NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017 The Port Authority will implement the replacement of the two northernmost Transfer Bridges (#9 and #10) with two new modern hydraulic bridges, the construction of associated rail track and fender infrastructure, the construction of a new barge, and the acquisition of approximately 41.5 acres of Greenville Yard property. Greenville Yard and Lift Bridge – State-of-Good-Repair Routes Name: Mileposts: DBNUM: 09338B NEWARK NEWARK NEWARK NEWARK NEWARK NEWARK NEWARK NEWARK NEWARK KEARNY KEARNY KEARNY KEARNY KEARNY KEARNY KEARNY KEARNY KEARNY ELIZABETH ELIZABETH ELIZABETH ELIZABETH ELIZABETH ELIZABETH ELIZABETH ELIZABETH ELIZABETH BAYONNE BAYONNE BAYONNE BAYONNE BAYONNE BAYONNE BAYONNE BAYONNE BAYONNE JERSEY CITY JERSEY CITY JERSEY CITY JERSEY CITY JERSEY CITY JERSEY CITY JERSEY CITY JERSEY CITY JERSEY CITY CO501 NJTP US1 I-95 I-78 09338B 09338B 09338B 09338B 09338B 09338B 09338B 09338B 09338B 10 US1T NJ169 NJ440 NJ139 NJ185 Counties: Hudson Municipalities: Jersey City NJDOT CIS Category: Multimodal Programs Sponsor: PANYNJ RCIS Category: Freight Est. Total Project Cost: (Million) Not Available Air Quality Code: NA SOURCE PHASE $87.510 (Million) Unconstrained Information FY 2014 - 2017 TIP Cost: 2018-2023 2015 2016 2014 2017 DEMO ERC $70.010 OTHER ERC $17.500 $87.510 Hudson Page 1 of 18

Upload: others

Post on 24-Jan-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

The Port Authority will implement the replacement of the two northernmost Transfer Bridges (#9 and #10) with two new modern hydraulic bridges, the construction of associated rail track and fender infrastructure, the construction of a new barge, and the acquisition of approximately 41.5 acres of Greenville Yard property.

Greenville Yard and Lift Bridge – State-of-Good-Repair

Routes

Name:

Mileposts: DBNUM: 09338B

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

ELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETH

BAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNE

JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

CO501

NJTP

US1

I-95I-78

09338B09338B09338B09338B09338B09338B09338B09338B09338B

10US1T

NJ169NJ440

NJ139

NJ185

Counties:Hudson

Municipalities:Jersey City

NJDOT CIS Category:Multimodal Programs

Sponsor:PANYNJ

RCIS Category:Freight

Est. Total Project Cost:(Million) Not Available

Air Quality Code:NA

SOURCEPHASE

$87.510(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOERC $70.010

OTHERERC $17.500

$87.510

Hudson Page 1 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

The Port Authority will implement the immediate rehabilitation and repair of the operational lift bridge and associated infrastructure. The project will involve mechanical, structural and electrical repairs to the lift bridge and maintenance and repair work on an existing rail barge and supporting rail track and fenders.

Greenville Yard and Lift Bridge – Temporary Maintenance of Barge Operations

Routes

Name:

Mileposts: DBNUM: 09338A

JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK

ELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETHELIZABETH

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

BAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNE

NJ185

NJ21

US1

I-78

NJTP

I-95

09338A09338A09338A09338A09338A09338A09338A09338A09338A

27

22

US1T

NJ169NJ440CO501

1

Counties:Hudson

Municipalities:Jersey City

NJDOT CIS Category:Multimodal Programs

Sponsor:PANYNJ

RCIS Category:Freight

Est. Total Project Cost:(Million) Not Available

Air Quality Code:NA

SOURCEPHASE

$1.500(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOERC $1.200

OTHERERC $.300

$1.500

Hudson Page 2 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

Revision 1 As of 6/12/2014

This is a combined project for the improvements to Observer Hwy. and Newark Street to enhance pedestrian safety in this area, given the high volumes of both vehicles and commuter. The project will include milling, paving, striping, signage, upgrading handicap ramps to meet ADA requirements, bump outs at the intersection of Newark Street and Hudson Street and fully upgrading 3 existing traffic signals and installing 2 new traffic signals. The intent of the Observer Highway project is to redesign it by applying NJDOT’s Complete Streets Policy principles, thereby allowing clearly defined pedestrian walkways on the north and south sides, installing bike lanes, street parking and better flow of traffic to augment both pedestrian and vehicular safety.

The project limits for Observer Highway are from mile post 0.0 (Henderson Street) to mile post 0.48 (Hudson Street) and the project limits for Newark Street are from mile post 0.69 (Washington Street) to Mile post 0.74 (East of Hudson Street).

The project will be funded with 3 SAFETEA-LU HPP listings: NJ 175 (Hoboken Observer Highway Operational and Safety Improvements - $1.8 M), NJ 223 (Newark and First St Improvements - $0.216 M), and NJ 240 (Hudson County Pedestrian Safety improvements - $0.720 M)

Hoboken Observer Highway Operational and Safety Improvements

N/ARoutes

Name:

Mileposts: DBNUM: 08441

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY

NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN

JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

Boonton Line

Bergen

Line

Northeast C

orridor

Morris & Essex Line

PATH

I-78

US1

NJ440

CO501

NJ139

US1T

084410844108441084410844108441084410844108441

95TP

Counties:Hudson

Municipalities:Hoboken City

NJDOT CIS Category:Local System Support

Sponsor:Hudson County

RCIS Category:Safety

Est. Total Project Cost:(Million) Not Available

Air Quality Code:S7 (Exempt)

SOURCEPHASE

$2.736(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOERC $2.736

$2.736

Hudson Page 3 of 18

NJTPA

Transportation Improvement Program Fiscal Years 2014 - 2017

THIS PAGE HAS BEEN REPLACED BY REVISION 1

Funding is provided for Hoboken Observer Highway Operational and Safety Improvements in Hoboken City, Hudson County.

Hoboken Observer Highway Operational and Safety Improvements

N/ARoutes

Name:

Mileposts: DBNUM: 08441

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY

NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN

JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

Boonton Line

Bergen

Line

Northeast C

orridor

Morris & Essex Line

PATH

I-78

US1

NJ440

CO501

NJ139

US1T

084410844108441084410844108441084410844108441

95TP

Counties:Hudson

Municipalities:Hoboken City

NJDOT CIS Category:Local System Support

Sponsor:Hoboken City

RCIS Category:Safety

Est. Total Project Cost:(Million) Not Available

Air Quality Code:S7 (Exempt)

SOURCEPHASE

$1.800(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOCON $1.800

$1.800

Hudson Page 4 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

The project will incorporate all existing traffic signals within the Meadowlands District into a network of self-adaptive traffic signals to efficiently reduce roadway congestion, delay, travel time, fuel consumptions, and airborne emissions. This will be accomplished through advanced, proven, and cost-effective technology of adaptive signal control. The system will adjust the signal timings based upon the real-time flow of traffic instead of utilizing fixed or actuated timings. Signals along multi-jurisdictional boundaries will be continuously coordinated for optimal operation. Traffic conditions and traffic signal operations will also be monitored and controlled in real-time by a central location. The intersection controls of the proposed system will include preemption for emergency vehicles to allow safe and efficient all-red signal access, as well as priority for mass transit vehicles in order to allow for improved and prioritized treatment along roadway corridors. All system components will utilize state-of-the-art components including wireless vehicle detection devices, wireless communication network, and advanced adaptive traffic signal control software. Inventory of the current signal infrastructure is near completion. Design of the system is currently underway and scheduled for completion in 2009. The system is ready for procurement and phased construction beginning in 2009. There will be $2 million funded by private developers through the Meadowlands Transportation Planning District (MTPD) and previously collected transportation impact funds.

This project was selected for Transportation Investment Generating Economic Recovery (TIGER 2) grant funding.

14 Municipalities: Carlstadt, East Rutherford, Jersey City, Kearny, Little Ferry, Lyndhurst, Moonachie, North Arlington, North Bergen, Teterboro, Ridgefield, Rutherford, Secaucus, South Hackensack.

Meadowlands Adaptive Signal System for Traffic Reduction (MASSTR)

N/ARoutes

Name:

Mileposts: DBNUM: N1101

Essex

Bergen

Hudson

N1101N1101N1101N1101N1101N1101N1101N1101N1101

NORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTONNORTH ARLINGTON

SOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACKSOUTH HACKENSACK

MOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIEMOONACHIELITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRYLITTLE FERRY

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

RIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDRIDGEFIELDCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT

EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD

RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD

LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN

JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

TETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBOROTETERBORO

Counties:Bergen Hudson

Municipalities:Various

NJDOT CIS Category:Local System Support

Sponsor:New Jersey Meadowlands Commission

RCIS Category:ITS

Est. Total Project Cost:(Million) Not Available

Air Quality Code:2014NM (Non-Exempt)

SOURCEPHASE

$6.250(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOEC $5.000

OTHEREC $1.250

$6.250

Hudson Page 5 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

This project is for traffic and pedestrian improvements in the segment of Newark St. one block north of the Hoboken Terminal. The project limits are from Hudson St to Washington St, approximately 350 feet.

Newark and First Street Improvements, Hoboken

N/ARoutes

Name:

Mileposts: DBNUM: 08446

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

JERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

Morris & Essex Line

1st

Paterson

I-78

Observer

Fir

eho

use

Blo

om

fie

ld

Wa

shin

gto

n

Gar

de

n

Hu

ds

on

Cli

nto

n

3rd

Jeff

ers

on

Mad

iso

n

Mo

nro

e

Central Railroad of New Jersey

Newark

084460844608446084460844608446084460844608446

PATH

n

Franklin

Mar

sha

ll

Ha

rris

on

2nd

Jack

son

4th

Jers

ey

16th

Eri

e

15th

Gro

ve

Lu

is Mu

no

z Mar in

Gra

nd

Wil

low

18th

13th

Par

k Co

urt

Riv

er

Sin

atra Counties:

Hudson

Municipalities:Hoboken City

NJDOT CIS Category:Local System Support

Sponsor:Hoboken City

RCIS Category:Road Enhancement

Est. Total Project Cost:(Million) Not Available

Air Quality Code:O10a (Exempt)

SOURCEPHASE

$0.216(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOCON $.216

$.216

Hudson Page 6 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

Under this program, the Port Authority will provide funding support for improvements to five NJDOT facilities: Route 7, Hackensack River (Wittpenn) Bridge, Route 139 (Hoboken and Conrail Viaducts), Route 1&9T Extension, Route 1&9 Pulaski Skyway, and Route 1&9 Pavement. This program will provide a total of $1.8 billion from FY 2012 through FY 2016 for these five projects.

The Route 7 Wittpenn Bridge will be replaced with a new vertical lift bridge. The total project cost is estimated at $650 to $700 million. The project is located in Kearny and Jersey City, Hudson County.

The Route 139 Contract 3 project will rehabilitate the Hoboken Viaduct, as well as replace the deck and rehabilitate the superstructure of the Conrail Viaduct. The total project cost is estimated at $180 to $200 million. The project is located in Jersey City, Hudson County.

The Route 1&9T Extension project, will provide a new roadway parallel to Route 1&9 along the railroad right-of-way in Jersey City. It will provide intermodal connections to the rail yards and divert trucks off the Tonnelle Circle and Route 1&9, helping to ease congestion and facilitating goods movement throughout the region. The total project cost is estimated at $70 to $80 million. The project is located in Jersey City, Hudson County.

The Route 1&9 Pulaski Skyway project will rehabilitate the 3.5 mile-long structure that carries Route 1&9 over the Hackensack and Passaic Rivers, the New Jersey Turnpike, several railroads and industrial facilities. The total project cost is estimated at $1.2 to $1.5 billion. The project is located in Jersey City, Kearny, and Newark in Hudson and Essex Counties.

The Route 1&9 Pavement project includes both express and local roadways in the northbound and southbound directions. The construction schedule will be coordinated with Pulaski deck construction. The total project cost is approximately $14.5 million. The project is located in Newark in Hudson County.

PANY&NJ-NJDOT Project Program

N/ARoutes

Name:

Mileposts: DBNUM: 11407

HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD

CO508I-280

I-95

US1

US1T

NJ139

CO501

NJ440

I-78

114071140711407114071140711407114071140711407

NJTP

NJ7CO507CO506NJ17

NJ21NJ495

CO505

Counties:Hudson Essex

Municipalities:Jersey City Newark City Kearny Town

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

Est. Total Project Cost:(Million) Not Available

Air Quality Code:2020M (Non-Exempt)

SOURCEPHASE

$1254.000(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017OTHERERC $250.000$150.000

PANY&NJERC $375.000 $353.000$376.000

$375.000 $353.000 $150.000$376.000 $250.000

Hudson Page 7 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

Pennsylvania Avenue/Fish House Road is a two-lane urban minor arterial that connects Central Avenue and Rt. 7. The roadway has an existing speed limit of 25 mph and has two travel lanes with no shoulders. Pennsylvania Avenue has an at-grade railroad crossing with Conrail located approximately 200 feet east of the Central Avenue/Pennsylvania Avenue signalized "T" intersection. The purpose of the project is to improve safety, mitigate the heavy truck congestion and improve the existing aging roadway to accommodate the growing demands. The project will improve safety by eliminating geometric substandard elements such as lack of shoulders and proper cross slope, as well as improve the Central Avenue/Pennsylvania Avenue signalized intersection to increase capacity and improve traffic movement. The at-grade rail crossing will be moved approximately 1200 feet from the intersection. The roadway will be designed specifically to provide superior regional connectivity and accommodate a heavily growing truck volume. Flooding problems will be addressed by providing a proper drainage system as well as improving the existing poor pavement condition.

CR 659

Portway, Fish House Road/Pennsylvania Avenue, CR 659

N/ARoutes

Name:

Mileposts: DBNUM: 97005B

NJ21

NJTPI-95

I-78

I-280

US1T

NJ440

NJ139

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark

97005B97005B97005B97005B97005B97005B97005B97005B97005B08

0

CO501

CO505

NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGEN

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City

Counties:Hudson

Municipalities:Kearny Town

NJDOT CIS Category:Local System Support

Sponsor:NJDOT

RCIS Category:Freight

Est. Total Project Cost:(Million) Not Available

Air Quality Code:S4, S7 (Exempt)

SOURCEPHASE

$6.000(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017STPPE $1.300

STPDES $1.500

STATEROW $3.200

STPCON $11.800

$1.500 $3.200$1.300 $11.800

Hudson Page 8 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

The purpose of the project is to improve the area of the Riverbank Park trail along Passaic Avenue from Bergen Avenue to the Belleville Turnpike.

Riverbank Park Bike Trail

N/ARoutes

Name:

Mileposts: DBNUM: 08440

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

BLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELD

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK

BELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBELLEVILLEBoonton Line

CO506SPUR

NJ17CO507

CO506

NJ7

NJ21

CO509

084400844008440084400844008440084400844008440City S

ub

way

N

Counties:Hudson

Municipalities:Kearny Town

NJDOT CIS Category:Multimodal Programs

Sponsor:Kearny Town

RCIS Category:Bike/Ped

Est. Total Project Cost:(Million) Not Available

Air Quality Code:AQ2 (Exempt)

SOURCEPHASE

$1.677(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017DEMOERC $1.677

$1.677

Hudson Page 9 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

Revision 2 As of 9/3/2015

The bridge is located in North Bergen Township, Hudson County. The bridge is functionally obsolete with sufficiency rating of 48. Based on latest inspection report condition of deck, superstructure and substructure is listed as in fair condition. The bridge is classified as “Functionally Obsolete” due to inadequate lateral underclearance and the substandard deck geometry. Currently, the bridge is listed as Priority 2 in the ranking of Bridge Management System. The bridge needs major rehabilitation/replacement including improvements to substandard geometric features to address its marginal structural condition and functional obsolescence.

3

Route 3, Bridge over Northern Secondary & Ramp A

10.74Routes

Name:

Mileposts: DBNUM: 08346

UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY

EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD

RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD

NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark

Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City

083460834608346083460834608346083460834608346

I-95NJTP

NJ120

CO505

NJ7

US1NJ495

CO501

0

08

US1T NJ139

CARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT CLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKEDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATER

NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERG

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN

WEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORK

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST

Counties:Hudson

Municipalities:North Bergen Twp

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

$22.949Est. Total Project Cost:(Million)

Air Quality Code:S19 (Exempt)

SOURCEPHASE

$22.750(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPDES $3.500

NHPPROW $1.000

STATECON $18.250

$3.500 $1.000 $18.250

Hudson Page 10 of 18

NJTPA

Transportation Improvement Program Fiscal Years 2014 - 2017

Revision 1 As of 9/26/2014THIS PAGE HAS BEEN REPLACED BY REVISION 2

The bridge is located in North Bergen Township, Hudson County. The bridge is functionally obsolete with sufficiency rating of 48. Based on latest inspection report condition of deck, superstructure and substructure is listed as in fair condition. The bridge is classified as “Functionally Obsolete” due to inadequate lateral underclearance and the substandard deck geometry. Currently, the bridge is listed as Priority 2 in the ranking of Bridge Management System. The bridge needs major rehabilitation/replacement including improvements to substandard geometric features to address its marginal structural condition and functional obsolescence.

3

Route 3, Bridge over Northern Secondary & Ramp A

10.74Routes

Name:

Mileposts: DBNUM: 08346

UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY

EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD

RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD

NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark

Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City

083460834608346083460834608346083460834608346

I-95NJTP

NJ120

CO505

NJ7

US1NJ495

CO501

0

08

US1T NJ139

CARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT CLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKEDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATER

NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERG

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN

WEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORK

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST

Counties:Hudson

Municipalities:North Bergen Twp

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

$22.949Est. Total Project Cost:(Million)

Air Quality Code:S19 (Exempt)

SOURCEPHASE

$22.750(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPDES $3.500

NHPPROW $1.000

STATECON $18.250

$4.500 $18.250

Hudson Page 11 of 18

NJTPA

Transportation Improvement Program Fiscal Years 2014 - 2017

THIS PAGE HAS BEEN REPLACED BY REVISION 2

The bridge is located in North Bergen Township, Hudson County. The bridge is functionally obsolete with sufficiency rating of 48. Based on latest inspection report condition of deck, superstructure and substructure is listed as in fair condition. The bridge is classified as “Functionally Obsolete” due to inadequate lateral underclearance and the substandard deck geometry. Currently, the bridge is listed as Priority 2 in the ranking of Bridge Management System. The bridge needs major rehabilitation/replacement including improvements to substandard geometric features to address its marginal structural condition and functional obsolescence.

3

Route 3, Bridge over Northern Secondary & Ramp A

10.74Routes

Name:

Mileposts: DBNUM: 08346

UNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITYUNION CITY

EAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORDEAST RUTHERFORD

RUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORDRUTHERFORD

NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark

Jersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey CityJersey City

083460834608346083460834608346083460834608346

I-95NJTP

NJ120

CO505

NJ7

US1NJ495

CO501

0

08

US1T NJ139

CARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADTCARLSTADT CLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKCLIFFSIDE PARKEDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATEREDGEWATER

NORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENNORTH BERGENGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERGGUTTENBERG

HOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKENHOBOKEN

WEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKENWEEHAWKEN

WEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORKWEST NEW YORK

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST

Counties:Hudson

Municipalities:North Bergen Twp

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

$22.949Est. Total Project Cost:(Million)

Air Quality Code:S19 (Exempt)

SOURCEPHASE

$21.750(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPDES $2.500

NHPPROW $1.000

STATECON $18.250

$1.000 $18.250$2.500

Hudson Page 12 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

This is a superstructure replacement project that includes minor repairs made to substructure. Improvements to roadway approaches are anticipated.

7

Route 7, Bridge over CONRAIL

2.4 - 2.6Routes

Name:

Mileposts: DBNUM: 10340

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

LYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURSTLYNDHURST

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

Amtrak Railroad

CO508

NJ7

103401034010340103401034010340103401034010340

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Boonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton LineBoonton Line

Belleville

Belleville

Belleville

Belleville

Belleville

Belleville

Belleville

Belleville

Belleville

I-95

I-95

I-95I-95

I-95I-95

I-95

I-95I-95

I-280I-280I-280I-280I-280I-280I-280I-280I-280

State Route 7

State Route 7

State Route 7

State Route 7

State Route 7

State Route 7

State Route 7

State Route 7

State Route 7

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Norfolk Southern Railway

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

Csx RR & Norfolk Southern Ry

NJTP

Counties:Hudson

Municipalities:Kearny Town

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

$15.749Est. Total Project Cost:(Million)

Air Quality Code:S19 (Exempt)

SOURCEPHASE

$13.100(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPCON $13.100

$13.100

Hudson Page 13 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

Revision 1 As of 1/29/2015

The topography in the area is extremely flat with marshlands surrounding the roadway. This section of Rt. 7 is generally uncurbed. Roadway runoff is collected through inlets or sheet flow, discharging directly into the marshlands. During moderate and heavy storms, in addition to high tide, the runoff overflows the banks onto the roadway and adjacent properties. DMS Rank 34.

7

Route 7, Kearny, Drainage Improvements

1.7 - 3.6Routes

Name:

Mileposts: DBNUM: 93186

HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

I-280

CO506

NJ17

CO508

I-95

NJTP931869318693186931869318693186931869318693186

LEVILLELEVILLELEVILLELEVILLELEVILLELLEVILLELLEVILLELLEVILLELEVILLE

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

Ln

Ln

L Ln

L n

n n

L

US1 S1

Counties:Hudson

Municipalities:Kearny Town

NJDOT CIS Category:Road Assets

Sponsor:NJDOT

RCIS Category:Road Preservation

$35.319Est. Total Project Cost:(Million)

Air Quality Code:S4 (Exempt)

SOURCEPHASE

$4.000(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPDES $3.000

STATEROW $1.000

STATECON $28.720

$3.000 $1.000 $28.720

Hudson Page 14 of 18

NJTPA

Transportation Improvement Program Fiscal Years 2014 - 2017

THIS PAGE HAS BEEN REPLACED BY REVISION 1

The topography in the area is extremely flat with marshlands surrounding the roadway. This section of Rt. 7 is generally uncurbed. Roadway runoff is collected through inlets or sheet flow, discharging directly into the marshlands. During moderate and heavy storms, in addition to high tide, the runoff overflows the banks onto the roadway and adjacent properties. DMS Rank 34.

7

Route 7, Kearny, Drainage Improvements

1.7 - 3.6Routes

Name:

Mileposts: DBNUM: 93186

HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

Boonton Line

I-280

CO506

NJ17

CO508

I-95

NJTP931869318693186931869318693186931869318693186

LEVILLELEVILLELEVILLELEVILLELEVILLELLEVILLELLEVILLELLEVILLELEVILLE

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARK

SECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUSSECAUCUS

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

Northeast C

orridor

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

ssex Line

Ln

Ln

L Ln

L n

n n

L

US1 S1

Counties:Hudson

Municipalities:Kearny Town

NJDOT CIS Category:Road Assets

Sponsor:NJDOT

RCIS Category:Road Preservation

$35.319Est. Total Project Cost:(Million)

Air Quality Code:S4 (Exempt)

SOURCEPHASE

$3.000(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPDES $2.000

STATEROW $1.000

STATECON $28.720

$2.000 $1.000 $28.720

Hudson Page 15 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

Revision 1 As of 4/1/2015

West of the Stickel Bridge, the approach interchanges and ramps have four deficient bridges and also operational and safety problems due to lack of speed change lanes, shoulders and many ingress/egress decision points within very short distances. Existing partial interchanges result in missing directional links from the Newark central business district to the I-280 corridor. Preliminary analysis has resulted in concepts that would rehabilitate or replace this bridges and add, relocate or remove ramps and/or add auxiliary lanes and shoulders to I-280.

280

Route 280, Route 21 Interchange Improvements

13.80 - 15.20Routes

Name:

Mileposts: DBNUM: 00314

NJ21

US1T

I-280

EAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGE

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

EAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARK

NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark

003140031400314003140031400314003140031400314

08

CO509

0

NJ58

US1

I-95NJTP

BLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELD

HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON

Counties:Essex Hudson

Municipalities:Newark City Harrison Town

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

$138.211Est. Total Project Cost:(Million)

Air Quality Code:2020M (Non-Exempt)

SOURCEPHASE

$97.400(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPCON $28.100$34.700 $42.150 $20.550

$34.700 $42.150 $20.550 $28.100

Hudson Page 16 of 18

NJTPA

Transportation Improvement Program Fiscal Years 2014 - 2017

THIS PAGE HAS BEEN REPLACED BY REVISION 1

West of the Stickel Bridge, the approach interchanges and ramps have four deficient bridges and also operational and safety problems due to lack of speed change lanes, shoulders and many ingress/egress decision points within very short distances. Existing partial interchanges result in missing directional links from the Newark central business district to the I-280 corridor. Preliminary analysis has resulted in concepts that would rehabilitate or replace this bridges and add, relocate or remove ramps and/or add auxiliary lanes and shoulders to I-280.

280

Route 280, Route 21 Interchange Improvements

13.80 - 15.20Routes

Name:

Mileposts: DBNUM: 00314

NJ21

US1T

I-280

EAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGEEAST ORANGE

KEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNYKEARNY

EAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARKEAST NEWARK

NewarkNewarkNewarkNewarkNewarkNewarkNewarkNewarkNewark

003140031400314003140031400314003140031400314

08

CO509

0

NJ58

US1

I-95NJTP

BLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELDBLOOMFIELD

HARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISONHARRISON

Counties:Essex Hudson

Municipalities:Newark City Harrison Town

NJDOT CIS Category:Bridge Assets

Sponsor:NJDOT

RCIS Category:Bridges

$138.211Est. Total Project Cost:(Million)

Air Quality Code:2020M (Non-Exempt)

SOURCEPHASE

$61.040(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017NHPPCON $57.960$11.150 $49.890

$11.150 $49.890 $57.960

Hudson Page 17 of 18

NJTPA Transportation Improvement Program Fiscal Years 2014 - 2017

This project entails increasing the air draft of the Bayonne Bridge by raising the roadway within the existing arch span by 64 feet, from 151 feet to 215 feet. Additionally, the new roadway will be wider (to better conform to AASHTO standards), and the 6-foot wide pedestrian walkway will be widened to a 12-foot wide shared-use path accommodating pedestrians and cyclists. A new higher roadway will be constructed within the existing constraints on the main span. The existing approach roads will be demolished and new, wider approaches will be constructed. The new approaches will have 8-foot wide outside shoulders and 4-foot wide inside shoulders. During construction, the median will be removable channelizer posts. Once the full bridge is completed, jersey barriers will be used in the median. The existing toll plaza will be demolished and replaced. Estimated duration of construction is about 3.5 years, during which time traffic will be reduced to one 12.5-foot lane per direction, with nightly road closures and 8 full weekend closures per year. ITS sign structures (including VMS, VSLS, CCTV and road sensors) will be constructed along the rehabilitated roadway. (On the NY side the project is in The City of New York, Richmond County.)

440

Route 440, Bayonne Bridge Navigational Clearance Project

12.02-12.78Routes

Name:

Mileposts: DBNUM: N1301

NEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKNEWARKJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITYJERSEY CITY

BAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNEBAYONNENJ81

NJ27

NJTP

I-95NJ185

CO501NJ169

NJ440

N1301N1301N1301N1301N1301N1301N1301N1301N1301

LIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETHLIZABETH

US22

US1

Counties:Hudson

Municipalities:Bayonne

NJDOT CIS Category:Bridge Assets

Sponsor:PANYNJ

RCIS Category:Bridges

$1,000.000Est. Total Project Cost:(Million)

Air Quality Code:S19 (Exempt)

SOURCEPHASE

$920.000(Million)Unconstrained

Information FY 2014 - 2017 TIP Cost:

2018-20232015 20162014 2017OTHERERC $230.000 $230.000 $230.000$230.000

$230.000 $230.000 $230.000$230.000

Hudson Page 18 of 18