NIZWA-JIBREEN ROAD, SULTANATOMAN
Facts Project DescriptionThe construction of the project consists of the dualization of 12.5 km single road and a newalignment of two carriageways of 19.5 km length. The pavement layers are of 40 mmbituminous wearing course, 60 mm bituminous base course, 250 mm crushed aggregatebase course and construction of box and pipe culverts and Irish crossings.The project is located in Ad Dakhliya Region, starts from the end of Rusayl-Nizwa road(Section III) and ends at Jibreen by passing Nizwa and Bahla towns.
Quantities:Length of road 32 kmWidth of road 26.9 mEarthworks 2,149,996 m³Granular subbase 147,563 m³Aggregate base course 201,000 m³Bituminous wearing andbase course 144,960 tonsAsphalt 59,876 m³Concrete 21,291 m³Rip rap 23,482 m³Gabions 600 m³Pipe culverts 360 mSafety barriers 68,000 m
City/Country
Nizwa-Jibreen / Oman
Client
Ministry of Transport and Communication
Contract Value
€ 22,70 Mio.
Construction Period
9/2005 - 1/2010 (52 months)
.