Check that the Tyres / Tracks are at the correct pressure and in good, clean condition.
![Page 2: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/2.jpg)
Check that the Crane is kept at a safe, predetermined distance from open
excavations, etc.
7Meters
![Page 3: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/3.jpg)
Check that, when travelling, the load is carried as near to the ground as possible and that hand lines are being used.
![Page 4: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/4.jpg)
Check that when travelling on sloping ground the driver changes the radius to accommodate the
moving of the load OR !
![Page 5: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/5.jpg)
Shock loading a Boom can result in this ! Fall of three people 20 m.
20 Meter
![Page 6: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/6.jpg)
Check that loads are not being slewed over persons and that persons and that persons are not standing or walking under the load.
NO!
![Page 7: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/7.jpg)
Automatic safe load indicatorAll Cranes with a lifting capacity in excess of 1 ton must be fitted with an approved type of automatic safe load indicator.
![Page 8: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/8.jpg)
It is the responsibility of the operator to:(a) Determine the type of Indicator fitted;(b) Determine how the adjustments are
made;(c) Ensure that it is correctly adjusted for
the various lifting duties;(d) Ensure that the electrical circuit is
tested for serviceability;(e) Take immediate action when an
overload is indicated.
![Page 9: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/9.jpg)
The signals given by the indicator take the form of colored light, a dial indicator or both and a bell.
Green/white -- Indicator adjusted for ‘free’ duties
Blue -- Indicator adjusted for ‘blocked’ duties
Amber -- Maximum safe load being approached
Red -- Overload condition reached.
![Page 10: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/10.jpg)
The red light will be supported by a bell to give an audible warning of
overload.
![Page 11: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/11.jpg)
Always use Tag Lines !
![Page 12: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/12.jpg)
Certification
![Page 13: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/13.jpg)
Certification
![Page 14: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/14.jpg)
Certification
![Page 15: NGI-Cranes-Part 04](https://reader037.vdocuments.net/reader037/viewer/2022100219/555c1ddcd8b42a09438b466e/html5/thumbnails/15.jpg)
Thank you Thank you for your for your
attention.attention.
Thank you Thank you for your for your
attention.attention.