent
to
obta
in,
rene
w
or
com
ply
wit
h su
ch
licen
ces,
pe
rmit
s or
ap
prov
als.
The
Pro
pone
nt s
hall
ensu
re t
hat
a co
py o
f th
is
appr
oval
an
d
all
rele
vant
en
viro
nmen
tal
appr
oval
s ar
e av
aila
ble
on th
e si
te a
t all
tim
es d
uri
ng th
e pr
ojec
t.
All
AG
L &
CB
I C
ompl
ianc
e
Ope
n
EP
BC
App
rova
l obt
aine
d (2
010-
5752
) 18
July
201
2
EP
L20
130
issu
ed to
CB
I for
che
mic
al s
tora
ge a
nd
petr
oleu
m a
nd fu
el p
rod
uct
ion
10 Ju
ly 2
012
Con
stru
ctio
n C
erti
fica
te r
ecei
ved
Fri
day
29t
h Se
ptem
ber
2012
.
Cop
ies
of E
PL
and
MC
oA in
sit
e of
fice
(War
ds
and
C
BI)
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A3
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
CO
MP
LIA
NC
E
A9
The
Pro
pone
nt s
hall
ensu
re t
hat
empl
oyee
s, c
ontr
acto
rs a
nd
sub-
cont
ract
ors,
and
vis
itor
s ar
e aw
are
of, a
nd c
ompl
y w
ith,
th
e co
ndit
ions
of
this
app
rova
l re
leva
nt t
o th
eir
resp
ecti
ve
acti
viti
es.
All
CB
I C
ompl
ianc
e
Ope
n
Gen
eral
ind
ucti
on a
tten
ded
15
Aug
ust i
nclu
des
som
e as
pect
s of
app
rova
l – r
efer
CE
MP
and
Su
b-P
lan
Ind
uct
ion
and
Tra
inin
g co
mm
itm
ents
for
furt
her
det
ails
.
Rev
iew
of D
aily
pre
star
ts 2
8/9/
2012
to 1
0/11
/20
12
SWM
S E
xcav
atio
n an
d T
renc
hing
, Dew
ater
ing
and
Su
rfac
e W
ater
Man
agem
ent.
Too
lbox
Reg
iste
r 17
/8/
2012
to 0
6/11
/20
12
SWM
S, JS
A a
nd to
ol b
ox ta
lks
also
dis
cuss
issu
es
rele
vant
to ta
sks
to b
e pe
rfor
med
PU
BL
ICL
Y A
VA
ILA
BL
E I
NFO
RM
AT
ION
A10
Su
bjec
t to
co
nfid
enti
alit
y,
the
Pro
pone
nt
shal
l m
ake
all
doc
umen
ts r
equi
red
und
er t
his
appr
oval
ava
ilabl
e fo
r pu
blic
in
spec
tion
on
requ
est
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L/
CB
I C
ompl
ianc
e
Ope
n
Pla
ns a
ppro
ved
by
DoP
I –
som
e lo
aded
ont
o w
ebsi
te
wit
h ac
cess
to
furt
her
plan
s av
aila
ble
upon
req
uest
–
refe
r to
Con
dit
ion
49.
STR
UC
TU
RA
L A
DE
QU
AC
Y
A11
T
he
Pro
pone
nt
shal
l en
sure
th
at
all
new
bu
ildin
gs
and
st
ruct
ure
s,
and
an
y al
tera
tion
s or
ad
dit
ions
to
ex
isti
ng
build
ings
and
str
uctu
res,
are
con
stru
cted
in a
ccor
dan
ce w
ith
the
rele
vant
req
uir
emen
ts o
f th
e B
CA
. Fo
r th
e pu
rpos
e of
se
ctio
n 75
S(2)
(b)
of
the
Act
, th
e re
leva
nt
prov
isio
ns,
as
def
ined
in s
ecti
on 7
5S(1
A) o
f the
Act
app
ly to
this
app
rova
l.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Sche
dul
e 3,
Bas
is o
f Des
ign,
Ap
pen
dix
C
Sect
ion
75S(
2)(b
) re
quir
es p
riva
te c
erti
fier
to
sign
off
on
build
ings
/st
ruct
ures
. A
GL
has
eng
aged
the
serv
ices
of
Bar
ker
Rya
n St
ewar
t a
New
cast
le-b
ased
m
ulti
dis
cipl
inar
y to
wn
plan
ning
, en
gine
erin
g an
d
priv
ate
cert
ific
atio
n co
nsul
tanc
y to
as
sist
AG
L i
n sa
tisf
ying
the
cer
tifi
cati
on r
equi
rem
ents
fo
r th
e pr
ojec
t. B
arke
r R
yan
Stew
art
has
in
turn
en
gage
d
the
loca
l fi
rm
New
Cer
t as
th
e P
rinc
ipal
C
erti
fyin
g A
utho
rity
. A
t th
is p
oint
in
tim
e, t
he c
erti
fica
tion
req
uire
men
ts f
or
Stag
e 1
– Si
te P
repa
rati
on h
ave
been
id
enti
fied
and
are
in
pr
ogre
ss.
The
re
quir
emen
ts
for
the
subs
equ
ent
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A4
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Stag
es w
ill b
e d
evel
oped
pro
gres
sive
ly.
SUB
DIV
ISIO
N
A12
In
un
der
taki
ng
the
subd
ivis
ion
appr
oved
un
der
th
is
appr
oval
, the
Pro
pone
nt m
ust
com
ply
wit
h th
e re
quir
emen
ts
of t
he E
nvir
onm
enta
l P
lann
ing
and
Ass
essm
ent
Act
197
9 re
lati
ng t
o th
e is
sue
of a
Sub
div
isio
n C
erti
fica
te (
the
rele
vant
pr
ovis
ions
ref
erre
d t
o u
nder
sec
tion
75S
(2)(
b) o
f th
e A
ct,
whi
ch c
onti
nues
to a
pply
to th
e pr
ojec
t).
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
Surv
ey P
lan
– Su
bdiv
isio
n of
Lot
105
DP
112
5747
and
ea
sem
ent o
ver
Lot
4 D
P 1
0435
61 –
su
rvey
dat
ed 2
7 M
arch
201
2
A13
T
he P
ropo
nent
sha
ll co
nsu
lt w
ith
and
ad
dre
ss a
ll re
ason
able
re
quir
emen
ts
of
Por
t St
ephe
ns
Cou
ncil
in
prep
arin
g it
s ap
plic
atio
n fo
r a
Subd
ivis
ion
Cer
tifi
cate
for
the
proj
ect.
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
Em
ail t
o P
SC 2
9 D
ec 2
012
wit
h su
bdiv
isio
n pl
an a
nd
s88B
inst
rum
ent a
ttac
hed
. PSC
rep
ly fr
om A
man
da
Gal
e 6
Janu
ary
2012
sta
ting
88B
inst
rum
ent a
nd L
inen
P
lan
prov
ide
an e
asem
ent w
hich
lega
lly s
atis
fies
the
conc
ern
mad
e by
Cou
ncil.
OB
LIG
AT
ION
TO
MIN
IMIS
E H
AR
M T
O T
HE
EN
VIR
ON
ME
NT
A14
T
he P
ropo
nent
sha
ll im
plem
ent
all
reas
onab
le a
nd f
easi
ble
mea
sure
s to
pre
vent
and
/or
min
imis
e an
y m
ater
ial
harm
to
the
envi
ronm
ent
that
m
ay
resu
lt
from
th
e co
nstr
uct
ion,
op
erat
ion
or r
ehab
ilita
tion
of t
he p
roje
ct.
All
AG
L –
ope
rati
on
and
reh
abili
tati
on
stag
e
CB
I – c
onst
ruct
ion
stag
e
Not
ed
Ope
n
Not
ed –
all
man
agem
ent
plan
s w
ith
impl
emen
tati
on t
o be
mon
itor
ed d
uri
ng a
ctiv
itie
s
INC
IDE
NT
RE
PO
RT
ING
A15
T
he P
ropo
nent
sha
ll no
tify
the
Dir
ecto
r-G
ener
al a
nd a
ny
othe
r re
leva
nt a
genc
ies
of a
ny i
ncid
ent
asso
ciat
ed w
ith
the
proj
ect
as s
oon
as p
ract
icab
le a
fter
the
Pro
pone
nt b
ecom
es
awar
e of
the
inci
den
t. W
ithi
n se
ven
day
s of
bec
omin
g aw
are
of t
he i
ncid
ent,
the
Pro
pone
nt s
hall
prov
ide
the
Dir
ecto
r-G
ener
al a
nd a
ny r
elev
ant
agen
cies
wit
h a
det
aile
d r
epor
t on
th
e in
cid
ent.
All
CB
I to
noti
fy
imm
edia
tely
as
per
PO
EO
Act
re
quir
emen
ts
AG
L to
liai
se w
ith
agen
cies
aft
er
init
ial n
otif
icat
ion
IO
Ope
n
1 in
cid
ent
repo
rted
to
DoP
I 15
/10
.201
2 (o
verf
low
fro
m
toile
ts).
Not
ific
atio
n em
ail
sent
16/
10/
2012
whi
ch a
lso
form
ed d
etai
led
wri
tten
rep
ort
to D
oPI.
Not
ific
atio
n on
po
lluti
on
hotl
ine
com
plet
ed
imm
edia
tely
an
d
emai
l se
nt
thro
ugh
15
/10
/20
12
whi
ch
sati
sfie
d
repo
rtin
g re
quir
emen
ts
of
EP
L.
P
SC
noti
fied
vi
a em
ail
16/
10/
2012
.
Wor
kCov
er
noti
fied
vi
a ph
one
call
16/
10/
2012
.
1 ad
dit
iona
l in
cid
ent
repo
rted
to
E
PA
fo
r 20
litre
hy
dra
ulic
hos
e le
ak o
n 18
/09
/20
12 a
s pe
r co
mm
itm
ent
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A5
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
in G
roun
dw
ater
Man
agem
ent
Sub
Pla
n. I
ncid
ent
will
be
rep
orte
d in
6 m
onth
ly c
ompl
ianc
e re
port
to D
oPI.
IO
– al
way
s no
tify
DoP
I im
med
iate
ly if
any
oth
er a
genc
ies
noti
fied
. A
dd
itio
n of
col
um
n to
inc
iden
t re
gist
er w
ith
nam
e of
ag
ency
no
tifi
ed
and
d
ate
will
as
sist
w
ith
trac
king
not
ific
atio
n co
mpl
ianc
e
A16
T
he P
ropo
nent
sha
ll m
eet
the
requ
irem
ents
of
the
Dir
ecto
r-G
ener
al t
o ad
dre
ss t
he c
ause
or
impa
ct o
f an
y in
cid
ent,
as i
t re
late
s to
th
is
appr
oval
, re
port
ed
in
acco
rdan
ce
wit
h co
ndit
ion
A15
of
this
app
rova
l, w
ithi
n su
ch p
erio
d a
s th
e D
irec
tor-
Gen
eral
may
req
uir
e.
All
CB
I –
impl
emen
tati
on
AG
L –
act
ive
gove
rnan
ce o
ver
corr
ecti
ve a
ctio
ns
take
n by
CB
I
IO
Ope
n
Cor
rect
ive
acti
ons
prop
osed
for
15/
10/
2012
inc
iden
t ha
ve
been
co
mpl
eted
. A
ll in
cid
ent
and
co
rrec
tive
ac
tion
s tr
acke
d t
hrou
gh a
n A
ctio
n R
egis
ter
(170
596-
EN
-R
04).
IO
– a
dd
itio
n of
pri
orit
y le
vels
and
dat
es f
or
com
plet
ion
may
ass
ist
furt
her
wit
h fo
cuss
ing
atte
ntio
n on
hig
her
risk
issu
es a
nd a
ctio
ns.
PA
RT
B –
PR
IO R
TO
AN
D D
UR
ING
CO
NS
TR
UC
TIO
N
BIO
DIV
ER
SIT
Y
B1
The
Pro
pone
nt s
hall
empl
oy a
sui
tabl
y-qu
alif
ied
eco
logi
st t
o at
tend
sit
e cl
eari
ng a
nd v
eget
atio
n re
mov
al w
orks
, an
d a
ny
acti
viti
es w
ith
the
pote
ntia
l to
dir
ectl
y or
ind
irec
tly
impa
ct
on t
he b
iod
iver
sity
of
the
proj
ect
site
or
surr
ound
ing
land
d
uri
ng c
onst
ruct
ion.
The
eco
logi
st s
hall
be e
mpl
oyed
for
the
pu
rpos
e of
id
enti
fyin
g an
d a
dvi
sing
on
pote
ntia
l ec
olog
ical
im
pact
s, i
nclu
din
g ap
prop
riat
e m
itig
atio
n an
d m
anag
emen
t, as
req
uir
ed u
nder
thes
e co
ndit
ions
of a
ppro
val.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
– C
BI
Shaw
n C
apar
aro
from
Eco
Bio
logi
cal a
ppoi
nted
FFM
SP –
App
end
ix B
, Tab
le 8
-1 (g
ener
al C
onst
ruct
ion)
, T
able
8-6
(Pre
-cle
arin
g P
roto
col)
and
Tab
le 8
-9
(Veg
etat
ion
Cle
arin
g P
roto
col)
Man
agem
ent
of I
mpa
cts
on F
lora
B2
The
Pro
pone
nt s
hall
take
rea
sona
ble
and
fea
sibl
e st
eps
to
min
imis
e th
e ar
ea o
f na
tive
veg
etat
ion
clea
ring
req
uir
ed f
or
the
proj
ect.
Are
as o
f ve
geta
tion
to
be c
lear
ed a
s pa
rt o
f th
e pr
ojec
t sh
all
be
clea
rly
dem
arca
ted
pr
ior
to
the
com
men
cem
ent
of
clea
ring
ac
tivi
ties
. P
roce
du
res
for
the
min
imis
atio
n an
d m
anag
emen
t of
veg
etat
ion
clea
ring
sha
ll be
d
etai
led
in
th
e Fl
ora
and
Fa
una
M
anag
emen
t P
lan
Pre
cle
arin
g A
GL
to
en
gage
ec
olog
ist
CB
I
Com
plia
nce
Clo
sed
– C
BI
AG
L r
ecei
ved
lett
er fr
om e
coB
iolo
gica
l on
14-M
ay-1
2 ou
tlin
ing
step
s ta
ken
to c
ompl
y w
ith
the
cond
itio
n. T
he
Flor
a &
Fau
na M
anag
emen
t Su
b P
lan
cont
ains
det
ails
on
cle
arin
g.
The
CC
FMP
has
bee
n su
bmit
ted
to th
e D
irec
tor‐
Gen
eral
as
part
of t
he C
EM
P a
nd a
ppro
ved
Si
te in
spec
tion
s ov
er p
erio
d in
dic
ate
site
bou
ndar
ies
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A6
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
requ
ired
und
er c
ond
itio
n B
57.
mar
ked
wit
h pi
nk ta
pe a
nd/o
r pa
raw
ebbi
ng to
pre
vent
fu
rthe
r cl
eari
ng. C
lear
ing
limit
ed to
mar
ked
are
as.
B3
The
Pro
pone
nt s
hall
cons
tru
ct t
he p
roje
ct i
n a
man
ner
that
av
oid
s d
irec
t an
d i
ndir
ect
impa
cts
to t
hose
are
as m
appe
d a
s “(
4) –
Fre
shw
ater
Wet
land
Com
plex
” an
d “
(7)
– P
hrag
mit
es
Rus
hlan
d”
in
Figu
re
7 –
Veg
etat
ion
Com
mun
itie
s in
E
colo
gica
l A
sses
smen
t: N
ewca
stle
G
as
Stor
age
Faci
lity
Pro
ject
(ec
oBio
logi
cal,
May
201
1), i
nclu
ded
as
App
end
ix 7
to
the
EA
. T
he
suit
ably
-qua
lifie
d
ecol
ogis
t re
quir
ed
und
er
cond
itio
n B
1 sh
all b
e en
gage
d f
or th
e pu
rpos
e of
ad
visi
ng o
n m
easu
res
to a
void
pot
enti
al d
irec
t or
ind
irec
t im
pact
s.
Pre
-con
stru
ctio
n –
Stag
e 2
Con
stru
ctio
n
AG
L
CB
I
NA
Ope
n
Veg
etat
ion
com
mun
itie
s m
ap in
clud
ed a
s Fi
gure
1 in
FF
MSP
The
are
as r
efer
red
to in
this
con
dit
ion
are
rele
vant
to
the
pipe
line
cons
tru
ctio
n an
d c
ross
ing
over
the
Hu
nter
R
iver
whi
ch is
par
t of S
tage
2 th
eref
ore
will
be
incl
ude
in th
e m
anag
emen
t pha
se fo
r th
is p
hase
of t
he w
orks
.
B4
Pri
or t
o th
e co
mm
ence
men
t of
con
stru
ctio
n, a
ppro
pria
tely
ti
med
an
d
targ
eted
su
rvey
s sh
ould
be
un
der
take
n to
d
eter
min
e th
e ab
senc
e/pr
esen
ce o
f th
e fo
llow
ing
taxa
for
w
hich
ge
nera
l ba
selin
e ve
geta
tion
su
rvey
s ar
e no
t co
nsid
ered
app
ropr
iate
:
(a) T
all K
not-
wee
d (P
ersi
cari
a el
atio
r);
(b) S
mal
l Wat
er-r
ibbo
ns (M
aund
ia tr
iglo
chin
oid
es);
and
(c) H
orne
d P
ond
wee
d (Z
anni
chel
lia p
alus
tris
).
Any
impa
cts
on th
ese
taxa
mus
t be
incl
ud
ed th
e B
iod
iver
sity
O
ffse
t St
rate
gy u
nder
con
dit
ion
B13
and
Bio
div
ersi
ty O
ffse
t P
acka
ge u
nder
con
dit
ion
C2.
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
Let
ter
from
eco
Bio
logi
cal o
n 14
-Feb
ruar
y-12
con
firm
ing
the
surv
ey w
ork
und
erta
ken
and
com
plia
nce
wit
h th
is
cond
itio
n
B5
Pri
or to
the
com
men
cem
ent o
f veg
etat
ion
clea
ring
wor
ks, t
he
site
sha
ll be
sub
ject
to
furt
her
conf
irm
ator
y su
rvey
wor
k to
d
eter
min
e th
e nu
mbe
r of
Ear
p’s
Gum
ind
ivid
uals
to
be
rem
oved
. T
he
num
ber,
qu
alit
y an
d
exte
nt
of
thes
e in
div
idua
ls s
hall
be u
sed
to
info
rm t
he B
iod
iver
sity
Off
set
Stra
tegy
un
der
co
ndit
ion
B13
an
d
Bio
div
ersi
ty
Off
set
Pac
kage
und
er c
ond
itio
n C
2.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
Let
ter
from
eco
Bio
logi
cal o
n 14
-May
-12
conf
irm
ing
the
surv
ey w
ork
und
erta
ken
and
com
plia
nce
wit
h th
is
cond
itio
n.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A7
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
B6
Pri
or to
the
com
men
cem
ent o
f veg
etat
ion
clea
ring
wor
ks, t
he
site
sha
ll be
sub
ject
to
furt
her
conf
irm
ator
y su
rvey
wor
k to
d
eter
min
e th
e ho
llow
-bea
ring
tr
ees
to
be
rem
oved
. T
he
num
ber
and
qu
alit
y of
the
se t
ree
hollo
ws
shal
l be
use
d t
o in
form
the
Bio
div
ersi
ty O
ffse
t St
rate
gy u
nder
con
dit
ion
B13
an
d B
iod
iver
sity
Off
set P
acka
ge u
nder
con
dit
ion
C2.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
Let
ter
from
eco
Bio
logi
cal o
n 14
-May
-12
conf
irm
ing
the
surv
ey w
ork
und
erta
ken
and
com
plia
nce
wit
h th
is
cond
itio
n.
B7
Wit
h th
e ex
cept
ion
of c
lear
ing
nece
ssar
y fo
r th
e ga
s pi
pelin
e ac
cess
cor
rid
or,
and
acc
ess
road
and
uti
lity
corr
idor
, on
the
si
te,
the
Pro
pone
nt s
hall
ensu
re t
hat
vege
tati
on m
appe
d a
s “P
refe
rred
Koa
la H
abit
at”
in F
igu
re 1
2 –
Rev
ised
Koa
la
Hab
itat
Map
ping
in
Eco
logi
cal
Ass
essm
ent:
New
cast
le G
as
Stor
age
Faci
lity
Pro
ject
(ec
oBio
logi
cal,
May
201
1),
incl
ud
ed
as A
ppen
dix
7 to
the
EA
, is
not d
irec
tly
or in
dir
ectl
y af
fect
ed
in th
e ca
rryi
ng o
ut o
f the
pro
ject
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
CB
I
Com
plia
nce
Clo
sed
– C
BI
CE
MP
– A
ppen
dix
A6
incl
ud
es e
nvir
onm
enta
l co
nstr
aint
s m
ap.
App
end
ix B
Tab
les
8-9
& 8
-12
FFM
SP –
App
end
ix B
Site
insp
ecti
ons
conf
irm
con
stru
ctio
n ar
ea d
elin
eate
d
wit
h te
mpo
rary
fenc
ing.
Cle
arin
g w
orks
now
co
mpl
eted
for
Stag
e 1
wit
h al
l cle
arin
g w
ithi
n P
roje
ct
Foot
prin
t
Rip
aria
n A
reas
B8
Pri
or t
o th
e co
mm
ence
men
t of
wor
ks w
ith
the
pote
ntia
l to
d
irec
tly
or i
ndir
ectl
y af
fect
rip
aria
n ar
eas,
the
Pro
pone
nt
shal
l en
gage
a s
uita
bly-
qual
ifie
d e
colo
gist
(re
quir
ed u
nder
co
ndit
ion
B1)
to
surv
ey a
nd r
ecor
d t
he c
ond
itio
n of
tho
se
pote
ntia
lly-a
ffec
ted
are
as.
Pre
-cle
arin
g –
Stag
e 2
AG
L
Com
plia
nce
Clo
sed
– C
BI
Pri
mar
ily r
efer
s to
Sta
ge 2
of t
he P
roje
ct.
The
re is
one
cu
lver
t cro
ssin
g fo
r th
is s
tage
ther
efor
e re
fere
nce
to th
is
cond
itio
n is
req
uire
d.
Shaw
n C
apar
aro
from
E
cobi
olog
ical
eng
aged
for
all p
re c
onst
ruct
ion
wor
ks
incl
ud
ing
ripa
rian
wor
ks.
Let
ter
from
Eco
biol
ogic
al o
n 14
-May
-12
conf
irm
ing
the
surv
ey w
ork
und
erta
ken
and
com
plia
nce
wit
h th
is
cond
itio
n.
B9
Wit
hin
six
mon
ths
of th
e co
nclu
sion
of c
onst
ruct
ion
acti
viti
es
dir
ectl
y or
ind
irec
tly
affe
ctin
g ri
pari
an a
reas
, th
e P
ropo
nent
sh
all i
mpl
emen
t a
prog
ram
me
to r
ehab
ilita
te t
hose
are
as t
o a
stan
dar
d o
f eq
ual
or
bett
er c
ond
itio
n th
an s
urv
eyed
und
er
cond
itio
n B
8,
unle
ss
othe
rwis
e ag
reed
by
th
e D
irec
tor-
Gen
eral
. R
ipar
ian
reha
bilit
atio
n w
orks
sha
ll be
und
erta
ken
in c
onsu
ltat
ion
wit
h N
OW
and
DP
I (Fi
sher
ies)
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
NA
Ope
n
VR
MSP
incl
ud
es r
equ
irem
ent i
n T
able
8-5
Nil
ripa
rian
are
as c
lear
ed a
s at
tim
e of
aud
it a
s w
orks
ye
t to
com
men
ce
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A8
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
B10
U
nles
s ot
herw
ise
agre
ed
by
the
Dir
ecto
r-G
ener
al,
the
Pro
pone
nt
shal
l m
onit
or
and
m
aint
ain
the
cond
itio
n of
re
habi
litat
ed r
ipar
ian
area
s un
til
such
tim
e as
tho
se a
reas
ha
ve b
een
veri
fied
by
a su
itab
ly-q
ualif
ied
eco
logi
st (r
equi
red
un
der
co
ndit
ion
B1)
as
be
ing
wel
l-es
tabl
ishe
d,
in
good
he
alth
and
sel
f-su
stai
ning
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
NA
Ope
n
VR
MSP
incl
ud
es r
equ
irem
ent i
n T
able
8-5
Nil
ripa
rian
are
as c
lear
ed a
s at
tim
e of
aud
it a
s w
orks
ye
t to
com
men
ce
Man
agem
ent
of I
mpa
cts
on F
auna
B11
P
rior
to
the
com
men
cem
ent
of v
eget
atio
n cl
eari
ng w
orks
in
the
site
, th
e si
te s
hall
be s
ubj
ect
to s
urv
ey w
ork
to i
den
tify
th
e pr
esen
ce o
f K
oala
(P
hasc
olar
ctos
cin
ereu
s) i
ndiv
idua
ls.
All
Koa
la i
ndiv
idua
ls i
den
tifi
ed o
n th
e si
te s
hall
be a
llow
ed
to s
elf-
tran
sloc
ate
in t
he f
irst
ins
tanc
e pr
ior
to a
ny o
ther
tr
ansl
ocat
ion
met
hod
s be
ing
cons
ider
ed. I
f se
lf-t
rans
loca
tion
pr
oves
im
prac
tica
ble,
hum
an-a
ssis
ted
tra
nslo
cati
on w
ill b
e co
nduc
ted
and
the
Koa
las
loca
ted
on
the
gas
stor
age
faci
lity
site
sha
ll be
tra
nslo
cate
d t
o an
app
ropr
iate
, saf
e lo
cati
on o
ff-
site
. Su
rvey
and
tra
nslo
cati
on o
f K
oala
ind
ivid
ual
s sh
all
be
cond
ucte
d
in
acco
rdan
ce
wit
h th
e P
ort
Step
hens
C
ompr
ehen
sive
Koa
la P
lan
of M
anag
emen
t an
d t
o m
eet
the
requ
irem
ents
of
the
OE
H. I
f hu
man
-ass
iste
d t
rans
loca
tion
is
cond
ucte
d, i
t sh
all b
e un
der
take
n by
a s
uita
bly
qual
ifie
d a
nd
expe
rien
ced
ec
olog
ist
in
Koa
la
man
agem
ent
and
in
ac
cord
ance
wit
h P
olic
y fo
r th
e T
rans
loca
tion
of
Thr
eate
ned
Fa
una
in N
SW (N
PW
S, 2
001)
.
Pre
-cle
arin
g A
GL
CB
I
Com
plia
nce
Clo
sed
– C
BI
FFM
SP –
App
end
ix B
Tab
le 8
-12
No
koal
as r
epor
ted
to b
e en
cou
nter
ed d
uri
ng c
lear
ing
wor
ks (R
epor
t: V
eget
atio
n C
lear
ing
for
New
cast
le G
as
Stor
age
Faci
lity,
Eco
biol
ogic
al (N
ovem
ber
2012
)).
Cle
arin
g ac
tivi
ties
com
plet
ed fo
r St
age
1
B12
P
rior
to
th
e co
mm
ence
men
t of
ve
geta
tion
cl
eari
ng
and
co
nstr
uct
ion
wor
ks,
the
Pro
pone
nt s
hall
dem
onst
rate
tha
t it
ha
s un
der
take
n a
prog
ram
me
of t
rapp
ing
on t
he g
as s
tora
ge
faci
lity
site
wit
h th
e ai
m o
f co
llect
ing
any
New
Hol
land
M
ouse
(P
seud
omys
nov
aeho
lland
iae)
ind
ivid
uals
. A
ll N
ew
Hol
land
M
ouse
in
div
idua
ls
shal
l be
tr
ansl
ocat
ed
to
an
appr
opri
ate,
saf
e lo
cati
on o
ff-s
ite.
Tra
ppin
g, c
olle
ctio
n an
d
tran
sloc
atio
n of
New
Hol
land
Mou
se i
ndiv
idua
ls s
hall
mee
t
Pre
-cle
arin
g A
GL
CB
I
Com
plia
nce
Clo
sed
– C
BI
Tra
ppin
g pr
ogra
m o
utl
ined
in th
e FF
MSP
App
end
ix B
T
able
8-1
1
Tra
ppin
g co
mpl
eted
pri
or to
cle
arin
g w
orks
at f
our
loca
tion
s co
veri
ng th
ree
dif
fere
nt p
erio
ds.
No
New
H
olla
nd M
ouse
ind
ivid
uals
wer
e tr
appe
d (R
epor
t: V
eget
atio
n C
lear
ing
for
New
cast
le G
as S
tora
ge F
acili
ty,
Eco
biol
ogic
al (N
ovem
ber
2012
)).
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A9
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
the
requ
irem
ents
of a
ny g
uid
elin
es is
sued
by
DSW
EP
aC.
Bio
dive
rsit
y O
ffse
ts
B13
P
rior
to
th
e co
mm
ence
men
t of
ve
geta
tion
cl
eari
ng
or
cons
tru
ctio
n w
orks
, th
e P
ropo
nent
sh
all
prep
are
a B
iod
iver
sity
Off
set
Stra
tegy
in
cons
ult
atio
n w
ith
the
OE
H
and
Por
t St
ephe
ns C
ounc
il, a
nd f
or t
he a
ppro
val
of t
he
Dir
ecto
r-G
ener
al.
The
pu
rpos
e of
the
Str
ateg
y sh
all
be t
o pr
ovid
e hi
gh-l
evel
dir
ecti
on t
o gu
ide
the
dev
elop
men
t of
the
B
iod
iver
sity
Off
set
Pac
kage
req
uire
d u
nder
con
dit
ion
C2.
T
he
Bio
div
ersi
ty
Off
set
Stra
tegy
sh
all
be
prep
ared
by
a
suit
ably
-qua
lifie
d e
colo
gist
con
sist
ent
wit
h th
e B
ioba
nkin
g M
etho
dol
ogy
und
er
the
Bio
bank
ing
and
O
ffse
ts
Sche
me
outl
ined
in B
ioba
nkin
g A
sses
smen
t M
etho
dol
ogy
and
Cre
dit
C
alcu
lato
r O
pera
tion
al
Man
ual
(D
EC
C,
2009
), an
d
shal
l in
clud
e:
(a)
cons
ider
atio
n of
al
l na
tive
ve
geta
tion
lo
sses
and
the
ad
equ
acy
of th
e pr
opos
ed o
ffse
t;
(b)
an o
ffse
t ar
ea f
or t
he E
arp’
s G
um
com
men
sura
te w
ith
the
area
occ
upie
d b
y th
e E
arp’
s G
um in
div
idua
ls t
o be
rem
oved
fr
om
the
site
, an
d
incl
udin
g su
cces
sful
pl
anti
ng
of
Eu
caly
ptu
s pa
rram
atte
nsis
su
bsp.
dec
aden
s tr
ees
at a
rat
io o
f at
le
ast
3:1
and
th
e m
aint
aini
ng
of
thes
e tr
ees
unt
il es
tabl
ishe
d.
(c)
an o
ffse
t ra
tio
for
tree
hol
low
s of
no
less
tha
n 1:
1, t
o be
d
eliv
ered
thr
ough
nes
t bo
xes
or o
ther
mea
sure
s ag
reed
wit
h th
e O
EH
;
(d)
habi
tat
offs
et
mea
sure
s fo
r K
oala
s (P
hasc
olar
ctos
ci
nere
us)
and
N
ew
Hol
land
M
ouse
(P
seud
omys
no
vaeh
olla
ndia
e);
(e)
dem
onst
rati
on
of
how
th
e of
fset
w
ould
‘im
prov
e or
Pre
-cle
arin
g
Pre
-con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
Off
set S
trat
egy
repo
rt p
repa
red
by
ecoB
iolo
gica
l dat
ed
May
201
2
Med
owie
Con
serv
atio
n A
rea
Off
set M
onit
orin
g P
roto
col p
repa
red
by
ecoB
iolo
gica
l dat
ed M
ay 2
012
Dra
ft C
onse
rvat
ion
Agr
eem
ent f
or L
ot 2
0 at
3 O
ld S
wan
B
ay R
oad
, Med
owie
Dra
ft C
onse
rvat
ion
Agr
eem
ent f
or L
ot 1
6 at
218
Old
Sw
an B
ay R
oad
, Med
owie
.
Off
set S
trat
egy
Rep
ort:
a)
Ref
er S
ecti
on 3
.1 a
nd 3
.3
b)
Ref
er C
hapt
er 4
. Fou
r E
arp’
s gu
ms
to b
e re
plac
ed.
Tar
get o
f 60
plan
ts e
stab
lishe
d w
ith
OE
H. H
unt
er
Reg
ion
Bot
anic
Gar
den
s ha
ve id
enti
fied
are
as
suit
able
for
plan
ting
c)
As
agre
ed b
y O
EH
two
larg
e of
fset
are
as id
enti
fied
ha
ve a
deq
uate
hol
low
bea
ring
tree
s av
aila
ble
to
mit
igat
e ne
ed fo
r ne
st b
oxes
d)
Koa
la –
11.
8ha
offs
et a
rea
prov
ided
to o
ffse
t los
s of
0.
7ha.
New
Hol
land
Mou
se -
25 h
a pr
efer
red
ha
bita
t and
80h
a su
b op
tim
al h
abit
at to
rep
lace
12
ha s
ub
opti
mal
hab
itat
e)
Ref
er C
hapt
er 5
– im
prov
emen
t of b
iod
iver
sity
va
lues
in o
ffse
t are
as
f)
Ref
er C
hapt
er 3
g)
Con
tain
ed w
ithi
n V
olu
ntar
y C
onse
rvat
ion
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A10
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
mai
ntai
n’ b
iod
iver
sity
val
ues;
(f)
the
prop
osed
of
fset
ra
tios
an
d
conn
ecti
vity
im
prov
emen
ts;
(g) p
ropo
sed
man
agem
ent a
ctio
ns;
(h)
dem
onst
rati
on
of
how
th
e st
rate
gy
was
pr
epar
ed
in
acco
rdan
ce
wit
h th
e O
EH
’s
Pri
ncip
les
for
the
Use
of
B
iod
iver
sity
Off
sets
in N
SW; a
nd
(i)
mea
sure
s to
en
sure
in
-per
petu
ity
the
cons
erva
tion
co
mm
itm
ent.
Agr
eem
ents
h)
13 p
rinc
iple
s ad
dre
ssed
in C
hapt
er 5
i)
Ref
er C
hapt
er 3
and
Cha
pter
5
Cor
resp
ond
ence
from
DoP
I acc
epti
ng S
trat
egy
AG
L s
ubm
itte
d S
trat
egy
to P
SC v
ia e
mai
l on
01.0
6.12
, an
d P
SC e
mai
led
DoP
I on
13.6
.12
ind
icat
ing
that
they
ha
d b
een
cons
ulte
d, a
nd p
rovi
ded
com
men
ts.
OE
H e
mai
led
DoP
I on
01.0
6.12
ad
visi
ng th
at th
ey h
ad
been
con
sult
ed.
HA
ZA
RD
S A
ND
RIS
KS
B14
T
he P
ropo
nent
sha
ll es
tabl
ish
and
mai
ntai
n A
sset
Pro
tect
ion
Zon
es a
rou
nd t
he p
roje
ct,
bein
g no
les
s th
an 2
5 m
etre
s ar
ound
the
gas
pla
nt s
ite
and
no
less
tha
n 31
met
res
arou
nd
the
proc
essi
ng p
lant
and
sto
rage
tan
k. T
he E
arp’
s G
um
in
div
idua
ls a
re t
o be
ret
aine
d w
ithi
n th
e as
set
prot
ecti
on
zone
s w
here
ap
prop
riat
e ca
nopy
d
ista
nces
ex
ist.
The
u
nder
stor
y in
th
e vi
cini
ty
of
reta
ined
E
arp’
s G
um
in
div
idua
ls i
s to
be
appr
opri
atel
y m
anag
ed t
o m
inim
ise
fire
ri
sk. D
etai
ls s
hall
be i
ncor
pora
ted
int
o th
e Fi
re S
afet
y St
udy
requ
ired
und
er B
16(a
).
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I – d
esig
n
AG
L -
revi
ew
Com
plia
nce
Ope
n
Incl
uded
in F
FMSP
Ap
pen
dix
B T
able
8-5
Bus
h Fi
re
B15
D
uri
ng c
onst
ruct
ion,
the
Pro
pone
nt s
hall
stor
e an
d h
and
le
all
dan
gero
us
good
s,
as
def
ined
by
th
e A
ustr
alia
n D
ange
rous
Goo
ds
Cod
e, s
tric
tly
in a
ccor
dan
ce w
ith:
(a)
all
rele
vant
Au
stra
lian
Stan
dar
ds;
and
(b)
DE
CC
's E
nvir
onm
ent
Pro
tect
ion
Man
ual
Tec
hnic
al B
ulle
tin
-– B
und
ing
and
Spi
ll M
anag
emen
t.
In t
he e
vent
of
an i
ncon
sist
ency
bet
wee
n th
e re
quir
emen
ts
liste
d f
rom
(a)
to
(b)
abov
e, t
he m
ost
stri
ngen
t re
quir
emen
t
Con
stru
ctio
n C
BI
IO
Ope
n
Dan
gero
us
Goo
ds
and
Haz
ard
ous
Mat
eria
ls H
and
ling
Man
agem
ent S
ub-
Pla
n Se
ctio
n 1.
5.2
Min
or a
mou
nts
of fu
el a
nd o
ils c
urre
ntly
kep
t on
site
. Si
te in
spec
tion
s in
dic
ate
smal
l fu
el c
ans
are
stor
ed o
n se
lf-c
onta
ined
bun
ds.
Ref
uelli
ng d
one
prim
arily
by
licen
sed
ref
uelli
ng tr
uck.
Spi
ll ki
ts n
oted
on
all v
ehic
les
insp
ecte
d.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A11
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
shal
l pre
vail
to th
e ex
tent
of t
he in
cons
iste
ncy.
Fo
rm c
ompl
eted
pri
or to
any
che
mic
als
com
ing
onto
si
ght w
ith
appr
oval
by
CB
I Env
iron
men
t Man
ager
and
Sa
fety
Man
ager
req
uir
ed.
IO –
con
sid
er a
reg
iste
r fo
r ch
emic
als
appr
oved
for
use
on
sit
e to
trac
k qu
anti
ties
and
com
plia
nce
B16
A
t le
ast
one
mon
th
prio
r to
th
e co
mm
ence
men
t of
co
nstr
uct
ion
of t
he p
roje
ct,
exce
pt f
or c
onst
ruct
ion
of t
hose
pr
elim
inar
y w
orks
tha
t ar
e ou
tsid
e th
e sc
ope
of t
he h
azar
d
stud
ies
(inc
lud
ing
such
wor
ks a
s ve
geta
tion
cle
arin
g an
d s
ite
prep
arat
ion
whi
ch
wou
ld
not
infl
uen
ce
or
pre-
empt
th
e ou
tcom
es o
f th
e ha
zard
s st
ud
ies)
, or
wit
hin
such
fu
rthe
r pe
riod
as
the
Dir
ecto
r-G
ener
al m
ay a
gree
, th
e P
ropo
nent
sh
all
prep
are
and
su
bmit
for
the
app
rova
l of
the
Dir
ecto
r-G
ener
al th
e fo
llow
ing
stud
ies:
(a)
A F
ire
Saf
ety
Stu
dy
prep
ared
in
acco
rdan
ce w
ith
and
co
veri
ng
the
rele
vant
as
pect
s in
H
azar
dou
s In
du
stry
P
lann
ing
Ad
viso
ry
Pap
er
No.
2
– Fi
re
Safe
ty
Stu
dy
Gu
idel
ines
(D
oP,
2011
) an
d
Bes
t P
ract
ice
Gu
idel
ines
fo
r C
onta
min
ated
W
ater
R
eten
tion
an
d
Tre
atm
ent
Syst
ems
(NSW
Gov
ernm
ent,
1994
). T
he s
tud
y sh
all a
lso
be s
ubm
itte
d
for
appr
oval
to
Fire
and
Res
cue
NSW
and
to
the
Ru
ral
Fire
Se
rvic
e;
(b)
A H
azar
d a
nd
Op
erab
ilit
y S
tud
y fo
r th
e pr
ojec
t, ch
aire
d
by a
qua
lifie
d p
erso
n, i
ndep
end
ent
of t
he p
roje
ct, a
ppro
ved
by
the
Dir
ecto
r-G
ener
al p
rior
to
the
com
men
cem
ent
of t
he
stud
y. T
he s
tud
y sh
all
be c
onsi
sten
t w
ith
the
Dep
artm
ent
of
Pla
nnin
g an
d I
nfra
stru
ctu
re’s
Haz
ard
ous
Ind
ust
ry P
lann
ing
Ad
viso
ry P
aper
No.
8 –
HA
ZO
P G
uid
elin
es (D
oP, 2
011)
. The
st
ud
y re
port
sha
ll be
acc
ompa
nied
by
a pr
ogra
mm
e fo
r th
e im
plem
enta
tion
of
all
reco
mm
end
atio
ns m
ade
in t
he r
epor
t. If
the
Pro
pone
nt i
nten
ds
to d
efer
the
im
plem
enta
tion
of
a re
com
men
dat
ion,
rea
sons
mus
t be
doc
umen
ted
and
just
ifie
d;
Pre
-con
stru
ctio
n a)
A
GL
b)
CB
I
c)
AG
L
Com
plia
nce
Ope
n
Let
ter
to D
oPI d
ated
19
June
201
2 re
ques
ting
app
rova
l to
sta
ge F
ire
Safe
ty S
tud
y (F
SS),
Haz
ard
and
O
pera
bilit
y St
ud
y (H
AZ
OP
), Fi
nal H
azar
d A
naly
sis
(FH
A).
Stag
e 1
– H
AZ
OP
, FSS
and
FH
A A
ugu
st 2
012
base
d o
n fi
nal d
esig
n
Stag
e 2
– u
pdat
e ba
sed
on
fina
l des
igns
– Ja
nuar
y 20
13
Let
ter
from
DoP
I dat
ed 6
Au
gust
201
2 ap
prov
ing
stag
ed a
ppro
ach
wit
h fo
llow
ing
requ
irem
ents
:
1. T
he H
AZ
OP
for
the
seco
nd s
tage
sho
uld
cov
er th
e in
tera
ctio
n w
ith
alre
ady
inst
alle
d e
quip
men
t;
2. T
he F
SS fo
r th
e se
cond
sta
ge s
houl
d b
e an
upd
ate
on
the
FSS
for
the
firs
t sta
ge. (
The
sit
e m
ust
hav
e a
sing
le
FSS
cove
ring
the
who
le s
ite.
)
3. T
he F
HA
for
the
seco
nd s
tage
sho
uld
be
an u
pdat
e of
th
e FH
A fo
r th
e fi
rst s
tage
. (A
s w
ith
the
FSS,
a s
ingl
e d
ocum
ent m
ust c
over
the
who
le s
ite.
)
Mee
ting
wit
h R
FS to
dis
cuss
FSS
sch
edul
ed 4
Se
ptem
ber
2012
Let
ter
dat
ed 1
9-Ju
ne r
equ
esti
ng fo
r ap
prov
al o
f a s
tage
d
appr
oach
to th
e H
AZ
OP
Stu
dy,
Fir
e Sa
fety
Stu
dy
and
Fi
nal H
azar
d A
naly
sis
Pro
cess
6-A
ug-
12: A
ppro
val r
ecei
ved
from
Dir
ecto
r G
ener
al fo
r
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A12
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
and
(c)
A F
inal
Haz
ard
An
alys
is o
f th
e pr
ojec
t, co
nsis
tent
wit
h H
azar
dou
s In
du
stry
P
lann
ing
Ad
viso
ry
Pap
er
No.
6
– G
uid
elin
es f
or H
azar
d A
naly
sis
(DoP
, 201
1). T
he F
HA
sha
ll re
port
on
the
impl
emen
tati
ons
of t
he r
ecom
men
dat
ions
of
the
Pre
limin
ary
Haz
ard
Ana
lysi
s.
Con
stru
ctio
n, o
ther
tha
n of
pre
limin
ary
wor
ks (
incl
udin
g su
ch
wor
ks
as
vege
tati
on
clea
ring
an
d
site
pr
epar
atio
n w
hich
wou
ld n
ot i
nflu
ence
or
pre-
empt
the
ou
tcom
es o
f th
e ha
zard
s st
ud
ies)
, sh
all
not
com
men
ce u
ntil
appr
oval
und
er
this
con
dit
ion
has
been
giv
en b
y th
e D
irec
tor-
Gen
eral
and
, w
ith
resp
ect
to t
he F
ire
Safe
ty S
tud
y, a
ppro
val h
as a
lso
been
gi
ven
by F
ire
and
Res
cue
NSW
and
the
Ru
ral F
ire
Serv
ice.
the
prop
osed
sta
ged
sub
mis
sion
app
roac
h.
28-N
ov-1
2: S
ubm
issi
on o
f Pha
se 1
Fir
e Sa
fety
Stu
dy
and
H
azop
Rep
ort t
o D
oPI.
10-D
ec-1
2: S
ubm
issi
on o
f Pha
se 1
Fin
al H
azar
d
Ana
lysi
s to
DoP
I
19-D
ec-1
2: P
hase
1 F
ire
Safe
ty S
tud
y ap
prov
ed b
y R
ura
l Fi
re S
ervi
ce.
17-J
an-1
3: P
hase
1 s
ubm
issi
on a
ppro
ved
by
DoP
I.
5-Fe
b-13
: Pha
se 1
Fir
e Sa
fety
Stu
dy
appr
oval
by
Fire
&
Res
cue
NSW
B17
P
rior
to
the
com
men
cem
ent
of t
he d
etai
led
des
ign
of t
he
proj
ect,
the
Pro
pone
nt s
hall
cons
ult
wit
h W
orkC
over
wit
h re
gard
to c
ompl
ying
wit
h th
e re
gula
tion
s ap
plic
able
to M
ajor
H
azar
d
Faci
litie
s an
d
shal
l ob
tain
re
quir
emen
ts
for
the
prep
arat
ion
of t
he S
ite
Ris
k A
sses
smen
t an
d t
he S
afet
y C
ase.
T
he P
ropo
nent
sha
ll co
mpl
y w
ith
all r
equi
rem
ents
issu
ed b
y W
orkC
over
.
Pre
-det
aile
d
des
ign
AG
L
CB
I to
assi
st
Com
plia
nce
Ope
n
Mee
ting
hel
d w
ith
Wor
kCov
er o
n 18
-Apr
il-20
12. R
efer
to
min
utes
of m
eeti
ng.
Req
uir
emen
ts to
be
chec
ked
if in
clud
ed in
Sit
e R
isk
Ass
essm
ent a
nd S
afet
y C
ase
six
mon
ths
prio
r to
co
mm
issi
onin
g of
pro
ject
B18
T
he S
afet
y C
ase
shal
l be
pre
pare
d b
y th
e P
ropo
nent
und
er
the
Maj
or
Haz
ard
Fa
cilit
ies
legi
slat
ion
and
sh
all
be
subm
itte
d t
o W
orkC
over
no
late
r th
an s
ix m
onth
s pr
ior
to
the
com
mis
sion
ing
of t
he p
roje
ct, o
r as
oth
erw
ise
agre
ed b
y W
orkC
over
.
Con
stru
ctio
n
Pre
co
mm
issi
onin
g
AG
L
CB
I to
assi
st
NA
Ope
n
Safe
ty C
ase
to b
e pr
epar
ed s
ix m
onth
s pr
ior
to
com
mis
sion
ing
DE
SIG
N P
RIN
CIP
LE
S
B19
B
uild
ings
and
car
par
king
ass
ocia
ted
wit
h th
e pr
opos
ed
dev
elop
men
t sh
ould
be
des
igne
d w
ith
cons
ider
atio
n to
the
ge
nera
l pr
inci
ples
an
d
obje
ctiv
es
of
Cri
me
Pre
vent
ion
thro
ugh
Env
iron
men
tal
Des
ign
(Aus
tral
ian
Inst
itut
e of
Des
ign
CB
I C
ompl
ianc
e
Clo
sed
Fina
l des
ign
incl
udes
follo
win
g:
Se
curi
ty fe
nce
(wit
h ba
rbed
wir
e) a
rou
nd th
e fa
cilit
y co
mpl
ying
wit
h A
S 17
25.1
-201
0 (d
raw
ing
NG
SF-C
BI-
ISB
L-C
I-D
WG
-500
1)
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A13
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Cri
min
olog
y, 1
989)
.
C
CT
V c
amer
as s
trat
egic
ally
pos
itio
ned
aro
und
the
secu
rity
fenc
e an
d a
t the
pla
nt e
ntry
gat
e (d
raw
ing
NG
SF-C
BI-
ISB
L-I
C-D
WG
-901
0) a
ll co
mm
uni
cati
ng
wit
h th
e C
CT
V v
iew
ing
stat
ion
in th
e co
ntro
l bu
ildin
g. A
ll ca
mer
as a
re c
onti
nuou
sly
reco
rded
fo
r up
to 3
0 d
ays.
In
tru
sion
det
ecti
on lo
cate
d a
ll th
e w
ay a
rou
nd th
e se
curi
ty fe
nce
(dra
win
g N
GSF
-CB
I-IS
BL
-IC
-DW
G-
9020
) com
mu
nica
ting
wit
h th
e co
ntro
l roo
m. T
he
intr
usio
n sy
stem
is d
ivid
ed in
to z
ones
ap
prox
imat
ely
100
met
ers
in le
ngth
that
can
sig
nal
the
cam
eras
to fo
cus
on th
e ac
tive
zon
e
C
ard
ope
rate
d s
lidin
g se
curi
ty g
ates
at t
he p
lant
en
try
on th
e m
ain
acce
ss r
oad
as
wel
l as
at th
e m
ain
entr
ance
gat
e w
ith
CC
TV
cam
eras
m
onit
orin
g al
l of t
hese
ent
ry p
oint
s.
B
esid
es th
e ve
hicl
e en
try
slid
ing
gate
s, th
ere
is o
nly
1 pe
rson
nel p
oint
of a
cces
s in
to th
e ad
min
bui
ldin
g an
d th
is r
equi
res
a ke
y ca
rd to
get
bey
ond
the
rece
ptio
n ar
ea.
C
ar p
ark
is w
ithi
n si
ght f
rom
the
adm
in/
cont
rol
build
ing.
H
igh
pres
sure
sod
ium
roa
dw
ay li
ghti
ng w
ill b
e pr
ovid
ed fo
r pe
rim
eter
roa
ds.
Hig
h pr
essu
re
sod
ium
floo
dlig
hts
will
be
prov
ided
for
the
plan
t bo
und
arie
s ne
ar th
e L
NG
tank
. Bot
h th
e ro
adw
ay
and
floo
dlig
htin
g la
yout
s w
ill b
e d
esig
ned
to
mai
ntai
n an
ave
rage
illu
min
atio
n le
vel o
f 2 lu
x at
gr
ound
for
the
enti
re s
ecu
rity
fenc
e lin
e.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A14
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
SOIL
S, W
AT
ER
AN
D H
YD
RO
LO
GY
B20
E
xcep
t as
may
be
expr
essl
y pr
ovid
ed b
y an
Env
iron
men
t P
rote
ctio
n L
icen
ce
for
the
proj
ect,
the
Pro
pone
nt
shal
l co
mpl
y w
ith
sect
ion
120
of
the
Pro
tect
ion
of
the
Env
iron
men
t O
pera
tion
s A
ct 1
997
du
ring
con
stru
ctio
n of
the
proj
ect.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Ref
er S
urf
ace
Wat
er M
anag
emen
t Su
b P
lan
and
Soi
l M
anag
emen
t Sub
Pla
n.
Incl
uded
in E
PL
as
Con
dit
ion
L1
One
inci
den
t pot
enti
ally
pol
luti
ng w
ater
s (o
verf
low
fr
om to
ilets
) whi
ch h
as b
een
repo
rted
and
inve
stig
ated
as
per
inci
den
t rep
orti
ng p
roto
col (
refe
r C
ond
itio
n A
15).
Tes
ting
of s
urfa
ce w
ater
dur
ing
inci
den
t ind
icat
e co
lifor
ms
and
e c
oli w
ere
belo
w A
NZ
EC
C (2
000)
M
icro
biol
ogic
al G
uid
elin
es
B21
E
rosi
on a
nd S
edim
ent
cont
rols
con
sist
ent
wit
h M
anag
ing
Urb
an
Stor
mw
ater
: So
ils
and
C
onst
ruct
ion
Man
ual
(L
and
com
, 200
4, o
r it
s la
test
ver
sion
) sh
all
be i
nsta
lled
pri
or
to t
he c
omm
ence
men
t of
soi
l d
istu
rbin
g w
orks
and
sha
ll be
m
aint
aine
d u
ntil
such
tim
e as
the
dis
turb
ed a
reas
hav
e be
en
reha
bilit
ated
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Ref
er S
ecti
on 9
of t
he S
oil M
anag
emen
t Pla
n Su
b P
lan
Site
spe
cifi
c E
rosi
on a
nd S
edim
ent C
ontr
ol P
lans
will
be
dev
elop
ed p
rogr
essi
vely
.
Site
insp
ecti
ons
ind
icat
e si
lt fe
nces
inst
alle
d a
roun
d s
ite
bou
ndar
ies
afte
r cl
eari
ng w
orks
. So
il is
loos
e sa
nd a
nd
site
is r
elat
ivel
y fl
at th
eref
ore
runo
ff r
isk
cons
ider
ed
low
.
B22
T
he P
ropo
nent
sha
ll ca
rry
out
reha
bilit
atio
n of
dis
turb
ed
area
s pr
ogre
ssiv
ely,
and
as
soon
as
reas
onab
ly p
ract
icab
le
follo
win
g d
istu
rban
ce.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
CB
I to
ad
vise
w
hen
wor
ks
com
plet
ed
and
re
ady
for
reha
bilit
atio
n
NA
Ope
n
Ref
er to
Veg
etat
ion
Reh
abili
tati
on M
anag
emen
t Sub
P
lan
App
end
ix B
– T
able
8-5
Reh
abili
tati
on w
orks
hav
e no
t com
men
ced
at t
ime
of
aud
it.
Log
s fo
r re
habi
litat
ion
plac
ed a
long
cle
ared
tr
acks
, mul
ch r
etai
ned
and
tops
oil s
tore
d a
long
gas
ac
cess
trac
k.
Con
stru
ctio
n M
etho
d
B23
T
he
Pro
pone
nt
shal
l ap
ply
the
gas
pipe
line
corr
idor
co
nstr
uct
ion
met
hod
s ge
nera
lly in
acc
ord
ance
wit
h T
able
2.2
of
the
PP
R, a
t the
loca
tion
s sp
ecif
ied
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
NA
Ope
n
Gas
pip
elin
e in
stal
lati
on y
et to
com
men
ce
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A15
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Floo
ding
B24
T
he
Pro
pone
nt
shal
l en
sure
th
at
all
stru
ctur
es
to
be
cons
tru
cted
be
low
kn
own
floo
d
plan
ning
le
vels
ar
e co
nstr
uct
ed o
f m
ater
ials
and
wit
h fi
nish
es t
hat
are
resi
stan
t to
flo
odw
ater
s/ t
ides
. C
onst
ruct
ion
of t
he p
roje
ct s
hall
be
und
erta
ken
in
acco
rdan
ce
wit
h th
e N
SW
Floo
d
Pla
in
Dev
elop
men
t Man
ual
(DIP
NR
, 200
5).
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L
Com
plia
nce
Ope
n
Gas
Sto
rage
Fac
ility
Des
ign
abov
e 1
in 1
00 y
ear
floo
d
leve
ls.
Roa
ds
and
str
uct
ure
s as
con
stru
cted
dra
win
gs to
co
nfir
m fi
nal l
evel
s on
ce w
orks
fini
shed
.
Gro
undw
ater
Mon
itor
ing
Pro
gram
B25
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt
shal
l d
evel
op
a G
roun
dw
ater
M
onit
orin
g P
rogr
amm
e in
co
nsu
ltat
ion
wit
h N
OW
and
HW
C a
nd t
o th
e sa
tisf
acti
on o
f th
e D
irec
tor-
Gen
eral
. T
he
prog
ram
me
shal
l d
etai
l th
e m
onit
orin
g st
rate
gy t
hat
wou
ld b
e im
plem
ente
d t
o m
onit
or
the
wat
er q
ual
ity
impa
cts
of th
e pr
ojec
t on
bene
fici
al a
quif
ers
(inc
lud
ing
asso
ciat
ed g
roun
dw
ater
use
rs, s
urfa
ce w
ater
s an
d
grou
ndw
ater
dep
end
ent e
cosy
stem
s). T
he p
rogr
amm
e sh
all:
(a)
iden
tify
su
rfac
e an
d g
roun
dw
ater
mon
itor
ing
loca
tion
s d
emon
stra
ting
th
eir
appr
opri
aten
ess
for
obta
inin
g re
pres
enta
tive
w
ater
qu
alit
y an
d
wat
er
leve
l d
ata
on
cons
truc
tion
and
ope
rati
onal
impa
cts
in r
elat
ion
to b
enef
icia
l aq
uif
ers,
gro
und
wat
er u
sers
and
su
rfac
e w
ater
s
(b)
prov
ide
det
ails
of
th
e m
onit
orin
g po
ints
(i
nclu
din
g lo
cati
on,
dep
th o
f m
onit
orin
g, d
ura
tion
and
fre
quen
cy o
f m
onit
orin
g an
d p
aram
eter
s to
be
mon
itor
ed);
(c)
iden
tify
pe
rfor
man
ce
crit
eria
, in
clud
ing
mon
itor
ing
crit
eria
to
det
ect
earl
y in
dic
ator
s of
dra
wd
own
impa
cts
or
wat
er q
ualit
y im
pact
s to
ben
efic
ial a
quif
ers;
(d) i
den
tify
the
freq
uen
cy o
f rep
orti
ng o
n m
onit
orin
g re
sult
s;
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
Gro
und
wat
er M
anag
emen
t Su
b P
lan
– se
nt i
n em
ail
to
DoP
I dat
ed 1
1 Ju
ly 2
012
Gro
und
wat
er M
onit
orin
g P
rogr
am –
let
ter
from
DoP
I d
ated
10
/08
/20
12
acce
ptin
g G
MP
. C
orre
spon
den
ce
from
HW
C d
ated
3 A
ugu
st 2
012
and
NO
W d
ated
9
Au
gust
201
2 su
ppor
ting
con
sult
atio
n re
quir
emen
t.
Em
ail
from
H
WC
31
O
ctob
er
2011
in
dic
atin
g sa
tisf
acti
on w
ith
GM
SP.
Em
ail
to
DoP
I 9
Au
gust
20
12 w
ith
corr
espo
nden
ce
atta
ched
end
orsi
ng G
MSP
from
NO
W
a)
GM
SP -
Gro
und
wat
er m
onit
orin
g bo
re l
ocat
ions
–
Figu
re 3
. A
lso
refe
r to
Tab
le 2
-1. O
ne b
ackg
roun
d
and
5
dow
nstr
eam
lo
cati
ons
(tow
ard
s T
omag
o aq
uif
er e
xtra
ctio
n si
te) 4
inte
rnal
loca
tion
s to
obt
ain
back
grou
nd
for
site
. Su
rfac
e w
ater
m
onit
orin
g lo
cati
ons
incl
ude
in
surf
ace
wat
er
man
agem
ent
plan
GM
P –
Sec
tion
4
b)
GM
SP
- A
ppen
dix
C
in
clud
es
base
line
wat
er
qual
ity,
d
epth
. D
urat
ion
and
fr
eque
ncy
of
mon
itor
ing
incl
ud
e in
T
able
5-
2 G
rou
ndw
ater
M
onit
orin
g R
equ
irem
ents
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A16
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
(e)
iden
tify
pro
ced
ure
s fo
r co
ntin
genc
y or
rem
edia
l ac
tion
w
here
ad
vers
e im
pact
s ar
e id
enti
fied
, su
ch t
hat
the
adve
rse
impa
cts
are
rem
edia
ted
pr
ior
to
any
impa
ct
to
othe
r gr
ound
wat
er u
sers
, and
/ o
r re
habi
litat
ion
mea
sure
s ap
plie
d
whe
re t
he p
roje
ct i
s id
enti
fied
as
adve
rsel
y af
fect
ing
any
grou
ndw
ater
dep
end
ent e
cosy
stem
s/ c
omm
unit
ies;
and
(f)
iden
tify
mec
hani
sms
for
the
regu
lar
revi
ew a
nd u
pdat
e of
th
e pr
ogra
mm
e in
con
sult
atio
n w
ith
NO
W a
nd H
WC
as
requ
ired
.
In
subm
itti
ng t
he p
rogr
amm
e fo
r th
e D
irec
tor
Gen
eral
’s
appr
oval
, th
e P
ropo
nent
sha
ll pr
ovid
e w
ritt
en e
vid
ence
of
cons
ult
atio
n w
ith
NO
W a
nd H
WC
on
the
robu
stne
ss a
nd
acce
ptab
ility
of
the
mon
itor
ing
prog
ram
me,
incl
udin
g is
sues
ra
ised
by
th
ese
agen
cies
an
d
how
th
ese
have
be
en
add
ress
ed.
The
pro
gram
me
shal
l be
rev
iew
ed a
nd u
pdat
ed
at th
e co
nclu
sion
of c
onst
ruct
ion
acti
viti
es.
GM
P –
Sec
tion
4
c)
GM
SP -
Per
form
ance
cri
teri
a in
clud
ed i
n Se
ctio
n 5.
1.1
for
wat
er q
ual
ity
and
cha
nges
in
wat
er l
evel
s (u
sing
CU
MSU
M)
GM
P –
Sec
tion
4.2
and
App
end
ix A
d)
GM
SP -
Fre
quen
cy o
f re
port
ing
incl
ude
in T
able
5-
1 GM
P -
Sect
ion
4.1
e)
GM
SP -
Con
ting
ency
Pla
n Fl
owch
art
Figu
re 5
and
A
ppen
dix
E fo
r sp
ills
GM
P -
Sec
tion
4.3
f)
GM
SP -
Sect
ion
3 an
d S
ecti
on 5
g)
GM
P –
Sec
tion
4.4
Stor
mw
ater
Man
agem
ent
B26
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt
shal
l eng
age
an in
dep
end
ent
and
sui
tabl
y qu
alif
ied
exp
ert
to
the
sati
sfac
tion
of
HW
C,
to u
nder
take
pee
r re
view
s of
the
d
esig
n,
cons
tru
ctio
n an
d
Ope
n m
aint
enan
ce
of
the
stor
mw
ater
man
agem
ent s
yste
m. T
he r
evie
ws
shal
l:
(a)
prov
ide
HW
C w
ith
a pe
er r
evie
w o
f th
e d
etai
led
des
ign
of th
e st
orm
wat
er m
anag
emen
t sys
tem
;
(b)
inve
stig
ate
the
cons
truc
tabi
lity,
ef
fect
iven
ess
and
d
urab
ility
of t
he s
torm
wat
er m
anag
emen
t sys
tem
;
(c)
be u
nder
take
n to
ens
ure
tha
t th
e sy
stem
is c
onst
ruct
ed a
s
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Ope
n
Con
firm
atio
n em
ail
by
Axe
l H
anso
n fr
om
Hu
nter
W
ater
Cor
pora
tion
dat
ed 2
-May
-12
appr
ovin
g SM
EC
as
the
ind
epen
den
t pee
r re
view
er.
Rev
iew
of
des
ign
com
plet
ed w
ith
emai
l re
ceiv
ed f
rom
H
WX
C 2
May
201
2 w
ith
reco
mm
end
atio
ns.
Mee
ting
he
ld w
ith
HW
C 2
0 Ju
ly 2
012
to d
iscu
ss r
evie
w a
nd
reco
mm
end
atio
ns.
Subm
itte
d to
DoP
I on
8 Ju
ne 2
012
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A17
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
des
igne
d t
o th
e sc
hed
ule
agr
eed
bet
wee
n th
e P
ropo
nent
and
H
WC
; and
(d) p
rovi
de
HW
C w
ith
insp
ecti
on r
epor
ts o
n th
e ad
equ
acy
of
the
stor
mw
ater
man
agem
ent
syst
em i
n ac
cord
ance
wit
h th
e in
spec
tion
s id
enti
fied
in th
e sc
hed
ule
ref
erre
d to
in (c
).
The
rev
iew
rep
orts
sha
ll be
inco
rpor
ated
into
the
com
plia
nce
trac
king
pro
gram
me
requ
ired
und
er c
ond
itio
n B
54 a
nd s
hall
incl
ude,
but
not
nec
essa
rily
be
limit
ed t
o: a
nnua
l re
port
s of
St
orm
wat
er s
yste
ms
Per
form
ance
sup
plie
d to
HW
C.
Any
fau
lts
iden
tifi
ed a
s a
resu
lt o
f th
e in
spec
tion
rep
orts
id
enti
fied
in
(d)
shal
l be
rec
tifi
ed a
nd r
e-in
spec
ted
at
the
Pro
pone
nt’s
exp
ense
.
NO
ISE
Con
stru
ctio
n H
ours
B27
Su
bjec
t to
con
dit
ions
B28
and
B29
, con
stru
ctio
n w
orks
(ot
her
than
ho
rizo
ntal
d
irec
tion
al
dri
lling
(H
DD
))
that
w
ould
ge
nera
te a
udib
le n
oise
at
any
sens
itiv
e re
ceiv
er s
hall
only
be
und
erta
ken
du
ring
the
follo
win
g ho
urs
:
(a) 7
:00
am to
6:0
0 pm
, Mon
day
s to
Fri
day
s, in
clus
ive;
(b) 8
:00
am to
1:0
0 pm
on
Satu
rday
s; a
nd
(c) a
t no
tim
e on
Sun
day
s or
pub
lic h
olid
ays.
Thi
s co
ndit
ion
doe
s no
t ap
ply
in t
he e
vent
of
a d
irec
tion
fr
om p
olic
e or
oth
er r
elev
ant
auth
orit
y fo
r sa
fety
rea
sons
or
emer
genc
y w
ork
to a
void
the
los
s of
liv
es, p
rope
rty
and
/or
to
pre
vent
env
iron
men
tal h
arm
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Not
ed ‐
hou
rs i
nclu
ded
in
NV
MSP
. N
VM
SP s
ent
to
DoP
I as
part
of C
EM
P
EP
L h
ours
alig
n w
ith
MC
oA.
No
repo
rted
ou
t of h
ours
wor
k co
mpl
eted
to d
ate
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A18
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
B28
A
ny
wor
k ge
nera
ting
hi
gh
nois
e th
at
has
impu
lsiv
e,
inte
rmit
tent
, lo
w
freq
uen
cy
or
tona
l ch
arac
teri
stic
s,
incl
udin
g ja
ck h
amm
erin
g, p
ile d
rivi
ng,
rock
ham
mer
ing,
ro
ck b
reak
ing,
saw
cut
ting
, she
et p
iling
or
vibr
ator
y ro
lling
, sh
all o
nly
be u
nder
take
n:
(a)
betw
een
the
hou
rs o
f 8.
00 a
m a
nd 6
.00
pm M
ond
ay t
o Fr
iday
;
(b) b
etw
een
the
hou
rs o
f 8.0
0 am
and
1.0
0 pm
Sat
urd
ay; a
nd
(c)
in c
onti
nuou
s bl
ocks
of
no m
ore
than
thr
ee h
ours
, wit
h at
le
ast
one
hou
r re
spit
e be
twee
n ea
ch
bloc
k of
w
ork
gene
rati
ng h
igh
nois
e im
pact
, whe
re th
e lo
cati
on o
f the
wor
k is
lik
ely
to i
mpa
ct t
he s
ame
rece
iver
s; e
xcep
t as
oth
erw
ise
appr
oved
by
the
Dir
ecto
r-G
ener
al.
For
the
purp
oses
of t
his
cond
itio
n “c
onti
nuou
s” in
clu
des
any
pe
riod
dur
ing
whi
ch t
here
is
less
tha
n a
one
hour
res
pite
be
twee
n ce
asin
g an
d r
ecom
men
cing
any
of
the
wor
k th
e su
bjec
t of t
his
cond
itio
n.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I IO
Ope
n
No
wor
ks o
utsi
de
of s
tand
ard
con
stru
ctio
n ho
urs
– ho
urs
of o
pera
tion
in N
VM
SP
App
end
ix B
– T
able
8-2
Vib
rato
ry
rolli
ng
and
vi
bro
com
pact
ion
acti
viti
es
obse
rved
d
urin
g si
te
insp
ecti
ons
ind
icat
e im
pact
s d
issi
pate
wit
hin
100m
– 2
50m
of
acti
vity
. N
eare
st
rece
ptor
s is
Hun
ter
Reg
ion
Bot
anic
al G
ard
ens.
IO –
ens
ure
lat
er s
tart
tim
e to
nor
mal
wor
king
hou
rs
requ
irem
ent
is c
omm
unic
ated
and
ad
here
d t
o d
urin
g vi
brat
ory
acti
viti
es.
B29
C
onst
ruct
ion
outs
ide
of t
he h
ours
spe
cifi
ed u
nder
con
dit
ion
B27
or
B28
may
be
vari
ed fo
r w
orks
as
appr
oved
thro
ugh
the
out-
of-h
ours
w
ork
prot
ocol
re
quir
ed
as
part
of
th
e C
onst
ruct
ion
Noi
se M
anag
emen
t P
lan
und
er c
ond
itio
n B
57
of
this
ap
prov
al.
Any
re
ques
t to
al
ter
the
hou
rs
of
cons
tru
ctio
n sh
all:
(a) b
e co
nsid
ered
on
a ca
se-b
y-ca
se b
asis
;
(b)
be a
ccom
pani
ed b
y d
etai
ls o
f th
e na
ture
and
nee
d f
or
acti
viti
es t
o be
con
du
cted
dur
ing
the
vari
ed c
onst
ruct
ion
hou
rs a
nd a
ny o
ther
inf
orm
atio
n ne
cess
ary
to r
easo
nabl
y d
eter
min
e th
at
acti
viti
es
und
erta
ken
du
ring
th
e va
ried
co
nstr
ucti
on h
ours
will
not
ad
vers
ely
impa
ct o
n th
e ac
oust
ic
amen
ity
of r
ecep
tors
in th
e vi
cini
ty o
f the
sit
e; a
nd
Pre
-con
stru
ctio
n
Con
stru
ctio
n
a)
CB
I
b)
CB
I
c)
CB
I to
no
tify
A
GL
>
72
hrs
prio
r to
ena
ble
AG
L
to
upd
ate
web
site
Com
plia
nce
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-2
Ref
er
to
MC
oA
B57
(f)
– O
OH
W
prot
ocol
be
ing
dev
elop
ed to
incl
ude
requ
irem
ents
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A19
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
(c)
requ
ire
that
aff
ecte
d r
esid
enti
al r
ecei
vers
are
inf
orm
ed o
f th
e ti
min
g an
d
du
rati
on
of
any
cons
tru
ctio
n ac
tivi
ties
ap
prov
ed u
nder
thi
s co
ndit
ion
at l
east
48
hou
rs b
efor
e th
at
wor
k co
mm
ence
s.
Con
stru
ctio
n N
oise
Cri
teri
a
B30
T
he P
ropo
nent
sha
ll im
plem
ent
all
reas
onab
le a
nd f
easi
ble
nois
e m
itig
atio
n m
easu
res
to m
inim
ise
nois
e ge
nera
ted
by
cons
tru
ctio
n of
the
pro
ject
, con
sist
ent
wit
h th
e re
quir
emen
ts
of t
he I
nter
im C
onst
ruct
ion
Noi
se G
uid
elin
es (
DE
CC
, Ju
ly
2009
).
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
– A
ppen
dix
B (a
ll ta
bles
)
Noi
se l
evel
s ar
e m
onit
ored
by
CB
I en
viro
nmen
t st
aff
and
any
issu
es n
oted
in d
aily
dia
ry n
otes
or
the
wee
kly
repo
rt.
ER
sit
e in
spec
tion
s no
te n
oise
leve
ls r
easo
nabl
e
B31
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt
shal
l un
der
take
a n
oise
ass
essm
ent
to i
den
tify
all
sens
itiv
e re
ceiv
ers
whe
re t
he c
onst
ruct
ion
nois
e m
anag
emen
t go
als,
ex
ceed
the
IC
NG
con
stru
ctio
n no
ise
goal
s fo
r th
at r
ecei
ver.
T
he r
esul
ts s
hall
be i
nclu
ded
in
the
Con
stru
ctio
n N
oise
M
anag
emen
t P
lan
requ
ired
u
nder
co
ndit
ion
B57
of
th
is
appr
oval
.
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
NV
MSP
– T
able
2-1
Sen
siti
ve R
ecei
vers
. Pre
dic
ted
noi
se
impa
cts
incl
uded
in S
ecti
on 2
.3
Noi
se
and
V
ibra
tion
A
sses
smen
t –
NG
SF,
Atk
ins
Aco
ust
ics
and
Ass
ocia
tes
Pty
Ltd
, M
ay 2
011
ind
icat
ed
nil
exce
edan
ces
of
ICN
G
cons
truc
tion
no
ise
man
agem
ent g
oals
for
the
wor
ks a
t any
rec
eive
rs.
TR
AFF
IC A
ND
TR
AN
SPO
RT
B32
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion
of t
he p
roje
ct,
the
Pro
pone
nt s
hall
com
mis
sion
a s
uita
bly
qual
ifie
d r
oad
in
fras
truc
ture
spe
cial
ist
to a
sses
s th
e co
ndit
ion
of a
ll pu
blic
ro
ads
prop
osed
to
be
tr
aver
sed
by
co
nstr
uct
ion
traf
fic
asso
ciat
ed w
ith
the
proj
ect
(inc
lud
ing
over
-mas
s or
ove
r-d
imen
sion
al v
ehic
les)
in
cons
ulta
tion
wit
h C
ounc
il an
d t
he
RM
S,
and
to
id
enti
fy
any
upg
rad
e re
quir
emen
ts
to
acco
mm
odat
e pr
ojec
t tr
affi
c fo
r th
e d
ura
tion
of
cons
tru
ctio
n (i
nclu
din
g cu
lver
t, br
idge
and
dra
inag
e d
esig
n; i
nter
sect
ion
trea
tmen
ts;
vehi
cle
turn
ing
requ
irem
ents
; an
d s
ite
acce
ss),
havi
ng r
egar
d t
o pe
ak t
raff
ic v
olu
mes
. The
Pre
-Con
stru
ctio
n R
oad
Ins
pect
ion
Rep
ort
shal
l be
su
bmit
ted
to
the
Dir
ecto
r-
Pre
-con
stru
ctio
n C
BI
AG
L –
sub
mis
sion
of
rep
ort
IO
Ope
n –
CB
I
Ref
er l
ette
r re
port
fro
m B
ette
r T
rans
port
Fu
ture
s 6
July
20
12 in
dic
atin
g th
e cu
rren
t ro
ad n
etw
ork
in t
he v
icin
ity
of t
he s
ubj
ect
site
can
acc
omm
odat
e th
e vo
lum
e an
d
size
of
the
vehi
cles
ass
ocia
ted
wit
h th
e co
nstr
ucti
on
phas
e of
the
Gas
Sto
rage
Fac
ility
and
no
road
upg
rad
es
are
requ
ired
.
RM
S no
t co
ntac
ted
for
Old
Pu
nt R
d c
ompo
nent
as
Cou
ncil
Roa
d.
TA
C N
orth
ern
Acc
ess
Roa
d p
riva
te
ther
efor
e lia
ison
wit
h R
MS
or P
SC n
ot r
equi
red
.
Subm
itte
d to
DoP
I 11
July
201
2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A20
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Gen
eral
pri
or t
o th
e co
mm
ence
men
t of
con
stru
ctio
n w
orks
, cl
earl
y id
enti
fyin
g re
com
men
dat
ions
mad
e by
the
Cou
ncil
and
the
RM
S an
d h
ow t
hese
hav
e be
en a
dd
ress
ed.
The
P
ropo
nent
sha
ll en
sure
tha
t al
l u
pgra
de
mea
sure
s id
enti
fied
in
th
e re
port
ar
e im
plem
ente
d
to
mee
t th
e re
ason
able
re
quir
emen
ts
of
Cou
ncil
and
th
e R
MS,
pr
ior
to
the
com
men
cem
ent o
f con
stru
ctio
n.
PSC
cor
resp
ond
ence
ou
tsta
ndin
g to
clo
se it
em
B33
A
com
mer
cial
-typ
e ve
hicu
lar
cros
sing
sha
ll be
con
stru
cted
ac
ross
th
e pu
blic
fo
otw
ay
at
the
prop
osed
d
rive
way
en
tran
ce/
exi
t to
the
Hex
ham
rec
eivi
ng s
tati
on s
ite
at t
he
expe
nse
of t
he P
ropo
nent
. T
he c
ross
ing
shal
l be
des
igne
d
and
co
nstr
uct
ed
in
acco
rdan
ce
wit
h N
ewca
stle
C
ity
Cou
ncil’
s A
017
Seri
es (
Con
cret
e V
ehic
ula
r C
ross
ings
) d
esig
n sp
ecif
icat
ions
.
Pre
-con
stru
ctio
n –
Stag
e 2
Con
stru
ctio
n
AG
L
NA
Ope
n
To
be i
nclu
ded
in
Tra
ffic
Man
agem
ent
Sub-
Pla
n fo
r re
leva
nt s
tage
of w
orks
B34
R
edun
dan
t ex
isti
ng
vehi
cula
r cr
ossi
ngs
at
the
Hex
ham
re
ceiv
ing
stat
ion
site
sha
ll be
rem
oved
at
the
expe
nse
of t
he
Pro
pone
nt a
nd th
e pu
blic
foo
tway
and
ker
b sh
all b
e re
stor
ed
to b
e co
nsis
tent
wit
h ex
isti
ng in
fras
tru
ctu
re.
Pre
-con
stru
ctio
n –
Stag
e 2
Con
stru
ctio
n
AG
L
NA
Ope
n
To
be i
nclu
ded
in
Tra
ffic
Man
agem
ent
Sub-
Pla
n fo
r re
leva
nt s
tage
of w
orks
AIR
QU
AL
ITY
Odo
ur
B35
D
uri
ng c
onst
ruct
ion,
the
Pro
pone
nt s
hall
ensu
re n
o of
fens
ive
odou
r as
def
ined
und
er t
he P
rote
ctio
n of
the
Env
iron
men
t O
pera
tion
s A
ct 1
997
is e
mit
ted
from
the
proj
ect s
ite.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Not
ed –
Pro
ject
Air
Qu
alit
y M
anag
emen
t Su
b P
lan
incl
udes
bes
t pr
acti
se m
itig
atio
n m
easu
res
to m
inim
ise
odou
r.
AQ
MSP
su
bmit
ted
to
DoP
I fo
r ap
prov
al w
ith
CE
MP
.
Nil
odou
r ge
nera
ting
act
ivit
ies
note
d d
urin
g E
R s
ite
insp
ecti
ons
to d
ate.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A21
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Dus
t
B36
T
he
Pro
pone
nt
shal
l em
ploy
re
ason
able
an
d
feas
ible
m
easu
res
to e
nsu
re th
at c
onst
ruct
ion
acti
viti
es a
ssoc
iate
d th
e pr
ojec
t ar
e u
nder
take
n in
a
man
ner
that
m
inim
ises
or
pr
even
ts th
e em
issi
on o
f dus
t.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Not
ed
– P
roje
ct
AQ
MSP
in
clu
des
be
st
prac
tise
m
itig
atio
n m
easu
res
to
min
imis
e od
our.
AQ
MSP
su
bmit
ted
to D
oPI f
or a
ppro
val w
ith
CE
MP
.
Site
ins
pect
ions
dur
ing
bulk
ear
thw
orks
ind
icat
e d
ust
leve
ls r
equ
ired
mit
igat
ion
– tw
o w
ater
car
ts e
mpl
oyed
on
sit
e to
sup
pre
ss d
ust.
ME
TE
OR
OL
OG
Y
B37
P
rior
to
th
e co
mm
ence
men
t of
co
nstr
uct
ion
wor
ks,
the
Pro
pone
nt
shal
l es
tabl
ish
a m
eteo
rolo
gica
l m
onit
orin
g st
atio
n on
the
sit
e, o
r at
a r
epre
sent
ativ
e lo
cati
on o
ff-s
ite,
for
th
e pu
rpos
e of
co
ntin
uou
sly
mon
itor
ing
met
eoro
logi
cal
cond
itio
ns
on
the
site
fo
r th
e lif
e of
th
e pr
ojec
t. T
he
met
eoro
logi
cal
mon
itor
ing
stat
ion
shal
l be
loc
ated
, ope
rate
d
and
mai
ntai
ned
to
mee
t th
e re
quir
emen
ts o
f th
e O
EH
. T
he
Pro
pone
nt m
ay s
atis
fy t
his
cond
itio
n by
dem
onst
rati
ng t
o th
e sa
tisf
acti
on o
f th
e O
EH
tha
t it
has
acc
ess
to d
ata
from
an
exis
ting
met
eoro
logi
cal
mon
itor
ing
stat
ion,
rep
rese
ntat
ive
of
cond
itio
ns o
n th
is s
ite,
and
ope
rate
d b
y a
thir
d p
arty
.
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Ope
n
Ref
er t
o le
tter
fro
m T
AC
on
21-M
ar-1
2 gr
anti
ng a
cces
s to
met
eoro
logi
cal m
onit
orin
g st
atio
n.
AG
L to
gai
n O
EH
app
rova
l for
use
of T
AC
met
sta
tion
HE
RIT
AG
E
B38
T
he
Pro
pone
nt
shal
l em
ploy
a
suit
ably
-qua
lifie
d
arch
aeol
ogis
t to
att
end
sit
e cl
eari
ng a
nd v
eget
atio
n re
mov
al
wor
ks w
ithi
n th
e ga
s st
orag
e fa
cilit
y si
te a
nd w
ithi
n ri
pari
an
area
s of
th
e H
unt
er
Riv
er,
and
an
y ac
tivi
ties
w
ith
the
pote
ntia
l to
d
irec
tly
or
ind
irec
tly
impa
ct
on
subs
urfa
ce
heri
tage
ite
ms.
The
arc
haeo
logi
st s
hall
be e
mpl
oyed
for
the
pu
rpos
e of
id
enti
fyin
g an
d a
dvi
sing
on
pote
ntia
l A
bori
gina
l he
rita
ge
impa
cts,
in
clud
ing
appr
opri
ate
mit
igat
ion
and
m
anag
emen
t, as
re
quir
ed
und
er
thes
e co
ndit
ions
of
ap
prov
al.
Item
s of
he
rita
ge
sign
ific
ance
th
at
may
be
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Ope
n
RP
S ap
poin
ted
arc
haeo
logi
sts.
Ref
er to
MC
oA B
57
Rep
ort
issu
ed b
y R
PS
21 N
ovem
ber
2012
det
ailin
g si
te
insp
ecti
ons
and
fin
ds.
Six
cul
tura
l he
rita
ge i
tem
s w
ere
reco
rded
w
ith
GP
S co
ord
inat
es
take
n an
d
phot
ogra
phed
. T
hey
are
bein
g he
ld
onsi
te
in
the
tem
pora
ry a
dm
inis
trat
ion
offi
ce a
nd o
nce
the
NG
SF
wor
ks a
re c
ompl
eted
will
be
man
aged
in
acco
rdan
ce
wit
h a
Car
e an
d C
ontr
ol a
gree
men
t d
evel
oped
bet
wee
n
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A22
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
unco
vere
d
dur
ing
cons
truc
tion
of
th
e pr
ojec
t sh
all
be
man
aged
in a
ccor
dan
ce w
ith
the
appr
oved
Cu
ltu
ral H
erit
age
Man
agem
ent P
lan
und
er c
ond
itio
n B
57.
the
Abo
rigi
nal
com
mun
ity
stak
ehol
der
gr
oups
an
d
AG
L (
refe
r Se
ctio
n 5
CB
I C
HM
P 2
012)
. The
mon
itor
ing
repo
rt
incl
ud
es
a re
cord
of
th
e m
onit
orin
g u
nits
, d
ocum
enta
tion
of
A
bori
gina
l si
tes,
as
w
ell
as
asse
ssm
ent o
f sig
nifi
canc
e.
Find
s w
ill b
e re
gist
ered
wit
h A
IHM
S/E
PA
onc
e it
ems
are
plac
ed
in
fina
l lo
cati
on
whi
ch
fulf
ils
legi
slat
ive
requ
irem
ents
(ver
bal a
dvi
ce R
PS,
Janu
ary
2013
).
B39
R
egis
tere
d A
bori
gina
l sta
keho
lder
s sh
all b
e in
vite
d t
o at
tend
si
te
clea
ring
an
d
soil
dis
turb
ance
w
ork
to
assi
st
in
the
iden
tifi
cati
on
of
heri
tage
it
ems,
in
clud
ing
pote
ntia
l m
itig
atio
n an
d m
anag
emen
t mea
sure
s.
Du
ring
cle
arin
g
AG
L
Com
plia
nce
Clo
sed
– C
BI
Cu
ltu
ral H
erit
age
Man
agem
ent S
ub
Pla
n –
Sect
ion
5.3.
1
Her
itag
e in
spec
tion
s co
mpl
eted
30
/08
/20
12,
07/
09/
2012
, 24/
09/
2012
, 15/
10/
2012
and
24/
10/
2012
.
B40
W
here
rea
sona
ble
and
fea
sibl
e, t
he P
ropo
nent
sha
ll re
mov
e ve
geta
tion
fr
om
the
site
w
ith
the
aim
of
av
oid
ing
or
min
imis
ing
the
need
to d
istu
rb th
e u
nder
lyin
g so
il.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Clo
sed
– C
BI
Req
uire
men
t is
det
aile
d in
follo
win
g d
ocum
ents
:
E
WM
S –
Cle
arin
g an
d G
rubb
ing
E
WM
S –
Top
soil
stri
ppin
g an
d s
tock
pilin
g
FF
MSP
– A
ppen
dix
B T
able
8-9
poi
nt 1
4
Site
in
spec
tion
d
uri
ng
heri
tage
sc
an
afte
r cl
eari
ng
com
men
ced
on
30/
08/
2012
ind
icat
es v
eget
atio
n w
as
rem
oved
w
ith
min
imal
d
istu
rban
ce
to
allo
w
for
heri
tage
insp
ecti
ons
to o
ccur
pri
or to
land
dis
turb
ance
.
WA
STE
MA
NA
GE
ME
NT
B41
T
he P
ropo
nent
sha
ll no
t ca
use,
per
mit
or
allo
w a
ny w
aste
ge
nera
ted
ou
tsid
e th
e si
te t
o be
rec
eive
d a
t th
e si
te f
or
stor
age,
tre
atm
ent,
proc
essi
ng,
repr
oces
sing
, or
dis
posa
l on
th
e si
te d
uri
ng c
onst
ruct
ion,
exc
ept
as e
xpre
ssly
per
mit
ted
by
a
licen
ce
und
er
the
Pro
tect
ion
of
the
Env
iron
men
t O
pera
tion
s A
ct 1
997,
if
such
a l
icen
ce i
s re
quir
ed i
n re
lati
on
to th
at w
aste
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Ref
er W
aste
Man
agem
ent
Sub
Pla
n (W
MSP
) –
Sect
ion
2.1.
3 an
d A
ppen
dix
A.
Site
doe
s no
t ac
cept
was
te.
Gra
vel
mat
eria
l u
sed
for
on
site
ro
ads
(pip
elin
e tr
ack
and
m
ain
acce
ss
trac
k)
sour
ced
fr
om
Han
son’
s B
rand
y H
ill
Qua
rry
– sp
ot
chec
k of
del
iver
y d
ocke
ts c
ompl
eted
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A23
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
B42
T
he P
ropo
nent
sha
ll m
axim
ise
the
reu
se a
nd/
or r
ecyc
ling
of
cons
tru
ctio
n w
aste
mat
eria
ls g
ener
ated
on
site
, to
min
imis
e th
e ne
ed f
or t
reat
men
t or
dis
posa
l of
thos
e m
ater
ials
ou
tsid
e th
e si
te.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
Ref
er W
aste
Man
agem
ent
Sub
Pla
n (W
MSP
) –
all
and
A
ppen
dix
A.
A m
ater
ial t
rack
ed o
ff s
ite
ente
red
in w
aste
reg
iste
r.
Subs
oil
dee
med
uns
uit
able
for
reu
se o
n-si
te h
as b
een
scre
ened
to e
nabl
e re
use
.
Bu
lk
of
mu
lch
wen
t to
A
ust
ar
min
e fo
r u
se
in
reha
bilit
atio
n w
orks
. E
xtra
mul
ch t
o L
ake
Mac
quar
ie
Cou
ncil.
Exc
ess
logs
to N
ewca
stle
Ear
thm
ovin
g fo
r fu
ture
use
.
B43
T
he P
ropo
nent
sha
ll en
sure
tha
t al
l liq
uid
and
/or
non
-liq
uid
co
nstr
uct
ion
was
te g
ener
ated
by
the
proj
ect
is a
sses
sed
and
cl
assi
fied
in
ac
cord
ance
w
ith
the
Was
te
Cla
ssif
icat
ion
Gu
idel
ines
(D
EC
C 2
008,
or
any
futu
re g
uid
elin
e th
at m
ay
supe
rsed
e th
at d
ocu
men
t) a
nd w
here
rem
oved
fro
m t
he s
ite
is o
nly
dir
ecte
d t
o a
was
te l
ocat
ion
law
fully
per
mit
ted
to
acce
pt th
ose
mat
eria
ls.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I IO
Ope
n
Ref
er W
aste
Man
agem
ent
Sub
Pla
n (W
MSP
) –
Sect
ion
2.1.
2 an
d A
ppen
dix
A.
Was
te R
egis
ter
mai
ntai
ned
rec
ord
ing
all
mov
emen
ts.
Was
te
gene
rate
d
prim
arily
d
ry
was
te.
So
il co
ntam
inat
ed
from
oi
l sp
ills
trac
ked
un
der
th
e re
gula
ted
was
te s
yste
m a
nd d
ispo
sed
to
auth
oris
ed
was
te fa
cilit
y.
IO
– co
nsid
er
add
ing
the
regu
late
d
was
te
trac
king
ce
rtif
icat
e nu
mbe
r to
the
was
te r
egis
ter
to a
ssis
t w
ith
conf
irm
ing
com
plia
nce
wit
h w
aste
tr
acki
ng
requ
irem
ents
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A24
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
VIS
UA
L A
ME
NIT
Y
B44
T
he P
ropo
nent
sha
ll:
(a)
take
all
reas
onab
le a
nd f
easi
ble
mea
sure
s to
mit
igat
e of
f-si
te li
ghti
ng im
pact
s fr
om th
e co
nstr
uct
ion
of th
e pr
ojec
t; an
d
(b)
ensu
re
that
al
l ex
tern
al
light
ing
asso
ciat
ed
wit
h co
nstr
uct
ion
of
the
proj
ect
com
plie
s w
ith
Au
stra
lian
Stan
dar
d A
S428
2 –
1997
– C
ontr
ol o
f th
e O
btru
sive
Eff
ects
of
Ou
tdoo
r L
ight
ing.
Thi
s co
ndit
ion
doe
s no
t ap
ply
to
light
ing
requ
ired
fo
r av
iati
on s
afet
y.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
CE
MP
has
bee
n u
pdat
ed t
o re
fer
to u
se o
f d
irec
tion
al
light
ing.
Ref
er T
able
12-
5 Fl
ora
and
Fau
na
Ext
erna
l lig
htin
g in
stal
led
on
si
te
offi
ce
– ch
eck
ind
icat
es d
irec
tion
al to
war
ds
grou
nd.
AIR
SA
FET
Y
B45
A
t le
ast
one
mon
th
prio
r to
th
e co
mm
ence
men
t of
co
nstr
uct
ion,
th
e P
ropo
nent
sh
all
noti
fy
the
RA
AF
Aer
onau
tica
l Inf
orm
atio
n Se
rvic
e of
the
loca
tion
and
hei
ghts
of
tal
l st
ruct
ure
s th
at a
re 3
0 m
etre
s or
mor
e ab
ove
grou
nd
leve
l w
ithi
n 30
kilo
met
res
of a
n ae
rod
rom
e, o
r 45
met
res
of
mor
e ab
ove
grou
nd le
vel e
lsew
here
.
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
Not
ific
atio
n le
tter
sen
t to
RA
AF
on 1
1 M
ay 2
012.
Con
stru
ctio
n pl
anne
d to
com
men
ce 2
7 A
ugu
st 2
012
INFR
AST
RU
CT
UR
E, S
ER
VIC
ES
AN
D A
NC
ILL
AR
Y F
AC
ILIT
IES
B46
T
he P
ropo
nent
sha
ll u
nder
take
all
nece
ssar
y al
tera
tion
s to
ex
isti
ng p
ublic
uti
lity
inst
alla
tion
s to
mee
t th
e re
ason
able
re
quir
emen
ts o
f, an
d a
t no
exp
ense
to,
the
rel
evan
t pu
blic
ut
ility
aut
hori
ty.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I
AG
L
NA
Ope
n
Com
mit
men
t is
incl
uded
in C
EM
P (p
37)
Nil
alte
rati
ons
to e
xist
ing
publ
ic u
tilit
y in
stal
lati
ons
have
bee
n co
mpl
eted
to d
ate
B47
T
he P
ropo
nent
sha
ll en
sure
tha
t ro
ad s
urf
aces
– a
nd a
ny
othe
r ro
ad-r
elat
ed i
nfra
stru
ctur
e in
clud
ing
dra
inag
e, s
tree
t lig
htin
g,
stre
et
furn
itur
e or
un
der
grou
nd
faci
litie
s –
dis
turb
ed o
r d
amag
ed d
urin
g co
nstr
ucti
on,
are
rest
ored
to
mee
t th
e re
ason
able
req
uir
emen
ts o
f, an
d a
t no
exp
ense
to,
th
e re
leva
nt r
oad
au
thor
ity.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I
AG
L
NA
Ope
n
Com
mit
men
t is
incl
uded
in C
EM
P (p
37)
No
exis
ting
ro
ad
surf
aces
d
istu
rbed
d
urin
g cu
rren
t w
orks
to d
ate
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A25
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
B48
T
he P
ropo
nent
sha
ll d
esig
n an
d p
rovi
de
on-s
ite
car
park
ing,
d
rive
way
s,
park
ing
bays
, ve
hicu
lar
turn
ing
area
s,
lett
erbo
xes,
lan
dsc
apin
g an
d d
rain
age
in c
onsu
ltat
ion
wit
h an
d to
mee
t the
rea
sona
ble
requ
irem
ents
of t
he r
elev
ant l
ocal
co
unci
l.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I
AG
L
Com
plia
nce
Ope
n
Com
mit
men
t is
incl
uded
in C
EM
P (p
37)
Fina
l d
esig
n to
be
chec
ked
for
com
plia
nce
wit
h P
SC
requ
irem
ents
CO
MM
UN
ITY
IN
FOR
MA
TIO
N, C
ON
SUL
TA
TIO
N A
ND
IN
VO
LV
EM
EN
T
Pro
visi
on o
f Ele
ctro
nic
Info
rmat
ion
B49
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt
shal
l es
tabl
ish
a d
edic
ated
web
site
or
mai
ntai
n d
edic
ated
pa
ges
wit
hin
its
exis
ting
w
ebsi
te
for
the
prov
isio
n of
el
ectr
onic
in
form
atio
n as
soci
ated
w
ith
the
proj
ect.
The
P
ropo
nent
sh
all
publ
ish
and
m
aint
ain
up-t
o-d
ate
info
rmat
ion
on t
his
web
site
or
ded
icat
ed p
ages
inc
lud
ing,
bu
t not
nec
essa
rily
lim
ited
to:
(a) t
he s
tatu
s of
the
proj
ect;
(b)
a co
py o
f th
is a
ppro
val
and
any
fu
ture
mod
ific
atio
n to
th
is a
ppro
val;
(c)
a co
py o
f ea
ch r
elev
ant
envi
ronm
enta
l ap
prov
al,
licen
ce
or p
erm
it r
equi
red
and
obt
aine
d in
rel
atio
n to
the
proj
ect;
(d)
a co
py o
f ea
ch p
lan,
rep
ort,
or m
onit
orin
g pr
ogra
mm
e re
quir
ed b
y th
is a
ppro
val;
and
(e)
det
ails
of
the
outc
omes
of
com
plia
nce
revi
ews
and
au
dit
s of
the
proj
ect.
Pre
-con
stru
ctio
n A
GL
– u
pdat
e
CB
I - c
onte
nt
NC
-2
Ope
n
http
://
agk.
com
.au
/ne
wca
stle
/in
dex
.php
/th
e-pr
ojec
t/
a) b
ackg
rou
nd f
or a
ppro
vals
and
cu
rren
t st
atu
s in
clu
de
on p
roje
ct p
age.
L
ast
new
slet
ter
issu
ed S
prin
g 20
12
whi
ch i
s lo
aded
ont
o th
e N
ews,
Pub
licat
ion
and
oth
er
Med
ia w
ebpa
ge.
b)
Lin
k to
co
py
of
appr
oval
in
clud
ed
und
er
Env
iron
men
t pag
e
c) c
opy
of r
elev
ant
appr
oval
inc
lud
es l
ink
to D
oPI
web
site
d)
A c
opy
of t
he C
EM
P is
incl
ud
ed o
n th
e w
ebsi
te -
not
al
l pl
ans
requ
ired
und
er t
he M
CoA
hav
e be
en l
oad
ed
onto
web
site
.
NC
-2 P
lans
not
upl
oad
ed i
nclu
de
the
FFM
SP, C
HM
SP,
SWM
SP,
FER
MSP
, N
MSP
, A
SSM
SP
and
T
MSP
. W
ebsi
te d
oes
ind
icat
e th
ese
are
avai
labl
e on
req
ues
t.
e)
Pre
-con
stru
ctio
n co
mpl
ianc
e au
dit
lo
aded
on
to
web
site
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A26
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Com
mun
ity
Info
rmat
ion
Pla
n
B50
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt
shal
l pr
epar
e an
d
impl
emen
t a
Com
mun
ity
Info
rmat
ion
Pla
n w
hich
set
s ou
t th
e co
mm
unit
y co
mm
unic
atio
n an
d
cons
ulta
tion
pr
oces
ses
to
be
impl
emen
ted
d
uri
ng
cons
tru
ctio
n an
d o
pera
tion
of
the
proj
ect.
The
Pla
n sh
all
incl
ude,
but
not
be
limit
ed to
:
(a)
proc
edu
res
to i
nfor
m t
he l
ocal
com
mu
nity
of
plan
ned
in
vest
igat
ions
and
con
stru
ctio
n ac
tivi
ties
, inc
lud
ing
blas
ting
w
orks
(if a
ny);
(b)
proc
edu
res
to
info
rm
the
rele
vant
co
mm
uni
ty
of
cons
tru
ctio
n tr
affi
c ro
ute
s an
d a
ny p
oten
tial
dis
rupt
ions
to
traf
fic
flow
s an
d a
men
ity
impa
cts;
(c) p
roce
du
res
to in
form
the
com
mu
nity
whe
re w
ork
outs
ide
the
cons
truc
tion
hou
rs s
peci
fied
in c
ond
itio
n 0,
in p
arti
cula
r no
isy
acti
viti
es, h
as b
een
appr
oved
; and
(d)
proc
edu
res
to
info
rm
and
co
nsu
lt
wit
h af
fect
ed
land
owne
rs to
reh
abili
tate
impa
cted
land
.
Pre
-con
stru
ctio
n A
GL
to
d
evel
op
plan
CB
I to
impl
emen
t
Com
plia
nce
Clo
sed
Pro
vid
ed
in
the
Com
mun
ity
Eng
agem
ent
Pla
n (D
ocu
men
t no
: N
GSF
-AG
L-N
AS-
PM
-PL
N-0
002)
-
Sect
ion
2
a)
Sect
ion
6.1
b)
Sect
ion
6.1
c)
Sect
ion
6.1
d)
Sect
ion
6.1
Com
plai
nts
Pro
cedu
re
B51
P
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion,
the
Pro
pone
nt
shal
l en
sure
tha
t th
e fo
llow
ing
are
avai
labl
e fo
r co
mm
unit
y co
mpl
aint
s fo
r th
e lif
e of
the
pro
ject
(in
clu
din
g co
nstr
uct
ion
and
op
erat
ion)
or
as
ot
herw
ise
agre
ed
by
the
Dir
ecto
r-G
ener
al:
(a)
a 24
-hou
r te
leph
one
num
ber
on w
hich
com
plai
nts
abou
t co
nstr
uct
ion
and
ope
rati
onal
act
ivit
ies
at t
he s
ite
may
be
regi
ster
ed;
(b)
a po
stal
ad
dre
ss t
o w
hich
wri
tten
com
plai
nts
may
be
Pre
-con
stru
ctio
n A
GL
‐ to
pub
licis
e av
aila
bilit
y of
th
ese
com
mun
icat
ion
chan
nels
to
lo
cal
com
mun
ity.
CB
I ‐
to
erec
t si
gnag
e th
at
is
clea
rly
visi
ble
to
the
publ
ic
Com
plia
nce
Ope
n
Pro
vid
ed
in
the
Com
mun
ity
Eng
agem
ent
Pla
n (D
ocu
men
t no:
NG
SF-A
GL
-NA
S-P
M-P
LN
-000
2)
Pro
ject
sig
nboa
rds
have
bee
n er
ecte
d o
n si
te a
t Hex
ham
an
d T
omag
o w
ith
cont
act d
etai
ls
a, b
, c
adve
rtis
ed o
n pr
ojec
t w
ebsi
te –
det
ails
als
o in
clud
ed in
New
spap
er a
dve
rtis
emen
t pub
lishe
d in
:
P
ort
Step
hens
Exa
min
er –
21
June
201
2 an
d 2
0 D
ecem
ber
2012
N
ewca
stle
Her
ald
– 2
1 Ju
ne 2
012
and
20
Dec
embe
r 20
12
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A27
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
sent
; and
(c)
an e
mai
l ad
dre
ss t
o w
hich
ele
ctro
nic
com
plai
nts
may
be
tran
smit
ted
.
The
tel
epho
ne n
um
ber,
pos
tal
add
ress
and
em
ail
add
ress
sh
all
be a
dve
rtis
ed i
n a
new
spap
er c
ircu
lati
ng i
n th
e ar
ea o
f th
e pr
ojec
t, on
at
le
ast
one
occa
sion
pr
ior
to
the
com
men
cem
ent
of c
onst
ruct
ion;
and
at
six-
mon
thly
inte
rval
s d
uri
ng c
onst
ruct
ion
and
for
a p
erio
d o
f tw
o ye
ars
follo
win
g co
mm
ence
men
t of
ope
rati
on o
f th
e pr
ojec
t. T
hese
det
ails
sh
all
also
be
pr
ovid
ed
on
the
Pro
pone
nt’s
in
tern
et
site
re
quir
ed b
y co
ndit
ion
B49
. The
tele
phon
e nu
mbe
r, th
e po
stal
ad
dre
ss a
nd t
he e
mai
l ad
dre
ss s
hall
be d
ispl
ayed
on
a si
gn
near
the
entr
ance
to th
e co
nstr
uct
ion
site
(s),
in a
pos
itio
n th
at
is c
lear
ly v
isib
le to
the
publ
ic.
B52
T
he P
ropo
nent
sha
ll re
cord
det
ails
of
all c
ompl
aint
s re
ceiv
ed
thro
ugh
the
mea
ns li
sted
in c
ond
itio
n B
51 o
f th
is a
ppro
val i
n an
up-
to-d
ate
Com
plai
nts
Reg
iste
r. T
he R
egis
ter
shal
l rec
ord
, bu
t not
nec
essa
rily
be
limit
ed to
:
(a) t
he d
ate
and
tim
e of
the
com
plai
nt;
(b)
the
mea
ns b
y w
hich
the
com
plai
nt w
as m
ade
(tel
epho
ne,
mai
l or
emai
l);
(c)
any
pers
onal
d
etai
ls
of
the
com
plai
nant
th
at
wer
e pr
ovid
ed, o
r if
no
det
ails
wer
e pr
ovid
ed, a
not
e to
that
eff
ect;
(d) t
he n
atu
re o
f the
com
plai
nt;
(e)
any
acti
on(s
) ta
ken
by t
he P
ropo
nent
in
rela
tion
to
the
com
plai
nt,
incl
udin
g ti
mef
ram
es
for
impl
emen
ting
th
e ac
tion
; and
(f)
if n
o ac
tion
was
tak
en b
y th
e P
ropo
nent
in r
elat
ion
to t
he
com
plai
nt, t
he r
easo
n(s)
why
no
acti
on w
as ta
ken.
The
C
ompl
aint
s R
egis
ter
shal
l be
m
ade
avai
labl
e fo
r
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L ‐
to
reco
rd
com
plai
nts
usin
g C
onsu
ltat
ion
Man
ager
.
CB
I ‐
det
ails
(a)
‐
(d)
of
any
com
plai
nts
rece
ived
d
irec
tly
by C
BI.
Nee
d t
o be
re
cord
ed
and
pa
ssed
on
to A
GL
w
ithi
n 4
hou
rs.
CB
I to
cl
ose
out
acti
ons
resu
ltin
g fr
om
com
plai
nts
in ti
mel
y fa
shio
n.
IO
Ope
n
Req
uire
men
ts
incl
ude
in
CE
MP
Se
ctio
n 5.
2.3
Com
plai
nts
Han
dlin
g w
hich
was
sub
mit
ted
to
DoP
I fo
r ap
prov
al
Com
mun
ity
Eng
agem
ent
Pla
n re
fers
to
Sect
ion
6.5.
5 fo
r co
mpl
aint
pro
toco
l
CE
MP
ref
ers
to S
ecti
on 5
.2.3
Pro
toco
l is
for
CB
I to
com
plet
e C
ompl
aint
s fo
rm a
nd
forw
ard
to
AG
L f
or i
nclu
sion
in
Com
plai
nts
Dat
abas
e.
Scre
en
shot
s of
co
mpl
aint
s d
atab
ase
conf
irm
al
l re
quir
emen
ts a
re r
ecor
ded
in th
e ca
se o
f a c
ompl
aint
.
IO –
CB
I re
cord
of
cont
act
form
to
be m
odif
ied
to
incl
ude
mea
ns
by
whi
ch
cont
act
was
m
ade
and
pr
ovis
ion
to
com
men
t if
no
ac
tion
to
be
m
ade
in
rela
tion
to a
com
plai
nt.
Nil
com
plai
nts
rece
ived
to d
ate
for
the
Pro
ject
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A28
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
insp
ecti
on b
y th
e D
irec
tor-
Gen
eral
upo
n re
ques
t.
B53
T
he
Pro
pone
nt
shal
l pr
ovid
e an
in
itia
l re
spon
se
to
any
com
plai
nts
mad
e in
re
lati
on
to
the
proj
ect
du
ring
co
nstr
uct
ion
or o
pera
tion
wit
hin
48 h
ours
of
the
com
plai
nt
bein
g m
ade.
The
res
pons
e an
d a
ny s
ubse
quen
t ac
tion
tak
en
shal
l be
rec
ord
ed i
n ac
cord
ance
wit
h co
ndit
ion
B52
. A
ny
subs
equ
ent
det
aile
d r
espo
nse
or a
ctio
n is
to
be p
rovi
ded
w
ithi
n tw
o w
eeks
, or
as
ot
herw
ise
agre
ed
by
the
com
plai
nant
/ D
irec
tor-
Gen
eral
.
Pre
-con
stru
ctio
n
Con
stru
ctio
n
AG
L ‐
to r
espo
nd
CB
I ‐
to
prov
ide
assi
stan
ce/
info
rmat
ion
in p
repa
ring
re
spon
ses
to
com
plai
nts
Com
plia
nce
Ope
n
Sect
ion
5.2.
3 C
ompl
aint
s H
and
ling
of C
EM
P i
ndic
ates
al
l com
plai
nts
to b
e re
spon
ded
wit
hin
48 h
ours
:
te
leph
one
com
plai
nts:
ve
rbal
re
spon
se
is
mad
e w
ithi
n 4
hou
rs;
w
ritt
en c
orre
spon
den
ce:
ackn
owle
dge
d w
ithi
n 48
ho
urs
and
a w
ritt
en r
espo
nse
wit
hin
5 d
ays;
E
mai
l or
fax
: su
bmis
sion
ack
now
led
ged
wit
hin
24
hou
rs
Nil
com
plai
nts
rece
ived
to d
ate
for
the
Pro
ject
CO
MP
LIA
NC
E T
RA
CK
ING
PR
OG
RA
M
B54
P
rior
to
th
e co
mm
ence
men
t co
nstr
uct
ion,
th
e P
ropo
nent
sh
all
dev
elop
an
d
impl
emen
t a
Com
plia
nce
Tra
ckin
g P
rogr
amm
e, t
o tr
ack
com
plia
nce
wit
h th
e re
quir
emen
ts o
f th
is a
ppro
val
du
ring
the
con
stru
ctio
n an
d o
pera
tion
of
the
proj
ect a
nd s
hall
incl
ude,
but
not
nec
essa
rily
be
limit
ed to
:
(a)
prov
isio
ns f
or p
erio
dic
rep
orti
ng o
f co
mpl
ianc
e st
atus
to
the
Dir
ecto
r-G
ener
al
incl
udin
g at
le
ast
prio
r to
th
e co
mm
ence
men
t of
con
stru
ctio
n of
the
pro
ject
, pr
ior
to t
he
com
men
cem
ent
of o
pera
tion
of
the
proj
ect
and
wit
hin
two
year
s of
ope
rati
on c
omm
ence
men
t;
(b)
a pr
ogra
mm
e fo
r in
dep
end
ent
envi
ronm
enta
l au
dit
ing
in
acco
rdan
ce w
ith
AS/
NZ
ISO
190
11:2
003
- G
uid
elin
es f
or
Qua
lity
and
/or
E
nvir
onm
enta
l M
anag
emen
t Sy
stem
s A
udit
ing;
(c)
proc
edu
res
for
rect
ifyi
ng a
ny n
on-c
ompl
ianc
e id
enti
fied
d
uri
ng e
nvir
onm
enta
l au
dit
ing
or r
evie
w o
f com
plia
nce;
(d)
mec
hani
sms
for
reco
rdin
g en
viro
nmen
tal
inci
den
ts a
nd
Pre
-con
stru
ctio
n A
GL
‐
esta
blis
h pr
oces
ses/
proc
edu
res
to
ensu
re
com
plia
nce
CB
I ‐
to
prov
ide
info
rmat
ion
as
requ
ired
, im
plem
ent
corr
ecti
ve
acti
ons
as r
equi
red
.
Com
plia
nce
Ope
n
Com
plia
nce
Tra
ckin
g P
rogr
am (
Doc
umen
t N
o: N
GSF
-A
GL
-NA
S-P
M-P
LN
-001
6)
Com
plia
nce
Tra
ckin
g R
egis
ter
(Doc
umen
t N
o: N
GSF
-W
PP
M-N
AS-
PM
-RE
G-0
004-
XL
S)
The
rel
evan
t se
ctio
n of
the
CT
P w
hich
ad
dre
sses
the
re
quir
emen
ts a
re a
s fo
llow
s:
a) S
ecti
on 2
.1 –
rep
orti
ng t
o be
com
plet
ed e
very
six
m
onth
s (f
irst
rep
ort
to c
over
per
iod
28
Au
gust
201
2 to
28
Feb
ruar
y 20
13)
b) S
ecti
on 2
.2 –
pro
gram
me
incl
ud
es 3
mon
thly
au
dit
s by
ER
. Fir
st a
ud
it d
ue
to b
e co
mpl
eted
Nov
embe
r 20
12
(act
ual
dat
e 27
th N
ovem
ber
2012
)
c)
Sect
ion
2.3
– R
efer
s to
Se
ctio
n 6.
5 an
d
7.2
of
App
end
ix A
. Env
iron
men
t A
ctio
n R
egis
ter
incl
udes
all
acti
ons
aris
ing
from
sit
e in
spec
tion
s, a
udit
s.
d)
Sect
ion
2.4
– R
efer
s to
Sec
tion
6 o
f A
ppen
dix
A.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A29
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
acti
ons
take
n in
res
pons
e to
thos
e in
cid
ents
;
(e)
prov
isio
ns f
or r
epor
ting
env
iron
men
tal
inci
den
ts t
o th
e D
irec
tor-
Gen
eral
du
ring
con
stru
ctio
n an
d o
pera
tion
; and
(f)
prov
isio
ns f
or e
nsu
ring
all
empl
oyee
s, c
ontr
acto
rs a
nd
sub-
cont
ract
ors
are
awar
e of
, an
d
com
ply
wit
h,
the
cond
itio
ns
of
this
ap
prov
al
rele
vant
to
th
eir
resp
ecti
ve
acti
viti
es.
Incl
ud
es
need
to
re
port
to
A
GL
w
ithi
n 24
ho
urs
ve
rbal
ly a
nd w
ithi
n 48
hou
rs a
wri
tten
rep
ort.
Sew
age
over
flow
w
as
repo
rted
ve
rbal
ly
and
in
em
ail
form
w
ithi
n sp
ecif
ied
tim
efra
mes
to A
GL
.
e) S
ecti
on 2
.5 -
Ver
bal
advi
ce w
ill b
e pr
ovid
ed a
s so
on
as p
ract
icab
le a
fter
AG
L b
ecom
es a
war
e of
the
inci
den
t an
d w
ritt
en a
dvi
ce w
ill b
e pr
ovid
ed w
ithi
n se
ven
(7)
wor
king
d
ays.
W
ritt
en
noti
fica
tion
of
th
e se
wag
e ov
erfl
ow
whi
ch
occu
rred
on
15
O
ctob
er
2012
w
as
repo
rted
via
em
ail t
o D
oPI o
n 16
Oct
ober
201
2.
The
E
R
is
noti
fied
im
med
iate
ly
of
all
inci
den
ts
requ
irin
g re
port
ing
to a
ny a
genc
ies
or t
he D
irec
tor-
Gen
eral
an
d
is
mad
e of
aw
are
of
min
or
inci
den
ts
thro
ugh
regu
lar
site
and
com
plia
nce
insp
ecti
ons.
f) S
ecti
on 2
.6 -
Pro
ject
Req
uir
emen
ts R
egis
ter
Doc
No.
N
GSF
-WP
PM
-NA
S-P
M-R
EG
-000
4 –
lists
req
uir
emen
ts
and
sta
keho
lder
res
pons
ible
CO
ST
RU
CT
ION
EN
VIR
ON
ME
NT
AL
MA
NA
GE
ME
NT
Env
iron
men
tal R
epre
sent
ativ
e
B55
P
rior
to
th
e co
mm
ence
men
t of
pr
e-co
nstr
uct
ion
or
cons
tru
ctio
n ac
tivi
ties
, the
Pro
pone
nt s
hall
nom
inat
e fo
r th
e ap
prov
al o
f th
e D
irec
tor-
Gen
eral
a s
uita
bly
qual
ifie
d a
nd
expe
rien
ced
E
nvir
onm
enta
l R
epre
sent
ativ
e(s)
w
ho
is
ind
epen
den
t of
th
e d
esig
n,
cons
tru
ctio
n an
d
oper
atio
n pe
rson
nel.
The
Pro
pone
nt s
hall
enga
ge t
he E
nvir
onm
enta
l R
epre
sent
ativ
e(s)
pr
ior
to
cons
tru
ctio
n u
ntil
at
leas
t si
x m
onth
s af
ter
com
men
cem
ent
of o
pera
tion
, or
as
othe
rwis
e ag
reed
by
the
Dir
ecto
r-G
ener
al.
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
The
Env
iron
men
tal
Rep
rese
ntat
ive
(Meg
an M
cLac
hlan
) ha
s be
en
appr
oved
by
th
e D
irec
tor‐
Gen
eral
on
25
/06
/20
12.
The
al
tern
ate
ER
(H
amis
h C
ampb
ell)
ha
s be
en
appr
oved
by
the
Dir
ecto
r-G
ener
al o
n 31
/07
/20
12.
Alt
erna
te E
R H
amis
h C
ampb
ell
repl
aced
by
Will
Elli
s an
d
appr
oved
by
D
oPI
in
corr
espo
nden
ce
dat
ed
29/
11/
2012
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A30
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Con
stru
ctio
n ac
tivi
ties
com
men
ced
27
Au
gust
201
2
Con
stru
ctio
n E
nvir
onm
ent
Man
agem
ent
Pla
n
B56
T
he P
ropo
nent
sha
ll pr
epar
e an
d i
mpl
emen
t a
Con
stru
ctio
n E
nvir
onm
enta
l M
anag
emen
t P
lan
(CE
MP
) to
ou
tlin
e en
viro
nmen
tal
man
agem
ent
prac
tice
s an
d p
roce
du
res
to b
e fo
llow
ed d
urin
g co
nstr
ucti
on o
f th
e pr
ojec
t. T
he P
lan
shal
l be
sha
ll be
con
sist
ent
wit
h th
e G
uid
elin
e fo
r th
e P
repa
rati
on
of E
nvir
onm
enta
l M
anag
emen
t P
lans
(D
IPN
R,
2004
or
its
late
st r
evis
ion)
. T
he P
lan
shal
l be
pre
pare
d i
n co
nsul
tati
on
wit
h C
ounc
ils,
NO
W
and
H
WC
an
d
incl
ude,
bu
t no
t ne
cess
arily
be
limit
ed to
:
(a)
a d
escr
ipti
on o
f al
l rel
evan
t act
ivit
ies
to b
e u
nder
take
n on
th
e si
te d
uri
ng c
onst
ruct
ion
incl
ud
ing
an in
dic
atio
n of
sta
ges
of c
onst
ruct
ion,
whe
re r
elev
ant;
(b)
iden
tifi
cati
on o
f th
e po
tent
ial
for
cum
ulat
ive
impa
cts
wit
h ot
her
cons
tru
ctio
n ac
tivi
ties
occ
urri
ng i
n th
e vi
cini
ty
and
how
suc
h im
pact
s w
ould
be
man
aged
;
(c)
det
ails
of
an
y co
nstr
uct
ion
site
s an
d
mit
igat
ion,
m
onit
orin
g,
man
agem
ent
and
re
habi
litat
ion
mea
sure
s sp
ecif
ic to
the
site
com
pou
nd(s
) tha
t wou
ld b
e im
plem
ente
d;
(d)
stat
uto
ry a
nd o
ther
obl
igat
ions
tha
t th
e P
ropo
nent
is
requ
ired
to
fulf
il d
urin
g co
nstr
ucti
on i
nclu
din
g al
l re
leva
nt
appr
oval
s,
cons
ulta
tion
s an
d
agre
emen
ts
requ
ired
fr
om
auth
orit
ies
and
oth
er s
take
hold
ers,
and
key
leg
isla
tion
and
p
olic
ies;
(e)
evid
ence
of
cons
ulta
tion
wit
h re
leva
nt p
ublic
aut
hori
ties
re
quir
ed u
nder
thi
s co
ndit
ion
and
how
iss
ues
rais
ed b
y th
e ag
enci
es h
ave
been
ad
dre
ssed
in th
e pl
an;
(f)
a d
escr
ipti
on o
f th
e ro
les
and
res
pons
ibili
ties
for
all
rele
vant
em
ploy
ees
invo
lved
in
th
e co
nstr
uct
ion
of
the
Pre
-con
stru
ctio
n C
BI (
a-c
and
f-j)
(d)
– C
BI/
AG
L a
s pe
r Sc
hed
ule
8 o
f A
gree
men
t
Com
plia
nce
Clo
sed
– C
BI
Con
stri
ctio
n E
nvir
onm
ent
Man
agem
ent
Pla
n se
nt t
o D
oPI
elec
tron
ical
ly o
n 23
Ju
ly 2
012
wit
h ha
rd c
opie
s se
nt v
ia m
ail w
ith
lett
er d
ated
31
July
201
2
Em
ails
to
Por
t St
ephe
ns C
ounc
il d
ated
8 A
ugu
st 2
012.
C
EM
P s
ent t
o P
SC 2
4 Ju
ly 2
012,
to N
OW
24
July
201
2
a)
Sect
ion
2.7
Pro
ject
Sch
edu
le
b)
Sect
ion
5.4
Mon
itor
ing
and
Rev
iew
c)
Sect
ion
5.4
Mon
itor
ing
and
Rev
iew
and
Sec
tion
5.5
In
cid
ent M
anag
emen
t
d)
Sect
ion
3: L
egis
lati
ve a
nd O
ther
Req
uir
emen
ts
e)
Sect
ion
5.2.
1: C
onsu
ltat
ion
for
CE
MP
f)
Sect
ion
4.4:
Rol
es a
nd R
espo
nsib
iliti
es
g)
Sect
ion
5.4
Mon
itor
ing
and
Rev
iew
and
Sec
tion
5.5
In
cid
ent M
anag
emen
t
h)
The
C
EM
P
and
as
soci
ated
su
b pl
ans,
en
viro
nmen
tal w
ork
met
hod
sta
tem
ents
i)
Sect
ion
5.2.
3 C
onsu
ltat
ion
wit
h St
akeh
old
ers
and
C
omm
unit
y E
ngag
emen
t Pla
n
j) Se
ctio
n 4.
3.4
EW
MS
and
A
ppen
dix
A
8:
EW
MS
Mat
rix
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A31
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
proj
ect
incl
udin
g re
leva
nt t
rain
ing
and
ind
ucti
on p
rovi
sion
s fo
r en
suri
ng
that
al
l em
ploy
ees,
co
ntra
ctor
s an
d
sub-
cont
ract
ors
are
awar
e of
thei
r en
viro
nmen
tal a
nd c
ompl
ianc
e ob
ligat
ions
und
er th
ese
cond
itio
ns o
f app
rova
l;
(g)
det
ails
of
ho
w
the
envi
ronm
enta
l pe
rfor
man
ce
of
cons
tru
ctio
n w
ould
be
mon
itor
ed,
and
wha
t ac
tion
s w
ould
be
ta
ken
to
add
ress
id
enti
fied
po
tent
ial
adve
rse
envi
ronm
enta
l im
pact
s;
(h)
spec
ific
con
sid
erat
ion
of r
elev
ant
mea
sure
s to
ad
dre
ss
any
requ
irem
ents
id
enti
fied
in
the
doc
um
ents
ref
erre
d t
o un
der
con
dit
ion
A1
of th
is a
ppro
val;
(i)
a co
mpl
aint
s ha
ndlin
g pr
oced
ure
du
ring
con
stru
ctio
n as
id
enti
fied
in c
ond
itio
ns B
51 to
B53
; and
(j) a
mat
rix
of c
onst
ruct
ion
wor
k m
etho
d s
tate
men
ts (
or
sim
ilar)
to
be p
repa
red
and
the
ant
icip
ated
lev
el o
f ri
sk
asso
ciat
ed w
ith
each
to b
e d
eter
min
ed.
The
Con
stru
ctio
n E
nvir
onm
enta
l M
anag
emen
t P
lan
shal
l be
su
bmit
ted
for
the
app
rova
l of
the
Dir
ecto
r-G
ener
al n
o la
ter
than
one
mon
th p
rior
to
the
com
men
cem
ent
of r
elev
ant
cons
truc
tion
wor
ks a
ssoc
iate
d w
ith
the
proj
ect,
or w
ithi
n su
ch
less
er
peri
od
othe
rwis
e ag
reed
by
th
e D
irec
tor-
G
ener
al.
Con
stru
ctio
n w
orks
sh
all
not
com
men
ce
unt
il w
ritt
en a
ppro
val
of t
he C
EM
P h
as b
een
rece
ived
fro
m t
he
Dir
ecto
r-G
ener
al.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A32
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
B57
a A
s pa
rt o
f th
e C
onst
ruct
ion
Env
iron
men
tal
Man
agem
ent
Pla
n re
quir
ed u
nder
con
dit
ion
B56
of
this
app
rova
l, th
e P
ropo
nent
sha
ll pr
epar
e an
d im
plem
ent t
he fo
llow
ing:
(a)
a Fl
ora
and
Fa
una
M
anag
emen
t P
lan,
pr
epar
ed
in
cons
ult
atio
n w
ith
the
rele
vant
Cou
ncil
and
wit
h re
fere
nce
to
the
OE
H r
equ
irem
ents
, to
ou
tlin
e m
easu
res
to p
rote
ct a
nd
min
imis
e lo
ss o
f na
tive
veg
etat
ion
and
nat
ive
fau
na h
abit
at
as a
res
ult
of
cons
tru
ctio
n of
the
pro
ject
. T
he P
lan
shal
l in
clud
e, b
ut n
ot n
eces
sari
ly b
e lim
ited
to:
(i)
plan
s sh
owin
g te
rres
tria
l ve
geta
tion
co
mm
unit
ies;
im
port
ant
flor
a an
d f
auna
hab
itat
are
as;
loca
tion
s w
here
E
EC
s, n
ativ
e gr
asse
s ar
e to
be
clea
red
. T
he p
lans
sha
ll al
so
iden
tify
veg
etat
ion
adjo
inin
g th
e si
te w
here
thi
s co
ntai
ns
impo
rtan
t ha
bita
t ar
eas
and
/or
th
reat
ened
sp
ecie
s,
popu
lati
ons
or e
colo
gica
l com
mu
niti
es;
(ii)
met
hod
s to
man
age
impa
cts
on f
lora
and
fau
na s
peci
es
and
thei
r ha
bita
t whi
ch m
ay b
e d
irec
tly
or in
dir
ectl
y af
fect
ed
by t
he p
roje
ct,
such
as
loca
tion
of
fenc
ing,
pro
ced
ure
s fo
r ve
geta
tion
cl
eari
ng
or
soil
rem
oval
/st
ockp
iling
an
d
proc
edur
es f
or l
ocat
ing
hollo
ws
or i
nsta
lling
nes
ting
box
es
and
man
agin
g w
eed
s;
(iii)
pro
ced
ures
to
accu
rate
ly d
eter
min
e th
e to
tal
area
, ty
pe
and
con
dit
ion
of v
eget
atio
n co
mm
uni
ty to
be
clea
red
; and
(iv)
a p
roce
du
re t
o re
view
man
agem
ent
met
hod
s w
here
the
y ar
e fo
und
to b
e in
adeq
uat
e
Pre
-con
stru
ctio
n C
BI
Com
plia
nce
Clo
sed
– C
BI
Flor
a an
d F
auna
Man
agem
ent S
ub
Pla
n
a)
Em
ail d
ate
8 A
ugu
st 2
012
to P
ort
Step
hens
Cou
ncil
re F
auna
Hol
low
Man
agem
ent.
Mee
ting
2 A
ugus
t d
iscu
ssin
g al
l en
viro
nmen
tal
com
mit
men
ts.
Em
ail
31 J
uly
201
2 w
ith
FFM
SP a
ttac
hed
to
PSC
. O
ffse
t st
rate
gy a
lso
sent
thro
ugh
to P
SC
i. Fi
gure
1 i
nclu
des
eco
logi
cal
com
mun
itie
s, F
igur
e 2
spec
ies
loca
tion
s fo
r pr
ojec
t are
a an
d s
urro
und
s
ii.
Sect
ion
3.2,
Sec
tion
4.1
App
end
ix B
iii.
Sect
ion
2.0
iv.
CE
MP
Sec
tion
4.0
B57
b (b
) a
Cu
ltu
ral
Her
itag
e M
anag
emen
t P
lan,
dev
elop
ed i
n co
nsu
ltat
ion
wit
h re
gist
ered
loca
l Abo
rigi
nal s
take
hold
ers,
to
outl
ine
mit
igat
ion
and
man
agem
ent
stra
tegi
es f
or i
tem
s of
he
rita
ge
sign
ific
ance
th
at
may
be
un
cove
red
d
urin
g co
nstr
uct
ion
of th
e pr
ojec
t;
Pre
-con
stru
ctio
n C
BI
Com
plia
nce
Clo
sed
– C
BI
Cul
tura
l Her
itag
e M
anag
emen
t Sub
Pla
n
Cor
resp
ond
ence
re
ceiv
ed
from
N
ur
Ru
n G
ee
12
Sept
embe
r 20
11 c
onfi
rmin
g re
view
of
dra
ft r
epor
t w
ith
nil c
omm
ents
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A33
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
Cor
resp
ond
ence
re
ceiv
ed
form
M
ur-
Roo
-Ma
8 Se
ptem
ber
2011
ack
now
led
ging
rev
iew
of d
raft
rep
ort.
Cor
resp
ond
ence
rec
eive
d f
orm
AT
OA
C (
Aw
abak
al)
20
Sept
embe
r 20
11 a
ckno
wle
dgi
ng r
ecei
pt o
f d
raft
rep
ort.
Rec
omm
end
ed t
hat
grou
ps a
ttai
ned
sit
e w
hen
curr
ent
den
se v
eget
atio
n la
yer
rem
oved
as
wel
l as
a fe
w m
inor
ed
its
whi
ch a
re n
ow in
clud
ed in
pla
n.
CH
MSP
in
clu
des
pr
otoc
ol
to
be
follo
wed
d
uri
ng
clea
ring
and
als
o if
une
xpec
ted
fin
d e
ncou
nter
ed a
fter
cl
eari
ng w
orks
.
B57
c (c
) a
Gro
und
wat
er
Man
agem
ent
Pla
n pr
epar
ed
in
cons
ult
atio
n w
ith
NO
W a
nd H
WC
to
det
ail
how
im
pact
s to
gr
ound
wat
er
will
be
av
oid
ed
and
m
itig
ated
d
urin
g th
e co
nstr
uct
ion
and
ope
rati
on o
f th
e pr
ojec
t. T
he P
lan
shal
l in
tegr
ate
dat
a fr
om g
rou
ndw
ater
mon
itor
ing
und
erta
ken
as
requ
ired
by
cond
itio
n B
25 t
o se
t ba
selin
e an
d t
o es
tabl
ish
targ
ets
and
thr
esho
lds
for
the
du
rati
on o
f th
e pr
ojec
t. A
co
ntin
genc
y pl
an
shal
l be
d
evel
oped
as
pa
rt
of
the
Gro
und
wat
er
Man
agem
ent
Pla
n in
th
e ev
ent
that
gr
ound
wat
er i
s co
mpr
omis
ed d
urin
g co
nstr
ucti
on,
such
as
thro
ugh
dra
wd
own
from
hor
izon
tal d
irec
tion
al d
rilli
ng;
Pre
-con
stru
ctio
n C
BI
Com
plia
nce
Clo
sed
– C
BI
Gro
und
wat
er M
anag
emen
t Su
b P
lan
– se
nt i
n em
ail
to
DoP
I dat
ed 1
1 Ju
ly 2
012
Em
ail
from
H
WC
31
O
ctob
er
2011
in
dic
atin
g sa
tisf
acti
on w
ith
plan
.
Em
ail
to
DoP
I 9
Au
gust
20
12 w
ith
corr
espo
nden
ce
atta
ched
end
orsi
ng G
MSP
from
NO
W
Ref
er C
ond
itio
n B
25
B57
d
(d)
a Su
rfac
e W
ater
M
anag
emen
t P
lan
prep
ared
in
co
nsu
ltat
ion
wit
h N
OW
, H
WC
an
d
the
Por
t St
ephe
ns
Cou
ncil
(par
ticu
larl
y in
re
gard
to
st
orm
wat
er
bein
g co
nvey
ed f
rom
the
gas
sto
rage
fac
ility
sit
e to
Old
Pun
t R
oad
), to
det
ail
how
sur
face
wat
er a
nd s
torm
wat
er w
ill b
e m
anag
ed o
n th
e si
te d
uri
ng c
onst
ruct
ion
and
ope
rati
on o
f th
e pr
ojec
t. T
he p
lan
shal
l in
clud
e d
etai
led
des
ign
of a
ll w
ater
cour
se
cros
sing
s,
culv
erts
an
d
in-s
trea
m
wor
ks,
a pr
ogra
mm
e to
mon
itor
and
man
age,
and
not
ific
atio
n an
d
Pre
-con
stru
ctio
n
Con
stru
ctio
n
CB
I
Oth
er
Com
plia
nce
Clo
sed
– C
BI
Surf
ace
Wat
er M
anag
emen
t Su
b P
lan
– se
nt i
n em
ail
to
DoP
I dat
ed 1
1 Ju
ly 2
012
Em
ail
from
H
WC
31
O
ctob
er
2011
in
dic
atin
g sa
tisf
acti
on w
ith
plan
.
Em
ail
to
DoP
I 9
Au
gust
20
12 w
ith
corr
espo
nden
ce
atta
ched
end
orsi
ng G
MSP
from
NO
W
Ad
dit
iona
l SW
MSP
to
be d
evel
oped
for
pip
elin
e w
orks
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A34
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
mit
igat
ion
of i
den
tifi
ed i
mpa
cts
of w
ater
cour
se c
ross
ings
, cu
lver
ts a
nd i
nstr
eam
cro
ssin
gs. I
n pa
rtic
ula
r, t
he d
esig
n fo
r th
e ho
rizo
ntal
dir
ecti
onal
dri
lling
und
er t
he H
unte
r R
iver
sh
all
be p
rovi
ded
, in
clud
ing
an a
sses
smen
t of
the
dep
th o
f sc
our
for
the
Hu
nter
Riv
er, a
nd d
emon
stra
tion
that
the
HD
D
will
be
und
erta
ken
belo
w t
his
dep
th.
The
pla
n sh
all
also
in
clu
de
use
of
appr
opri
atel
y si
zed
sto
rmw
ater
con
trol
s, i
n ac
cord
ance
wit
h M
anag
ing
Urb
an S
torm
wat
er:
Soils
and
C
onst
ruct
ion
(Lan
dco
m,
2004
). T
he
plan
sh
all
incl
ud
e sp
ecif
ic m
easu
res
to a
void
sed
imen
t-la
den
sto
rmw
ater
fro
m
ente
ring
the
Hu
nter
Riv
er,
a m
onit
orin
g pr
ogra
mm
e fo
r st
orm
wat
er l
eavi
ng t
he s
ite
(inc
lud
ing
the
requ
irem
ents
for
in
spec
tion
rep
orts
req
uire
d u
nder
con
dit
ion
B26
) d
etai
ls o
f ho
w
hyd
rost
atic
te
st
wat
er
wou
ld
be
dis
pose
d,
and
m
easu
res
to m
itig
ate
cont
amin
atio
n of
soi
ls a
nd w
ater
whi
ch w
ill in
clud
e ri
ver
cros
sing
.
B57
e (e
) a
Floo
d
Em
erge
ncy
Res
pons
e P
lan
prep
ared
in
co
nsu
ltat
ion
wit
h an
d t
o m
eet
the
reas
onab
le r
equ
irem
ents
of
New
cast
le C
ity
Cou
ncil
and
Por
t Ste
phen
s Sh
ire
Cou
ncil;
Pre
-con
stru
ctio
n C
BI
Com
plia
nce
Clo
sed
– C
BI
Floo
d E
mer
genc
y R
espo
nse
Man
agem
ent
Sub
Pla
n se
nt
to D
oPI 2
4 Ju
ly 2
012
Cor
resp
ond
ence
wit
h P
SC d
ated
26
July
201
2, E
mai
l in
dic
atin
g pl
an s
ent
thro
ugh
27
July
201
2. E
mai
l d
ated
16
Au
gust
201
2 ch
asin
g u
p if
any
com
men
ts
B57
f (f
) a
Noi
se
Man
agem
ent
Pla
n to
m
anag
e no
ise
impa
cts
dur
ing
cons
truc
tion
an
d
to
iden
tify
al
l fe
asib
le
and
re
ason
able
no
ise
mit
igat
ion
mea
sure
s.
The
P
lan
shal
l in
clud
e, b
ut n
ot n
eces
sari
ly b
e lim
ited
to:
(i)
det
ails
of
co
nstr
uct
ion
acti
viti
es
and
an
in
dic
ativ
e sc
hed
ule
for
cons
truc
tion
wor
ks;
(ii)
id
enti
fica
tion
of
co
nstr
uct
ion
acti
viti
es
that
ha
ve
the
pote
ntia
l to
gen
erat
e no
ise
impa
cts
on s
urro
und
ing
land
us
es, p
arti
cula
rly
resi
den
tial
are
as;
(iii)
d
etai
ls
of
the
requ
irem
ents
fo
r N
oise
Im
pact
St
atem
ent(
s) f
or d
iscr
ete
wor
k ar
eas,
inc
lud
ing
cons
truc
tion
Pre
-con
stru
ctio
n C
BI
(i‐iv
)&
AG
L
(v) &
(vi)
C
ompl
ianc
e
Ope
n
Noi
se a
nd V
ibra
tion
Man
agem
ent S
ub
Pla
n
i. T
able
2-
3 –
Sche
dul
e cu
rren
tly
alig
ns
wit
h ac
tual
wor
ks
ii.
Sect
ion
2.0,
Tab
le 2
-6 l
ists
mai
n co
nstr
uct
ion
acti
viti
es a
nd p
red
icte
d n
oise
lev
els
at v
ario
us
dis
tanc
es fr
om s
ite.
iii.
Sect
ion
2,
Tab
le
2-6.
As
nil
acti
viti
es
are
pred
icte
d t
o im
pact
the
sen
siti
ve r
ecep
tors
the
re
quir
emen
ts f
or N
oise
Im
pact
Sta
tem
ents
is
not
cons
ider
ed n
eces
sary
for
the
Pro
ject
. Sp
ot
chec
ks w
ill b
e co
nduc
ted
dur
ing
cons
truc
tion
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A35
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
site
com
poun
ds;
(iv)
id
enti
fy a
ll se
nsit
ive
rece
iver
s w
here
con
stru
ctio
n no
ise
goal
s ar
e pr
edic
ted
to b
e ex
ceed
ed;
(v)
det
ail w
hat
reas
onab
le a
nd f
easi
ble
acti
ons
and
mea
sure
s w
ould
be
impl
emen
ted
to m
inim
ise
nois
e im
pact
s;
(vi)
co
nsul
tati
on
wit
h th
e ow
ner/
occu
pier
s of
se
nsit
ive
rece
iver
s (i
nclu
din
g re
ceiv
ers
R4
(Tom
ago
Vill
age
Car
avan
P
ark)
and
R5
(217
Mai
tlan
d R
oad
), w
here
con
stru
ctio
n no
ise
goal
s ar
e ex
pect
ed
to
be
exce
eded
, w
ith
the
aim
of
id
enti
fyin
g an
d i
mpl
emen
ting
rea
sona
ble
and
fea
sibl
e no
ise
mit
igat
ion
and
m
anag
emen
t m
easu
res,
in
clud
ing
whe
re
nece
ssar
y,
the
cons
ider
atio
n of
re
spit
e pe
riod
s an
d
alte
rnat
ive
acco
mm
odat
ion
arra
ngem
ents
;
(vii)
pr
oced
ures
fo
r no
tify
ing
sens
itiv
e re
ceiv
ers
of
cons
tru
ctio
n ac
tivi
ties
tha
t ar
e lik
ely
to a
ffec
t th
eir
nois
e am
enit
y,
as
wel
l as
pr
oced
ure
s fo
r d
ealin
g w
ith
and
re
spon
din
g to
noi
se c
ompl
aint
s;
(viii
) an
ou
t-of
-hou
rs
wor
k (O
OH
W)
prot
ocol
fo
r th
e as
sess
men
t, m
anag
emen
t an
d a
ppro
val
of w
orks
out
sid
e of
st
and
ard
con
stru
ctio
n ho
urs
as d
efin
ed u
nder
thi
s ap
prov
al,
incl
udin
g a
risk
as
sess
men
t pr
oces
s un
der
w
hich
th
e E
nvir
onm
enta
l R
epre
sent
ativ
e m
ay
appr
ove
out-
of-h
our
cons
tru
ctio
n ac
tivi
ties
dee
med
to
be o
f lo
w e
nvir
onm
enta
l ri
sk a
nd r
efer
hig
h ri
sk w
orks
for
the
Dir
ecto
r-G
ener
al’s
ap
prov
al.
The
O
OH
W
prot
ocol
sh
all
det
ail
stan
dar
d
asse
ssm
ent,
mit
igat
ion
and
no
tifi
cati
on
requ
irem
ents
fo
r hi
gh a
nd l
ow r
isk
out-
of-h
our
wor
ks,
and
det
ail
a st
and
ard
pr
otoc
ol f
or r
efer
ring
app
licat
ions
to
the
Dir
ecto
r-G
ener
al;
and
(ix)
a d
escr
ipti
on o
f ho
w t
he e
ffec
tive
ness
of
thes
e ac
tion
s an
d m
easu
res
wou
ld b
e m
onit
ored
dur
ing
the
prop
osed
to c
onfi
rm p
red
icte
d le
vels
.
iv.
Sect
ion
2.0,
Tab
le 2
-1.
Nil
sens
itiv
e re
ceiv
ers
are
pred
icte
d to
be
impa
cted
by
the
Pro
ject
v.
App
end
ix B
– a
ll ta
bles
vi.
Sect
ion
3.0,
App
end
ix B
. R
4 an
d R
5 ar
e no
t af
fect
ed b
y th
e cu
rren
t sta
ge o
f wor
ks.
vii.
App
end
ix B
Tab
le 8
-1
viii.
A
ppen
dix
B
–
Tab
le
8-2.
Ad
dit
iona
l pr
oced
ure
s u
nder
dev
elop
men
t d
escr
ibin
g ou
t of
hou
rs p
roto
col.
Noi
se M
anag
emen
t P
lan
to
be
resu
bmit
ted
to
D
oPI
for
appr
oval
an
d
OO
HW
pr
otoc
ol
to
be
sent
to
E
PA
fo
r ap
prov
al (E
PL
)
ix.
Noi
se
mon
itor
ing
freq
uen
cy,
loca
tion
s an
d
resu
lts
reco
rdin
g an
d r
epor
ting
inc
lud
ed i
n Se
ctio
n 5.
2 of
the
NM
SP.
Man
agem
ent
of a
ny
exce
edan
ces
are
dis
cuss
ed
in
Sect
ion
5.4.
B
asel
ine
mea
sure
men
ts
take
n at
ne
ares
t re
cept
or (
Hu
nter
Reg
ion
Bot
anic
al G
ard
ens)
d
uri
ng
peri
od
20-2
7 N
ovem
ber
2012
. Sp
ot
chec
ks
will
be
co
mpl
eted
th
roug
hout
co
nstr
uct
ion
as d
etai
led
in p
lan.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A36
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
wor
ks,
clea
rly
ind
icat
ing
how
oft
en t
his
mon
itor
ing
wou
ld
be c
ond
uct
ed,
the
loca
tion
s w
here
mon
itor
ing
wou
ld t
ake
plac
e, h
ow t
he r
esu
lts
of t
his
mon
itor
ing
wou
ld b
e re
cord
ed
and
rep
orte
d;
and
, if
any
exc
eed
ance
is
det
ecte
d,
how
any
no
n-co
mpl
ianc
e w
ould
be
rect
ifie
d;
B57
g (g
) a
det
aile
d A
cid
Sul
phat
e So
il M
anag
emen
t Pla
n pr
epar
ed
in c
onsu
ltat
ion
wit
h D
PI(
Aqu
atic
Hab
itat
Pro
tect
ion
Uni
t),
and
NO
W p
rior
to a
ny c
onst
ruct
ion
acti
vity
in a
reas
map
ped
as
Pot
enti
al A
cid
Sul
phat
e So
ils o
r A
ctua
l A
cid
Sul
phat
e So
ils.
The
pla
n sh
all
incl
ude
refe
renc
e to
the
wat
er q
ualit
y m
onit
orin
g pr
ogra
mm
e co
ntai
ned
in
the
Gro
und
wat
er a
nd
Surf
ace
Wat
er
Man
agem
ent
Pla
ns.
The
pl
an
shal
l be
pr
epar
ed in
acc
ord
ance
wit
h th
e A
cid
Sul
phat
e So
ils M
anua
l (A
SSM
C,
1998
). A
s pa
rt o
f th
e pl
an,
a C
onti
ngen
cy P
lan
to
dea
l w
ith
the
une
xpec
ted
dis
cove
ry o
f ac
tual
or
pote
ntia
l ac
id s
ulph
ate
soils
sha
ll be
pre
pare
d i
n co
nsu
ltat
ion
wit
h N
OW
;
Pre
-con
stru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
Rec
eive
d c
onfi
rmat
ion
emai
l fr
om S
cott
Car
ter
(Sen
ior
Con
serv
atio
n M
anag
er
- C
entr
al
Reg
ion,
A
quat
ic
Hab
itat
P
rote
ctio
n U
nit,
NSW
D
PI)
on
28
-Mar
-12
acce
ptin
g ad
equ
acy
of A
SS M
anag
emen
t Pla
n
Em
ail
wit
h A
SSM
SP a
ttac
hed
sen
t to
DP
I 22
Mar
ch
2012
, res
pons
e re
ceiv
ed fo
rm D
PI 2
8 M
arch
201
2
ASS
MSP
Tab
le 5
-2 r
efer
s to
ad
dit
iona
l m
onit
orin
g G
W
and
SW
. C
onti
ngen
cy
stat
es
to
stoc
kpile
m
ater
ial
sepa
rate
ly a
nd a
dvi
ce s
ough
t.
Sect
ion
4 an
d 5
det
ails
wha
t to
do
if A
SS o
r P
ASS
fou
nd
B57
h h)
a T
raff
ic M
anag
emen
t P
lan
to m
anag
e tr
affi
c co
nflic
ts t
hat
may
be
ge
nera
ted
d
uri
ng
cons
tru
ctio
n.
The
P
lan
shal
l ad
dre
ss t
he r
equ
irem
ents
of
the
rele
vant
roa
d a
uth
orit
y an
d
shal
l inc
lud
e, b
ut n
ot n
eces
sari
ly b
e lim
ited
to:
(i)
det
ails
of
how
con
stru
ctio
n of
the
proj
ect w
ill b
e m
anag
ed
in p
roxi
mit
y to
loca
l and
reg
iona
l roa
ds;
(ii)
det
ails
of
traf
fic
rout
es f
or h
eavy
veh
icle
s, i
nclu
din
g an
y ne
cess
ary
rout
e or
tim
ing
rest
rict
ion
for
over
size
d lo
ads;
(iii)
mea
sure
s to
min
imis
e an
d m
anag
e tr
affi
c no
ise;
(iv)
an
asse
ssm
ent o
f suf
fici
ent a
cces
s fo
r em
erge
ncy
vehi
cles
to
en
sure
th
e pr
opos
ed
traf
fic
arra
ngem
ents
m
eet
the
requ
irem
ents
det
aile
d i
n G
uid
elin
es f
or E
mer
genc
y V
ehic
le
Acc
ess
Pol
icy
No
4 (N
SW F
ire
Bri
gad
es, 2
010)
;
Pre
-con
stru
ctio
n C
BI
Com
plia
nce
Clo
sed
– C
BI
Tra
ffic
Man
agem
ent S
ub
Pla
n
i. Se
ctio
n 2.
8
ii.
App
end
ix A
iii.
Tab
le 9
-4
iv.
App
end
ix C
Tab
le 9
-3
v.
Sect
ion
1.6,
Sec
tion
2.0
vi.
App
end
ix B
vii.
Sect
ion
3.0
viii.
A
ppen
dix
C T
able
9-2
ix.
App
end
ix C
Tab
le 9
-2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504/FINAL/01 MARCH 2013
A37
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
(v)
dem
onst
rati
on
that
al
l st
atut
ory
resp
onsi
bilit
ies
wit
h re
gard
to r
oad
traf
fic
impa
cts
have
bee
n co
mpl
ied
wit
h;
(vi)
det
ails
of
mea
sure
s to
min
imis
e in
tera
ctio
ns b
etw
een
the
proj
ect
and
oth
er u
sers
of
the
road
s su
ch a
s th
e u
se o
f fe
ncin
g, li
ghts
, bar
rier
s, tr
affi
c d
iver
sion
s et
c;
(vii)
pro
ced
ures
for
inf
orm
ing
the
publ
ic w
here
any
roa
d
acce
ss w
ill b
e re
stri
cted
as
a re
sult
of t
he p
roje
ct;
(viii
) pr
oced
ures
to
man
age
cons
truc
tion
tra
ffic
to
ensu
re t
he
safe
ty o
f liv
esto
ck a
nd to
min
imis
e d
isru
ptio
n to
live
stoc
k;
(ix)
spe
ed li
mit
s to
be
obse
rved
alo
ng r
oute
s to
and
fro
m t
he
site
and
wit
hin
the
site
; and
(x)
det
ails
of
th
e ex
pect
ed
beha
viou
ral
requ
irem
ents
fo
r ve
hicl
e d
rive
rs t
rave
lling
to
and
fro
m t
he s
ite
and
wit
hin
the
site
.
x.
Sect
ion
3.2
Annex B
Audit Table - Statement of Commitments
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B1
Tab
le B
1 C
ompl
ianc
e A
sses
smen
t –S
tate
men
t of
Com
mit
men
ts
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7.1
Soi
ls
7.1.
1 So
il C
onta
min
atio
n
1 In
clud
e a
spill
res
pons
e pl
an i
n th
e em
erge
ncy
resp
onse
pl
an a
nd e
nsur
e th
at t
here
is
adeq
uate
spi
ll re
spon
se
equi
pmen
t sto
red
ons
ite.
Per
sonn
el w
ill b
e tr
aine
d o
n th
e em
erge
ncy
resp
onse
pla
n an
d c
orre
ct u
se o
f th
e sp
ill
resp
onse
equ
ipm
ent.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
Ref
er
App
end
ix
C
of
the
Pol
luti
on
Inci
den
t R
espo
nse
Man
agem
ent P
lan
All
vehi
cles
to
carr
y sp
ill k
its
wit
h sp
ot c
heck
s co
mpl
eted
by
C
BI
staf
f an
d
ER
d
urin
g si
te
insp
ecti
ons.
Spill
res
pons
e tr
aini
ng i
nclu
ded
in
Too
l bo
x ta
lk
13/
10/
2012
and
06/
11/
2012
SMSP
– T
able
8-1
2
2 E
nsur
e co
ncre
te m
ixer
s an
d p
ump
truc
ks a
re n
ot w
ashe
d
on-s
ite.
C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
27.0
2.12
- A
GL
req
ues
ted
cha
nge
to th
is (v
ia D
oPI)
to
en
able
on
site
w
asho
uts
w
ith
appr
opri
ate
cont
rols
to
be i
mpl
emen
ted
by
CB
I. A
ppro
ved
by
DoP
I 8 F
ebru
ary
2013
Con
cret
e w
asho
ut
proc
edu
res
incl
ud
ed
in
App
end
ix B
of
the
Was
te M
anag
emen
t Su
b-P
lan.
U
pdat
ed
Pro
ced
ure
se
nt
to
AG
L
23/
11/
2012
. H
WC
an
d
NO
W
cons
ult
atio
n –
appr
oved
23
/11
/20
12.
Let
ter
from
HW
C t
o D
oPI
dat
ed
22/
08/
20/
12 e
ndor
sing
pro
ced
ure
. E
mai
l fr
om
EP
A
sent
22
/11
/20
12
resp
ond
ing
to
upd
ated
pr
oced
ure
whi
ch w
ill a
llow
was
hing
on
-sit
e
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B2
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
3 St
ore
PA
SS c
apab
le o
f pr
oduc
ing
leac
hate
wit
hin
lined
bu
nds.
C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
ASS
MP
– r
efer
Tab
le 4
-1
SMSP
– r
efer
Tab
le 8
-6 a
nd T
able
8-8
Nil
PA
SS e
ncou
nter
ed to
dat
e.
4 C
onta
in e
xces
s co
nstr
ucti
on m
ater
ials
, d
rill
flui
ds
and
cu
ttin
gs u
sing
app
ropr
iate
met
hod
s su
ch a
s pl
asti
c-lin
ed
pits
, sk
ips
or h
old
ing
tank
s fo
r ap
prop
riat
e re
use
or
off-
site
dis
posa
l. H
DD
flu
ids
will
be
cont
aine
d w
ithi
n th
e bu
nded
HD
D w
ork
area
.
Con
stru
ctio
n –
Stag
e 2
CB
I N
A
Ope
n
Not
cur
rent
ly a
pplic
able
5 P
rovi
de
wor
kfor
ce
ind
ucti
ons
and
tr
aini
ng
to
ensu
re
pers
onne
l hav
e kn
owle
dge
of t
he c
orre
ct u
se o
f ref
uelli
ng
syst
ems
and
che
mic
al h
and
ling
proc
edur
es.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
– S
ecti
on 3
.2
Ref
uelli
ng i
nclu
ded
in
ind
ucti
on.
All
refu
ellin
g d
one
on
site
us
ing
mob
ile
refu
ellin
g tr
ucks
. SW
MS
for
refu
ellin
g ch
ecke
d.
Ref
uelli
ng
also
in
clu
de
in
War
d’s
SW
MS
for
Cle
arin
g an
d
Gru
bbin
g,
Bul
k E
arth
wor
ks,
Vib
ro
com
pact
ion
wor
ks
wit
h re
fuel
ling
and
as
soci
ated
co
ntro
ls
dis
cuss
ed.
Sit
e in
spec
tion
s in
dic
ate
any
pum
ps
cont
aini
ng
fuel
co
ntai
ned
w
ithi
n im
perv
iou
s co
ntai
ner.
6 R
estr
ict
vehi
cle
mov
emen
ts t
o se
aled
or
ded
icat
ed a
reas
an
d r
oad
way
s, a
s fa
r as
pra
ctic
al.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
– T
able
5-2
and
Tab
le 8
-8
Site
bo
und
arie
s d
elin
eate
d
wit
h pa
raw
ebbi
ng.
Roa
d c
onst
ruct
ion
und
erw
ay a
long
mai
n ac
cess
ro
ad, g
as tr
ack
road
com
plet
ed.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B3
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7 E
nsu
re d
rain
age
arou
nd v
ehic
le a
nd e
quip
men
t ser
vici
ng
area
s, w
orks
hops
and
che
mic
al s
tora
ge a
reas
is
dir
ecte
d
to s
umps
.
Con
stru
ctio
n C
BI
NA
Ope
n
SMSP
– T
able
8-2
Nil
vehi
cle
and
eq
uipm
ent
serv
icin
g ar
eas,
w
orks
hops
and
che
mic
al s
tora
ge a
reas
cur
rent
ly
on s
ite
8 U
se li
cens
ed c
ontr
acto
rs t
o co
llect
, tra
nspo
rt a
nd d
ispo
se
of h
azar
dou
s m
ater
ials
su
ch a
s w
aste
sol
vent
s, p
aint
s,
mer
cury
ab
sorp
tion
m
ediu
m
and
hy
dro
carb
ons
to
a lic
ense
d
off-
site
fa
cilit
y in
ac
cord
ance
w
ith
EP
A
guid
elin
es.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
WM
SP –
App
end
ix A
DG
&H
MM
SP –
Sec
tion
1.6
.2
Reg
ulat
ed w
aste
s tr
acke
d w
ith
cert
ific
ates
iss
ued
–
incl
udes
lice
nce
num
ber
of c
ontr
acto
r.
9 R
emov
e w
aste
wat
er a
nd s
ewag
e fr
om s
ite
by a
n E
PA
lic
ense
d
oper
ator
fo
r tr
eatm
ent
at
an
EP
A-a
ppro
ved
w
aste
wat
er tr
eatm
ent f
acili
ty.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
WM
SP –
Sec
tion
2.1
.3 a
nd A
ppen
dix
A.
Sew
age
colle
cted
by
Aff
ord
able
San
itat
ion
Serv
ice
– d
ocke
ts
rece
ived
an
d
doc
umen
ted
in
W
aste
R
egis
ter.
Fin
al d
ispo
sal l
ocat
ion
not t
rack
ed.
10
Reg
ula
rly
insp
ect
haza
rdou
s m
ater
ial
cont
ainm
ent
faci
litie
s to
ens
ure
thei
r in
tegr
ity.
C
onst
ruct
ion
CB
I N
A
Ope
n
SMSP
– T
able
5-2
DG
&H
MM
SP –
App
end
ix E
(wee
kly
chec
klis
t)
Nil
haza
rdou
s m
ater
ial
cont
ainm
ent
faci
litie
s cu
rren
tly
on s
ite
11
Ens
ure
pot
enti
al c
onta
min
ants
at
the
Hex
ham
rec
eivi
ng
stat
ion
are
stor
ed w
ithi
n fl
ood
-pro
tect
ed fa
cilit
ies.
C
onst
ruct
ion
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
CE
MP
- SM
SP
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B4
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
12
Per
form
an
asse
ssm
ent
(in
acco
rdan
ce w
ith
the
SEP
P 5
5 an
d
NE
PM
19
99)
to
conf
irm
th
e co
ntam
inan
t ty
pe,
conc
entr
atio
ns a
nd e
xten
t of
con
tam
inat
ion
in t
he e
vent
of
une
arth
ing
hist
oric
ally
con
tam
inat
ed s
oil.
Act
ion
will
th
en b
e u
nder
take
n in
acc
ord
ance
wit
h re
leva
nt E
PA
re
quir
emen
ts a
nd la
nd u
se c
rite
ria
to e
ithe
r re
med
iate
the
impa
cted
are
a or
rem
ove
the
cont
amin
ants
.
Pre
cons
truc
tion
C
BI
IO
Ope
n
SMSP
– T
able
5-2
and
Tab
le 4
-1
AG
L
to
pay
for
any
cost
s as
soci
ated
w
ith
cont
amin
atio
n (i
f fo
und
) -
CB
I m
ust
ha
ve
appr
opri
ate
man
agem
ent p
roce
sses
in p
lace
.
Tw
o fi
nds
of a
sbes
tos
du
ring
bu
lk e
arth
wor
ks –
re
mov
ed
by
licen
sed
co
ntra
ctor
. N
il ot
her
cont
amin
atio
n is
sues
to d
ate
IO –
inc
lud
e re
mov
ed a
sbes
tos
was
te d
etai
ls i
n w
aste
reg
iste
r
13
Inve
stig
ate
the
curr
ent
stat
us
of
the
exis
ting
se
wag
e m
anag
emen
t sy
stem
at
th
e w
este
rn
bou
ndar
y of
th
e H
exha
m r
ecei
ving
sta
tion
sit
e.
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
CE
MP
- SM
SP
14
Incl
ude
ind
ucti
ons
to c
onst
ruct
ion
pers
onne
l tha
t ou
tlin
e m
easu
res
on h
ow t
o d
eal
wit
h su
spec
ted
con
tam
inat
ed
soil.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
– S
ecti
on 3
.2
Une
xpec
ted
fi
nd
proc
edu
re
dev
elop
ed
whi
ch
incl
udes
con
tam
inat
ed s
oil.
Une
xpec
ted
so
il co
ntam
inat
ion
man
agem
ent
incl
uded
in in
duc
tion
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B5
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7.1.
2 So
il E
rosi
on
15
A
cons
tru
ctio
n su
rfac
e w
ater
m
anag
emen
t pl
an
that
d
escr
ibes
ero
sion
and
sed
imen
t co
ntro
l w
ill b
e pr
epar
ed
in
acco
rdan
ce
wit
h N
SW
DE
CC
M
anag
ing
Urb
an
Stor
mw
ater
: So
ils
and
C
onst
ruct
ion
– V
olu
me
2A
Inst
alla
tion
of
Serv
ices
200
8 (D
EC
C, 2
008)
and
Man
agin
g U
rban
St
orm
wat
er:
Soils
an
d
Con
stru
ctio
n (T
he
Blu
e B
ook)
(L
and
com
, 200
4). A
ll er
osio
n co
ntro
l and
dra
inag
e w
orks
will
be
des
igne
d i
n ac
cord
ance
wit
h U
rban
and
Se
dim
ent C
ontr
ol G
uid
elin
es (D
LW
C, 1
992)
.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Ope
n
Surf
ace
Wat
er M
gt S
ub
Pla
n (S
WM
SP)
and
Soi
l M
anag
emen
t Su
b P
lan
(SM
SP)
Silt
fen
ce i
nsta
lled
aro
und
bou
ndar
y of
pro
ject
w
orks
as
per
Figu
re 1
0-2
in t
he S
MSP
(P
rim
ary
Pro
ject
Are
a).
Div
ersi
on a
nd s
wal
e d
rain
s to
sti
ll be
ins
talle
d a
s pe
r Fi
gure
10-
3 in
the
SM
SP (
Acc
ess
Roa
d a
nd
Cor
rid
or)
7.1.
3 A
cid
Sulf
ate
Soil
s
16
Con
du
ct
a d
etai
led
A
SS
asse
ssm
ent
at
the
Hex
ham
re
ceiv
ing
stat
ion
site
pri
or t
o co
nstr
uct
ion
at t
his
site
to
det
erm
ine
the
natu
ral
buff
erin
g ca
paci
ty o
f th
e so
il an
d
asce
rtai
n th
at s
ite
wor
ks m
eet
the
requ
irem
ents
of
clau
se
25
of
the
New
cast
le
Loc
al
Env
iron
men
tal
Pla
n 20
03
(New
cast
le L
EP
200
3).
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
CE
MP
– A
SSM
SP
17
Min
imis
e d
istu
rban
ce a
nd e
xpos
ure
of A
SS.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
ASS
MSP
– T
able
4-1
AG
L s
tud
ies
to d
ate
ind
icat
e pr
obab
ility
is
low
of
enco
unte
ring
ASS
on
area
s C
BI
will
be
wor
king
, bu
t th
at i
f fo
und
, A
SS w
ill b
e d
ealt
wit
h in
sam
e m
anne
r as
fo
r pi
pelin
e ro
ute
w
here
A
SS
are
anti
cipa
ted
.
Nil
ASS
enc
ount
ered
to d
ate
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B6
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
18
Stor
e ex
cava
ted
A
SS
in
cond
itio
ns
that
si
mul
ate
its
natu
ral
stat
e, o
r tr
eat
and
sto
re a
way
fro
m w
ater
bod
ies
and
dra
inag
e lin
es.
Pre
cons
truc
tion
C
BI
NA
Ope
n
ASS
MSP
– T
able
4-1
Nil
ASS
enc
ount
ered
to d
ate
19
Tre
at
exca
vate
d
ASS
u
sing
ag
ricu
ltur
al
lime
wit
h m
achi
nery
suf
fici
ent
to p
erfo
rm a
deq
uate
mix
ing,
whe
re
prac
tica
ble.
Pre
cons
truc
tion
C
BI
NA
Ope
n
ASS
MSP
– T
able
4-1
Nil
ASS
enc
ount
ered
to d
ate
20
Bu
nd a
reas
whe
re A
SS a
re e
xpos
ed,
incl
udin
g at
the
H
DD
ent
ry a
nd e
xit
poin
ts f
or t
he p
ipel
ine
bene
ath
the
Hu
nter
Riv
er,
to p
reve
nt l
each
ate
ente
ring
the
wid
er
envi
ronm
ent.
Pre
cons
truc
tion
C
BI
NA
Ope
n
ASS
MSP
– T
able
4-1
Nil
ASS
enc
ount
ered
to d
ate
21
Und
erta
ke
any
pote
ntia
l A
SS
rem
edia
tion
w
orks
in
ac
cord
ance
wit
h cl
ause
25
of t
he N
ewca
stle
LE
P 2
003,
an
d th
e A
cid
Su
lfat
e So
ils M
anu
al (A
SSM
AC
, 199
8).
Pre
cons
truc
tion
O
ther
N
A
Ope
n
ASS
MSP
– T
able
4-1
Nil
ASS
enc
ount
ered
to d
ate
22
Und
erta
ke
any
pote
ntia
l A
SS
rem
edia
tion
w
orks
in
ac
cord
ance
w
ith,
th
e P
ort
Step
hens
C
ounc
il L
ocal
E
nvir
onm
enta
l P
lan
2003
, th
e P
ort
Step
hens
C
ounc
il A
cid
Su
lfat
e So
ils P
olic
y, 2
004
and
the
Aci
d S
ulf
ate
Soils
M
anu
al (A
SSM
AC
, 199
8).
Pre
cons
truc
tion
C
BI
NA
Ope
n
ASS
MSP
– T
able
4-1
Nil
ASS
enc
ount
ered
to d
ate
7.1.
4 M
onit
orin
g
23
Insp
ecti
ng
and
m
onit
orin
g ha
zard
ous
mat
eria
l co
ntai
nmen
t fac
iliti
es to
ens
ure
thei
r in
tegr
ity.
P
reco
nstr
ucti
on
CB
I C
ompl
ianc
e
Ope
n
DG
&H
MM
SP –
App
end
ix E
(wee
kly
chec
klis
t)
SMSP
– T
able
5-2
and
Tab
le 8
-1
24
Insp
ecti
ng a
nd m
aint
aini
ng e
rosi
on a
nd s
edim
enta
tion
co
ntro
l str
uctu
res.
P
reco
nstr
ucti
on
CB
I C
ompl
ianc
e
Ope
n
SMSP
– T
able
5-2
Wee
kly
chec
klis
ts
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B7
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
25
Insp
ecti
ng a
nd m
onit
orin
g of
all
wor
ks t
o en
sure
soi
l er
osio
n or
con
tam
inat
ion
is n
ot o
ccu
rrin
g.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
SMSP
– T
able
5-2
Wee
kly
chec
klis
ts
26
Mon
itor
ing
soil
qual
ity
arou
nd P
roje
ct w
orks
pri
or t
o an
d
du
ring
co
nstr
uct
ion
to
asce
rtai
n th
e pr
esen
ce
of
cont
amin
ated
soi
l or
ASS
.
Pre
cons
truc
tion
C
BI
NA
Ope
n
ASS
MSP
– T
able
5-2
Not
app
licab
le a
s ye
t as
nil
exca
vati
ons
on s
ite.
Sp
ot
chec
ks
to
be
com
plet
ed
once
ex
cava
tion
s co
mm
ence
bel
ow g
roun
dw
ater
.
7.1.
5 M
odif
icat
ions
to
Man
agem
ent
and
Mit
igat
ion
Mea
sure
s fo
r So
ils
27
Con
du
ct a
n A
SS a
sses
smen
t of
the
Hex
ham
Rec
eivi
ng
Stat
ion
site
pri
or t
o co
nstr
uct
ion
at t
he s
ite
to c
heck
the
na
tura
l bu
ffer
ing
capa
city
of
the
soil
and
to
sati
sfy
the
requ
irem
ents
und
er c
lau
se 2
5 of
the
New
cast
le L
ocal
E
nvir
onm
enta
l Pla
n 20
03.
Pre
cons
truc
tion
–
Stag
e 2
AG
L
NA
Ope
n
Stag
e 2,
ASS
MSP
28
A
haza
rdou
s m
ater
ial
surv
ey
is
carr
ied
ou
t pr
ior
to
dem
olit
ion
of
the
exis
ting
bu
ildin
g at
th
e H
exha
m
rece
ivin
g st
atio
n si
te.
Pre
cons
truc
tion
–
Stag
e 2
AG
L
NA
Ope
n
Stag
e 2,
ASS
MSP
29
A C
EM
P i
s pr
epar
ed t
hat
incl
ud
es p
roce
du
res
for
the
man
agem
ent
and
dis
posa
l of
fill
mat
eria
l, pr
oced
ures
for
u
nexp
ecte
d
find
s an
d
an
ASS
m
anag
emen
t pl
an,
if
requ
ired
.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
SMSP
– T
able
5-2
ASS
MSP
– T
able
5-1
Une
xpec
ted
fi
nds
proc
edu
re
dev
elop
ed
whi
ch
incl
udes
con
tam
inat
ed s
oil a
nd A
SS e
tc
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B8
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
30
Ens
ure
tha
t th
e ba
nks
of w
ater
cou
rses
are
not
dis
turb
ed
du
ring
con
stru
ctio
n.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Incl
ud
e in
Tab
le 4
-1 o
f ASS
MSP
Nil
wor
ks
wit
hin
wat
erco
urse
s d
urin
g au
dit
pe
riod
7.2
Su
rfac
e W
ater
31
A
co
nstr
uct
ion
surf
ace
wat
er
man
agem
ent
plan
(S
WM
SP)
is b
eing
pre
pare
d a
nd i
mpl
emen
ted
pri
or t
o co
nstr
ucti
on c
omm
enci
ng o
n si
te.
The
SW
MSP
will
be
prep
ared
in
cons
ult
atio
n w
ith
HW
C,
NO
W,
OE
H a
nd
PSC
. T
he p
lan
will
des
crib
e be
st p
ract
ice
surf
ace
wat
er
cont
rol
mea
sure
s to
red
uce
the
risk
of
cont
amin
atio
n of
su
rfac
e w
ater
and
sha
llow
gro
und
wat
er, o
r th
e al
tera
tion
of
sur
face
wat
er f
low
s. T
he p
lan
will
be
supp
orte
d b
y a
surf
ace
wat
er m
onit
orin
g ne
twor
k as
des
crib
ed in
sec
tion
9.
2.3
of th
e E
A M
ain
Rep
ort.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
– C
BI
Surf
ace
Wat
er M
anag
emen
t Su
b P
lan
– se
nt i
n em
ail t
o D
oPI d
ated
11
July
201
2
Em
ail
from
H
WC
31
O
ctob
er
2011
in
dic
atin
g sa
tisf
acti
on w
ith
plan
.
Em
ail t
o D
oPI
9 A
ugu
st 2
012
wit
h co
rres
pond
ence
at
tach
ed e
ndor
sing
GM
SP fr
om N
OW
Ad
dit
iona
l SW
MSP
to
be d
evel
oped
for
pip
elin
e w
orks
whi
ch w
ill in
clud
e ri
ver
cros
sing
.
32
The
sur
face
wat
er m
anag
emen
t pl
an w
ill b
e pr
epar
ed
and
impl
emen
ted
as
part
of t
he C
EM
P a
nd O
EM
P.
Pre
cons
truc
tion
C
BI
Oth
ers
Com
plia
nce
Ope
n
SWM
SP fo
r C
BI c
ompl
eted
Impl
emen
tati
on c
heck
ed d
urin
g si
te i
nspe
ctio
ns –
in
tern
al a
nd e
xter
nal.
Ref
er in
div
idu
al r
epor
ts a
nd
6 m
onth
ly
com
plia
nce
trac
king
re
port
fo
r im
plem
enta
tion
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B9
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Wat
er S
uppl
y an
d D
ispo
sal
33
Min
imis
e w
ater
use
. C
onst
ruct
ion
CB
I IO
Ope
n
SWM
SP –
Tab
le 8
-1
IO –
inc
lud
e th
is S
oC n
umbe
r in
SW
MSP
SoC
T
able
1-3
. Wou
ld a
lso
assi
st if
SoC
wer
e pl
aced
in
chro
nolo
gica
l ord
er.
Ref
er a
lso
SoC
91
Bul
k of
wat
er u
sed
for
dus
t sup
pres
sion
.
34
Sou
rce
wat
er f
rom
exi
stin
g w
ater
su
pply
inf
rast
ruct
ure
. U
ntil
the
perm
anen
t w
ater
su
pply
is
av
aila
ble,
it
is
cu
rren
tly
prop
osed
th
at
this
w
ill
be
supp
lied
to
co
nstr
uct
ion
site
s by
ei
ther
w
ater
ta
nker
s or
fr
om
a st
and
pipe
su
ch a
s a
HW
C m
eter
ed s
tand
pipe
alo
ng O
ld
Pun
t Roa
d.
Con
stru
ctio
n C
BI
IO
Ope
n
SWM
SP –
Tab
le 8
-1
IO –
inc
lud
e th
is S
oC n
umbe
r in
SW
MSP
SoC
T
able
1-3
Wat
er s
uppl
ied
to
site
via
tan
kers
sou
rcin
g w
ater
fr
om H
WC
met
ered
sta
ndpi
pe o
n O
ld P
unt R
d.
35
Dev
elop
hy
dro
stat
ic
test
m
anag
emen
t m
easu
res
in
cons
ult
atio
n w
ith
HW
C,
OE
H
and
N
OW
. T
he
man
agem
ent m
easu
res
will
ad
dre
ss:
H
ydro
stat
ic t
est
wat
er s
upp
ly.
Thi
s is
lik
ely
to b
e po
tabl
e w
ater
fr
om
exis
ting
H
WC
w
ater
su
pply
in
fras
tru
ctu
re, u
ntre
ated
wat
er fr
om H
WC
Sta
tion
20
bore
s,
grou
ndw
ater
lo
cally
ab
stra
cted
fr
om
new
bo
res
or a
com
bina
tion
of t
hese
;
A
sses
smen
t of
po
tent
ial
chan
ges
to
grou
ndw
ater
le
vels
if
grou
ndw
ater
is
abst
ract
ed f
rom
exi
stin
g H
WC
and
new
AG
L b
ores
Con
stru
ctio
n C
BI
IO
Ope
n
SWM
SP –
Tab
le 1
-3 i
ndic
ates
inc
lud
ed i
n T
able
8-
1.
IO.
Che
ck
of
Tab
le
8-1
ind
icat
es
not
actu
ally
d
iscu
ssed
in th
is ta
ble.
Ref
er in
stea
d to
Sec
tion
2.4
.
Nil
hyd
rost
atic
tes
ting
com
plet
ed d
urin
g au
dit
pe
riod
.
AG
L
to
dev
elop
H
ydro
stat
ic
Tes
t W
ater
M
anag
emen
t Pla
n by
June
201
3.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B10
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
36
Tra
nspo
rt
amen
itie
s w
aste
wat
er
offs
ite
by
a lic
ense
d
oper
ator
to a
lice
nsed
dis
posa
l fac
ility
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
WM
SP –
ref
er T
able
7-1
SWM
SP –
Tab
le 8
-1
GW
MSP
– T
able
8-1
Rev
iew
of
m
ater
ials
tr
acki
ng
regi
ster
in
dic
ates
am
enit
ies
was
tew
ater
tra
nspo
rted
by
Aff
ord
able
Sa
nita
tion
Ser
vice
s –
serv
ice
doc
kets
are
left
at s
ite
offi
ce.
Ver
bal
conf
irm
atio
n re
ceiv
ed t
hat
dis
posa
l lo
cati
on is
app
ropr
iate
ly li
cenc
ed
Wri
tten
co
nfir
mat
ion
of
dis
posa
l lo
cati
on
from
tr
ansp
orte
r ob
tain
ed.
37
Tes
t an
d t
reat
wat
er g
ener
ated
by
dew
ater
ing
of tr
ench
es
or e
xcav
atio
ns i
f re
quir
ed,
and
inf
iltra
te b
ack
into
the
gr
ound
wat
er t
able
at
des
igna
ted
inf
iltra
tion
are
as,
or
alte
rnat
ivel
y tr
ansp
ort
offs
ite
to
a lic
ense
d
dis
posa
l fa
cilit
y.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP -
Tab
le 8
-10
Nil
dew
ater
ing
und
erta
ken
dur
ing
aud
it p
erio
d
Surf
ace
Wat
er F
low
and
Flo
odin
g
38
Div
ert
runo
ff f
rom
ou
tsid
e th
e w
ork
area
to
exis
ting
d
rain
age
lines
to
prev
ent
the
form
atio
n of
new
su
rfac
e fl
ow p
aths
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Tab
le 8
-1
Nil
runo
ff fr
om o
utsi
de
curr
ent w
ork
area
flow
s to
si
te
39
Inst
all
culv
erts
und
er n
ew r
oad
s to
mai
ntai
n ex
isti
ng
surf
ace
dra
inag
e fl
ows.
C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP –
Tab
le 8
-3
Cu
lver
ts n
oted
und
er c
onst
ruct
ion
on M
ain
acce
ss
trac
k an
d
gas
pipe
line
road
d
uri
ng
site
in
spec
tion
s.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B11
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
40
Res
tric
t ve
hicl
e m
ovem
ents
to
form
ed a
cces
s ro
ads
and
se
aled
ro
ads
to
avoi
d
surf
ace
com
pact
ion
whe
re
prac
tica
ble.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Tab
le 8
-1
Veh
icle
s no
ted
usi
ng f
orm
ed a
cces
s ro
ads
and
te
mpo
rary
co
nstr
ucti
on
acce
ss
dur
ing
site
in
spec
tion
s
41
Mon
itor
the
pot
enti
al f
or f
lood
ing
by o
bser
ving
wea
ther
re
port
s an
d r
iver
leve
ls d
uri
ng p
oten
tial
floo
d e
vent
s.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Tab
le 8
-1
Ad
vers
e w
eath
er f
orec
asts
are
dis
cuss
ed i
n pr
e st
art
mee
ting
s (p
rest
art
reco
rds)
w
ith
wea
ther
re
port
s po
sted
on
mee
ting
roo
m w
all.
42
Stor
e eq
uip
men
t se
cure
ly w
hen
not
in u
se t
o pr
even
t it
be
ing
was
hed
aw
ay in
a fl
ood
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP –
Tab
le 8
-11
Site
in
spec
tion
s in
dic
ate
tool
s an
d
othe
r eq
uip
men
t is
pack
ed in
to s
tora
ge c
onta
iner
s –t
heft
pr
even
tion
ad
dit
iona
l dri
ver
43
Avo
id u
nnec
essa
ry c
lear
ing
of v
eget
atio
n an
d e
xcav
atio
n w
orks
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP –
Tab
le 8
-1
Veg
etat
ion
clea
red
alo
ng d
elin
eate
d b
ound
arie
s.
Tre
es a
long
bou
ndar
y lin
e re
tain
ed a
s no
ted
in E
R
site
insp
ecti
on r
epor
ts.
44
The
gas
sto
rage
fac
ility
will
hav
e a
min
imum
flo
or l
evel
eq
uiv
alen
t to
th
e 10
0-ye
ar
AR
I fl
ood
le
vel
(app
roxi
mat
ely
4.6
m A
HD
) pl
us
a fr
eebo
ard
of
0.5
m
(i.e
., at
lea
st 5
.1 m
AH
D).
The
pre
limin
ary
des
ign
for
the
faci
lity
has
a fi
nish
ed fl
oor
leve
l of 6
.3 m
AH
D.
Con
stru
ctio
n A
GL
C
ompl
ianc
e
Ope
n
SWM
SP –
Tab
le 8
-1
Des
ign
is
com
plia
nt
wit
h th
is
cond
itio
n –
cons
tru
ctio
n cu
rren
tly
und
erw
ay
wit
h fu
rthe
r co
nfir
mat
ion
of
com
plia
nce
once
ea
rthw
orks
co
mpl
eted
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B12
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
45
The
d
esig
n of
th
e H
exha
m
rece
ivin
g st
atio
n ha
s a
min
imu
m fl
oor
leve
l equ
ival
ent t
o th
e 10
0-ye
ar A
RI f
lood
le
vel
(app
roxi
mat
ely
3.9
m A
HD
) pl
us
a fr
eebo
ard
of
0.5
m
(i.e
., at
le
ast
4.4
m A
HD
). N
o ad
dit
ions
to
th
e ex
isti
ng b
uild
ing
are
curr
entl
y pr
opos
ed.
Con
stru
ctio
n –
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
- Tec
hnic
al D
esig
n sp
ec
Run
off,
Ero
sion
and
Sed
imen
t C
ontr
ol
46
Res
tric
t co
nstr
ucti
on t
raff
ic m
ovem
ent
to f
orm
ed a
cces
s tr
acks
to
avoi
d e
xces
s d
istu
rban
ce t
o so
il an
d c
reat
ion
of
bare
are
as w
here
pra
ctic
able
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP -
Tab
le 8
-1
SMSP
– T
able
4-1
Veh
icle
s no
ted
dur
ing
ER
sit
e in
spec
tion
s us
ing
form
ed a
cces
s ro
ads
and
tem
pora
ry c
onst
ruct
ion
acce
ss d
urin
g si
te in
spec
tion
s
47
Sele
ct
cons
tru
ctio
n eq
uip
men
t to
m
inim
ise
the
dis
turb
ance
to s
oils
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP -
Tab
le 8
-1
48
Min
imis
e d
urat
ion
of
subs
oil
(inc
lud
ing
stoc
kpile
s)
expo
sure
to w
eath
er.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
– T
able
8-6
Subs
oil
stoc
kpile
con
sist
ing
of u
nsui
tabl
e m
ater
ial
bein
g pr
oces
sed
to e
nabl
e re
use
on
site
. Sto
rage
<2
mon
ths.
49
Secu
re d
istu
rbed
bar
e so
ils b
y re
-spr
ead
ing
tops
oil,
re-
vege
tati
ng o
r ap
plyi
ng a
geo
-fab
ric
(or
sim
ilar)
, as
soo
n as
pra
ctic
able
aft
er r
eins
tate
men
t of e
arth
wor
ks.
Con
stru
ctio
n C
BI
NA
Ope
n
SMSP
– T
able
8-6
Ear
thw
orks
sti
ll cu
rren
t –
rein
stat
emen
t w
orks
yet
to
com
men
ce
50
Re-
vege
tate
exp
osed
soi
ls a
s so
on a
s po
ssib
le t
o re
du
ce
pote
ntia
l for
sed
imen
t-la
den
ru
noff
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
VR
WM
P
SMSP
– T
able
8-1
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B13
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
51
Pro
vid
e w
ind
-bre
aks
(or
equ
ival
ent
cont
rol
mea
sure
s)
arou
nd e
xpos
ed a
reas
and
sto
ckpi
les
to p
reve
nt w
ind
er
osio
n.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
– T
able
8-3
, Tab
le 8
-9
52
Pla
ce s
oil
stoc
kpile
s up
slop
e of
exc
avat
ions
and
not
in
dra
inag
e lin
es.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
– T
able
8-3
Not
ed d
urin
g si
te i
nspe
ctio
ns t
opso
il st
ockp
iles
loca
ted
al
ong
pipe
line
ease
men
t aw
ay
from
d
rain
age
lines
. O
ne e
xcav
atio
n on
sit
e fo
r se
wag
e sy
stem
fo
r co
nstr
ucti
on
site
of
fice
–
stoc
kpile
lo
cate
d
up
grad
ient
as
ob
serv
ed
dur
ing
site
in
spec
tion
s.
53
Con
stru
ct r
oad
sid
e sw
ales
to
capt
ure
ru
noff
fro
m t
he
Pri
mar
y P
roje
ct A
rea
acce
ss r
oad
s d
uri
ng c
onst
ruct
ion.
C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SMSP
– T
able
8-2
SWM
SP –
Tab
le 8
-2
54
Des
ign
dra
ins
to m
inim
ise
wat
er v
eloc
itie
s.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP -
Tab
le 8
-2
SMSP
– T
able
8-2
55
Inst
all
velo
city
red
ucti
on d
evic
es,
such
as
sand
bags
, in
d
rain
s an
d s
lope
d d
rain
s to
red
uce
eros
ion.
C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP -
Tab
le 8
-7
SMSP
– A
ppen
dix
C (S
ecti
on 6
)
56
Inst
all
sed
imen
t ca
ptur
e d
evic
es,
such
as
silt
fen
ces
and
bu
ndin
g, d
own-
slop
e of
exp
osed
soi
ls a
nd s
oil s
tock
pile
s.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP -
Tab
le 8
-1
SMSP
– T
able
4-1
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B14
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
57
Con
stru
ct s
uita
bly
lined
sed
imen
t co
ntro
l po
nds
dow
n-sl
ope
of c
onst
ruct
ion
wor
k ar
eas
upfr
ont.
The
se w
ill
subs
eque
ntly
be
d
evel
oped
in
to
perm
anen
t w
etla
nds
du
ring
the
oper
atio
ns s
tage
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP -
Tab
le 8
-4
GW
MSP
– T
able
8-1
CB
I w
ill c
onst
ruct
the
sed
imen
t po
nd a
s pa
rt o
f th
e ea
rly
civi
l w
ork.
A
GL
w
ill
subs
eque
ntly
co
nver
t th
is t
o pe
rman
ent
wet
land
s d
uri
ng t
he
oper
atio
n st
age.
58
Tre
at
cons
tru
ctio
n tr
acks
to
m
inim
ise
surf
ace
deg
rad
atio
n, e
.g.,
com
pact
ion
or to
ppi
ng w
ith
grav
el.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP -
Tab
le 8
-1
SMSP
– T
able
4-1
59
Stab
ilise
th
e ba
nks
of
any
dis
turb
ed
wat
erco
urse
s ad
jace
nt t
o O
ld P
unt
Roa
d u
sing
mea
sure
s su
ch a
s ro
ck
rip-
rap,
div
ersi
on b
erm
s, s
edim
ent
fenc
es,
jute
mat
ting
an
d r
esee
din
g.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SMSP
- A
ppen
dix
C S
ecti
on 4
.2
60
Div
ert
runo
ff u
pstr
eam
of
dis
turb
ed a
reas
to
exis
ting
d
rain
age
lines
to
prev
ent
the
risk
of
incr
easi
ng e
rosi
on
and
req
uir
ing
furt
her
sed
imen
t con
trol
mea
sure
s.
Con
stru
ctio
n C
BI
NA
Ope
n
SWM
SP –
Tab
le 8
-2
SMSP
– T
able
4-1
Cu
rren
t pr
ojec
t ar
ea
slig
htly
hi
gher
th
an
surr
ound
ing
land
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B15
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
61
Und
erta
ke d
aily
ins
pect
ions
of
all
runo
ff,
eros
ion
and
se
dim
ent
cont
rol
stru
ctur
es
dur
ing
the
cons
truc
tion
pe
riod
.
Con
stru
ctio
n C
BI
IO
Ope
n
SMSP
– T
able
5-2
SWM
SP –
Sec
tion
5.0
Tab
le 5
-2.
Tab
le 5
-2 i
ndic
ates
che
cks
don
e w
eekl
y an
d a
fter
ra
infa
ll.
IO
– co
nsid
er
clar
ifyi
ng
that
d
aily
ch
ecks
ar
e co
mpl
eted
and
dia
rise
d.
Als
o st
ates
in
Tab
le 8
.1
chec
ks c
ompl
eted
wee
kly
whi
ch w
ill a
lso
need
to
be a
men
ded
to
refl
ect
dai
ly c
heck
s as
per
the
co
mm
itm
ent
62
Mai
ntai
n ru
noff
, ero
sion
and
sed
imen
t co
ntro
l str
uct
ure
s ac
cord
ing
to a
ppro
pria
te s
tand
ard
s.
Con
stru
ctio
n C
BI
IO
Ope
n
SMSP
– T
able
8-1
IO -
SW
MSP
ind
icat
es in
clud
ed in
Tab
le 8
-2 b
ut is
no
t. C
onsi
der
incl
udin
g in
Tab
le 8
-1.
Con
trol
s ch
ecke
d w
eekl
y by
CB
I sit
e st
aff.
63
Ens
ure
silt
fen
ces
are
in a
ver
tica
l po
siti
on a
nd s
ecur
ely
fixe
d a
nd r
emov
e se
dim
ent
or r
esid
ue b
ehin
d s
edim
ent
cont
rol b
arri
ers.
Con
stru
ctio
n C
BI
IO
Ope
n
SWM
SP –
Tab
le 8
-7
IO -
ref
erre
d t
o in
Tab
le 1
-3 o
f SM
SP b
ut
not
add
ress
ed i
n pl
an.
Con
sid
er a
dd
ing
mit
igat
ion
mea
sure
into
Tab
le 5
-2 o
r re
mov
e re
fere
nce
Silt
fen
ces
note
d i
nsta
lled
alo
ng b
ound
arie
s of
si
te.
Min
or r
epai
r is
sues
rai
sed
aft
er w
eekl
y C
BI
site
ins
pect
ions
. M
inor
iss
ues
note
d d
urin
g E
R
site
insp
ecti
ons.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B16
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
64
Mon
itor
ear
thw
ork
area
s re
gula
rly
for
sign
s of
ero
sion
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP –
Tab
le 8
-1
SMSP
- T
able
5-2
inc
lud
es g
ener
al r
equ
irem
ent
to
chec
k al
l str
ictu
res
dur
ing
all w
orks
CB
I w
eekl
y re
port
s in
dic
ated
th
is
is
chec
ked
re
gula
rly.
65
Inst
all
and
com
mis
sion
at
the
oper
atio
ns p
hase
, ru
noff
, er
osio
n an
d
sed
imen
t co
ntro
l m
easu
res
as
soon
as
pr
acti
cal.
Ope
rati
ons
AG
L
NA
Ope
n
To
be
incl
ud
e in
O
EM
P
to
be
dev
elop
ed
for
oper
atio
ns p
hase
Dis
char
ge o
f Con
tam
inat
ed W
ater
, Spi
lls
and
Lea
ks
66
Min
imis
e th
e vo
lum
e of
haz
ard
ous
chem
ical
s st
ored
on
site
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP –
Tab
le 8
-11
DG
&H
MM
SP –
Tab
le 8
-1
Min
or
volu
mes
of
ch
emic
als
stor
ed
on
site
in
bu
nded
sto
rage
– p
rim
arily
cle
anin
g fl
uid
s, m
inor
qu
anti
ties
of f
uel,
oils
and
lubr
ican
ts.
67
Stor
e an
d t
rans
port
haz
ard
ous
mat
eria
ls a
ccor
din
g to
th
eir
mat
eria
l saf
ety
dat
a sh
eet (
MSD
S).
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Tab
le 8
-11
DG
&H
MM
SP –
Tab
le 8
-2
Flam
mab
les
stor
ed i
n fl
amm
able
goo
ds
cabi
net
or
in
plas
tic
bund
s ad
equa
te
to
cont
ain
spill
s or
le
aks.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B17
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
68
Stor
e po
tent
ially
con
tam
inat
ing
chem
ical
s ac
cord
ing
to
the
appr
opri
ate
stan
dar
ds,
inc
lud
ing
mea
sure
s su
ch a
s im
perv
iou
s bu
nded
are
as c
apab
le o
f ca
ptu
ring
110
% o
f th
e m
axim
um s
pill
vol
ume.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Tab
le 8
-11
DG
&H
MM
SP –
Tab
le 8
-1
Fuel
d
rum
s no
ted
st
ored
in
pl
asti
c co
ntai
ners
ca
pabl
e of
hol
din
g co
nten
t vo
lum
e.
Nil
maj
or
quan
titi
es o
f che
mic
als
curr
entl
y st
ored
on
site
69
Pre
pare
a s
pill
resp
onse
pla
n an
d e
nsur
e ad
equa
te s
pill
kits
are
ava
ilabl
e at
all
cons
tru
ctio
n si
tes
and
per
sonn
el
are
trai
ned
in th
eir
use
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Sec
tion
3.2
and
App
end
ix D
DG
&H
MM
SP –
Tab
le 8
-4 a
nd A
ppen
dix
C
Spill
kit
loc
ated
at
site
off
ice
and
in
PP
A.
Sm
all
spill
kit
s ar
e re
quir
ed b
y th
e si
te t
o be
car
ried
by
all
vehi
cles
on
site
. R
and
om c
heck
s d
urin
g si
te
insp
ecti
ons
by
CB
I st
aff
and
E
R
conf
irm
co
mpl
ianc
e w
ith
site
req
uir
emen
t.
Tw
o to
olbo
x ta
lks
det
ailin
g sp
ill
resp
onse
co
mpl
eted
dur
ing
peri
od o
f aud
it
70
Mai
ntai
n al
l co
nstr
uct
ion
equ
ipm
ent
appr
opri
atel
y an
d
insp
ect m
achi
nery
for
leak
s.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP –
Tab
le 8
-11
All
mac
hine
ry c
heck
ed d
aily
and
doc
umen
ted
71
Bu
nd H
DD
ent
ry p
oint
s to
pre
vent
the
rele
ase
of le
acha
te
from
dri
ll cu
ttin
gs,
dri
lling
flu
ids,
or
spill
s en
teri
ng t
he
surr
ound
ing
envi
ronm
ent,
incl
ud
ing
the
Hu
nter
Riv
er.
Con
stru
ctio
n –
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
CE
MP
– S
WM
SP
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B18
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
72
Impl
emen
t hy
dro
stat
ic t
est
wat
er m
anag
emen
t m
easu
res
in c
onsu
ltat
ion
wit
h H
WC
and
NO
W t
o d
eter
min
e an
d
add
ress
re
quir
emen
ts
for
test
ing
and
tr
eati
ng o
f th
is
hyd
rost
atic
te
st
wat
er
prio
r to
re
-use
or
d
ispo
sal.
Dis
posa
l op
tion
s in
clu
de
infi
ltra
tion
to
grou
ndw
ater
or
dis
char
ge to
an
exis
ting
wat
erco
urs
e.
Con
stru
ctio
n C
BI
IO
Ope
n
SWM
SP –
Tab
le 8
-1.
IO.
Che
ck
of
Tab
le
8-1
ind
icat
es
not
actu
ally
d
iscu
ssed
in th
is ta
ble.
Ref
er in
stea
d to
Sec
tion
2.4
. A
GL
to
dev
elop
hyd
rost
atic
tes
ting
str
ateg
y an
d
plan
.
Nil
hyd
rost
atic
test
ing
dur
ing
peri
od o
f aud
it.
AG
L
to
dev
elop
H
ydro
stat
ic
Tes
t W
ater
M
anag
emen
t Pla
n by
June
201
3.
Frac
-out
73
A d
etai
led
geo
tech
nica
l in
vest
igat
ion
will
be
und
erta
ken
prio
r to
HD
D u
nder
the
Hun
ter
Riv
er. T
his
will
inc
lud
e d
rilli
ng
inve
stig
atio
n bo
re
hole
s an
d
shal
low
se
ism
ic
surv
eys
to
prov
ide
det
aile
d
und
erst
and
ing
of
the
geol
ogic
al s
trat
a u
nder
and
ad
jace
nt to
the
rive
r.
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
CE
MP
7.2.
2 M
onit
orin
g
74
A
surf
ace
wat
er
qual
ity
mon
itor
ing
prog
ram
w
ill
be
dev
elop
ed a
s pa
rt o
f th
e C
EM
P a
nd O
EM
P s
urfa
ce w
ater
m
anag
emen
t pl
an
and
in
co
nsu
ltat
ion
wit
h re
leva
nt
auth
orit
ies
(OE
H,
NO
W,
and
H
WC
). It
w
ill
incl
ude
prec
onst
ruct
ion
(‘ba
selin
e’),
cons
truc
tion
and
ope
rati
ons
mon
itor
ing
of w
ater
qua
lity
para
met
ers.
Mon
itor
ing
will
be
und
erta
ken
wit
hin
the
prim
ary
proj
ect
area
and
at
surf
ace
runo
ff c
ontr
ol f
acili
ties
(su
ch a
s se
dim
ent
pond
s).
The
follo
win
g m
onit
orin
g lo
cati
ons
are
prop
osed
:
Se
dim
ent p
ond
s (d
uri
ng c
onst
ruct
ion
only
).
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Ope
n
SWM
SP –
Sec
tion
5.0
and
App
end
ix C
Bas
elin
e W
ater
Dat
a
App
end
ix
A
– Fi
gure
s in
clud
ing
mon
itor
ing
loca
tion
s
Sed
imen
t po
nds
in
ESC
P
– to
be
up
dat
ed
as
requ
ired
Tar
gets
incl
ude
in A
ppen
dix
C
Mon
itor
ing
loca
tion
s to
be
inst
alle
d a
t ti
me
of
aud
it
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B19
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
H
old
ing
and
insp
ecti
on ta
nks.
O
utf
low
from
the
hold
ing
pond
.
W
ater
Fea
ture
s 1
and
2.
The
pro
pose
d s
torm
wat
er c
onta
inm
ent
and
tre
atm
ent
syst
em w
ill b
e d
esig
ned
to
prov
ide
trea
tmen
t of
sur
face
w
ater
ru
noff
fro
m t
he s
ite
thro
ugh
con
tain
ing,
tre
atin
g an
d a
deq
uate
ly d
ispo
sing
of
this
run
off.
Mai
nten
ance
an
d m
onit
orin
g w
ill n
eed
to
be u
nder
take
n to
ens
ure
dis
char
ges
sati
sfy
regu
lato
ry r
equi
rem
ents
.
Con
stru
ctio
n an
d o
pera
tion
s m
onit
orin
g re
sult
s w
ill b
e co
mpa
red
to
ta
rget
co
ncen
trat
ions
(t
rigg
er
valu
es)
der
ived
fro
m b
asel
ine
dat
a. W
here
thi
s is
not
pos
sibl
e d
ue
to
insu
ffic
ient
d
ata,
th
e co
ncen
trat
ions
w
ill
be
com
pare
d t
o re
com
men
ded
tri
gger
val
ue c
once
ntra
tion
s fo
r pr
otec
tion
of a
quat
ic e
cosy
stem
s (A
NZ
EC
C, 2
000)
.
The
pla
n w
ill a
lso
requ
ire
insp
ecti
ng w
ater
lev
els
in a
nd
the
inte
grit
y of
sur
face
run
off
cont
rol
faci
litie
s (s
uch
as
hold
ing
pond
, bi
o-re
tent
ion
syst
ems,
dra
ins,
su
mps
and
se
dim
ent
fenc
es)
mon
thly
an
d
follo
win
g si
gnif
ican
t ra
infa
ll.
7.2.
3 M
odif
icat
ions
to
Man
agem
ent
and
Mit
igat
ion
Mea
sure
s fo
r Su
rfac
e W
ater
75
A s
urf
ace
wat
er b
asel
ine
mon
itor
ing
prog
ram
is
carr
ied
ou
t bef
ore
cons
tru
ctio
n co
mm
ence
s.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Com
plet
ed –
ref
er E
A
SWM
SP l
ists
bas
e –
Tab
le l
ine
dat
a re
sult
s in
A
ppen
dix
C
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B20
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
76
Du
ring
the
con
stru
ctio
n pr
ogra
m, h
old
ing
and
sed
imen
t po
nd a
reas
on
site
will
be
mon
itor
ed m
onth
ly f
ollo
win
g th
e in
itia
l 12
-mon
th c
onst
ruct
ion
peri
od.
It i
s en
visa
ged
th
at a
rep
ort
on a
six
-mon
thly
bas
is w
ill b
e pr
oduc
ed,
how
ever
fin
al r
equi
rem
ents
will
dep
end
on
the
spec
ific
pl
anni
ng
appr
oval
s (a
nd
asso
ciat
ed
repo
rtin
g re
quir
emen
ts t
o d
iffe
rent
age
ncie
s) f
or s
urf
ace
wat
er a
nd
grou
ndw
ater
mon
itor
ing.
Con
stru
ctio
n C
BI
IO
Ope
n
SWM
SP –
Tab
le 5
.1 d
etai
ls m
onit
orin
g pr
ogra
m
requ
irem
ent
IO –
Con
sid
er a
dd
ing
this
SoC
to T
able
1.3
Hol
din
g an
d
sed
imen
t po
nd
area
s un
der
co
nstr
uct
ion
at ti
me
of a
ud
it
77
AG
L w
ill a
ppoi
nt a
pee
r re
view
er f
or t
he e
ngin
eeri
ng
des
ign
of th
e st
orm
wat
er m
anag
emen
t sys
tem
. P
re-
cons
tru
ctio
n A
GL
C
ompl
ianc
e
Clo
sed
Con
firm
atio
n em
ail
by A
xel
Han
son
from
Hu
nter
W
ater
C
orpo
rati
on
dat
ed
2-M
ay-1
2 ap
prov
ing
SME
C a
s th
e in
dep
end
ent p
eer
revi
ewer
.
Rev
iew
of
des
ign
com
plet
ed w
ith
emai
l re
ceiv
ed
from
HW
C 2
May
201
2 w
ith
reco
mm
end
atio
ns.
Mee
ting
hel
d w
ith
HW
C 2
0 Ju
ly 2
012
to d
iscu
ss
revi
ew a
nd r
ecom
men
dat
ions
.
Subm
itte
d to
DoP
I on
8 Ju
ne 2
012
78
Stor
mw
ater
fro
m t
he s
ite
will
be
trea
ted
in
acco
rdan
ce
wit
h P
SC’s
‘U
rban
Sto
rmw
ater
and
Ru
ral
Wat
er Q
ual
ity
Man
agem
ent
Pla
n fo
r N
ew
Dev
elop
men
ts’
and
w
ill
ther
efor
e be
of
eq
uiv
alen
t (o
r be
tter
) qu
alit
y th
an
stor
mw
ater
from
oth
er s
ites
wit
hin
the
mun
icip
alit
y.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
Thi
s M
gt P
lan
has
been
ref
eren
ced
in
des
ign
of
stor
mw
ater
con
trol
s on
sit
e.
CE
MP
, EW
MS,
SW
MSP
Ref
er v
ario
us c
omm
itm
ents
for
spec
ific
con
trol
s
79
Hol
din
g po
nd w
ill b
e si
zed
to
acco
mm
odat
e up
to
a 1
year
AR
I. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
SWM
SP –
ref
er F
igu
re 5
Hol
din
g po
nd h
as b
een
size
d f
or u
p to
1 y
ear
AR
I 24
hou
r st
orm
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B21
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
80
Dis
posa
l of h
ydro
stat
ic te
st w
ater
will
be
man
aged
und
er
the
surf
ace
wat
er m
anag
emen
t pl
an i
n co
nsu
ltat
ion
wit
h re
leva
nt a
genc
ies.
Con
stru
ctio
n C
BI
IO
Ope
n
SWM
SP –
Sec
tion
2.4
. SW
MSP
has
bee
n su
bmit
ted
to
age
ncie
s fo
r re
view
and
acc
epte
d.
IO –
Con
sid
er a
dd
ing
this
SoC
to T
able
1.3
Nil
hyd
rost
atic
test
ing
dur
ing
aud
it p
erio
d
81
AG
L w
ill p
repa
re a
sto
rmw
ater
man
agem
ent p
lan
for
the
Pro
ject
. P
reco
nstr
ucti
on
CB
I
Oth
er
Com
plia
nce
Clo
sed
- C
BI
SWM
SP c
ompl
eted
for
CB
I
Stag
e 2
to b
e co
mpl
eted
82
A f
lood
em
erge
ncy
resp
onse
pla
n w
ill b
e pr
epar
ed f
or
the
Hex
ham
rec
eivi
ng s
tati
on.
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
83
The
sur
face
wat
er m
anag
emen
t pl
an w
ill b
e pr
epar
ed i
n co
nsul
tati
on
wit
h H
WC
, O
EH
an
d
NO
W,
and
w
ill
incl
ude,
but
not
be
limit
ed to
:
a)
A
des
crip
tion
of
th
e qu
anti
ty
and
so
urc
e of
al
l su
rfac
e w
ater
su
pplie
s re
lati
ng t
o co
nstr
uct
ion
and
op
erat
ions
;
b)
Det
aile
d b
asel
ine
dat
a on
sur
face
wat
er q
ualit
y;
c)
Surf
ace
wat
er q
ualit
y im
pact
ass
essm
ent
crit
eria
and
a
prot
ocol
fo
r th
e in
vest
igat
ion,
no
tifi
cati
on
and
m
itig
atio
n of
iden
tifi
ed e
xcee
dan
ces;
d)
A p
rogr
am to
mon
itor
su
rfac
e w
ater
qu
alit
y;
e)
Det
aile
d d
esig
n of
all
wat
er c
ross
ings
, cu
lver
ts a
nd
inst
ream
wor
ks;
Pre
cons
truc
tion
C
BI
IO
Ope
n
SWM
SP –
ref
er C
oA 5
7d
a)
Sect
ion
2.3
b)
Bas
elin
e in
clud
ed in
Sec
tion
5.2
and
A
ppen
dix
C
c)
App
end
ix C
for
asse
ssm
ent c
rite
ria.
IO -
Pro
toco
l for
inve
stig
atio
n, n
otif
icat
ion
and
rep
orti
ng o
f id
enti
fied
exc
eed
ance
s ne
eds
to b
e ad
ded
d)
Mon
itor
ing
prog
ram
incl
uded
in S
ecti
on 5
.1
e)
Des
ign
of w
ater
cro
ssin
gs, c
ulve
rts
and
in
stre
am w
orks
incl
uded
in E
SCP
as
part
of
SMSP
– S
ecti
on 1
0.2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B22
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
f)
A
prog
ram
to
m
onit
or
and
m
anag
e w
ater
cour
se
cros
sing
s, c
ulve
rts
and
inst
ream
wor
ks;
g)
A p
roto
col
for
the
inve
stig
atio
n, n
otif
icat
ion
and
m
itig
atio
n of
id
enti
fied
im
pact
s as
soci
ated
w
ith
wat
erco
urse
cro
ssin
gs, c
ulve
rts
and
inst
ream
wor
ks.
f)
IO- P
rogr
am to
mon
itor
and
man
age
wat
erco
urse
cro
ssin
gs, c
ulve
rts
and
inst
ream
w
orks
to b
e ad
ded
to p
lan
if a
pplic
able
to th
is
stag
e of
wor
ks (S
ecti
on 5
.2.2
)
g)
IO –
pro
toco
l for
inve
stig
atio
n, n
otif
icat
ion
and
mit
igat
ion
of id
enti
fied
impa
cts
asso
ciat
ed w
ith
wat
erco
urse
cro
ssin
gs,
culv
erts
and
inst
ream
wor
ks to
be
incl
uded
in
plan
IO -
Ad
d th
is S
oC to
Tab
le 2
.3
84
Wat
er
feat
ure
4
is
not
dis
turb
ed b
y th
e ac
cess
roa
d
corr
idor
. P
reco
nstr
ucti
on
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
CE
MP
- SW
MSP
85
Whe
n w
aste
wat
er i
s ta
nker
ed:
The
sys
tem
will
hav
e a
tele
met
ered
lev
el s
enso
r th
at a
larm
s w
hen
over
ran
ge;
The
tan
k w
ill b
e in
clud
ed o
n th
e re
gula
r si
te i
nspe
ctio
n an
d r
epor
ting
pro
gram
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
WM
SP –
Tab
le 7
-1
Bot
h to
ilet
bloc
ks h
ave
visi
ble
and
au
dib
le a
larm
s in
stal
led
(l
adie
s in
stal
led
re
tros
pect
ivel
y af
ter
over
flow
in
cid
ent)
.
Was
tew
ater
pu
mpe
d
out
regu
larl
y (w
eekl
y) w
hich
is e
nter
ed in
to m
ater
ials
tr
acki
ng
regi
ster
.
Vol
umes
re
port
ed
in
six
mon
thly
com
plia
nce
repo
rt.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B23
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
86
The
re i
s a
grou
ndw
ater
mon
itor
ing
piez
omet
er t
hat
is
regu
larl
y sa
mpl
ed
for
path
ogen
s an
d
nutr
ient
s,
dow
nstr
eam
of t
he w
aste
wat
er h
old
ing
tank
.
Con
stru
ctio
n C
BI
IO
Ope
n
GM
SP –
Tab
le 8
.1
IO –
ed
it r
efer
ence
in
Tab
le 1
.3 f
rom
Tab
le 1
.8 t
o T
able
8.1
, cha
nge
SoC
num
ber
to c
orre
ct n
umbe
r.
Cur
rent
was
tew
ater
hol
din
g ta
nks
inst
alle
d a
bove
gr
ound
.
Gro
und
wat
er
bore
lo
cate
d
to
nort
h (d
own
grad
ient
) of
se
wag
e ho
ldin
g ta
nk
(MW
6 an
d
MW
7) A
naly
tes
to b
e te
sted
inc
lud
e nu
trie
nts
but
not
path
ogen
s su
ch
as
E.
Col
i, to
tal
or
faec
al
colif
orm
s to
ind
icat
e se
wag
e co
ntam
inat
ion
IO –
con
sid
er s
ampl
ing
for
E C
oli
or s
imila
r to
d
etec
t an
y se
wag
e co
ntam
inat
ion
in
dow
n gr
adie
nt b
ores
whi
lst
sew
age
tank
is
inst
alle
d f
or
cons
tru
ctio
n s
ite
offi
ce
87
Ens
ure
tha
t th
e ba
nks
of w
ater
cou
rses
are
not
dis
turb
ed
du
ring
con
stru
ctio
n.
Con
stru
ctio
n C
BI
Oth
er
NA
Ope
n
GW
MSP
– T
able
8-1
Nil
wor
ks c
ompl
eted
alo
ng b
anks
of
wat
erco
urse
d
urin
g au
dit
per
iod
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B24
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
88
Tho
se
cond
itio
ns
1 to
5
reco
mm
end
ed
by
PSC
ar
e im
plem
ente
d fo
r th
e P
roje
ct.
1)
Full
det
ails
of
st
orm
wat
er
dra
inag
e sh
all
be
appr
oved
by
an a
ccre
dit
ed c
erti
fier
or
Cou
ncil
prio
r to
issu
e of
Con
stru
ctio
n C
erti
fica
te.
2)
Subm
issi
on o
f W
orks
-As-
Exe
cute
d p
lans
and
rep
ort
prep
ared
an
d
cert
ifie
d
by
a su
itab
ly
qual
ifie
d
dra
inag
e en
gine
er
conf
irm
ing
all
dra
inag
e w
orks
(v
olum
e, d
isch
arge
, le
vels
, lo
cati
on e
tc)
are
built
in
acco
rdan
ce
wit
h co
ndit
ions
of
co
nsen
t an
d
the
appr
oved
pla
n.
The
doc
umen
ts s
hall
be s
ubm
itte
d
to, a
nd a
ccep
ted
by
the
Cer
tify
ing
Au
thor
ity
prio
r to
is
sue
of th
e O
ccup
atio
n ce
rtif
icat
e.
3)
The
sto
rmw
ater
sys
tem
, inc
lud
ing
any
wat
er q
ualit
y or
qu
anti
ty
com
pone
nts,
sh
all
be
mai
ntai
ned
in
pe
rpet
uit
y fo
r th
e lif
e of
the
dev
elop
men
t.
4)
Sepa
rate
app
rova
l is
req
uir
ed t
o oc
cupy
, cl
ose
or
part
ially
cl
ose
the
road
re
serv
e ad
jace
nt
to
the
prop
erty
u
nder
th
e R
oad
s A
ct.
The
st
orag
e of
m
ater
ials
, pl
acem
ent
of t
oile
ts a
nd r
ubbi
sh s
kips
w
ithi
n th
e ro
ad r
eser
ve is
not
per
mit
ted
.
5)
Pro
vid
e w
ater
qu
alit
y re
port
tha
t sh
ows
that
the
sy
stem
for
rem
oval
of
nutr
ient
s an
d o
ther
pol
luta
nts
mee
ts
the
targ
ets
set
out
in
Cou
ncil'
s 'U
rban
St
orm
wat
er a
nd R
ural
Wat
er Q
ualit
y m
anag
emen
t P
lan'
(se
e se
ctio
n 8)
. D
etai
ls t
o be
pro
vid
ed t
o th
e
Pre
ope
rati
ons
AG
L
(1,3
,5)
CB
I (2,
4)
Com
plia
nce
Ope
n
1)
Com
plet
ed.
2)
To
be
subm
itte
d
once
pl
ant
has
been
co
nstr
uct
ed
3)
Not
ed
– to
be
in
clu
de
in
OE
MP
to
be
d
evel
oped
for
oper
atio
ns p
hase
4)
Ref
er S
urv
eyor
s P
lan
for
DP
1173
564
– cu
rren
t lo
cati
on o
f bu
ildin
gs i
s on
sho
uld
er o
f T
AC
ac
cess
ro
ad.
Che
ck
of
PSC
L
EP
fo
r ar
ea
conf
irm
s ro
ad is
not
a P
ublic
Roa
d
5)
Com
plet
ed
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B25
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
cert
ifyi
ng a
utho
rity
pri
or to
issu
e of
the
Con
Cer
t.
7.3
Gro
un
dw
ater
90
A
gro
und
wat
er m
anag
emen
t pl
an w
ill b
e pr
epar
ed i
n co
nsu
ltat
ion
wit
h re
leva
nt a
genc
ies
and
im
plem
ente
d a
s pa
rt
of
the
CE
MP
an
d
OE
MP
. T
he
grou
ndw
ater
m
anag
emen
t pl
an
will
d
escr
ibe
best
pr
acti
ce
cont
rol
mea
sure
s to
red
uce
the
risk
of
cont
amin
atio
n of
sha
llow
gr
ound
wat
er,
or
the
subs
tant
ial
alte
rati
on
of
grou
ndw
ater
fl
ows
due
to
d
raw
dow
n ef
fect
s.
The
pr
opos
ed (
onsi
te)
mon
itor
ing
netw
ork
will
be
effe
ctiv
e in
id
enti
fyin
g an
y im
pact
s d
urin
g bo
th t
he s
ite
cons
tru
ctio
n an
d o
pera
tion
of t
he fa
cilit
y.
The
gr
ound
wat
er
man
agem
ent
plan
w
ill
def
ine
the
grou
ndw
ater
m
onit
orin
g ne
twor
k,
anal
ytes
an
d
freq
uenc
ies,
in
clud
e a
spill
re
spon
se
plan
an
d
a co
ntin
genc
y pl
an t
o re
spon
d t
o an
y sp
ills
or m
easu
red
gr
ound
wat
er c
onta
min
atio
n d
urin
g P
roje
ct c
onst
ruct
ion
or o
pera
tion
s. G
roun
dw
ater
leve
ls w
ill a
lso
be m
onit
ored
at
a s
elec
tion
of
site
s. I
t w
ill a
lso
incl
ude
a co
ntin
genc
y pl
an to
res
pond
to a
ny d
raw
dow
n ca
used
by
HD
D b
ased
on
gro
und
wat
er m
onit
orin
g d
escr
ibed
in
sect
ion
7.4.
6 of
th
e E
A M
ain
Rep
ort.
Pre
cons
truc
tion
C
BI
Oth
er –
Sta
ge 2
Com
plia
nce
Ope
n
Em
ail
from
H
WC
31
O
ctob
er
2011
in
dic
atin
g sa
tisf
acti
on w
ith
plan
.
Em
ail t
o D
oPI
9 A
ugu
st 2
012
wit
h co
rres
pond
ence
at
tach
ed e
ndor
sing
GM
SP fr
om N
OW
Gro
und
wat
er
Man
agem
ent
Sub
Pla
n –
sent
in
em
ail
to D
oPI
dat
ed 1
1 Ju
ly 2
012.
Let
ter
from
D
OP
I re
ceiv
ed
10/
08/
2012
ap
prov
ing
plan
fo
r pr
imar
y pr
ojec
t are
a
Gro
und
wat
er M
anag
emen
t Su
b P
lan
– re
fer
CoA
B
25 a
nd B
57
Con
ting
ency
pla
n to
res
pond
to
any
dra
wd
own
cau
sed
by
H
DD
ba
sed
on
gr
ound
wat
er
mon
itor
ing
to
be
incl
uded
in
re
leva
nt
GM
SP
(Sta
ge 2
).
7.3.
1 G
roun
dwat
er L
evel
s an
d Fl
ow
91
Min
imis
e gr
ound
wat
er u
se.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
GM
SP –
Tab
le 8
-1
Nil
grou
ndw
ater
use
d d
urin
g au
dit
per
iod
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B26
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
92
Dis
char
ge e
xces
s gr
ound
wat
er p
umpe
d f
rom
tre
nche
s d
urin
g co
nstr
ucti
on
whe
re
poss
ible
to
m
inim
ise
tem
pora
ry c
hang
es in
loca
l gro
und
wat
er le
vels
.
Pre
cons
truc
tion
C
BI
IO
Ope
n
GM
SP –
Tab
le 8
-1
IO T
able
1-3
ref
ers
to S
oC 4
8 w
ith
this
des
crip
tion
.
Nil
grou
ndw
ater
pum
ped
fro
m t
renc
hes
dur
ing
aud
it p
erio
d
93
Rep
lace
mat
eria
l ex
cava
ted
fro
m t
renc
hes
to m
inim
ise
chan
ges
to g
roun
dw
ater
flo
ws,
as
far
as p
ract
ical
. Whe
re
poss
ible
, pip
elin
es w
ill b
e be
dd
ed o
n sa
nd i
n th
e ba
se o
f th
e tr
ench
.
Pre
cons
truc
tion
C
BI
IO
Ope
n
GM
SP –
Tab
le 8
-2
IO –
alig
n nu
mbe
r in
Tab
le 1
-3 t
o So
C n
umbe
r (1
11 to
93)
One
pit
exc
avat
ed a
t th
e in
ters
ecti
on o
f th
e ga
s pi
pelin
e an
d A
usg
rid
pow
erlin
e ea
sem
ent
du
ring
au
dit
per
iod
– m
ater
ial
exca
vate
d f
rom
pit
was
re
plac
ed b
ack
into
pit
.
94
Und
erta
ke i
nfilt
rati
on r
ate
test
s at
the
sit
es o
f pr
opos
ed
infi
ltra
tion
bas
ins
to d
eter
min
e lo
cal i
nfilt
rati
on r
ates
and
th
e pr
esen
ce
of
ind
ura
ted
sa
nd
laye
rs
capa
ble
of
inhi
biti
ng g
rou
ndw
ater
rec
harg
e.
Pre
cons
truc
tion
C
BI
IO
Ope
n
IO -
GM
SP to
incl
ud
e th
is S
oC
Nil
infi
ltra
tion
ba
sins
in
stal
led
d
urin
g au
dit
pe
riod
95
Mon
itor
gr
ound
wat
er
leve
ls
wit
hin
and
at
th
e bo
und
arie
s of
the
gas
plan
t sit
e.
Pre
cons
truc
tion
C
BI
IO
Ope
n
GM
SP –
Sec
tion
5.0
IO –
alig
n nu
mbe
r in
Tab
le t
o So
C n
umbe
r (9
0 to
95
)
Mon
thly
gr
ound
wat
er
mon
itor
ing
com
plet
ed
– re
sult
s an
d r
epor
ts p
end
ing
revi
ew.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B27
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7.3.
2 G
roun
dwat
er Q
uali
ty
96
A
grou
ndw
ater
ba
selin
e m
onit
orin
g pr
ogra
m
has
com
men
ced
and
will
con
tinu
e d
urin
g co
nstr
ucti
on a
nd
oper
atio
ns.
Thi
s in
clu
des
mea
sure
men
t of
gro
und
wat
er
leve
ls
and
qu
alit
y.
Gro
und
wat
er
mon
itor
ing
will
be
ca
rrie
d o
ut
thro
ugh
out
the
life
of t
he P
roje
ct w
ithi
n th
e ga
s pl
ant s
ite.
M
easu
res
for
prev
enti
ng c
onta
min
atio
n of
su
rfac
e w
ater
d
escr
ibed
in
sect
ion
7.3.
4 of
the
EA
Mai
n R
epor
t w
ill
assi
st i
n pr
even
ting
the
con
tam
inat
ion
of g
rou
ndw
ater
. M
easu
res
for
prev
enti
ng c
onta
min
ated
soi
ls o
r A
SS s
oils
co
ntam
inat
ing
surf
ace
wat
er
are
des
crib
ed
in
sect
ion
7.2.
4 of
the
EA
Mai
n R
epor
t. T
hese
mea
sure
s w
ill p
reve
nt
cont
amin
atio
n of
gr
ound
wat
er
by
nega
ting
th
e in
filt
rati
on
of
cont
amin
ated
su
rfac
e w
ater
an
d
the
leac
hing
of
pote
ntia
l co
ntam
inan
ts f
rom
the
soi
l in
to t
he
grou
ndw
ater
. A t
horo
ugh
geot
echn
ical
inve
stig
atio
n w
ill
be c
ompl
eted
pri
or to
HD
D c
omm
enci
ng to
ens
ure
that
it
is
des
igne
d
to
prev
ent
grou
ndw
ater
co
ntam
inat
ion
du
ring
con
stru
ctio
n.
Wat
er
qual
ity
para
met
ers
to
be
mon
itor
ed
will
be
d
eter
min
ed
dur
ing
dev
elop
men
t of
th
e gr
ound
wat
er
man
agem
ent
plan
and
in
cons
ult
atio
n w
ith
HW
C,
OE
H
and
NO
W.
A r
epor
t pr
esen
ting
dat
a an
d a
naly
sis
of t
he
six
mon
ths
of
base
line
wat
er
qual
ity
dat
a (b
oth
grou
ndw
ater
an
d s
urfa
ce w
ater
) w
ill b
e pr
ovid
ed t
o H
WC
, O
EH
and
NO
W.
The
bas
elin
e re
port
will
rev
iew
th
e in
teri
m t
hres
hold
s an
d d
evel
op t
he f
inal
thr
esho
lds
for
wat
er q
ual
ity
crit
eria
for
both
the
CE
MP
and
OE
MP
.
Pre
cons
truc
tion
Pre
cons
truc
tion
–
Stag
e 2
AG
L
Com
plia
nce
Ope
n –
Stag
e 2
Bas
elin
e re
port
com
plet
ed a
nd s
umm
ary
of r
esul
ts
incl
ude
in G
WM
P
Stag
e 2
- G
eote
chni
cal
inve
stig
atio
n pr
ior
to H
DD
to
be
com
plet
ed
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B28
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Spil
ls a
nd L
eaks
97
The
m
easu
res
for
prev
enti
ng
dir
ect
cont
amin
atio
n of
su
rfac
e w
ater
inc
lud
e m
easu
res
to p
reve
nt s
pills
at
the
gas
plan
t rea
chin
g gr
ound
wat
er.
All
stag
es
AG
L
IO
Ope
n
SWM
SP
GM
SP
– sp
ill
resp
onse
co
ntin
genc
y pl
an
flow
char
t, A
ppen
dix
E S
pill
Res
pons
e P
roce
dur
e
IO –
ad
dit
ion
of t
his
com
mit
men
t to
Tab
le 1
-3 o
f th
e SW
MSP
7.3.
3 M
onit
orin
g
98
Gro
und
wat
er
mon
itor
ing
will
be
un
der
take
n in
ac
cord
ance
w
ith
the
grou
ndw
ater
m
anag
emen
t pl
an
thro
ugh
out
the
life
of t
he P
roje
ct i
n th
e P
PA
and
du
ring
co
nstr
ucti
on o
nly
at t
he H
exha
m r
ecei
ving
sta
tion
sit
e an
d a
dja
cent
to
HD
D e
ntry
and
exi
t po
ints
, ass
umin
g no
ch
ange
s be
yond
exp
ecte
d n
atur
al v
aria
tion
are
obs
erve
d
in th
ese
bore
s.
Mon
itor
ing
bore
s w
ill b
e in
stal
led
. The
re m
ay b
e se
vera
l ph
ases
of
inst
alla
tion
dep
end
ing
on t
he r
espe
ctiv
e si
te
and
pi
pelin
e co
nstr
uct
ion
prog
ram
s.
A
grou
ndw
ater
ba
selin
e w
ill
be
esta
blis
hed
be
fore
co
nstr
ucti
on
com
men
ces
(min
imum
si
x m
onth
s at
bo
und
ary
loca
tion
s).
The
fin
al m
onit
orin
g lo
cati
ons
will
be
def
ined
dur
ing
dev
elop
men
t of
the
Gro
und
wat
er M
anag
emen
t P
lan
for
the
site
and
det
erm
ined
in c
onsu
ltat
ion
wit
h H
WC
, OE
H
and
NO
W.
Pre
cons
truc
tion
Pre
cons
truc
tion
–
Stag
e 2
CB
I
AG
L
IO
Ope
n
GM
SP –
Sec
tion
5.0
IO –
alig
n nu
mbe
r in
Tab
le t
o So
C n
um
ber
(119
to
98)
Stag
e 2
– H
DD
GM
SP to
be
dev
elop
ed
Gro
und
wat
er
mon
itor
ing
com
pete
d
mon
thly
. R
esul
ts a
nd r
epor
ts p
end
ing.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B29
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
A t
horo
ugh
geot
echn
ical
inv
esti
gati
on w
ill b
e co
mpl
eted
pr
ior
to H
DD
com
men
cing
to
ensu
re t
hat
it i
s d
esig
ned
to
pr
even
t gr
ound
wat
er
cont
amin
atio
n d
uri
ng
cons
tru
ctio
n.
Gro
und
wat
er m
onit
orin
g w
ill b
e un
der
take
n th
roug
hout
th
e lif
e of
the
Pro
ject
in
the
PP
A i
n ac
cord
ance
wit
h th
e gr
ound
wat
er
man
agem
ent
plan
. In
ad
dit
ion
the
grou
ndw
ater
man
agem
ent
plan
will
mak
e pr
ovis
ion
for
add
itio
nal
grou
ndw
ater
m
onit
ored
at
th
e H
exha
m
rece
ivin
g st
atio
n si
te a
nd a
dja
cent
to
HD
D e
ntry
and
exi
t po
ints
du
ring
con
stru
ctio
n.
Wat
er
qual
ity
para
met
ers
to
be
mon
itor
ed
will
be
d
efin
ed
dur
ing
dev
elop
men
t of
th
e gr
ound
wat
er
man
agem
ent
plan
fo
r th
e si
te
and
d
eter
min
ed
in
cons
ult
atio
n w
ith
HW
C, O
EH
and
NO
W.
Gro
und
wat
er
mon
itor
ing
resu
lts
will
be
ev
alua
ted
ag
ains
t na
tura
l ba
ckgr
ound
con
cent
rati
ons
(the
pri
mar
y co
mpa
riso
n)
and
ha
ve
rele
vanc
e to
A
NZ
EC
C
2000
ec
osys
tem
tri
gger
val
ues
and
NH
MR
C 2
004
Au
stra
lian
dri
nkin
g w
ater
gui
del
ines
. Thr
esho
lds
will
be
def
ined
in
the
grou
ndw
ater
m
anag
emen
t pl
an
for
the
site
an
d
det
erm
ined
in
cons
ult
atio
n w
ith
HW
C, O
EH
and
NO
W.
Exc
eed
ance
s ab
ove
the
fina
l ad
opte
d t
hres
hold
s w
ould
tr
igge
r re
spon
ses
as o
utlin
ed i
n th
e co
ntin
genc
y fl
ow
char
t.
The
in
dic
ativ
e gr
ound
wat
er
mon
itor
ing
prog
ram
sc
hed
ule
is o
utl
ined
in T
able
7.1
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B30
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
99
Spill
Res
pons
e w
ill in
clud
e:
(1) C
lean
-up
of th
e co
ntam
inat
ion
sou
rce;
(2)
Ass
ess
the
grou
ndw
ater
qu
alit
y w
ith
resp
ect
to
rele
vant
gui
del
ines
;
(3)
Ad
vise
OE
H, N
OW
and
HW
C o
f an
y sp
ill o
r le
akag
e to
u
npav
ed
grou
nd
that
ha
s po
tent
ial
to
impa
ct
grou
ndw
ater
.
(4)
Und
erta
ke h
ydra
ulic
con
tain
men
t us
ing
one
or m
ore
dow
nstr
eam
pum
ping
bor
es;
(5)
inst
all
add
itio
nal
mon
itor
ing
bore
s an
d
incr
ease
m
onit
orin
g fr
eque
ncy;
(6)
Pum
p th
e co
ntai
ned
wat
er t
o a
trea
tmen
t fa
cilit
y fo
r tr
eatm
ent
and
rei
njec
tion
to
grou
ndw
ater
if
the
wat
er
mee
ts c
rite
ria.
Pre
cons
truc
tion
C
BI
(1,
3,
6),
AG
L (2
, 4, 5
) IO
Ope
n
GM
SP
1.
App
end
ix E
2.
Sect
ion
2.0
3.
App
end
ix E
4.
App
end
ix E
and
Fig
ure
s 5
& 6
5.
App
end
ix E
6.
App
end
ix E
IO –
alig
n nu
mbe
r in
Tab
le 1
-3 t
o So
C n
umbe
r (v
ario
us)
100
Ad
vise
OE
H, N
OW
and
HW
C o
f any
spi
ll or
leak
age
to
unp
aved
gro
und
that
has
pot
enti
al to
impa
ct
grou
ndw
ater
.
Con
stru
ctio
n C
BI
AG
L
IO
Ope
n
OE
H
noti
fied
in
G
MSP
, E
mer
genc
y R
espo
nse
Pla
n, C
EM
P a
nd P
IRM
P. G
MSP
– A
ppen
dix
E a
lso
incl
ud
es r
equ
irem
ent t
o co
ntac
t NO
W a
nd H
WC
IO
ad
d i
n th
e re
quir
emen
t to
not
ify
HW
C a
nd
NO
W i
n th
e E
RP
, C
EM
P a
nd P
IRM
P i
f po
tent
ial
grou
ndw
ater
impa
cts
N
il m
ajor
spi
lls o
n si
te d
urin
g au
dit
per
iod
tha
t m
ay
have
po
tent
ially
im
pact
ed
grou
ndw
ater
. C
omm
itm
ent
to r
epor
t al
l sp
ills
over
20l
itre
s to
E
PA
, NO
W a
nd H
WC
. Tw
o in
cid
ents
rep
orte
d t
o ag
enci
es d
uri
ng a
ud
it p
erio
d 1
5/10
/20
12 (
sew
age
over
flow
) and
18/
09/
2012
(hyd
rau
lic o
il).
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B31
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7.3.
4 M
odif
icat
ions
to
Man
agem
ent
and
Mit
igat
ion
Mea
sure
s fo
r G
roun
dwat
er
101
A g
rou
ndw
ater
ass
essm
ent
(at
Hex
ham
sit
e) b
ased
on
site
red
evel
opm
ent d
etai
ls a
re c
arri
ed o
ut.
Pre
cons
truc
tion
–
Stag
e 2
AG
L
NA
Ope
n
Stag
e 2
102
NO
W
will
be
co
nsu
lted
re
gard
ing
any
cons
tru
ctio
n d
ewat
erin
g of
pip
elin
e ex
cava
tion
s to
ens
ure
tha
t an
y ex
trac
tion
s ar
e pr
oper
ly li
cens
ed (i
f req
uir
ed).
Con
stru
ctio
n –
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
103
AG
L w
ill e
nsu
re c
ompl
ianc
e w
ith
all
stat
uto
ry l
icen
sing
re
quir
emen
ts,
incl
udin
g th
ose
stip
ula
ted
by
th
e co
ndit
ions
of a
ppro
val.
Con
stru
ctio
n A
GL
CB
I
Com
plia
nce
Ope
n
GM
SP –
Sec
tion
5.0
Au
dit
sc
hed
ule
, re
view
of
op
erat
ions
,
CB
I re
port
ing
104
All
wat
er s
upp
lies
for
cons
tru
ctio
n an
d o
pera
tion
s w
ill
be s
ourc
ed fr
om a
n au
thor
ised
and
rel
iabl
e su
pply
. C
onst
ruct
ion
Ope
rati
ons
CB
I IO
Ope
n
GM
SP –
Tab
le 8
-1
IO –
alig
n nu
mbe
r in
Tab
le to
SoC
num
ber
Wat
er s
ourc
ed f
rom
HW
C m
eter
ed s
tand
pipe
on
Old
Pu
nt R
d
105
A g
rou
ndw
ater
man
agem
ent
plan
will
be
prep
ared
in
cons
ult
atio
n w
ith
HW
C,
OE
H
and
N
OW
. T
he
grou
ndw
ater
man
agem
ent
plan
will
inc
lud
e, b
ut n
ot b
e lim
ited
to:
A d
escr
ipti
on o
f th
e qu
anti
ty a
nd s
ourc
e of
all
surf
ace
wat
er
supp
lies
rela
ting
to
co
nstr
uct
ion
and
op
erat
ions
; A
d
escr
ipti
on
of
all
dew
ater
ing
acti
viti
es
incl
ud
ing
the
quan
tity
of
grou
ndw
ater
to
be t
aken
; In
re
lati
ons
to g
roun
dw
ater
leve
ls a
nd q
ualit
y,
Pre
cons
truc
tion
A
GL
IO
Ope
n
GM
SP –
sen
t in
em
ail
to D
oPI
dat
ed 1
1 Ju
ly 2
012
wit
h ac
cept
ance
of
plan
rec
eive
d A
ugu
st 2
012
for
Pri
mar
y P
roje
ct A
rea.
Em
ail
from
H
WC
31
O
ctob
er
2011
in
dic
atin
g sa
tisf
acti
on w
ith
plan
.
Em
ail t
o D
oPI
9 A
ugu
st 2
012
wit
h co
rres
pond
ence
at
tach
ed e
ndor
sing
GM
SP fr
om N
OW
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B32
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
(i)
a d
etai
led
bas
elin
e d
ata
on g
roun
dw
ater
lev
els
and
qu
alit
y,
(ii)
G
roun
dw
ater
qua
lity
impa
ct a
sses
smen
t cri
teri
a,
(iii)
a p
rogr
am t
o m
onit
or t
he e
ffec
ts o
f an
y ch
ange
in
grou
ndw
ater
leve
ls a
nd q
ualit
y on
gro
und
wat
er
dep
end
ent e
cosy
stem
s,
(iv)
A p
roto
col
for
the
inve
stig
atio
n, n
otif
icat
ion
and
m
itig
atio
n of
id
enti
fied
ex
ceed
ance
s of
th
e gr
ound
wat
er q
ualit
y im
pact
ass
essm
ent c
rite
ria,
(v)
A s
trat
egy
to p
reve
nt i
llega
l d
umpi
ng o
f w
aste
on
the
site
and
any
acc
ess
road
s or
trac
ks.
(i)
App
end
ix
C
incl
udes
ba
selin
e w
ater
qu
alit
y, d
epth
. Du
rati
on a
nd f
requ
ency
of
m
onit
orin
g in
clu
de
in
Tab
le
5-2
Gro
und
wat
er M
onit
orin
g R
equ
irem
ents
(ii)
P
erfo
rman
ce c
rite
ria
incl
uded
in S
ecti
on 5
.1.1
(iii)
Sec
tion
5.1
.1 f
or w
ater
qu
alit
y an
d c
hang
es in
wat
er le
vels
(usi
ng C
UM
SUM
)
(iv)
Con
ting
ency
P
lan
Flow
char
t Fi
gure
5
and
App
end
ix E
for
spill
s
IO -
ad
dit
ion
to p
lan
if m
onit
orin
g re
sult
s
ind
icat
e im
pact
s,
elev
ated
an
alyt
e
conc
entr
atio
ns, c
hang
es in
GW
leve
ls
(v)
WM
SP –
Tab
le 7
-7 Il
lega
l Dum
ping
106
A g
rou
ndw
ater
mon
itor
ing
piez
omet
er w
ill b
e in
stal
led
an
d
regu
larl
y sa
mpl
ed
for
path
ogen
s an
d
nutr
ient
s,
dow
nstr
eam
of t
he h
old
ing
tank
for
was
tew
ater
.
Pre
cons
truc
tion
C
BI
IO
(rep
eat o
f SoC
86)
IO
Ope
n
GM
SP –
Tab
le 8
.1
Gro
und
wat
er m
onit
orin
g co
mpl
eted
at
IO –
alig
n nu
mbe
r in
Tab
le 1
-3 to
SoC
num
ber
Ref
er S
oC 8
6 (r
epea
t)
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B33
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Cur
rent
was
tew
ater
hol
din
g ta
nks
inst
alle
d a
bove
gr
ound
.
Gro
und
wat
er
bore
lo
cate
d
to
nort
h (d
own
grad
ient
) of
se
wag
e ho
ldin
g ta
nk
(MW
6 an
d
MW
7) A
naly
tes
to b
e te
sted
inc
lud
e nu
trie
nts
but
not
path
ogen
s su
ch
as
E.
Col
i, to
tal
or
faec
al
colif
orm
s to
ind
icat
e se
wag
e co
ntam
inat
ion
IO –
con
sid
er s
ampl
ing
for
E C
oli
or s
imila
r to
d
etec
t an
y se
wag
e co
ntam
inat
ion
in
dow
n gr
adie
nt b
ores
whi
lst
sew
age
tank
is
inst
alle
d f
or
cons
tru
ctio
n s
ite
offi
ce
107
Gro
und
wat
er m
onit
orin
g d
ata
colle
cted
from
the
site
will
be
pro
vid
ed to
HW
C, O
EH
and
NO
W.
Con
stru
ctio
n C
BI
IO
Ope
n
GW
MP
– S
ecti
on 3
.0 a
nd S
ecti
on 5
.0
IO –
alig
n nu
mbe
r in
Tab
le to
SoC
num
ber
Gro
und
wat
er
mon
itor
ing
com
plet
ed
mon
thly
–
revi
ew
of
corr
espo
nden
ce
send
ing
repo
rts
to
agen
cies
to c
onfi
rm c
ompl
ianc
e ou
tsta
ndin
g.
108
Mon
itor
and
ass
ess
grou
ndw
ater
qu
alit
y w
ith
resp
ect
to
back
grou
nd c
once
ntra
tion
s.
Con
stru
ctio
n C
BI
IO
Ope
n
GM
SP –
Sec
tion
5.0
IO –
alig
n nu
mbe
r in
Tab
le 1
-3 to
SoC
num
ber
Mon
thly
gro
und
wat
er m
onit
orin
g re
port
s to
not
re
view
ed d
uri
ng th
is a
ud
it.
109
Con
du
ct a
rev
iew
of
the
anal
ytic
al s
uit
e of
gro
und
wat
er
mon
itor
ing
para
met
ers
follo
win
g fi
rst
12
mon
ths
of
cons
tru
ctio
n w
orks
.
Con
stru
ctio
n C
BI
IO
Ope
n
GM
SP –
Sec
tion
5.0
, App
end
ix C
IO –
alig
n nu
mbe
r in
Tab
le 1
-3 to
SoC
num
ber
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B34
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Con
stru
ctio
n w
ithi
n fi
rst
12 m
onth
s at
dat
e of
au
dit
.
110
Pre
pare
re
med
iati
on
acti
on
plan
w
hich
is
lik
ely
to
incl
ude
hyd
raul
ic c
onta
inm
ent
usin
g on
e or
mor
e d
own
grad
ient
(new
) pum
ping
bor
es (i
n th
e ev
ent o
f spi
ll).
Con
stru
ctio
n C
BI
IO
Ope
n
GM
SP –
App
end
ix E
and
Fig
ure
s 5
& 6
GM
SP o
utl
ines
app
roac
h to
be
take
n in
eve
nt o
f sp
ill/
pollu
tion
w
hich
in
clud
es
hyd
raul
ic
cont
ainm
ent.
In
rela
tion
to
spec
ific
eve
nt A
GL
m
ay
prov
ide
supp
ort
to
CB
I w
hen
CB
I is
d
evel
opin
g m
anag
emen
t st
rate
gy.
Stra
tegy
to
be
impl
emen
ted
by
CB
I.
IO –
alig
n nu
mbe
r in
Tab
le 1
-3 to
SoC
num
ber
7.4
Flor
a an
d F
aun
a
7.4.
1 Fl
ora
111
Lim
it t
he w
idth
of
the
cons
tru
ctio
n ri
ght
of w
ays
for
the
gas
pipe
line
(up
to 1
0 m
) w
here
sig
nifi
cant
spe
cies
and
ve
geta
tion
rem
nant
s ar
e lo
cate
d (
appl
ies
to g
as p
ipel
ine
corr
idor
alo
ng n
orth
ern
bou
ndar
y).
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
FFM
SP
– A
ppen
dix
B
, T
able
8-
9 V
eget
atio
n C
lear
ing
Pro
toco
l, T
able
8-
10
Ear
p’s
Gu
m
Pro
tect
ion
Pro
toco
l
The
cu
rren
t W
P d
raw
ings
sho
w t
he w
hole
of
the
30m
eas
emen
t be
ing
clea
red
alo
ng t
he g
as a
cces
s tr
ack,
wit
h 10
m b
eing
use
d to
cre
ate
a tr
ack.
Let
ter
from
eco
Bio
logi
cal
14/
05/
2012
con
firm
ing
that
the
re a
re n
o si
gnif
ican
t sp
ecie
s or
eco
logi
cal
com
mun
itie
s w
hich
wou
ld l
imit
the
cle
arin
g to
10
m
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B35
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
112
Re-
vege
tate
rel
evan
t se
ctio
ns o
f th
e ri
ght
of w
ays
wit
h su
itab
le n
ativ
e sp
ecie
s th
at c
ompl
y w
ith
pipe
line
licen
se
requ
irem
ents
(e
.g.,
no
larg
e tr
ee
spec
ies)
as
so
on
as
prac
tica
ble
follo
win
g co
nstr
uct
ion.
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Cu
rren
tly
not
refe
renc
ed i
n FF
MSP
or
VR
MSP
as
CB
I no
t co
mpl
etin
g w
orks
– p
ipel
ine
inst
alla
tion
co
ntra
ctor
to a
dd
in th
eir
plan
s as
req
uire
d
113
Allo
w a
n ap
prop
riat
e bu
ffer
dis
tanc
e (t
o be
det
erm
ined
w
hen
dev
elop
ing
the
CE
MP
) be
twee
n an
y co
nstr
uct
ion
acti
vity
an
d
rem
nant
na
tive
ve
geta
tion
, w
here
pr
acti
cabl
e. I
n su
ch s
itua
tion
s, s
tric
t er
osio
n co
ntro
ls w
ill
be
impl
emen
ted
to
pr
even
t se
dim
ent-
lad
en
runo
ff
ente
ring
the
adja
cent
veg
etat
ion.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Ope
n
VR
SMP
App
end
ix B
Tab
le 8
-2
114
Ens
ure
ve
hicl
e an
d
equ
ipm
ent
park
ing
area
s an
d
stoc
kpile
are
as a
re i
den
tifi
ed a
nd s
ited
to
avoi
d a
reas
co
ntai
ning
eco
logi
cal v
alu
e.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
FFM
SP –
App
end
ix B
Tab
le 8
-2 A
cces
s
Tab
le 8
-10
Ear
p’s
Gu
m P
rote
ctio
n P
roto
col
VR
SMP
App
end
ix C
SWM
SP –
Tab
le 8
-11
CE
MP
–
incl
udes
lo
cati
on
of
stoc
kpile
s an
d
offi
ces.
A
reas
loc
ated
wit
hin
del
inea
ted
pro
ject
ar
ea.
ER
and
CB
I ins
pect
ions
con
firm
loca
tion
s
115
Ere
ct f
lagg
ing
tape
to
mar
k ‘n
o-go
’ zon
es t
o en
sure
are
as
to
be
prot
ecte
d
are
clea
rly
def
ined
, id
enti
fied
an
d
avoi
ded
.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
- C
BI
FFM
SP –
App
end
ix B
Tab
le 8
-1 G
ener
al C
onst
ruct
ion
Tab
le 8
-6 P
re-c
lear
ing
Pro
toco
l
Tab
le 8
-10
Ear
p’s
Gu
m P
rote
ctio
n P
roto
col
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B36
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Tab
le 8
-12
Koa
la P
rote
ctio
n P
roto
col
Tab
le 8
-13
Hol
low
dep
end
ant
Thr
eate
ned
Fau
na
Pro
tect
ion
Pro
toco
l
VR
SMP
App
end
ix C
Site
in
spec
tion
s co
nfir
med
fl
aggi
ng
tape
d
elin
eate
d b
ound
ary
of w
orks
.
116
Iden
tify
app
ropr
iate
bio
div
ersi
ty o
ffse
ts c
onsi
sten
t w
ith
‘impr
ove
or m
aint
ain’
pri
ncip
les.
P
reco
nstr
ucti
on
AG
L
Com
plia
nce
Clo
sed
Ref
er O
ffse
t Str
ateg
y E
coB
iolo
gica
l May
201
2
117
Use
nat
ive
vege
tati
on g
row
n fr
om l
ocal
see
d b
anks
for
re
-veg
etat
ion
whe
re a
ppro
pria
te.
Pre
cons
truc
tion
A
GL
(r
espo
nsib
le
for
seed
ba
nk),
Oth
er
resp
onsi
ble
for
re-v
eget
atio
n
Com
plia
nce
Ope
n
VR
SMP
App
end
ix D
, App
end
ix B
Tab
le 8
-5
Re-
vege
tati
on w
orks
yet
to
com
men
ce a
t ti
me
of
aud
it
118
Lim
it a
cces
s to
sen
siti
ve a
reas
of
rive
rban
ks a
nd r
ipar
ian
vege
tati
on d
uri
ng c
onst
ruct
ion
of t
he p
ipel
ines
whe
re
prac
tica
ble
to
avoi
d
inad
vert
ent
or
una
uth
oris
ed
dis
turb
ance
of a
dja
cent
veg
etat
ion.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Stag
e 2
Pip
elin
e co
ntra
ctor
s to
inc
lud
e in
the
ir
FFM
SP
119
Rei
nsta
te lo
gs a
nd r
ocks
, whi
ch a
re r
emov
ed f
or p
ipel
ine
cons
tru
ctio
n, a
long
the
rig
ht o
f w
ays
or r
eloc
ate
them
to
appr
opri
ate
near
by h
abit
ats.
Con
stru
ctio
n –
Stag
e 2
Ope
rati
ons
Oth
er
NA
Ope
n
Stag
e 2
Pip
elin
e co
ntra
ctor
s to
inc
lud
e in
the
ir
FFM
SP
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B37
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
120
Tri
m v
eget
atio
n w
here
pos
sibl
e ra
ther
than
rem
ovin
g it
. C
onst
ruct
ion
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
VR
SMP
Sec
tion
3.2
ER
si
te
insp
ecti
ons
conf
irm
tr
ees
left
al
ong
bou
ndar
ies
and
tri
mm
ed w
here
pos
sibl
e –
refe
r in
spec
tion
rep
orts
.
121
Re-
vege
tate
dis
turb
ed a
reas
whe
re p
ossi
ble,
oth
er t
han
thos
e re
quir
ed f
or p
erm
anen
t u
se, a
cces
s to
the
eas
emen
t or
fa
cilit
ies
or
for
bush
fire
pr
otec
tion
s ar
eas.
T
he
follo
win
g pr
oced
ures
w
ill
be
follo
wed
d
urin
g re
-ve
geta
tion
:
R
eins
tate
tops
oil;
R
e-sp
read
cle
ared
veg
etat
ion
in t
he P
roje
ct a
rea
to
faci
litat
e na
tura
l re
gene
rati
on o
f na
tive
veg
etat
ion,
w
here
app
ropr
iate
;
U
nder
take
wee
d c
ontr
ol w
here
nec
essa
ry to
pro
mot
e th
e re
habi
litat
ion
of r
e-ve
geta
ted
are
as;
In
co
nsu
ltat
ion
wit
h th
e la
ndow
ner,
fe
nce
reha
bilit
ated
are
as u
ntil
succ
essf
ul r
e-ve
geta
tion
is
evid
ent
or u
ntil
such
tim
e as
the
land
owne
r re
ques
ts
fenc
ing
to b
e re
mov
ed;
M
onit
or
reha
bilit
atio
n su
cces
s,
and
un
der
take
su
pple
men
tary
ac
tive
re
-veg
etat
ion
(as
outl
ined
ab
ove)
, if r
equi
red
.
Con
stru
ctio
n
Ope
rati
ons
Oth
er
Com
plia
nce
Ope
n
FFM
SP –
App
end
ix B
Tab
le 8
-1 G
ener
al C
onst
ruct
ion
Tab
le 8
-9 V
eget
atio
n C
lear
ing
Pro
toco
l
VR
MSP
– T
able
8-2
, Tab
le 8
-5, S
ecti
on 3
.1, S
ecti
on
5 Re-
vege
tati
on w
orks
yet
to
com
men
ce a
t ti
me
of
aud
it
7.4.
2 Fa
una
122
Pre
pare
a
det
aile
d
fau
na
tran
sloc
atio
n (d
ispl
acem
ent)
pr
otoc
ol t
o as
sist
in
the
tran
sloc
atio
n of
wild
life
dur
ing
the
clea
ring
pro
cess
.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
FFM
SP –
App
end
ix B
Tab
le 8
.8 G
ener
al F
auna
Dis
plac
emen
t Pro
toco
l
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B38
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
123
Use
HD
D w
here
war
rant
ed.
Con
stru
ctio
n –
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
124
Min
imis
e th
e le
ngth
of
tim
e th
at c
onst
ruct
ion
tren
ches
re
mai
n op
en,
part
icul
arly
in
ar
eas
whe
re
habi
tat
for
sign
ific
ant s
peci
es h
as b
een
iden
tifi
ed n
earb
y.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
FFM
SP
– A
ppen
dix
B
T
able
8-
1 G
ener
al
Con
stru
ctio
n
One
pit
ex
cava
ted
at
the
inte
rsec
tion
of
the
gas
pipe
line
and
Au
sgri
d p
ower
line
ease
men
t d
uri
ng
aud
it p
erio
d –
open
for
tw
o d
ays
befo
re b
eing
ba
ckfi
lled
125
Cle
ar f
auna
fro
m t
he r
ight
of
way
pri
or t
o ve
geta
tion
cl
eari
ng
and
im
plem
ent
mit
igat
ion
mea
sure
s w
here
ha
bita
t is
pres
ent.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Clo
sed
FFM
SP –
App
end
ix B
Tab
le 8
-9 V
eget
atio
n C
lear
ing
Pro
toco
l
Cle
arin
g pr
oces
s no
w c
ompl
eted
– E
cobi
olog
ical
co
mpl
eted
re
port
“V
eget
atio
n C
lear
ing
for
New
cast
le G
as S
tora
ge F
acili
ty”
(Nov
embe
r 20
12)
det
ailin
g fa
una
resc
ue a
nd r
eloc
atio
ns. T
otal
of
57
anim
als
resc
ued
from
cle
arin
g zo
ne.
126
Rem
ove
habi
tat f
eatu
res,
su
ch a
s ro
cks
and
logs
, fro
m th
e ri
ght
of w
ay p
rior
to
clea
ring
, an
d c
aref
ully
sto
ckpi
le
prio
r to
cle
arin
g an
d r
etu
rn d
uri
ng e
asem
ent
rest
orat
ion.
In
spec
t th
ese
feat
ure
s fo
r si
gns
of f
auna
and
rem
ove
habi
tat f
eatu
res
prio
r to
cle
arin
g th
e ri
ght o
f way
.
Pre
-cle
arin
g C
BI
Com
plia
nce
Clo
sed
IO
– cu
rren
tly
not
incl
uded
in
FF
MSP
bu
t re
fere
nced
in
T
able
1-
3 –
to
be
add
ed
into
A
ppen
dix
B T
able
8-6
Pre
cle
arin
g pr
otoc
ol.
One
sig
nifi
cant
roc
k in
are
a –
will
rem
ain
in P
PA
.
Nil
rock
s or
log
s su
itab
le f
or r
esto
rati
on w
orks
w
ere
iden
tifi
ed
by
Eco
biol
ogic
al
as
per
repo
rt
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fa
cilit
y” (N
ovem
ber
2012
).
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B39
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
127
Con
du
ct p
re-c
lear
ing
surv
eys
prio
r to
any
tre
e fe
lling
to
iden
tify
hol
low
-bea
ring
tree
s, w
hich
will
be
left
sta
ndin
g,
whe
re p
ract
icab
le.
Nes
ting
box
es w
ill b
e pl
aced
int
o ne
arby
tree
s w
here
hol
low
-bea
ring
tree
s ar
e re
mov
ed.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Clo
sed
FFM
SP
– A
ppen
dix
B
T
able
8-
6 P
re-c
lear
ing
Pro
toco
l,
Tab
le 8
-7 H
ollo
w B
eari
ng T
ree
Cle
arin
g P
roto
col
Eco
biol
ogic
al
det
aile
d
proc
ess
in
repo
rt
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fa
cilit
y” (
Nov
embe
r 20
12).
ER
sit
e in
spec
tion
s al
so n
oted
pro
toco
l fo
llow
ed –
ref
er i
nspe
ctio
n re
port
s.
Cle
arin
g no
w c
ompl
eted
128
Con
du
ct
pre-
cons
tru
ctio
n tr
appi
ng
and
re
loca
tion
of
ta
rget
ed s
peci
es w
here
pos
sibl
e in
spe
cifi
ed e
colo
gica
lly
sens
itiv
e lo
cati
ons.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Clo
sed
FFM
SP –
App
end
ix B
Tab
le 8
-8 G
ener
al F
auna
Dis
plac
emen
t Pro
toco
l
Tab
le
8-11
N
ew
Hol
land
M
ouse
P
rote
ctio
n P
roto
col
Tab
le 8
-12
Koa
la P
rote
ctio
n P
roto
col
Eco
biol
ogic
al d
etai
led
tra
ppin
g re
sult
s in
rep
ort
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fa
cilit
y”
(Nov
embe
r 20
12).
N
il N
ew
Hol
land
M
ice
fou
nd d
uri
ng tr
appi
ng p
rogr
am.
Cle
arin
g no
w c
ompl
eted
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B40
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
129
Mon
itor
op
en
sect
ions
of
tr
ench
es
as
requ
ired
fo
r tr
appe
d
anim
als,
su
ch
as
smal
l gr
ound
-dw
ellin
g m
amm
als,
par
ticu
larl
y in
are
as w
here
sen
siti
ve h
abit
at
has
been
iden
tifi
ed.
Con
stru
ctio
n C
BI
IO
Ope
n
FFM
SP –
App
end
ix B
Tab
le 8
-15
Mon
itor
ing
IO
– ad
d
cros
s re
fere
nce
of
SoC
to
T
able
in
A
ppen
dix
B
One
pit
ex
cava
ted
at
the
inte
rsec
tion
of
the
gas
pipe
line
and
Au
sgri
d p
ower
line
ease
men
t d
uri
ng
aud
it p
erio
d –
che
cked
dai
ly b
y C
BI
envi
ronm
ent
staf
f for
two
day
s pi
t was
ope
n
130
Ens
ure
fau
na r
amps
are
reg
ula
rly
inco
rpor
ated
into
ope
n se
ctio
ns o
f tr
ench
to
allo
w a
nim
als
that
hav
e fa
llen
into
th
e tr
ench
to m
ake
thei
r w
ay o
ut
Con
stru
ctio
n C
BI
IO
Ope
n
FFM
SP –
App
end
ix B
Tab
le 8
-1 G
ener
al C
onst
ruct
ion
Tab
le 8
-15
Mon
itor
ing
IO
– ad
d
cros
s re
fere
nce
of
SoC
to
T
able
in
A
ppen
dix
B
One
pit
exc
avat
ed a
t th
e in
ters
ecti
on o
f th
e ga
s pi
pelin
e an
d A
usg
rid
pow
erlin
e ea
sem
ent
du
ring
au
dit
per
iod
– e
colo
gist
s pl
aced
bra
nch
into
pit
to
allo
w fa
una
to e
scap
e. N
oted
in E
R s
ite
insp
ecti
on
repo
rt
and
E
cobi
olog
ical
re
port
“V
eget
atio
n C
lear
ing
for
New
cast
le
Gas
St
orag
e Fa
cilit
y”
(Nov
embe
r 20
12).
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B41
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
131
Re-
vege
tate
dis
turb
ed a
reas
whe
re p
ossi
ble,
oth
er t
han
thos
e re
quir
ed f
or p
erm
anen
t u
se, a
cces
s to
the
eas
emen
t or
fa
cilit
ies,
or
fo
r bu
shfi
re
asse
t pr
otec
tion
. R
epla
ce
terr
estr
ial
habi
tat
feat
ures
, su
ch
as
rock
s an
d
logs
, fo
llow
ing
cons
tru
ctio
n w
ith
land
owne
r ap
prov
al. W
here
la
ndow
ner
appr
oval
can
not
be o
btai
ned
, re
plac
e ro
cks
and
logs
in a
noth
er s
uita
ble
loca
tion
.
Con
stru
ctio
n C
BI
IO
Ope
n
VR
MSP
- T
able
8-5
IO –
ad
d to
SoC
Tab
le 1
.2 in
VR
MSP
Ref
er S
oC 1
26
Nil
reve
geta
tion
wor
ks d
urin
g au
dit
per
iod
132
Man
age
re-v
eget
ated
ar
eas
(spe
cifi
c te
chni
ques
to
be
d
evel
oped
as
part
of
the
CE
MP
to
prev
ent
over
graz
ing
from
nat
ive
fau
na a
nd in
trod
uce
d p
est a
nim
als.
Con
stru
ctio
n C
BI
IO
Ope
n
IO –
ad
d t
o So
C T
able
1.2
in
VR
MSP
and
inc
lud
e in
Tab
le 8
.5
Rev
eget
atio
n w
orks
yet
to c
omm
ence
Gas
Pla
nt S
ite
133
A n
um
ber
of a
void
ance
and
min
imis
atio
n m
easu
res
have
be
en i
ncor
pora
ted
int
o th
e P
roje
ct d
esig
n, f
or e
xam
ple,
th
e ri
goro
us r
oute
sel
ecti
on o
f th
e pi
pelin
e al
ignm
ents
to
avoi
d s
igni
fica
nt s
peci
es a
nd h
abit
at.
Con
stru
ctio
n A
GL
R
efer
bel
ow
Des
ign
layo
ut
134
Gas
pla
nt fa
cilit
y w
ill b
e lo
cate
d a
t the
wes
tern
end
of t
he
gas
plan
t si
te a
nd p
arti
ally
on
prev
ious
ly d
istu
rbed
lan
d
to
min
imis
e cl
eari
ng
of
esta
blis
hed
fl
ora
and
fa
una
co
mm
uni
ties
(in
clu
din
g pr
efer
red
koa
la h
abit
at),
east
of
the
gas
plan
t sit
e.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Fina
l d
esig
n –
plan
t is
loc
ated
at
wes
tern
end
of
land
135
Dev
elop
an
d
impl
emen
t co
mpr
ehen
sive
C
EM
P
and
O
EM
P.
The
se
doc
umen
ts
will
in
clud
e d
etai
led
in
form
atio
n ab
out
sign
ific
ant
flor
a an
d f
auna
spe
cies
, th
eir
man
agem
ent
and
on
-goi
ng
cons
erva
tion
re
com
men
dat
ions
.
Pre
cons
truc
tion
Pre
-ope
rati
ons
CB
I
AG
L
Com
plia
nce
Ope
n
FFM
SP –
CE
MP
com
plet
ed
OE
MP
to
be d
evel
oped
for
ope
rati
ons
phas
e to
be
dev
elop
ed c
lose
r to
com
mis
sion
ing
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B42
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
136
Cle
arin
g of
Ear
p’s
gum
will
be
min
imis
ed b
y:
(1)
Map
ping
loc
atio
n of
ind
ivid
ual
Ear
p's
gum
s w
ithi
n 10
0m o
f fac
ility
;
(2) M
arki
ng s
ensi
tive
'no-
go' a
reas
;
(3)
Lim
itin
g am
ount
of
dis
turb
ance
du
ring
con
stru
ctio
n ph
ase;
(4) E
nsu
ring
veh
icle
s ke
ep to
des
igna
ted
trac
ks.
Pre
cons
truc
tion
A
GL
(1,2
),
CB
I (3,
4)
Com
plia
nce
Clo
sed
FFM
SP A
ppen
dix
D –
Tab
le 8
-10
1)
Figu
re 2
of F
FMSP
2)
N
o go
ar
eas
mar
ked
ou
t w
ith
tape
an
d
para
web
bing
3)
D
istu
rban
ce li
mit
ed to
pro
ject
foot
prin
t 4)
A
cces
s tr
acks
onl
y us
ed fo
r ve
hicl
es
All
cont
rols
no
ted
as
im
plem
ente
d
in
Eco
biol
ogic
al
repo
rt
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fac
ility
” (N
ovem
ber
2012
). C
lear
ing
com
plet
ed –
bou
ndar
y d
elin
eate
d w
ith
fenc
ing.
Ear
p’s
Gum
s ad
jace
nt
to
boun
dar
y m
arke
d.
137
A
biod
iver
sity
of
fset
s st
rate
gy
will
be
pr
epar
ed
and
im
plem
ente
d in
con
sult
atio
n w
ith
OE
H a
nd D
SEW
PaC
. P
reco
nstr
ucti
on
AG
L
Com
plia
nce
Clo
sed
Ref
er
Bio
div
ersi
ty
Off
set
Stra
tegy
pr
epar
ed
by
Eco
biol
ogic
al M
ay 2
012
Cor
resp
ond
ence
fr
om
DoP
I ac
cept
ing
Stra
tegy
si
ghte
d.
138
The
C
EM
P
will
in
clu
de
man
agem
ent
stra
tegi
es
to
mit
igat
e w
ork-
site
lig
htin
g, d
ust
supp
ress
ion
and
noi
se
asso
ciat
ed w
ith
the
cons
truc
tion
pha
se o
f the
Pro
ject
.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
CE
MP
Dus
t - A
QM
SP, N
oise
– N
VM
SP
Site
in
spec
tion
s in
dic
ate
com
plia
nce
dur
ing
curr
ent c
onst
ruct
ion
acti
viti
es
139
A
habi
tat
man
agem
ent
plan
w
ill
be
prep
ared
to
d
ocu
men
t off
set a
reas
. P
reco
nstr
ucti
on
AG
L
NA
Ope
n
AG
L to
dev
elop
pla
n.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B43
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
140
The
CE
MP
and
OE
MP
will
inc
lud
e ve
geta
tion
and
wee
d
man
agem
ent
plan
s to
pre
vent
spr
ead
of
wee
d s
peci
es
and
avo
id d
istu
rban
ce o
n qu
alit
y an
d f
unct
ioni
ng o
f se
nsit
ive
ecol
ogic
al c
omm
unit
ies.
Pre
cons
truc
tion
C
BI
Oth
er
Com
plia
nce
Ope
n
VR
MSP
– T
able
8-4
.
Wee
ds
spra
yed
pri
or t
o cl
eari
ng w
orks
. W
eed
m
ater
ial
stoc
kpile
d
into
se
para
te
pile
s an
d
dis
pose
d o
ff-s
ite
to la
ndfi
ll. D
aily
and
wee
kly
CB
I in
spec
tion
s ch
eck
for
new
wee
d o
utbr
eaks
.
141
The
O
EM
P
will
co
nsid
er
appr
opri
ate
mea
sure
s as
soci
ated
wit
h lig
htin
g of
faci
lity,
e.g
., d
ownw
ard
faci
ng
light
ing,
to
m
inim
ise
light
po
lluti
on
and
im
pact
s on
lig
ht-s
ensi
tive
fau
na.
Pre
cons
truc
tion
O
ther
N
A
Ope
n
OE
MP
to
be
d
evel
oped
pr
ior
to
oper
atio
ns
com
men
cing
142
Surf
ace
wat
er m
anag
emen
t pl
an w
ill b
e im
plem
ente
d,
part
icul
arly
th
e be
st
prac
tice
se
dim
ent
and
er
osio
n co
ntro
l m
easu
res,
to
avo
id i
mpa
cts
on s
urfa
ce w
ater
qu
alit
y.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
SWM
SP
com
plet
ed
– im
plem
enta
tion
ch
ecke
d
dur
ing
dai
ly a
nd w
eekl
y in
spec
tion
s co
mpl
eted
by
CB
I sta
ff.
Are
a re
lati
vely
fla
t an
d g
roun
d s
and
y lo
wer
ing
eros
ion
pote
ntia
l. S
ilt f
ence
s in
stal
led
alo
ng w
ork
bou
ndar
ies
to
prev
ent
off
site
tr
ansp
ort
of
sed
imen
t.
143
Impl
emen
t a
pest
an
imal
co
ntro
l pr
ogra
m
on
area
s ow
ned
and
/or
man
aged
by
AG
L t
o pr
even
t in
crea
se i
n pe
st a
nim
al p
opu
lati
ons
in t
he v
icin
ity
of t
he g
as p
lant
si
te.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
FFM
SP –
Tab
le 8
-4 F
eral
Ani
mal
s
Wild
dog
s no
ted
on
site
– E
PA
tra
ppin
g pr
ogra
m
cove
rs t
he a
rea.
No
othe
r pe
st a
nim
als
note
d o
n C
BI i
nspe
ctio
n re
port
s or
dur
ing
ER
insp
ecti
ons
144
Fenc
ing
will
be
in a
ccor
dan
ce w
ith
PSC
’s K
oala
Pla
n of
M
anag
emen
t to
al
low
fo
r fa
una
dis
pers
ion.
Fe
ncin
g ar
ound
fac
ility
will
be
verm
in p
roof
sec
urit
y fe
ncin
g to
pr
even
t fau
na e
nter
ing
the
site
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
FFM
SP –
Tab
le 8
-12
Koa
la P
rote
ctio
n
Nil
perm
anen
t fen
cing
inst
alle
d a
t tim
e of
aud
it
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B44
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Acc
ess
road
and
uti
lity
cor
rido
r
145
The
acc
ess
road
and
uti
lity
corr
idor
will
be
part
ially
lo
cate
d o
n la
nd a
lrea
dy
clea
red
for
fir
e tr
ails
and
for
el
ectr
icit
y ea
sem
ents
. T
his
will
min
imis
e cl
eari
ng o
f ke
y fl
ora
and
fa
una
co
mm
uni
ties
w
ithi
n th
e Sw
amp
Mah
ogan
y an
d W
ood
land
Reh
abili
tati
on c
omm
unit
ies.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Fina
l d
esig
n of
roa
d a
cces
s co
mpl
eted
wit
h fi
re
trai
ls
and
el
ectr
icit
y ea
sem
ents
u
sed
w
here
p
ossi
ble.
146
The
alig
nmen
t of
the
acc
ess
road
and
uti
lity
corr
idor
will
av
oid
cle
arin
g of
Ear
p’s
gum
. P
reco
nstr
ucti
on
AG
L
Com
plia
nce
Clo
sed
Init
ial
des
ign
wou
ld
have
re
mov
ed
67
Ear
ps
Gum
s. F
inal
des
ign
rem
oved
4.
147
Fenc
ing
arou
nd s
ensi
tive
‘no
go’
are
as w
ill b
e er
ecte
d
and
spe
ed l
imit
s w
ill b
e in
acc
ord
ance
wit
h P
SC’s
Koa
la
Pla
n of
M
anag
emen
t to
av
oid
or
m
inim
ise
dea
th
or
inju
ry o
f wild
life.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Clo
sed
FFM
SP –
Tab
le 8
-1, 8
-12
Site
in
spec
tion
s in
dic
ate
proj
ect
area
s m
arke
d
wit
h fl
aggi
ng
init
ially
an
d
repl
aced
w
ith
para
web
bing
onc
e bo
und
arie
s su
rvey
ed.
Ear
ps
gum
s m
arke
d
off
wit
h pa
raw
ebbi
ng
prio
r to
cl
eari
ng.
148
Per
imet
er f
enci
ng o
f A
cces
s R
oad
and
uti
lity
corr
idor
w
ill
be
in
acco
rdan
ce
wit
h P
SC’s
K
oala
P
lan
of
Man
agem
ent
to
allo
w
faun
a d
ispe
rsio
n be
yond
th
e co
rrid
or.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
FFM
SP –
Tab
le 8
-12
Koa
la P
rote
ctio
n P
roto
col
Nil
perm
anen
t fen
cing
inst
alle
d a
t tim
e of
aud
it
Pre
ferr
ed G
as P
ipel
ine
Acc
ess
Cor
rido
r
149
Cle
arin
g of
Red
gum
-Ear
p’s
gum
-App
le-B
anks
ia F
ores
t w
ill b
e m
inim
ised
by:
L
imit
ing
amou
nt o
f d
istu
rban
ce d
uri
ng c
onst
ruct
ion
phas
e;
E
nsu
ring
veh
icle
s ke
ep to
des
igna
ted
trac
ks.
Pre
cons
truc
tion
–
stag
e 2
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B45
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
150
Cle
arin
g of
Ear
p's
Gu
m-A
pple
Ban
ksia
For
est
will
be
min
imis
ed b
y –
Mar
king
‘no
go’ a
reas
whe
re p
ossi
ble.
P
reco
nstr
ucti
on
– st
age
2 C
ontr
acto
r –
Stag
e 2
NA
Ope
n
Stag
e 2
of w
orks
151
Per
imet
er f
enci
ng o
f G
as p
ipel
ine
acce
ss c
orri
dor
will
be
in a
ccor
dan
ce w
ith
PSC
’s K
oala
Pla
n of
Man
agem
ent
to
allo
w fa
una
dis
pers
ion
beyo
nd th
e co
rrid
or.
Pre
cons
truc
tion
–
stag
e 2
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
152
Pip
elin
e co
rrid
or w
ill b
e lo
cate
d o
n pr
evio
usl
y d
istu
rbed
la
nd o
r al
ongs
ide
road
eas
emen
ts t
o av
oid
rem
oval
of
Swam
p M
ahog
any-
Pap
erba
rk
Swam
p Fo
rest
an
d
Phr
agm
ites
Rus
hlan
d.
Pre
cons
truc
tion
–
stag
e 2
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
153
Sele
ctio
n of
pip
elin
e co
rrid
or (
opti
on 2
) an
d H
DD
will
be
used
to
avoi
d r
emov
al o
f P
hrag
mit
es R
ushl
and
, H
unte
r R
iver
, SE
PP
14
Coa
stal
Wet
land
s an
d S
EP
P 7
1 C
oast
al
Pro
tect
ion
Are
as w
here
pra
ctic
able
.
Pre
cons
truc
tion
–
stag
e 2
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
153A
T
he
surf
ace
wat
er
man
agem
ent
plan
w
ill
be
impl
emen
ted
to a
void
dis
turb
ance
from
wat
er r
unof
f and
er
osio
n.
Pre
cons
truc
tion
–
stag
e 2
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
154
Geo
tech
nica
l in
vest
igat
ions
, sp
ecia
list
site
d
esig
n an
d
suit
able
m
anag
emen
t of
re
quir
ed
mat
eria
ls
will
be
ca
rrie
d o
ut to
min
imis
e fr
ac-o
ut a
ssoc
iate
d w
ith
HD
D.
Pre
cons
truc
tion
–
stag
e 2
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
155
Ens
uri
ng
that
w
orks
oc
cur
whe
n fa
vou
rabl
e w
eath
er
cond
itio
ns p
reva
il.
Con
stru
ctio
n –
Stag
e 2
Ope
rati
on
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
155A
U
se s
edim
ent
fenc
es a
nd/
or s
teri
le s
traw
bal
es d
own
slop
e of
exp
osed
soi
l and
sto
ckpi
les
Con
stru
ctio
n –
Stag
e 2
Con
trac
tor
– St
age
2 N
A
Stag
e 2
of w
orks
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B46
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Ope
rati
on
Ope
n
156
Und
erta
ke r
apid
see
din
g an
d r
e-ve
geta
tion
of
dis
turb
ed
area
s to
lim
it th
e ti
me
soil
is e
xpos
ed to
ero
sion
. C
onst
ruct
ion
– St
age
2 O
pera
tion
Con
trac
tor
– St
age
2 N
A
Ope
n
Stag
e 2
of w
orks
Thr
eate
ned
Eco
logi
cal C
omm
unit
ies
Acc
ess
Roa
d an
d U
tili
ty C
orri
dor
156A
W
orks
ite
light
ing
will
be
kept
to a
min
imu
m.
Con
stru
ctio
n
Ope
rati
on
CB
I C
ompl
ianc
e
Ope
n
CE
MP
– A
ppen
dix
A7
Tab
le 1
2-5
Nil
light
ing
alon
g ac
cess
ro
ad
dur
ing
curr
ent
phas
e of
w
orks
.
All
wor
ks
com
pete
d
dur
ing
day
light
hou
rs w
ith
no p
erm
anen
t in
fras
tru
ctu
re
inst
alle
d in
clud
ing
light
ing.
157
The
acc
ess
road
and
uti
lity
corr
idor
will
be
part
ially
lo
cate
d o
n la
nd a
lrea
dy
clea
red
for
fir
e tr
ails
. T
his
will
m
inim
ise
clea
ring
of
key
flor
a an
d f
auna
com
mun
itie
s w
ithi
n th
e Sw
amp
Mah
ogan
y an
d
Woo
dla
nd
Reh
abili
tati
on c
omm
unit
ies.
Con
stru
ctio
n
Ope
rati
on
Con
trac
tor
C
ompl
ianc
e
Clo
sed
Acc
ess
road
and
uti
lity
corr
idor
hav
e be
en s
ited
to
min
imis
e cl
eari
ng
of
key
flor
a an
d
faun
a co
mm
uni
ties
wit
hin
the
Swam
p M
ahog
any
and
W
ood
land
Reh
abili
tati
on c
omm
unit
ies.
158
Exp
lore
impl
emen
ting
the
follo
win
g op
tion
s:
Use
of
pa
ssiv
e m
eans
of
lig
htin
g,
such
as
in
stal
ling
refl
ecto
r ro
adw
ay m
arke
rs, l
ines
, war
ning
or
info
rmat
ion
sign
s an
d a
ttac
hing
ref
lect
ors
to fu
rnis
hing
s,
Use
so
lar-
pow
ered
lig
ht
emit
ting
d
iod
e st
uds
to
high
light
roa
dw
ays
and
pat
hs o
f tra
vel,
Use
of d
irec
tion
al li
ghti
ng fo
cuss
ed o
nly
upon
are
as to
be
Con
stru
ctio
n O
pera
tion
C
BI
AG
L
NA
Ope
n
Des
ign
to b
e cl
arif
ied
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B47
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
illum
inat
ed a
nd n
ot m
ount
ed h
ighe
r th
an a
n ap
prop
riat
e he
ight
fro
m g
roun
ds.
T
his
will
ass
ist
in r
educ
ing
visu
al
impa
cts
from
ligh
t sp
ill.
Pre
ferr
ed P
ipel
ine
Cor
rido
r (O
ptio
n 2)
159
Pip
elin
e co
rrid
or w
ill b
e lo
cate
d o
n pr
evio
usl
y d
istu
rbed
la
nd o
r al
ongs
ide
road
eas
emen
ts t
o av
oid
rem
oval
of
Swam
p M
ahog
any-
Pap
erba
rk
Swam
p Fo
rest
an
d
Phr
agm
ites
Rus
hlan
d.
Con
stru
ctio
n –
Stag
e 2
Ope
rati
on
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
160
Sele
ctio
n of
pip
elin
e co
rrid
or (
opti
on 2
) an
d H
DD
will
be
used
to
avoi
d r
emov
al o
f P
hrag
mit
es R
ushl
and
, H
unte
r R
iver
, SE
PP
14
Coa
stal
Wet
land
s an
d S
EP
P 7
1 C
oast
al
Pro
tect
ion
Are
as w
here
pra
ctic
able
.
Con
stru
ctio
n –
Stag
e 2
Ope
rati
on
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
160A
T
he C
EM
P w
ill i
nclu
de
an A
SS m
anag
emen
t pl
an t
o m
inim
ise
pote
ntia
l ASS
P
reco
nstr
ucti
on
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
of p
roje
ct
160B
T
he
surf
ace
wat
er
man
agem
ent
plan
w
ill
be
impl
emen
ted
to a
void
dis
turb
ance
from
wat
er r
unof
f and
er
osio
n
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
160C
T
he C
EM
P a
nd O
EM
P w
ill i
nclu
de
vege
tati
on a
nd w
eed
m
anag
emen
t pl
ans
to p
reve
nt s
prea
d o
f w
eed
spe
cies
an
d e
nsur
e av
oid
dis
turb
ance
on
qual
ity
and
fun
ctio
ning
of
sen
siti
ve e
colo
gica
l com
mu
niti
es
Pre
cons
truc
tion
–
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
160D
G
eote
chni
cal
inve
stig
atio
ns,
spec
ialis
t si
te
des
ign
and
C
onst
ruct
ion
– O
ther
N
A
Stag
e 2
of p
roje
ct
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B48
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
suit
able
m
anag
emen
t of
re
quir
ed
mat
eria
ls
will
be
ca
rrie
d o
ut to
min
imis
e fr
ac-o
ut a
ssoc
iate
d w
ith
HD
D
Stag
e 2
Ope
n
160E
U
se s
edim
ent
fenc
es a
nd/
or s
teri
le s
traw
bal
es d
own
slop
e of
exp
osed
soi
l and
sto
ckpi
les
Con
stru
ctio
n-
Stag
e 2
Ope
rati
on
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
160F
E
nsu
ring
th
at
wor
ks
occu
r w
hen
favo
ura
ble
wea
ther
co
ndit
ions
pre
vail
Con
stru
ctio
n –
Stag
e 2
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
160G
U
nder
take
rap
id s
eed
ing
and
rev
eget
atio
n of
dis
turb
ed
area
s to
lim
it th
e ti
me
soil
is e
xpos
ed to
ero
sion
C
onst
ruct
ion
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
of p
roje
ct
‘SE
PP
14
Coa
stal
Wet
land
s
161
HD
D w
ill b
e u
sed
to
avoi
d r
emov
al o
f SE
PP
14
Coa
stal
W
etla
nds
for
pref
erre
d p
ipel
ine
corr
idor
(opt
ion
2).
Pre
cons
truc
tion
–
Stag
e 2
Con
stru
ctio
n
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
162
The
su
rfac
e w
ater
m
anag
emen
t pl
an
will
be
im
plem
ente
d to
avo
id d
istu
rban
ce fr
om w
ater
run
off a
nd
eros
ion.
Con
stru
ctio
n-
Stag
e 2
Ope
rati
on
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
SEP
P 7
1 C
oast
al P
rote
ctio
n A
reas
163
HD
D w
ill b
e u
sed
to
avoi
d r
emov
al o
f SE
PP
71
Coa
stal
P
rote
ctio
n A
reas
whe
re p
ract
icab
le.
Con
stru
ctio
n-
Stag
e 2
Ope
rati
on
Oth
er
NA
Ope
n
Stag
e 2
of p
roje
ct
164
Con
stru
ctio
n ri
ght
of w
ay w
ill b
e re
du
ced
to
10 m
to
Con
stru
ctio
n-
Oth
er
NA
St
age
2 of
pro
ject
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B49
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
min
imis
e re
mov
al o
f SE
PP
71
Coa
stal
Pro
tect
ion
Are
as.
Stag
e 2
Ope
rati
on
Ope
n
SEP
P 4
4 K
oala
Hab
itat
Are
as
165
The
P
roje
ct
com
pone
nts
will
be
si
ted
to
av
oid
or
m
inim
ise
pref
erre
d k
oala
hab
itat
whe
re p
ossi
ble
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Fina
l pr
ojec
t la
you
t si
ted
to
wes
t to
avo
id k
oala
ha
bita
t.
166
Cle
arin
g of
su
pple
men
tary
koa
la h
abit
at w
ill b
e av
oid
ed
or m
inim
ised
thr
ough
HD
D o
r re
duc
ing
cons
truc
tion
ri
ght o
f way
whe
re p
ract
icab
le
Con
stru
ctio
n –
Stag
e 2
O
ther
N
A
Ope
n
Stag
e 2
of P
roje
ct
167
Iden
tify
ing
and
res
tori
ng p
oten
tial
koa
la h
abit
at w
ill b
e u
nder
take
n in
con
sult
atio
n w
ith
PSC
C
onst
ruct
ion
Ope
rati
on
AG
L
Ope
n
Con
serv
atio
n A
gree
men
t
168
Fenc
ing
arou
nd p
ipel
ine
ease
men
ts w
ithi
n L
ot 1
05 w
ill
be i
n ac
cord
ance
PSC
’s K
oala
Pla
n of
Man
agem
ent
to
ensu
re K
oala
mov
emen
t bey
ond
the
Pro
ject
are
a
Con
stru
ctio
n
Ope
rati
on
CB
I C
ompl
ianc
e
Ope
n
FFM
SP –
Tab
le 8
-12
Koa
la P
rote
ctio
n. F
enci
ng f
or
Lot
105
has
been
sp
ecif
ied
by
W
P
in
det
aile
d
des
ign
wor
k.
Per
man
ent f
enci
ng n
ot in
stal
led
as
at ti
me
of a
ud
it
169
Spee
d l
imit
s al
ong
the
acce
ss r
oad
and
uti
lity
corr
idor
w
ill
be
in
acco
rdan
ce
wit
h P
SC’s
K
oala
P
lan
of
Man
agem
ent
to m
inim
ise
inju
ry o
r d
eath
to
koal
as a
nd
othe
r w
ildlif
e
Con
stru
ctio
n
Ope
rati
on
CB
I C
ompl
ianc
e
Ope
n
FFM
SP –
Tab
le 8
-12
Koa
la P
rote
ctio
n
Acc
ess
road
an
d
utili
ty
corr
idor
un
der
co
nstr
uct
ion
at t
ime
of a
ud
it.
Con
stru
ctio
n sp
eed
lim
it 2
0km
/h.
Hab
itat
and
Cor
rido
rs
170
Con
stru
ctio
n ri
ght
of
way
w
ill
be
red
uce
d,
whe
re
poss
ible
, to
min
imis
e re
mov
al o
f sen
siti
ve v
eget
atio
n an
d
habi
tat.
Con
stru
ctio
n
Ope
rati
on
AG
L
Com
plia
nce
Clo
sed
Pre
-con
stru
ctio
n –
surv
eys
com
plet
ed
by
Eco
biol
ogic
al
prio
r to
cl
eari
ng
to
ensu
re
end
ange
red
flo
ra n
ot r
emov
ed. S
ight
ing
of a
cces
s ro
ads
alon
g fi
re t
rails
and
ele
ctri
city
eas
emen
ts
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B50
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
com
plet
ed w
here
pos
sibl
e.
Inst
ream
Hab
itat
s
171
Geo
tech
nica
l in
vest
igat
ions
, sp
ecia
list
site
d
esig
n an
d
suit
able
m
anag
emen
t of
re
quir
ed
mat
eria
ls
will
be
ca
rrie
d o
ut to
min
imis
e fr
ac-o
ut a
ssoc
iate
d w
ith
HD
D.
Con
stru
ctio
n –
Stag
e 2
Ope
rati
on
AG
L
NA
Ope
n
Stag
e 2
of P
roje
ct
Gro
undw
ater
dep
enda
nt e
cosy
stem
s (G
DE
s)
172
The
im
plem
enta
tion
of
man
agem
ent
mea
sure
s id
enti
fied
in
gro
und
wat
er a
sses
smen
t, in
clud
ing
impl
emen
tati
on o
f gr
ound
wat
er
man
agem
ent
plan
an
d
surf
ace
wat
er
man
agem
ent
plan
to
av
oid
d
istu
rban
ce
from
w
ater
ru
noff
and
ero
sion
, w
ill a
void
mea
sura
ble
impa
cts
to
grou
ndw
ater
qu
alit
y, l
evel
s or
flo
w a
nd o
n gr
ound
wat
er
dep
end
ent e
cosy
stem
s.
Con
stru
ctio
n
Ope
rati
on
CB
I, A
GL
to
im
plem
ent
mon
itor
ing
com
pone
nt
Com
plia
nce
Ope
n
GW
MSP
and
SW
MP
dev
elop
ed a
nd im
plem
ente
d
173
Con
du
ct
pre-
clea
ring
su
rvey
s on
id
enti
fied
cl
eari
ng
area
s.
Pre
-cle
arin
g C
BI
Com
plia
nce
Clo
sed
- C
BI
FFM
SP –
Tab
le 8
-6 P
re C
lear
ing
Pro
toco
l
Eco
biol
ogic
al c
ompl
eted
sur
veys
in m
orni
ng p
rior
to
wor
ks c
omm
enci
ng.
Ref
er E
cobi
olog
ical
rep
ort
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fa
cilit
y” (N
ovem
ber
2012
).
174
All
hollo
w-b
eari
ng t
rees
to
be s
oft-
felle
d b
y ex
peri
ence
d
mac
hine
ope
rato
r.
Con
stru
ctio
n
Ope
rati
on
CB
I C
ompl
ianc
e
Clo
sed
- C
BI
FFM
SP –
Tab
le 8
-7 H
ollo
w B
eari
ng T
ree
Cle
arin
g P
roto
col.
Ref
er E
cobi
olog
ical
rep
ort
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fac
ility
” (N
ovem
ber
2012
).
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B51
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
175
Rem
ove
habi
tat f
eatu
res,
su
ch a
s ro
cks
and
logs
, fro
m th
e ri
ght
of w
ay p
rior
to
clea
ring
, an
d c
aref
ully
sto
ckpi
led
pr
ior
to c
lear
ing
and
ret
urn
ed,
whe
re p
ossi
ble,
du
ring
ea
sem
ent r
esto
rati
on.
Con
stru
ctio
n
Ope
rati
on
CB
I C
ompl
ianc
e
Clo
sed
Ref
er S
oC 1
26 a
nd 1
31
One
sig
nifi
cant
roc
k in
are
a –
will
rem
ain
in P
PA
.
Nil
rock
s or
log
s su
itab
le f
or r
esto
rati
on w
orks
w
ere
iden
tifi
ed
by
Eco
biol
ogic
al
as
per
repo
rt
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fa
cilit
y” (N
ovem
ber
2012
).
EP
BC
– E
arp’
s G
um
T
he
gas
plan
t fa
cilit
y w
ill
min
imis
e cl
eari
ng
of
the
Woo
dla
nd
Reh
abili
tati
on
com
mun
ity
to
the
nort
hern
po
rtio
n. T
his
will
avo
id f
ragm
enta
tion
of
the
exis
ting
E
arp’
s gu
m p
opul
atio
n
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
CB
I
Com
plia
nce
Clo
sed
Siti
ng o
f pla
nt to
wes
t and
nor
th e
dge
of p
roje
ct
area
. Fo
ur
Ear
p’s
Gu
ms
rem
oved
du
ring
cle
arin
g w
orks
rat
her
than
67
as o
rigi
nally
ass
esse
d.
176
Cle
arin
g of
Ear
p’s
gum
will
be
min
imis
ed b
y: –
Map
ping
lo
cati
on o
f in
div
idu
al E
arp’
s gu
m w
ithi
n 10
0 m
of
gas
plan
t fac
ility
and
acc
ess
road
and
uti
lity
corr
idor
.
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
FFM
SP –
inc
lud
es m
ap w
ith
loca
tion
of
Ear
p’s
Gum
s.
177
Cle
arin
g of
Ear
p’s
gum
will
be
min
imis
ed b
y: –
Mar
king
‘n
o go
’ are
as w
here
pos
sibl
e.
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
FFM
SP
– T
able
8-
10
Ear
p’s
Gu
m
Pro
tect
ion
Pro
toco
l, si
te i
nspe
ctio
n re
port
s. E
arp’
s G
um
s on
ed
ge o
f pr
ojec
t ar
ea m
arke
d w
ith
para
web
bing
to
prev
ent
acci
den
tal
rem
oval
or
dam
age.
P
roje
ct
area
def
ined
by
tem
pora
ry t
apin
g re
plac
ed w
ith
para
web
bing
onc
e bo
und
ary
lines
su
rvey
ed.
178
Cle
arin
g of
Ear
p’s
gum
will
be
min
imis
ed b
y: –
Lim
itin
g am
ount
of d
istu
rban
ce d
uri
ng c
onst
ruct
ion
phas
e.
Pre
cons
truc
tion
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Clo
sed
FFM
SP –
Tab
le 8
-9, s
ite
insp
ecti
on r
epor
ts
Pro
ject
are
a cl
earl
y m
arke
d. V
ehic
les
rem
aine
d o
n
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B52
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
mar
ked
acc
ess
trac
ks.
Ear
p’s
Gum
s on
ed
ge o
f pr
ojec
t ar
ea m
arke
d w
ith
para
web
bing
to
prev
ent
acci
den
tal
rem
oval
or
d
amag
e.
P
roje
ct
area
d
efin
ed
by
tem
pora
ry
tapi
ng
repl
aced
w
ith
para
web
bing
onc
e bo
und
ary
lines
su
rvey
ed.
179
Cle
arin
g of
Ear
p’s
gum
will
be
min
imis
ed b
y: –
Ens
uri
ng
vehi
cles
kee
p to
des
igna
ted
trac
ks.
Pre
cons
truc
tion
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Clo
sed
FFM
SP –
Tab
le 8
-2 A
cces
s
EP
BC
– D
war
f Ker
raw
ang
180
No
rem
oval
of
po
tent
ial
dw
arf
kerr
awan
g ha
bita
t is
en
visa
ged
. H
owev
er,
clea
ring
of
po
tent
ial
suit
able
ha
bita
t w
ill
be
limit
ed
to
dis
turb
ed
area
s ac
ross
th
e P
roje
ct a
rea.
Pre
cons
truc
tion
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Clo
sed
Not
inc
lud
ed i
n FF
MSP
how
ever
, not
req
uire
d a
s ni
l cle
arin
g of
dw
arf k
erra
wan
g ha
bita
t.
Eco
Bio
logi
cal
map
ped
all
vege
tati
on o
n si
te a
nd
mar
ked
out
lim
it o
f are
a to
be
clea
red
.
Cle
arin
g re
stri
cted
to
mar
ked
are
as a
s st
ipu
late
d
in F
FMSP
– T
able
8-1
and
Tab
le 8
-2.
EP
BC
– N
ew H
olla
nd M
ouse
181
The
cle
arin
g of
su
itab
le N
ew H
olla
nd m
ouse
hab
itat
, the
H
eath
Reh
abili
tati
on c
omm
unit
y, w
ill b
e av
oid
ed.
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
Site
ins
pect
ions
dur
ing
pre-
clea
ring
and
cle
arin
g,
Eco
Bio
logi
cal
repo
rt
issu
ed.
Fi
nal
area
to
be
cl
eare
d m
oved
to w
est a
nd n
orth
of p
roje
ct a
rea
to
avoi
d a
rea
182
The
Pro
ject
will
min
imis
e th
e cl
eari
ng o
f si
mila
r su
itab
le
habi
tat
(inc
lud
ing
Coa
stal
San
d A
pple
-Bla
ckbu
tt F
ores
t)
by
whe
re
poss
ible
lo
cati
ng
Pro
ject
co
mpo
nent
s in
d
istu
rbed
are
as o
r by
red
ucin
g co
nstr
ucti
on w
idth
s of
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
Site
ins
pect
ions
dur
ing
pre-
clea
ring
and
cle
arin
g,
Eco
Bio
logi
cal
Rep
ort
issu
ed –
mai
n ac
cess
and
pi
pelin
e co
rrid
or
limit
ed
to
fire
tr
ails
an
d
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B53
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
righ
t of w
ays.
el
ectr
icit
y ea
sem
ent w
here
pos
sibl
e.
183
The
O
EM
P
will
co
nsid
er
appr
opri
ate
mea
sure
s as
soci
ated
wit
h lig
htin
g to
min
imis
e im
pact
on
the
light
-se
nsit
ive
New
Hol
land
mou
se.
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Ope
n
Che
ck
fina
l d
esig
n if
in
clud
ed.
OE
MP
to
be
d
evel
oped
for
oper
atio
ns p
hase
183A
P
repa
re a
nd d
etai
led
bio
div
ersi
ty o
ffse
ts s
trat
egy
that
in
clu
des
im
plem
enta
tion
of
a re
cove
ry p
lan
for
the
New
H
olla
nd
mou
se
in
cons
ult
atio
n w
ith
the
OE
H
and
D
SEW
PaC
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
Off
set
Stra
tegy
rep
ort
prep
ared
by
ecoB
iolo
gica
l d
ated
May
201
2
Cor
resp
ond
ence
from
DoP
I acc
epti
ng S
trat
egy
Bio
div
ersi
ty
repo
rt
stat
es
that
P
SC,
OE
H
and
D
SEW
PaC
co
nsul
ted
d
urin
g d
evel
opm
ent
of
offs
et s
trat
egy
EP
BC
– M
igra
tory
Spe
cies
184
HD
D a
nd r
edu
cing
con
stru
ctio
n w
idth
s of
rig
ht o
f w
ays
will
av
oid
or
m
inim
ise
rem
oval
of
su
itab
le
habi
tat
asso
ciat
ed w
ith
rege
nt h
oney
eat
er,
swif
t pa
rrot
, sa
tin
flyc
atch
er,
blac
k-fa
ced
m
onar
ch
and
ru
fou
s fa
ntai
l, re
spec
tive
ly. T
hese
com
mu
niti
es a
re: A
lluvi
al T
all
Moi
st
Fore
st,
Red
gum
-App
le-B
anks
ia
Fore
st,
Swam
p M
ahog
any-
Pap
erba
rk
Swam
p Fo
rest
, C
oast
al
Sand
A
pple
-Bla
ckbu
tt F
ores
t.
Pre
cons
truc
tion
Con
stru
ctio
n
AG
L
Com
plia
nce
Ope
n
RO
W
rest
rict
ed
to
30m
an
d
wit
hin
des
ign
bou
ndar
ies
EP
BC
- H
unte
r es
tuar
y w
etla
nds
185
Geo
tech
nica
l in
vest
igat
ions
, sp
ecia
list
site
d
esig
n an
d
suit
able
m
anag
emen
t of
re
quir
ed
mat
eria
ls
will
be
ca
rrie
d
out
to
avoi
d
risk
of
fr
ac-o
ut
asso
ciat
ed
wit
h H
DD
.
Pre
cons
truc
tion
–
Stag
e 2
Con
trac
tor
NA
Ope
n
Stag
e 2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B54
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
T
he
surf
ace
wat
er
man
agem
ent
plan
w
ill
be
impl
emen
ted
to a
void
dis
turb
ance
from
wat
er r
unof
f and
er
osio
n
Pre
cons
truc
tion
–
Stag
e 2
Con
trac
tor
NA
Ope
n
Stag
e 2
T
he C
EM
P w
ill i
nclu
de
an A
SS m
anag
emen
t pl
an t
o av
oid
ASS
ent
erin
g th
e H
unt
er R
iver
P
reco
nstr
ucti
on
– St
age
2 C
ontr
acto
r N
A
Ope
n
Stag
e 2
186
The
im
plem
enta
tion
of
man
agem
ent
mea
sure
s id
enti
fied
in
gro
und
wat
er a
sses
smen
t, in
clud
ing
the
surf
ace
wat
er
man
agem
ent
plan
to
av
oid
d
istu
rban
ce
from
w
ater
ru
noff
and
ero
sion
, w
ill a
void
mea
sura
ble
impa
cts
to
grou
ndw
ater
qua
lity,
lev
els,
flo
w a
nd t
here
fore
on
the
Hu
nter
Est
uar
y W
etla
nds.
Pre
cons
truc
tion
–
Stag
e 2
Con
trac
tor
NA
Ope
n
Stag
e 2
186A
E
nsu
re
cons
tru
ctio
n w
orks
oc
cur
whe
n fa
vou
rabl
e w
eath
er c
ond
itio
ns p
reva
il P
reco
nstr
ucti
on
– St
age
2 C
ontr
acto
r N
A
Ope
n
Stag
e 2
186B
U
se s
edim
ent
fenc
es a
nd/
or s
teri
le s
traw
bal
es d
own
slop
e of
exp
osed
soi
l and
sto
ckpi
les
Pre
cons
truc
tion
–
Stag
e 2
Con
trac
tor
NA
Ope
n
Stag
e 2
187
Und
erta
ke r
apid
see
din
g an
d r
e-ve
geta
tion
of
dis
turb
ed
area
s to
lim
it th
e ti
me
soil
is e
xpos
ed to
ero
sion
. P
reco
nstr
ucti
on
– St
age
2 C
ontr
acto
r N
A
Ope
n
Stag
e 2
188
Noi
se a
tten
uat
ion
mea
sure
s as
soci
ated
wit
h H
DD
will
be
cons
ider
ed
to
min
imis
e im
pact
s on
si
gnif
ican
t bi
rd
spec
ies.
Pre
cons
truc
tion
–
Stag
e 2
Con
trac
tor
NA
Ope
n
Stag
e 2
CE
MP
- N
VM
SP
7.4.
3 M
onit
orin
g
189
Insp
ect
‘no-
go’
area
s to
ens
ure
they
are
cle
arly
mar
ked
pr
ior
to c
lear
ing
acti
viti
es.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e FF
MSP
– A
ppen
dix
B
Tab
le 8
-1 G
ener
al C
onst
ruct
ion
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B55
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Clo
sed
- C
BI
Tab
le 8
-6 P
re-c
lear
ing
Pro
toco
l
Tab
le 8
-10
Ear
p’s
Gu
m P
rote
ctio
n P
roto
col
Tab
le 8
-12
Koa
la P
rote
ctio
n P
roto
col
Tab
le 8
-13
Hol
low
dep
end
ant
Thr
eate
ned
Fau
na
Pro
tect
ion
Pro
toco
l
Ear
ps g
ums
mar
ked
and
oth
er n
o go
are
as m
arke
d
wit
h ta
pe.
All
clea
ring
an
d
scru
bbin
g w
orks
co
mpl
eted
w
ith
ecol
ogis
t on
si
te
to
prev
ent
acci
den
tal
clea
ring
- r
efer
to
Eco
biol
ogic
al r
epor
t “V
eget
atio
n C
lear
ing
for
New
cast
le G
as S
tora
ge
Faci
lity”
(Nov
embe
r 20
12).
190
Con
du
ct p
re-c
lear
ing
surv
eys
prio
r to
any
tre
e fe
lling
to
iden
tify
hol
low
-bea
ring
tree
s, w
hich
will
be
left
sta
ndin
g,
whe
re p
ract
icab
le.
Nes
ting
box
es w
ill b
e pl
aced
int
o ne
arby
tree
s w
here
hol
low
-bea
ring
tree
s ar
e re
mov
ed.
Pre
-cle
arin
g A
GL
C
ompl
ianc
e
Clo
sed
- C
BI
FFM
SP –
App
end
ix B
Tab
le 8
-7 H
ollo
w B
eari
ng T
ree
Cle
arin
g P
roto
col
Pre
-cle
arin
g su
rvey
s co
mpl
eted
by
Eco
biol
ogic
al -
re
fer
to E
cobi
olog
ical
rep
ort
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fac
ility
” (N
ovem
ber
2012
).
191
Con
du
ct
pre-
cons
tru
ctio
n tr
appi
ng
and
re
loca
tion
of
ta
rget
ed
spec
ies
in
spec
ifie
d
ecol
ogic
ally
se
nsit
ive
loca
tion
s.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
- C
BI
FFM
SP –
App
end
ix B
Tra
ppin
g fo
r N
ew H
olla
nd M
ouse
com
plet
ed b
y E
cobi
olog
ical
-
refe
r to
E
cobi
olog
ical
re
port
“V
eget
atio
n C
lear
ing
for
New
cast
le G
as S
tora
ge
Faci
lity”
(Nov
embe
r 20
12).
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B56
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
192
Supe
rvis
e co
nstr
uct
ion
acti
viti
es
in
sens
itiv
e ar
eas
to
ensu
re
proc
edu
res
for
spre
ad
mov
e ar
ound
, re
du
ced
ri
ght
of w
ay,
HD
D e
tc.
are
bein
g im
plem
ente
d,
whe
re
requ
ired
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
FFM
SP –
App
end
ix B
193
Mon
itor
reh
abili
tate
d a
reas
per
iod
ical
ly t
o ev
alu
ate
the
succ
ess
of
reha
bilit
atio
n pr
oced
ures
w
ithi
n P
roje
ct
com
pone
nts.
Con
stru
ctio
n C
BI,
AG
L
NA
Ope
n
VR
MSP
– S
ecti
on 5
.0 a
nd A
ppen
dix
B T
able
8-5
Reh
abili
tati
on a
ctiv
itie
s ye
t to
com
men
ce a
t ti
me
of a
ud
it
194
Mon
itor
tren
ched
sec
tion
s d
aily
for
trap
ped
ani
mal
s su
ch
as
rept
iles
and
sm
all
grou
nd-d
wel
ling
mam
mal
s,
part
icu
larl
y in
are
as w
here
sen
siti
ve h
abit
ats
have
bee
n id
enti
fied
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
FFM
SP –
App
end
ix B
Tab
le 8
-15
Mon
itor
ing
One
pit
exc
avat
ed a
t th
e in
ters
ecti
on o
f th
e ga
s pi
pelin
e an
d A
usg
rid
pow
erlin
e ea
sem
ent
du
ring
au
dit
per
iod
–op
en f
or t
wo
day
s be
fore
bei
ng
back
fille
d. M
onit
ored
by
CB
I env
iron
men
t sta
ff
7.4.
4 B
iodi
vers
ity
Off
sets
195
AG
L w
ill s
ecu
re a
bio
div
ersi
ty o
ffse
ts p
acka
ge f
or t
he
Pro
ject
in
co
nsu
ltat
ion
wit
h O
EH
, D
P&
I an
d
the
DSE
WP
aC p
rior
to
the
com
men
cem
ent
of c
onst
ruct
ion.
It
is
curr
entl
y pr
opos
ed
that
th
e B
iod
iver
sity
O
ffse
t P
acka
ge w
ill c
ompr
ise:
• O
ffse
ts w
hich
will
be
asse
ssed
in
acco
rdan
ce w
ith
the
Bio
bank
ing
asse
ssm
ent
met
hod
olog
y to
en
sure
re
ason
ably
‘lik
e fo
r lik
e’ p
rinc
iple
and
veg
etat
ion
type
s to
thos
e im
pact
ed b
y th
e P
roje
ct.
• A
dd
itio
nal
reha
bilit
atio
n to
off
set
loss
of
up t
o 15
E
uca
lypt
us
parr
amat
tens
is
(Ear
p’s
gum
) fr
om
the
dev
elop
men
t sit
e.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Ope
n
Ref
erre
d t
o in
FFM
SP b
ut d
etai
l in
'Con
serv
atio
n A
gree
men
t' w
ith
OE
H
Off
set
Stra
tegy
rep
ort
prep
ared
by
ecoB
iolo
gica
l d
ated
May
201
2
“Bio
Ban
king
A
sses
smen
t M
etho
dol
ogy”
(S
eid
el
and
B
rigg
s 20
09)
adop
ted
fo
r d
eter
min
ing
the
exte
nt a
nd ty
pe o
f off
set r
equ
ired
by
AG
L.
Med
owie
Con
serv
atio
n A
rea
Off
set
Mon
itor
ing
Pro
toco
l pr
epar
ed
by
ecoB
iolo
gica
l d
ated
M
ay
2012
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B57
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
A n
um
ber
of p
oten
tial
off
sets
sit
es h
ave
been
id
enti
fied
an
d A
GL
is c
omm
itte
d t
o co
ntin
uing
to
asse
ss t
hese
sit
es
and
con
sult
wit
h la
ndow
ners
and
the
OE
H,
DP
&I
and
D
SEW
PaC
to d
eter
min
e th
e fi
nal p
refe
rred
off
sets
.
AG
L i
s co
mm
itte
d t
o se
curi
ng t
he s
elec
ted
off
sets
in
perp
etui
ty w
ith
appr
opri
ate
man
agem
ent
regi
mes
and
fi
nanc
ial
secu
rity
vi
a on
e or
m
ore
of
the
follo
win
g m
echa
nism
s:
• C
onse
rvat
ion
agre
emen
t u
nder
the
Nat
iona
l Par
ks a
nd
Wild
life
Act
197
4 (N
SW) (
NP
W A
ct).
• D
edic
atio
n of
land
und
er th
e N
PW
Act
. •
Pla
nnin
g ag
reem
ent u
nder
the
EP
&A
Act
•
Tru
st a
gree
men
t u
nder
the
Nat
ure
Con
serv
atio
n T
rust
A
ct 2
001
(NSW
). •
Bio
bank
ing
agre
emen
t u
nder
the
Thr
eate
ned
Spe
cies
C
onse
rvat
ion
Act
199
5 (N
SW).
Dra
ft C
onse
rvat
ion
Agr
eem
ent
for
Lot
20
at 3
Old
Sw
an B
ay R
oad
, Med
owie
Dra
ft C
onse
rvat
ion
Agr
eem
ent
for
Lot
16
at 2
18
Old
Sw
an B
ay R
oad
, Med
owie
.
4 E
arp’
s gu
ms
rem
oved
from
dev
elop
men
t sit
e. 6
0 pl
ants
will
be
esta
blis
hed
in H
unte
r R
egio
n B
otan
ical
Gar
den
s
Bio
div
ersi
ty r
epor
t sta
tes
that
PSC
, OE
H a
nd
DSE
WP
aC c
onsu
lted
dur
ing
dev
elop
men
t of
offs
et s
trat
egy
Cor
resp
ond
ence
fr
om
DoP
I ac
cept
ing
Stra
tegy
d
ated
15
Au
gust
201
2
7.4.
5 M
odif
icat
ions
to
Man
agem
ent
and
Mit
igat
ion
Mea
sure
s fo
r Fl
ora
and
Faun
a
196
The
int
erna
l ac
cess
roa
d i
nto
the
gas
plan
t si
te w
ill b
e re
des
igne
d t
o gr
eatl
y re
duc
e th
e nu
mbe
r of
Ear
p’s
gum
re
quir
ing
rem
oval
.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Roa
d r
ealig
ned
to
avoi
d c
lear
ing
Ear
p’s
Gum
s.
Four
gu
ms
rem
oved
d
urin
g cl
eari
ng
wor
ks
– re
duc
ed fr
om 6
7 pr
edic
ted
in E
A.
Cle
arin
g no
w c
ompl
eted
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B58
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
197
Seed
col
lect
ed f
rom
Ear
p’s
gum
wit
hin
the
site
will
be
prov
ided
to th
e H
unt
er B
otan
ic G
ard
ens
to p
ropa
gate
the
seed
and
pla
nt t
he s
eed
lings
on
thei
r pr
oper
ty. A
hab
itat
m
anag
emen
t su
b pl
an w
ill b
e pr
epar
ed w
hich
will
det
ail
the
man
agem
ent
and
on
-goi
ng
prot
ecti
on
of
the
rem
aini
ng E
arp’
s gu
m w
ithi
n th
e si
te.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Ope
n
Lon
g te
rm m
anag
emen
t of
Ear
p’s
gum
s in
clud
e in
B
iod
iver
sity
Str
ateg
y, E
cobi
olog
ical
May
201
2
Man
agem
ent
of E
arp’
s gu
ms
dur
ing
cons
truc
tion
d
etai
led
in F
FMSP
App
end
ix B
Tab
le 8
-10.
Hab
itat
Man
agem
ent S
ub
Pla
n to
be
dev
elop
ed b
y A
GL
198
A v
eget
atio
n re
habi
litat
ion
man
agem
ent
sub
plan
will
be
prep
ared
whi
ch w
ill d
etai
l th
e m
anag
emen
t an
d o
n-go
ing
prot
ecti
on o
f th
e re
mai
ning
Ear
p’s
gum
wit
hin
the
PP
A.
Pre
cons
truc
tion
C
BI
IO
Ope
n
IO
– co
nsid
er
add
ing
to
VR
MSP
T
able
1-
3 St
atem
ent o
f Com
mit
men
ts o
r m
ain
bod
y of
pla
n.
Man
agem
ent
of E
arp’
s gu
ms
dur
ing
cons
truc
tion
d
etai
led
in F
FMSP
App
end
ix B
Tab
le 8
-10
199
Ad
dit
iona
l ta
rget
ed s
urv
eys
will
be
und
erta
ken
in t
he
appr
opri
ate
seas
on
for
Asp
eru
la
asth
enes
, G
aliu
m
aust
rale
, L
ind
erni
a al
sino
ides
, P
ersi
cari
a el
atio
r,
Zan
nich
ellia
pal
ustr
is a
nd M
aund
ia t
rigl
ochi
noid
es i
n ar
eas
of s
uita
ble
habi
tat
wit
hin
the
fina
l d
evel
opm
ent
foot
prin
t pr
ior
to c
onst
ruct
ion.
Sho
uld
any
spe
cies
be
likel
y to
be
impa
cted
by
the
prop
osal
the
n su
ch s
peci
es
will
be
ad
equa
tely
co
mpe
nsat
ed
for
in
the
form
of
of
fset
s.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Surv
ey c
ompl
eted
25
Nov
201
1. O
ffse
ts in
clu
de
in
Off
set S
trat
egy,
Eco
biol
ogic
al M
ay 2
012
200
A
habi
tat
man
agem
ent
plan
w
ill
be
prep
ared
(i
n co
nsu
ltat
ion
wit
h th
e O
EH
an
d
DSE
WP
aC)
and
im
plem
ente
d
for
the
offs
ets
and
th
e d
evel
opm
ent
foot
prin
t.
Pre
cons
truc
tion
A
GL
O
pen
Hab
itat
Man
agem
ent
Pla
n to
be
dev
elop
ed a
nd
impl
emen
ted
by
AG
L
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B59
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
201
In o
rder
to
prot
ect
Ear
p’s
gum
, in
div
idu
al t
rees
will
be
reta
ined
wit
hin
the
AP
Z.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Clo
sed
FFM
SP –
Tab
le 8
-1, T
able
8-1
2, S
ite
insp
ecti
ons.
Tre
es
wit
hin
AP
Z
area
m
arke
d
usi
ng
para
web
bing
202
The
re w
ill b
e no
dir
ect
dis
turb
ance
to
the
Fres
hwat
er
Wet
land
s E
ndan
gere
d
Eco
logi
cal
Com
mun
ity
(EE
C),
Riv
erfl
at E
ucal
ypt
Fore
st E
EC
and
Sw
amp
Scle
roph
yll
Fore
st t
hat
are
loca
ted
alo
ng O
ld P
unt
Roa
d (
du
e to
pi
pelin
e re
alig
nmen
t an
d
choi
ce
of
cons
truc
tion
te
chni
que)
.
Pre
cons
truc
tion
–
Stag
e 2
AG
L
NA
Ope
n
Fina
l d
esig
n co
mpl
eted
.
To
be
add
ed
to
Man
agem
ent
Sub
Pla
ns.
Che
ck d
urin
g pi
pelin
e w
orks
sta
ge 2
203
The
pro
pose
d w
idth
of
the
gas
pipe
line
acce
ss c
orri
dor
w
ill b
e re
duc
ed t
o 30
m w
hich
will
red
uce
clea
ring
in t
he
Red
gum
-App
le-B
anks
ia
com
mu
nity
(t
hat
cont
ains
E
uca
lypt
us
tere
tico
rnis
) fro
m 0
.85
ha to
0.6
9 ha
.
Pre
cons
truc
tion
A
GL
CB
I
Com
plia
nce
Clo
sed
FFM
SP –
Tab
le 8
-2.
Site
Insp
ecti
ons
Pro
ject
ar
eas
mar
ked
w
ith
flag
ging
ta
pe
and
pa
raw
ebbi
ng.
Gas
pip
elin
e ac
cess
cor
rid
or 3
0m
wid
th
204
Any
New
Hol
land
Mou
se t
rapp
ed w
ill b
e tr
ansl
ocat
ed
into
are
as s
afe
away
fro
m d
evel
opm
ent.
Thi
s w
ill b
e d
one
in c
onsu
ltat
ion
wit
h D
SEW
PaC
.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
FFM
SP
– T
able
8-
11
New
H
olla
nd
Mou
se
Pro
tect
ion
Pro
toco
l
Five
tra
nsec
ts c
ompl
eted
wit
h ni
l N
ew H
olla
nd
Mic
e ca
ptur
ed.
Ref
er
to
Eco
biol
ogic
al
repo
rt
“Veg
etat
ion
Cle
arin
g fo
r N
ewca
stle
Gas
Sto
rage
Fa
cilit
y” (N
ovem
ber
2012
)
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B60
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7.5
Bus
h Fi
re
7.5.
2 E
mer
genc
y P
lann
ing
205
An
emer
genc
y re
spon
se p
lan
will
det
ail
requ
ired
act
ions
at
con
stru
ctio
n si
tes
for
appr
oach
ing
bush
fir
e d
ange
r.
Thi
s em
erge
ncy
resp
onse
pla
n w
ill b
e co
nsis
tent
wit
h th
e R
FS
Gu
idel
ines
fo
r th
e P
repa
red
ness
of
E
mer
genc
y/E
vacu
atio
n P
lan
and
be
in c
ompl
ianc
e w
ith
AS
3745
-200
2 ‘E
mer
genc
y co
ntro
l or
gani
sati
on
and
pr
oced
ures
fo
r bu
ildin
gs,
stru
ctu
res
and
w
orkp
lace
s’.
The
pla
n w
ill b
e pr
epar
ed p
rior
to c
onst
ruct
ion.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Clo
sed
- C
BI
CB
I's
Bus
hfir
e M
anag
emen
t Su
b P
lan
incl
udes
re
fere
nce
to th
e A
S
206
A C
EM
P w
ill i
nclu
de
mea
sure
s fo
r w
orki
ng i
n a
bush
fi
re-p
rone
are
a. A
GL
will
app
ly i
ts s
tand
ard
pro
ced
ures
d
uri
ng c
onst
ruct
ion
e.g.
, hot
wor
k pe
rmit
s.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Clo
sed
- C
BI
BFM
SP –
App
end
ix B
(Mit
igat
ion
Mea
sure
s)
Tab
le 1
2-13
in C
EM
P a
lso
has
mit
igat
ion
mea
sure
s in
clud
ed
7.5.
3 A
cces
s an
d E
gres
s
207
The
des
ign
of t
he a
cces
s ro
ad a
nd u
tilit
y co
rrid
or w
ill b
e su
ffic
ient
ly w
ide
to a
llow
att
end
ing
emer
genc
y ve
hicl
es
and
eva
cuat
ing
vehi
cles
to
pass
uni
mpe
ded
in
case
of
fire
. It
will
be
acce
ssib
le i
n al
l w
eath
er c
ond
itio
ns a
nd
will
be
des
igne
d t
o ha
ve a
min
imum
loa
d r
atin
g to
ac
com
mod
ate
fire
-fig
htin
g un
its.
The
gas
pip
elin
e ac
cess
co
rrid
or w
ill s
erve
as
an a
lter
nati
ve a
cces
s/eg
ress
roa
d.
It w
ill b
e d
esig
ned
for
one
way
tra
ffic
and
for
lig
ht
vehi
cles
onl
y.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Wid
th o
f ro
ads
30m
to
allo
w s
pace
for
veh
icle
s to
p
ass.
TM
SP
– T
able
9-
1 fo
r re
quir
emen
t d
uri
ng
cons
tru
ctio
n ph
ase
208
The
acc
ess
road
and
em
erge
ncy
acce
ss r
oad
will
inc
lud
e ad
equ
ate
oute
r ra
diu
s-tu
rnin
g ci
rcle
s at
the
ent
ry o
f th
e P
reco
nstr
ucti
on
AG
L
IO
Ref
eren
ced
in
E
RP
T
able
1-
3 St
atem
ent
of
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B61
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
gas
plan
t si
te a
nd v
erti
cal
clea
ranc
e w
ill b
e m
aint
aine
d
abov
e th
e ac
cess
roa
d.
Ope
n C
omm
itm
ents
IO –
con
sid
er in
clud
ing
requ
irem
ent i
n m
ain
bod
y of
rep
ort
or r
emov
e fr
om T
able
1-3
if n
ot r
equ
ired
fo
r th
is s
tage
of t
he p
roje
ct
Incl
ud
ed in
TM
SP –
Tab
le 9
-1
7.5.
4 P
roje
ct D
esig
n
209
The
gas
pla
nt i
s cl
assi
fied
as
a C
lass
10
build
ing
und
er
the
BC
A.
The
co
nstr
uct
ion
of
build
ings
an
d
infr
astr
uct
ure
will
be
in a
ccor
dan
ce w
ith
AS
3959
-200
9 ‘C
onst
ruct
ion
of B
uild
ings
in B
ush
Fire
Pro
ne A
reas
’.
Pre
cons
truc
tion
A
GL
O
pen
Pre
-con
stru
ctio
n te
chni
cal d
esig
n
Not
che
cked
dur
ing
this
aud
it
7.5.
5 W
ater
and
Ser
vice
s
210
The
bu
sh f
ire
figh
ting
wat
er s
upp
ly f
or t
he g
as p
lant
sit
e w
ill e
xcee
d t
he m
inim
um
vol
um
e re
quir
emen
t of
20,
000
L (
0.02
ML
). T
he f
irew
ater
tan
k w
ill b
e ab
le t
o d
irec
t w
ater
for
fir
e su
ppre
ssio
n an
d c
oolin
g w
ithi
n th
e pl
ant
for
a m
inim
um o
f tw
o ho
urs.
Fix
ed p
umpi
ng s
yste
ms,
on
e el
ectr
ic a
nd o
ne d
iese
l-en
gine
dri
ven,
will
be
used
. T
he w
ater
tan
k w
ill b
e cl
ose
to t
he s
outh
ern
boun
dar
y of
th
e si
te a
nd u
nim
ped
ed a
cces
s fo
r em
erge
ncy
vehi
cles
w
ill b
e pr
ovid
ed.
Con
nect
ions
to
the
wat
er t
ank
will
be
prov
ided
for
fire
figh
ting
team
s.
Pre
cons
truc
tion
Ope
rati
ons
AG
L
Ope
n P
re-c
onst
ruct
ion
tech
nica
l des
ign
Not
che
cked
dur
ing
this
aud
it
7.5.
6 L
ands
cape
and
Veg
etat
ion
Man
agem
ent
211
A b
ush
fire
man
agem
ent
plan
will
be
prep
ared
for
the
P
PA
. T
he
plan
w
ill
add
ress
th
e m
anag
emen
t an
d
mai
nten
ance
of
bu
sh
fire
m
itig
atio
n in
fras
tru
ctu
re.
Cle
aran
ce w
ithi
n th
e ea
sem
ents
will
be
mai
ntai
ned
to
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
BFM
SP –
App
end
ix B
Tab
le 8
-1
Tab
le
12-1
3 (R
isk
Reg
iste
r)
in
CE
MP
ha
s m
itig
atio
n m
easu
res
incl
uded
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B62
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
ensu
re fu
el lo
ads
are
kept
to a
min
imum
.
7.5.
8 M
odif
icat
ions
to
Man
agem
ent
and
Mit
igat
ion
Mea
sure
s fo
r B
ush
Fire
212
AP
Zs
will
be
size
d t
o pr
ovid
e a
Bu
shfi
re A
ttac
k L
evel
(B
AL
) of 2
9 kW
/m
2.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
AP
Z b
ased
on
des
ign
– P
PA
cle
ared
as
per
des
ign
213
An
emer
genc
y pl
an w
ill b
e pr
epar
ed i
n ac
cord
ance
wit
h cl
ause
17
4ZC
of
th
e O
ccu
pati
onal
H
ealt
h an
d
Safe
ty
Reg
ula
tion
s 20
01 (
NSW
) an
d t
he D
P&
I gu
idan
ce n
ote
HIP
AP
1, E
mer
genc
y P
lann
ing.
Pre
cons
truc
tion
C
BI
NC
-2
Ope
n
NC
-2 C
BI's
PR
P d
oes
not
refe
r to
eit
her
doc
um
ent
ther
efor
e it
is
uncl
ear
if p
lan
is c
onsi
sten
t w
ith
thes
e gu
idel
ines
an
d
proc
edu
res.
C
onsi
der
in
clud
ing
dis
cuss
ion
in P
IRM
P o
r P
RP
on
the
com
plia
nce/
non-
com
plia
nce
wit
h th
ese
doc
umen
ts.
AG
L w
ill b
e re
spon
sibl
e fo
r d
evel
opin
g th
e E
RP
fo
r th
e op
erat
ions
pha
se o
f the
Pro
ject
.
214
A f
ire
safe
ty s
tud
y w
ill b
e pr
epar
ed a
nd s
ubm
itte
d t
o FR
NSW
for
rev
iew
and
com
men
t. T
he f
ire
safe
ty s
tud
y w
ill b
e co
mpi
led
in a
ccor
dan
ce w
ith
NSW
Dep
artm
ent o
f P
lann
ing
and
Inf
rast
ruct
ure
gui
dan
ce n
ote
HIP
AP
2, F
ire
Safe
ty S
tud
y G
uid
elin
es.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
CB
I –FS
S A
ugu
st 2
012
base
d o
n fi
nal d
esig
n
Stag
e 2
– up
dat
e ba
sed
on
fina
l d
esig
ns –
Jan
uary
20
13
Let
ter
from
DoP
I d
ated
6 A
ugu
st 2
012
appr
ovin
g st
aged
app
roac
h w
ith
requ
irem
ent
the
FSS
for
the
seco
nd s
tage
sho
uld
be
an u
pdat
e on
the
FSS
for
th
e fi
rst
stag
e. (
The
sit
e m
ust
have
a s
ingl
e FS
S co
veri
ng th
e w
hole
sit
e)
Mee
ting
w
ith
RFS
to
d
iscu
ss
FSS
sche
dul
ed 4
Se
ptem
ber
2012
Upd
ates
from
AG
L to
be
obta
ined
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B63
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
215
The
pro
pose
d e
mer
genc
y tr
affi
c ar
rang
emen
ts w
ill b
e re
view
ed a
nd a
sses
sed
to
ensu
re c
ompl
ianc
e w
ith
the
stat
ed E
mer
genc
y V
ehic
le A
cces
s P
olic
y N
o. 4
.
Pre
cons
truc
tion
C
BI
NC
-2
Ope
n
NC
-2 –
con
sid
er i
nclu
din
g re
quir
emen
t in
to C
BI's
P
RIM
P o
r P
RP
216
Wit
h re
gard
s to
the
LN
G T
ank,
ther
e ar
e tw
o so
urc
es t
o d
eter
min
e th
e A
PZ
. T
he
Eur
opea
n L
NG
C
ode,
E
N
1473
:200
7 re
com
men
ds
a ra
dia
nt
heat
le
ss
than
15
kW/
m2,
w
hich
re
quir
es
an
AP
Z
of
43m
. T
he
Dep
artm
ent
of P
lann
ing
reco
mm
end
s a
rad
iant
hea
t le
ss
than
23k
W/
m2,
whi
ch r
equ
ires
an
AP
Z o
f 31
m.
The
cu
rren
t si
te
layo
ut
has
a A
PZ
of
46
m
(min
imum
), in
clu
din
g th
e sl
ashi
ng z
ones
, and
the
refo
re s
atis
fies
bot
h re
quir
emen
ts.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
Not
ed
7.6
Abo
rigi
nal C
ultu
ral H
erit
age
218
Mai
ntai
n an
Abo
rigi
nal c
ult
ura
l her
itag
e si
te r
egis
ter.
P
reco
nstr
uct
ion
Con
stru
ctio
n
CB
I IO
Ope
n
CH
MSP
ref
ers
to r
equ
irem
ent i
n SO
C T
able
1-3
.
Nil
regi
ster
cur
rent
ly k
ept
on s
ite.
Ins
pect
ion
log
mai
ntai
ned
. R
FS
incl
udes
ta
ble
of
arte
fact
at
trib
utes
IO
–
cons
ider
lin
k to
A
IHM
S ca
rds
whi
ch i
nclu
des
all
det
ails
of
find
. R
efer
ence
thi
s re
gist
er/
tabl
e in
the
CH
MSP
219
Rec
ord
al
l A
bori
gina
l cu
ltu
ral
heri
tage
si
tes
wit
hin
prox
imit
y of
the
Pro
ject
are
a in
the
CE
MP
and
OE
MP
. P
reco
nstr
ucti
on
Con
stru
ctio
n
AG
L
Com
plia
nce
Clo
sed
CH
MSP
– S
ecti
on 2
and
Fig
ure
2-1
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B64
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
220
Tra
in
all
empl
oyee
s an
d
cont
ract
ors
as
part
of
th
e in
duc
tion
pro
cess
in t
he p
roce
dur
es t
o be
fol
low
ed in
the
ev
ent
that
A
bori
gina
l cu
ltur
al
heri
tage
si
tes,
ob
ject
s an
d/
or r
emai
ns a
re u
near
thed
.
Pre
cons
truc
tion
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
CH
MSP
– S
ecti
on 3
-1 a
nd A
ppen
dix
A
Ind
uct
ion
incl
ud
es o
verv
iew
of
proc
ess
if h
erit
age
item
foun
d.
Spec
ific
s on
her
itag
e w
orks
dis
cuss
ed f
urth
er i
n w
orks
hop
21
Au
gust
20
12
wit
h cl
eari
ng
cont
ract
ors.
221
Pre
pare
a C
ult
ura
l H
erit
age
Man
agem
ent
Pla
n (C
HM
P)
in c
onsu
ltat
ion
wit
h A
bori
gina
l St
akeh
old
ers
prio
r to
co
nstr
uct
ion
for
inco
rpor
atio
n in
to
the
CE
MP
. T
he
CH
MP
will
ad
dre
ss:
a)
The
im
pact
m
itig
atio
n an
d
man
agem
ent
requ
irem
ents
for
Abo
rigi
nal a
nd h
isto
ric
heri
tage
,
b)
Det
ails
of
an
y ad
dit
iona
l ar
chae
olog
ical
in
vest
igat
ions
to
be u
nder
take
n an
d a
ny a
ssoc
iate
d
licen
ces
or a
ppro
vals
req
uire
d,
c)
Pro
ced
ure
s to
be
im
plem
ente
d
if
prev
iou
sly
unid
enti
fied
A
bori
gina
l or
hi
stor
ic
obje
cts
are
dis
cove
red
dur
ing
cons
truc
tion
,
d)
Pro
ced
ure
s if
hu
man
rem
ains
fou
nd,
e)
An
edu
cati
on p
rogr
am fo
r co
nstr
uct
ion
pers
onne
l on
thei
r ob
ligat
ions
for
Abo
rigi
nal
cult
ural
mat
eria
ls
and
his
tori
c it
ems.
Pre
cons
truc
tion
A
GL
C
ompl
ianc
e
Clo
sed
CH
MSP
a)
Sect
ion
2-3,
Sec
tion
4
b)
Sect
ion
5-1
and
App
end
ix C
for
leg
isla
tive
co
ntex
t
c)
App
end
ix A
d)
App
end
ix A
e)
App
end
ix A
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B65
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
222
Con
du
ct a
fie
ld s
urv
ey o
f th
e P
PA
whe
n th
e cu
rren
t d
ense
ve
geta
tion
la
yer
is
rem
oved
. T
his
will
be
u
nder
take
n by
a
qual
ifie
d
arch
aeol
ogis
t an
d
repr
esen
tati
ves
from
the
Wor
imi
Loc
al A
bori
gina
l L
and
C
ounc
il, M
u-R
oo-M
a In
c, N
u-R
un-G
ee P
ty L
td a
nd t
he
GG
AC
.
Pre
cons
truc
tion
Cle
arin
g
AG
L
Com
plia
nce
Clo
sed
CH
MSP
– S
ecti
on 5
-3
Thr
ee i
nspe
ctio
ns o
f th
e si
te w
ere
com
plet
ed b
y th
e gr
oups
.
30 A
ugu
st 2
012
– u
nder
stor
y ve
geta
tion
rem
oved
7 Se
ptem
ber
2012
– a
ll m
ater
ial c
lear
ed
24 S
epte
mbe
r 20
12 –
tops
oil r
emov
ed.
223
Reg
ular
m
onit
orin
g of
im
plem
enta
tion
of
A
bori
gina
l cu
ltur
al h
erit
age
proc
edur
es,
incl
udin
g th
e C
HM
P,
and
re
leva
nt le
gisl
atio
n w
ill b
e co
nduc
ted
to
ensu
re t
hat
they
ar
e fo
llow
ed b
y st
aff a
nd c
ontr
acto
rs.
Con
stru
ctio
n C
BI
AG
L
IO
Ope
n
CH
MSP
Tab
le 5
-1 i
ndic
ates
wee
kly
insp
ecti
ons
an
d th
ree
mon
thly
inte
rnal
au
dit
s co
mpl
eted
.
Dai
ly
and
w
eekl
y ch
ecks
fo
r he
rita
ge
issu
es
cond
uct
ed
by
CB
I en
viro
nmen
t st
aff.
T
hree
m
onth
ly in
tern
al a
ud
it n
ot c
ompl
eted
.
IO –
con
sid
er t
he c
ompl
etio
n of
thr
ee m
onth
ly
aud
it a
s in
clu
ded
in C
HM
SP.
7.7
Non
-Abo
rigi
nal C
ultu
ral H
erit
age
224
The
CH
MP
will
inc
lud
e pr
oced
ure
s in
the
eve
nt t
hat
sign
ific
ant
non-
Abo
rigi
nal
cult
ural
her
itag
e m
ater
ial
is
une
arth
ed d
uri
ng c
onst
ruct
ion
of th
e P
roje
ct.
Pre
cons
truc
tion
A
GL
CB
I
Com
plia
nce
Clo
sed
CH
MSP
– A
ppen
dix
A
All
subs
oil
wor
ks c
ompl
eted
on
PP
A –
nil
non-
Abo
rigi
nal c
ult
ura
l her
itag
e m
ater
ial f
ound
.
225
All
staf
f an
d c
ontr
acto
rs w
ill b
e in
du
cted
and
tra
ined
in
cult
ural
her
itag
e pr
oced
ures
and
the
CH
MP
so
they
are
aw
are
of th
eir
oblig
atio
ns u
nder
the
NSW
Her
itag
e A
ct.
Pre
cons
truc
tion
Con
stru
ctio
n
CB
I C
ompl
ianc
e
Ope
n
CH
MSP
– S
ecti
on 3
-2
Ind
uct
ion
incl
ud
ed o
verv
iew
of p
roce
ss if
her
itag
e it
em fo
und
. Sp
ecif
ic
trai
ning
on
he
rita
ge f
ind
id
enti
fica
tion
d
eliv
ered
to
clea
ring
con
trac
tors
at
wor
ksho
p 21
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B66
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
Au
gust
201
2.
7.8
Soci
o-E
cono
mic
Env
iron
men
t
226
Em
ploy
a s
trat
egy
that
foc
uses
on
equ
ipm
ent
supp
liers
, tr
ades
an
d
serv
ices
, w
ithi
n th
e P
ort
Step
hens
an
d
New
cast
le L
GA
s, b
oost
ing
the
loca
l eco
nom
y.
All
CB
I C
ompl
ianc
e
Ope
n
Subc
ontr
acto
rs h
ave
been
sou
rced
from
New
cast
le
are
incl
ud
ing
War
ds
Eng
inee
ring
, N
ewca
stle
E
arth
wor
ks a
nd A
ntqu
ip
227
Mee
t th
e co
nstr
uct
ion
and
ope
rati
ons
nois
e go
als
of t
he
Pro
ject
to m
inim
ise
dis
turb
ance
to s
ensi
tive
rec
epto
rs.
All
CB
I IO
Ope
n
NV
MSP
– S
ecti
on 2
.0
IO
– im
plem
ent
the
NV
MSP
m
onit
orin
g pr
ogra
mm
e to
con
firm
noi
se g
oals
are
bei
ng m
et
228
Use
loc
al l
abou
r w
here
app
ropr
iate
ly q
ual
ifie
d p
eopl
e ar
e av
aila
ble
to m
inim
ise
the
infl
ux
of w
orke
rs t
o th
e ar
ea
dur
ing
cons
truc
tion
an
d
red
uce
the
risk
of
su
bseq
uent
pot
enti
al im
pact
s on
ren
tal p
rice
s.
All
CB
I C
ompl
ianc
e
Ope
n
Bul
k ea
rthw
orks
an
d
clea
ring
co
mpl
eted
by
su
bcon
trac
tors
sou
rced
fro
m l
ocal
are
a at
tim
e of
au
dit
229
Ou
tlin
e ac
com
mod
atio
n op
tion
s fo
r w
orke
rs
du
ring
in
duc
tion
s an
d e
ncou
rage
d,
whe
re p
ract
icab
le,
to s
hare
ho
use
s d
uri
ng c
onst
ruct
ion.
All
CB
I C
ompl
ianc
e
Ope
n
Bul
k ea
rthw
orks
an
d
clea
ring
co
mpl
eted
by
su
bcon
trac
tors
sou
rced
fro
m l
ocal
are
a at
tim
e of
au
dit
230
Con
sult
w
ith
loca
l ac
com
mod
atio
n pr
ovid
ers
and
to
uris
m i
ndus
try
repr
esen
tati
ves
on a
n on
-goi
ng b
asis
to
man
age
pote
ntia
l im
pact
s on
sho
rt-t
erm
acc
omm
odat
ion,
pa
rtic
ular
ly d
urin
g pe
ak c
onst
ruct
ion
peri
ods.
All
CB
I O
pen
Not
che
cked
dur
ing
this
aud
it
7.8.
3 P
rope
rty
231
Acc
ess
to p
rope
rtie
s w
ill b
e m
aint
aine
d d
uri
ng p
ipel
ine
cons
truc
tion
w
orks
an
d
pipe
line
tren
ches
w
ill
be
prog
ress
ivel
y re
inst
ated
to
min
imis
e im
pact
s on
the
use
of
land
.
Pre
cons
truc
tion
Con
stru
ctio
n
CB
I N
A
Ope
n
27.0
2.12
: C
BI
only
res
pons
ible
whe
re t
heir
wor
k cr
osse
s T
AC
pri
vate
acc
ess
road
and
Old
Pun
t R
d
asso
ciat
ed w
ith
stor
mw
ater
pip
e.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B67
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
232
Min
imis
e th
e re
quir
emen
t fo
r ro
adw
orks
al
ong
the
sect
ion
of O
ld P
unt
Roa
d p
assi
ng t
hrou
gh t
he T
omag
o in
du
stri
al
esta
te
betw
een
Ken
ning
ton
Dri
ve
and
O
ld
Pu
nt
Roa
d
and
L
aver
ick
Ave
nue
and
T
omag
o R
oad
in
ters
ecti
ons.
Pre
cons
truc
tion
–
Stag
e 2
Con
stru
ctio
n
AG
L
NA
Ope
n
Stag
e 2
of P
roje
ct
Che
ck d
esig
n
7.8.
4 E
mpl
oym
ent,
Tra
inin
g an
d L
ocal
Bus
ines
s
233
Eng
age
loca
l bu
sine
sses
whe
re p
ossi
ble
to s
ervi
ce t
he
Pro
ject
bo
th
du
ring
co
nstr
uct
ion
and
op
erat
ions
. D
etai
led
ad
vanc
ed
noti
ces
of
good
s an
d
serv
ices
re
quir
ed b
y th
e P
roje
ct w
ill b
e is
sued
to
assi
st l
ocal
bu
sine
sses
mee
t the
nee
ds
of th
e P
roje
ct.
All
CB
I
AG
L
Com
plia
nce
Ope
n
Bul
k ea
rthw
orks
an
d
clea
ring
co
mpl
eted
by
su
bcon
trac
tors
sou
rced
fro
m l
ocal
are
a at
tim
e of
au
dit
Che
ck i
f ad
vanc
ed n
otic
e is
sued
not
che
cked
as
part
of t
his
aud
it
7.8.
5 So
cial
Inf
rast
ruct
ure
234
Com
mu
nity
con
sult
atio
n w
ill b
e on
-goi
ng d
uri
ng t
he li
fe
of th
e P
roje
ct.
All
CB
I
AG
L
Com
plia
nce
Ope
n
Pro
ced
ure
pr
ovid
ed
in
the
Com
mu
nity
E
ngag
emen
t P
lan
(Doc
umen
t no
: N
GSF
-AG
L-
NA
S-P
M-P
LN
-000
2) -
Sect
ion
4
Firs
t C
CC
m
eeti
ng
4 Ju
ly
2012
. M
inu
tes
are
avai
labl
e on
the
Pro
ject
web
site
.
235
Not
ify
the
loca
l co
mm
uni
ty b
y m
eans
of
publ
ic n
otic
e pu
blic
atio
ns a
nd a
dve
rtis
emen
ts o
n th
e pr
ogre
ss o
f th
e P
roje
ct a
nd th
e sc
hed
ulin
g of
wor
ks.
All
CB
I
AG
L
Com
plia
nce
Ope
n
Pro
vid
ed
in
the
Com
mun
ity
Eng
agem
ent
Pla
n (D
ocu
men
t no:
NG
SF-A
GL
-NA
S-P
M-P
LN
-000
2)
Pro
ject
sig
nboa
rds
have
bee
n er
ecte
d o
n si
te a
t H
exha
m a
nd T
omag
o w
ith
cont
act d
etai
ls
Con
tact
det
ails
ad
vert
ised
on
proj
ect
web
site
–
det
ails
als
o in
clud
ed in
New
spap
er a
dve
rtis
emen
t pu
blis
hed
in:
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B68
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
• P
ort S
teph
ens
Exa
min
er –
21
June
201
2
• N
ewca
stle
Her
ald
– 2
1 Ju
ne 2
012
Not
ices
ind
icat
e ex
pect
ed o
pera
tion
al d
ate
(mid
20
15)
and
tha
t A
GL
will
con
tinu
e to
inf
orm
the
co
mm
uni
ty th
rou
ghou
t all
stag
es o
f the
pro
ject
236
Pre
vent
ativ
e oc
cupa
tion
al h
ealt
h an
d s
afet
y m
easu
res
and
aw
aren
ess
prog
ram
s w
ill b
e im
plem
ente
d.
Con
stru
ctio
n C
BI
AG
L
Com
plia
nce
Ope
n
Too
lbox
talk
s he
ld w
eekl
y (r
ecor
ds
sigh
ted
) whi
ch
dis
cuss
ed a
ny to
pic
al is
sues
Pre
-sta
rts
held
d
aily
hi
ghlig
htin
g ha
zard
s an
d
dis
cuss
ing
wor
ks to
be
com
plet
ed th
at d
ay
237
All
staf
f, co
ntra
ctor
s an
d s
ite
visi
tors
will
und
ergo
sit
e in
duc
tion
s, b
e co
nver
sant
wit
h th
e co
nstr
ucti
on s
afet
y m
anag
emen
t pl
an a
nd t
he e
mer
genc
y m
anag
emen
t pl
an,
as w
ell a
s oc
cupa
tion
al h
ealt
h an
d s
afet
y re
quir
emen
ts a
s sp
ecif
ied
by
spec
ialis
t co
ntra
ctor
s, p
rofe
ssio
nal
bod
ies
and
uni
ons.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
CE
MP
–Se
ctio
n 3.
2 T
rain
ing
and
Aw
aren
ess
PIR
MP
– S
ecti
on 3
.2 T
rain
ing
and
Aw
aren
ess
Ind
ucti
on r
ecor
ds
mai
ntai
ned
– a
ll st
aff
requ
ired
to
und
ergo
ind
ucti
ons
prio
r to
com
men
cing
wor
ks
on s
ite
Rev
iew
of
ind
ucti
on c
onte
nt c
ompl
eted
Aug
ust
2012
.
238
Wor
king
rel
atio
nshi
ps w
ill b
e d
evel
oped
wit
h lo
cal
area
em
erge
ncy
serv
ices
pr
ovid
ers,
in
clud
ing
Ray
mon
d
Ter
race
P
olic
e,
Am
bula
nce
and
Fi
re
serv
ices
, an
d
regi
onal
hos
pita
ls t
o ad
vise
on
risk
s re
lati
ng t
o on
-sit
e w
ork
and
pre
pare
for
em
erge
ncie
s. A
ssis
tanc
e w
ill b
e pr
ovid
ed
wit
h em
erge
ncy
trai
ning
. T
his
proc
ess
will
be
gin
prio
r to
con
stru
ctio
n.
Con
stru
ctio
n C
BI
AG
L
Com
plia
nce
Ope
n
BFM
SP –
Sec
tion
3.1
for
Fir
e Se
rvic
es s
take
hold
er
cons
ult
atio
n on
ce p
lan
com
plet
ed.
Vis
it t
o R
ura
l Fi
re S
ervi
ce c
omm
and
cen
tre
in R
aym
ond
Ter
race
co
mpl
eted
w
ith
dis
cuss
ion
of
plan
co
mpl
eted
. R
FS w
as i
nvit
ed t
o si
te t
o co
mpl
ete
tool
box
for
bush
fire
m
anag
emen
t ho
wev
er
RFS
ha
s no
t at
tend
ed s
ite
as a
t dat
e of
au
dit
. P
olic
e an
d a
mbu
lanc
e ar
e aw
are
of s
ite
how
ever
, sp
ecif
ic r
elat
ions
hips
are
yet
to b
e d
evel
oped
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B69
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
239
A z
ero-
tole
ranc
e on
-sit
e d
rug
and
alc
ohol
pol
icy
will
be
enfo
rced
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
Ran
dom
br
eath
te
stin
g co
mpl
eted
d
uri
ng
pre-
star
ts a
nd r
esul
ts r
ecor
ded
in r
egis
ter.
Dru
g te
stin
g is
not
cur
rent
ly c
ompl
eted
as
type
of
test
ing
appr
opri
ate
to s
ite
to b
e co
nfir
med
i.e
. bl
ood
, uri
ne, s
aliv
a sw
ab e
tc
240
As
the
Pro
ject
w
ill
be
clas
sifi
ed
as
a M
ajor
H
azar
d
Faci
lity,
the
Pro
ject
will
com
ply
wit
h th
e re
quir
emen
ts
for
haza
rd a
nd r
isk
man
agem
ent
und
er t
he N
atio
nal
Stan
dar
d
for
the
Con
trol
of
M
ajor
H
azar
d
Faci
litie
s ad
min
iste
red
by
N
SW
Wor
kCov
er.
The
N
atio
nal
Stan
dar
d
for
the
Con
trol
of
M
ajor
H
azar
d
Faci
litie
s re
quir
es t
hat
rele
vant
com
mun
ity
and
em
ploy
ee g
roup
s ar
e co
nsu
lted
.
Con
stru
ctio
n C
BI
AG
L
Com
plia
nce
Ope
n
MC
oA B
16 s
tate
s th
at a
Fin
al H
azar
d A
naly
sis
of
the
proj
ect,
cons
iste
nt w
ith
Haz
ard
ous
Ind
ust
ry
Pla
nnin
g A
dvi
sory
Pap
er N
o. 6
– G
uid
elin
es f
or
Haz
ard
Ana
lysi
s (D
oP,
2011
) sh
all
be d
evel
oped
. T
he F
HA
sha
ll re
port
on
the
impl
emen
tati
ons
of
the
reco
mm
end
atio
ns o
f th
e P
relim
inar
y H
azar
d
Ana
lysi
s.
241
Pri
or t
o op
erat
ion
of t
he P
roje
ct,
a sa
fety
man
agem
ent
syst
em
will
be
im
plem
ente
d,
whi
ch
will
in
clud
e an
em
erge
ncy
resp
onse
pla
n.
Ope
rati
ons
AG
L
Com
plia
nce
Clo
sed
- C
BI
PR
IMP
has
bee
n d
evel
oped
Safe
ty m
anag
emen
t sy
stem
and
pro
ced
ures
has
be
en d
evel
oped
and
impl
emen
ted
242
Pro
ject
d
esig
n w
ill
prov
ide
suff
icie
nt
open
sp
ace
for
emer
genc
y ve
hicl
es
and
eq
uipm
ent
incl
udin
g fi
re
figh
ting
and
res
cue.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
Che
ck o
f fi
nal d
esig
n no
t com
plet
ed a
s pa
rt o
f thi
s au
dit
Ref
er S
oC 2
07 a
nd 2
08
TM
SP –
Tab
le 9
-2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B70
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
243
Tw
o su
itab
ly q
ual
ifie
d f
irst
aid
off
icer
s (w
ith
acce
ss t
o ba
sic
med
ical
fa
cilit
ies)
w
ill
be
on
dut
y at
al
l ti
mes
d
uri
ng c
onst
ruct
ion
acti
viti
es a
ssoc
iate
d w
ith
the
gas
plan
t, th
e re
ceiv
ing
stat
ion
in H
exha
m a
nd t
he p
ipel
ine
corr
idor
, an
d
at
all
tim
es
at
the
gas
plan
t d
uri
ng
oper
atio
ns.
Con
stru
ctio
n C
BI
AG
L
Com
plia
nce
Ope
n
Thr
ee d
esig
nate
d f
irst
aid
off
icer
s on
sit
e –
det
ails
on
wal
l of c
rib
hut.
7.8.
6 M
onit
orin
g
244
The
nu
mbe
r of
jo
bs
crea
ted
by
th
e P
roje
ct
for
loca
l re
sid
ents
d
urin
g th
e co
nstr
ucti
on
peri
od
to
assi
st
in
quan
tify
ing
the
posi
tive
im
pact
s of
th
e P
roje
ct
on
wor
kfor
ce p
arti
cipa
tion
.
Con
stru
ctio
n C
BI
Ope
n M
onit
orin
g re
cord
s no
t ch
ecke
d a
s pa
rt o
f th
is
aud
it
245
Stak
ehol
der
fe
edba
ck
via
the
impl
emen
tati
on
of
a co
mm
unit
y in
form
atio
n lin
e to
en
sure
th
at
issu
es
asso
ciat
ed w
ith
the
Pro
ject
are
app
ropr
iate
ly a
dd
ress
ed.
Con
stru
ctio
n A
GL
C
ompl
ianc
e
Ope
n
Info
rmat
ion
line
adve
rtis
ed o
n w
ebsi
te
Mon
itor
ing
reco
rds
not
chec
ked
as
part
of
this
au
dit
246
The
loc
al c
omm
uni
ty’s
res
pons
e an
d a
war
enes
s of
the
P
roje
ct
as
a re
sult
of
th
e co
mm
uni
ty
cons
ult
atio
n pr
ogra
m.
Con
stru
ctio
n A
GL
O
pen
Mon
itor
ing
reco
rds
not
chec
ked
as
part
of
this
au
dit
247
Lon
g-te
rm b
enef
its
to t
he c
omm
uni
ty a
chie
ved
by
AG
L’s
pa
rtne
ring
wit
h st
akeh
old
ers.
C
onst
ruct
ion
AG
L
Ope
n M
onit
orin
g re
cord
s no
t ch
ecke
d a
s pa
rt o
f th
is
aud
it
7.9
Vis
ual A
men
ity
248
Col
our
sele
ctio
n of
off
ice
build
ings
will
be
cons
ider
ate
of
the
surr
ound
ing
envi
ronm
ent.
All
CB
I O
pen
Pre
cons
truc
tion
- d
esig
n
Not
che
cked
as
part
of t
his
aud
it
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B71
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
249
Exi
stin
g ve
geta
tion
will
be
reta
ined
whe
re p
ossi
ble
to a
ct
as a
vis
ual
scr
een.
A
ll A
GL
C
ompl
ianc
e
Ope
n
Onl
y re
quir
ed
area
fo
r P
PA
, ac
cess
tr
ack
and
pi
pelin
e cl
eare
d.
All
othe
r ve
geta
tion
in
Pro
ject
ar
ea
reta
ined
.
Pro
ject
is
no
t vi
sibl
e fr
om
surr
ound
ing
road
s, r
esid
ence
s or
bus
ines
ses.
Pip
elin
e ro
ute
and
Hex
ham
Rec
eivi
ng S
tati
on t
o be
che
cked
250
Ad
dit
iona
l sc
reen
pla
ntin
g w
ill b
e u
nder
take
n on
the
fr
ont
and
si
de
boun
dar
ies
of
the
Hex
ham
re
ceiv
ing
stat
ion
site
. P
lant
ing
will
nee
d t
o al
low
for
the
fin
al s
ite
layo
ut,
loca
tion
of
und
ergr
ound
inf
rast
ruct
ure
and
any
se
curi
ty s
urve
illan
ce r
equi
rem
ents
.
All
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
of P
roje
ct
251
On
com
plet
ion
of t
he p
ipel
ine
cons
tru
ctio
n, d
istu
rbed
ar
eas
of
land
w
ill
be
reha
bilit
ated
an
d
retu
rned
to
pr
evio
us u
se.
All
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
7.10
Tra
ffic
252
A c
onst
ruct
ion
traf
fic
man
agem
ent
plan
will
be
prep
ared
fo
r th
e P
roje
ct t
o m
inim
ise
any
impa
cts
on t
he r
oad
ne
twor
k.
Mea
sure
s in
th
e co
nstr
uct
ion
traf
fic
man
agem
ent p
lan
will
incl
ude:
a)
Tra
nspo
rtat
ion
of e
quip
men
t an
d m
achi
nery
lik
ely
to c
ause
del
ays
to tr
affi
c fl
ows
will
be
tim
ed to
avo
id
peak
traf
fic
flow
s, w
here
pra
ctic
able
;
b)
Ens
ure
hea
vy v
ehic
les
mee
t th
e A
ust
ralia
n R
oad
R
ules
and
RT
A s
tand
ard
s so
tha
t ro
ad s
afet
y is
not
co
mpr
omis
ed;
Pre
cons
truc
tion
C
BI
Com
plia
nce
Clo
sed
Tra
ffic
Man
agem
ent S
ub
Pla
n (T
MSP
)
a)
Tab
le 9
-1
b)
Sect
ion
2.7
and
Tab
le 9
-1
c)
Tab
le 9
-1
d)
Tab
le 9
-1
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B72
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
c)
Tra
nspo
rt o
vers
ized
equ
ipm
ent
and
mac
hine
ry i
n ac
cord
ance
wit
h th
e R
TA
gu
idel
ines
for
ove
rsiz
ed
mov
emen
ts;
d)
Impl
emen
t ap
prop
riat
e si
gnag
e to
war
n ro
ad u
sers
of
the
pre
senc
e of
con
stru
ctio
n ve
hicl
es a
s w
ell
as
chan
ges
to th
e no
rmal
traf
fic
cond
itio
ns.
253
Not
ify
the
loca
l co
mm
uni
ty b
y m
eans
of
publ
ic n
otic
e pu
blic
atio
ns a
nd a
dve
rtis
emen
ts o
n th
e pr
ogre
ss o
f th
e P
roje
ct a
nd t
he s
ched
ulin
g of
wor
ks s
o as
to
info
rm t
he
loca
l co
mm
unit
y of
any
ad
dit
iona
l ve
hicl
es a
dd
ed o
nto
the
loca
l roa
d n
etw
ork.
All
CB
I
AG
L
Com
plia
nce
Ope
n
TM
SP –
Tab
le 9
-3 N
otif
icat
ion
Sect
ion
3
AG
L
need
s to
si
gn
off
any
publ
ic
noti
ces
rega
rdin
g th
e pr
ojec
t.
254
The
se m
easu
res
(rel
atin
g to
traf
fic)
will
be
dev
elop
ed a
nd
impl
emen
ted
in
co
nsu
ltat
ion
wit
h th
e R
TA
, P
ort
Step
hens
Cou
ncil
and
New
cast
le C
ity
Cou
ncil.
All
CB
I C
ompl
ianc
e
Ope
n
TM
SP -
Sect
ion
3.1
255
It i
s an
tici
pate
d t
hat
som
e P
roje
ct c
ompo
nent
s w
ill b
e tr
ansp
orte
d
as
over
-dim
ensi
onal
lo
ads
du
ring
co
nstr
ucti
on. R
equi
red
per
mit
s w
ill b
e ob
tain
ed.
All
CB
I IO
Ope
n
TM
SP –
Tab
le 9
-1
IO –
ad
d S
OC
nu
mbe
r to
rel
evan
t se
ctio
n of
Tab
le
9-1
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B73
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
256
The
pi
pelin
e co
nstr
uct
ion
may
ne
cess
itat
e th
e pa
rtia
l cl
osur
e of
tr
affi
c la
nes
alon
g O
ld
Pun
t R
oad
d
urin
g pi
pelin
e in
stal
lati
on.
Tem
pora
ry
dec
king
w
ill
be
impl
emen
ted
if
requ
ired
dur
ing
the
tren
chin
g w
orks
to
allo
w
vehi
cles
to
tr
aver
se
the
open
tr
ench
. T
he
cons
truc
tion
tr
affi
c m
anag
emen
t pl
an
will
ou
tlin
e m
anag
emen
t m
easu
res
to p
rote
ct p
edes
tria
n, c
yclis
t an
d
vehi
cula
r m
ovem
ents
.
All
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
CE
MP
- T
MSP
257
Ope
rati
on
traf
fic
man
agem
ent
cont
rols
w
ill
be
impl
emen
ted
to
ensu
re s
taff
, con
trac
tor
and
pub
lic s
afet
y re
lati
ng t
o ve
hicl
e tr
ansp
ort.
Safe
dri
ver
cond
uct
pol
icie
s an
d s
tand
ard
s w
ill b
e ap
plic
able
to
all
AG
L s
taff
and
co
ntra
ctor
s. O
ther
con
trol
s in
clud
e:
Im
plem
ent
dri
ver
and
ped
estr
ian
safe
ty a
war
enes
s pr
ogra
ms,
R
evie
w s
peed
lim
its
acro
ss t
he P
roje
ct s
ites
for
all
vehi
cles
,
C
ond
uct
a
rand
om
alco
hol
and
d
rug
test
ing
prog
ram
.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
258
A d
etai
led
con
stru
ctio
n tr
affi
c m
anag
emen
t pl
an w
ill b
e pr
epar
ed a
nd im
plem
ente
d
All
CB
I C
ompl
ianc
e
Ope
n
TM
SP p
repa
red
.
Impl
emen
tati
on to
be
chec
ked
(on-
goin
g)
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B74
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
259
A n
um
ber
of t
empo
rary
con
stru
ctio
n co
mpo
und
s w
ill b
e re
quir
ed
alon
g th
e ro
ute
of
th
e pi
pelin
e fo
r it
s co
nstr
uct
ion.
Saf
e tr
affi
c m
ovem
ent
in a
nd o
ut
of t
hese
si
tes
will
be
d
escr
ibed
in
th
e co
nstr
ucti
on
traf
fic
man
agem
ent p
lan.
All
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
TM
SP
260
Tem
pora
ry i
mpa
cts
to r
oad
inf
rast
ruct
ure
by
the
Pro
ject
d
urin
g th
e co
nstr
ucti
on p
hase
will
be
reha
bilit
ated
and
re
inst
ated
by
AG
L.
All
– St
age
2 A
GL
N
A
Ope
n
Stag
e 2
TM
SP
261
AG
L w
ill c
arry
ou
t H
DD
ben
eath
the
Old
Pu
nt R
oad
and
T
omag
o R
oad
int
erse
ctio
n to
avo
id d
isru
ptio
n to
tra
ffic
d
uri
ng th
e P
roje
ct c
onst
ruct
ion
phas
e.
All
– St
age
2 O
ther
N
A
Ope
n
Stag
e 2
TM
SP
262
AG
L s
hall
arra
nge
for
a pu
blic
lia
bilit
y po
licy
to c
over
th
e R
TA
and
the
rel
evan
t C
ounc
il fo
r pu
blic
lia
bilit
y in
re
lati
on t
o th
is c
ontr
act/
wor
ks f
or a
n am
ount
of
$20
mill
ion.
All
AG
L
Ope
n N
ot c
heck
ed a
s pa
rt o
f thi
s au
dit
263
Use
of
th
e ex
isti
ng
infr
astr
uct
ure
of
th
e H
exha
m
rece
ivin
g st
atio
n w
here
pos
sibl
e, n
otin
g th
at t
here
is
exis
ting
par
king
and
acc
ess
to th
e si
te.
All
– St
age
2 C
BI
NA
Ope
n
Stag
e 2
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B75
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
7.11
Noi
se a
nd V
ibra
tion
7.11
.1 N
oise
264
A n
oise
and
vib
rati
on m
anag
emen
t pla
n w
ill b
e pr
epar
ed
as p
art o
f the
CE
MP
and
OE
MP
to e
nsu
re n
oise
leve
ls a
re
adeq
uate
ly c
ontr
olle
d a
nd a
ny i
mpa
cts
man
aged
. T
he
traf
fic
nois
e m
anag
emen
t pl
an w
ill b
e pr
epar
ed w
ithi
n th
e co
nstr
ucti
on
traf
fic
man
agem
ent
plan
. It
w
ill
be
prep
ared
in
lin
e w
ith
prac
tice
s ou
tlin
ed
in
DE
CC
W
Inte
rim
Con
stru
ctio
n N
oise
Gu
idel
ine
2009
and
DE
CC
W
Env
iron
men
tal
Cri
teri
a fo
r R
oad
Tra
ffic
Noi
se 1
999
and
in
co
nsu
ltat
ion
wit
h th
e P
ort
Step
hens
C
ounc
il,
New
cast
le C
ity
Cou
ncil
and
OE
H.
The
CE
MP
will
be
impl
emen
ted
by
AG
L a
nd th
e co
nstr
ucti
on c
ontr
acto
rs.
All
CB
I C
ompl
ianc
e
Ope
n
Noi
se
and
V
ibra
tion
M
anag
emen
t Su
b pl
an
(NV
MSP
)
TM
SP –
Tab
le 9
-4.
Con
sult
atio
n w
ith
PSC
, N
CC
an
d
EP
A
to
be
chec
ked
wit
h A
GL
265
Noi
se e
mis
sion
s w
ill b
e co
nfir
med
for
equ
ipm
ent
and
in
fras
truc
ture
(i
nclu
din
g lo
w
freq
uen
cy n
oise
) d
uri
ng
det
aile
d d
esig
n w
hen
fina
l spe
cifi
cati
ons
are
know
n. T
he
pote
ntia
l fo
r hi
gh-f
low
gas
fla
ring
at
the
gas
plan
t si
te
will
be
revi
ewed
and
noi
se a
sses
smen
t m
ay b
e re
quir
ed
to d
eter
min
e im
pact
s of
noi
se a
ssoc
iate
d w
ith
high
-flo
w
gas
flar
ing.
All
AG
L
Ope
n T
echn
ical
des
ign
spec
To
be c
ompl
eted
266
Con
stru
ctio
n an
d o
pera
tion
act
ivit
ies
will
be
und
erta
ken
wit
h a
focu
s on
noi
se c
ontr
ol a
t so
urce
, noi
se a
tten
uati
on
and
in
cons
ult
atio
n w
ith
pote
ntia
lly a
ffec
ted
rec
epto
rs t
o m
inim
ise
the
risk
of
nois
e ex
ceed
ing
nois
e cr
iter
ia a
nd
dis
turb
ing
sens
itiv
e re
cept
ors.
The
fol
low
ing
mea
sure
s w
ill
be
impl
emen
ted
(w
here
pr
acti
cal)
to
m
anag
e im
pact
s of
noi
se a
nd e
nsur
e P
roje
ct g
oals
are
met
:
All
CB
I R
efer
bel
ow
NV
MSP
co
mpl
eted
w
ith
mit
igat
ion
and
m
anag
emen
t mea
sure
s in
clud
ed in
App
end
ix B
.
EA
Noi
se c
ompo
nent
ind
icat
e co
nstr
uct
ion
nois
e w
ill n
ot e
xcee
d c
rite
ria
at th
e se
nsit
ive
rece
ptor
s.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B76
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
267
Stag
e P
roje
ct a
ctiv
itie
s (a
nd r
edu
ce s
imu
ltan
eou
s no
ise
emit
ting
pra
ctic
es) t
o re
du
ce p
eak
nois
e le
vels
. A
ll C
BI
Com
plia
nce
Ope
n
NV
MSP
–
App
end
ix
B
Tab
le
8-2
Hou
rs
of
Con
stru
ctio
n
Con
stru
ctio
n ac
tivi
ties
an
d
ind
icat
ive
tim
ings
in
clud
e in
Tab
le 2
-3
Pre
dic
ted
noi
se le
vels
for
eac
h ac
tivi
ty in
clud
ed in
T
able
2-6
. Cle
arin
g an
d b
ulk
eart
hwor
ks id
enti
fied
as
no
isie
st
acti
vity
–
pred
icte
d
leve
ls
belo
w
crit
eria
at r
ecep
tors
.
268
Inco
rpor
ate
atte
nuat
ion
(su
ch a
s m
uff
lers
) int
o th
e d
esig
n of
Pro
ject
equ
ipm
ent a
nd in
fras
tru
ctu
re.
All
CB
I IO
Ope
n
Not
incl
ude
in C
BI N
VM
SP.
IO –
inve
stig
ate
appr
opri
aten
ess
of S
oC t
o cu
rren
t st
age
of w
orks
and
inc
orpo
rate
int
o N
VM
SP i
f ap
plic
able
269
Ori
ent e
quip
men
t aw
ay fr
om r
ecep
tors
. A
ll C
BI
Com
plia
nce
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt a
nd M
achi
nery
Pre
dic
ted
noi
se l
evel
s fr
om c
urre
nt s
ite
wor
ks n
ot
aud
ible
at n
eare
st r
ecep
tor
(Bot
anic
al G
ard
ens)
.
270
Res
tric
t no
ise
gene
rati
ng
cons
tru
ctio
n ac
tivi
ties
to
d
ayti
me
hou
rs (
7.00
a.m
. to
6.0
0 p.
m.
Mon
day
to
Frid
ay
and
8.
00
a.m
. to
1.
00
p.m
. Sa
turd
ay).
In
spec
ial
circ
umst
ance
s, i
f no
ise
gene
rati
ng e
veni
ng o
r ni
ght
wor
k is
req
uire
d, a
con
sult
atio
n pr
oces
s w
ill b
e un
der
take
n to
en
sure
noi
se i
mpa
cts
can
be a
deq
uate
ly c
ontr
olle
d.
Thi
s w
ill b
e th
e ca
se f
or h
oriz
onta
l d
irec
tion
al d
rilli
ng w
orks
, w
hich
will
occ
ur 2
4 ho
urs
a d
ay, 7
day
s pe
r w
eek.
All
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
–
App
end
ix
B
Tab
le
8-2
Hou
rs
of
Con
stru
ctio
n
Hou
rs o
f con
stru
ctio
n w
ithi
n sp
ecif
ied
hou
rs
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B77
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
271
Sche
du
le
high
no
ise
gene
rati
ng
acti
viti
es
for
less
se
nsit
ive
tim
es o
f th
e d
ay (
incl
udin
g pe
riod
ic r
espi
te
brea
ks fr
om n
oise
).
All
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
–
App
end
ix
B
Tab
le
8-2
Hou
rs
of
Con
stru
ctio
n
Nil
high
noi
se g
ener
atin
g ac
tivi
ties
dur
ing
peri
od
of a
ud
it
272
Con
sult
po
tent
ial
nois
e re
cept
ors
(par
ticu
larl
y th
ose
wit
hin
500
m o
f th
e ga
s pi
pelin
e w
orks
) ab
out
the
natu
re
of t
he n
oise
em
issi
ons
and
avo
idan
ce a
nd m
itig
atio
n pr
acti
ces
to b
e ad
opte
d.
Com
plai
nts
and
fee
dba
ck a
nd
will
be
reco
rded
and
ad
dre
ssed
whe
re p
ract
ical
.
All
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
-
Sect
ion
3.1
and
T
able
8-
1 G
ener
al
Con
stru
ctio
n
Nil
wor
ks
wit
hin
500m
of
se
nsit
ive
rece
ptor
s d
uri
ng p
erio
d o
f au
dit
wit
h ex
cept
ion
of b
otan
ical
ga
rden
s.
273
Ens
ure
veh
icle
s an
d e
quip
men
t ar
e in
goo
d w
orki
ng
ord
er a
nd h
ave
effe
ctiv
e no
ise
red
uct
ion
feat
ure
s.
All
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt a
nd M
achi
nery
Veh
icle
s ch
ecke
d d
aily
– r
ecor
ds
kept
.
CB
I en
viro
nmen
t st
aff
note
lev
els
dur
ing
dai
ly
and
wee
kly
site
insp
ecti
ons
274
Ens
ure
tha
t be
st p
ract
ices
for
noi
se a
tten
uat
ion
(su
ch a
s ex
hau
st s
ilenc
ers,
mu
ffle
rs a
nd e
nclo
sure
s) a
nd n
oise
m
inim
isat
ion
are
inco
rpor
ated
int
o th
e d
esig
n of
the
gas
pl
ant a
nd H
exha
m r
ecei
ving
sta
tion
.
All
CB
I O
pen
Tec
hnic
al d
esig
n sp
ec n
o ch
ecke
d a
s pa
rt o
f th
is
aud
it
275
Con
sult
pot
enti
al n
oise
rec
epto
rs a
bou
t th
e na
ture
of
oper
atio
ns n
oise
em
issi
ons
and
avo
idan
ce a
nd m
itig
atio
n pr
acti
ces
to b
e ad
opte
d. F
eed
back
and
com
plai
nts
will
be
reco
rded
and
ad
dre
ssed
whe
re p
ract
ical
.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B78
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
276
Mon
itor
no
ise
leve
ls
du
ring
op
erat
ions
to
en
sure
lo
calis
ed n
oise
cre
ep (
incr
ease
in
loca
l am
bien
t no
ise)
is
not o
ccu
rrin
g d
ue
to th
e P
roje
ct.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
7.11
.2 V
ibra
tion
277
Con
stru
ctio
n ac
tivi
ties
will
be
impl
emen
ted
wit
h a
focu
s on
vi
brat
ion
cont
rol
at
sour
ce
and
co
nsul
tati
on
wit
h po
tent
ially
aff
ecte
d r
ecep
tors
.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
NV
MSP
– T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt
and
Mac
hine
ry
Vib
rato
ry r
olle
r an
d v
ibro
com
pact
ion
com
plet
ed
dur
ing
aud
it p
erio
d –
sit
e in
spec
tion
s in
dic
ate
imp
acts
loca
lised
278
The
fo
llow
ing
mea
sure
s w
ill b
e im
plem
ente
d (
whe
re
prac
tica
l) t
o m
anag
e im
pact
s of
con
stru
ctio
n vi
brat
ion
and
ens
ure
Pro
ject
goa
ls a
re m
et:
Con
stru
ctio
n C
BI
Ref
er b
elow
R
efer
bel
ow
279
Use
al
tern
ativ
e,
low
er-i
mpa
ct
equ
ipm
ent
or
met
hod
s w
here
pra
ctic
able
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
– A
ppen
dix
B
280
Ope
rate
hi
gh
vibr
atio
n eq
uip
men
t as
fa
r aw
ay
from
re
cept
ors
as p
ossi
ble.
Roc
k-br
eake
rs w
ill n
ot b
e us
ed
wit
hin
20 m
of r
esid
ence
s.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
NV
MSP
– T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt
and
Mac
hine
ry
281
Sche
du
le v
ibra
tion
-cau
sing
equ
ipm
ent
to b
e u
sed
at
the
leas
t sen
siti
ve ti
me
of d
ay (
tim
es o
f d
ay to
be
det
erm
ined
in
co
nsul
tati
on
wit
h lo
cal
stak
ehol
der
s,
incl
udin
g co
unci
ls).
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
NV
MSP
– A
ppen
dix
B
Vib
rato
ry r
olle
r an
d v
ibro
com
pact
ion
com
plet
ed
dur
ing
aud
it p
erio
d –
sit
e in
spec
tion
s in
dic
ate
impa
cts
loca
lised
.
Nil
sens
itiv
e re
cept
ors
imp
acte
d.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B79
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
282
Kee
p eq
uip
men
t wel
l mai
ntai
ned
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt a
nd M
achi
nery
Veh
icle
ch
eckl
ist
com
plet
ed
dai
ly
pres
tart
. R
ecor
ds
mai
ntai
ned
.
283
Red
uce
inst
ance
s of
sim
ult
aneo
us
vibr
atio
n ac
tivi
ties
. C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt a
nd M
achi
nery
Vib
rato
ry r
olle
r an
d v
ibro
com
pact
ion
com
plet
ed
du
ring
au
dit
per
iod
– w
orks
in
dif
fere
nt a
reas
w
ith
site
in
spec
tion
s in
dic
atin
g ni
l cu
mul
ativ
e im
pac
t.
284
Isol
ate
high
vib
rati
on e
quip
men
t on
resi
lient
mou
nds.
C
onst
ruct
ion
CB
I C
ompl
ianc
e
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt a
nd M
achi
nery
285
Con
sult
po
tent
ial
rece
ptor
s ab
out
the
natu
re
of
cons
tru
ctio
n vi
brat
ion
and
av
oid
ance
an
d
mit
igat
ion
prac
tice
s to
be
adop
ted
(pa
rtic
ula
rly
thos
e w
ithi
n 50
0 m
of
the
pip
elin
e w
orks
, inc
lud
ing
the
rece
ptor
R5
(217
Old
M
aitl
and
Roa
d))
. C
omm
unit
y fe
edba
ck a
nd c
ompl
aint
s w
ill b
e re
cord
ed a
nd a
dd
ress
ed w
here
pra
ctic
al.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
NV
MSP
– A
ppen
dix
B T
able
8-1
Gen
eral
Nil
vibr
ator
y w
orks
com
plet
ed w
ithi
n 50
0m o
f se
nsit
ive
rece
ptor
s d
urin
g au
dit
per
iod
7.11
.3 M
onit
orin
g
286
Noi
se e
mis
sion
s d
uri
ng c
onst
ruct
ion
and
ope
rati
ons
to
ensu
re
equi
pmen
t is
m
eeti
ng
nois
e ce
rtif
icat
ion
and
cr
iter
ia r
equi
rem
ents
and
det
ect
any
faul
ty o
r d
amag
ed
equ
ipm
ent.
All
CB
I IO
Ope
n
NV
MSP
- S
ecti
on 5
.0
IO
- M
onit
orin
g as
pe
r th
e N
VM
SP
to
be
impl
emen
ted
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B80
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
287
Vib
rati
on l
evel
s d
uri
ng c
onst
ruct
ion
to e
nsu
re v
ibra
tion
cr
iter
ia a
re b
eing
met
. A
ll C
BI
IO
Ope
n
NV
MSP
- S
ecti
on 5
.0
IO
- M
onit
orin
g as
pe
r th
e N
VM
SP
to
be
impl
emen
ted
.
288
Res
pond
ing
to c
omm
uni
ty c
ompl
aint
s in
lin
e w
ith
EP
A
licen
se c
ond
itio
ns.
All
CB
I
AG
L
Com
plia
nce
Ope
n
NV
MSP
- S
ecti
on 5
.0
Nil
com
plai
nts
rece
ived
dur
ing
the
aud
it p
erio
d –
re
fer
com
plai
nts
regi
ster
7.12
Air
Qua
lity
289
Min
imis
e ve
geta
tion
cle
aran
ce t
o re
du
ce t
he a
reas
of
exp
osed
soi
l. C
onst
ruct
ion
Ope
rati
ons
AG
L
Com
plia
nce
Ope
n
Pre
-Con
- Si
te L
ayou
t - D
etai
led
des
ign
AQ
MSP
– A
ppen
dix
B T
able
8-1
Gen
eral
290
Wat
er c
onst
ruct
ion
site
s d
uri
ng d
ry w
ind
y co
ndit
ions
as
requ
ired
, in
clud
ing
clea
red
ar
eas,
so
il st
ockp
iles
and
u
nsea
led
roa
ds.
Con
stru
ctio
n
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-1
Gen
eral
Site
ins
pect
ions
ind
icat
e w
ater
car
ts u
sed
– r
efer
E
R s
ite
insp
ecti
on r
epor
ts.
291
Und
erta
ke
acti
viti
es
likel
y to
ge
nera
te
du
st
du
ring
fa
vour
able
m
eteo
rolo
gica
l co
ndit
ions
w
here
pr
acti
cal.
Ear
th m
ovin
g ac
tivi
ties
will
be
mod
ifie
d w
hen
win
d
spee
ds
exce
ed 3
0 km
/h
if e
xces
sive
dus
t is
gene
rate
d.
Con
stru
ctio
n
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
AQ
MSP
-
App
end
ix
B
Tab
le
8-1
Gen
eral
an
d
Tab
le 8
-4 E
xtre
me
Wea
ther
Con
dit
ions
292
Pre
vent
dir
t be
ing
carr
ied
ont
o th
e T
AC
Nor
ther
n A
cces
s R
oad
or
Old
Pu
nt R
oad
fro
m t
he a
cces
s ro
ad w
here
it
coul
d fo
rm d
ust.
Con
stru
ctio
n
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-1
Gen
eral
Rum
ble
grid
s in
stal
led
at
site
exi
t po
int
to a
ssis
t w
ith
prev
enti
ng
trac
king
f
mat
eria
l on
to
TA
C
Nor
ther
n A
cces
s R
oad
. Sw
eepe
r u
sed
to
clea
r an
y tr
acke
d m
ater
ial –
ref
er s
ite
insp
ecti
on r
epor
ts.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B81
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
293
Loa
d t
ruck
s tr
ansp
orti
ng a
ny p
oten
tial
du
st g
ener
atin
g m
ater
ial
off
site
to
belo
w t
he h
eigh
t of
the
sid
e an
d t
ail
boar
d a
nd c
over
the
load
.
Con
stru
ctio
n
Ope
rati
ons
CB
I IO
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-1
Gen
eral
IO –
con
sid
er a
dd
ing
requ
irem
ent
to t
rans
port
m
ater
ial
offs
ite
belo
w t
he h
eigh
t of
the
tai
l an
d
sid
e bo
ard
Loa
ds
note
d
to
be
cove
red
w
hen
leav
ing
site
d
urin
g si
te in
spec
tion
s
294
Enf
orce
veh
icle
spe
ed li
mit
s on
uns
eale
d r
oad
s to
red
uce
d
ust g
ener
atio
n.
Con
stru
ctio
n
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-1
Gen
eral
Site
spe
ed li
mit
20k
m/
h .
295
Re-
vege
tate
as
soon
as
prac
tica
l. C
onst
ruct
ion
Ope
rati
ons
AG
L
Com
plia
nce
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-5
Re-
vege
tati
on o
f C
lear
ed A
reas
Reh
abili
tati
on a
nd r
eveg
etat
ion
yet
to c
omm
ence
d
uri
ng p
erio
d o
f au
dit
296
Mai
ntai
n tr
uck
s an
d
cons
tru
ctio
n eq
uip
men
t in
ac
cord
ance
wit
h th
e m
anuf
actu
rers
’ sp
ecif
icat
ions
and
co
mpl
y w
ith
all r
elev
ant r
egul
atio
ns.
Con
stru
ctio
n
Ope
rati
ons
CB
I IO
Ope
n
IO -
con
sid
er a
dd
ing
to A
QM
SP -
App
end
ix B
or
rem
ove
from
T
able
1-
3 St
atem
ent
of
Com
mit
men
ts if
not
app
licab
le
NV
MSP
– A
ppen
dix
B T
able
8-3
Ope
rati
on o
f V
ehic
les,
Pla
nt a
nd M
achi
nery
297
Avo
id u
nnec
essa
ry id
ling
of tr
uck
s, p
lant
and
eng
ines
. C
onst
ruct
ion
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-2
Veh
icle
, Pla
nt a
nd
Equ
ipm
ent M
anag
emen
t and
Mai
nten
ance
298
Pla
n m
ater
ial
del
iver
ies
to
avoi
d
cong
esti
on
and
ex
cess
ive
truc
k qu
euin
g an
d tr
uck
idlin
g.
Con
stru
ctio
n
Ope
rati
ons
CB
I C
ompl
ianc
e
Ope
n
AQ
MSP
- A
ppen
dix
B T
able
8-1
Gen
eral
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B82
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
299
Pro
ject
equ
ipm
ent,
mac
hine
ry a
nd v
ehic
les
will
mee
t ex
haus
t ai
r qu
alit
y st
and
ard
s an
d w
ill c
ompl
y w
ith
stat
e re
gula
tion
s.
Mac
hine
ry
will
be
fi
tted
w
ith
the
appr
opri
ate
emis
sion
co
ntro
l eq
uipm
ent
and
w
ill
be
mai
ntai
ned
and
ser
vice
d fr
eque
ntly
.
Con
stru
ctio
n
Ope
rati
ons
CB
I IO
Ope
n
IO –
con
sid
er a
dd
ing
to A
QM
SP -
App
end
ix B
T
able
8-
2 V
ehic
le,
Pla
nt
and
E
quip
men
t M
anag
emen
t and
Mai
nten
ance
300
Pro
ject
equ
ipm
ent
will
be
des
igne
d t
o en
able
mon
itor
ing
of o
pera
ting
per
form
ance
to
ensu
re t
he e
quip
men
t is
op
erat
ing
acco
rdin
g to
man
ufac
ture
r’s
spec
ific
atio
ns.
Con
stru
ctio
n
Ope
rati
ons
CB
I O
pen
N
ot c
heck
ed d
urin
g th
is a
ud
it p
erio
d
301
A
mon
itor
ing
prog
ram
w
ill
be
esta
blis
hed
to
en
sure
re
gula
r (o
r co
ntin
uou
s) m
onit
orin
g of
air
em
issi
ons.
O
pera
tion
s A
GL
N
A
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
302
The
ac
cess
ro
ad
will
be
se
aled
d
uri
ng
oper
atio
ns
to
prev
ent
the
gene
rati
on o
f d
ust
by
vehi
cles
usi
ng t
he r
oad
an
d t
o d
irt
bein
g ca
rrie
d o
nto
the
TA
C N
orth
ern
Acc
ess
Roa
d o
r O
ld P
unt R
oad
whe
re it
cou
ld fo
rm d
ust.
Ope
rati
ons
AG
L
NA
Ope
n
Pre
-con
/T
echn
ical
Des
ign
Spec
303
Mon
itor
ing
of t
he P
roje
ct e
mis
sion
s w
ill b
e in
acc
ord
ance
w
ith
curr
ent
AG
L p
ract
ice.
Em
issi
ons
of p
ollu
tant
s ar
e re
port
ed a
nnua
lly i
n th
e N
atio
nal
Pol
luti
on I
nven
tory
(N
PI)
.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
304
Che
mic
als
and
ana
lyte
s, in
clu
din
g gl
ycol
, use
d a
cros
s th
e P
roje
ct f
or d
ehyd
rati
on,
rehy
dra
tion
and
ref
rige
rati
on
will
be
mon
itor
ed a
nd m
odel
led
.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B83
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
305
Lia
ison
w
ill
cont
inu
e w
ith
OE
H
in
rela
tion
to
th
e lic
ensi
ng r
equ
irem
ents
for
the
Pro
ject
und
er t
he P
OE
O
Act
an
d
the
prop
osed
d
raft
co
ndit
ions
fo
r th
e en
viro
nmen
tal p
rote
ctio
n lic
ence
.
Ope
rati
ons
AG
L
NA
Ope
n
Ope
rati
ons
306
The
re w
ill n
ot b
e an
y ga
s ve
ntin
g d
uri
ng s
hutd
own
othe
r th
an in
an
emer
genc
y.
Con
stru
ctio
n
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to
be
d
evel
oped
fo
r op
erat
ions
ph
ase/
Tec
hnic
al D
esig
n Sp
ec
7.13
Gre
enho
use
Gas
Em
issi
ons
307
Des
ign
the
site
lay
out
to r
edu
ce t
he e
xten
t of
veg
etat
ion
clea
ring
req
uir
ed.
All
AG
L
Com
plia
nce
Clo
sed
- C
BI
Cle
arin
g as
per
des
ign.
Cle
arin
g no
w c
ompl
eted
–
stag
e 1
308
Inco
rpor
ate
init
iati
ves
focu
sing
on
ener
gy e
ffic
ienc
y in
th
e P
roje
ct
des
ign.
T
his
may
in
clud
e hi
gh-e
ffic
ienc
y m
otor
s,
vari
able
sp
eed
d
rive
s an
d
high
-eff
icie
ncy
light
ing
(e.g
., m
otio
n se
nsor
s or
pas
sive
ligh
ting
).
All
AG
L (W
P)
Ope
n D
esig
n to
be
chec
ked
.
309
Impl
emen
t th
e A
GL
Clim
ate
Cha
nge
Pol
icy
whi
ch i
s in
corp
orat
ed
thro
ugh
th
e H
ealt
h,
Safe
ty
and
E
nvir
onm
ent
Man
agem
ent
Syst
em i
nclu
din
g gr
eenh
ouse
ab
atem
ent i
niti
ativ
es w
ill b
e ad
opte
d fo
r th
e P
roje
ct.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
310
Est
ablis
h m
easu
reab
le
gree
nhou
se
gas
emis
sion
re
du
ctio
n ta
rget
s.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
311
Mai
ntai
n ve
hicl
es a
ppro
pria
tely
to
max
imis
e th
eir
fuel
ef
fici
ency
. A
ll C
BI
IO
Ope
n
IO
- co
nsid
er
add
ing
to
AQ
MSP
A
ppen
dix
B
T
able
8-
2 V
ehic
le,
Pla
nt
and
E
quip
men
t M
anag
emen
t and
Mai
nten
ance
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B84
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
312
In
acco
rdan
ce
wit
h th
e C
omm
onw
ealt
h N
atio
nal
Gre
enho
use
and
Ene
rgy
Rep
orti
ng A
ct 2
007,
AG
L w
ill b
e re
quir
ed t
o re
port
on
gree
nhou
se g
as e
mis
sion
s, e
nerg
y pr
odu
ctio
n an
d e
nerg
y co
nsu
mpt
ion.
Gre
enho
use
gas
em
issi
ons
will
be
mon
itor
ed a
nd r
evie
wed
on
an a
nnua
l ba
sis.
All
CB
I
AG
L
IO
Ope
n
IO –
con
sid
er a
dd
ing
requ
irem
ent
to t
rack
fu
el
usa
ge a
nd e
lect
rici
ty c
onsu
mpt
ion
of c
onst
ruct
ion
phas
e to
AQ
MSP
.
Fuel
usa
ge m
aint
aine
d i
n ex
cel
spre
adsh
eet
– ni
l el
ectr
icit
y fr
om g
rid
(gen
erat
or o
nly)
.
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
7.14
Haz
ard
and
Ris
k
7.14
.1 R
isk
Man
agem
ent
313
Con
du
ct a
rev
iew
of t
he h
azar
d a
nd r
isk
asse
ssm
ent o
nce
det
aile
d
des
ign
and
ha
zard
an
d
oper
abili
ty
stu
die
s (H
AZ
OP
s) h
ave
been
com
plet
ed f
or t
he P
roje
ct, t
his
will
en
sure
that
the
assu
mpt
ions
mad
e in
this
haz
ard
and
ris
k as
sess
men
t rem
ain
valid
thou
gh c
onse
rvat
ive.
All
AG
L
Com
plia
nce
Ope
n
Let
ter
to
DoP
I d
ated
19
Ju
ne
2012
re
ques
ting
ap
prov
al t
o st
age
Fire
Saf
ety
Stu
dy
(FSS
), H
azar
d
and
Ope
rabi
lity
Stu
dy
(HA
ZO
P),
Fina
l H
azar
d
Ana
lysi
s (F
HA
).
CB
I –
HA
ZO
P,
FSS
and
FH
A A
ugu
st 2
012
base
d
on fi
nal d
esig
n
Let
ter
from
DoP
I d
ated
6 A
ugu
st 2
012
appr
ovin
g st
aged
app
roac
h w
ith
requ
irem
ent t
he H
AZ
OP
for
the
seco
nd s
tage
sho
uld
cov
er t
he in
tera
ctio
n w
ith
alre
ady
inst
alle
d e
quip
men
t.
314
Und
erta
ke
an
aud
it
of
the
Safe
ty
(Hea
lth
and
E
nvir
onm
ent)
M
anag
emen
t Sy
stem
w
ithi
n tw
elve
m
onth
s of
com
mis
sion
ing
the
gas
plan
t. T
his
aud
it w
ill
focu
s on
the
man
agem
ent
of p
oten
tial
maj
or h
azar
ds
asso
ciat
ed w
ith
the
dev
elop
men
t an
d b
ased
on
the
DP
&I
Haz
ard
Au
dit
Gu
idel
ines
.
Ope
rati
ons
AG
L
NA
Ope
n
12 m
onth
s af
ter
oper
atio
ns c
omm
ence
d
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B85
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
315
Dev
elop
an
em
erge
ncy
resp
onse
pl
an
that
w
ill
coor
din
ate
proc
edu
res
wit
h th
e T
omag
o A
lum
iniu
m
Smel
ter,
oth
er a
dja
cent
ind
ustr
ial
faci
litie
s an
d a
ny l
ocal
em
erge
ncy
plan
ning
gro
ups,
fir
e br
igad
es, s
tate
and
loca
l po
lice
and
app
ropr
iate
gov
ernm
ent
agen
cies
. T
his
plan
w
ill in
clud
e:
a)
Con
tact
s w
ith
stat
e an
d l
ocal
em
erge
ncy
resp
onse
ag
enci
es;
b)
Scal
able
pro
ced
ure
s fo
r th
e pr
ompt
not
ific
atio
n of
ap
prop
riat
e lo
cal
offi
cial
and
em
erge
ncy
resp
onse
ag
enci
es, b
ased
on
the
leve
l and
sev
erit
y of
pot
enti
al
inci
den
ts;
c)
Pro
ced
ures
for
not
ifyi
ng b
usin
esse
s, r
esid
ents
and
re
crea
tion
al u
sers
wit
hin
area
s of
pot
enti
al h
azar
d;
d)
Eva
cuat
ion
rout
es/
met
hod
s fo
r re
sid
ents
, bu
sine
ss
and
mem
bers
of
the
publ
ic i
n th
e vi
cini
ty o
f th
e P
roje
ct.
Eva
cuat
ion
rout
es w
ill i
nclu
de
alte
rnat
ives
to
the
mai
n ac
cess
roa
d;
e)
The
loca
tion
s of
per
man
ent s
iren
s an
d o
ther
war
ning
d
evic
es;
f)
App
oint
men
t of
an
emer
genc
y co
ord
inat
or(s
) to
be
avai
labl
e on
sit
e at
all
tim
es;
g)
Pla
ns
for
init
ial
and
co
ntin
ued
tr
aini
ng
of
plan
t op
erat
ors
and
lo
cal
resp
ond
ers,
al
ong
wit
h pr
ovis
ions
for
per
iod
ic e
mer
genc
y re
spon
se d
rills
by
emer
genc
y pe
rson
nel,
emer
genc
y re
spon
se a
genc
ies
and
fed
eral
, sta
te a
nd lo
cal o
ffic
ials
.
All
CB
I IO
Ope
n
PR
IMP
– R
ev 0
a) S
ecti
on 3
.0, S
ecti
on 6
.1.2
(Tab
le 6
-2)
b) S
ecti
on 2
.1
c) S
ecti
on 6
.1.2
d)
Not
ap
plic
able
to
th
is
stag
e of
w
orks
-
oper
atio
ns
e) IO
- an
y w
arni
ng d
evic
es to
be
mar
ked
on
map
f)
Sect
ion
1.8.
IO
– co
nsid
er
incl
udin
g
iden
tifi
cati
on
of
des
igna
ted
em
erge
ncy
cont
rolle
r/co
ord
inat
or i
n ca
se o
f em
erge
ncy
into
re
spon
sibi
litie
s se
ctio
n
g)
Not
ap
plic
able
to
th
is
stag
e of
w
orks
-
oper
atio
ns
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B86
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
316
Und
erta
ke a
sec
uri
ty a
sses
smen
t to
ens
ure
arr
ange
men
ts
are
acce
ptab
le f
or t
he g
as p
lant
sit
e as
per
the
cu
rren
t re
quir
emen
ts
for
crit
ical
in
fras
truc
ture
in
N
SW
and
u
nder
the
NSW
Reg
ula
tion
s fo
r M
ajor
Haz
ard
s Fa
cilit
ies.
All
AG
L
Com
plia
nce
Ope
n
Des
ign
and
op
erat
ions
ph
ase
of
proj
ect.
P
relim
inar
y H
azar
d A
naly
sis
com
plet
ed a
s pa
rt o
f E
A. F
inal
Haz
ard
Ana
lysi
s to
be
com
plet
ed
317
Des
ign
the
gas
plan
t to
ens
ure
that
any
spi
lls w
ill d
rain
in
to
sum
ps,
away
fr
om
othe
r pl
ant
item
s an
d
infr
astr
uctu
re.
Ad
dit
iona
l d
esig
n fe
atur
es w
ill a
lso
be
inco
rpor
ated
to
min
imis
e th
e ri
sk o
f co
ld m
etal
bri
ttle
fr
actu
re a
nd v
erif
y th
e ad
equ
acy
of t
he d
esig
n fe
atur
es
dur
ing
the
HA
ZO
P
and
sa
fety
in
tegr
ity
leve
l (S
IL)
stud
ies.
All
AG
L
NA
Ope
n
Des
ign
to b
e co
nfir
med
318
Inst
all
an a
uto
mat
ic s
hutd
own
syst
em f
or u
se i
n th
e ev
ent o
f a le
ak.
All
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
319
Eva
luat
e ad
dit
iona
l m
itig
atio
n of
vap
our
gene
rate
d i
n th
e im
poun
dm
ent
syst
em,
such
as
the
inst
alla
tion
of
insu
lati
ng
conc
rete
in
sid
e th
e L
NG
im
poun
dm
ent
tren
ches
and
su
mp.
All
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
320
Inst
all
an a
ir q
ual
ity
mon
itor
ing
or o
ther
ear
ly w
arni
ng
syst
em in
sid
e th
e co
mpr
esso
r bu
ildin
g.
All
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
321
Det
erm
ine
the
requ
irem
ent
for
light
ning
pro
tect
ion
for
the
top
of th
e ta
nk d
uri
ng d
etai
led
des
ign.
A
ll A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
322
Inst
all a
n ov
erfi
ll an
d o
verp
ress
ure
pro
tect
ion
syst
em f
or
tank
er lo
adin
g.
All
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B87
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
323
Con
sult
wit
h ai
r tr
ansp
ort
stak
ehol
der
s to
det
erm
ine
any
requ
irem
ents
for
res
tric
ting
air
spac
e ab
ove
the
gas
plan
t an
d a
ircr
aft w
arni
ng li
ghts
or
othe
r w
arni
ng d
evic
es.
All
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
324
Inco
rpor
ate
appr
opri
ate
allo
wan
ces
in t
he P
roje
ct d
esig
n to
ens
ure
that
mul
tipl
e pi
pelin
es l
ocat
ed i
n th
e sa
me
ease
men
t ar
e se
para
ted
by
acce
ptab
le d
ista
nces
to
ensu
re
that
rad
iant
hea
t pr
odu
ced
du
ring
an
inci
den
t is
not
tr
ansf
erre
d to
a n
eigh
bou
ring
pip
e.
All
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
7.14
.2 S
afe
Eng
inee
ring
Des
ign
325
The
st
orag
e fa
cilit
y w
ill
be
des
igne
d
acco
rdin
g to
A
ustr
alia
n an
d/
or i
nter
nati
onal
sta
ndar
ds
to m
eet
the
requ
ired
ear
thqu
ake
char
acte
rist
ics
of th
e si
te.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
326
AG
L w
ill c
onti
nue
to c
onsu
lt w
ith
all
rele
vant
age
ncie
s th
roug
h th
e d
etai
led
d
esig
n an
d
Pro
ject
op
erat
ion
phas
es.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
327
Max
imis
e se
para
tion
d
ista
nces
to
se
para
te
the
mos
t cr
edib
le
(tho
ugh
rare
) le
aks
from
ig
niti
on
sour
ces,
ph
ysic
ally
is
olat
e an
y fi
re,
prev
ent
its
spre
ad
and
m
inim
ise
the
risk
to p
eopl
e an
d p
rope
rty.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
328
Min
imis
e th
e in
vent
ory
of
LN
G
and
of
pr
essu
rise
d
natu
ral g
as in
pro
cess
equ
ipm
ent.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
329
Min
imis
e pu
mpi
ng r
ates
and
pre
ssu
re l
evel
s in
Pro
ject
co
mpo
nent
s ex
tern
al to
the
stor
age
tank
. P
reco
nstr
ucti
on
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B88
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
330
Min
imis
e vu
lner
abili
ty
of
equ
ipm
ent
and
pr
oces
ses
thro
ugh
equi
pmen
t sel
ecti
on a
nd d
esig
n.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
331
Ens
ure
m
axim
um
in
tegr
ity
of
flam
mab
le
mat
eria
l co
ntai
nmen
t. P
reco
nstr
ucti
on
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
332
Min
imis
e ex
posu
re
to
peop
le
by
red
uci
ng
proc
ess
com
plex
ity
and
mai
nten
ance
req
uire
men
ts.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
333
Ens
ure
sys
tem
s ar
e av
aila
ble
for
rapi
d d
etec
tion
and
pr
ompt
rem
ote
isol
atio
n of
any
leak
s.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
334
Con
trol
all
igni
tion
sou
rces
. P
reco
nstr
uct
ion
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
335
Min
imis
e th
e op
port
uni
ty f
or i
gnit
ion
sou
rces
in
area
s w
here
hyd
roca
rbon
leak
s ar
e a
poss
ibili
ty.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
336
Pro
vid
e pa
ssiv
e an
d a
ctiv
e fi
re p
rote
ctio
n sy
stem
s fo
r th
e ga
s pl
ant s
ite.
P
reco
nstr
ucti
on
AG
L
NA
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
337
Con
sid
er t
he i
mpl
icat
ions
of
cold
met
al b
ritt
le f
ailu
re i
n th
e d
esig
n of
the
pla
nt.
The
lik
elih
ood
of
a ca
tast
roph
ic
cold
m
etal
br
ittl
e fa
ilure
ev
ent
shou
ld
be
rend
ered
ne
glig
ible
thro
ugh
des
ign.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
338
Ens
ure
tha
t L
NG
tra
nsfe
r pi
pes
whi
ch e
nter
and
lea
ve
the
stor
age
tank
are
pos
itio
ned
on
the
roof
of t
he ta
nk.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B89
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
339
Min
imis
e th
e lik
elih
ood
of
over
pre
ssu
re, u
nder
pre
ssu
re
or
over
fill
scen
ario
s of
th
e L
NG
st
orag
e ta
nk
by
inst
igat
ing
appr
opri
ate
mea
sure
s in
the
des
ign
of t
he
Pro
ject
.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Che
ck o
f fin
al d
esig
n to
be
com
plet
ed to
con
firm
7.14
.3 M
odif
icat
ions
to
Man
agem
ent
and
Mit
igat
ion
Mea
sure
s fo
r H
azar
d an
d R
isk
340
Ad
vise
the
Off
ice
of A
irsp
ace
Reg
ula
tion
of
the
expe
cted
st
art
dat
e of
the
ope
rati
on o
f th
e fa
cilit
y si
x m
onth
s pr
ior
to c
omm
ence
men
t of o
pera
tion
.
Pre
cons
truc
tion
A
GL
N
A
Ope
n
Not
ific
atio
n no
t re
quir
ed u
ntil
six
mon
ths
prio
r to
ex
pect
ed o
pera
tion
of f
acili
ty
341
Rea
sona
ble
mea
sure
s w
ill b
e ta
ken
to m
aint
ain
secu
rity
of
the
con
stru
ctio
n si
te t
o pr
even
t th
ird
par
ties
gai
ning
un
law
ful
acce
ss t
o th
e si
te. M
easu
res
will
inc
lud
e se
cure
fe
ncin
g an
d l
ight
ing
alon
g th
e m
ain
acce
ss r
oad
and
the
pi
pelin
e co
rrid
or c
lose
to O
ld P
unt
Roa
d.
Pre
cons
truc
tion
C
BI
Com
plia
nce
Ope
n
Tem
pora
ry
site
al
ongs
ide
TA
C
Acc
ess
Roa
d
fenc
ed w
ith
light
ing.
CB
I O
ccup
ier
of a
cces
s ro
ad o
nly
dur
ing
Civ
il W
orks
Pac
kage
.
Fenc
ing
and
ligh
ting
to b
e in
stal
led
.
342
If a
ny e
vid
ence
of
illeg
al d
um
ping
of
was
tes
on t
he
Pro
ject
are
a is
obs
erve
d t
he d
umpe
d m
ater
ial
will
be
rem
oved
im
med
iate
ly.
If a
ny l
iqui
d s
lud
ge o
r ch
emic
al
was
te
is
obse
rved
th
en
appr
opri
ate
sam
plin
g an
d
mon
itor
ing
will
be
impl
emen
ted
to
det
erm
ine
whe
ther
an
y im
pact
to g
roun
dw
ater
has
occ
urre
d.
Con
stru
ctio
n C
BI
Com
plia
nce
Ope
n
WM
SP –
Tab
le 7
-1
Gat
es to
sit
e lo
cked
aft
er h
ours
.
Som
e in
cid
ence
s of
w
aste
m
ater
ial
dum
ped
ou
tsid
e si
te
gate
s.
Leg
acy
was
te
enco
unte
red
d
urin
g in
itia
l cl
eari
ng w
orks
. M
ater
ial
colle
cted
by
was
te c
ontr
acto
r an
d d
ispo
sed
to
land
fill
– re
fer
ER
Sit
e In
spec
tion
rep
orts
343
AG
L w
ill p
rovi
de
‘as
cons
tru
cted
’ d
raw
ings
and
det
ails
to
RA
AF.
O
pera
tion
s A
GL
N
A
Ope
n
NA
- op
erat
ions
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
B90
Item
C
omm
itm
ent
Sta
ge/t
imin
g R
esp
onsi
bil
ity
Com
pli
ance
Sta
tus
Ref
eren
ce/ C
omm
ent
344
AG
L w
ill c
onti
nue
to c
onsu
lt w
ith
all
rele
vant
age
ncie
s th
roug
h th
e d
etai
led
des
ign
and
ope
rati
on p
hase
s of
the
P
roje
ct.
Ope
rati
ons
AG
L
NA
Ope
n
NA
345
An
emer
genc
y pl
an w
ill b
e pr
epar
ed t
o co
mpl
y w
ith
clau
se
174Z
C
of
the
Occ
upa
tion
al
Hea
lth
and
Sa
fety
R
egu
lati
ons
2001
(N
SW).T
he e
mer
genc
y re
spon
se p
lan
will
be
com
pile
d in
acc
ord
ance
wit
h D
P&
I gu
idan
ce n
ote
HIP
AP
1, E
mer
genc
y P
lann
ing.
Ope
rati
ons
AG
L
NA
Ope
n
OE
MP
to b
e d
evel
oped
for
oper
atio
ns p
hase
346
The
pro
pose
d e
mer
genc
y tr
affi
c ar
rang
emen
ts w
ill b
e re
view
ed a
nd a
sses
sed
to
ensu
re c
ompl
ianc
e w
ith
the
stat
ed E
mer
genc
y V
ehic
le A
cces
s P
olic
y N
o.4.
Ope
rati
ons
AG
L
NA
Ope
n
NA
- op
erat
ions
347
Com
plia
nce
wit
h th
e re
gula
tion
s ap
plic
able
to
m
ajor
ha
zard
fa
cilit
ies
and
w
ill
cont
inu
e to
co
nsu
lt
wit
h W
orkC
over
in
ord
er t
o ob
tain
det
ails
of
its
requ
irem
ents
fo
r in
clus
ion
in th
e si
te r
isk
asse
ssm
ent a
nd s
afet
y re
port
.
Ope
rati
ons
AG
L
NA
Ope
n
NA
- op
erat
ions
348
AG
L
will
pr
epar
e an
d
subm
it
the
safe
ty
repo
rt
to
Wor
kCov
er s
ix m
onth
s pr
ior
to c
omm
issi
onin
g.
Ope
rati
ons
AG
L
NA
Ope
n
NA
- op
erat
ions
Annex C
Audit Table – Environment Protection and Biodiversity Conservation
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
C1
Tab
le C
1 C
ompl
ianc
e A
sses
smen
t –E
PB
C A
ppro
val 2
010/
5752
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
AP
PR
OV
AL
CO
ND
ITIO
NS
1 T
o m
inim
ise
the
risk
of
co
nstr
uct
ion
and
op
erat
iona
l ac
tivi
ties
lea
din
g to
the
off
site
mov
emen
t of
sed
imen
ts o
r co
ntam
inan
ts
that
co
uld
ad
vers
ely
affe
ct
the
Koo
raga
ng
Nat
ure
R
eser
ve
(now
H
unt
er
Wet
land
s N
atio
nal
Par
k)
wet
land
of
inte
rnat
iona
l im
port
ance
, th
e pe
rson
tak
ing
the
acti
on m
ust
impl
emen
t C
ond
itio
ns B
20
to B
26 i
nclu
sive
(d
ealin
g w
ith
Soils
, Wat
er a
nd H
ydro
logy
), an
d B
56 (
dea
ling
wit
h a
Con
stru
ctio
n E
nvir
onm
enta
l M
anag
emen
t P
lan)
, im
pose
d u
nder
the
New
Sou
th W
ales
Pla
nnin
g A
sses
smen
t C
omm
issi
on c
ond
itio
ns o
f ap
prov
al d
ated
10
May
201
2 fo
r A
pplic
atio
n N
um
ber
MP
10_0
133
und
er
the
NSW
E
nvir
onm
enta
l Pla
nnin
g &
Ass
essm
ent A
ct 1
979
All
CB
I
AG
L
Com
plia
nce
Ope
n
Ref
er M
CoA
B20
– B
26 a
nd B
56
2 T
o m
inim
ise
adve
rse
impa
cts
dur
ing
cons
truc
tion
on
liste
d
thre
aten
ed
spec
ies
and
ec
olog
ical
co
mm
uni
ties
, an
d
in
part
icul
ar
the
New
H
olla
nd
Mou
se
(Pse
udom
ys
nova
ehol
land
iae)
, an
d
Ear
p's
Gum
(E
ucal
yptu
s pa
rram
atte
nsis
su
bsp.
d
ecad
ens)
, th
e pe
rson
ta
king
th
e ac
tion
mus
t im
plem
ent
Con
dit
ions
B 5
6 (d
ealin
g w
ith
a C
onst
ruct
ion
Env
iron
men
tal
Man
agem
ent
Pla
n),
impo
sed
u
nder
th
e N
ew
Sou
th
Wal
es
Pla
nnin
g A
sses
smen
t C
omm
issi
on c
ond
itio
ns o
f ap
prov
al d
ated
10
May
201
2 fo
r A
pplic
atio
n N
um
ber.
MP
10_0
133.
Pre
-cle
arin
g
Con
stru
ctio
n
CB
I
AG
L
Com
plia
nce
Ope
n
Ref
er M
CoA
B56
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
C2
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
3 T
o of
fset
the
los
s of
app
roxi
mat
ely
fou
r (4
) in
div
idu
als
of
Ear
p's
Gum
(E
ucal
yptu
s pa
rram
atte
nsis
sub
sp.
dec
aden
s)
and
app
roxi
mat
ely
15ha
of
pote
ntia
l ha
bita
t fo
r th
e N
ew
Hol
land
Mou
se (
Pse
udom
ys n
ovae
holla
ndia
e),
the
pers
on
taki
ng t
he a
ctio
n m
ust
impl
emen
t C
ond
itio
n C
2 (d
ealin
g w
ith
a B
iod
iver
sity
Off
set P
acka
ge),
impo
sed
und
er th
e N
ew
Sout
h W
ales
Pla
nnin
g A
sses
smen
t C
omm
issi
on c
ond
itio
ns
of a
ppro
val
dat
ed 1
0 M
ay 2
012
for
App
licat
ion
Nu
mbe
r M
P10
_013
3.
Pre
-co
mm
issi
onin
g C
BI
AG
L
Com
plia
nce
Ope
n
Ref
er M
CoA
C2
4 T
he B
iod
iver
sity
Off
set
Pac
kage
req
uire
d u
nder
con
dit
ions
B
13 a
nd C
2 im
pose
d u
nder
the
New
Sou
th W
ales
Pla
nnin
g A
sses
smen
t C
omm
issi
on c
ond
itio
ns o
f ap
prov
al d
ated
10
May
Pag
e 2
of 3
2012
for
App
licat
ion
Nu
mbe
r M
P10
_013
3, m
ust
pro
vid
e fo
r th
e pe
rman
ent
offs
ite
prot
ecti
on o
f at
lea
st 2
5ha
of o
ptim
al
habi
tat
for
the
New
H
olla
nd
Mou
se
(Pse
ud
omys
no
vaeh
olla
ndia
e) a
nd p
erm
anen
t off
site
pro
tect
ion
of a
t lea
st
60 in
div
idua
l Ear
p's
Gum
(E
ucal
yptu
s pa
rram
atte
nsis
su
bsp.
d
ecad
ens)
tree
s.
Pre
-cle
arin
g
Pre
co
mm
issi
onin
g
C
ompl
ianc
e
Ope
n
Off
set R
epor
t
60 E
arp’
s gu
ms
to b
e es
tabl
ishe
d i
n H
unte
r B
otan
ic
Gar
den
s in
an
area
of 2
.9 h
a
New
H
olla
nd
Mou
se
- th
e of
fset
si
tes
prov
ide
perm
anen
t pr
otec
tion
of
at l
east
25
ha o
f pr
efer
red
ha
bita
t an
d
appr
oxim
atel
y 80
ha
of
su
b-op
tim
al
habi
tat,
whi
ch m
ay b
ecom
e m
ore
suit
able
for
thi
s sp
ecie
s w
ith
appr
opri
ate
fire
m
anag
emen
t as
ou
tlin
ed
in
the
Con
serv
atio
n A
gree
men
ts
for
the
offs
et s
ites
. T
he d
evel
opm
ent
of t
he G
as S
tora
ge
faci
lity
will
rem
ove
appr
oxim
atel
y 12
ha
of s
ub-
opti
mal
hab
itat
for
this
spe
cies
.
5 W
ithi
n 10
day
s af
ter
the
com
men
cem
ent
of t
he a
ctio
n, t
he
pers
on t
akin
g th
e ac
tion
mu
st a
dvi
se t
he D
epar
tmen
t in
w
riti
ng o
f the
act
ual
dat
e of
com
men
cem
ent.
Com
men
cem
ent
of C
onst
ruct
ion
AG
L
Com
plia
nce
Clo
sed
Not
ific
atio
n le
tter
iss
ued
to
Cyn
thia
Pis
cite
lli o
n 28
A
ug
2012
to
advi
se t
hat
clea
ring
has
com
men
ced
on
27 A
ug
2012
.
ENVIRONMENTAL RESOURCES MANAGEMENT AUSTRALIA 0169504RP1/FINAL/1 MARCH 2013
C3
Item
A
sses
smen
t Req
uir
emen
t S
tage
/tim
ing
Res
pon
sib
ilit
y C
omp
lian
ce
Sta
tus
Ref
eren
ce/ C
omm
ent
6 T
he p
erso
n ta
king
the
act
ion
mus
t m
aint
ain
accu
rate
rec
ord
s su
bsta
ntia
ting
all
acti
viti
es a
ssoc
iate
d w
ith
or r
elev
ant
to
thes
e co
ndit
ions
of
appr
oval
, in
clud
ing
mea
sure
s ta
ken
to
impl
emen
t m
anag
emen
t pl
ans
requ
ired
as
pa
rt
of
the
appr
oval
, an
d m
ake
them
ava
ilabl
e u
pon
requ
est
to t
he
Dep
artm
ent.
Such
rec
ord
s m
ay b
e su
bjec
t to
aud
it b
y th
e D
epar
tmen
t or
an
ind
epen
den
t au
dit
or i
n ac
cord
ance
wit
h se
ctio
n 45
8 of
the
EP
BC
Act
, or
use
d t
o ve
rify
com
plia
nce
wit
h th
e co
ndit
ions
of
appr
oval
. Sum
mar
ies
of a
udit
s w
ill b
e po
sted
on
the
Dep
artm
ent's
web
site
. T
he r
esu
lts
of a
ud
its
may
als
o be
pub
licis
ed th
roug
h th
e ge
nera
l med
ia.
All
stag
es
AG
L
CB
I
Com
plia
nce
Ope
n
Doc
umen
t C
ontr
ol i
s in
clud
ed i
n Se
ctio
n 4.
5 of
the
C
EM
P.
7 W
ithi
n 3
mon
ths
of e
very
12
mon
th a
nniv
ersa
ry o
f th
e co
mm
ence
men
t of
the
act
ion,
the
per
son
taki
ng t
he a
ctio
n m
ust
pu
blis
h a
repo
rt
on
thei
r w
ebsi
te
add
ress
ing
com
plia
nce
wit
h th
e co
ndit
ions
of
this
app
rova
l ov
er t
he
prev
ious
12
m
onth
s,
incl
udin
g im
plem
enta
tion
of
an
y m
anag
emen
t pl
ans
as
spec
ifie
d
in
the
cond
itio
ns.
Non
-co
mpl
ianc
e w
ith
any
of t
he c
ond
itio
ns o
f th
is a
ppro
val m
ust
be r
epor
ted
to
the
Dep
artm
ent
at t
he s
ame
tim
e as
the
co
mpl
ianc
e re
port
is p
ublis
hed
.
One
ye
ar
anni
vers
ary
of
com
men
cem
ent
AG
L
NA
Ope
n
To
be c
ompl
eted
12
mon
ths
afte
r co
mm
ence
men
t of
co
nstr
uct
ion
– ap
prox
imat
ely
27 A
ugu
st 2
013
ERM has over 100 officesacross the followingcountries worldwide
Australia
Argentina
Belgium
Brazil
China
France
Germany
Hong Kong
Hungary
India
Indonesia
Ireland
Italy
Japan
Korea
Malaysia
Mexico
Netherlands
New Zealand
Peru
Poland
Portugal
Puerto Rico
Singapore
Spain
Sri Lanka
Sweden
Taiwan
Thailand
UK
USA
Venezuela
Vietnam