nikon metrology environmental management system manual · pdf filenikon metrology i vision...
TRANSCRIPT
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 2 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
Approval
Approved By Signature Date
Chief Executive Officer
25/07/2017
VP Quality & Service
25/07/2017
Quality Manager
25/07/2017
Revision Record
Date Issue Description of Change / Reason Editor
13/03/2013 1 First issue M Brocklehurst
20/06/2014 2 Scope extended to X-Tek. Fig 1&2 revised. Doc reference numbers change (incl. addition of GBP-009, REC-E016 removed)
M Brocklehurst
03/08/2015 3 Removal of the Environmental Policy Statement and amended 1.1 EMS scope.
D Hayes
17/05/2016 4 Complete review of the manual. Use of BMS template. Addition of interested parties and change of references and role.
N Cole
04/07/2016 5 Changes to numbering structure of EMS to align with BMS. Amendments in accordance with Nikon Corporate review.
N Cole
11/07/2017 6 Remove references to ISO14001:2015:2004 standard. Removing ‘Q’ from EHS Advisor role. Add Interested Parties.
A Heron
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 3 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
Table of Contents Approval .............................................................................................................................................................. 2
Revision Record ................................................................................................................................................... 2
1. Introduction ................................................................................................................................................. 4
1.1. General Guidelines for Nikon Metrology’s EMS .................................................................................. 4
1.2. Definition of Terms .............................................................................................................................. 4
2. Scope of EMS Certification .......................................................................................................................... 5
2.1. Environmental Management Systems Structure ................................................................................ 5
3. Environmental Policy ................................................................................................................................... 6
4. Relationship with Nikon Corporation .......................................................................................................... 6
.................................................................................................................... 7 4.1. EMS Organisational Chart
5. Planning and Defining the EMS ................................................................................................................... 8
5.1. Interested Parties .................................................................................................................................... 8
5.2. Environmental Aspects ............................................................................................................................ 9
5.3. Legal and Other Requirements .............................................................................................................. 10
5.4. Objectives, Targets & Programmes ....................................................................................................... 10
5.4.1. Defining Objectives and Targets .................................................................................................... 11
5.4.2. Review of Objectives and Targets ................................................................................................. 11
5.5. Responsibilities for EMS ........................................................................................................................ 12
5.6. Documentation ...................................................................................................................................... 13
6. EMS Implementation & Operation ............................................................................................................ 15
6.1. Competence, Training & Awareness ..................................................................................................... 15
6.2. Communication ..................................................................................................................................... 15
6.3. Operational Control ............................................................................................................................... 16
6.4. Emergency Preparedness & Response .................................................................................................. 16
6.5. Document & Records Control ................................................................................................................ 17
7. Monitoring and Checking of EMS .............................................................................................................. 17
7.1. Monitoring & Measurement ................................................................................................................. 18
7.2. Evaluation of Compliance ...................................................................................................................... 18
7.3. Non-conformity, Corrective & Preventive Action ................................................................................. 19
7.4. Internal Audit ......................................................................................................................................... 19
8. Review of EMS ........................................................................................................................................... 20
8.1. Management Review ............................................................................................................................. 20
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 4 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
1. Introduction
Nikon recognises its environmental responsibilities in local, national and global
terms therefore it is committed to taking a strong lead as a corporate citizen and
in achieving an excellent standard of environmental control, whilst maintaining its
position as a highly competitive manufacturer.
As a result of this commitment an Environmental Management System has been
introduced globally within Nikon’s manufacturing environment.
Nikon Metrology manufactures high precision equipment for measurement, material analysis and imaging
for a variety of industries, laboratories and educational institutions for the worldwide market.
As part of a major manufacturer and a world-renowned brand of Nikon, Nikon Metrology is also committed
to its environmental responsibilities.
An Environmental Management System was introduced and implemented in accordance with the guiding
principles set out by the corporate guidelines (as defined in Nikon Environmental Management Manual).
1.1. General Guidelines for Nikon Metrology’s EMS
i. Ultimately supervised by the Chairman of the Environmental Committee of Nikon.
ii. Consistent with Nikon’s corporate management operations, considering the potential influence of Nikon
business activities, products and services on the environment.
iii. Adapted to the International Standard ISO14001:2015 and verified by a third party.
1.2. Definition of Terms
Terms and Abbreviation Definition
Nikon Nikon Corporation and Nikon Group companies
Nikon Metrology Nikon Metrology UK Ltd. and X-Tek Systems Ltd.
EMS Environmental Management System
Nikon Environmental Management
Manual
Fundamental EMS manual on which Nikon Metrology’s Environmental Manual is
based
The Environmental Committee Nikon’s top-level organisation overseeing the group’s overall EMS
Local Environmental Sub-
Committee
Nikon Metrology’s own organisation overseeing its local EMS
The Internal Audit Team of Nikon
Environmental Committee
The team of EMS internal auditors appointed by the Chairman of Nikon
Environmental Committee
Nikon Environment Symbol 1998
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 5 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
2. Scope of EMS Certification
Site
Nikon Metrology NV Nikon Metrology UK Ltd. X-Tek Systems Ltd. Nikon Metrology Inc.
Geldenaaksebaan 329 3001 Leuven
Belgium
EMA, Argosy Road Castle Donington Derby DE74 2SA
UK
Tring Business Centre Icknield Way
Tring, Herts HP23 4JX UK
9453 Innovation Drive Manassas
Virginia 20110 United States
Scope N/A
Design, Manufacture, Installation, Maintenance and
Service of CMM Products. manufacture, installation,
maintenance and service of laser scanner products.
Design & Development of associated application software
Design, Manufacture, Installation,
Maintenance and Service of X-RAY Systems for
Industrial Applications Design & Development
of associated application software
N/A
Locations -
Unit 410 – (Area 1) Unit 409 –(Area 2) Unit 437 – (Area 3) Unit 439 - (Area 4)
Building 424
Unit 5D Unit 5E Unit 5F Unit 7
Unit 8A
-
Products Headquarters No Production
CMMLaser Scanners Products X-Ray Systems Laser Radar, iGPS
2.1. Environmental Management Systems Structure
Environmental Management System adopted by Nikon Metrology is based on the requirements of
ISO14001:2015 and follows the Plan-Do-Check-Act improvement cycle.
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 6 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
3. Environmental Policy
The Nikon specifies its core environmental commitment as Basic Environmental Policy. This Policy is
endorsed by the Nikon Chairman of the Environmental Committee.
Nikon Metrology defined it’s environmental commitment based on the core Nikon beliefs. This is defined as
local Environmental Policy POL-003 and is endorsed by Nikon Metrology’s CEO, who’s also the Chairman of
the Local Environmental Sub-Committee.
The NM’s Environmental Policy meets the requirements of section 5.2 of ISO14001:2015. The Policy is
communicated to all employees and is available to the public on request.
References
POL-003 – Environmental Policy
Nikon EMS - Nikon Basic Environmental Management (available here)
4. Relationship with Nikon Corporation
Nikon Metrology’s Environmental Management System is maintained as part of the global Nikon
Corporation EMS.
The Nikon Metrology’s Certification to ISO14001:2015 is an extension of the global Nikon Certification. This
ensures common structure across all of Nikon sites as well as establishes Nikon’s environmental
commitment.
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 7 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
4.1. EMS Organisational Chart
Top management
Chairman of Environmental
Committee
[Headquarters]
Internal audit team
Environmental Committee
Operating Environmental Subcommittee
Personnel in charge ofenvironmental management
Headquarters secretariat
Group’s major sites
Green Procurement
Subcommittee
Distribution Environmental Subcommittee
Product Environmental Subcommittee
CO2 Emission Reduction
Subcommittee
Head officeenvironmental subcommittee
Group’slocal
environmentalsubcommittees
Nikon Metrology
local environmental subcommittee
Head Office] Internal audit
teamChairman
Local environmental sub-committee
manager
Local environmental sub-committee
secretariat
Personnel in charge offacilities
management
Engineering NMUK & X-Tek
Production NMUK & X-Tek
Purchasing NMUK & X-Tek
Logistics NMUK & X-Tek
HR NMUK & X-Tek
Service NMUK & X-Tek
Sales NMUK & X-Tek
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 8 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
5. Planning and Defining the EMS
5.1. Interested Parties NM’s interested parties are outlined and reviewed as part of our Context of the Organisation Planning
process. Interested parties and their requirements are identified below:
Interested parties What are their interests What are their requirements How we meet
requirements
Head Office Performance of NMUK. Financial interests.
Provision of requests from NMUK for capital, records of performance & progress of achieving strategy and targets
Provide requests, reports and progress updates
Nikon Corporate Performance of NMUK. Financial interests.
Provision of requests from NMUK for capital, records of performance & progress of achieving strategy and targets
Provide requests, reports and progress updates
HSE General H&S requirements adherence. Specifically interests in safe controls and use of radiation sources used in X-Rays
NMUK are to have safe processes and controls in place for general activities and specific to radiation sources. Report significant HS issues. Ensuring responsible & trained person(s) in organisation
BSI Online. Cedrec assessments, Corporate communications
Import / Export controls (directed from corporate or external authorities)
Ensure that NMUK are exporting / importing from correct sources who do not deviate from Social, economic, political (etc.) interests of both Corporate & national requirements
NMUK to adhere to import and export controls for products and services.
Corporate communications, Department for International Trade (Government), Home Office (Government)
Agents / Distributers / Partners
Provision of product and services to achieved sales
Receiving and processing orders. Provision of information related to new and changes to products and services
Internal operational controls (Operations, OF, Procurement, Sales)
Airport Authority Nikons use of land within the Airport jurisdiction
Information and planning details of any activity that could affect operations of the airport (e.g. chemical use, use of cranes). Ensuring the contracts in place are complied with.
SLA / Contract
General customers Provision of products and services to order
Ensure specification and orders are met and delivered on time
Internal operational controls (BMS)
Suppliers Purchasing of materials Effective provision of PO’s with clear specifications. Ensuring purchases are processed and invoices payed. Effective PO and purchasing controls
Internal procurement processes (BMS)
Landlords Use of buildings
Compliance with any and all contracts and SLAs in place. Notifications of any significant changes associated with building use
SLA / Contract
Standards and regulations (HSE, PHE,ISO, CE, EA,
NMUK’s compliance with standards and regulations associated with product and service provision
NMUK’s monitoring of existing and new standards and regulations. Effective controls to implement
BSI Online, Cedric
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 9 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
HMRC) changes and requirements. Report to specific bodies activities and incidents (e.g. Environmental Agency)
Local residents General operations of the business that may impact local residents.
Ensure noise, smell, atmospheric particulates, and traffic are kept to an acceptable level (i.e. minimal impact). Consultation of significant impact of operations.
CSR policy
Stakeholders Performance of the organisation To perform to or above plan CEO updates, reports
Competitors Performance of the organisation NMUK to have adequate awareness of competitors and potential new markets to capitalise on
CEO reviews, Sales reports (only if applicable)
European Commission (Member states)
Compliance to EC directives Ensuring effective requirements and controls are in place to implement and maintain specific requirements such as RoSH, REACH and CE marking.
BSI online, Cedric
Environment Agency Compliance to Environmental regulations and controls
Ensuring effective requirements and controls are in place to implement and maintain specific requirements such as waste controls.
EA notifications, Cedric
Public Health England
Specifically interests in safe controls and use of radiation sources used in X-Rays
NMUK are to have safe processes and controls in place specific to radiation sources. Report significant HS issues. Ensuring responsible & trained person(s) in organisation
PHE notifications.
These are set and maintained by NMUK’s leadership teams
5.2. Environmental Aspects
The scope of the EMS covers those aspects of the product life cycle, which Nikon Metrology can control and
can be expected to have a significant influence in light of legislative changes, audit findings, policy change
and operational change.
The Quality Assurance Department is responsible for assessing Nikon Metrology’s environmental aspects
and determining their relative significance in terms of impact on the environment.
Nikon Metrology assesses their operations and identifies which aspects are significant and can be influenced.
References
GBP-056 – Evaluation of Significant Environmental Aspects
Register of Environmental Aspects
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 10 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
5.3. Legal and Other Requirements
The Quality Assurance Department is responsible for tracking the environmental legislation and regulations
and other environmental requirements.
Nikon Metrology ensures that it identifies and has access to environmental legislation, regulations and
standards related to these environmental aspects which it can control or be expected to have a significant
influence on.
A register of relevant legislation is maintained and updated in light of any legislative developments, including
revisions and obsolescence. Any changes that need to be made to the documented procedures will be
communicated via the Management Review mechanism and/or the Document Control mechanism.
References
GBP-061 – Evaluation of Compliance
Legislation Register
5.4. Objectives, Targets & Programmes
The Quality Assurance Department is responsible for the proposal of Nikon Metrology’s environmental
targets and objectives. The Management Team will then review proposed Objectives and Targets whilst
nominating responsible personnel.
Objectives are identified and pursued through targets and management program actions, which are detailed
in the Environmental Objectives and Targets and Management Programs and agreed during Management
Review.
The Quality Assurance Department is also responsible for coordinating and supporting each individual
management program by providing any necessary guidance or technical assistance. Responsible personnel
establish the means of implementation and timeframe by which they are to be achieved.
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 11 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
5.4.1. Defining Objectives and Targets
Main Inputs into Nikon Metrology’s Environmental Objectives & Targets
Other requirements that can influence Objectives & Targets
5.4.2. Review of Objectives and Targets
The progress and applicability of Objectives & Targets is reviewed regularly during Management Reviews to
ensure the targets can be achieved and risks relating to achieving these targets are identified and managed.
When appropriate, programs for achieving the objectives and targets are amended to ensure that new
developments, new or modified activities, products and services are taken into consideration.
Nikon’s Environmental Objectives (officially called ‘Environmental Action Plans’)
The requirements of the ISO14001:2015 standard
NM's Environmental Policy
Regional, national and international legislative and regulatory requirements
NM's significant environmental aspects
Business Objectives
Operational Requirements
Needs of Interested
Parties
Financial Requirements
Technological Requirements
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 12 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
Avenues for Review of Objectives and Targets
References
GBP-004 – Management Review
5.5. Responsibilities for EMS
All employees of Nikon Metrology are expected to act responsibly towards the environment and follow the
defined processes, policies and procedures.
Detailed descriptions of the responsibilities, authority and interrelation of different areas are described in
the relevant processes and procedures.
The general overview of Roles and Responsibilities in relation to the Environmental Management System is
presented in the table below.
Operational Role @ Nikon
Metrology
Role @ Local Environmental Sub-Committee
Responsibility
CEO Chairman of Local Environmental Sub-Committee
Assumes ultimate responsibility and authority for the environmental effects at Nikon Metrology, including setting environmental objectives and targets and authorising the Environmental Policy.
Ensures that adequate resources in terms of people, skills and equipment are available to allow the implementation and continuous improvement of its environmental management system, and to prevent the occurrence, and/or mitigate the effects, of environmental incidents.
Chairs Global Quality Leaders meet.
Local Management Team
Local Environmental Sub-Committee
Reviews and approves the significant environmental aspects proposed by the Local Environmental Sub-Committee Secretariat.
Approves the environmental objectives and targets proposed by the Local Environmental Sub-Committee Secretariat.
Agrees on timeframes and responsible personnel.
Discusses any issues related Nikon Metrology’s environmental management.
EHS Advisor Local Environmental Sub-Committee Secretariat
Initiate the Local Environmental Sub-Committee Meeting
Reports Sub-Committee’s activities and output from the Management Review to the Environmental Committee
Performs all relevant tasks in establishing, implementing and maintaining EMS
Evaluates the significance of environmental aspects and presents the results to the Local Environmental Sub-Committee
Proposes environmental objectives and targets and improvement plans to the Local Environmental Sub-Committee
Maintains, revises, and issues all EMS-related documents
Management Review
Audits (Internal & External)
ISO14001:2015 Changes Process Review
Complaints
Feedback from interested parties
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 13 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
Develops and implements an environmental training plan
Develops emergency preparedness plans and coordinates the response to an environmental incident
Reports environmental incidents to Management Review
Selects waste carriers and checks for a valid carrier’s licence
Coordinates internal environmental communication
Maintains the record of hazardous substances used and carries out risk assessment
Monitors Nikon Metrology’s utility consumption and waste generation
Ensures that an emergency preparedness program is implemented and approves the emergency preparedness plans.
Reports the performance data of EMS to Nikon Environmental Committee
Group Quality Manager
Local Environmental Sub-Committee Manager
Verifies the validity of EMS-related documentation
Ensures appropriate preventive/corrective actions are taken
Reports any major incidents to relevant regulatory authorities
Facilitates the Management Review, circulates minutes, and follows up actions
Oversees audit management and improvement activities
Arranges necessary internal auditor training and manages internal audits
Executive Assistant
Personnel in charge of Facilities Management
Ensures that Nikon Metrology’s overall facilities are maintained by managing contractors and contracts
Communicates any significant changes to the infrastructure that may have an effect on the EMS
Operations Manager
Operations Manager
Ensures appropriate storage, handling and disposal of hazardous substances
Supports and drives requirements of the EMS through operations
HR Manager HR Manager Maintains Nikon Metrology’s Organisation Chart
Coordinates the general training courses for employees
Keeps the employees’ individual training records
All Employees All Employees Follow the procedures and Work Instructions relevant to their roles
Segregate and dispose of waste in the appropriate containers at designated areas
Report any environmental incidents to the Quality Assurance Department
5.6. Documentation
Environmental Management System documentation is structured in line with the requirements of Nikon
Metrology Business Management System.
Environmental Processes are defined and based on the requirements of Nikon Environmental Management
System planning, Objectives & Targets, Aspects, Interested Parties, Risks and Opportunities, ISO14001
requirements, operational controls and legal compliance requirements.
Documents specific to the EMS will be identified on the BMS index. Specific controls will either be in the BMS
index or as part of current DBP’s, GDP’s, PIN’s and TEMP’s
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 14 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
References
MAN-003: Environmental Management System Manual
GBP-001 – Documentation Control
5.7 Risks and Opportunities As part of assessing Interested parties, their needs and expectations and their impact on the EMS, Risks and
opportunities are defined in terms of high level impacts to the business.
If significant these will enable the business to define specific objectives, projects, KPIs and controls
References
Context of the organisation planning
5.8 Context of the organisation
All planning activities such as defining interested parties, risks and opportunities, aspects, policies and
legal/Regulatory compliance obligations help define the context of the organisation for NMUK.
The context of the organisation planning is reviewed at least annually or when there is significant change to
operations or products. This is comprised mainly of a review of interested parties and risks and
opportunities.
Business Policies Principles and guidelines formulated by Nikon Metrologyto reach its long-term goals
Business Objectives Goals, defined to ensure Policies are achieved
Business Manual Document outlining the processes and their interaction within Nikon Metrology
General Business Process Documents detailing process requirements applicable to all areas of the business
Departmental Business Process Documents detailing process requirements that are applicable to a specific department
Process Instructions Documents specifying steps to carry out an activity, interfacing with other processes
Template A pre-designed document formatted for common purposes
Records Results of process generated/populated on pre-defined templates
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 15 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
References
Context of the organisation planning
6. EMS Implementation & Operation
6.1. Competence, Training & Awareness
Nikon Metrology places great emphasis on the competence of its employees. All employees have an
important role to play within the organisation, and many have a direct influence on the environment. The
employee competence and awareness is achieved by providing as required:
Periodically planned E-Learning
Job/Function Specific Training
Specialised Training
It is through suitable training that each employee can fully understand their role.
Training combined with experience allows each employee to look for better ways to carry out their
responsibilities, so that Nikon Metrology can achieve its objectives.
The required training can be identified either locally by the Departmental Managers, the EHS Advisor or the
HR Manager.
Contractors are required to confirm the competence of their own personnel to carry out the specific tasks
and provide evidence to Nikon Metrology as required. This may include the use of training records or
method statements as appropriate.
References
GBP-006 – Training
Training Records (Cypher – HR)
My1HS E-learning package (Nikon Metrology employees)
6.2. Communication
Nikon Metrology ensures that communication regarding the significant aspects and the EMS is carried out in a
systematic approach.
Relevant communication from external interested parties is documented and recorded. The decision to
communicate environmental performance information will be evaluated on a case-by-case basis.
The EHS Advisor is responsible for internal communication of relevant environmental information, as well as for
external communication with regulatory authorities and legal compliance schemes.
Regular environmental bulletins are sent to keep employees up to date with relevant environmental information.
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 16 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
References
GBP-060 – Environmental Communications
6.3. Operational Control
Procedures have been written and implemented where they are required to ensure compliance with the
Environmental Policy, legal requirements, control of significant environmental aspects and progressing with the
environmental management plan.
In order to maintain process capability during normal production, equipment and processes are subject to
appropriate maintenance. Each process is regularly reviewed, and may be modified to match changing
requirements; for example, design changes or process efficiency improvements.
Where appropriate, the aspect register is amended, to ensure that any significant environmental effects of new
developments, new or modified activities products are services are taken into consideration.
References
POL-003 – Environmental Policy
Register of Environmental Aspects
‘EHS’ Area GBP’s, DBP’s & PIN documents (Various)
6.4. Emergency Preparedness & Response
Emergency planning and response procedures have been established to identify potential accidents and
emergencies, and to deal with unexpected incidents. Responsibilities and information sources are clearly
defined in the relevant procedures, as well as the actions to be followed in the event of an emergency.
Testing of the effectiveness of the plans is undertaken on a periodic basis. Records will be maintained to
demonstrate the test methods, results and any corrective actions taken to improve the plans.
In the event of an emergency or accident, the Chairman of Local Environmental Sub-Committee shall report
the contents and countermeasures taken to the Chairman of the Environmental Committee, who shall
provide directions for subsequent measures.
Each department is responsible for notifying, responding to and reporting emergencies as appropriate.
The Local Environmental Sub-Committee Secretariat is responsible for coordinating environmental
emergencies.
References
GBP-056 – Evaluation of Environmental Aspects
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 17 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
GBP-057 – Emergency Preparedness and Incident Response
Environmental Emergency Response Plan
Register of Environmental Aspects
6.5. Document & Records Control
All company documented processes and records are maintained in line with general Business Management
System requirements defined in GBP-001.
All documented processes are stored on local network. All processes are maintained in as electronic
information. There are no paper copies of documented processes available/maintained.
The authorization of processes prior to release is carried electronically.
Unless specifically stated in the procedure or other controlled documents, it is the responsibility of the
receiving area to ensure that the correct version of the document is being used and obsolete versions are
prevented from use.
Environmental records are identified from external regulations, legal requirements, or internal operational
requirements to provide evidence of control and historical data.
Records identified include source documents such as standards, as well as actual records in terms of reports
or data. Records also include electronic data.
References
GBP-001 – Document Control
GBP-057 – Emergency Preparedness and Response
BMS Index
7. Monitoring and Checking of EMS
The correct information is available at the right time, in the right place;
Documents can be readily located;
Documents are reviewed and revised as necessary;
Documents are authorised before release and are circulated to named people or locations;
Obsolete documents are removed from use;
Obsolete documents which need to be retained for historical/legal purposes are controlled
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 18 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
7.1. Monitoring & Measurement
Monitoring and measurement is undertaken to track performance, relevant operational controls and
conformance with targets and objectives. This is achieved by establishing performance indicators which are
objective and verifiable.
Resource usage is monitored in line with objectives and will be baselined to allow future effective performance
monitoring.
The business utilizes other methods to monitor, measure, analyze and evaluate performance such as Internal
Audit, External audit, Complaints, Non-conformances, Emergency response performance, management review
and KPIs where applicable to the specific department operations
References
GBP-002 – Audit Process
GBP-003 – Control of non conforming outputs
GBP-004 – Management Review
GBP-005 – Monitoring and Measurement
GBP-007 – External CIR process
GBP-008 – Corrective & Preventative action
7.2. Evaluation of Compliance
To ensure continual compliance to latest legislations, regulations and any other applicable requirements it is
the policy of Nikon Metrology to regularly review its environmental aspects.
The EHS Advisor shall regularly evaluate and keep records on legal and other requirements applicable to
Nikon Metrology’s significant environmental aspects. These include its compliance with local, national and
international legislation, as well as with relevant guidelines stipulated by Nikon.
Due to the complexity of legislation and compliance requirements, NMUK utilizes 3rd party organisations to
identify and define applicable legislation. This is completed periodically where compliance obligation are
reviewed and actions defined.
The results of this evaluation are regularly reviewed by the Management Team during Management Reviews.
References
GBP-061 – Evaluation of Compliance
Register of Environmental Aspects
Legislation Register
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 19 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
7.3. Non-conformity, Corrective & Preventive Action
Non-conformances can be identified as a result of external and internal audits, deviation from environmental
objectives and targets, non-compliance with legal and other requirements, and standards set out in Nikon
Metrology’s own procedures and Work Instruction Sheets, complaints from interested parties.
On identification of such an occurrence, appropriate steps shall be taken to control any impact depending on the
magnitude of the non-conformities or incidence:
Urgent measures are taken by responsible personnel who shall identify and correct non-conformities
and take appropriate actions to mitigate their environmental impact.
Corrective actions are taken by responsible personnel who shall investigate non-conformities,
determine root causes, and take appropriate actions to prevent their recurrence.
Preventive actions are taken by responsible personnel who shall evaluate the need for action for
non-conformities, and implement appropriate actions to prevent their occurrence.
Results of corrective and preventive actions and their effectiveness shall be recorded and passed onto the
Quality Assurance Department by responsible personnel. When necessary, procedures will be revised or
new procedures written. Any changes in existing procedures resulting from corrective and preventive actions
shall be recorded.
References
GBP-007 – External CIR
GBP-003 – Non-Conformance Control
GBP-008 – Corrective & Preventive Action
GBP-057 – Emergency Preparedness and Incident Response
7.4. Internal Audit
Nikon Metrology operates a global Internal Audit process that covers all of the requirements of management
systems implemented across the company. This includes the requirements of the Environmental
Management System.
Nikon Environmental Committee Internal Audit
• Nikon Headquarters Internal Audit
• Conducted by the team appointed by the Chairman of the Environmental Commitee
• Conducted annually unless required otherwise
• Conducted against the requirements of ISO14001:2015 and specific Nikon Requirements
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 20 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
The audit team consists of trained auditors, who are impartial to the process and have the necessary
competence to identify any non-conformances, observations and opportunities for improvement within the
EMS processes.
Audit reports are written and recommendations for corrective or preventive action are made and agreed
when necessary. These actions are then implemented and followed up.
Audit findings and actions taken are reported to the Management Review meetings and Non Conformance
findings are recorded in CRM database for visibility.
References
GBP-002 – Internal Audit
GBP-004 – Management Review
GBP-007 – External CIR
TEMP-213 – Environmental Non-Conformance and Incident Report
8. Review of EMS
8.1. Management Review
Local Management Team meets weekly to review company objectives. The EMS requirements are reviewed
during specific slots at the Management Meetings.
All of the requirements of EMS should be covered by the Management reviews at least once per calendar
year. The process for Management review is defined as GBP-004.
Any decisions and actions arisen as a result of the Management Review that may lead to changes to the
Environmental Policy, environmental objectives and targets, and other elements of the EMS shall be implemented
in order to achieve continual improvement of the EMS.
The EHS Advisor shall periodically report the input and output of the Management Reviews to Nikon
Environmental Committee.
References
GBP-004 – Management Review
Environmental Manual Issue Date: 11/07/2017 Issue No: 6 Page 21 of 21
© Nikon Metrology UK Ltd. All printed copies of this document are uncontrolled. MAN-003-06
Headquarters Corporate Nikon Metrology NV Geldenaaksebaan 329 B-3001 Leuven, Belgium phone: +32 16 74 01 00 fax: +32 16 74 01 03 [email protected]
Nikon Corporation Shin-Yurakucho Bldg., 12-1, Yurakucho 1-chome Chiyoda-ku, Tokyo 100-8331 Japan phone: +81-3-3216-2384 fax: +81-3-3216-2388 www.nikon-instruments.jp/eng/
Manufacturing Nikon Metrology UK Ltd. EMA, Argosy Road, Castle Donington Derby DE74 2SA UK Tel: +44 1332 811 349 Fax: +44 1332 639 881
X-Tek Systems Ltd. Tring Business Centre Icknield Way Tring Herts HP23 4JX UK Tel: +44 1442 821 128 Fax: +44 1442 828118
Nikon Metrology Inc. 9453 Innovation Drive Manassas Virginia 20110 United States Tel +1 (703) 656-7187 Fax: +1 (703) 656-7211
More offices and resellers at www.nikonmetrology.com