NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
The Port Authority will implement the replacement of the two northernmost Transfer Bridges (#9 and #10) with two new modern hydraulic bridges, the construction of associated rail track and fender infrastructure, the construction of a new barge, and the acquisition of approximately 41.5 acres of Greenville Yard property.
Greenville Yard and Lift Bridge – State-of-Good-Repair
Routes
Name:
Mileposts: DBNUM: 09338B
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
ELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETH
BAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNE
JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
CO501
NJTP
US1
I-95I-78
09338B09338B09338B09338B09338B09338B09338B09338B09338B
10US1T
NJ169NJ440
NJ139
NJ185
Counties:Hudson
Municipalities:Jersey City
NJDOT CIS Category:Multimodal Programs
Sponsor:PANYNJ
RCIS Category:Freight
Est. Total Project Cost:(Million) Not Available
Air Quality Code:NA
SOURCEPHASE
$87.510(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOERC $70.010
OTHERERC $17.500
$87.510
Hudson Page 1 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
The Port Authority will implement the immediate rehabilitation and repair of the operational lift bridge and associated infrastructure. The project will involve mechanical, structural and electrical repairs to the lift bridge and maintenance and repair work on an existing rail barge and supporting rail track and fenders.
Greenville Yard and Lift Bridge – Temporary Maintenance of Barge Operations
Routes
Name:
Mileposts: DBNUM: 09338A
JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK
ELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETH
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
BAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNE
NJ185
NJ21
US1
I-78
NJTP
I-95
09338A09338A09338A09338A09338A09338A09338A09338A09338A
27
22
US1T
NJ169NJ440CO501
1
Counties:Hudson
Municipalities:Jersey City
NJDOT CIS Category:Multimodal Programs
Sponsor:PANYNJ
RCIS Category:Freight
Est. Total Project Cost:(Million) Not Available
Air Quality Code:NA
SOURCEPHASE
$1.500(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOERC $1.200
OTHERERC $.300
$1.500
Hudson Page 2 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
Revision 1 As of 6/12/2014
This is a combined project for the improvements to Observer Hwy. and Newark Street to enhance pedestrian safety in this area, given the high volumes of both vehicles and commuter. The project will include milling, paving, striping, signage, upgrading handicap ramps to meet ADA requirements, bump outs at the intersection of Newark Street and Hudson Street and fully upgrading 3 existing traffic signals and installing 2 new traffic signals. The intent of the Observer Highway project is to redesign it by applying NJDOT’s Complete Streets Policy principles, thereby allowing clearly defined pedestrian walkways on the north and south sides, installing bike lanes, street parking and better flow of traffic to augment both pedestrian and vehicular safety.
The project limits for Observer Highway are from mile post 0.0 (Henderson Street) to mile post 0.48 (Hudson Street) and the project limits for Newark Street are from mile post 0.69 (Washington Street) to Mile post 0.74 (East of Hudson Street).
The project will be funded with 3 SAFETEA-LU HPP listings: NJ 175 (Hoboken Observer Highway Operational and Safety Improvements - $1.8 M), NJ 223 (Newark and First St Improvements - $0.216 M), and NJ 240 (Hudson County Pedestrian Safety improvements - $0.720 M)
Hoboken Observer Highway Operational and Safety Improvements
N/ARoutes
Name:
Mileposts: DBNUM: 08441
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY
NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN
JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
Boonton Line
Bergen
Line
Northeast C
orridor
Morris & Essex Line
PATH
I-78
US1
NJ440
CO501
NJ139
US1T
084410844108441084410844108441084410844108441
95TP
Counties:Hudson
Municipalities:Hoboken City
NJDOT CIS Category:Local System Support
Sponsor:Hudson County
RCIS Category:Safety
Est. Total Project Cost:(Million) Not Available
Air Quality Code:S7 (Exempt)
SOURCEPHASE
$2.736(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOERC $2.736
$2.736
Hudson Page 3 of 18
NJTPA
Transportation Improvement Program Fiscal Years 2014 - 2017
THIS PAGE HAS BEEN REPLACED BY REVISION 1
Funding is provided for Hoboken Observer Highway Operational and Safety Improvements in Hoboken City, Hudson County.
Hoboken Observer Highway Operational and Safety Improvements
N/ARoutes
Name:
Mileposts: DBNUM: 08441
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY
NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN
JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
Boonton Line
Bergen
Line
Northeast C
orridor
Morris & Essex Line
PATH
I-78
US1
NJ440
CO501
NJ139
US1T
084410844108441084410844108441084410844108441
95TP
Counties:Hudson
Municipalities:Hoboken City
NJDOT CIS Category:Local System Support
Sponsor:Hoboken City
RCIS Category:Safety
Est. Total Project Cost:(Million) Not Available
Air Quality Code:S7 (Exempt)
SOURCEPHASE
$1.800(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOCON $1.800
$1.800
Hudson Page 4 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
The project will incorporate all existing traffic signals within the Meadowlands District into a network of self-adaptive traffic signals to efficiently reduce roadway congestion, delay, travel time, fuel consumptions, and airborne emissions. This will be accomplished through advanced, proven, and cost-effective technology of adaptive signal control. The system will adjust the signal timings based upon the real-time flow of traffic instead of utilizing fixed or actuated timings. Signals along multi-jurisdictional boundaries will be continuously coordinated for optimal operation. Traffic conditions and traffic signal operations will also be monitored and controlled in real-time by a central location. The intersection controls of the proposed system will include preemption for emergency vehicles to allow safe and efficient all-red signal access, as well as priority for mass transit vehicles in order to allow for improved and prioritized treatment along roadway corridors. All system components will utilize state-of-the-art components including wireless vehicle detection devices, wireless communication network, and advanced adaptive traffic signal control software. Inventory of the current signal infrastructure is near completion. Design of the system is currently underway and scheduled for completion in 2009. The system is ready for procurement and phased construction beginning in 2009. There will be $2 million funded by private developers through the Meadowlands Transportation Planning District (MTPD) and previously collected transportation impact funds.
This project was selected for Transportation Investment Generating Economic Recovery (TIGER 2) grant funding.
14 Municipalities: Carlstadt, East Rutherford, Jersey City, Kearny, Little Ferry, Lyndhurst, Moonachie, North Arlington, North Bergen, Teterboro, Ridgefield, Rutherford, Secaucus, South Hackensack.
Meadowlands Adaptive Signal System for Traffic Reduction (MASSTR)
N/ARoutes
Name:
Mileposts: DBNUM: N1101
Essex
Bergen
Hudson
N1101N1101N1101N1101N1101N1101N1101N1101N1101
NORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTON
SOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACK
MOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIELITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRY
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
RIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT
EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD
RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD
LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN
JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
TETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBORO
Counties:Bergen Hudson
Municipalities:Various
NJDOT CIS Category:Local System Support
Sponsor:New Jersey Meadowlands Commission
RCIS Category:ITS
Est. Total Project Cost:(Million) Not Available
Air Quality Code:2014NM (Non-Exempt)
SOURCEPHASE
$6.250(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOEC $5.000
OTHEREC $1.250
$6.250
Hudson Page 5 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
This project is for traffic and pedestrian improvements in the segment of Newark St. one block north of the Hoboken Terminal. The project limits are from Hudson St to Washington St, approximately 350 feet.
Newark and First Street Improvements, Hoboken
N/ARoutes
Name:
Mileposts: DBNUM: 08446
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
Morris & Essex Line
1st
Paterson
I-78
Observer
Fir
eho
use
Blo
om
fie
ld
Wa
shin
gto
n
Gar
de
n
Hu
ds
on
Cli
nto
n
3rd
Jeff
ers
on
Mad
iso
n
Mo
nro
e
Central Railroad of New Jersey
Newark
084460844608446084460844608446084460844608446
PATH
n
Franklin
Mar
sha
ll
Ha
rris
on
2nd
Jack
son
4th
Jers
ey
16th
Eri
e
15th
Gro
ve
Lu
is Mu
no
z Mar in
Gra
nd
Wil
low
18th
13th
Par
k Co
urt
Riv
er
Sin
atra Counties:
Hudson
Municipalities:Hoboken City
NJDOT CIS Category:Local System Support
Sponsor:Hoboken City
RCIS Category:Road Enhancement
Est. Total Project Cost:(Million) Not Available
Air Quality Code:O10a (Exempt)
SOURCEPHASE
$0.216(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOCON $.216
$.216
Hudson Page 6 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
Under this program, the Port Authority will provide funding support for improvements to five NJDOT facilities: Route 7, Hackensack River (Wittpenn) Bridge, Route 139 (Hoboken and Conrail Viaducts), Route 1&9T Extension, Route 1&9 Pulaski Skyway, and Route 1&9 Pavement. This program will provide a total of $1.8 billion from FY 2012 through FY 2016 for these five projects.
The Route 7 Wittpenn Bridge will be replaced with a new vertical lift bridge. The total project cost is estimated at $650 to $700 million. The project is located in Kearny and Jersey City, Hudson County.
The Route 139 Contract 3 project will rehabilitate the Hoboken Viaduct, as well as replace the deck and rehabilitate the superstructure of the Conrail Viaduct. The total project cost is estimated at $180 to $200 million. The project is located in Jersey City, Hudson County.
The Route 1&9T Extension project, will provide a new roadway parallel to Route 1&9 along the railroad right-of-way in Jersey City. It will provide intermodal connections to the rail yards and divert trucks off the Tonnelle Circle and Route 1&9, helping to ease congestion and facilitating goods movement throughout the region. The total project cost is estimated at $70 to $80 million. The project is located in Jersey City, Hudson County.
The Route 1&9 Pulaski Skyway project will rehabilitate the 3.5 mile-long structure that carries Route 1&9 over the Hackensack and Passaic Rivers, the New Jersey Turnpike, several railroads and industrial facilities. The total project cost is estimated at $1.2 to $1.5 billion. The project is located in Jersey City, Kearny, and Newark in Hudson and Essex Counties.
The Route 1&9 Pavement project includes both express and local roadways in the northbound and southbound directions. The construction schedule will be coordinated with Pulaski deck construction. The total project cost is approximately $14.5 million. The project is located in Newark in Hudson County.
PANY&NJ-NJDOT Project Program
N/ARoutes
Name:
Mileposts: DBNUM: 11407
HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD
CO508I-280
I-95
US1
US1T
NJ139
CO501
NJ440
I-78
114071140711407114071140711407114071140711407
NJTP
NJ7CO507CO506NJ17
NJ21NJ495
CO505
Counties:Hudson Essex
Municipalities:Jersey City Newark City Kearny Town
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
Est. Total Project Cost:(Million) Not Available
Air Quality Code:2020M (Non-Exempt)
SOURCEPHASE
$1254.000(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017OTHERERC $250.000$150.000
PANY&NJERC $375.000 $353.000$376.000
$375.000 $353.000 $150.000$376.000 $250.000
Hudson Page 7 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
Pennsylvania Avenue/Fish House Road is a two-lane urban minor arterial that connects Central Avenue and Rt. 7. The roadway has an existing speed limit of 25 mph and has two travel lanes with no shoulders. Pennsylvania Avenue has an at-grade railroad crossing with Conrail located approximately 200 feet east of the Central Avenue/Pennsylvania Avenue signalized "T" intersection. The purpose of the project is to improve safety, mitigate the heavy truck congestion and improve the existing aging roadway to accommodate the growing demands. The project will improve safety by eliminating geometric substandard elements such as lack of shoulders and proper cross slope, as well as improve the Central Avenue/Pennsylvania Avenue signalized intersection to increase capacity and improve traffic movement. The at-grade rail crossing will be moved approximately 1200 feet from the intersection. The roadway will be designed specifically to provide superior regional connectivity and accommodate a heavily growing truck volume. Flooding problems will be addressed by providing a proper drainage system as well as improving the existing poor pavement condition.
CR 659
Portway, Fish House Road/Pennsylvania Avenue, CR 659
N/ARoutes
Name:
Mileposts: DBNUM: 97005B
NJ21
NJTPI-95
I-78
I-280
US1T
NJ440
NJ139
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark
97005B97005B97005B97005B97005B97005B97005B97005B97005B08
0
CO501
CO505
NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City
Counties:Hudson
Municipalities:Kearny Town
NJDOT CIS Category:Local System Support
Sponsor:NJDOT
RCIS Category:Freight
Est. Total Project Cost:(Million) Not Available
Air Quality Code:S4, S7 (Exempt)
SOURCEPHASE
$6.000(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017STPPE $1.300
STPDES $1.500
STATEROW $3.200
STPCON $11.800
$1.500 $3.200$1.300 $11.800
Hudson Page 8 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
The purpose of the project is to improve the area of the Riverbank Park trail along Passaic Avenue from Bergen Avenue to the Belleville Turnpike.
Riverbank Park Bike Trail
N/ARoutes
Name:
Mileposts: DBNUM: 08440
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
BLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELD
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK
BELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBoonton Line
CO506SPUR
NJ17CO507
CO506
NJ7
NJ21
CO509
084400844008440084400844008440084400844008440City S
ub
way
N
Counties:Hudson
Municipalities:Kearny Town
NJDOT CIS Category:Multimodal Programs
Sponsor:Kearny Town
RCIS Category:Bike/Ped
Est. Total Project Cost:(Million) Not Available
Air Quality Code:AQ2 (Exempt)
SOURCEPHASE
$1.677(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017DEMOERC $1.677
$1.677
Hudson Page 9 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
Revision 2 As of 9/3/2015
The bridge is located in North Bergen Township, Hudson County. The bridge is functionally obsolete with sufficiency rating of 48. Based on latest inspection report condition of deck, superstructure and substructure is listed as in fair condition. The bridge is classified as “Functionally Obsolete” due to inadequate lateral underclearance and the substandard deck geometry. Currently, the bridge is listed as Priority 2 in the ranking of Bridge Management System. The bridge needs major rehabilitation/replacement including improvements to substandard geometric features to address its marginal structural condition and functional obsolescence.
3
Route 3, Bridge over Northern Secondary & Ramp A
10.74Routes
Name:
Mileposts: DBNUM: 08346
UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY
EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD
RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD
NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark
Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City
083460834608346083460834608346083460834608346
I-95NJTP
NJ120
CO505
NJ7
US1NJ495
CO501
0
08
US1T NJ139
CARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT CLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKEDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATER
NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERG
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN
WEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORK
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST
Counties:Hudson
Municipalities:North Bergen Twp
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
$22.949Est. Total Project Cost:(Million)
Air Quality Code:S19 (Exempt)
SOURCEPHASE
$22.750(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPDES $3.500
NHPPROW $1.000
STATECON $18.250
$3.500 $1.000 $18.250
Hudson Page 10 of 18
NJTPA
Transportation Improvement Program Fiscal Years 2014 - 2017
Revision 1 As of 9/26/2014THIS PAGE HAS BEEN REPLACED BY REVISION 2
The bridge is located in North Bergen Township, Hudson County. The bridge is functionally obsolete with sufficiency rating of 48. Based on latest inspection report condition of deck, superstructure and substructure is listed as in fair condition. The bridge is classified as “Functionally Obsolete” due to inadequate lateral underclearance and the substandard deck geometry. Currently, the bridge is listed as Priority 2 in the ranking of Bridge Management System. The bridge needs major rehabilitation/replacement including improvements to substandard geometric features to address its marginal structural condition and functional obsolescence.
3
Route 3, Bridge over Northern Secondary & Ramp A
10.74Routes
Name:
Mileposts: DBNUM: 08346
UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY
EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD
RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD
NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark
Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City
083460834608346083460834608346083460834608346
I-95NJTP
NJ120
CO505
NJ7
US1NJ495
CO501
0
08
US1T NJ139
CARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT CLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKEDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATER
NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERG
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN
WEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORK
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST
Counties:Hudson
Municipalities:North Bergen Twp
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
$22.949Est. Total Project Cost:(Million)
Air Quality Code:S19 (Exempt)
SOURCEPHASE
$22.750(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPDES $3.500
NHPPROW $1.000
STATECON $18.250
$4.500 $18.250
Hudson Page 11 of 18
NJTPA
Transportation Improvement Program Fiscal Years 2014 - 2017
THIS PAGE HAS BEEN REPLACED BY REVISION 2
The bridge is located in North Bergen Township, Hudson County. The bridge is functionally obsolete with sufficiency rating of 48. Based on latest inspection report condition of deck, superstructure and substructure is listed as in fair condition. The bridge is classified as “Functionally Obsolete” due to inadequate lateral underclearance and the substandard deck geometry. Currently, the bridge is listed as Priority 2 in the ranking of Bridge Management System. The bridge needs major rehabilitation/replacement including improvements to substandard geometric features to address its marginal structural condition and functional obsolescence.
3
Route 3, Bridge over Northern Secondary & Ramp A
10.74Routes
Name:
Mileposts: DBNUM: 08346
UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY
EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD
RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD
NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark
Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City
083460834608346083460834608346083460834608346
I-95NJTP
NJ120
CO505
NJ7
US1NJ495
CO501
0
08
US1T NJ139
CARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT CLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKEDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATER
NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERG
HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN
WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN
WEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORK
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST
Counties:Hudson
Municipalities:North Bergen Twp
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
$22.949Est. Total Project Cost:(Million)
Air Quality Code:S19 (Exempt)
SOURCEPHASE
$21.750(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPDES $2.500
NHPPROW $1.000
STATECON $18.250
$1.000 $18.250$2.500
Hudson Page 12 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
This is a superstructure replacement project that includes minor repairs made to substructure. Improvements to roadway approaches are anticipated.
7
Route 7, Bridge over CONRAIL
2.4 - 2.6Routes
Name:
Mileposts: DBNUM: 10340
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
Amtrak Railroad
CO508
NJ7
103401034010340103401034010340103401034010340
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Boonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton Line
Belleville
Belleville
Belleville
Belleville
Belleville
Belleville
Belleville
Belleville
Belleville
I-95
I-95
I-95I-95
I-95I-95
I-95
I-95I-95
I-280I-280I-280I-280I-280I-280I-280I-280I-280
State Route 7
State Route 7
State Route 7
State Route 7
State Route 7
State Route 7
State Route 7
State Route 7
State Route 7
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Norfolk Southern Railway
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
Csx RR & Norfolk Southern Ry
NJTP
Counties:Hudson
Municipalities:Kearny Town
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
$15.749Est. Total Project Cost:(Million)
Air Quality Code:S19 (Exempt)
SOURCEPHASE
$13.100(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPCON $13.100
$13.100
Hudson Page 13 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
Revision 1 As of 1/29/2015
The topography in the area is extremely flat with marshlands surrounding the roadway. This section of Rt. 7 is generally uncurbed. Roadway runoff is collected through inlets or sheet flow, discharging directly into the marshlands. During moderate and heavy storms, in addition to high tide, the runoff overflows the banks onto the roadway and adjacent properties. DMS Rank 34.
7
Route 7, Kearny, Drainage Improvements
1.7 - 3.6Routes
Name:
Mileposts: DBNUM: 93186
HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
I-280
CO506
NJ17
CO508
I-95
NJTP931869318693186931869318693186931869318693186
LEVILLELEVILLELEVILLELEVILLELEVILLELLEVILLELLEVILLELLEVILLELEVILLE
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
Ln
Ln
L Ln
L n
n n
L
US1 S1
Counties:Hudson
Municipalities:Kearny Town
NJDOT CIS Category:Road Assets
Sponsor:NJDOT
RCIS Category:Road Preservation
$35.319Est. Total Project Cost:(Million)
Air Quality Code:S4 (Exempt)
SOURCEPHASE
$4.000(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPDES $3.000
STATEROW $1.000
STATECON $28.720
$3.000 $1.000 $28.720
Hudson Page 14 of 18
NJTPA
Transportation Improvement Program Fiscal Years 2014 - 2017
THIS PAGE HAS BEEN REPLACED BY REVISION 1
The topography in the area is extremely flat with marshlands surrounding the roadway. This section of Rt. 7 is generally uncurbed. Roadway runoff is collected through inlets or sheet flow, discharging directly into the marshlands. During moderate and heavy storms, in addition to high tide, the runoff overflows the banks onto the roadway and adjacent properties. DMS Rank 34.
7
Route 7, Kearny, Drainage Improvements
1.7 - 3.6Routes
Name:
Mileposts: DBNUM: 93186
HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
Boonton Line
I-280
CO506
NJ17
CO508
I-95
NJTP931869318693186931869318693186931869318693186
LEVILLELEVILLELEVILLELEVILLELEVILLELLEVILLELLEVILLELLEVILLELEVILLE
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK
SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
Northeast C
orridor
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
ssex Line
Ln
Ln
L Ln
L n
n n
L
US1 S1
Counties:Hudson
Municipalities:Kearny Town
NJDOT CIS Category:Road Assets
Sponsor:NJDOT
RCIS Category:Road Preservation
$35.319Est. Total Project Cost:(Million)
Air Quality Code:S4 (Exempt)
SOURCEPHASE
$3.000(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPDES $2.000
STATEROW $1.000
STATECON $28.720
$2.000 $1.000 $28.720
Hudson Page 15 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
Revision 1 As of 4/1/2015
West of the Stickel Bridge, the approach interchanges and ramps have four deficient bridges and also operational and safety problems due to lack of speed change lanes, shoulders and many ingress/egress decision points within very short distances. Existing partial interchanges result in missing directional links from the Newark central business district to the I-280 corridor. Preliminary analysis has resulted in concepts that would rehabilitate or replace this bridges and add, relocate or remove ramps and/or add auxiliary lanes and shoulders to I-280.
280
Route 280, Route 21 Interchange Improvements
13.80 - 15.20Routes
Name:
Mileposts: DBNUM: 00314
NJ21
US1T
I-280
EAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGE
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
EAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARK
NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark
003140031400314003140031400314003140031400314
08
CO509
0
NJ58
US1
I-95NJTP
BLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELD
HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON
Counties:Essex Hudson
Municipalities:Newark City Harrison Town
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
$138.211Est. Total Project Cost:(Million)
Air Quality Code:2020M (Non-Exempt)
SOURCEPHASE
$97.400(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPCON $28.100$34.700 $42.150 $20.550
$34.700 $42.150 $20.550 $28.100
Hudson Page 16 of 18
NJTPA
Transportation Improvement Program Fiscal Years 2014 - 2017
THIS PAGE HAS BEEN REPLACED BY REVISION 1
West of the Stickel Bridge, the approach interchanges and ramps have four deficient bridges and also operational and safety problems due to lack of speed change lanes, shoulders and many ingress/egress decision points within very short distances. Existing partial interchanges result in missing directional links from the Newark central business district to the I-280 corridor. Preliminary analysis has resulted in concepts that would rehabilitate or replace this bridges and add, relocate or remove ramps and/or add auxiliary lanes and shoulders to I-280.
280
Route 280, Route 21 Interchange Improvements
13.80 - 15.20Routes
Name:
Mileposts: DBNUM: 00314
NJ21
US1T
I-280
EAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGE
KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY
EAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARK
NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark
003140031400314003140031400314003140031400314
08
CO509
0
NJ58
US1
I-95NJTP
BLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELD
HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON
Counties:Essex Hudson
Municipalities:Newark City Harrison Town
NJDOT CIS Category:Bridge Assets
Sponsor:NJDOT
RCIS Category:Bridges
$138.211Est. Total Project Cost:(Million)
Air Quality Code:2020M (Non-Exempt)
SOURCEPHASE
$61.040(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017NHPPCON $57.960$11.150 $49.890
$11.150 $49.890 $57.960
Hudson Page 17 of 18
NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017
This project entails increasing the air draft of the Bayonne Bridge by raising the roadway within the existing arch span by 64 feet, from 151 feet to 215 feet. Additionally, the new roadway will be wider (to better conform to AASHTO standards), and the 6-foot wide pedestrian walkway will be widened to a 12-foot wide shared-use path accommodating pedestrians and cyclists. A new higher roadway will be constructed within the existing constraints on the main span. The existing approach roads will be demolished and new, wider approaches will be constructed. The new approaches will have 8-foot wide outside shoulders and 4-foot wide inside shoulders. During construction, the median will be removable channelizer posts. Once the full bridge is completed, jersey barriers will be used in the median. The existing toll plaza will be demolished and replaced. Estimated duration of construction is about 3.5 years, during which time traffic will be reduced to one 12.5-foot lane per direction, with nightly road closures and 8 full weekend closures per year. ITS sign structures (including VMS, VSLS, CCTV and road sensors) will be constructed along the rehabilitated roadway. (On the NY side the project is in The City of New York, Richmond County.)
440
Route 440, Bayonne Bridge Navigational Clearance Project
12.02-12.78Routes
Name:
Mileposts: DBNUM: N1301
NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY
BAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNENJ81
NJ27
NJTP
I-95NJ185
CO501NJ169
NJ440
N1301N1301N1301N1301N1301N1301N1301N1301N1301
LIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETH
US22
US1
Counties:Hudson
Municipalities:Bayonne
NJDOT CIS Category:Bridge Assets
Sponsor:PANYNJ
RCIS Category:Bridges
$1,000.000Est. Total Project Cost:(Million)
Air Quality Code:S19 (Exempt)
SOURCEPHASE
$920.000(Million)Unconstrained
Information FY 2014 - 2017 TIP Cost:
2018-20232015 20162014 2017OTHERERC $230.000 $230.000 $230.000$230.000
$230.000 $230.000 $230.000$230.000
Hudson Page 18 of 18