nh route 28 corridor safety audit preliminary analysis of historic and existing conditions

27
NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions

Upload: lambert-butler

Post on 16-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

  • Slide 1
  • NH Route 28 Corridor Safety Audit Preliminary Analysis of Historic and Existing Conditions
  • Slide 2
  • Slide 3
  • Road Safety Audits ( 23 CFR Part 924) Road Safety Audits means a formal safety performance examination of an existing or future road or intersection by an independent multidisciplinary audit team. Road Safety Audits are identified as a process for conducting engineering studies of hazardous locations, sections, and elements to develop highway safety improvement projects.
  • Slide 4
  • Background Information Crash Analysis Vehicle Counts: Volume, Speed, Classification Zoning and Land Use Sign Inventory Pavement Evaluation LOS Vehicles, Bicycles, and Pedestrians
  • Slide 5
  • SR28 Preliminary Crash Analysis Segments Rate Quality Control Segments with higher than average crash rates Intersections Equivalent Property Damage Only EPDO Greater than 25 Behavioral Aggregate summary of crash records
  • Slide 6
  • Segments
  • Slide 7
  • Intersections
  • Slide 8
  • Slide 9
  • Background Information Crash Analysis Vehicle Counts: Volume, Speed, Classification Zoning and Land Use Sign Inventory Pavement Evaluation LOS Vehicles, Bicycles, and Pedestrians
  • Slide 10
  • 1 ALTON (South of Prospect Mountain High School) 2 ALTON (South of Stockbridge Road) 3 ALTON/BARNSTEAD town line 4 BARNSTEAD (South of Peacham Road) 5 BARNSTEAD (North of NH Route 126) 6 BARNSTEAD (South of NH Route 126) 7 PITTSFIELD (North of Leavitt Road) 8 CHICHESTER (South of Webster Mills Road) 9 CHICHESTER (South of Bear Hill Road) 10 CHICHESTER (Main Street West of NH Route 28) 11 EPSOM (North of Epsom Traffic Circle) 12 EPSOM (South of Short Falls Road) Location Order
  • Slide 11
  • Slide 12
  • Sample of data collected for each location.
  • Slide 13
  • Slide 14
  • Corridor 85 th Percentile Speed vs. Posted Speed Limits
  • Slide 15
  • Slide 16
  • Background Information Crash Analysis Vehicle Counts: Volume, Speed, Classification Zoning and Land Use Sign Inventory Pavement Evaluation LOS Vehicles, Bicycles, and Pedestrians
  • Slide 17
  • Slide 18
  • Background Information Crash Analysis Vehicle Counts: Volume, Speed, Classification Zoning and Land Use Sign Inventory Pavement Evaluation LOS Vehicles, Bicycles, and Pedestrians
  • Slide 19
  • Slide 20
  • Slide 21
  • Background Information Crash Analysis Vehicle Counts: Volume, Speed, Classification Zoning and Land Use Sign Inventory Pavement Evaluation LOS Vehicles, Bicycles, and Pedestrians
  • Slide 22
  • Slide 23
  • Background Information Crash Analysis Traffic Volume Speed Study Vehicle Classification Counts Zoning and Land Use Sign Inventory Pavement Evaluation LOS Vehicles, Bicycles, and Pedestrians
  • Slide 24
  • Slide 25
  • Next Steps Obtain Crash Records for Identified Intersections Behavioral Analysis Crash Summary Additional data collection may be required Sign Retro-reflectivity Turning Movement Counts at specific locations Additional Speed Counts to fill in data gaps
  • Slide 26
  • Next Steps - continued Road Safety Audit & Crash Reduction Factor Training Manchester Community College March 3 rd and 4 th 2009 Conduct Road Safety Audit Recommend Cost Effective Improvements
  • Slide 27
  • Project Timeline 20082009 Tasks / MonthSepOctNovDecJanFebMarAprMayJunJulAug 1. Data Collection 2. PAC Development 3. Committee Meeting I 4. Training 5. Safety Audits 6. Committee Meeting II 7. QBS Consultant 8. Conceptual Improvements 9. Committee Meeting III 10. Final Report 11. Community Presentations