INDEX
CONDITIONS PRECEDENT OF AUTHORITY12 LA 23 FOREST CLEARANCE4 ENVIRONMENT CLEARANCE5 WILDLIFE CLEARANCE6 ROB-RUB7 RIGHT OF WAY- ARTICLE 10 OF MCA8 CONDITION PRECEDENT OF CONCESSIONAIRE9 APPLICABLE PERMITS AS PER CONDITIONS PRECEDENT OF CONCESSIONAIRE10
PROPRIETARY RIGHTS, LICENSES, AGREEMENTS AND PERMISSIONSREPRESENTATION AND WARRANTIESLEGAL OPINION BY CONCESSIONAIRE
111213
EMPLOYMENT OF FOREIGN NATIONALS BY CONCESSIONAIREPROJECT AGREEMENTS
14 CHANGE OF SCOPE151617181920
COMMERCIAL OPENING DATEFORCE MAJEURE AND TERMINATION
21MISCELLANEOUS
WORK FLOW TAG
LA 1
UTILITY SHIFTING
APPOINTMENT OF IEMONITORING OF CONSTRUCTIONAPPOINTMENT OF SAFETY CONSULTANT
PERFORMANCE SECURITYESCROW ACCOUNTCHANGE IN OWNERSHIPPAY DAMAGES TO AUTHORITYSUBST. AGREEMENTSFINANCIAL CLOSURE
O & M
Workflow TAG/LEGEND(s)
A B CInitiator Concessionaire Initiator Concessionaire Initiator ConcessionaireReviewer IE Reviewer PD Reviewer IEApprover 1 PD Approver RO Approver PDApprover 2 RO
D E FInitiator Concessionaire Initiator Concessionaire Initiator PIUReviewer GM(Tech) Reviewer GM(Finance) Reviewer ROApprover CGM (Tech) Approver CGM (Finance) Approver CGM(LA)
G H IInitiator Manager/DGM (Tech) Initiator Design Consultant Initiator GM(Tech)Reviewer GM(Tech) Reviewer PD Reviewer GM(Tech)Approver CGM (Tech) Approver RO Approver CGM (Tech)
J K LInitiator PD Initiator GM(Tech) Initiator GM(Tech)Reviewer RO Reviewer CGM (Tech) Reviewer CGM (Tech)Approver RO Approver CGM (Tech) Approver NHAI Executive Committee
M NInitiator GM(Finance) Initiator Safety ConsultantReviewer CGM (Finance) Reviewer PD in Consultation with IEApprover CGM (Finance) Approver RO
Conditions Precedent of Authority
Conditions Precedent of Concessionaire
1. Provided to the Concessionaire the Right of Way to the Sitea. Post completion of PPPAC Approval process for Land Acquisition
b. Land Acquisition
2. Issued the Fee Notification
3. Provided for the Concessionaire the Right of Way to ****
4. Procured approval of Railway Authorities to construct road over bridges / under bridges at level crossings
a. ROB/RUB Clearance, alongside approval for GADs for them
5. Procured all Applicable Permits relating to environmental protection and conservation of the site
a. Applicable Permits
b. Forest clearance
c. Environment clearance
d. Wildlife clearance
1. Provided Performance Security to the Authority
2. Executed and procured execution of the Escrow Agreement;
3. Executed and procured execution of the Substitution Agreement;
4. Procured all the Applicable Permits specified in Schedule-E unconditionally or if subject to conditions, then all such conditions shall have been satisfied in full and such Applicable Permits are in full force and effect;
a. Conditions Precedent Obligations of Concessionaire
5. Executed the Financing Agreements and delivered to the Authority 3 (three) true copies thereof, duly attested by a Director of the Concessionaire;
7. Delivered to the Authority 3 (three) true copies of the Financial Package and the Financial Model, duly attested by a Director of the Concessionaire, along with 3 (three) soft copies of the Financial Model in MS Excel version or any substitute there
8. Delivered to the Authority from {the Consortium Members, their respective} confirmation, in original, of the correctness of their representations and warranties setforth in Sub clauses (k), (l) and (m) of clause 7.1 of this Agreement; and
9. Delivered to the Authority a legal opinion from the legal counsel of the Concessionaire with respect to the authority of the Concessionaire to enter into this Agreement and the enforceability of the provisions thereof
PPPAC Approval: Compliance to Condition PrecedentSl. No. Clause of Concession Agreement Description Before issue of RFP Before issue of LOA Before giving Appointed Date
1 4.1.2 (a) Availability of land
Input Form LA 1Requirement Status Date Action taken and Action by Remarks/Issues
Completed
Existing ROW + 3D of 80% land to be acquired Completed 11.11.2011 - Do -
Completed 22.11.2013 - Do -
Before submission of proposal to PPPAC
Existing ROW + 3D of 60% land to be acquired+ 3A of 90% land to be acquired
Existing ROW + 3D of 80% land to be acquired
Existing ROW + 3D of 80% land to be acquired
Existing ROW + 3D of 90% land to be acquired and at least 80% front of 30 Mtr for two lane paved shoulders, 45 Mtr for four laning and 60Mtr for six laning projects should be available
Existing ROW + 3D of 60% land to be acquired+ 3A of 90% land to be acquired
11.11.201105.03.2013
CA (LA)/ Project Director NHAI-PIU-Sikar
3D of 60% land (i.e. 64.1525 Ha) on 11.11.2011 (Total 92.652 Ha on 11.11.2013)3A of 90% land (i.e. 96.288 Ha), up to 05.03.2013-95.277 Hac & up to 08.07.2011- again 11.6439 Ha completed on 05.03.2013)
3D of 80% land (i.e. 85.5367 Ha), Total 92.652 Ha achieved on 11.11.2013
Existing ROW + 3D of 90% land to be acquired and at least 80% front of 30 Mtr for two lane paved shoulders, 45 Mtr for four laning and 60Mtr for six laning projects made available
*3D on 90% land (i.e. 96.288 Ha), completed up to 22.11.2013 (Total 95.277 Ha up to 06.07.2012 & Balance 11.643 Ha on 22.11.2013)*on 03.05.2012-80 % of 45m ROW was available for 4-laning after Forest clearance on 03.05.12
FORM FOR LAND ACQUISITION PPPAC Approval: Compliance to Condition Precedent
Sl. No. Description Before issue of RFP Before issue of LOA
1 4.1.2 (a) Availability of land
Sl. No. Project PIU No. NH No. Stretch Length (in km) Chainage (in Kms.)
From To1 2 3 4 5 6 7 8F F F F F F F F
1 Sikar 11 Reengus-Sikar 43.887 298.075 341.962
NHDP Phase Land already in Possession 3A (Hec) 3D (Hec)
9 10 11 12 13 14 15 16F F F F F F F FIII 276 Hec. 24 169 Hec. 106.9209 Hec. 39.532 km 106.9209 106.9209
Cumulative progress up to 25.01.2014 Pending LA works (in Hec)3G (Hec) Possession (Hec) 3A (Hec) 3D (Hec) 3G (Hec) Possession (Hec)
17 18 19 20 21 22 22A 22BF F F F F F F F
95.45 69.49 - - 11.47 37.43 - -
23 24 25 26 27 28 28A 28BF F F F F F F F
100 100 100 65 86.41 39.532 39.532 39.532
3A ParticularsPrivate Land (in Hact.) Govt. Land (in Hact.) Stretch covered (chainage)
29 30 31 32 33 34 35 36
F F F F F F F F98.58 8.34 298+075 - 341+962 - -
Clause of Concession Agreement
Before submission of proposal to PPPAC
Before giving Appointed Date
Existing ROW + 3D of 60% land to be acquired+ 3A of 90% land to be acquired
Existing ROW + 3D of 80% land to be acquired
Existing ROW + 3D of 80% land to be acquired
Existing ROW + 3D of 90% land to be acquired and at least 80% front of 30 Mtr for two lane paved shoulders, 45 Mtr for four laning and 60Mtr for six laning projects should be available
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to
Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT
(Annuity) Project on DBFOT Pattern Under NHDP Phase
– III
Cumulative progress up to 17.02.2014Total Land required (in Hec) No. of villages in the entire
stretch of Land to be acquired
Total additional land to be acquired (Hec)
Length available for road development up to
17.02.2014
Total length of critical stretches, if any, as per
clause of 4.1.2 of MCA (km)
Length of critical stretch available for construction (km) as against column no
22A
% 3A completed (current 3A notified/total additional
land to be acquired)
% 3D completed (current 3D notified/total additional
land to be acquired)
% of total land vested with NHAI (already in possession
+ 3D notified)/Total land required
% of additional land in possession (current
possession made/total additional land to be
acquired)
% of total Land in Possession (Land already in
possession + current possession made)/Total
land required
Length where minimum required width
(30m/45m/60m as applicable for 2-laning/4-laning/6-laning) of ROW is available for construction
(km)
Length available for road development upto end of
previous month, (year)
Length where entire width of ROW is available for
Construction(km)
Date of submission of 3A proposal by DPR consultant
Date of submission of 3A proposal to Authority's HQ
Name(s) of villages covered in the 3A
proposal
3A Gazette Notification No. vide which the land
mentioned was acquired
Date of 3A Gazette Notification No.
Reengus, Jetushar, Bhopatpura, Bawadi,
Malkpur, Thikaria, Shahpura, Samota Ka Bas,
Mandha (Madni), Goverdhanpura, Badhala
Ki Dhani, Vijay Nagar, Palsana, Akhaipura, Sisiu,
Ranauali, Trilokpura, Sujabas, Rebasha, Bhoja Ki Dhani, Goriya, Kaharon Ki
Dhani, Bajor, Malkeda, Gokulpura and Ramu Ka
Bas
95.277 Hac, SO 2921(E) dated 09.12.2010 &
SO 1602(E) dated 08.07.2011
11.6439 Hac, SO 506(E) dated 05.03.2013
09.12.2010 08.07.201105.03.2013
3D ParticularsPrivate Land (in Hact.) Govt. Land (in Hact.) Stretch covered (chainage) Type of land
37 38 39 40 41 42 43 44F F F F F F F F
98.58 8.34 298+075 - 341+962 -Nil
3D Particulars
45 46 47 48 49 50 51F F F F F F F
Not Applicable
Encumbrance Tehsil/Village/District Wise Mutation DetailsStretch covered (chainage)
52 53 54 55 56 57 58 59F F F F F F F F
0.15 Ch. 298.075 to Ch. 337.600 95.41 Ha
Tehsil/Village/District Wise Mutation Details Compensation Status for Land Acquisition Remarks on mutation TPC as per DPR
60 61 62 63 64 65 66 67F F F F F F F F
33 Ha Required to be speeded up. 366.50 Crore 24 Crore 29.99 Crore
Compensation Status for Land AcquisitionDate of Approval by RO/HO
68 69 70 71F F F F
4.45 Cr - 05.11.2012 16.11.2012 19.51 Crore
16.14 Cr. - 26.03.2013 18.04.20135.49 Cr - 26.03.2013 18.04.20133.79 Cr - 20.06.2013 08.08.2013
Total 29.87 Cr
Date of submission of related 3D proposal at
Authority's HQ
3D Notification No. vide which the land mentioned
was acquired
Date of publication of 3D notification No.
Area of Land with Central Govt. (3D Notified) but not
utilized (in ha)
92.652 Hac, SO 2536(E) 2.625 Hac, SO 1511(E)
11.6439 Hac, SO 3472(E)
11.11.201106.07.201222.11.2013
Agricultural, Non-Agricultural - Commercial
and Abadi
Status of valuation of structures
Date of award under section 3G for related 3D
notification
Summary of issues impeding land acquisition
for the project
Date pending since (of issues)
Pending with whom (Concerned officer the State / Central Govt.)Reason why 3D notified
land has not been utilized (change in
alignment/excess land acquired/ mistake in
acquisition, etc., (please specify)
Date of actual possession of land for area notified
under 3D
3D published for 106.92 Ha up to 22.11.2013, 3G
Award declared for 95.41 Ha up to 10.02.2014.
However actual possession till date is available for 69.49 Ha. Possesion of balance land is under
process.
Completed except one structure at the end of
project, this is delayed due to protest of owner.
35.7604 Ha dt. 17.07.201226.49 Ha dt. 03.01.2013
11.952 Ha dt. 23.01.20135.381 Ha dt. 15.05.20132.353 Ha dt. 30.12.20131.874 Ha dt. 27.01.201411.64 Ha dt. 10.02.2014
Total 95.45 Ha
Delay in declaration of balance Award /
Disbursement of award amount / subsequently
providing actual possession.
Award of 11.47 Ha is pending since Dec. 2011
ADM (CA/LA) Sikar, Officer of State Govt. of Rajasthan
Stretch of Highway (chainage) where
encumbrance free land is not available
Area of unavailable land (in ha.) in encumbrance
Reasons in brief for unavailability of
encumbrance free land in the stretch
Concerned officer who may resolve the issue
No. of days by which handing over is delayed w.r.t. appointed date
Name of Tehsil/Village/District
Area of land acquired by NHAI (Ha)
303+530 to 303+580 RHS303+970 to 304+020 LHS334+570 to 334+620 RHS334+680 to 334+720 LHS
Non-Removal of structures due to dispute of land
demarcation & not been resolved so far by revenue authorities, matter is under
process of resolution of dispute.
ADM (CA/LA) Sikar, Officer of State Govt. of Rajasthan
624 days since appointed date 05.03.2012
Dist. - SikarTehsil - Srimadhopur,
Dantaramgarah & Sikar
Villages - Reengus, Bhopatpura, Bawadi,
Malikpur, Thikaria, Shahpura, Mandha
(Madni) Goverdhanpura, Badhala Ki Dhani,
Vijaynagar, Palsana, Akhaipur, Sisiu, Ranoli
(Part), Trilokpura, Sujabas, Rebasha, Kaharon Ki Dhani,
Bajor
Area of land mutated in the name of NHAI (Ha)
Area of land remaining to be mutated in favour of
NHAI (Ha)
Designated State Authority responsible for mutation
Reason for not mutating the area of land and action
taken by NHAI
Estimate for LA as per DPR (in Rs.)
Value of Award approved by RO/HO
Dist. - SikarTehsil - DantaramgarahVillages - Palsana, Vijay Nagar, Badhala Ki Dhani
ADM (CA/LA) Sikar, Officer of State Govt. of Rajasthan
NHAI is continuously pursuading state authorities
for mutation, the same is under process.
Date of Deposition of Award Amount with CALA
Amount disbursed by CALA (in Rs.)
Actual Land acquisition cost per ha.
0.68 Cr / Ha including cost of structrue
Forest Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)Fixed Fields
Project name / ID NH No. Length Stretch State PIU
1 2 3 4 5 6 7 8 9 10 11 12 13F F F F F F F F F F F F F
11 43.887 Reengus-Sikar Rajasthan Sikar 05.03.2012 31.08.2014 No _ _ No
Total length
14 15 16 17 18 19 20 21 22 23 24 25F F F F F F F F F F F F
43.887 84.13 36.287 Sikar 84.13 Sikar 31.01.2011 07.07.2011 07.07.2011 09.08.2011 17.08.2011 Sikar
26 27 28 29 30 31 32 33 34 35 36 37F F F F F F F F F F F F
Scheduled Start date
Scheduled End date
Whether requirement of additional land is more than 40m on
existing alignment and 60m on new
alignments / bypass ?
Whether Environmental
Clearance required ? [Not required if length is less than 100km, or answer to column 9 is
No]
If environmental clearance
required, fill details in
relevant format
Whether Forest Clearance
required ? [If yes, fill details in the relevant
format]
Whether Wildlife
clearance required ? [If
yes, fill details in the relevant
format]
Four Laning of Reengus to Sikar Section Km.
298.075 Near Madhopura Junction to
Km. 341.047 (After Sikar Town) Of NH-11
(Proposed Chainage Km. 298.075 to Km.
341.962) (Design Length 43.887 Km.) In The State of Rajasthan
on BOT (Annuity) Project on DBFOT
Pattern Under NHDP Phase – III
MoEF clearance obtained as per
existing circular at that time
Total Forest area to be
diverted (in ha )
Total Length affected
Forest Division and forest Circle
involved
Forest area to be diverted (in ha ) in the
Division
Length affected in the Division
Date of finalization of
proposal by the DPR Consultant
Date of registration with
the Nodal Officer
Date of submission of Diversion proposal to
DFO
Date of receipt of observations from
DFO
Date of sending replies / modified
proposal to DFO
Name of the Forest Circle
involved
Date of forwarding the proposal to CF/CCF
(officer in charge of the circle)
Date of receipt of observations from the Circle
office
Date of sending replies / modified
proposal to Circle office
Date of forwarding the
proposal to PCCF
Date of receipt of observations
from PCCF
Date of sending replies / modified
proposal to PCCF
Date of forwarding the
proposal to Nodal Officer
Date of receipt of observations
from Nodal Officer
Date of sending replies / modified proposal to Nodal
Officer
Date of forwarding the proposal to State
Government
Date of receipt of observations
from State Government
Date of sending replies / modified
proposal to State
government
06.01.2012 10.01.2012 28.02.2012 28.02.2012 05.03.2012 - 04.05.2012 - - - - -
NPV
38 39 40 41 42 43 44 45 46 47 48 49 50F F F F F F F F F F F F F- - - - - - - - - - 07.06.2012 07.06.2012
Status of tree cutting In Diverted Area Status of tree cutting In Non-forest area RemarksStatus of Enumeration Status of Enumeration Status of tree cutting In Diverted Area
No. of trees to be cut Trees cut Trees cut
51 52 53 54 55 56 57 58 59 60 61 62F F F F F F F F F F F F
9374 9374 36.287 8191 36.287 - - - - - -
Date of forwarding the proposal to MoEF
Date of receipt of observations
from MoEF
Date of sending replies / modified
proposal to MoEF
Date of consideration of
proposal by MoEF
Status of in principle approval
Compliance of conditions laid
down in Stage- I
Amount to be deposited as per clearance conditions
Date of Depositing the amount in CAMPA fund
Date of Forwarding of compliance by the
State Govt. to MoEF
Status of Grant of Stage-II
clearance by MoEF
Order of State Govt.
Date of handing over of diverted
forest landCA and other
amount
Granted on 03.05.2012
Expenditure on tree cuttingStatus of tree cutting In Diverted
AreaTrees
enumeratedLength on which
enumeration done
Length cleared in relation to
affected length
No. of trees to be cut
Trees enumerated
Length on which enumeration
done
Length cleared in relation to affected
length
Environment Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)Fixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date1 2 3 4 5 6 7 8F F F F F F F F
11 43.887 Reengus-Sikar Rajasthan Sikar 05.03.2012 31.08.2014
Fixed Fields
9 10 11 12 13F F F F F
NO Yes Yes No
Date of pubic hearing Date of approval of CZMA
14 15 16 17 18 19 20 21F F F F F F F F_ _ _ _ _ No _ _
Remarks
22 23 24 25 26 27 28
Four Laning of Reengus to Sikar Section Km.
298.075 Near Madhopura Junction to
Km. 341.047 (After Sikar Town) Of NH-11
(Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT
(Annuity) Project on DBFOT Pattern Under
NHDP Phase – III
Whether requirement of additional land is more than 40m on existing
alignment and 60m on new alignments /
bypass
Whether Environmental Clearance required ?
[Not required if length is less than 100km, or answer to column 9 is
No]
If environmental clearance required, fill
details in relevant format
Whether Forest Clearance required ? [If
yes, fill details in the relevant format]
Whether Wildlife clearance required ? [If yes, fill details in the
relevant format]
MoEF clearance obtained as per existing circular at that
time on 19.09.2011
Date of submission of draft TOR by Consultant
If yes, Submission of TOR to MoEF
Date of approval of TOR by MoEF
Submission of draft EIA to SPCB for conducting public
hearing
Whether CRZ clearance required ?
If yes, Date of submission of proposal to CZMA
Date of submission of all documents required for
clearance by the consultant
Date of submission of EIA to MoEF
Date of consideration of Project by MoEF
Date and number of MoEF approval latter
Date of submission of application for NOC of PCB
by consultant
Date and number of NOC by PCB
F F F F F F F_ _ _ _ NA _No. 10-59/2009-IAIII
dated 19.09.2011
Wildlife Clearance - Clause 4.1.2 (e) of Model Concession Agreement (MCA)Fixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled End date
1 2 3 4 5 6 7 8 9 10 11 12 13F F F F F F F F F F F F F
Total length Date of forwarding the proposal toState Govt. MOEF
14 15 16 17 18 19 20 21 22 23 24 25 26F F F F F F F F F F F F F
27 28 29 30 31 32 33 34 35 36 37 38 39F F F F F F F F F F F F F
NPV
40 41 42 43 44 45 46 47 48 49 50 51 52F F F F F F F F F F F F F
Order of State Govt. Status of tree cutting In Diverted AreaStatus of Enumeration Status of tree cutting In Diverted Area
Trees enumerated Trees cut
53 54 55 56 57 58 59 60 61 62F F F F F F F F F F
Status of tree cutting In Non-forest areaStatus of Enumeration Status of tree cutting In Diverted Area Remarks
Trees enumerated Trees cut
63 64 65 66 67 68 69F F F F F F F
Not Applicable
Scheduled Start date
Whether requirement of
additional land is more than 40m on existing alignment and 60m on new
alignments / bypass
Whether Environmental
Clearance required ? [Not
required if length is less than 100km, or answer to column 9
is No]
If environmental clearance required,
fill details in relevant format
Whether Forest Clearance
required ? [If yes, fill details in the relevant format]
Whether Wildlife clearance required ? [If yes, fill details in the relevant format]
Total Wildlife area to be diverted (in
ha)
Total Length Affected
Name of Wild Life Area and Division
Wildlife area to be diverted (in ha) in
the Division /
Length Affected in the Division / wildlife area
Date of submission of proposal to DFO / Wildlife
Date of consideration of
proposal by SBWL
Date of consideration of
proposal by NBWL
Date of conveyance of decision of MoEF
to State Govt
Date of filing Application to
Hon’ble Supreme
Date of Order of Hon’ble Supreme
Court.
Date of registration with the Nodal
Officer
Date of submission of Diversion
proposal to DFO
Date of receipt of observations from
DFO
Date of sending replies / modified proposal to DFO
Name of the Forest Circle involved
Date of forwarding the proposal to
CF/CCF (officer in charge of the circle)
Date of receipt of observations from
the Circle office
Date of sending replies / modified proposal to Circle
office
Date of forwarding the proposal to
PCCF
Date of receipt of observations from
PCCF
Date of sending replies / modified proposal to PCCF
Date of forwarding the proposal to
Nodal Officer
Date of receipt of observations from
Nodal Officer
Date of sending replies / modified proposal to Nodal
Officer
Date of forwarding the proposal to
State Government
Date of receipt of observations from State Government
Date of sending replies / modified proposal to State
government
Date of forwarding the proposal to
MoEF
Date of receipt of observations from
MoEF
Date of sending replies / modified proposal to MoEF
Date of consideration of
proposal by MoEF
Status of in principle approval
Compliance of conditions laid
down in Stage- I
Amount to be deposited as per clearance conditionsCA and other
amount
Date of Depositing the amount in CAMPA fund
Date of Forwarding of compliance by the State Govt. to
MoEF
Status of Grant of Stage-II clearance
by MoEF
Date of handing over of diverted
forest land No. of trees to be cut
Length on which enumeration done
Length cleared in relation to affected
length
Expenditure on tree cuttingNo. of trees to be
cutLength on which
enumeration doneLength cleared in
relation to affected length
RAILWAY OVER BRIDGE / RAILWAY UNDER BRIDGES. No. Name of Project PIU NH. No NH Section Chainge NH km ROB/RUB ID No. NHDP Phase State of Project Year of Sanction
From To
1 2 3 4 5 6 7 8 9 10 11 12 13H H H H H H H H H H H H H
Zonal Railways RLY Div. RLY KM LC NO. RLY Block Deposition of codal charges to Railway(P&E, D&G, Maintenance and other)
14 15 16 17 18 19 20 21 22 23 24H H H H H H H H H H H
Status of approval at RailwaysGAD Design and Drawing
Reply by NHAI Reply by NHAI
25 26 27 28 29 30 31 32 33 34 35 36 37H H H H H H H A A A A A A
Status of approval at RailwaysTAD CRS Traffic Block
Reply by NHAI Reply by NHAI
38 39 40 41 42 43 44 45 46 47 48 49A A A A A A A A A A A A
Status of approval at RailwaysLevel Crossing Utility shifting
Reply by NHAI Reply by NHAI
50 51 52 53 54 55 56 57 58 59 60 61A A A A A A A A A A A A
Progress % Remarks
Not Applicable62 63 64A A A
Description of ROB/RUB
Project Status (Awarded/ Progress)
Date of application on
charges deposition with feasibilty/profil
e sketch
Date of Joint Inspection
Observations of Railway, if any
Reply to Railway on observation
Approval for Deposition
Date of Deposition by
NHAI
At RFP whether GAD approved
(Yes/No)GAD prepared by Consultant
Yes/ No
Date of Submission to
Railway
Observation raised by Railway
Date of approval by
Railway
Due Date of approval of GAD as per Concession Agreement
Whether Railway
approved GAD within 90 days
from submission
D&D prepared by
Concessionaire Yes/ No
Date of Submission to
Railway
Observation raised by Railway
Date of approval by
Railway
TAD prepared by
Concessionaire Yes/ No
Date of Submission to
Railway
Observation raised by Railway
Date of approval by
Railway
Date of application
Date of approval by
Railway
Date of Traffic Plan prepared
by Concessionaire
Date of Submission to
Railway
Observation raised by Railway
Date of approval by
Railway
Level crossing shifting plan prepared by
Concessionaire Yes/ No
Date of Submision to
Railway
Observation raised by Railway
Date of approval by
Railway
Date of Utility shifting plan prepared by
Concessionaire
Date of Submision to
Railway
Observation raised by Railway
Estimate prepared by
Railway
Deposition of amount for
Utility shifting by NHAI
Status of Utility shifting
Likely date of completion
Input Fields Format for Right of Way - Article 10 of MCATotal land required for the project Unencumbered Land at the time of Appointed Date Land not free from encumberance at the time of Appointed Date
S. No. Chainage (in Km) Area S. No. Chainage (in Km) Area S. No. Chainage (in Km) AreaFrom To From To From To
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19F F F F F F F F F F F F F F F F F F F
05.03.2012 _ 1 298.075 341.962 276 60 Mtr. 1 298.075 341.962 45 M 1 298.075 341.962 84.13 45 M
Land handed over to concessionnaire after AD (cumulative) Additional Land Required for 6 laningS. No. Chainage (in Km) Scheduled Date of 6 laning:
From To Details of required land Detalis of handing over
20 21 22 23 24 25 26 27 S. No. Chainage S. No. ChainageFrom To
28 29 30 31 32 33 34 35 36F F F F F F F F F F F F F F F F F1 298+075 341+962 238.46 60 M 84.13 Ha 03.05.12 N.A.
Major Bridges Railway Over Bridges Grade SeparatorsS. No. Chainage (in Km) S. No. Chainage (in Km) S. No. Chainage (in Km)
From To From To From To
37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57F F F F F F F F F F F F F F F F F F F F F1 330.352 330.457 RCC Slab 8.3 M Yes NA - NIL NIL
Minor Bridges Total No. of Structures on the SiteS. No. Chainage (in Km)
From To
58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74F F F F F F F F F F F F F F F F F1 309+617 309+637
RCC Slab8.3 Yes NA 1 - - 3 - - 1 10 - -
Appointed Date
Date of joint
inspection (chainage
wise)
Total ROW (in m)
Total ROW (in m)
Total ROW (in m)
Reason for encumber
ance
Is the encumber
ance critical ?
84.87 Hac (excluding
area of protected
forest diverted later
on dated 03.05.2012)
Forest clearance for
protected forest of
83.14 Ha & Encroachmen
ts in EROW
Yes, protected forest area (83.14 Ha)
Any encumberance reported by Area
HaTotal ROW
(in m)Extent of
critical stretch handed
over
Date of reporting
Chainaage-wise brief of report
Additional ROW
required
Additional area
required
Date of handing
over
Area handed
over
Full stretch except Palsana Bypass from
315+450 to
323+050
Type of Structure
Width (in m)
Whether handed
over on AD
If not, date of handing
over
Type of Structure
Width (in m)
Whether handed
over on AD
If not, date of handing
over
Type of Structure
Width (in m)
Whether handed
over on AD
If not, date of handing
over
Type of Structure
Width (in m)
Whether handed
over on AD
If not, date of handing
over
No. of major
bridges
No. of ROBs
No. of Grade
Separators
No. of Minor
Bridges
No. of Vehicular and Non Vehicular
No. of Box Culverts
No. of Pipe Culverts
No. of Slab Culverts
Structures not free
from encumber
Cumulative no. of
structures handed
2 335+699 335+719 RCC Slab 8.3 Yes NA3 338+214 338+234 8.3 Yes NA
Bus Bays and Truck Lay Byes Remarks
F F F F F F F F F75 76 77 78 79 80 81 82 83- - - - - - - - -
No. of bus bays on LHS
No. of bus bays on
RHS
bus bays not free
from encumber
ance
cumulative no. of bus
bays handed
over after AD
No. of Truck lay-byes on
LHS
No. of Truck lay-byes on
RHS
Whether handed
over on AD
If not, date of handing
over
Post Award Monitoring of PPP ProjectsCondition Precedent of Concessionaire before Appointed Date
S.No. Name of the Project Project Stretch NH No. State Date of Award (b) Submission of executed Escrow Agreement
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19D D D D D D D D D D D D D E E E E E E1
Reengus-Sikar 11 Rajasthan 31.03.2011 26.04.2011 25.10.2011 26.04.2011
(c) Submission of executed Substitution Agreement (e) Submission of executed Financing Agreements (f) Submission of Financial Package & Model
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37E E E E E E E E E E E E E E E E E E
(h) Submission of legal opinion from the legal counsel
38 39 40 41 42 43 44 45E E E E E E E E
Name of Concessionai
re
Date of Signing of CA
Due Date for Fulfillment of
Condition Precedent
(a) Performance Security(Cl. 4.1.3 (a) & Cl 9.1)
Date of submission
Date of Comments from NHAI
Date of Compliance
by Concessionai
re/ Bnk
Date of acceptance
by NHAI
Date of submission
of draft Escrow
Agreement
Date of Comments
by NHAI
Date of Compliance
by Concessionai
re
Date of acceptance
by NHAI
Date of submission of Executed Agreement
Date of signing of
Agreement
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus Sikar
Expressway Ltd
Date of submission
of draft Substitution Agreement
Date of Comments by NHAI
Date of Compliance by Concessionaire
Date of acceptance
Date of submission of Executed Agreement
Date of signing of
Agreement
Date of submission of
draft Financing Agreement
Date of Comments by
NHAI
Date of Compliance by Concessionaire
Date of acceptance
by NHAI
Date of issue of sanction
letter by lender/
Bank.
Date of approval by
NHAI
Date of Submission of executed
Financing Agreement
Date of submission
of draft Financial
Package & model
Date of Comments
by NHAI
Date of Compliance
by Concessionai
re
Date of acceptance
Date of submission of Financial Package &
model
(g) Submission from Consort. Members for correctness of representations and warranties.
Date of submission
Date of Comments by NHAI
Date of Compliance by Concessionaire
Date of acceptance
Date of submission
Date of Comments
by NHAI
Date of Compliance by Concessionaire
Date of acceptance
Applicable Permits (clause 4.1.3 (d) and Schedule E
Permission for extraction of boulders License for use of explosives License for setting up Batching Plant
46 47 48 49 50 51 52 53 54 55 56 57 58 59 60B B B B B B B B B B B B B B B
08.11.2011 20.12.2011 No 20.12.2011 No 01.08.2011 20.12.2011 No NA NA No 21.07.2011 20.12.2011 No
Applicable Permits (clause 4.1.3 (d) and Schedule E Remarks
Clearance of PCB for setting up Batching Plant
61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79B B B B B B B B B B B B B B B B B B B
19.08.2011 20.12.2011 No 20.12.2011 No 20.12.2011 No 07.06.2012 07.06.2012 No 20.12.2011 No - No 05.03.2112 -
Permission of Village Panchayat & PCB for installation of crushers
Permission for drawing water from river/reservoir
Date of permission granted by
the concerned authority
Date of intimation to NHAI by the Concessionaire
If waived(yes/no)
Date of permission
granted by the concerned authority
Date of intimation to NHAI by the Concessionai
re
If waived(yes/no)
Date of permission
granted by the concerned authority
Date of intimation to NHAI by the
Concessionaire
If waived(yes/no)
Date of permission granted by
the concerned authority
Date of intimation to NHAI by the Concessionai
re
If waived(yes/no)
Date of permission granted by
the concerned authority
Date of intimation to NHAI by the Concessionai
re
If waived(yes/no)
Panchayat 05.07.2011
Polution Control Boaed
03.10.2011
Date of request of
concessionaire for grant of
waiver
Waiver request
granted by Authority (Yes/No)
Appointed Date
Clearance of Village Panchayats and PCB for Asphalt Plant
Permission of Village Panchayat and State Govt. for borrow earth
Permission of State Govt. for cutting of trees
Any other permits or clearances required under Applicable Laws
Date of permission granted by
the concerned authority
Date of intimation to NHAI by the Concessionaire
If waived(yes/no)
Date of permission
granted by the concerned authority
Date of intimation to NHAI by the Concessionai
re
If waived(yes/no)
Date of permission
granted by the concerned authority
Date of intimation to NHAI by the
Concessionaire
If waived(yes/no)
Date of permission granted by
the concerned authority
Date of intimation to NHAI by the Concessionai
re
If waived(yes/no)
Date of permission granted by
the concerned authority
Date of intimation to NHAI by the Concessionai
re
If waived(yes/no)
Panchyat 08.06.2011
Polution Control Board
07.12.2011
20.08.2011
Labour Licence
19.08.2011BOCA Licence - 05.07.2011CAR Policy 14.09.2011Workmen
Compensation Policy
15.07.2011
APPLICABLE PERMITS AS PER CONDITIONS PRECEDENT OF CONCESSIONAIRE - Clause 4.1.3 (e) and Schedule E of Model Concession Agreement (MCA)Fixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement
1 2 3 4 5 6 7 8 9 10
NH No. 11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 26.04.2011
Applicable Permits
Sl. No. Approval Required for Approval Type Date Status/ Remarks
A State Government Permits/ Quarrying Permits:
1 STP 08.11.2011 Obtained
2 Obtained
3 License for explosives from the office of Explosive controller - - -
4 Explosive license for storing diesel Obtained
B Electricity:
1 NA NA NA
2 Permission for electrical connection, if power source is available Obtained
C Water:
1 NA NA -
D Batching Plant:1 License from inspection of factories NA NA
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus Sikar Expressway Ltd.
Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines
Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board
Panchayat
Polution Contol Board
05.07.2011
03.10.2011
Petroleum & Explosives
Departement
01.08.2011
Permission required from State Electricity Board (SEB) for installation of Diesel Generator (DG)
Camp 1Camp 2
16.11.201130.12.2011
If water has to be taken from river/ reservoir, permission to be obtained from State Irrigation Department
2 Obtained
E Asphalt Plant:
1 Obtained
F Borrow Earth:
1 Permission from irrigation department if land taken from irrigation land NA NA NA
2 07.06.2012 Obtained
3 Permission from Local Municipalities and Development Authorities NA NA NA
G Cutting of trees and other environment clearances:
1 Permission from Forest Department and other applicable agencies 07.06.2012 Obtained
H Sewage Lines and Water Mains:
1 Permission from Local Municipalities and Development Authorities NA NA -
NOC consent/Clearance required from village panchayat & State/Central Pollution Control Board/Dept.
21.07.201119.08.2011
Clearance required from village panchayat & State/Central Pollution Control Board
Panchayat
Polution Control Board
08.06.2011
07.12.2011
Permission required from village panchayat and ADM mines for Government & private land
UTILITY SHIFTINGFixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10
11 43.887 RAJASTHAN SIKAR 05.03.2012 31.08.2014 RSEL 26.04.2011
I) Status of shifting of Electric Lines (Nos.)Item type & Description Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11
U/G Lattice Structures 42' long 1073 Nos LHS/RHS 298.075 342.000 820 Nos 31.12.13 253 Nos_
XLPE Cable 11 KV 3 Core 185 sqmm 22.58 Km LHS/RHS 298.075 342.000 21.58 Km 31.12.13 1 Km._
XLPE Cable 33 KV 3 Core 300 sqmm 3.05 Km LHS/RHS 298.075 342.000 2.97 Km 31.12.13 0.08 Km_
XLPE LT Cable 3.5 Core 185 sqmm 14.2 Km LHS/RHS 298.075 342.000 14.2 Km 31.12.13 0 _ _ Work Complete
ACSR Rabbit Conductor 72.0 Km LHS/RHS 298.075 342.000 65.56 Km 31.12.13 6.44 Km_
Name of Concessionaire
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
REENGUS - SIKAR
Total No. to be shifted
Expected shifting date
On availability of ROW
Work held up for ROW
On availability of ROW
Work held up for ROW
On availability of ROW
Work held up for ROW
On availability of ROW
Work held up for ROW
II) Status of shifting of Water Supply Pipelines (Kms.) Item type & Description Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 115 _ _ _ 4 - 1 4
Construction of 125 mm dia single point tube well 6 _ 4 - 2 4
Construction of Hand pump 23 _ _ _ 18 - 5 18_ -
_ _ _ - -
1 _ _ _ _ - _
III) Status of shifting of Irrigation/ Structures (Nos.)Item type & Description Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11- - - - - - - - - - -
IV) Status of Shifting of Other Utilities (Kms. / Nos.)Item type & Description Position (LHS/RHS) Chainage from Chainage To Shifted so far Date shifted Balance to be shifted Cumulative Present Status
1 2 3 4 5 6 7 8 9 10 11- - - - - - - - - - -
S. No. Name of work Received from Letter no. & Date Division
12 13 14 15 16 17 18 19 20 21 22- - - - - - - - - - -
Date of Handing over work order to concessionaire Status of Work Date of Completion Remarks
From (km) To (km)
23 24 25 26 27 28 29 30 31- - - - - - - - -
Total No. to be shifted
Expected shifting date
Construction of 200 mm dia tube well by rotary & DTH rig.
On availability of land
P/L 7 jointing of dist/rising mains - 100mm dia DIK-7 - 150 mm dia DIK -7
17400
1700
17210
1555190145
17210
1555
Road crossing by trench less technology for pipes crossing the road - trench less length - Ducting length
210
840
210 840
210
840
Construction of RCC GLR of 100KL capacity including commissioning
Total No. to be shifted
Expected shifting date
Total No. to be shifted
Expected shifting date
Division Wise Particulars of Utility Shifting Estimates (Electrical / Water supply) – (Within 3 months of signing Concessionaire Agreement)Amount of Estimate I/c S.C./ S. Tax as received from Dept. (lacs)
Approved Amount of estimate by NHAI I/c S.C./S. Tax
(lacs)
Supervision Charges / S.Tax (Rs.)
Approved vide letter no. & date by
HO/RO
Date of Deposition of S.C./ S. Tax
Date of work order from concerned
Dept.
Date of Start of Work
Date of Commencement
Length affected due to the utility to be
shifted
Status of availability of encumbrance free
land
Obligations (Concessionaire) - Article 5.1.4 (b) of Model Concession AgreementForm for Proprietary Rights, Licenses, Agreements and Permissions
Fixed FieldsProject name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10NA NA NA NA NA NA NA NA NA NA
Proprietary Rights, Licenses, Agreements and Permissions related transactional fieldsProprietary rights Agreements
Current Status Agreements required Current Status
11 12 13 14 15 16 17 18 19 20NA NA NA NA NA NA NA NA NA NA
Proprietary Rights, Licenses, Agreements and Permissions related transactional fieldsLicenses Permissions
Licenses required Current Status Permissions required Current Status
21 22 23 24 25 26 27 28 29 30NA NA NA NA NA NA NA NA NA NA
Name of Concessionaire
Proprietary rights required
Date of submission of application(s) for rights
Date of acquiring Proprietary rights
Concerned Govt. Dept. / official involved
Date of submission of application(s) for Agreements
Date of acquiring Agreements
Concerned Govt. Dept. / official involved
Date of submission of application(s) for licenses
Date of acquiring Licenses
Concerned Govt. Dept. / official involved
Date of submission of application(s) for Permissions
Date of acquiring Permits
Concerned Govt. Dept. / official involved
REPRESENTATION AND WARRANTIES AS PER MCA CLAUSE 4.1.3 (e) Fixed Fields
Project name / ID NH No. Length Stretch State PIU
1 2 3 4 5 6 7 8 9 10
Clause Sub clause Key Action Point Action Responsibility Date of Submission
7.1 1 The concessionaire represents and warrants to Authority that Concessionairea Concessionaire
b Concessionaire
c Concessionaire
d Concessionaire
e Concessionaire
f Concessionaire
g Concessionaire
h Concessionaire
i Concessionaire
j Concessionaire
k Concessionaire
l Concessionaire
m Concessionaire
n Concessionaire
o Concessionaire
p Concessionaire
q Concessionaire
Scheduled Start date
Scheduled End date
Name of Concessionaire
Date of agreement
Date of Acceptance by NHAI
It is duly organized and validly existing under the laws of India and has full power and authority to execute and perform its obligations
It has taken all necessary corporate and other actions under applicable laws to authorize the execution and delivery of this agreement.
It has financial standing and the capacity to undertake the project in accordance with the terms of this agreement
Its obligation under this agreement will be legally valid and, binding and enforceable obligations against it in accordance with terms thereofIt is subject to laws of India and irrevocably waives any immunity in any jurisdiction in respect of this agreement.The information furnished in the bid and as updated on or before date the date of this agreement is true.The execution, delivery and performance of this agreement will not conflict with, result in breach of, constitute a default under or accelerate performance required by any of the terms of its Memorandum and Articles of association or any other applicable laws
There are no actions, suits, proceeding, or investigations pending or to its knowledge, threatened against it at law or equity before any court.It has no knowledge of any violation or default w.r.t any order, writ, injunction or decree of any court or any legally binding order of any Gov. instrumentality.
It has complied with applicable laws in all material respects and has not been subject to any fines, penalties, or any other civil or criminal liabilities.
It shall at no time undertake or permit any change in ownership except in accordance with the provision of Clause 5.3The selected bidder and its associates have financial standing and resource to fund the required equity and raise the debt necessary for undertaking and implementing the project.
The selected bidder is duly organized and validly existing under the laws of the jurisdiction of its incorporation All its rights and interests in project highway shall pass to and vest in the Authority on the transfer date free and clear of all liens, claims and encumbrances.
No representation or warranty by it contained herein or in any other document furnished by it to the authority or to any government instrumentality in relation to applicable permits contains or will any untrue or misleading statement of material fact.
No sums in cash or kind have been paid or will be paid by it or on its behalf to any person by way of fees, commissions or otherwise for securing the concession.
All information provided by selected bidder in response to the Request for Qualification and Request for proposal true and accurate in all material respects.
Clause Sub clause Key Action Point Action Responsibility Date of Submission
7.2 1 Represent and Warrant to Concessionaire NHAIa NHAI
b NHAI
c It has financial standing and capacity to perform its obligations NHAId NHAI
e NHAI
f It has complied with applicable laws in all material aspects. NHAIg NHAI
h NHAI
Clause Sub clause Key Action Point Action Responsibility Date of Disclosure
7.3 1 NHAI/Concessionaire
Date of Acceptance by Concessionaire
It has full power and authority to execute, deliver and perform its obligation under this agreement and carry out the transactions contemplated herein.
It has taken all necessary actions under the applicable laws to authorise the execution, delivery and performance of this agreement.
This agreement constitutes a legal, valid, and binding obligation enforceable against it in accordance with terms thereof.It has no knowledge of any violation or default w.r.t any order, writ, injunction or any decree of any court of any legally binding order of any government instrumentality.
It has right, power, and authority to manage and operate the project highway upto the appointed dateIt has good and valid right to the site and has power and authority to grant a license in respect there to the concessionaire.
Action by Authority / Concessionaire
Disclose to other party if any representations or warranties are untrue or incorrect
Legal Opinion by Concessionaire - Conditions Precedent Clause 4.1.3 (h)Fixed Fields
NH No. Length Stretch State PIU
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 16.04.2011
Date of receipt of Legal Opinion by Authority
Name of Concessionaire's Legal Counsel
Project name / ID
Scheduled Start date
Scheduled End date
Four Laning of Reengus to
Sikar Section Km. 298.075
Near Madhopura
Junction to Km. 341.047 (After Sikar Town) Of
NH-11 (Proposed
Chainage Km. 298.075 to Km.
341.962) (Design Length 43.887 Km.) In
The State of Rajasthan on BOT (Annuity)
Project on DBFOT Pattern Under NHDP Phase – III
Mr. Harsh Metha
(Advocate) Udaipur Raj.
Appointment of Independent Engineer by Authority - Article 23 of Model Concession AgreementFixed Fields
S.No. NH No. State Stretch Length PIU
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 11 Rajasthan 333.53cr 43.887 Sikar 17 2.5 14.11.2011 04.11.2011 31.10.2011 -
Appointment of IE
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
G G G G G G G G G G G G G G G
26.07.2011 NA 27.05.2011 30.09.2011 31.10.2011 04.11.2011 31.10.2011 36 Months 14.11.2011
Appointment of IEIE Contract amount Remarks
31 32 33 34 35
G G G G G- 90,938,760.00 - - -
Total Project Cost (Rs. In Cr.)
Concession period (in years)
Construction period (in years)
Scheduled Start date
Scheduled End date
Name of Concessionaire
Date of agreement
Date of Appointment
Date of financial close
Reengus - Sikar
36 Month from commencemen
t
Reengus - Sikar Expressway
Ltd.
Due date of Appointment of
IE (within 90 days from date of Concession Agreement)
Name and date of Appointment of
Government Entity as IE, if applicable
Date of invitation RFP
for IE
Date of receipt of PFP for IE
Date of opening of
tech. proposal
Date of Issue of letter to
Concessionaire for their Consent
Date of receipt of reply from
Concessionaire (within 15 days)
Date of opening of financial
proposal
Date of Issue of LOA
Date of submission of Performance
security
Date of Agreement of IE
Services
Date of issue of letter for
commencement of services
Duration of IE Services
Name of selected IE/Firm
Date of commencement
of Services
URS Scottwilson
India Pvt. Ltd.
Date of completion of
Services
Date of Extension
granted for IE services, if any
Date of invitation of RFP for fresh panel
for Appointment of IE
Monitoring of Construction Article 13 as per MCA
Main Format
Fixed FieldsProject name / ID NH No. Length Stretch (From and To) State PIU TPC (in Crore)
1 2 3 4 5 6 7
11 43.887 Reengus - Sikar Rajasthan Sikar 333.51 Cr
As per clause 12.1 & Schedule-GMilestone-I Milestone-II Milestone-III
Achieved (Date) Achieved (Date) Achieved (Date)
8 9 10 11 12 13 14 15 16 17 18 19 20
A A A A A A A A A A A A A
Annuity 27.06.2012 01.08.201205.03.2012 31.08.2014
31.08.2012 31.07.2012 08.04.2013 23.01.2013 14.12.2013 23.07.2013 NA
Physical Progress (%) Photo & Video Recording - Clause 13.6
Target Achieved
Stretch covered in Video RecordingFrom To
21 22 23 24 25 26 27 28 29A A A A A A A A A- 91.31 17.01.2014 43.887 298.075 341.962 NA
Expenditure (in Rs. Crores) Pre Construction Expenditure Post Construction Expenditure
Utilities Shifting
Four Laning of Reengus to Sikar Section Km. 298.075 Near
Madhopura Junction to Km. 341.047 (After Sikar Town) Of
NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity)
Project on DBFOT Pattern Under NHDP Phase – III
Grant/Premium/
Annuity Payment(cpy)
Name of EPC Contractor
Date of submission of
Work Programme by Concessionaire
Date of approval Work Programmed by
Authority
Scheduled Start date (as per
Contract)
Scheduled Completion date (as per Contract)
Remarks on Milestones not
achieved (If "No" for any of the Milestones I
to III, then reasons thereof)
Scheduled (Date)
Scheduled (Date)
Scheduled (Date)
G. R. Infraprojects
Ltd.
Completed Length during month (DBM: Km / BC : Km)
Cummu. Completed
Length (DBM: Km /BC : Km )
Date of Submission of Video Recording by Concessionaire
Length covered in Video
Recording
Number of sites covered in photos
39.532/ 39.532
100 (As per
Concessionaire's programme)
Up to previous FY
Expenditure during Month
Cumm. Expenditure(CP
Y) Cumm.
ExpenditureLand
AcquisitionCompensatory
aforesaid forestation
Restructure & rehabilitation
Up to previous FY
Expenditure upto previous
Month Expenditure
during MonthCumm.
Expenditure(CPY)
Cumm. Expenditure
30 31 32 33 34 35 36 37 38 39 40 41 42A A A A A A A A A A A A A
133.49 0.6 72.4 205.891 29.87 Cr 8.25 Cr NIL - - - - -
Sub Format (i) - Maintenance of Roads
43 44 45 46 47A A A A A
Good / NA Poor / Available Inferior Better Maintenance carried out
Sub Format (ii) - Safety, QA and Accident ReportingAccident Reporting Inspection - Clause 13.2 Tests for Quality Assurance - Clause 13.3
Casualties if any
48 49 50 51 52 53 54 55A A A A A A A A
weekly 53 20.01.2014 29.01.2014 NIL NIL NIL NIL
Construction Delay - Clause 13.4Construction Delay Status (Y/N) Reason for delay
56 57 58 59 60 61A A A A A A
NIL
Work Suspension - Clause 13.5 Construction Works Extension - Clause 13.5.4
62 63 64 65 66 67 68 69 70 71A A A A A A A A A A
NIL
Elec- 17.29 CrPHED- 3.91 Cr
HT Line-1.66 CrGT-22.86 Cr
Status of road construction 7 days prior to
bid date including video recording/phot
ograph
Condition of the road at time of appointed date including video
recording/photograph
Comparision statement as
per the present road condition vis -a-vis 7 days prior to bid due
date
Road condition during the monthly construction within 7
days prior to the bid due date by concessionare
If any deficiency then action taken by the concessionare to
restore the same within the time limit as per schedule k to bring
7 days prior to bid due date
Frequency of Accidents
Date of Inspection by
Engineer
Date of submission of
Inspection Report
Date of Test for Quality
Assurance
Sample Size taken for Test
Date of Test Report
submission
Cost incurred on Test
Date of submission of report for delay by Concessionaire
Action to be taken by
Date of Corrective
Action
Date of Issue of Notice for delay to Concessionaire
Work Suspension Status (Y/N)
Work suspension due
to Authority (Y/N)
Work suspension due
to Concessionaire
(Y/N)
Date of Issue of notice for
suspension of work by
Authority to concessionaire
Date of Issue of notice by
Concessionaire for remedial actions taken
Cost incurred by
Concessionaire during work suspension
Cost incurred by Authority during work suspension
Construction Works
Extension Status
Date of Issue of Extension for Construction
Works
Term of Extension for Construction
Works
Appointment of Safety Consultant by Authority - Article 18.1.2 of Model Concession AgreementFixed Fields
Project name / ID State PIU NH No. Length Date of agreement Name of I/E
1 2 3 4 5 6 7 8 9 10 11 12
Rajasthan Sikar 11 43.887 26.04.2011 333.51 05.03.2012 31.08.2014 30.06.2014
Appointment of Safety ConsultantDevelopment Stage
Inception Report Draft Safety Audit Report Final Comprehensive Audit Report
13 14 15 16 17 18 19 20 21 22 23 24
N N N N N N N N N N N N
BITS, Pilani Pilani Rajasthan Pro. A. K. Sarkar 20.07.2013 3 Years 1811379.00 - Oct. 2013 - - - -
Construction Stage - Schedule L
Name of Concessionaire
Total Project of Cost in Crore
Schedule Commentement
dateSchedule
Completion dateAnticipated
Completion date
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction
to Km. 341.047 (After Sikar Town) Of NH-11
(Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT
(Annuity) Project on DBFOT Pattern Under
NHDP Phase – III
Reengus-sikar Expressway
Limited
URS Scott Wilson India
P. Ltd.
Name of selected Safety Consultant
Address of Safety Consultant
Contact person / PM
Schedule Commentement
dade
Schedule Completion date
Safety Consultant's
Contract amount in Lakh
Date of Submission as per
Agreement
Actual Date of Submission
Date of Submission as per
Agreement
Actual Date of Submission
Date of Submission as per
Agreement
Actual Date of Submission
One Day Work Shop No. of Remedial Measures suggested Remarks
Short Term Long Term Short Term Long Term
25 26 27 28 29 30 31 32 33 34 35N N N N N N N N N N N
Date of submission of Monthly Progress Report
Quarterly Work Zone Safety Audit Report
Corrective measures taken on no. of Remedial Measures
Date of Final Comprehensive Audit Report
Date of Submission as per
Agreement
Actual Date of Submission
Schedule date of Workshop
Actual date of workshop
Employment of Foreign Nationals by Concessionaire - Article 5.4 of Model Concession AgreementFixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10
NIL
Employment of Foreign NationalName of Personnel Work permit granted ? VISA No. VISA valid till date Remarks
11 12 13 14 15 16 17 18 19 20NIL
Name of Concessionaire
Date of start of Employment
Authority's Regulatory approval
Citizenship country of Personnel
Passport No. of Personnel
Employment valid till date
Obligations (Concessionaire) related to Project Agreements - Article 5.2 of Model Concession AgreementInput Form for Project Agreements Submission by Concessionnaire
Fixed FieldsProject name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Name of Concessionaire Date of agreement
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 26.04.2011
Project AgreementsStatus Status
11 12 13 14 15 16 17 18
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus - Sikar Expressway Ltd.
Date of submission of Draft Project Agreements
Name of Person submitting Draft Project Agreements
Date of submission of True copy of Project Agreements
Name of Person submitting True copy of Project Agreements
True copy of Project Agreements attested by Director of Concessionaire
Right of substitution allowed to Authority in True copy of Agreements
Fixed FieldsProject name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 0.03.2012 31.08.2014 26.04.2011
Change in Scope (for Concessionaire) Clause 16.1.1
11 12 13 14 15 16 17 18 19- - - - - - - - -
Change in Scope (for Concessionaire)Remarks (if any) Status
20 21 22 23 24- - - - -
Change in Scope Notice (to/by Concessionaire) - Article 16 - ( Clause 16.1 )of Model Concession Agreement
Name of Concessionaire
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus - Sikar Expressway Ltd.
Date of submission Change in scope
notice
Name of Authority submitting Change in
scope notice
Impact and effects of Change in scope as per Concessionaire
Date of submission of impact and effects due to Change in
scope to Authority
Change in Scope cost as per Concessionaire
Change in Scope cost as per IE - clause
16.3.1
Date of Acceptance to Change in Scope
Date of issuance of Change in scope
Order by Authority - clause 16.2.3
Party paying for Change in scope cost
Failure to complete Construction Works
under Change of scope
Advance payment amount received by Concessionaire for
Change in scope clause-16.4.2
Damages amount paid to Authority for failure to complete Construction Works
under Change of scope
Performance SecurityFixed Fields
Project name / ID NH No. Length Stretch State PIU TPC
1 2 3 4 5 6 7 8 9
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014
(a) Performance Security (Cl. 4.1.3 (a) & Cl 9.1)Date of submission PBG No. Date of PBG Validity of BG, till date
10 11 12 13 14 15 1614.10.2011 Not Available 1097311BG0001804 13.10.2011 12.04.2013
Name of Concessionaire Amount of PBG Issuing Bank Status
17 18 19 20 21 22 2326.04.2011 Rs. 16.68 Crores SBBJ Udaipur NIL
Performance Security transactionsAction Date Status Remarks/Issues
Provided 14.10.2011 Rs. 16.68 Crores NIL
Invoked NA NA NA NAEncashed NA NA NA NATerminated NA NA NA NAReleased NA NA NA NAAppropriated (partial) NA NA NA NAReplenished NA NA NA NAReturned NA NA NA NAI
Scheduled Start date
Scheduled End date
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Rs. 227.51 Crores
Date of seeking confirmation of issue of PBG from Bank By NHAI
Date of Confirmation by issuing Bank
Date of acceptance by NHAI
Date of Concession Agreement
Branch and address of Bank
Remarks (if any)
Reengus Sikar Expressway Ltd.
SBBJ, 1st floor Chetak Circle Udaipur Rajasthan
Expired and not requird to be extended as project progress has already expended 20% of TPC (as per Para 8 of Schedule F of CA).
Amount (where applicable)
Expired and not requird to be extended as project progress has already expended 20% of TPC (as per Para 8 of Schedule F of CA).
Form for EscrowFixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date
1 2 3 4 5 6 7 8
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014
Name of Concessionaire Escrow Bank Name
9 10 11 12 13 14 15 16 17 18I I I I I I I I I IReengus - Sikar Expressway Limited 13.10.2011 Current Account 13.10.2011 13.10.2011 61131132897 Vinod Agarwal
(Drop down) List
Mandatory
At Financial Closer Mandatory SBBJAt Substitution On need basisAt COD On need basisAt Refinancing On need basisAny other reason On need basis
Status Remarks
19 20 21 22 23I I I I I- - - - -
Escrow Account OperationAction Date Amount (if applicable) Action by Status Remarks/Issues
23.12.2011
Retention of reservesDeposits & ReceiptsPayments from accountAppropriation after terminationI I I I I I
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Escrow Account creation due date
Type of Escrow Account
Date of Escrow Agreement
Actual Escrow Account creation date
Escrow Bank Account No.
Branch and address of Bank
List of signatories to the Escrow Account
Names of Lenders
SBBJ, - Hiran Magari, Sector - 11, Udaipur
SBBJ, - Hiran Magari, Sector - 11, Udaipur
SBBJ & Vijaya Bank
At the time of signing Concessionaire Agreement
Name of Lender(s) - Non Mandatory
Extended Escrow Account creation date
Monthly Escrow Account Statement Report submitted to Authority by Financial Consultant ?
Monthly Escrow Account Statement Report in order ?
Procure execution of Escrow Agreement
Obligations (Concessionaire) Notify Change in Ownership - Article 5.3 of Model Concession AgreementFixed Fields
Project Name/ID NH NO. Length Stretch State PIU Scheduled End date
1 2 3 4 5 6 7 8 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 31.08.2014 26.04.2011
Original Shareholding Pattern Revised Shareholding Pattern Proposed Revised Shareholding Pattern Approved% of Shares held % of Shares held % of Shares held
11 12 13 14 15 16 17 18 19 20 21 22 23 24I I I I I I I I I I I I I I
Name %
4999400 99.99
100 0.002
100 0.002
Mahendra Agarwal 100 0.002
Ajendra Agarwal 100 0.002Purshottam Agarwal 100 0.002
D. Dilly Babu 100 0.002
Name of the Selected Bidder
Name of the Concessionaire
Name of Concessionaire
Date of agreement
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
G R Infraprojects Limited
Reengus Sikar Expressway Limited
Reengus Sikar Expressway Limited
Name of the Shareholders in SPV (I)
Date of Submission of Request letter of Change in Ownership
Date of Approval of
Lender(s)(if required)
Date of Approval of
revised Shareholding
pattern by
Status / Remarks (if
any)Shareholders' names
Face value of the shares held
Proposed Shareholders' names
Face value of the shares held
Approved Shareholders' names
Face value of the shares held
Face Value of Shares
G R Infraprojects LimitedDevki Nandan AgarwalVinod Kumar Agarwal
Payment of Damages to Authority - Various Articles of Model Concession AgreementFixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 26.04.2011
Failure to Achieve Milestone(MILESTONES ACHIEVED) AS SCHEDULED)Date of payment
11 12 13 14 15 16 17J J J J J J J
MILE Stone ACHIEVED AS SCHEDULED
(NO DELAY) Delay in COD AS NO DATEReasons for delay in COD Date of payment Actual date of COD
18 19 20 21 22 23 24 25 26 27J J J J J J J J J J
NO DELAY, AS ON DATE
Name of Concessionaire
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus - Sikar Expressway Ltd.
Name of milestone failure with contract provision
Reasons for failure to achieve milestone (works)
Amount paid to Authority
Pending amount to be paid to Authority
Date of demand sent for debit to Escrow Account
Interest on damages due to delay in payment (if any)
No. of days delayed with contract provisions
Amount paid to Authority
Pending amount to be paid to Authority
Date of demand sent for debit to Escrow Account
Expected Date of Project Completion
Expected Date of Project Completion
Interest on damages due to delay in payment (if any)
Failure to Achieve Financial Close (FINANACIAL CLOSE ACHIEVED) AS SCHEDULEDActual date of Financial Close Date of payment
28 29 30 31 32 33 34 35K K K K K K K J
ACHIEVED AS SCHEDULED
Non-Completion of Punch ListActual date of Completion Punch List items
36 37 38 39 40 41 42 43 44 45J J J J J J J J J J31.08.2014 NA
Non-Completion of Punch ListDate of payment Date of COD
46 47 48 49 50 51J J J J J J
- - - - - -
Failure to Rectify DefectRectification demand date Cure Period Amount paid to Authority Date of payment
52 53 54 55 56 57 58 59J J J J J J J J
- - - - - - - -
Material DefaultAmount paid to Authority Date of payment
60 61 62 63 64 65
Scheduled date of Financial Close
Number of days delayed
Reasons for failure to achieve Financial Close
Amount paid to Authority
Pending amount to be paid to Authority
Interest on damages due to delay in payment (if any)
Scheduled date of Completion of COD
Number of days delayed
Value of Punch List items
After 120 days extension, Punch List items not completed
Reasons for not completing Punch List items
Value of Punch List items not completed after 120 days
Penalty applied for not completing Punch List items
Amount paid to Authority
Date of demand sent for debit to Escrow Account
Pending amount to be paid to Authority
Project Completion Date
Interest on damages due to delay in payment (if any)
Reasons for failure to rectify any defect or deficiency
Date of demand sent for debit to Escrow Account
Pending amount to be paid to Authority
Interest on damages due to delay in payment (if any)
Reasons for failure material default
Date of demand sent for debit to Escrow Account
Pending amount to be paid to Authority
Interest on damages due to delay in payment (if any)
J J J J J J
- - - - - -
Conditions Precedent of Substitution Agreement (Concessionaire) - Article 4.1.3 (c) of Model Concession AgreementInput Form for Substitution Agreement
Fixed FieldsProject name / ID NH No. Length Stretch State PIU Scheduled End date
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 26.04.2011
Substitution Agreement Related FieldsDate of Execution Status Remarks
11 12 13 14 15 16 17L L L L L L L
Scheduled Start date
Name of Concessionaire
Date of Concession agreement
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
The Concession Agreement was signed on 26.04.2011 and the as per scheduled Start Date was 22.10.2011. But the project was actually started i.e. appointed date is
05.03.2012. The delay in notifying the
appointed date is due to delay in
Environmental Clearance
910 days from the date of
appointment i.e. 31.08.2014
Reengus - Sikar Expressway Ltd.
Names of Sr. Lenders
Name of Lenders' Representative
Branch and address of Lenders
Signatories to the Substitution Agreement
Format for Financial Close
Fixed FieldsProject Name/ID NH No. Length Stretch State PIU
1 2 3 4 5 6 7 8 9 10 11
11 43.887 Reengus - Sikar Rajasthan Sikar 13.04.2011 26.04.2011 13.10.2011
Scheduled COD
12 13 14 15 16 17 18 19
M M M M M M M M
14.10.2011 16.06.2011 22.10.2011 19.10.2011 05.03.2012 31.08.2014 22.10.2011
Name of the Selected Bidder
Name of the Concessionaire
Date of Formation of Company (SPV) by Concessionaire
Date of signing of the CA
Date of opening of Escrow Account
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
G R Infraprojects Limited
Reengus Sikar Expressway Limited
Date of Submission of Draft Financing Agreements (received by NHAI)
Date of submission of Banks' Sanction letter
Scheduled date of Financial Close (Normal)
Date of Financial Close with Extension
Date of Financial Close with Cost
Scheduled Appointed Date
Scheduled date prior to which Performance Security to be submitted
19.10.2011Rs. 227.51 Crores
Current Status) Remarks
20 21 23 24 25 26 27 28 29 30
M M M M M M M M M M
List of Documents
S. No. Date of Review given by FC
1
2
3
4
5 Deed of Hypothecation
6 Indenture of Mortgage
7 Mortgage Deed
8
9
10
11
12 Accession Deed
13 Financial Package
14 EPC Agreement
List of Documents submitted, along with Declaration that these constitute the complete set of Project Documents including Financing Documents by Concessionaire
Date of final Legal scrutiny of draft documents and comments by Authority
Date of acceptance of comments by Concessionaire
Signing of the Loan / Project Documents including Financing Documents by the Concessionaire
Date of submission by the Concessionaire of three sets of Project Documents including Financing Documents duly executed, along with soft copy of Financial Model (if applicable)
Either an item by item verification by NHAI of satisfaction of all Pre-Sanction Conditions and Pre-Disbursement Conditions of Lenders,ORCertification from Lenders to be obtained by Concessionaire confirming that only Post-Disbursement conditions are required to be completed,
Date of execution of Substitution Agreement
Date of declaration of Financial Close
Name of the Agreement
Date of submission
Date of forwarding to Financial Consultant (FC)
Date of forwarding FC's Comments to Concessionaire
Remarks / Current Status
Senior Common Loan AgreementSubordinate Common Loan Agreement
Security Trustee AgreementLenders' Agent Agreement
Supplementary Escrow AgreementInter Creditor AgreementShare Pledge AgreementSponsors' Support Agreement
15 Any other document
M M M M M M M
RefinancingFinancing Plan
31 32 33 34 35 36 37 38
M M M M M M M M
Type of Instrument Amount % age
Debt 171 Cr 75.16
Equity 56.51 Cr 24.84
Grant
Sub Debt
Zero Interest Loan
Semi Anuity 18.77 Cr
Total 100%
Date of submission of refinancing documents (if any)
Date of final Legal scrutiny of draft documents and comments by Authority
Date of acceptance of comments by Concessionaire
Signing of the Loan / Project Documents including Financing Documents by the Concessionaire
Date of submission by the Concessionaire of three sets of Re-Financing Documents duly executed, along with soft copy of Financial Model (if applicable)
Date of execution of revised Escrow Account
Date of execution / submission of revised Substitution Agreements
Form for Commercial Opening Date – Article 15.1 of Model Concession AgreementFixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 26.04.2011
COD (Concessionaire)Appointed Date Status
11 12 13 14 15 16 17 18 19
05.03.2012 YES 39.532 Not yet issued NA Not yet achieved Not Applicable
Appointed DateFixed Fields
Project Name/ID NH NO. Length Stretch State PIU
1 2 3 4 5 6 7 8 9 10
Name of Concessionaire
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus - Sikar Expressway Ltd.
Conditions Precedent achieved ?
Total completed length of the Project
Date of issuance of Provisional Certificate
Date of issuance of Completion Certificate
COD extended to Date (if applicable)
Date of achievement of COD
Amount of Damages paid to Authority (if any)
Not yet issued. Under process
Work in 39.532 Km. completed in
available work front. Work in progress in remaining length to
the extent land is made available.
Name of the Selected Bidder
Name of the Concessionaire
Date of signing of the CA
Schedule Appointed Date
11 43.887 Reengus - Sikar Rajasthan Sikar 26.04.2011 05.03.2012
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
G R Infraprojects Limited
Reengus - Sikar Expressway Ltd.
Appointed DateConcessionaire's Obligation
11 12 13 14 15 16 17
14.10.2011 14.10.2011 26.11.2011 14.10.2011 22.10.2011 19.10.2011
Total Project Cost (TPC) Details [As per MCA]Fixed Fields
Project Name/ID NH NO. Length Stretch State PIU Scheduled date of FC
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 26.04.2011 22.10.2011
Lenders' TPC at the time of Financial CloseEquity Debt Grant
11 12 13 14 15 16 17Semi Anuuity - 18.77 Cr Rs. 171.00 Crores Rs. 56.51 Crore Rs. 331.51 Crores Rs. 56.51 Crores Rs. 171.00 Crores NA
Lenders' TPC at the time of Novation TPC at the time of Project CompletionEquity Debt Grant Equity Debt18 19 20 21 22Rs. 56.51 Crores Rs. 171.00 Crores Semi Anuuity - 18.77 Cr - -
Date of Submission of PS
Date of Submission of Executed of Executed & Substitution Agreement
Date of procurement of Applicable permits
Date of submission of Financial Package
Scheduled Date of Submission of Financial Close
Actual Date of Submission of Financial Close
Current Status / Remarks
All requirements are complied in line with CA
Name of the Selected Bidder
Name of the Concessionaire
Date of signing of the CA
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
G R Infraprojects Limited
Reengus - Sikar Expressway Ltd.
NHAI' Grant (if there is any)
Debt portion in TPC as per CA
Equity portion in TPC as per CA
Authority's TPC at the time of RFP/Bid (in Crores)
Events of Project related to Force Majeure and Termination (PART V)Fixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 26.04.2011
Appointed Date COD Concession Period
11 12 13 14 15 16 17 18 19 2005.03.2012 Not yet Issued 17 Years
Date of Termination
21 22 23 24 25 26 27
Name of Concessionaire
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus - Sikar Expressway Ltd.
Date of notice for Force Majeure
Date of occurrence of Force Majeure
Effect of Force Majeure on the concession e.g. change in AD, COD, CP
Date of Breach or default by Concessionaire/Authority
Date of Notice for Suspension
Date of Suspension of Concessionaire
Date of substitution of Concessionaire by lender if any
Date of Revocation of Suspension
Date of Notice by Concessionaire for revoking Suspension and issuing termination Notice
Date of Notice for Termination
Date of Cure after termination
Date of Transfer of project
Last date of defect libaility after termination
Operations & Maintenance (O&M) - Articles 17, 19 of Model Concession Agreement (MCA)Fixed Fields
Project name / ID NH No. Length Stretch State PIU Scheduled Start date Scheduled End date Date of agreement
1 2 3 4 5 6 7 8 9 10
11 43.887 Reengus - Sikar Rajasthan Sikar 05.03.2012 31.08.2014 26.04.2011
Breach / Blockade Damages17.2, Schedule-K (a)(i) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
11 12 13 14 15 16 17 18 19A A A A A A A A A
Roughness Damages17.2, Schedule-K (a) (ii) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
20 21 22 23 24 25 26 27 28A A A A A A A A A
Pot Holes Damages17.2, Schedule-K (a)(iii) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
29 30 31 32 33 34 35 36 37A A A A A A A A A
Cracking in more than 5% of road surface in a stretch of 1 km Damages17.2, Schedule-K (a)(iv) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
Name of Concessionaire
Four Laning of Reengus to Sikar Section Km. 298.075 Near Madhopura Junction to Km. 341.047 (After Sikar Town) Of NH-11 (Proposed Chainage Km. 298.075 to Km. 341.962) (Design Length 43.887 Km.) In The State of Rajasthan on BOT (Annuity) Project on DBFOT Pattern Under NHDP Phase – III
Reengus - Sikar Expressway Ltd.
Date & Time of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date & Time of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Not Applicable
O&M Stage yet to
start
38 39 40 41 42 43 44 45 46A A A A A A A A A
Rutting exceeding 10 mm in more than 2% of road surface in a stretch of 1 km Damages17.2, Schedule-K (a)(v) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
47 48 49 50 51 52 53 54 55A A A A A A A A A
Bleeding/skidding Damages17.2, Schedule-K (a)(vi) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
56 57 58 59 60 61 62 63 64A A A A A A A A A
Ravelling/Stripping of bitumen surface exceeding 10 sq m Damages
17.2, Schedule-K (a)(vii) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
65 66 67 68 69 70 71 72 73A A A A A A A A A
Damage to pavement edges exceeding 10 cm Damages
17.2, Schedule-K (a)(viii) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
74 75 76 77 78 79 80 81 82A A A A A A A A A
Removal of debris/dust 17.2, Schedule-K (a)(ix) Damages Remarks (if any)
Status / Remarks Damages to be paid by Concessionaire
Amount Paid Unpaid
83 84 85 86 87 88 89 90 91A A A A A A A A A
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with
Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Hard/earth shoulders, side slopes, drains and culverts 17.2, Schedule-K (b)
Variation by more than 2% in the prescribed slope of camber/cross fall Damages
17.2, Schedule-K (b)(i) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
91 92 93 94 95 96 97 98 99A A A A A A A A A
Edge drop at shoulders exceeding 40 mm Damages17.2, Schedule-K (b)(ii) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
100 101 102 103 104 105 106 107 108A A A A A A A A A
Variation by more than 15% in the prescribed side (embankment) slopes Damages17.2, Schedule-K (b)(iii) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
109 110 111 112 113 114 115 116 117A A A A A A A A A
Rain cuts/gullies in slope Damages17.2, Schedule-K (b)(iv) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
118 119 120 121 122 123 124 125 126A A A A A A A A A
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Damage to or silting of culverts and side drains during and immediately preceding the rainy season Damages
17.2, Schedule-K (b)(v) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
127 128 129 130 131 132 133 134 135A A A A A A A A A
Desilting of drains in urban/semi-urban areas Damages
17.2, Schedule-K (b)(vi) Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
136 137 138 139 140 141 142 143 144A A A A A A A A A
Damages
Damage to shape or position; poor visibility or loss of retro-reflectivity Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
145 146 147 148 149 150 151 152 153A A A A A A A A A
Street lighting and telecom (ATMS) Damages
Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
154 155 156 157 158 159 160 161 162A A A A A A A A A
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Road side furniture including road signs and pavement marking 17.2, Schedule-K (c)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Any major failure of the system17.2, Schedule-K (d)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Street lighting and telecom (ATMS) Damages
Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
163 164 165 166 167 168 169 170 171A A A A A A A A A
Trees and plantation 17.2, Schedule-K (e)(i) Damages
Obstruction in a minimum head-room of 5 m above carriageway or obstruction in visibility of road signs Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
172 173 174 175 176 177 178 179 180A A A A A A A A A
Trees and plantation 17.2, Schedule-K (e)(ii) Damages
Deterioration in health of trees and bushes Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
181 182 183 184 185 186 187 188 189A A A A A A A A A
Trees and plantation 17.2, Schedule-K (e)(iii) DamagesReplacement of trees and bushes Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
190 191 192 193 194 195 196 197 198A A A A A A A A A
Faults and minor failures17.2, Schedule-K (d)(ii)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Trees and plantation 17.2, Schedule-K (e)(iv) DamagesRemoval of vegetation affecting sight line and road structures/Cleaning of median Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
199 200 201 202 203 204 205 206 207A A A A A A A A A
Rest areas 17.2, Schedule-K (f)(i) DamagesCleaning of toilets Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
208 209 210 211 212 213 214 215 216A A A A A A A A A
Rest areas 17.2, Schedule-K (f)(ii) DamagesDefects in electrical, water and sanitary installations Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
217 218 219 220 221 222 223 224 225A A A A A A A A A
Toll plaza[s] 17.2, Schedule-K (g)(i) DamagesFailure of toll collection equipment or lighting Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
226 227 228 229 230 231 232 233 234A A A A A A A A A
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Date of recording/reporting
Location/Chainage of Plaza
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Toll plaza[s] 17.2, Schedule-K (g)(ii) DamagesDamage to toll plaza Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
235 236 237 238 239 240 241 242 243A A A A A A A A A
Damages
Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
244 245 246 247 248 249 250 251 252A A A A A A A A A
DamagesCracks - Temporary measures Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
253 254 255 256 257 258 259 260 261A A A A A A A A A
Damages
Cracks - Permanent measures Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
262 263 264 265 266 267 268 269 270A A A A A A A A A
Date of recording/reporting
Location/Chainage of Plaza
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Other Project Facilities and Approach roads17.2, Schedule-K (h)(i)
Damage or deterioration in Approach Roads, pedestrian facilities, truck lay-bays, bus-bays, bus- shelters, cattle crossings, Traffic Aid Posts, Medical Aid Posts and other works
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Superstructure of bridges17.2, Schedule-K, Bridges - (a)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Superstructure of bridges17.2, Schedule-K, Bridges - (a)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Damages
Spalling/scaling Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
271 272 273 274 275 276 277 278 279A A A A A A A A A
Damages
Scouring and/or cavitation Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
280 281 282 283 284 285 286 287 288A A A A A A A A A
Damages
Cracks and damages including settlement and tilting Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
289 290 291 292 293 294 295 296 297A A A A A A A A A
Damages
Deformation Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
298 299 300 301 302 303 304 305 306A A A A A A A A A
Superstructure of bridges17.2, Schedule-K, Bridges - (a)(ii)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Foundations of bridges17.2, Schedule-K, Bridges - (b)(i)
Date of recording/reporting
Exact Location/Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Piers, abutments, return walls and wing walls of bridges 17.2, Schedule-K, Bridges - (c)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Bearings (metallic) of bridges17.2, Schedule-K, Bridges - (d)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
DamagesLoosening and malfunctioning of joints Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
307 308 309 310 311 312 313 314 315A A A A A A A A A
Damages
Deforming of pads in elastomeric bearings Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
316 317 318 319 320 321 322 323 324A A A A A A A A A
Damages
Gathering of dirt in bearings and joints; or clogging of spouts, weep holes and vent-holes Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
325 326 327 328 329 330 331 332 333A A A A A A A A A
Damages
Damage or deterioration in parapets and handrails Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
334 335 336 337 338 339 340 341 342A A A A A A A A A
Joints in bridges17.2, Schedule-K, Bridges - (e)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(i)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(ii)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(iii)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of
repair / rectification
O&M Stage yet to
Start
Damages
Rain-cuts or erosion of banks of the side slopes of approaches Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
343 344 345 346 347 348 349 350 351A A A A A A A A A
Damages
Damage to wearing coat Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
352 353 354 355 356 357 358 359 360A A A A A A A A A
Damages
Damage or deterioration in approach slabs, pitching, apron, toes, floor or guide bunds Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
361 362 363 364 365 366 367 368 369A A A A A A A A A
Damages
Growth of vegetation affecting the structure or obstructing the waterway Damages to be paid by Concessionaire Remarks (if any)
Status / Remarks Amount Paid Unpaid
370 371 372 373 374 375 376 377 378A A A A A A A A A
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(iv)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of repair / rectification
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(v)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of repair / rectification
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(vi)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of repair / rectification
Other items relating to bridges17.2, Schedule-K, Bridges - (f)(vii)
Date of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of completion of repair / rectification
O&M Stage yet to
Start
Maintenance Manual DamagesClause 17.3 Damages to be paid by Concessionaire Remarks (if any)
Status/Remarks Amount Paid Unpaid
379 380 381 382 383 384 385 386 387 388 389A A A A A A A A A A A- - - - 13.11.2013 YES Under review of IE - - - -
Maintenance Programme DamagesClause 17.4 Damages to be paid by Concessionaire Remarks (if any)
Review By IE Suggestion Status / Remarks Amount Paid Unpaid
390 391 392 393 394 395 396 397 398 399 400A A A A A A A A A A A- - - - - - - - - - -
Maintenance Programme shall include DamagesClause 17.4.1 Damages to be paid by Concessionaire Remarks (if any)
Amount Paid Unpaid
401 402 403 404 405 406 407 408 409 410 411A A A A A A A A A A A- - - - - - - - - - -
Date of submission of 5 copies of Maintenance Manual to Authority
Whether IE Consulted ?
Y/N
If Yes,Date of observation of IE
Time Allowed for rectification
Date of submission of 2 copies of Maintenance Manual to IE
Compliance with Specifications and Standards, Maintenance Requirements, Safety Requirements and Good Industry Practices
Date of submission of Maintenance Programme to IE
Time Allowed for rectification
Date of submission of Maintenance Programme to Authority
Date of Revision after 3 Years
Includes preventive maintenance schedule?
[Y/N]
Includes arrangements and procedures for carrying out urgent repairs?
[Y/N]
Includes criteria to be adopted for deciding maintenance needs?
[Y/N]
Includes intervals and procedures for carrying out inspection of all elements of the Project Highway?
[Y/N]
Includes intervals at which the Concessionaire shall carry out periodic maintenance?
[Y/N]
Includes arrangements and procedures for carrying out safety related measures?
[Y/N]
Includes intervals for major maintenance works and the scope thereof?
[Y/N]
Safety, vehicle breakdowns and accidents
Clause 17.5Detailed Reason
412 413 414 415 416 417 418 419 420 421 422A A A A A A A A A A A
DamagesDamages to be paid by Concessionaire Remarks (if any)
Amount Paid Unpaid423 424 425 426A A A A
Advertising on the Site Clause 17.15 Damages
Date of Removal Damages to be paid by Concessionaire Remarks (if any)
Amount Paid Unpaid
427 428 429 430 431 432 433 434 435 436A A A A A A A A A A
Monitoring O&MArticle 19
for (Month)
437 438 439 440 441 442A A A A A A
O&M Inspection Report and Remedial measuresClause 19.2, 19.3, 19.4
Cost of Such Items Status / Remarks Date Date of Rectification If yes, Then Status
Date & Time of recording/reporting
Exact Location (LHS/RHS) with Chainage
Time Allowed for rectification
Date & Time of remedial action
Date & Time of restoration
Status (dropdown)1. Rectification Done2. Rectification Partially Done3. Rectification Not Done
Any Other Information
Does it follow the relevant operating procedures including the setting up of temporary traffic cones and lights, and removal of obstruction and debris without delay?
Is maintaining and operating a round-the-clock vehicle rescue post with one mobile crane having the capacity to lift a truck with a Gross Vehicle Weight of 30,000 KG
Is maintaining and operating requisite number of such vehicle rescue posts, with one crane each, and such posts are located at each of the Toll Plaza(s)
Safety, vehicle breakdowns and accidentsClause 17.5
No. of advertisements Non compliant to norms
Exact Location (LHS/RHS) with Chainage
Date of Notice to Concessionaire for Removal
Nature of advertisement
Time Allowed for rectification
Date of submission of Monthly Status Report by Concessionaire
Date of Inspection by IE
Date of Submission of Inspection report by IE
Conducted tests as per IE and MCA ?
Carried out remedial measures as per Maintenance Requirements/Manual / Programme ?
Items identified for Risk & Cost
Defect identified in O&M Inspection Report
If not Completed within 15 Days
Status of Rectification
Whether further tests proposed by IE
NIL
443 444 445 446 447 448 449 450 451 452A A A A A A A A A A
Monthly Fee Statement Reports of unusual occurrence
Clause 19.5 Clause 19.6Month Reported
453 454 455 456A A A A
Force Majeure
Date of occurrence
Status
Financial Impact Party Impacted
457 458 459 460 461A A A A A
462 463 464A A A
New revised fee
465 466 467 468 469 470 471 472 473 474A A A A A A A A A A
475 476A A
Date of furnishing Monthly Fee Statement
Date of submission of Reports of unusual occurrences
Brief description of unusual occurrences reported
Type of Force Majeure
Nature of hindrance due to Force Majeure
Fee Collection and its Rules
Date of approval of Fee Notification by Authority
Collection of Fee as per MCA ?
Date of Issue of Fee Notification
Appropriation of Fee as per MCA ?
Date of revision of fee
Fee exemption for local traffic ?
Free use of service lane ?
Re-appropriation of excess fee as per MCA ?
Name of fee collector and user fee list should be displayed at the collection point ?
Sufficient change / coins should be available with the toll collector ?
Addition fee for overloaded vehicles ?
Overloading allowed to pass through the toll after paying the over charged fee ?
Date of submission of Traffic Census
Bi-annual or annual traffic survey conducted by the Field Authority ?
NIL
MiscellaneousAuthority
Setting up of Safety Fund (Cl. 18.2) Date of Safety Fund set up
1 2
Disbursing Grant (Cls. 25.2 and 25.3) Recommended by IE ? Equity met ?
1 2 3 4 5 6
1 2
1 2 3
1 2 3 4
Compensation paid (INR) Status (if any)
1 2 3 4 5
1 2 3 4
1 2 3
Status (if any)
1 2 3 4 5 6 7
Termination for failure to complete four-laning within the specified period (Cl. 12.4.3)
Safety Fund set up as per Concessionaire Agreement ?
Date of Grant request from Concessionaire
Financing plan approved by Authority ?
Date of Financing plan approval by Authority
As per Concessionaire Agreement
Issuing notice for a Force Majeure Event (Cls. 34.5.1 and 34.5.2)
Need to issue notice for a Force Majeure Event
Date of issuing notice for a Force Majeure Event
Taking action for Force Majeure after Appointed Date (Cl. 34.6.2)
Allocation of costs arising out of Force Majeure (Cl. 34.7)
Date of issue notice for a Force Majeure Event
Allocation of Cost done as per Concessionaire Agreement?
Costs arising out of Force Majeure (INR)
Informing Concessionaire regarding intention to terminate (Cl. 34.8)
Has termination been approved by Authority ?
Informed Concessionaire regarding intention to terminate ?
Date of informing Concessionaire regarding intention to terminate
Approved / Expected date of termination
Termination Payment for Force Majeure(Cl. 34.9)
Compensating for Additional Tollway/ Competing Road (Cl. 35.4)
Compensation as per Concessionaire Agreement ?
Compensation recommended by IE ?
Escrow A/C utilized for payments ?
Informing Concessionaire of intent to terminate (Cl. 34.8)
Informing Lenders of the intent to Terminate (Cl. 37.1.3)
Has termination been approved by Authority ?
Informed Lenders regarding intention to terminate ?
Date of informing Lenders regarding intention to terminate
Approved / Expected date of termination
Termination Payment for Authority Default (Cls. 37.3.2 and 37.3.3)
Issuing a Divestment Certificate (Cl. 38.3)
Divestment Certificate approved by IE
Divestment Certificate approved by Authority
Date of issue of Divestment Certificate
Adjusting the costs arising out of Change in Law (Cl. 41.1)
Change in Law as per Concessionaire Agreement ?
Demand for costs arising out of Change in Law raised by Concessionaire ?
Date of demand from Concessionaire
Cost adjustment recommended by IE ?
Costs to be adjusted (INR)
Escrow A/C utilized for payments ?
1
Complying with General Indemnity requirements (Cl. 42.1)
Indemnification as per Concessionaire Agreement ?
List of such disputes Status of each dispute
1 2 3 4
Status / Remarks (if any)
1 2 3 4
Remarks (if any)
1 2
Remarks (if any)
1 2
ConcessionaireAmount credited (INR) Date of credit
1 2 3 4 5
Maintaining books of accounts (Cl. 33.1)
1 2
Tenure for Statutory Auditors
1 2 3
Amicably resolving disputes (Cl. 44.1 and 44.2)
Any pending disputes not amicably resolved ?
Contact Person in Authority for dispute
Any other observation, complaint or suggestion
Observation, complaint or suggestion received
Date of observation, complaint or suggestion
Action / Response on the observation, complaint or suggestion
Suspension upon occurrence of Concessionaire Default (Cl. 36.1)
Termination Payment for a Concessionaire Default (Cl. 37.3.1)
Termination Payment for Authority Default (Cls. 37.3.2 and 37.3.3)
Exercising rights and obligations upon Termination (Cl. 37.4)
Have rights and obligations been exercised by Authority upon Termination ?
Is the complaint redressal mechanism working satisfactorily (Cl. 46.2)
Is complaint redressal mechanism working ?
Crediting the balance to the Safety Fund (Cl. 16.3.2)
Credit due to excess of Traffic related revenue collections or differential from change in Scope of work payments
Credited the balance to the Safety Fund ?
Status / Remarks (if any)
Effecting and maintaining insurance cover (Cls. 32.1 and 32.2)
Depositing and using the proceeds from insurance claims (Cl. 32.7)
Have book of Accounts been maintained as per Auditor's Report ?
Date of receipt by NHAI of Auditor's Report ?
Appointing Statutory Auditors (Cl. 33.2.1)
Date of Appointment of Statutory Auditors
Name of Firm/Persons as Statutory Auditors
1
1 2 3
Costs to be adjusted (INR) Status (if any)
1 2 3 4 5
1
1
List of such disputes Status of each dispute
1 2 3 4
Remarks (if any)
1 2 3
1
Resolution status of Complaints
1 2 3
Status / Remarks (if any)
1 2 3 4
Issuing notice for Force Majeure Event (Cls. 34.5.1and 34.5.2)
Informing the Authority regarding intent to Terminate (Cl. 34.8)
Complying with the Divestment Requirements (Cl. 38.1)
Do Divestment requirements comply as per Concessionaire Agreement ?
Paying all costs incidental to divestment (Cl. 38.5)
Costs incidental to divestmentapproved by IE ?
Date of payment for all costs incidental to divestment
Amount paid to Authority for costs incidental to divestment
Paying to the Authority the benefits arising out of Change in Law (Cl. 41.2)
Change in Law as per Concessionaire Agreement ?
Cost adjustment recommended by IE ?
Escrow A/C utilized for payments ?
Complying with General Indemnity requirements (Cls. 42.1 and 42.2)
Do Indemnity requirements comply as per Concessionaire Agreement ?
Allowing free access to the Site at all times to the Authority (Cl. 43.2)
Is free access allowed to the Site at all times to the Authority ?
Amicably resolving disputes (Cl. 44.1and 44.2)
Any pending disputes not amicably resolved ?
Contact Person in Authority for dispute
Availability of Specified Documents and documents for inspection (Cls. 45.1 and 45.2)
Is there availability of Specified Documents and documents for inspection ?
List of unavailable Specified Documents and documents for inspection
Maintaining public relations office and Complaints Register (Cl. 46.1)
Have public relations office and Complaints Register been maintained as per Concessionaire Agreement
Inspecting Complaints Register every day and taking prompt and reasonable action (Cl. 46.2)
Has Complaints Register been inspected every day ?
Have prompt and reasonable action been taken ?
Any other observation, complaint or suggestion
Observation, complaint or suggestion received
Date of observation, complaint or suggestion
Action / Response on the observation, complaint or suggestion