nkt cablesnkt cables – our passion brings power to lifeour passion brings power to … · 2016....
TRANSCRIPT
nkt cables – Our passion brings power to lifenkt cables – Our passion brings power to lifeCompany presentationExpert Day Bucharest 10 05 2016Expert Day Bucharest 10.05.2016
1Valthermo® | 10May 2016 |
nkt cables is fully owned by NKT Holding A/Sy y g
NKT Holding1)
Turnover: 972 mEUREmployees: 5,545
Turnover: 40,6 mEUREmployees: 174
Turnover: 1,212 mEUREmployees: 3,208Employees: 5,545
Prof. cleaning equipmentEmployees: 174Optical components
Employees: 3,208Cable solutions
In 2015 NKT Holding A/S achieved a turnover of 2,224 mEUR with 8,927 employees
2Valthermo® | 10May 2016 |1) NKT Holding is listed on the Danish Stock Exchange - numbers concern 2015
g , , p y
In 2015 nkt cables generated sales of ~1.2 billion EUR with ~3,200 employees worldwide
nkt cables overviewnkt cables overview Sales by segment [in %]Sales by segment [in %]
• nkt cables was founded in 1891
• Headquarters in Cologne, Germany ~15%~13%
High voltage onshore
Railway
Automotive, flexiblesand others
• Sales of ~1.2 billion EUR in 2015
• ~3 200 employees worldwide~18%~3%
~5%
~5%
Offshore
APAC cables
Accessoriesnkt cables with strong market
positions across• 3,200 employees worldwide
• 26 locations in 17 countries
APAC cables positions across the portfolio
~41%
Building wire, low/med. voltage
3Valthermo® | 10May 2016 |
nkt cables is represented in 17 countries with 26 locations and strongly positioned in the European marketp pGermanyCologne, HQ (P&S)
Berlin (P&S)
H tt t dt
SwedenFalun (P&S)
NorwayDrammen (P&S)
DenmarkAsnaes (P&S)
Broendby (S)
S lillHettstedt (P&S)
Nordenham (P&S)Stenlille (P&S)
FinlandJorvas (S)
Russia
Great BritainPreston (S)
ChinaCh h
RussiaMoscow (S)Benelux
Oostvoorne, NL (SR)
Antverp, B (SR)
Changzhou (P&S)
Heijan (P)
VietnamHo Chi Minh Cit
UAEDubai (S)
FranceAix-en-Provence (SR)
Ho Chi Minh City (S)
AustraliaBrisbane (S)
Dubai (S)SpainBarcelona (S)
Italy
Czech RepublicKladno (P&S)
Velke Mezirici (P)
PolandWarszowice (P&S)
4Valthermo® | 10May 2016 |
yGenova (S) Vrchlabi (P)
P = Production SiteS = Sales OfficeSR = Sales Representative
Our manufacturing facilities are at the highest technological level and among the most modern, flexible and cost-effective in the world
nkt cables’ manufacturing facilities...nkt cables’ manufacturing facilities... …are among the most modern factories in the world…are among the most modern factories in the world
,
• Our manufacturing plants are among the most modern, flexible and cost-effective in the world
• We invest heavily in our manufacturing facilities to keep them at the highest technological level
• High investments in CO2-neutral production and in waste Asnaes, DenmarkWarszowice, Polandg 2 pprevention
• New state-of-the-art facility in Cologne, Germany
Falun Sweden Cologne Germany (HQ)
5Valthermo® | 10May 2016 |
Falun, Sweden Cologne, Germany (HQ)
Our customers deserve the best products and the best service – we create a partnership that provides benefits to both partiesp p p p
OEMs WHOLESALERS CONTRACTORS UTILITIES RAILWAY AUTOMOTIVE
6Valthermo® | 10May 2016 |
Project Raesfeld: Expansion of German power system from north to south of Germany was realized by nkt cables with environmental advantages
400-kV-project „Raesfeld“, GER („Delivery Project“ = nkt cables has not conducted civil engineering works)400-kV-project „Raesfeld“, GER („Delivery Project“ = nkt cables has not conducted civil engineering works)
1. EnLAG Project
y y g
• Expansion of power transport system from Meppen to Wesel by Amprion• First 400-kV-cable project of its kind under the law on energy line
extension EnLAG1) (Cable type: 2,500mm²; Cu)• Construction of a 3.5 km line
Project assignment
j
• Number of connecting sleeves could be minimized• Reduction of civil engineering works and accesses to a minimumResults • Reduction of civil engineering works and accesses to a minimum• Higher security and lower investments
Results
• Cable system has been successfully brought into service• Avoidance of high voltage power lines near residential areas• Excavation refilled to ensure a constant agricultural use
Success for companies and the environment
7Valthermo® | 10May 2016 |1) EnLAG = Energieleitungsausbaugesetz (German law)
Project Riffgat: nkt cables is able to conduct economically and ecologically valuable projects in a professional, transparent, and flexible manner
Offshore wind farm „Riffgat“, GER North SeaOffshore wind farm „Riffgat“, GER North Sea
p j p , p ,
• Creation of a cable connection between wind farm and mainland• Project management, technical planning, production and onsite installation• Delivery of 48 km 155 kV submarine cables (cable type: 630mm², Cu)
Project assignment
• Capacity of 108 MW through 30 wind turbines• Can provide 120 000 households with environmental friendly powerResults • Can provide 120,000 households with environmental-friendly power• Removal of explosive substances from the Second World War
Results
• First commercial wind farm in the German North Sea• Settlement of marine animals to create new habitat• Further step towards a future ecological energy generation
Success for companies and the environment
8Valthermo® | 10May 2016 |
Project Gemini: nkt cables is a proud partner of Gemini, the largest wind farm under construction
Offshore wind farm „Gemini“, NL North Sea Offshore wind farm „Gemini“, NL North Sea
• Support of wind farm Gemini in the Dutch North Sea• Delivery of 200 km 220 kV submarine cables (different cable types) • Additionally 5 km 380 kV and 30 km 220 kV cable to connect wind farm
Project assignment
• Capacity of 600 MW through 150 wind turbines• Gemini will feed 2 6 billion kilowatt hours into the gridResults • Gemini will feed 2.6 billion kilowatt hours into the grid• Already the 10th nkt cables offshore wind farm project since 2010
Results
• Production-related CO2 emission is amortized within three months• Submarine cable production in one of the most modern cable plants
worldwide• Contributes to an ecological achievement of climate goals
Success for companies and the environment
9Valthermo® | 10May 2016 |
g g
Project Berlin-Munich High Speed: nkt cables railway delivered high speed contact wire and messenger wire
High speed line connecting Berlin and Munich at top speed of 330 km/hHigh speed line connecting Berlin and Munich at top speed of 330 km/h
g
• Development and manufacturing of high speed line contact wire, messenger wire and droppers
• Delivery on-time according to progress of projectProject assignment
• Deliveries starting 2013 and lasting throughout 2016Results
• High strength copper magnesium contact wire and bronze cablesResults
• Reduction of traveling time from more than 6 hours to less than 4 hours• Operation of line will start later in 2016• Project is part of the VDE1) Program (German Reunification Programme)
Success for companies and the environment
10Valthermo® | 10May 2016 |1) VDE: Verkehrsprojekte Deutsche Einheit
Valthermo®: Innovation in Contact WireValthermo : Innovation in Contact Wirenkt cables railway
11Valthermo® | 10May 2016 |
Operators and installers benefit from nkt cables railway‘s international experience and referencesp
Messenger WiresDroppers
< 160 km/h
Cu Contact Wires
CuAg Contact Wires
Power Connectors NEW Valthermo®
0 k /h
Return Conductors
< 570 km/h
CuMg
CuMg Contact Wires
Installation
CuSnCuSn
Contact Wires
12Valthermo® | 10May 2016 |
VALTHERMO® offers a unique set of properties ………….q p p
• High electric conductivity
• High resistance against recrystallisationHigh resistance against recrystallisation
• Low creep
• Low wear during operation
• Low Initial Cost and low Life-Cycle-Cost
… the cost efficient alternative for AC and DC powered rail systems …
13Valthermo® | 10May 2016 |
p y
VALTHERMO® is the cost efficient contact wire alternative for AC and DC powered rail systems
In comparison to Copper, VALTHERMO® offers …In comparison to Copper, VALTHERMO® offers … In comparison to Copper Silver, VALTHERMO® offers …In comparison to Copper Silver, VALTHERMO® offers …
p y
• same electric conductivity • same high electric conductivitysame electric conductivity• higher resistance against recrystallisation• less creep• less wear during operation• lower Life-Cycle-Cost
same high electric conductivity• same high resistance against recrystallisation• same low creep• less wear during operation• less initial cost and lower Life-Cycle-Costlower Life-Cycle-Cost • less initial cost and lower Life-Cycle-Cost
Operators and installers benefit from VALTHERMO® application
14Valthermo® | 10May 2016 |
p pp
VALTHERMO® has gained regulatory approval in record timeg g y pp
1
April 2012 • First presentation to German Railways (DB Netz)
S • Field Test in commercial operation at DB Netz (Valthermo® in12
September 2012 Field Test in commercial operation at DB Netz (Valthermo in comparison to Cu, CuAg0.1 und CuMg0.2)
3 November 2012 • Creep measurement during field test in commercial operation
• Workshops with and introduction to other operators from4 January 2013
• Workshops with and introduction to other operators fromGermany, Switzerland and Austria
5 January 2013 • Compatibility test with Overhead Line (OHL) components for
various OHL systems and speed ranges66
February 2013 • Additional field test in other DC and AC powered rail systems
June 2013
7• Trademark VALTHERMO® registered574,8 km/h, 300 km
89
May 2014• Field test wear measurement : Valthermo® in comparison to Cu,
CuAg0.1 und CuMg0.2)
August 2014• Regulatory Approval by DB Netz, Valthermo® now being officially
registered as product for DB Netz
15Valthermo® | 10May 2016 |
g registered as product for DB Netz
VALTHERMO® has been introduced successfully in commercial operation of urban and long distance railway systemsg y y
BOCHUM BOGESTRA Tram
ROSTOCKTramRostock
TALLINLinnatranspordi
BERLINBVGBerlin
Potsdam
DUSSELDORFDB Replacement Demand 2nd Half 2015
Bochum
NeussCologne
Friedberg DRESDEN
POTSDAMTramDüsseldorfCOLOGNE - NEUSS
DB Field Test
Friedberg
Darmstadt
FRIEDBERG
DRESDENTram Replacement Demand
Frankfurt
FRANKFURT
COLOGNEDB Replacement Demand
GDB Replacement Demand
AUSTRIAN Railways ÖBBFirst
DARMSTADTTram Replacement
DB Replacement DemandVienna
16Valthermo® | 10May 2016 |
First pDemand
German Railways DB Netz and nkt cables railway are investigating VALTHERMO® within a long term field test in commercial operation
Field Test DB Netz, Cologne-NeussField Test DB Netz, Cologne-Neuss
g p
• DB field test to investigate 4 different types of contact wireDB field test to investigate 4 different types of contact wirematerial
• Identical mechanical and electrical load for all 4 sections• Identical demands resulting from commercial operationVALTHERMO®
• Contact Wire Materials (1 span length each)• Valthermo®
• CuAg0,1 (400+)• CuMg0,2 Valcond• Cu-ETP
CuAg0,1 (400+)
Cu ETP
• Measurements regarding Creep and Wear are taken by DB• The only field test in commercial operation of its kind
CuMg0,2 Valcond
Cu-ETP
17Valthermo® | 10May 2016 |
VALTHERMO® showing higher wear resistance than other contact wirematerials on the same route 1)
Ø Average wear rates Ø Average wear rates Wear rates at individual pointsWear rates at individual points
Reduction of vertical contact wire diameter; mm Reduction of vertical contact wire diameter; mm 0,145
0,1210,128
0,15
;
0,3
0,4
CuMg 0,2 ValcondVALTHERMOCuAg0,1- 400+
;
0,073
0,05
0,10
0,2
Cu-ETP
0,00
,
C ETPC M 0 2 V l dVALTHERMOC A 0 1 400
0,0
0,1
0 1 2 3 4 5 6 7 8Cu-ETPCuMg 0,2 ValcondVALTHERMOCuAg 0,1-400+Contact Wire Material
Average wear rate of a contact wires (AC-100) made of different materials; measurements taken at comparable points (i.e. mid point
anchor etc.) after 20 months with 92,000 pantograph passes
0 1 2 3 4 5 6 7 8
Individual wear rates measured at comparable points at contactwires (AC-100) made of different materials after 20 months with
92,000 pantograph passes
Measurement Points
18Valthermo® | 10May 2016 |
anchor etc.) after 20 months with 92,000 pantograph passes 92,000 pantograph passes
1) Field Test Cologne-Neuss, OCS: Re160, contact wire AC-100
VALTHERMO® offering excellent combination of tensile strengthand half hard point
Tensile Strength (MPa) and Half Hard Point (°C)Tensile Strength (MPa) and Half Hard Point (°C)
p
490450
430
360360360 375370344
Half Hard PointTensile Strength
344320320
180180
CuMg 0,5 ValcondCuMg 0,2 ValcondCuSn 0,2VALTHERMOCuAg 0,1Cu-ETP
Contact Wire Material (120 mm² cross section)
19Valthermo® | 10May 2016 |
( )
Profitability analysis to evaluate life cycle costs of VALTHERMO® conducted
A joint projectA joint project
y y y
Life cycle cost optimizationanalysis of OHL systems
based on the use ofVALTHERMO ®
20Valthermo® | 10May 2016 |
…and results in clear benefit in total costs over considered period of timep
Life cycle cost analysis for long distance rail 50 km length, double-track line, 70 years observation periodLife cycle cost analysis for long distance rail 50 km length, double-track line, 70 years observation period
Total costs over time in k€(excluding price dynamics)
Installation costs in k€ Total costs over time in k€(including price dynamics1)(excluding price dynamics)
35,406
27 50928,140
(including price dynamics1)
17,08617,382
21,421
27,509,
Cost benefit for Cu-ETP Contact wire when only
3 035 3,1293,131Cost benefit
VALTHERMO®
Cost benefitVALTHERMO®
7,897 Cost benefitVALTHERMO®
Contact wire when only considering installation costs
Cu-ETP C
Cu-Ag0,1 C
VALTHERMO ®
3,035
VALTHERMO ®
3,129
Cu-ETP C
3,131
Cu-Ag0,1 C
VALTHERMO ®Cu-Ag0,1 Cu-ETP
4,335 Cost benefitVALTHERMO®
296
O631
21Valthermo® | 10May 2016 |
Contact wire Contact wire
1) Nominal interest rate 2,0 %, rate of price increase 1,5 % = real interest rate (adequate target rate) 0,49 %
Contact wire Contact wire Contact wireContact wire
Why we do what we do
““O iO i
y
Our passion ““Our passion Our passion pbringsbrings brings brings
power to lifegg
power to life”power to life”power to lifepower to lifepower to life22Valthermo® | 10May 2016 |