ng9-1-1 program update

15
JASON HORNING NDACO 3/6/2013 NG9-1-1 PROGRAM UPDATE

Upload: rad

Post on 12-Feb-2016

44 views

Category:

Documents


0 download

DESCRIPTION

NG9-1-1 Program Update. Jason Horning NDACo 3/6/2013. Three Pronged Approach. Carrier Outreach/Planning GIS Outreach/Planning NG9-1-1 Outreach/Planning. Carrier outreach/planning. Ongoing dialog with Local Exchange Carriers - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: NG9-1-1 Program Update

J A S O N H O R N I N GN D A C O

3 / 6 / 2 0 1 3

NG9-1-1 PROGRAM UPDATE

Page 2: NG9-1-1 Program Update

THREE PRONGED APPROACH

• Carrier Outreach/Planning• GIS Outreach/Planning• NG9-1-1 Outreach/Planning

Page 3: NG9-1-1 Program Update

CARRIER OUTREACH/PLANNING

• Ongoing dialog with Local Exchange Carriers • Ongoing dialog with National Information Solution

Cooperative (NISC)• Ongoing dialog with Dakota Carrier Network (DCN)• For collocated equipment• Bismarck / Fargo

• Aggregation point for 9-1-1 call delivery from LECs operating in ND.• Pilot program being discussed to replace TDM with IP transport• Program would develop a model for ultimately transitioning all

LECs to IP transport for 9-1-1• Presentations on NG9-1-1 to the carrier community

Page 4: NG9-1-1 Program Update

LECs LECs

PSAPSPSAPS

FargoTandem

BismarckTandem

BismarckDCN

FargoDCN

Page 5: NG9-1-1 Program Update

LECs LECs

PSAPsPSAPs

FargoTandem

BismarckTandem

BismarckDCN

FargoDCN

CarrierIP

Page 6: NG9-1-1 Program Update

LECs LECs

PSAPsPSAPs

FargoTandem

BismarckTandem Bismarck

DCNFargoDCN

Carrier IP Network

Page 7: NG9-1-1 Program Update

LECs LECs

PSAPsPSAPs

FargoTandem

BismarckTandem Bismarck

DCNFargoDCN

Carrier IP Network

ESInet

Page 8: NG9-1-1 Program Update

LECs LECs

PSAPsPSAPs

BismarckDCN

FargoDCN

Carrier IP Network

ESInet & NG9-1-1 Core Services

Page 9: NG9-1-1 Program Update

GIS OUTREACH/PLANNING

• GIS is CRITICAL to achieving NG9-1-1• Without good GIS, NG9-1-1 is not possible.

• Please ensure you have identified an effective maintenance plan and resource for the added level of effort required!• 9-1-1 Association’s GIS Committee• Ongoing discussions with DOT, ITD, Tax Department• Required Layers for NG9-1-1 have been identified• Working to establish layer authority and responsibility• Who is responsible for maintaining each layer?• Who is responsible for aggregating each layer?• Who will provision the aggregated GIS data into the NG9-1-1

system?

Page 10: NG9-1-1 Program Update

GIS OUTREACH/PLANNING

• NDACo considering an end-to-end GIS Maintenance Service if necessary• Counties/Cities/PSAPs will drive that need

• Please come see me if you have questions!

Page 11: NG9-1-1 Program Update

Layer Name Required Geometry Type

Aggregation Authority

Minimum Update

Frequency

Maintenance

Authority

Priority

Road Centerlines Yes Line NDDES Daily Local 2

Site/Structure Addresses

Yes Point NDDES Daily Local 3

States Yes Polygon DOT Monthly State 4

Counties Yes Polygon DOT Monthly State 5

Municipalities Yes Polygon T.B.D Monthly Local 6

PSAP Yes Polygon NDDES 1 hour Local 1

Law Enforcement

Yes Polygon NDDES Daily Local 7

Fire Yes Polygon NDDES Daily Local 8

Ambulance Yes Polygon NDDES Daily Local 9

Page 12: NG9-1-1 Program Update

NG9-1-1 OUTREACH

• PSAP Visits• Visited 21 of 22 PSAPs thus far• Explain the NG9-1-1 Program• Answered NG9-1-1 questions and potential impacts• Gathered trunk/switch layouts (for transition planning)

• Continued meetings with DCN / ITD / CenturyLink• Setting expectations

Page 13: NG9-1-1 Program Update

NG9-1-1 PLANNING

• Phase I (2013-2014)• ESInet deployment, Legacy Connectivity and Data

Centers• Phase II (2015-2016)• 9-1-1 Database Aggregation and NG9-1-1 Core Service

Build-out• Phase III (2017 +)• PSAP / Originating Service Provider Migration and Long-

Term Maintenance

Page 14: NG9-1-1 Program Update

OTHER NOTABLE UPDATES

• FCC Legal and Regulatory Framework for NG9-1-1 Report and Recommendations to Congress released on 2/22/2013• Talks about how states can position themselves well for grants

moving forward• Good material for understanding NG9-1-1 current state

• Cassidian is suing numerous NG9-1-1 Providers claiming patent infringement on U.S. Patent 6,744,858• Seeking clarification….• FCC also seeking comments

• Rolette planning to “go-live” with 9-1-1 calls at the end of March

Page 15: NG9-1-1 Program Update

NG9-1-1 “THE GOAL”

• Wireless contract replacement must support the evolution of the current 9-1-1 environment in ND to a “Baseline NG9-1-1 System”.• http://www.nena.org/?NG911_Baseline

• Would appreciate the endorsement of the 9-1-1 Association• Vote and/or Board Approval on the above statement as

our collective objective and expectation