NO. ERPC/PROTECTION/2019/1146-89 DATE: 02.05.2019 FAX MESSAGE NO . - 661 To, As per list enclosed. Sub: Notice for 79 th Protection Coordination sub-Committee (PCC) meeting of ERPC Notice is hereby given that 79 th PCC meeting of ERPC will be held on 21 st May 2019 (Tuesday) at 11:00 hrs at ERPC Conference Room, Kolkata. The tentative agenda items for discussion will be as follows: 1) Confirmation of the minutes of 78 th Protection sub-Committee Meeting of ERPC 3) Analysis of following grid disturbances of April, 2019: Sl No GD/GI Date Time Affected System Summary Load loss (MW) Gen loss (MW) 1 GD-I 05-04- 2019 15:03 WBPDCL Bus-II at Santaldih S/S was under shutdown. At 15:03 hrs total power failure occurred at Santaldih S/S due to flash over at B phase isolator of ST-III resulting tripping all feeders connected to S/S 40 480 2 GI-II 11-04- 2019 13:39 ISTS +/-500 KV Talcher Kolar HVDC Pole 1 got blocked due to Emergency switch off signal receipt from Kolar end resulting reduction of power flow from 2000 MW to 1000 MW. Pole 2 was operated in metallic return mode after the incident. 0 190 3 GD-I 12-04- 2019 23:55 ISTS At 23:55 Hrs, R-Y phase to phase fault occurred on 400 kV Teesta 3-Kishanganj circuit resulting in its tripping. Subsequently 400 kV Rangpo-Kishanganj ckt tripped on backup over current protection leading to Isolation of Sikkim Hydro complex (1908 MW) with Gangtok Load (17 MW) and the island collapsed due to large load generation imbalance causing total blackout of 400/220/132 kV Rangpo, 400 kV Teesta V, 400 kV Teesta 3, 400/132 kV Dikchu, 220 kV Jorethang, 220 kV Tashiding, 132 kV Chujachen and 132 kV Gangtok substations. 17 1908 Tel No.:033-24239651, 24239651, FAX No.:033-24239652, 24239653 Web: www.erpc.gov.in

Upload: others

Post on 15-Sep-2019

1 views

Category:

Documents


0 download

TRANSCRIPT

NO. ERPC/PROTECTION/2019/1146-89 DATE: 02.05.2019

FAX MESSAGE NO. - 661

To,

As per list enclosed.

Sub: Notice for 79th Protection Coordination sub-Committee (PCC) meeting of ERPC

Notice is hereby given that 79th PCC meeting of ERPC will be held on 21st May 2019 (Tuesday) at 11:00 hrs at ERPC Conference Room, Kolkata.

The tentative agenda items for discussion will be as follows:

1) Confirmation of the minutes of 78th Protection sub-Committee Meeting of ERPC 3) Analysis of following grid disturbances of April, 2019:

Sl No

GD/GI Date Time Affected System

Summary Load loss (MW)

Gen loss (MW)

1 GD-I 05-04-2019

15:03 WBPDCL

Bus-II at Santaldih S/S was under shutdown. At 15:03 hrs total power failure occurred at Santaldih S/S due to flash over at B phase

isolator of ST-III resulting tripping all feeders connected to S/S

40 480

2 GI-II 11-04-2019

13:39 ISTS

+/-500 KV Talcher Kolar HVDC Pole 1 got blocked due to Emergency switch off signal

receipt from Kolar end resulting reduction of power flow from 2000 MW to 1000 MW. Pole 2 was operated in metallic return mode after

the incident.

0 190

3 GD-I 12-04-2019

23:55 ISTS

At 23:55 Hrs, R-Y phase to phase fault occurred on 400 kV Teesta 3-Kishanganj circuit resulting in its tripping. Subsequently 400 kV

Rangpo-Kishanganj ckt tripped on backup over current protection leading to Isolation of Sikkim Hydro complex (1908 MW) with Gangtok Load (17 MW) and the island collapsed due to large load generation

imbalance causing total blackout of 400/220/132 kV Rangpo, 400 kV Teesta V, 400

kV Teesta 3, 400/132 kV Dikchu, 220 kV Jorethang, 220 kV Tashiding, 132 kV

Chujachen and 132 kV Gangtok substations.

17 1908

Tel No.:033-24239651, 24239651, FAX No.:033-24239652, 24239653 Web: www.erpc.gov.in

4 GI-II 16-04-2019

23:30 ISTS

At 23:32 Hrs, 400 kV Rangpo-Kishangunj circuit tripped from Kishangunj end on directional E/F. With this fault, Dikchu

400/132 kV ICT tripped on Backup Overcurrent protection causing tripping of both its units. In addition, during this fault, Jorethang Unit 2 also tripped on generator

protection. The SPS associated with this circuit did not operate at Rangpo End. As the line

loading on 400 kV Teesta3-Kishanganj circuit was 1538 MW, the SPS for Line overloading at

Teesta 3 end operated tripping its unit 1. However, this did not reduce the loading on

the line below the set limit of 2000 Amps. The low voltage persisted at Teesta 3 generating plant and after 5 minutes, the Teesta 3 Unit

2,3,4 and 6 tripped .

0 1118

5 GD-I 17-04-2019

10:16 JUSNL

220 kV Ranchi – Hatia D/C was out of service. At 10:16 hrs 220 kV Biharshariff-Tenughat S/C tripped on R-N resulting into islanding of Hatia load with 2 running units of Tenughat and one

unit of CPP Inland power. Island could not survive due to generation load unbalance

leading to the load loss of around 150 MW at Hatia/ Namkum/Lohardangha /Kamdara area in Jharkhand system and loss of two running units of Tenughat and 1 running unit of CPP

Inland. 315 MVA ICT-I & II of Biharshariff tripped sensing the fault of 220 kV

Biharshariff-Tenughat S/C.

165 390

6 GI-I 18-04-2019

10:16 ISTS

At 10:16 hrs 220 kV Muzaffarpur - Hazipur - II, 220 kV bus II at Muzaffarpur, 400/220 kV ICT -

III at Muzaffarpur and 220 kV Muzaffarpur - Dhalkebar II tripped.

0 0

7 GD-I 27-04-2019

12:47 JUSNL

220 kV Arrah Khagul D/C were out of service. 220 kV Khagul Sipara S/C was under breakdown prior to the incident. So Khagul was connected to only one source i.e. Patna. At 12:47 hrs 220 kV Patna Khagul S/C tripped on B-N fault resulting total power failure at Khagul S/C.

147 0

8 GD-I 29-04-2019

12:37 JUSNL At 12:37 Hrs, all lines emanating from 220 KV Patratu S/s tripped leading to a total power failure of the S/S

65 0

9 GD-I 30-04-2019

02:15 ISTS

At 2:15hrs, 765 KV Bus I at Angul tripped on Bus bar protection due to B ph bursting of CT associated with Tie bay of 765 KV Angul-Jharsuguda IV. At the same time,1500 MVA 765/400 KV ICT IV also tripped on back up O/C protection.

0 0

4) Single line tripping incidences of April-2019 is enclosed at Annexure-I.

5) Islanding scheme of Kanti TPS

You are requested to kindly furnish the detail report along with all records (SLD, SOE, DR, Relay and schematic diagram of auxiliary supply, wherever applicable) related to above trippings for meaningful analysis during the meeting. You are also requested to upload the details in on-line tripping incident reporting system implemented in Protection Database Management System www.erpc-protectiondb.in.

Your participation in the meeting is highly solicited. Please confirm your participation in the meeting along with name and designation of the participants.

Yours faithfully,

-Sd- (J. Ganeswara Rao) Executive Engineer

LIST OF ADDRESSES:

Chief Engineer, Trans (O&M)

Bihar State Power Transmission Limited, Vidyut

Bhawan, Bailey Road, Patna-800021

Electrical Superintending Engineer (CRITL)

Bihar State Power Transmission Limited, Vidyut

Bhawan, Bailey Road, Patna-800021

Chief Engineer (SLDC)

Damodar Valley Corporation, GOMD-I Premises,

P.O.- Danesh Seikh Lane, Howrah- 711109

Chief Engineer (CTC)

Damodar Valley Corporation, P.O. Maithon Dam,

Dist. Dhanbad, Jharkhand-828207

Chief Engineer, (CRITL)

Jharkhand Urja Sancharan Nigam Limited

Kusai Colony, Doranda, Ranchi-834002

Electrical Superintending Engineer (CLD)

Jharkhand Urja Sancharan Nigam Limited,

Kusai Colony, Doranda, Ranchi-834002

Chief General Manager (O&M),

OPTCL, Janpath, Bhubaneswar,

Odisha – 751 022. FAX: 0674-2542932

[email protected]

Sr. General Manager (PPA), Technical Wing,

OHPCL, Orissa State Police Housing & Welfare

Corpn. Bldg. Vanivihar Chowk,

Janpath,Bhubaneswar-752022

Chief Load Dispatcher, SLDC

OPTCL, P.O. Mancheswar Rly. Colony

Bhubaneswar-751017

Chief Engineer (Testing), WBSETCL

Central Testing Laboratory, Abhikshan, Salt Lake,

Kolkata-700091 ( Fax no. 2367-3578/1235 )

Chief Engineer (CLD)

WBSETCL, P.O. Danesh Sheikh Lane,

Andul Road, Howrah-711109

Addl. Chief Engineer (ALDC)

West Bengal Electricity Distribution Company Ltd

Vidyut Bhavan, 7th Floor, Bidhannagar, Sector-I

Salt Lake City, Kolkata-700091(Fax-033-2334-5862)

Dy. Chief Engineer (Testing)/ Sr. Manager (Testing)

CESC Ltd.,4, Sasi Sekhar Bose Road,

Kolkata-700025

General Manager (O&M)

KhSTPS, NTPC Ltd., P.O. Deepti Nagar,

Dist. Bhagalpur, Bihar-813203

General Manager(O&M)

FSTPS, NTPC Ltd., P.O. Nabarun,

Dist. Murshidabad, West Bengal-742236

Dy. General Manager ( Engineering),

WBPDCL,OS Dept. Corporate Office, 3/C,L.A Block,

Salt Lake-III, Kolkata-700098 ( Fax-033-23350516)

General Manager (O&M) General Manager (OS), ERHQ-II, NTPC Ltd., 3rd

flr.

Barh STPS, NTPC Ltd., P.O. NTPC Barh,

Dist. Patna, Bihar-803213

OLIC Building, Plot no. N 17/2, Nayapalli, Unit-8

Bhubaneswar- 751012 (Fax No. 0674-2540919)

General Manager(O&M), TSTPS, NTPC Ltd.,

P.O.Kaniha, Dist. Angul, Orissa-759117 General Manager (O&M), POWERGRID, Odisha

Projects, Sahid Nagar, Bhubaneswar – 751 007

General Manager(OS), ERHQ-I, NTPC Ltd.,

Loknayak Jaiprakash Bhawan, (2nd

Floor),

Dak Bunglow Chawk, Patna-800001

Manager (Electrical), Adhunik Power & Natural

Resources Ltd. “Lansdowne Towers, Kolkata-700020

( Fax No. 033-2289 0285)

Executive Director (O&M)

NHPC Ltd., NHPC Office Complex, Sector-33,

Faridabad, Haryana-121003 ( Fax-01292272413 )

Electrical Superintending Engineer, TTPS,

Tenughat Vidyut Nigam Ltd., Lalpania, Dist. Bokaro,

Jharkhand-829149

Dy. General Manager (Electrical)

IB Thermal Power Station, OPGCL

Banhapalli, Dist. Jharsuguda-768234,Orissa

General Manager (OS), ER-I

Power Grid Corporation of India Ltd.,

Alankar Place, Boring Road, Patna-800001

Chief Engineer (Trans.)

Power Deptt., Govt. of Sikkim, Gangtok-731010

Sr. Manager (CTMC)

Durgapur Projects Limited, Durgapur-713201

Executive Director,

ERLDC, POSOCO, Tollygunge,Kolkata-700033

Head Construction, ENCIL, Siliguri-7340051

General Manager (OS), ER-II

Power Grid Corporation of India Ltd.,

J-I-15, Block-EP, Sector-V,Salt Lake,Kolkata-91

Shri A.K.Nayak/Shri Sumit S Ghosh

Maithon Power Limited, Maithon Office, MA 5

Gogna, Dist. Dhanbad, Jhankand State, PIN-828207

General Manager (P&O), PTC Ltd.,

Kanchanjunga Bldg.,18, Barakhamba Road,

New Delhi-110001

Vice President, Vedanta Ltd.

1st Floor, Module C/2, Fortune Tower, C S Pur,

Bhubaneswar- 751023

Managing Director, Bhutan Power Corporation

Post Box no. 580, Thimpu, Bhutan.

Managing Director, Druk Green Power Corprn.

P.O. Box-1351, Thimpu, Bhutan.

General Manager, Darbhanga(Bihar), Darbhanga

Motihari Transmission Company Limited (DMTCL)

Shri Brajesh Kumar Pande, Plant Head, JITPL.

(FAX:011-26139256-65)

Shri D. P. Bhagava, Chief Consultant (O&M), Teesta

Urja Limited, New Delhi (FAX:011-46529744)

Director (GM Division), Central Electricity Authority

Sewa Bhawan, R. K. Puram, New Delhi-110066

Director (NPC), CEA, NRPC Building, Katwaria

Sarai, New Delhi- 110016

President, Dans Energy Pvt. Ltd, 5th Floor, DLF

Building No. 8, Tower-C, Gurgaon - 722OO2

Director, Shiga Energy Pw. Ltd., 5th Floor, DLF

Building No. 8, Tower-C, Gurgaon - 722OO2

DGM (E&I), HALDIA ENERGY LIMITED, BARIK

BHAWAN, KOKATA-700072, FAX: 033-22360955

CC:

ASSISTANT SECRETARY, ERPC

Tripping Name Tripping Date & Time Element Type Element NameFrom

OwnerFrom Station FIR(F) DR(F) EL(F) To Owner To Station FIR(T) DR(T) EL(T)

400KV MAITHON-DURGAPUR-II 30-04-2019 17:24:00 Transmission Line400 KV-Mithon(400/220kV)-400 KV-Durgapur steel TPS

21/400kV-2POWERGRID 400 KV-Mithon(400/220kV) No No No DVC 400 KV-Durgapur steel TPS 21/400kV No No No

400KV DSTPS(ANDAL)-RAGHUNATHPUR-I 30-04-2019 16:31:00 Transmission Line400 KV-Durgapur steel TPS 21/400kV-400 KV-Raghunathpur

TPS 20/400/220/33kV-1DVC 400 KV-Durgapur steel TPS 21/400kV No No No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

220KV RANCHI-CHANDIL-II 30-04-2019 16:24:00 Transmission Line 220 KV-Ranchi(400/220kV)-220 KV-Chandil(220/132kV)-2 POWERGRID 220 KV-Ranchi(400/220kV) No No No JUSNL 220 KV-Chandil(220/132kV) No No No

400KV MAITHON-MEJIA-III 30-04-2019 16:14:00 Transmission Line400 KV-Mithon(400/220kV)-400 KV-Mejia TPS

16.5/400/220/33kV-3POWERGRID 400 KV-Mithon(400/220kV) No No No DVC 400 KV-Mejia TPS 16.5/400/220/33kV No No No

400KV RANCHI-RAGHUNATHPUR-III 30-04-2019 15:20:00 Transmission Line400 KV-Ranchi(400/220kV)-400 KV-Raghunathpur TPS

20/400/220/33kV-3POWERGRID 400 KV-Ranchi(400/220kV) No No No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

400KV RANCHI-RAGHUNATHPUR-II 30-04-2019 15:18:00 Transmission Line400 KV-Ranchi(400/220kV)-400 KV-Raghunathpur TPS

20/400/220/33kV-2POWERGRID 400 KV-Ranchi(400/220kV) No No No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

400KV NEW PPSP-NEW RANCHI-II 30-04-2019 15:09:00 Transmission Line 400 KV-New_PPSP 400kV-400 KV-Ranchi_N(765/400kV)-2 WBSETCL 400 KV-New_PPSP 400kV No No No POWERGRID 400 KV-Ranchi_N(765/400kV) No No No

400KV DSTPS(ANDAL)-RAGHUNATHPUR-II 30-04-2019 14:39:00 Transmission Line400 KV-Durgapur steel TPS 21/400kV-400 KV-Raghunathpur

TPS 20/400/220/33kV-2DVC 400 KV-Durgapur steel TPS 21/400kV No No No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

GI - II at Jharsuguda 30-04-2019 02:15:00 Transmission Line 765 KV-JHARSUGUDA 765 KV-765 KV-ANGUL -4 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No POWERGRID 765 KV-ANGUL No No No

30-04-2019 02:15:00 Bus 765 KV-JHARSUGUDA 765 KV--1 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

30-04-2019 02:15:00 Transformer 765 KV-JHARSUGUDA 765 KV--1 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

30-04-2019 02:15:00 Bus 765 KV-JHARSUGUDA 765 KV--1 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

30-04-2019 02:15:00 Transformer 765 KV-JHARSUGUDA 765 KV--1 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

30-04-2019 02:15:00 Bus 765 KV-JHARSUGUDA 765 KV--1 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

30-04-2019 02:15:00 Transformer 765 KV-JHARSUGUDA 765 KV--1 POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

30-04-2019 02:15:00 Bus jhar--1 jhar

GD at PTPS 29-04-2019 12:37:00 Transmission Line220 KV-PTPS_G(220/132/33/11kV)-220 KV-HATIA 220/132KV-

1220 KV-PTPS_G(220/132/33/11kV) JUSNL 220 KV-HATIA 220/132KV No No No

29-04-2019 12:37:00 Transmission Line220 KV-PTPS_G(220/132/33/11kV)-220 KV-HATIA 220/132KV-

2NTPC 220 KV-PTPS_G(220/132/33/11kV) No No No JUSNL 220 KV-HATIA 220/132KV No No No

29-04-2019 12:37:00 Transmission Line220 KV-PTPS_G(220/132/33/11kV)-220 KV-

TVNL_Tenughat(15.7/220kV)-1NTPC 220 KV-PTPS_G(220/132/33/11kV) No No No TVNL 220 KV-TVNL_Tenughat(15.7/220kV) No No No

220KV STPS(WBSEB)-CHANDIL-SC 29-04-2019 12:27:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Chandil(220/132kV)-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No JUSNL 220 KV-Chandil(220/132kV) No No No

220KV MAITHON-DUMKA-I 29-04-2019 10:35:00 Transmission Line220 KV-Mithon(400/220kV)-220 KV-

Dumka_MADANPUR(220/132kV)-1POWERGRID 220 KV-Mithon(400/220kV) No No No JUSNL 220 KV-Dumka_MADANPUR(220/132kV) No No No

400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-2 28-04-2019 11:53:00 Transmission Line 400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-2 DMTCL 400 KV-DMTCL MOTIHARI 400/132kV No No NoNORTHERN

REGION400 KV-GORAKHPUR No No No

400 KV-RENGALI 400KV-400 KV-KEONJHAR400KV-1 28-04-2019 11:19:00 Transmission Line 400 KV-RENGALI 400KV-400 KV-KEONJHAR400KV-1 POWERGRID 400 KV-RENGALI 400KV No No No POWERGRID 400 KV-KEONJHAR400KV No No No

400 KV-ALIPURDUAR PGCIL 400/220kV-400 KV-BONGAIGAON-

128-04-2019 01:57:00 Transmission Line

400 KV-ALIPURDUAR PGCIL 400/220kV-400 KV-BONGAIGAON-

2POWERGRID 400 KV-ALIPURDUAR PGCIL 400/220kV No No No POWERGRID 400 KV-BONGAIGAON No No No

220 KV-Santaldih TPS 220kV-220 KV-Chandil(220/132kV)-1 27-04-2019 12:48:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Chandil(220/132kV)-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No JUSNL 220 KV-Chandil(220/132kV) No No No

GI-I at Khagul 27-04-2019 12:47:00 Transmission Line 220 KV-PATNA 400KV-220 KV-KHAGAUL 220KV-1 POWERGRID 220 KV-PATNA 400KV No No No

220 KV-BUDHIPADAR220KV-220 KV-RAIGARH_PGCIL-1 27-04-2019 12:25:00 Transmission Line 220 KV-BUDHIPADAR220KV-220 KV-RAIGARH_PGCIL-1 OPTCL 220 KV-BUDHIPADAR220KV No No No

220 KV-PATNA 400KV-220 KV-SIPARA 220KV-1 27-04-2019 12:22:00 Transmission Line 220 KV-PATNA 400KV-220 KV-SIPARA 220KV-2 POWERGRID 220 KV-PATNA 400KV No No No BSPTCL 220 KV-SIPARA 220KV No No No

220 KV-Mithon(400/220kV)-220 KV-

Dumka_MADANPUR(220/132kV)-127-04-2019 11:09:00 Transmission Line

220 KV-Mithon(400/220kV)-220 KV-

Dumka_MADANPUR(220/132kV)-1POWERGRID 220 KV-Mithon(400/220kV) No No No JUSNL 220 KV-Dumka_MADANPUR(220/132kV) No No No

Multiple tripping at 220 KV-Talcher super thermal power 26-04-2019 14:37:00 Transmission Line220 KV-Talcher super thermal power 21/400-220 KV-

RENGALI220KV-1220 KV-Talcher super thermal power 21/400 OPTCL 220 KV-RENGALI220KV No No No

26-04-2019 14:37:00 Transmission Line220 KV-Talcher super thermal power 21/400-220 KV-

TALCHER(TTPS)220KV-1220 KV-Talcher super thermal power 21/400 OPTCL 220 KV-TALCHER(TTPS)220KV No No No

400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 26-04-2019 14:31:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No POWERGRID 400 KV-RANGPO 400KV No No No

220 KV-Mithon(400/220kV)-220 KV-

Dhanbad_D(220/132/33kV)-126-04-2019 13:12:00 Transmission Line

220 KV-Mithon(400/220kV)-220 KV-

Dhanbad_D(220/132/33kV)-2220 KV-Mithon(400/220kV) DVC 220 KV-Dhanbad_D(220/132/33kV) No No No

220 KV-NEW PURNEA 400KV-220 KV-MADHEPURA 220KV-

DC tripping25-04-2019 22:12:00 Transmission Line 220 KV-NEW PURNEA 400KV-220 KV-MADHEPURA 220KV-1 220 KV-NEW PURNEA 400KV

25-04-2019 22:12:00 Transmission Line 220 KV-NEW PURNEA 400KV-220 KV-MADHEPURA 220KV-2 220 KV-NEW PURNEA 400KV

400 KV-KISHANGANJ 400KV-400 KV-DMTCL DARBHANGA

400kV-125-04-2019 22:12:00 Transmission Line

400 KV-KISHANGANJ 400KV-400 KV-DMTCL DARBHANGA

400kV-1400 KV-KISHANGANJ 400KV DMTCL 400 KV-DMTCL DARBHANGA 400kV No No No

220 KV-SASARAM 765KV-220 KV-SAHUPURI-1 25-04-2019 14:02:00 Transmission Line 220 KV-SASARAM 765KV-220 KV-SAHUPURI-1 220 KV-SASARAM 765KVNORTHERN

REGION220 KV-SAHUPURI No No No

400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 25-04-2019 12:46:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No POWERGRID 400 KV-RANGPO 400KV No No No

220 KV-SASARAM 765KV-220 KV-SAHUPURI-1 25-04-2019 12:03:00 Transmission Line 220 KV-SASARAM 765KV-220 KV-SAHUPURI-1 POWERGRID 220 KV-SASARAM 765KV No No NoNORTHERN

REGION220 KV-SAHUPURI No No No

765 KV-ANGUL -765 KV-JHARSUGUDA 765 KV-1 24-04-2019 14:29:00 Transmission Line 765 KV-ANGUL -765 KV-JHARSUGUDA 765 KV-4 POWERGRID 765 KV-ANGUL No No No POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

400 KV-RANGPO 400KV-400 KV-KISHANGANJ 400KV-1 24-04-2019 13:30:00 Transmission Line 400 KV-RANGPO 400KV-400 KV-KISHANGANJ 400KV-1 POWERGRID 400 KV-RANGPO 400KV No No No POWERGRID 400 KV-KISHANGANJ 400KV No No No

400 KV-JAMSHEDPUR 400/220KV--1 23-04-2019 17:41:00 Transformer 400 KV-JAMSHEDPUR 400/220KV--1 POWERGRID 400 KV-JAMSHEDPUR 400/220KV No No No

400 KV-Durgapur steel TPS 21/400kV-400 KV-Raghunathpur

TPS 20/400/220/33kV-123-04-2019 17:21:00 Transmission Line

400 KV-Durgapur steel TPS 21/400kV-400 KV-Raghunathpur

TPS 20/400/220/33kV-1DVC 400 KV-Durgapur steel TPS 21/400kV No No No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

220 KV-Ranchi(400/220kV)-220 KV-Chandil(220/132kV)-1 23-04-2019 15:08:00 Transmission Line 220 KV-Ranchi(400/220kV)-220 KV-Chandil(220/132kV)-1 POWERGRID 220 KV-Ranchi(400/220kV) No No No JUSNL 220 KV-Chandil(220/132kV) No No No

220 KV-BUDHIPADAR220KV-220 KV-RAIGARH_PGCIL-1 23-04-2019 13:35:00 Transmission Line 220 KV-BUDHIPADAR220KV-220 KV-RAIGARH_PGCIL-1 OPTCL 220 KV-BUDHIPADAR220KV No No No

400 KV-DMTCL DARBHANGA 400kV-400 KV-KISHANGANJ

400KV-123-04-2019 07:07:00 Transmission Line

400 KV-DMTCL DARBHANGA 400kV-400 KV-KISHANGANJ

400KV-2DMTCL 400 KV-DMTCL DARBHANGA 400kV No No No POWERGRID 400 KV-KISHANGANJ 400KV No No No

220 KV-CHUKHA-220 KV-BirparaPGCIL-1 22-04-2019 12:10:00 Transmission Line 220 KV-CHUKHA-220 KV-BirparaPGCIL-1 220 KV-CHUKHA POWERGRID 220 KV-BirparaPGCIL No No No

400 KV-SASARAM 765KV-400 KV-VARANASI-1 22-04-2019 11:57:00 Transmission Line 400 KV-SASARAM 765KV-400 KV-VARANASI-1 POWERGRID 400 KV-SASARAM 765KV No No NoNORTHERN

REGION400 KV-VARANASI No No No

400 KV-New Chanditola 400 kV-400 KV-Kharagpur 400kV-1 21-04-2019 17:37:00 Transmission Line 400 KV-New Chanditola 400 kV-400 KV-Kharagpur 400kV-1 WBSETCL 400 KV-New Chanditola 400 kV No No No WBSETCL 400 KV-Kharagpur 400kV No No No

400 KV-MERAMUNDALI 400KV-400 KV-ANGUL -1 21-04-2019 17:15:00 Transmission Line 400 KV-MERAMUNDALI 400KV-400 KV-ANGUL -1 OPTCL 400 KV-MERAMUNDALI 400KV Yes Yes No POWERGRID 400 KV-ANGUL No No No

400 KV-BIDHANNAGAR/DURGAPR 400KV-400 KV-Arambag

400kV-121-04-2019 16:47:00 Transmission Line

400 KV-BIDHANNAGAR/DURGAPR 400KV-400 KV-Arambag

400kV-1WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes No Yes WBSETCL 400 KV-Arambag 400kV No No No

765 KV-DHARAMJAYGARH-765 KV-JHARSUGUDA 765 KV-1 21-04-2019 15:14:00 Transmission Line 765 KV-DHARAMJAYGARH-765 KV-JHARSUGUDA 765 KV-1WESTERN

REGION765 KV-DHARAMJAYGARH No No No POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

400 KV-Durgapur steel TPS 21/400kV-400 KV-Raghunathpur

TPS 20/400/220/33kV-121-04-2019 14:50:00 Transmission Line

400 KV-Durgapur steel TPS 21/400kV-400 KV-Raghunathpur

TPS 20/400/220/33kV-1DVC 400 KV-Durgapur steel TPS 21/400kV No No No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

220 KV-Chaibasa(400/220kV)-220 KV-

Chaibasa(220/132/33kV)-121-04-2019 14:40:00 Transmission Line

220 KV-Chaibasa(400/220kV)-220 KV-

Chaibasa(220/132/33kV)-2POWERGRID 220 KV-Chaibasa(400/220kV) No No No JUSNL 220 KV-Chaibasa(220/132/33kV) No No No

400 KV-NEW PURNEA 400KV-400 KV-BIHARSHARIFF 400KV-1 21-04-2019 11:59:00 Transmission Line 400 KV-NEW PURNEA 400KV-400 KV-BIHARSHARIFF 400KV-1 POWERGRID 400 KV-NEW PURNEA 400KV No No No POWERGRID 400 KV-BIHARSHARIFF 400KV No No No

400 KV-Kharagpur 400kV--1 19-04-2019 21:43:00 Transformer 400 KV-Kharagpur 400kV--3 WBSETCL 400 KV-Kharagpur 400kV No No No

400 KV-New Chanditola 400 kV-400 KV-Kharagpur 400kV-1 19-04-2019 21:25:00 Transmission Line 400 KV-New Chanditola 400 kV-400 KV-Kharagpur 400kV-1 WBSETCL 400 KV-New Chanditola 400 kV No No No WBSETCL 400 KV-Kharagpur 400kV No No No

220 KV-Chaibasa(220/132/33kV)-220 KV-

Chaibasa(400/220kV)-119-04-2019 19:54:00 Transmission Line

220 KV-Chaibasa(220/132/33kV)-220 KV-

Chaibasa(400/220kV)-2JUSNL 220 KV-Chaibasa(220/132/33kV) No No No POWERGRID 220 KV-Chaibasa(400/220kV) No No No

400 KV-PATNA 400KV-400 KV-KISHANGANJ 400KV-1 19-04-2019 15:34:00 Transmission Line 400 KV-PATNA 400KV-400 KV-KISHANGANJ 400KV-1 POWERGRID 400 KV-PATNA 400KV No No No POWERGRID 400 KV-KISHANGANJ 400KV No No No

220 KV-Chandil(220/132kV)-220 KV-

Ramchandrapur(220/132/33kV)-119-04-2019 01:27:00 Transmission Line

220 KV-Chandil(220/132kV)-220 KV-

Ramchandrapur(220/132/33kV)-1JUSNL 220 KV-Chandil(220/132kV) No No No JUSNL 220 KV-Ramchandrapur(220/132/33kV) No No No

220 KV-Chandil(220/132kV)-220 KV-Santaldih TPS 220kV-1 19-04-2019 01:27:00 Transmission Line 220 KV-Chandil(220/132kV)-220 KV-Santaldih TPS 220kV-1 JUSNL 220 KV-Chandil(220/132kV) No No No WBPDCL 220 KV-Santaldih TPS 220kV No No No

400 KV-ANGUL -400 KV-JITPL (Derang)21/400-1 18-04-2019 21:25:00 Transmission Line 400 KV-ANGUL -400 KV-JITPL (Derang)21/400-2 POWERGRID 400 KV-ANGUL No No No JITPL 400 KV-JITPL (Derang)21/400 No No No

765 KV-ANGUL -765 KV-JHARSUGUDA 765 KV-1 18-04-2019 20:22:00 Transmission Line 765 KV-ANGUL -765 KV-JHARSUGUDA 765 KV-1 POWERGRID 765 KV-ANGUL No No No POWERGRID 765 KV-JHARSUGUDA 765 KV No No No

Muzuffarpur event 18-04-2019 10:16:00 Transmission Line 220 KV-MUZAFFARPUR 400KV-220 KV-DHALKEBAR-1 POWERGRID 220 KV-MUZAFFARPUR 400KV No Yes No NEPAL 220 KV-DHALKEBAR No No No

18-04-2019 10:16:00 Transmission Line220 KV-MUZAFFARPUR 400KV-220 KV-HAZIPUR NEW 220KV-

2POWERGRID 220 KV-MUZAFFARPUR 400KV No No No BSPTCL 220 KV-HAZIPUR NEW 220KV Yes No No

18-04-2019 10:16:00 Transmission Line220 KV-MUZAFFARPUR 400KV-220 KV-MUZAFFARPUR

TPS220KV-2POWERGRID 220 KV-MUZAFFARPUR 400KV No No No NTPC 220 KV-MUZAFFARPUR TPS220KV No No No

18-04-2019 10:16:00 Bus 220 KV-MUZAFFARPUR 400KV--2 POWERGRID 220 KV-MUZAFFARPUR 400KV No No No

18-04-2019 10:16:00 Transformer 400 KV-MUZAFFARPUR 400KV--3 POWERGRID 400 KV-MUZAFFARPUR 400KV No No No NEPAL No No No

220KV TENUGHAT-BIHARSARIFF-SC 17-04-2019 10:16:00 Transmission Line220 KV-TVNL_Tenughat(15.7/220kV)-220 KV-BIHARSHARIFF

220KV-1TVNL 220 KV-TVNL_Tenughat(15.7/220kV) No No No BSPTCL 220 KV-BIHARSHARIFF 220KV Yes Yes Yes

220KV ARRAH-NADHOKHAR-SC 17-04-2019 08:07:00 Transmission Line 220 KV-ARRAH 220KV-220 KV-PUSAULI 220KV-1 POWERGRID 220 KV-ARRAH 220KV No No No BSPTCL 220 KV-PUSAULI 220KV Yes No No

400KV ARAMBAGH-BAKRESWAR-SC 17-04-2019 05:45:00 Transmission Line 400 KV-Arambag 400kV-400 KV-BAKRESWAR 400kV-1 WBSETCL 400 KV-Arambag 400kV No No No WBPDCL 400 KV-BAKRESWAR 400kV No No No

400KV ALIPURDUAR-BONGAIGAON-II 17-04-2019 00:31:00 Transmission Line400 KV-ALIPURDUAR PGCIL 400/220kV-400 KV-BONGAIGAON-

2POWERGRID 400 KV-ALIPURDUAR PGCIL 400/220kV No No No POWERGRID 400 KV-BONGAIGAON No No No

400KV KISHANGANJ-RANGPO-I 16-04-2019 23:32:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No POWERGRID 400 KV-RANGPO 400KV No No No

220KV MUZAFFARPUR-DHALKEBAR-I 16-04-2019 19:57:00 Transmission Line 220 KV-MUZAFFARPUR 400KV-220 KV-DHALKEBAR-1 POWERGRID 220 KV-MUZAFFARPUR 400KV No Yes No NEPAL 220 KV-DHALKEBAR No No No

220KV MUZAFFARPUR-DHALKEBAR-II 16-04-2019 19:57:00 Transmission Line 220 KV-MUZAFFARPUR 400KV-220 KV-DHALKEBAR-2 POWERGRID 220 KV-MUZAFFARPUR 400KV No Yes No NEPAL 220 KV-DHALKEBAR No No No

400KV PPSP-BIDHANNAGAR-II 15-04-2019 14:30:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

2WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

15-04-2019 12:58:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

2WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

400KV KHARAGPUR-KOLAGHAT-I 15-04-2019 12:42:00 Transmission Line 400 KV-Kharagpur 400kV-400 KV-Kolaghat TPS 400kV-1 WBSETCL 400 KV-Kharagpur 400kV No No No WBPDCL 400 KV-Kolaghat TPS 400kV No No No

400KV NEW PPSP-NEW RANCHI-I 15-04-2019 11:40:00 Transmission Line 400 KV-New_PPSP 400kV-400 KV-Ranchi_N(765/400kV)-1 WBSETCL 400 KV-New_PPSP 400kV No No No POWERGRID 400 KV-Ranchi_N(765/400kV) No Yes No

220KV CHANDIL-RANCHI-SC 15-04-2019 10:54:00 Transmission Line 220 KV-Ranchi(400/220kV)-220 KV-Chandil(220/132kV)-1 POWERGRID 220 KV-Ranchi(400/220kV) No Yes No JUSNL 220 KV-Chandil(220/132kV) No No No

400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-2 14-04-2019 12:42:00 Transmission Line 400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-2 400 KV-DMTCL MOTIHARI 400/132kVNORTHERN

REGION400 KV-GORAKHPUR No No No

400KV GORAKHPUR-MOTIHARI-II 14-04-2019 12:42:00 Transmission Line 400 KV-GORAKHPUR-400 KV-DMTCL MOTIHARI 400/132kV-2NORTHERN

REGION400 KV-GORAKHPUR No No No DMTCL 400 KV-DMTCL MOTIHARI 400/132kV No No No

400KV PPSP-BIDHANNAGAR-II 14-04-2019 12:31:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

2WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

14-04-2019 12:06:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

2WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

400KV KISHANGANJ-RANGPO-I 14-04-2019 02:52:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No POWERGRID 400 KV-RANGPO 400KV No No No

220KV CHANDIL-RANCHI-sc 13-04-2019 16:06:00 Transmission Line 220 KV-Chandil(220/132kV)-220 KV-Ranchi(400/220kV)-1 JUSNL 220 KV-Chandil(220/132kV) No No No POWERGRID 220 KV-Ranchi(400/220kV) No Yes No

220KV DARBHANGA (DMTCL)-SAMASTIPUR-SC 13-04-2019 12:15:00 Transmission Line220 KV-DMTCL DARBHANGA 400kV-220 KV-SAMASTIPUR

220KV-1DMTCL 220 KV-DMTCL DARBHANGA 400kV No No No BSPTCL 220 KV-SAMASTIPUR 220KV No Yes No

400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-1 13-04-2019 11:51:00 Transmission Line 400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-1 400 KV-DMTCL MOTIHARI 400/132kVNORTHERN

REGION400 KV-GORAKHPUR No No No

400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-2 13-04-2019 11:35:00 Transmission Line 400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-2 400 KV-DMTCL MOTIHARI 400/132kVNORTHERN

REGION400 KV-GORAKHPUR No No No

Grid Disturbance in Sikkim Hydro complex 12-04-2019 23:55:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-RANGPO 400KV-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No POWERGRID 400 KV-RANGPO 400KV No No No

12-04-2019 23:55:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-Teesta III-1 POWERGRID 400 KV-KISHANGANJ 400KV No No No TUL 400 KV-Teesta III No Yes Yes

400KV TSTPP-ROURKELA-II 12-04-2019 15:59:00 Transmission Line400 KV-Talcher super thermal power 21/400-400 KV-

ROURKELA 400KV-2NTPC 400 KV-Talcher super thermal power 21/400 No No No POWERGRID 400 KV-ROURKELA 400KV Yes Yes Yes

400KV PATNA-BARH-II 12-04-2019 12:42:00 Transmission Line 400 KV-PATNA 400KV-400 KV-BARH 400kV-2 POWERGRID 400 KV-PATNA 400KV No Yes No NTPC 400 KV-BARH 400kV No No No

400KV JEYPORE-GAJUWAKA-I 12-04-2019 12:27:00 Transmission Line 400 KV-JEYPORE 400/220 KV-400 KV-GAJUWAKA-1 POWERGRID 400 KV-JEYPORE 400/220 KV Yes Yes YesSOUTHERN

REGION400 KV-GAJUWAKA No No No

220KV PUSAULI-SAHUPURI-SC 12-04-2019 11:57:00 Transmission Line 220 KV-SASARAM 765KV-220 KV-SAHUPURI-1 POWERGRID 220 KV-SASARAM 765KV No Yes NoNORTHERN

REGION220 KV-SAHUPURI No No No

GI - II event at Talcher Kolar SPS operation 11-04-2019 13:39:00 HVDC poles400 KV-Talcher super thermal power 21/400-400 KV-KOLAR

HVDC-1NTPC 400 KV-Talcher super thermal power 21/400 No No No

SOUTHERN

REGION400 KV-KOLAR HVDC No No No

400KV DARBHANGA (DMTCL)-KISHANGANJ(PG)-II 10-04-2019 09:23:00 Transmission Line400 KV-DMTCL DARBHANGA 400kV-400 KV-KISHANGANJ

400KV-2DMTCL 400 KV-DMTCL DARBHANGA 400kV No No No POWERGRID 400 KV-KISHANGANJ 400KV No Yes No

400KV ANGUL-TSTPP-SC 09-04-2019 20:47:00 Transmission Line400 KV-ANGUL -400 KV-Talcher super thermal power 21/400-

1POWERGRID 400 KV-ANGUL Yes Yes Yes NTPC 400 KV-Talcher super thermal power 21/400 No No No

400KV NEW CHANDITALA-KHARAGPUR-II 09-04-2019 18:19:00 Transmission Line 400 KV-New Chanditola 400 kV-400 KV-Kharagpur 400kV-2 WBSETCL 400 KV-New Chanditola 400 kV No No No WBSETCL 400 KV-Kharagpur 400kV No No No

400KV PPSP-BIDHANNAGAR-I 09-04-2019 16:17:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

1WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

400KV PPSP-BIDHANNAGAR-II 09-04-2019 16:17:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

2WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes No Yes

220KV MAITHON-DHANBAD-II 09-04-2019 15:56:00 Transmission Line220 KV-Mithon(400/220kV)-220 KV-

Dhanbad_D(220/132/33kV)-2POWERGRID 220 KV-Mithon(400/220kV) No No No DVC 220 KV-Dhanbad_D(220/132/33kV) No No No

400KV MAITHON-DURGAPUR-I 09-04-2019 15:56:00 Transmission Line400 KV-Mithon(400/220kV)-400 KV-DURGAPUR PGCIL

400/220kV-1POWERGRID 400 KV-Mithon(400/220kV) No No No POWERGRID 400 KV-DURGAPUR PGCIL 400/220kV No No No

220KV DEHRI-GAYA-I 09-04-2019 15:09:00 Transmission Line 220 KV-DEHRI 220KV-220 KV-GAYA 765KV-1 BSPTCL 220 KV-DEHRI 220KV Yes No Yes POWERGRID 220 KV-GAYA 765KV No Yes No

400 KV-SAGARDIGHI(SGTPP)-400 KV-Parulia 400kV-1 09-04-2019 15:04:00 Transmission Line 400 KV-SAGARDIGHI(SGTPP)-400 KV-Parulia 400kV-1 WBPDCL 400 KV-SAGARDIGHI(SGTPP) No No No

400KV DURGAPUR-SAGARDIGHI-I 09-04-2019 15:04:00 Transmission Line400 KV-DURGAPUR PGCIL 400/220kV-400 KV-

SAGARDIGHI(SGTPP)-1POWERGRID 400 KV-DURGAPUR PGCIL 400/220kV No No No WBPDCL 400 KV-SAGARDIGHI(SGTPP) No No No

400KV BIHARSARIFF(PG)-BANKA(PG)-II 09-04-2019 14:55:00 Transmission Line 400 KV-BIHARSHARIFF 400KV-400 KV-BANKA 400KV-2 POWERGRID 400 KV-BIHARSHARIFF 400KV No Yes No POWERGRID 400 KV-BANKA 400KV No Yes No

400KV BARH-PATNA-IV 09-04-2019 14:18:00 Transmission Line 400 KV-BARH 400kV-400 KV-PATNA 400KV-4 NTPC 400 KV-BARH 400kV No No No POWERGRID 400 KV-PATNA 400KV No Yes No

400KV KhSTPP-BARH-I 09-04-2019 12:58:00 Transmission Line 400 KV-KAHALGAON 400kV-400 KV-BARH 400kV-1 NTPC 400 KV-KAHALGAON 400kV No No No NTPC 400 KV-BARH 400kV No No No

400KV TSTPP-ROURKELA-I 09-04-2019 10:27:00 Transmission Line400 KV-Talcher super thermal power 21/400-400 KV-

ROURKELA 400KV-1NTPC 400 KV-Talcher super thermal power 21/400 No No No POWERGRID 400 KV-ROURKELA 400KV Yes Yes No

400KV JAMSHEDPUR-BARIPADA-SC 08-04-2019 20:31:00 Transmission Line400 KV-JAMSHEDPUR 400/220KV-400 KV-BARIPADA KUCHEI

400KV-1POWERGRID 400 KV-JAMSHEDPUR 400/220KV No No No POWERGRID 400 KV-BARIPADA KUCHEI 400KV No No No

220KV RAURKELLA-TARKERA-I 08-04-2019 17:40:00 Transmission Line 220 KV-ROURKELA 400KV-220 KV-TARKERA220KV-1 POWERGRID 220 KV-ROURKELA 400KV No No No OPTCL 220 KV-TARKERA220KV No No No

400KV ROURKELA-JHARSUGUDA-I 08-04-2019 17:35:00 Transmission Line 400 KV-ROURKELA 400KV-400 KV-JHARSUGUDA 765 KV-1 POWERGRID 400 KV-ROURKELA 400KV No No No POWERGRID 400 KV-JHARSUGUDA 765 KV No No No

400KV RANCHI-RAGHUNATHPUR-II 08-04-2019 17:05:00 Transmission Line400 KV-Ranchi(400/220kV)-400 KV-Raghunathpur TPS

20/400/220/33kV-2POWERGRID 400 KV-Ranchi(400/220kV) No Yes No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

400KV RANCHI-RAGHUNATHPUR-III 08-04-2019 17:05:00 Transmission Line400 KV-Ranchi(400/220kV)-400 KV-Raghunathpur TPS

20/400/220/33kV-3POWERGRID 400 KV-Ranchi(400/220kV) No Yes No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-1 08-04-2019 12:12:00 Transmission Line 400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-1 DMTCL 400 KV-DMTCL MOTIHARI 400/132kV No No NoNORTHERN

REGION400 KV-GORAKHPUR No No No

400KV NEW PPSP-NEW RANCHI-I 08-04-2019 09:43:00 Transmission Line 400 KV-New_PPSP 400kV-400 KV-Ranchi_N(765/400kV)-1 WBSETCL 400 KV-New_PPSP 400kV No No No POWERGRID 400 KV-Ranchi_N(765/400kV) No Yes No

220KV BARIPADA-BALASORE-II 08-04-2019 06:56:00 Transmission Line 220 KV-KUCHEI BARIPADA 400KV-220 KV-BALASORE 220KV-1 POWERGRID 220 KV-KUCHEI BARIPADA 400KV No No No OPTCL 220 KV-BALASORE 220KV No Yes Yes

400KV NEW CHANDITALA-KHARAGPUR-I 08-04-2019 00:16:00 Transmission Line 400 KV-New Chanditola 400 kV-400 KV-Kharagpur 400kV-1 WBSETCL 400 KV-New Chanditola 400 kV No No No WBSETCL 400 KV-Kharagpur 400kV No No No

400KV GORAKHPUR-MOTIHARI-I 06-04-2019 21:45:00 Transmission Line 400 KV-GORAKHPUR-400 KV-DMTCL MOTIHARI 400/132kV-1NORTHERN

REGION400 KV-GORAKHPUR No No No DMTCL 400 KV-DMTCL MOTIHARI 400/132kV No No No

400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-1 06-04-2019 21:29:00 Transmission Line 400 KV-DMTCL MOTIHARI 400/132kV-400 KV-GORAKHPUR-1 DMTCL 400 KV-DMTCL MOTIHARI 400/132kV No No NoNORTHERN

REGION400 KV-GORAKHPUR No No No

400KV KODERMA-BOKARO-I 06-04-2019 19:35:00 Transmission Line400 KV-Koderma_G(400/220/21kV)-400 KV-

BTPSA_D(400/220/33/21kV)-1DVC 400 KV-Koderma_G(400/220/21kV) No No No DVC 400 KV-BTPSA_D(400/220/33/21kV) No No No

400KV BIDHANNAGAR-NEW CHANDITALA-SC 06-04-2019 19:24:00 Transmission Line400 KV-BIDHANNAGAR/DURGAPR 400KV-400 KV-New

Chanditola 400 kV-1WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV No No No WBSETCL 400 KV-New Chanditola 400 kV No No No

400KV RANCHI-RAGHUNATHPUR-II 06-04-2019 17:21:00 Transmission Line400 KV-Ranchi(400/220kV)-400 KV-Raghunathpur TPS

20/400/220/33kV-2POWERGRID 400 KV-Ranchi(400/220kV) No Yes No DVC 400 KV-Raghunathpur TPS 20/400/220/33kV No No No

400 KV-SAGARDIGHI(SGTPP)-400 KV-Parulia 400kV-1 06-04-2019 17:02:00 Transmission Line 400 KV-SAGARDIGHI(SGTPP)-400 KV-Parulia 400kV-1 WBPDCL 400 KV-SAGARDIGHI(SGTPP) No No No

400KV SAGARDIGHI-I 06-04-2019 17:02:00 Transmission Line400 KV-DURGAPUR PGCIL 400/220kV-400 KV-

SAGARDIGHI(SGTPP)-1POWERGRID 400 KV-DURGAPUR PGCIL 400/220kV No No No WBPDCL 400 KV-SAGARDIGHI(SGTPP) No No No

400KV KISHANGANJ-NEW PURNEA-II 06-04-2019 16:45:00 Transmission Line 400 KV-KISHANGANJ 400KV-400 KV-NEW PURNEA 400KV-2 POWERGRID 400 KV-KISHANGANJ 400KV No No No POWERGRID 400 KV-NEW PURNEA 400KV No No No

400KV PPSP-BIDHANNAGAR-I 06-04-2019 16:23:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

1WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

400KV PPSP-BIDHANNAGAR-II 06-04-2019 16:23:00 Transmission Line400 KV-PPSP 400kV-400 KV-BIDHANNAGAR/DURGAPR 400KV-

2WBSEDCL 400 KV-PPSP 400kV No No No WBSETCL 400 KV-BIDHANNAGAR/DURGAPR 400KV Yes Yes Yes

220KV MAITHON-DHANBAD-II 06-04-2019 15:40:00 Transmission Line220 KV-Mithon(400/220kV)-220 KV-

Dhanbad_D(220/132/33kV)-2POWERGRID 220 KV-Mithon(400/220kV) No No No DVC 220 KV-Dhanbad_D(220/132/33kV) No No No

400KV JAMSHEDPUR-CHAIBASA-I 06-04-2019 12:33:00 Transmission Line400 KV-JAMSHEDPUR 400/220KV-400 KV-

Chaibasa(400/220kV)-1POWERGRID 400 KV-JAMSHEDPUR 400/220KV No Yes No POWERGRID 400 KV-Chaibasa(400/220kV) No Yes No

400KV KHARAGPUR-CHAIBASA-II 05-04-2019 18:38:00 Transmission Line 400 KV-Kharagpur 400kV-400 KV-Chaibasa(400/220kV)-2 WBSETCL 400 KV-Kharagpur 400kV No No No POWERGRID 400 KV-Chaibasa(400/220kV) No Yes No

Grid Disturbance at Santaldih 05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-ASANSOL 220KV-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No WBSETCL 220 KV-ASANSOL 220KV No No No

05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-ASANSOL 220KV-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No WBSETCL 220 KV-ASANSOL 220KV No No No

05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Bishnupur (new) 220kV-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No WBSETCL 220 KV-Bishnupur (new) 220kV No No No

05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Bishnupur (new) 220kV-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No WBSETCL 220 KV-Bishnupur (new) 220kV No No No

05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Chandil(220/132kV)-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No JUSNL 220 KV-Chandil(220/132kV) No No No

05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Hura (220/132)Kv-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No WBSETCL 220 KV-Hura (220/132)Kv No No No

05-04-2019 15:03:00 Transmission Line 220 KV-Santaldih TPS 220kV-220 KV-Hura (220/132)Kv-1 WBPDCL 220 KV-Santaldih TPS 220kV No No No WBSETCL 220 KV-Hura (220/132)Kv No No No

05-04-2019 15:03:00 Transformer GENERATOR-Santaldih TPS 220kV--1 DVC GENERATOR-Santaldih TPS 220kV No No No WBSETCL No No No

05-04-2019 15:03:00 Generator GENERATOR-Santaldih TPS 220kV--5 DVC GENERATOR-Santaldih TPS 220kV No No No WBSETCL No No No

05-04-2019 15:03:00 Generator GENERATOR-Santaldih TPS 220kV--6 DVC GENERATOR-Santaldih TPS 220kV No No No WBSETCL No No No

220KV PUSAULI-DEHRI-SC 05-04-2019 08:09:00 Transmission Line 220 KV-SASARAM 765KV-220 KV-DEHRI 220KV-1 POWERGRID 220 KV-SASARAM 765KV No Yes No BSPTCL 220 KV-DEHRI 220KV Yes Yes Yes

220KV TENUGHAT-BIHARSARIFF-SC 04-04-2019 12:45:00 Transmission Line220 KV-TVNL_Tenughat(15.7/220kV)-220 KV-BIHARSHARIFF

220KV-1TVNL 220 KV-TVNL_Tenughat(15.7/220kV) No No No BSPTCL 220 KV-BIHARSHARIFF 220KV Yes Yes Yes

220KV PUSAULI-DEHRI-SC 03-04-2019 13:55:00 Transmission Line 220 KV-SASARAM 765KV-220 KV-DEHRI 220KV-1 POWERGRID 220 KV-SASARAM 765KV No Yes No BSPTCL 220 KV-DEHRI 220KV Yes Yes Yes

400KV MERAMUNDALI-LAPANGA-II 03-04-2019 13:52:00 Transmission Line 400 KV-MERAMUNDALI 400KV-400 KV-LAPANGA 400KV-2 OPTCL 400 KV-MERAMUNDALI 400KV Yes Yes No OPTCL 400 KV-LAPANGA 400KV Yes Yes Yes

400KV BARIPADA-KHARAGPUR-SC 02-04-2019 12:33:00 Transmission Line 400 KV-BARIPADA KUCHEI 400KV-400 KV-Kharagpur 400kV-1 POWERGRID 400 KV-BARIPADA KUCHEI 400KV Yes Yes Yes WBSETCL 400 KV-Kharagpur 400kV No No No

400KV BINAGURI-TALA-I 01-04-2019 00:23:00 Transmission Line 400 KV-Binaguri 400 Kv-400 KV-TALA-1 POWERGRID 400 KV-Binaguri 400 Kv No Yes No BHUTAN 400 KV-TALA No No No