NEXUS Capabilities and Experience Deepwater, Shallow Water and Topsides This document presents an overview of Nexus Deepwater Engineering Inc., its capabilities, experience and global offices that are providing world class engineering services in the area of Subsea and Topsides Production Systems 2012 Created by Nexus Global Marketing Team Nexus Deepwater Engineering Inc., 10/12/2012

Upload: trinhthu

Post on 26-Mar-2018

217 views

Category:

Documents


3 download

TRANSCRIPT

NEXUS Capabilities

and Experience Deepwater, Shallow Water and Topsides

This document presents an overview of Nexus Deepwater Engineering Inc., its

capabilities, experience and global offices that are providing world class

engineering services in the area of Subsea and Topsides Production Systems

2012

Created by Nexus Global Marketing Team

Nexus Deepwater Engineering Inc.,

10/12/2012

2 REVISION OCTOBER 2012

CAPABILITIES AND EXPERIENCE

- SUBSEA DEEPWATER

- SUBSEA SHALLOW WATER

- PIPELINES / FLOWLINES

- PLATFORM STRUCTURAL

SUBSEA PRODUCTION SYSTEMS

3 REVISION OCTOBER 2012

Table of Contents

1 INTRODUCTION....................................................................................................................... 4

2 OVERVIEW ................................................................................................................................. 5

3 SUBSEA PRODUCTION SYSTEM PROJECT LIST / CAPABILITIES .................... 6

4 PROJECT PROFILES ............................................................................................................ 11

5 NEXUS OFFICES / CONTACT INFORMATION ........................................................... 18

4 REVISION OCTOBER 2012

1 INTRODUCTION

Nexus Deepwater Engineering Inc. (NEXUS) is a Houston Based engineering company

that has the most innovative independent subsea deepwater / shallow-water

engineering and management consultancy, with a team that brings over 30 years of

experience. Our global team capacity and offices are as following:

The Houston office has been operating since 2008 at 908 Town & Country Blvd

Suite 120, Houston Texas.

The Kuala Lumpur office has been operating since 2009 at Menara Citibank, Level

36, 165 Jalan Ampang KL. We have also opened our new engineering office on

Level 9-1 in Wisma UOAII, Jalan Pinang 50450 KL. The office is located near the

Petronas Twin Towers.

The Perth office was opened in the city center located in the AMP Tower close to

Woodside.

The Vietnam office also opened its doors on 1st October, 2012 in Ho Chi Minh

City’s main business district.

In 2008 NEXUS was formed by the joining of Oceanus S.A., NG Solutions and Rabia

Enterprises (Pvt Ltd) to provide a consolidated Subsea engineering (shallow and

deepwater), floating systems and construction management services. We are backed up

by a full suite of unique in-house specialist software, our comprehensive subsea and

topside capabilities include expertise in Project Management, Project Engineering, pre-

FEED, FEED, Bid Evaluation, Project Execution, Vessel Selection, Pre-Commissioning,

Installation Workover Control Systems, Rig Surveys and Onshore/Offshore Testing

Support.

Flow Assurance is an integral part of FEED study, where steady-state and transient state

for single-phase or multi-phase flow plays a critical role. Well fluid conditions are a key

driver for selection of materials, production control system, system hardware selection

and topside process system design.

5 REVISION OCTOBER 2012

2 OVERVIEW

NEXUS is a solution provider in the upstream subsea field development. It has achieved

its success through technical and commercial integrity. Our highly qualified Senior

Management and Engineering Professionals have provided quality and expertise in

executing an array of major international projects.

NEXUS has taken client projects from Concept through Design, Execution, Installation

and Safely into Production in accordance with the specifications, industry standards and

regulations.

NEXUS Subsea Professionals have proven track record of developing and completing

complex projects. The team has experience in managing multi-facet projects with a

decade or more experience in Engineering, Project Management, Manufacturing and

Offshore Installations of Subsea Production Systems.

Our team consists of Engineers that have worked on world class subsea projects:

Kanowit KAKG (Shallow Water)

Talisman Hoi Mai (Shallow Water)

Murphy Serendah-Patricia (Shallow Water)

Shell F-14/F-29 (Shallow Water)

Shell Gumusut-Kakap (Deepwater)

Chevron Jack & St.Malo (Deepwater)

Petrobras Cascade & Chinook (Ultra-Deepwater / Walker Ridge)

PDVSA Marsical Sucre (Shallow Water)

Chevron Agbami (Deepwater)

BP Thunderhorse (Deepwater)

BP Atlantis (Deepwater)

Kings Peak (Deepwater)

Canyon Express (Deepwater)

6 REVISION OCTOBER 2012

3 SUBSEA PRODUCTION SYSTEM PROJECT LIST / CAPABILITIES

PROJECT

NAME/LOCATION CLIENT PROJECT HIGHLIGHTS STATUS

Kanowit KAKG-A pre-

commissioning,

commissioning and

start-up

PCSB/PETRA/J

PK

Provision of Hook-up and Commissioning work for

KASS Project at KAKG-A Platform. Nexus was

involved in writing the topside subsea production

control system pre-commission, commissioning

and black-start up procedures. Furthermore,

Nexus was selected to lead the platform teams in

the pre-commissioning phase.

●Safety Instrumented System integraEon

between MCS and Subsea ESD/PSD

●Master Control StaEon powering and start-up

●Electrical Power Unit power-up and start-up

●Chemical InjecEon Unit start-up and

commissioning

●Hydraulic Power Unit start-up and testing

●Topside Umbilical TerminaEon Unit (TUTU)

testing

Ongoing

Kanowit KAKG-A pre-

commissioning,

commissioning and

start-up

PCSB/PETRA/J

PK

Nexus was selected by Petronas and PETRA to

provide a hydraulic flushing unit that is being used

on the platform for flushing control lines to

maintain NAS Class 6 level cleanliness

Ongoing

Structural Design and

SACS analysis Project

AXON/AmerCa

ble (USA)

Detail Structural design based on a workable

structural configuration in place with the

telescopic crane as part of the cage. The

incorporation of the crane shall be up to the top

pedestal. The design of structural support for the

cage system will be included (structural integrity

of the cantilever deck will not be considered as

part of the design scope).

Ongoing

Pressure Vessel

Engineering Design

Review Project

Shell (USA)/

Metarock

Nexus was selected by Shell to provide its

Professional Engineering Licensing in evaluating

the design of eighteen (18) pressure vessels. A

comprehensive calculation package was created

and Stamped for each vessel. ASME VII was used

as a criterion for comparison.

Completed 2012

Subsea Training PCSB/JPK

Nexus was selected by Petronas (PCSB) to provide

training on:

●Level 2, Subsea Front End Engineering (FEED)

training

●Level 2, Subsea Umbilical and Subsea

Distribution System training

Nexus created presentation material, animations,

Ongoing

7 REVISION OCTOBER 2012

workshop, assessment exam and trainer's manual

for each module

Patricia Water

Injection System Murphy

JP Kenny Malaysia was awarded the Patricia and

Serendah Pipeline and Subsea Pre-FEED study for

a Water Injection System. Based on Patricia Gas

Production draw-down by 2013, Murphy would

like a feasibility study that would introduce two

Water Injection Wells that would allow for

increased production. Processed water is pumped

from 13km to the Water Injectors; whereas, the

control system is located 1km away on the

Patricia Platform. The subsea control system

(MCS, EPU, TUTA, Umbilical, SUTA and Flying

Leads) ranges from simple direct hydraulics to

complex MUX systems. Nexus has been engaged

in developing a report that will examine an array

of field architectures, using proven technologies.

The Cost Analysis is to ensure that CAPEX and

OPEX are optimized and if a system is selected,

the well economics is favorable.

Completed 2011

F14-F29 Conceptual

Design Shell

JP Kenny Malaysia was requested by SSB Shell

Sarawak through Aker Solutions to conduct a

number of Conceptual pre-FEED studies for its F29

Subsea Well. Nexus was contracted to provide the

following:

● Subsea ProducEon Control System Philosophy

(MCS, HPU, and EPU)

● Subsea Shutdown and Startup Philosophy

●Subsea Interface Matrix Development

● Conduct subsea system HAZOP

● Develop Umbilical and Hydraulic Flying Lead

Installation Scope of Work

●Extensive interfacing with Topsides Process,

Structural, Piping, Mechanical, Instrumentation

and Electrical disciplines.

●Line Diagrams and drawings were provided for

interfacing with IPS and Process Shutdowns

- Process Shutdown Review and interface review

- Shell TA review and pigging philosophy review

Completed 2011

8 REVISION OCTOBER 2012

Subsea Control

System Pre-

commissioning

Woodside

JP Kenny Malaysia was requested by Woodside

Australia to provide pre-commissioning Subsea

Control System Test Leadership at Keppel

Shipyard Singapore. Nexus was contracted to play

a lead role in representing Woodside to

successfully pre-commission the MCS, EPU, HPU

and ESD system; including testing of Control

System Lines on the OKHA FPSO. An extensive

testing program was reviewed, with daily

readiness reviews, interfacing with SBM and

implementation of control system.

Completed 2011

Liwan Umbilical

System CNOOC

Technip Malaysia was contracted by COOEC to

perform the conceptual and detailed engineering

for the Liwan 3-1, Block 29/26 Field Development.

Technip contracted NEXUS to develop a feasibility

study of Umbilical, Umbilical Installation and

possible utilization of Subsea System SSIV.

ISO13628-5 was used as a bench mark to provide

a customized report.

Completed 2010

PROD Tool Testing BP

JP Kenny Malaysia was requested by BP United

Kingdom to provide technical expertise to

support its new Seismic Tool Technology for the

Shendiz Caspian Project (AzSPU). Nexus was

screened and selected by BP to oversee the

qualification of its new PROD technology in

Brisbane Australia. Extensive seismic testing and

drilling tool functionalities were tested to ensure

product integrity and reliability.

Completed 2010

SSIV Control System

Design (TGT) Petro Vietnam

JP Kenny Malaysia was contracted by Petro

Vietnam to provide pipelines and subsea control

system FEED / detailed design engineering. TGT

Field Development required expertise that would

guide TGT, Hong Long JOC and Petro Vietnam with

a subsea controls solution. NEXUS team started

out by creating an Interface Management Tool to

identify technical and contractual gaps. Then the

team set out through a series of studies, detailed

reports, data sheets and vendor product reviews

to provide a topside-to-subsea SSIV control

system that was located on the Bumi Armada

FPSO.

Completed 2010

9 REVISION OCTOBER 2012

Gumusut-Kakap Shell

Gumusut-Kakap is a deepwater field located in

Sarawak Malaysian waters. JP Kenny Malaysia was

awarded the SIFOE contract by Shell Malaysia to

put an umbrella team that will pull in global

expertise to successfully deliver the project.

NEXUS was one of the global experts selected and

seconded to Shell. The scope of work was related

to Subsea Control System, Manifold System and

IWOCS/CWOR systems in a lead role. Well over

100 documents were reviewed and approved:

● FAT and EFAT TesEng of IWOCS HMI was

conducted in Norway Kongsberg

● EFAT tesEng of IWOCS and CWOR System

including the EDP / LRP breakaway system were

tested and approved (Johor Bahru Malaysia)

●ProducEon, WI and GI Manifold tesEng;

including control system testing was conducted

and approved in Lumut Malaysia

● HAZOP and HAZID's for IWOCS and Control

Systems were conducted in Shell's KL Deepwater

Office

Completed 2010

Festoon System BP

A new Festoon design was required by BP in the

Gulf of Mexico that would meet the stringent

standards - harsh Arctic environment. Nexus

provided the design verification package,

including a detailed design study that enabled EMI

to successfully quality, manufacture, test and

operate a Festoon System on the Parker Drilling

Rig.

Completed 2008

Hydraulic Power Unit

Development Chevron

Agbami was West Africa (Nigeria) deepwater

project. A total of four (4) Test Hydraulic Power

Units (THPU) were designed, manufactured and

tested in Houston Texas. The HPU manufacturer

experienced some challenges when DNV

discovered that some of the tubing "markings"

were hard to verify. Nexus conducted an onsite

investigation and provided its P.E.Stampings on a

calculation package. This design verification

document would serve to ensure that tubing

pressure integrity was per the 1:4 burst ratio.

Completed 2008

10 REVISION OCTOBER 2012

Pressure Vessel

Standardization Shell

Shell Geological Group in Houston Texas

implemented ASME pressure vessel codes by

releasing a new Shell DEP standard. Pressure

Vessels at Shell facilities for Soil Sampling were

closely examined and a complete design

verification package with detailed calculations

was provided; with P.E. Stampings. The package

was approved by Shell Netherlands and was

regarded a bench mark document.

COMPLETED 2005

11 REVISION OCTOBER 2012

4 PROJECT PROFILES

PETRONAS

Project: KANOWIT

Client: PETRA

Location: Kumang Cluster (Shallow Water)

Scope:

Pre-commissioning, Commissioning and Start-

up

Duration 8 Months (Ongoing)

Project Value USD 1/2 Million

Phases 1 2 3 4 5

Conceptual Pre-FEED FEED Execute Commissioning

Scope of Work and Services

This project engaged our team in developing detailed procedures for pre-commissioning, commissioning and start-up of the KASS 1 and KASS 2 subsea wells for the Kanowit Project. The Subsea Production Control pre-commissioning involved the SIS, MCS, EPU, HPU, TUTU and CIU; including a post umbilical Hook-up procedure. Our team has been on the KAKG platform leading this project.

12 REVISION OCTOBER 2012

AXON

Project: Platform Festoon Cage System

Client: AXON

Location: TLP (GoM)

Scope: Detail Design

Duration 8 weeks

Project Value USD 200,000

Phases 1 2 3 4 5

Conceptual Pre-FEED FEED

Detail

Design Operate

Scope of Work and Services

Detail Structural design based on a workable structural configuration. Design and Analysis of Festoon System structure on TLP using SACS. The structure has is being designed for dynamic loading resulting from land transportation, vessel transportation (using Noble Denton Criteria) and platform dynamics.

13 REVISION OCTOBER 2012

MURPHY OIL

Project: SERENDAH, PATRICIA, SOUTH ACIS (SPSA)

Client: Murphy Sarawak Oil Co Ltd (MURPHY)

Location: Blocks SK309 and SK311

Scope: Conceptual & Pre-FEED Design Study for Subsea Water Injection System

Duration 4 months

Project Value RM 1,200,000

Phases 1 2 3 4 5

Conceptual Pre-FEED FEED Execute Operate

Scope of Work and Services

The scope of this preliminary design report is evaluate an array of subsea tie-back configurations for two (2) water injection Trees located within a 1km radius of PT-SA (Patricia Platform). The subsea control system (SCS) is to be located on the PT-SA platform, providing the required subsea electro-hydraulic controls. Moreover, 6-inch flow-line(s) approximately 13km long, shall supply treated water from WP-PA to the two PT-IA water injection wells. The following key drivers provide the net value (NV) in terms of CAPEX and OPEX: 1. Subsea Christmas Hardware 2. Subsea Control System. 3. Flow Lines. 4. Testing. 5. Installation, Hook-up and Commissioning.

14 REVISION OCTOBER 2012

SHELL F29

Project: F14 / F29

Client: Shell Sabah Oil, Malaysia

Location: F14 and F29 Fields

Scope: Conceptual & Pre-FEED Subsea Production Control System

Duration Ongoing

Project Value RM 900,000

Phases 1 2 3 4 5

Conceptual Pre-FEED FEED Execute Operate

Scope of Work and Services

The scope of work was to develop conceptual/pre-FEED studies that would set the pace for developing a Subsea Production Control System for successfully operating F29 Well. The following conceptual studies were carried out: 1. Field Layout and Architecture 2. Subsea Control System Philosophy (MCS, EPU, HPU, TUTA) 3. Subsea Start-up and Shutdown Philosophy 4. Umbilical and Flying Lead Installation Scope of Work (Umbilical, SUTA) 5. Subsea Interface Management 6. Subsea Operability and HAZOP 7. Topsides to Subsea Interfacing

15 REVISION OCTOBER 2012

WOODSIDE

Project: CWLH Project

Client: Woodside Australia

Location: Cossack Wanaea Lambert Hermes Fields

Scope: Pre-commissioning of Subsea Production Control System

Duration 8-Weeks

Project Value RM 475,000

Phases 1 2 3 4 5

Conceptual

Pre-

FEED FEED Execute Commissioning

Scope of Work and Services

Subsea Production Control System pre-commissioning was carried out. The MCS, EPU, HPU, TUTA and ESD system were integrated to function along with the OKHA FPSO Distributed Control System (DCS) and IPS. An extensive testing program was implemented, with daily readiness reviews, continuous interfacing with SBM and rectification of all onsite hardware operational issues.

16 REVISION OCTOBER 2012

COOEC

Project: LIWAN 3-1

Client: COOEC

Location: Block 29/26

Scope: FEED Study

Duration 8-Weeks

Project Value RM 120,000

Phases 1 2 3 4 5

Conceptual Pre-FEED FEED Execute Operate

Scope of Work and Services

This was a FEED study for the Liwan 3-1, Block 29/26 Shallow Field Development. Studies were conducted to understand the impact of SSIV and Subsea Umbilical System suitable for the life of the project.

17 REVISION OCTOBER 2012

SHELL

Project: GUMUSUT-KAKAP

Client: Shell Malaysia

Location: Deepwater Field

Scope: Execute Phase: SCS, IWOCS, Manifolds

Duration 2.5yrs

Project Value

USD

1,000,000

Phases 1 2 3 4 5

Conceptual Pre-FEED FEED Execute Operate

Scope of Work and Services

This was a challenging project that required training of Local Content, overview of various Subsea Vendors, Interface Management with Shell Malaysia and Shell USA to ensure that the FMC IWOCS, CWOR and Manifold Systems were manufactured and tested to Shell DEP's. A brand new HMI design was implemented for the IWOCS system that was extensively tested in Norway. The HPU was built in Stavenger Norway and the system tested in Johor Bahru. The manifolds were manufactured in Lumut Malaysia. All testing programs were lead by our team.

18 REVISION OCTOBER 2012

5 NEXUS OFFICES / CONTACT INFORMATION