news from the rmr-lidar 2010/2011 asac meeting norderstedt 21./22.03.2011 g. baumgarten et al

30
News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al.

Upload: virginia-lashbrook

Post on 31-Mar-2015

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

News from the RMR-Lidar 2010/2011ASAC meeting

Norderstedt 21./22.03.2011

G. Baumgarten et al.

Page 2: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

Telescope Field of View tests NWT

• Removed polarizer from NWT, using pol. branch for FOV tests

• 1.5 mm fiber: 180 µrad up to 20.12.2010• 1.0 mm fiber: 120 µrad 20.12. – 25.01.2010• 0.5 mm fiber: 60 µrad 25.01. – 16.02.2011• 0.8 mm fiber: 96 µrad since 16.02.2011

Page 3: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

CamServer/Client on tel-srv2Green=goodyellow=clouds?red=off Laser image BGM steps

NWT CamClient

CamServer

SET CamClient

Distance to target

Server timing

BGM commands

Page 4: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

Performance of new system

• Analysis of 40 or 50 images (25/s, ~2 s) for BGM3 steps (two motors)

• 1 s timeout after motor command

• Stabilization (1µrad : 10cm @ 100km)– average 5 µrad NWT– average 10 µrad SET– Peaks 30 µrad

• Beam deviations mostly caused by air turbulence at low altitudes (wind)

Page 5: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

526th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Optical Bench 2011

Page 6: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

626th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

New Etalon

Motor + Piston

Etalon

Page 7: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

726th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

New Etalon Housing

Page 8: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

826th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Etalon test measurements 2010

Page 9: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

926th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Etalon test measurements 2010

Page 10: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

1026th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Optical bench status and outlook

• Improvement: only one Etalon T=75%easy to align

• replacement of 532 nm detectorslower darkcount < 25Hz, lower deadtime ~30 ns

• replacement of 355 nm detectorshigher QE~40%, darkcount <30 Hz

Page 11: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 11

Instrument Network Communication (INC)

• internal RMR-lidar network: *.rmrlidar.rocketrange.no

- rmr-srv (192.168.41.10)- las-srv (192.168.41.21)- las-bm1 (192.168.41.23)- las-bm2 (192.168.41.24)- tel-srv1 (192.168.41.41)- tel-srv2 (192.168.41.42)- daq-atmos (192.168.41.61)- daq-spec (192.168.41.62)- power controller Control Room (192.168.41.63)- power controller Detection Room (192.168.41.64)

• communication types- port based (pb)- file based (fb)

Page 12: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 12

• computers involved: 8

• port based communication

- servers: 17- clients: 22

• file based communication: several scripts

INC: Summary

Page 13: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 13

• Installation of Newport “NewStep” motor for handling of l/2 plate at HG of laser#1.

Lasers: Maintenance July/August 2010

Page 14: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 14

Lasers: Maintenance July/August 2010

• Exchange of flash lamps.- laser#1: 53 M pulses- laser#2: 53 M pulses

• Sealing of flow regulator in power supply of laser#1 due to leakage.

Page 15: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 15

Lasers: Maintenance March 2011

• Exchange of flash lamps.- laser#1: 43 M pulses- laser#2: 40 M pulses

• Exchange of primary mirror at beam widening telescope on laser table#2- holes in coating, also at 45° mirrors => probably singular seeding problem

• Connection of lasers to the new observatory N2 purge system

Page 16: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 16

Lasers: Maintenance March 2011

• Exchange of iodine cell in seeder box due to observed strange behavior of

absorption spectrum.- old cell: usage since 1994, solid iodine at 40°C- new cell: all iodine in gas phase at 40°C (by eye)

• Logging of 2 additional IR energies in seeder box, now:

- seeder head- laser#1 group- laser#2 group

Page 17: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

ALOMAR RMR-Lidar – Norderstedt, 2011 17

Lasers: Misc

• Shutdown of seeder control PC, program runs now on laser control PC:- saving of computer maintenance and energy- runs now as executable created with LabVIEW 8.6

Mobile Laser Status

Page 18: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

1826th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Data base

measurement statisticsand

system performance

Page 19: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

measurement statistics 1994 – 2010

1

23

6

1926th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Page 20: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2026th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Measurements 2010/2011

Single / Twin / DoRIS

2010

2009: Jan → RMR-Meeting: 122 h2010: Jan → RMR-Meeting: 220 h2011: Jan → RMR-Meeting: 100 h

Page 21: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2126th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Daily max. Signal

Page 22: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2226th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Monthly mean max signal 2008 – 2011

Page 23: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2326th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Monthly mean max signal 2008 – 2011

Page 24: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2426th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Monthly mean background 2008 – 2011

Page 25: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2526th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Monthly mean max signal 2008 – 2011

Page 26: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2626th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Monthly mean max signal 2008 – 2011

Page 27: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2726th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Data summary

• 61% of measurements performed under daylight conditions.

• Most measurements performed with DoRIS, preferably N,E.

• Time resolution 30 seconds.

Page 28: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2826th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

ALOMAR level1 datafiles

• Signal corr. For nonlinearity / background removed+ Uncertainty (1.4 GB/24h w/o raman channels)

• Level 1a: Gridded in 5 min time slots / 150 m altitude (35 MB/24h)

Level1a Level2 ?

Page 29: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

2926th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

Future activities

Summer 2011

Page 30: News from the RMR-Lidar 2010/2011 ASAC meeting Norderstedt 21./22.03.2011 G. Baumgarten et al

3026th ALOMAR RMR-Lidar meeting - Norderstedt20.03.2011

IAP RMR-Lidar operations summer 2011

NLC campaign : 31.05.2010 – 20.08.2010

Met. Rockets May 2011?