PURPOSE AND NEED Enhance opportunities within the Las Vegas Valley for economic development Improve access to activity centers within the Las Vegas Valley Facilitate efficient mobility for emergency access, evacuation, & national defense The purpose and need will continue to be refined as we receive input from the public, agencies, and other stakeholders. The purpose of the I-11 Corridor within the Las Vegas Metropolitan Area is to: Support improved regional mobility for people & freight by reducing congestion and improving travel efficiency Provide the link through the Las Vegas Valley for a continuous I-11 that connects major metropolitan areas & markets in the Intermountain West Corridor with Mexico & Canada Provide a high-capacity, access-controlled transportation corridor The Interstate 11 (I-11) Corridor is envisioned as a new major north-south multimodal corridor that will provide enhanced transportation mobility and goods movement while creating a foundation for robust economic vitality for the region. The Nevada Department of Transportation (NDOT), in cooperation with the Federal Highway Administration (FHWA), have determined that an I-11 Planning and Environmental Linkages (PEL) Study is the most appropriate approach in identifying a recommended corridor, building upon data from the previous Tier 1 EIS. A thorough review and evaluation of initial corridor alternatives has identified a western and a central corridor alternative to be advanced for further study. An eastern corridor alternative will no longer be considered for further analysis in the PEL study. The result of the PEL process will select an I-11 corridor through the Las Vegas Metropolitan Area, between the Arizona border on US 93 and the vicinity of Kyle Canyon Road on US 95. I-11 LAS VEGAS METROPOLITAN AREA PEL STUDY FACT SHEET SUMMER 2021 PROJECT TIMELINE Ongoing Stakeholder Engagement May Final PEL Report & Selection of I-11 Corridor 2021 2022 Mar – Apr In-Person Public Hearings March Draft PEL Report Sept – Feb Stakeholder Meetings (In Person) September Telephone Town Hall Aug – Sept Online & In-Person Public Information Meetings June Stakeholder Meetings (Virtual) May Alternatives Development Report January Transition from Tier 1 EIS to PEL Study P L A N N I N G & E N V I R O N M E N T A L L I N K A G E S S T U D Y L A S V E G A S M E T R O P O L I T A N A R E A

Upload: others

Post on 15-Mar-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

PURPOSE AND NEED

Enhance opportunities within the Las Vegas Valley for economic development

Improve access to activity centers within the Las Vegas Valley

Facilitate e�cient mobility for emergency access, evacuation, & national defense

The purpose and need will continue to be re�ned as we receive input from the public, agencies, and other stakeholders.

The purpose of the I-11 Corridor within the Las Vegas Metropolitan Area is to:

Support improved regional mobility for people & freight by reducing congestion and improving travel e�ciency

Provide the link through the Las Vegas Valley for a continuous I-11 that connects major metropolitan areas & markets in the Intermountain West Corridor with Mexico & Canada

Provide a high-capacity, access-controlled transportation corridor

The Interstate 11 (I-11) Corridor is envisioned as a new major north-south multimodal corridor that will provide enhanced transportation mobility and goods movement while creating a foundation for robust economic vitality for the region. The Nevada Department of Transportation (NDOT), in cooperation with the Federal Highway Administration (FHWA), have determined that an I-11 Planning and Environmental Linkages (PEL) Study is the most appropriate approach in identifying a recommended

corridor, building upon data from the previous Tier 1 EIS. A thorough review and evaluation of initial corridor alternatives has identi�ed a western and a central corridor alternative to be advanced for further study. An eastern corridor alternative will no longer be considered for further analysis in the PEL study. The result of the PEL process will select an I-11 corridor through the Las Vegas Metropolitan Area, between the Arizona border on US 93 and the vicinity of Kyle Canyon Road on US 95.

I-11 LAS VEGAS METROPOLITAN AREA PEL STUDY

FACT SHEET SUMMER 2021

PROJECT TIMELINE

Ongoing Stakeholder Engagement

MayFinal PEL Report &

Selection ofI-11 Corridor

2021 2022

Mar – AprIn-Person

PublicHearings

MarchDraft

PEL Report

Sept – FebStakeholder

Meetings(In Person)

SeptemberTelephoneTown Hall

Aug – SeptOnline &

In-Person Public Information

Meetings

JuneStakeholder

Meetings (Virtual)

MayAlternatives

Development Report

JanuaryTransition

from Tier 1 EISto PEL Study

PLAN

NIN

G&

ENVIRONMENTAL LINKAGES

STUDY

LAS VEGAS METROPOLITAN AREA

STAY UPDATED!

ENVIRONMENTAL PROCESS

COMMUNITY OUTREACH

For federally funded projects, a PEL study lays the groundwork for the future studies that may be used during the NEPA process. The PEL study develops the project purpose and need, de�nes the important issues, identi�es critical environmental concerns, and recommends corridor alternatives to be further evaluated in the NEPA process. Through coordination with local, regional, state, and federal partners, including regulatory agencies and public stakeholders, the PEL recognizes potential risks of impacts related to the identi�ed corridor alternatives.

The PEL process also ensures:

• Reasonable transportation corridor alternativesare considered

• Community input and involvement play a key role

• Environmental and community e�ects are disclosed

During the PEL process there are ongoing opportunities for engagement with key public comment periods identi�ed below:

Public Involvement is a critical component to a successful PEL process. There are numerous opportunities for public participation from in-person, virtual, and online public meetings to a telephone town hall and ongoing engagement throughout the project in the best interest of stakeholders and the overall community.

NDOT is committed to providing transparent and timely public involvement. Please visit the project website to sign-up for noti�cations and for information on upcoming engagement opportunities.

Website: i11nv.com

Email: [email protected]

Hotline: (702) 472-8018

PUBLIC AND AGENCY SCOPING

ALTERNATIVES DEVELOPMENT

PREPARE DRAFT PEL STUDY

PUBLIC REVIEW OF DRAFT PEL STUDY/PUBLIC HEARING

RESPONSE TO COMMENTS ON DRAFT PEL STUDY

PREPARE FINAL PEL STUDY AND DECISION DOCUMENT

ONGOING REGIONAL

STAKEHOLDER ENGAGEMENT

WILL OCCUR THROUGHOUT

THE STUDY

PUBLIC MEETINGS/HEARINGS& KEY COMMENT PERIODS

I-11 LAS VEGAS METROPOLITAN AREA PEL

WE ARE HERE

PLAN

NIN

G&

ENVIRONMENTAL LINKAGES

STUDY

LAS VEGAS METROPOLITAN AREA

SpringValley

Paradise

NorthLas Vegas

Las Vegas

Henderson

BoulderBasin

604

146

564

166

167

147

582

215

215

159

159

593

595

15

15

515

515

215

95 95

93

Corridor AlternativesRecommended to Advance to Complete PEL

Western AlternativeWestern Alternative(Sheep Mountain option)Western Alternative(Centennial Bowl option)Central Alternative

Las Vegas Metropolitan Area