Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 1 of 21
PRE-FEASIBILITY REPORT
Non Production Activies under modernization of M/s. Divi's Laboratories Limited
(Unit-2) -- Bulk Drug Unit at Chippada and Annavaram Villages, Annavaram
Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
1. Executive Summary:
S.No. Description Details
1. Name of the Project “Non Production Activies Under Modernization” of
M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug
Unit at Chippada and Annavaram Villages, Annavaram
Taluka, Bheemunipatnam Mandal, Visakhapatnam District,
Andhra Pradesh”
2. Name and Address of the
Applicant:
Madhu Sudhana Rao Divi, Director (Projects),
Divi’s Laboratories Limited, 1-72/23(P)/DIVIS/303, Cyber hills, Gachibowli,
Hyderabad-500032 3. Location of the Plant The Plant is located at Chippadaand AnnavaramVillages,
Annavaram Taluka, Bheemunipatnam Mandal,
Visakhapatnam District.
Coordinates of the Plant are
17 55’ 59.38” N 83 28’ 25.90” E
17 55’ 48.47” N 83 28’ 26.32” E
17 55’ 55.92” N 83 28’ 44.17” E
17 55’ 49.98” N 83 28’ 57.73” E
17 56’ 04.93” N 83 28’ 59.89” E
4. Production/Estimated Existing Products as per
CFE 14.09.2015
Existing Production Capacity
as per CFE 14.09.2015
88 17,197 kg/day
5. Total Plant area a) As per CFE order no:
APPCB/VSP/196/CFE/HO/2015 Date:
14.09.2015: 387 acres.
b) As per Amendment of CFE order no
APPCB/VSP/VSP/196/CFE/HO/2012 Date:
07.01.2016 : 387 + 71.26 acres = 458.26 acres
c) Additional acquired land 458.26 +37.33 = 495.59
acres.
6. Total Water requirement & After modernization the total water required and wastewater
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 2 of 21
S.No. Description Details
Source generation will not have any change and the source of water
is meet from Gosthani River as mentioned in the EC and
CFE.
The total water requirement for existing projects is 1866.6
KLD. Source of the water form Gosthani River as per CFE
14.09.2015. (After change in product Mix).
7. Working hours One shift operation with 8 hour per shift.
8. Manpower [Operation] 7826
9. Total Cost of the Project Modernization Cost: Rs 100 Crs.
Existing Plant Cost: Rs 600 Crs.
Total Plant Cost: Rs 700 Crs.
10. Nearest Railway station, Sea
Port, Airport
Railway Station :Vizianagarm- 21 KM, NW
Airport: Visakhapatnam 35 KM SW.
11. Existence of Public Road,
Railway Track nearby
Yes, The proposed modernization plant is adjacent to road
connecting NH5 (Vizag to Kolkatt) to Annavaram village.
2. Introduction of the project:
2.1. Identification of Project and Project proponent:
The Divis Laboratories Limited established in the year 1990, with Research &Development
as its prime fundamental, Divis Laboratories focussed on developing new processes for the
production of Active Pharma Ingredients (APIs) & Intermediates. The company in a matter
of short time expanded its breadth of operations to provide complete turnkey solutions to
the domestic Indian pharmaceutical industry.
Divi's Laboratories Limited is proposing for Non production activies under Modernization
of Unit-II as a commercial facility for manufacturing of APIs & Intermediates products with
a firm commitment to Environmental care. This manufacturing facility as Unit-2 is existing
plant located at Chippada Village, Annavaram Post, Bheemunipatnammandal,
Visakhapatnam. This manufacturing facility is Non Production Activies under
modernization unit to be developed.
2.2. Breif Description of nature of the project:
The production and manufacturing process of API’s and Intermediates involves various raw
materials, where chemical reactions will take precipitation, substitution, addition,
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 3 of 21
centrifugation, purifications, solvent recovery etc. The layout of the Non Production
Activies under modernization project is shown below
2.3. Need for the project and its importance to the Country and or Region:
In the Indian sub-continent population growth is more than that of developed countries. To
meet the needs and comforts of ever-growing population industrialization became
inevitable. For the growing population the needs of health care substitutes are also
increasing.
2.4. Demand – Supply Gap:
Divi’s Laboratories Limited Unit-2 has intended to develop and manufacture intermediates
for many MNC customers by undertaking contract research work for them. The project is
envisaged to meet the demand supply gap in both domestic market and export market, as
API demand is increasing day by day.
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 4 of 21
2.5. Imports vs. Indigenous production:
The project shall meet to reduce the imports in some of the intermediate products and also
enhance the foreign exchange reserves in view of the proposed exports of few products.
2.6. Employment Generation (Direct and Indirect) due to the Project.
The present project for manufacturing of Synthetic Organic Chemicals – Bulk Drugs
&Intermediates requires substantial handling of raw materials, goods in process and
finished goods. It is expected that the following employment will be generated by the
project:
S.No Designation Exisiting
1 Offices 232
2 Superrvisors 3443
3 Ministerial Staff 56
4 Technical Works 378
5 Skilled Workers 3007
6 Unskilled workers 710
Total 7826
Note: No change in manpower after modernization.
3. Project Description:
3.1. Type of the project including interlinked and interdependent projects:
The project is an exisiting unit manufacturing of Bulk Drug and Intermediates. Now
Proposed for modernization by adding additional land for de congestion of production area
by shifting no production activies to new area proposed.
No interlinked or Interdependent Project.
3.2. Location:
District and State: Visakhapatnam, Andra Pradesh.
Mandal: Bheemunipatnam
Village: Chippada Village
Plot No/Survey/Khasra
no:
Existing Modernization
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 5 of 21
Sy No. 52, 134, 138, 139, 140, 159, 160
to 168, 168/1, 183 & 184 of Chippada
village and 1, to 4, 6, 45 & 46 of
Annavaram village.
Sy No. 52, 134, 138, 139, 140, 159, 160 to
168, 168/1, 183 & 184 of Chippada village
and 1 to 4, 6, 45 & 46 of Annavaram village.
Addiitional survey number : 107, 158, 168,
to 172
Area: Existing After Modernization
387 Acres 495.59Acres
Modernization of its unit by adding 108.59 acres of land to its existing
387 Acres of land fordecongestion of the production area by shifting
non production activities to new area proposed.
Ownership/Occupancy: M/S Divi’s Laboratories Limited (Unit-2)
Nearest Railway station,
Airport.
Railway Station :Vizianagarm- 27.4 KM, North Airport: Visakhapatnam 35.5 KM South
West.
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 6 of 21
Figure 3-1 Index Map Showing the Project Site
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 7 of 21
Figur3-2Map of the Area 5 km around the project site
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 8 of 21
3.3. Details of alternative sites:
No Alternative sites are examined as this is an Non Production Activies under
modernization project.
3.4. Size or Magnitude of Operation:
After modernization of Exisiting unit production capacity remains same. The industry was
permitted to produce not more then one scenario and individual capacities of product
mentioned therein at any point as presented in Table 3-1.
Table 3-1: List of Bulk Drug Existing
S.NO PRODUCT NAME Qnty kg/day as per
CFE 14.09.2015
1 Dl –naproxen ( intermediate of NAP/SN) ~1960 274
2 Naproxen ( 450 MTA) 5616.4
3 Naproxen (sodium) ( 1600 MTA)
4 SIGMA –I with & ISB ( DEXTROMETHORPHAN HBR INTERMEDITAES) 684.9
5 SIGMA (DEXTROMETHORPHAN HBR INTERMEDITAES) 5.5
6 ATIPA 684.9
7 IMPALA with BAH & 3-HAP 479.5
8 FMOU OSU 1.4
9 CPCCA(KEY) 82.2
10 VERAPAMIL HCL 1.4
11 VENLAFAXINE 41.1
12 SIMVASTATIN 82.2
13 BUPROPION HCL 68.5
14 SITAGLIPTIN PHOSPHATE & KETOAMIDE 411
15 AMINO ALHOCOL 1.4
16 Carbidopa 137
17 Levodopa 547.9
18 Gabapentin 4383.6
19 Triprolidinehcl 5.5
20 (2r)-amino (2,3-dihydro-1h-inden-2yl) ethanoic acid ( classic) 2.7
21 LAMOTRIGINE 191.8
22 CAPECITABINE 54.8
23 VIGADATRINE 13.7
24 RALTEGRAVIER 109.6
25 DCAM 41.1
26 CKE 54.8
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 9 of 21
S.NO PRODUCT NAME Qnty kg/day as per
CFE 14.09.2015
27 CRLISTAT 82.2
28 DIAL 2.7
29 ASTAXANTHIN 137
30 CANTHAXANTHIN 13.7
31 LYCOPENE 27.4
32 BETA- CAROTENE 137
33 ASCORBYL PALMITATE 27.4
34 Z-L VALINE 191.8
35 LOSARTAN ( MECEDES) 274
36 ATOVAQUINE (IVAX-NEW) 68.5
37 SUMATRIPTAN 8.2
38 MOC VALINE 2.7
39 INTERMIDATE OF LEVETRACITAM 821.9
40 BOC –CORE SUCCINATE /BCS (DAVINCY) 137
41 KETOENAMINE (RADO) 274
42 2,4 WING ACTIVE ESTER ( ZODIC) 95.9
43 Dihydroxypyridone carboxylic acid methyl ester /dhpm (elentra) 41.1
44 ALENDRONIC ACID (OPTRA) 27.4
45 BOSENTAN MONOHYDRATE (LILLY) 13.7
46 ENTACAPONE 13.7
47 IRBESARTAN 68.5
48 4-isopropyl-3- methyl phenol/ ipmp (dione) 2.7
49 Valsartan (chevorlet) 274
50 Olmisartan (epic) 5.5
51 2,3-dimethyl-6-amino-2-h-indazole /gw776994 (mimas) 41.1
52 4-chloro-6- methoxy-7(3-morpholin-4-yl propoxy) quinoline (eris) 2.71
53 (2r,3r)-3-(2,5-difluorophenyl)-3-hydroxy-2-methyl-4-(1h-1,2,4-triazol-1-yl) butanethioamide (nano)
5.5
54 2-((1,5-bis (benzhydroxy)-4-oxo -1,4-dihydropyridin-2-yl)methoxy)isoindoline-1,3-dione (swallow)
5.5
55 3-(propan-2-yl)-5-(trichloromethyl)-1,2,4-oxadiazole 2.7
56 4-[(5-methylpyridin-2-yl)methoxy]aniline dihydrochloride 2.7
57 (1s)-2-amino-1-{3-[3-(benzyloxy)propoxy]phenyl}ethanol hydrochloride 2.7
58 Apocarotenol 5.5
59 Lutein 5.5
60 Levodopa ethylester succinate 2.7
61 INTERMIDATE OF PRELADENANT 2.7
62 Phthalazinone 2.7
63 5-bromo-[1,2,4] triazol [1,5-a]pyridine-2-yl amine (gsk 283119a) 2.7
64 Enoxaparin sodium 2.7
65 Ef-9 [3-o-acetyl-1,6-anyhdro-2-azido-2-deoxy-4-o-(methyl 2,3-di-o-glucopyranosyluronate) beta-d-glucopyranose
2.7
66 ACOSAMIDE 2.7
67 PREGABALIN 27.4
68 Chloropurine/cis(1s,4r)-1-amino-4-(hydroxymethyl)-2-cyclopentene.hcl / amino alcohol 205.5
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 10 of 21
S.NO PRODUCT NAME Qnty kg/day as per
CFE 14.09.2015
69 ABACAVIR 2.7
70 Suvorexanthcl (including amine hcl&triazole acid)
13.7
71 Propan-2-yl(2r)-2-{[(r)-({(2r,3r,4r,5r)-4-chloro-5-[2,4-dioxo-3,4-dihydropyrimidin-1(2h)-yl]-3-hydroxy-4-methyloxolan-2yl}methoxy)(phenoxy)phosphoryl]amino}propanoate
13.7
72 DOULTERAVIR 5.5
73 PANTAPROZOLE 2.7
74 ESOMERPOZOLE 2.7
75 ALLOGLIPTIN 2.7
76 MERABAGRAN 2.7
77 VILDAGLIPTIN 2.7
78 LINALIPTIN 2.7
79 RANOLZINE 5.5
80 VILAZODONE HCL 2.7
81 PIPREQUINE 2.7
82 SOFOSBUVIR 2.7
83 UBT 5.5
84 TATD SALT 5.5
85 MESALAMINE 68.5
86 ETHYL ESTER 5.5
87 ETHYL ISOCYANATO ACETATE 2.7
88 R & D PRODUCTS 109.6
3.5. Raw Material required along with estimated quantity likely source, marketing area of final Products, Mode of transpot of raw material and finished product:
All the raw materials required for manufacturing mostly available in India. There are
nobanned chemicals or products which are proposed to be used. It is proposed to enter
into long term arrangements with some of the raw material suppliers both in India and
overseas to avoid shortages at any time.
3.6. Availability of water its source, Energy/ Power Requirementand Source:
3.6.1 Water Source:
Total water requirement will be about 1866.6 KLD. The source of water would be
Gosthani River.
Table 3-2 Water Balance of Water consumption and Effluent Generation.
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 11 of 21
As per CFE Order No APPCB /VSP/VSP/196/CFE/HO/2015 date 14.09.2015
S.No Purpose
Quantity as per CFE order dt
17.12.2013
Quantity after change of
product Mix KLD
After Change of product Mix (KLD)
1 Process 324.59 324.59 396.74
HTDS-129.07
LTDS-246.72
Hgh COD -13.50
Metal Bearing -0.67
Nitrate & phosphate -6.73
2 Washings 75 75 75
3 Boiler feed 350 350 310
4 Cooling 240 240 200
5 Dm / softener effluent/ro plant 227 227 227
6 Domestic and Town ship Waste Effluent 235 235 225
7 Others(incinerator scrubbing ) 15 15 15
8 For Green belt ...... 400 Total 1467.59 1866.59 1448.74
3.6.2. Energy/Power Source :
The power required before and after modernization is 30 MVA is taken from APTransco, for
emergency requirements DG sets are used ( 6x1250 KVA; 6x1500 KVA; 2x320 KVA; 2x125 KVA;
2x1000 KVA; 1x62.5KVA; 1x10 KVA).
Table 3-3 Power Requirment and Back up Source
No Change in exsiting Power, Boiler , Dg set etc
Power Source and Requirement APTRANSCO 30 MVA
Proposed DG Sets
Numbers 6 x 1250 KVA
6 x 1500 KVA
2 x 320 KVA
2 x 125 KVA
2 x 1000 KVA
1 x 62.5 KVA
1 x 10 KVA
Coal Fired Boilers
i) 2x16 TPH Coal Fired Boilers (1 No. of 16 TPH standby)
ii) 6 TPH & 2 TPH Coal Fired Boiler (Standby)
iii)24 TPH Boiler of 3 x 8 TPH FBC out of which 1 No. 8 TPH is stand by
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 12 of 21
3.7. Quantity of Hazardous Wastes Generated and Scheme for their Management
/Disposal:
Table 3-4: Hazardous waste generation & Disposal Options S.No Name of the Hazardous waste Existing Disposal Option
1. Process residue 3102.2 Kg/day For Incineration / Co-incineration in cement industries
2. ETP sludge 200 Kg/day To TSDF, Parawada, Visakhapatnam District for secured land filling.
3. Multiple effect evaporation or forced evaporation salts
391 Kg/day
4. Incineration ash 75 Kg/day
5. Off specified & Discarded raw materials, lab chemicals & products
25 Kg/day To TSDF/ Cement industry
6. Containers & Container liners of Hazardous chemicals & Hazardous wastes.
Containers – 2000 Nos. /Month & Liners – 5000 Kgs/Month
After complete detoxification, it shall be disposed of to outside agencies.
7. Spent carbon 2500 kgs/Month
Shall be sent to the authorized cement plants for co-processing (or) for incineration at onsite / TSDF Parawada, Visakhapatnam District.
8. Used Oil/Waste lubricant Oil 200 lts/Month Shall be sent to authorized reprocessors /recyclers
9. Spent solvents 258.7 Kl/day Shall be recovered within the premises
10. Mixed spent solvent 80 Kl/day Shalll be sent to authorized agencies / for Co-incineration in cement industries.
11. Spent acids 35 Kl/day Shall be sent to authorized agencies
12. Spent catalysts 2000 kgs/Month Shall be sent to authorizedreprocessors/recyclers.
4. Site Analysis:
4.1. Connectivity:
Existence of Public
Road, Railway nearby:
All weather road (passing between existing and proposed non-
produvtion facilities) is approachable to Chippada village located
(1.0 km) in West.
Nearest Railway Railway Station :Vizianagarm- 21 KM, North west
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 13 of 21
station, Sea Port,
Airport.
Airport: Visakhapatnam 35 KM South west.
4.2. Land form, land use and land ownership:
The Non Production Activies under modernization of the Divi’s Laboratory Limited is
adjacent to the existing plant. The plant area which was allotted by APIIC/ purchase
thorugh acution to Divi’s Laboratory Limited, Unit – 2, Chippada village.
4.3. Topography:
The study area (10 and 5 km radius around the site) the map has been prepared from Survey
of India, and Topo sheet Numbers E44R5, E44R9, E44L8, E44L12 (New) are the
Topographical map of 5 km study area is given in Figure 3-2 above.
4.4. Land Break-up Details
Table 4-1. Land Break up Details
Land Break-up Details
Existing in Acres
Modernization in Acers
Built up Area 120 153
Greenbelt Development
213 250
Road Network
19 26
Common Facilities Area
20 29
Future Expansion
15 37.5
Total Area 387 495.59
4.5. Soil Clasification:
Soils are at the heart of the Earth s critical zone, the thin outer veneer between the top of
the tree canopy and the bottom of groundwater aquifers that humans rely on for most of
their resources. Soil is a vital part of the earth and also important to plants. It also helps for
agriculture and farmers for planting crops. It shows and records human activities from the
past. Soils are nonrenewable resource, formed at the rate of 1 inch every 250 to 1,200 years
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 14 of 21
under most conditions. The soil present within the study area is Red in color with Sandy
Loam texture. The soil derived from the existing basement rock Khondaliteby the process
of weathering & erosion.
4.6. Climatic Data from the secondary Data:
4.6.1. Climatic Condition:
Summer season in Visakhapatnam it spans from the month of April to June. The
maximum temperature may shoot up to 40°C and Average of 36°C. In spite of this,
summer is usually Sunny and evenings are pleasant. Monsoon Season usually get railfall
fromthe South West monsoon between July and October. However, these showers are
light to moderate. Winter season from the month of November to February. The
temperature during this season might drop to 15°C.
4.6.2. Rainfall:
The average annual rainfall of the district is 1116 mm. and monthly rainfallranges from
nil rainfall in January to 207.5 mm in October. October is thewettest month of the year.
The mean seasonal rainfall distribution is 673.5 mm.in southwest monsoon (June-
September), 271.8 mm. in northeast monsoon(October-December), 10.9 mm. rainfall in
Winter (Jan-Feb) and 159.6 mm insummer (March – May). The percentage distribution
of rainfall, season-wise, is60.36% in southwest monsoon, 24.36 % in northeast
monsoon, 0.97percentage in winter and 14.3 % in summer.
The annual rainfall ranges from 708 mm in 2002 to 1703 mm in 2010. Theannual
rainfall departure ranges from -37 % in 2002 to 53% in 2010. Thesouthwest monsoon
rainfall contributes about 60 % of annual rainfall. It rangesfrom 459 mm in 2002 to 864
mm in 2006. The year 2002 and 2009 experienceddrought conditions in the district as
the annual rainfall recorded in these twoyears is 37 % and 34% less than the long period
average (LPA) respectively.The cumulative departure of annual rainfall from LPA
indicates that the rainfalldeparture as on 2011 is negative i.e. 40%, showing deficit
rainfall. The annualrainfall during 2012 is 1218 mm.
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 15 of 21
4.6.3. Wind Velocity and Wind Direction:
The wind direction at Visakhapatnam at 8:30 hours in the morning was from South
West, West, North East with calm period being 24%. At 17:30 hours most prominent
wind directions varied from South West, South, Eastwith calm periods being at 7%.
The wind velocities at Visakhapatnam varied from 1 to 19 kmph for an average of 252
days while it was calm for 88 days. Wind velocities were excess of 20 kmph for 25 days.
However, between the months of September to February, the mean wind speed varies
from 6.5 kmph to 8.2kmph. While from March to August the mean wind speed were
higher, from 10.6 kmph to 14kmph.
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 16 of 21
Table 4-2Climatology and Meteorology of Study Region – IMD 1997-2000 (Temperature, Rainfall, Humidity)
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 17 of 21
Table 4-3Climatology and Meteorology of Study Region – IMD 1997-2000
(Wind Direction and Wind Speed)
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 18 of 21
4.7. Social Infrastructure Available:
All infrastructure facilities such as education, health facilities and other social facilities are
adequate at Vizianagaram (district) 20 km in north.
5. Planning Brief:
5.1. Planing Concept:
The need for the environmental administration of India to become active in the field of
environmental planning is founded in the Environment (Protection) Act, 1986, which
authorizes the Central and State Government " to have the power to take all such measures
as it deems necessary or expedient for the purpose of protecting andimproving the quality of
the environment and preventing, controlling and abating environmental pollution. Since, the
carrying capacity of the environment is not unlimitedand some areas or ecosystems are more
susceptible to adverse environmental impacts.
5.2. Assessment of Infrastructure Demand
It is obvious to have some of the essential infrastructures to facilitate the employees. For this
purpose it is planned to have canteen, medical facility, etc. Other physical and social facilities
are available in this area.
5.3. Amenities/ Facilities:
All infrastructure facilities such as education, health facilities and other social facilities are
available at district headquarter due to which the proposed site is facilitated with adequacy in
amenities. As most of the workers are employed from the surrounding villages, they would
be using available medical facilities in the nearest primary health center.
6. Proposed Infrastructure:
6.1. Industrial Area:
The proposed project is an non production acitivies under modernization of plant. The
production capacity remain same as per As per CFE Order No APPCB
/VSP/VSP/196/CFE/HO/2015 date 14.09.2015 which is 17197 kg/day.
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 19 of 21
6.2. Residential Area.
No Residential Area Proposed. As Skilled and Unskilled Labour drawn from near by villages.
6.3. Green Blet:
At any given time more then 33 % of the total area will be under green belt. Along the
boundary three plantations of 15 M wide will be maintained, 1-2 M all along the internal road
will be maintained. In addation open area are developed under green belt.
6.4. Social Infrastructure:
This Project is providing employment to local people directly and indirectly. Indirect
employers are shopkeepers, mechanic, drivers, transporters etc. The lessee will responsible
for providing better social infrastructure benefits such as drinking water, health care
measures, educational facilities, promotion of culture and religious activities in surroundings.
6.5. Connectivity (Traffic and transportation Road/Rail/Metro/Water ways etc)
6.5.1. Availability Of Roads:
All weather road is passing in between the exsting plant and proposed
Modernizationplant which is connected to annavaram village.
6.5.2. Nearest Railway station:
Vizianagaram (21km) is the nearest railway station in Northwest.
6.5.3. Nearest Sea Port:
Visakhapatnam Port Trust, Visakhapatnam (37 km) in South west.
6.5.4. Nearest Airport:
Visakhapatnam Airport, Visakhapatnam (35 km) in East.
6.6. Effluent Generation and Treatment Scheme for Disposal
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 20 of 21
S.no Description of
Effulent Stream Treatment Mode of Disposal
1 HTDS stream
Shall be treated in stripper ( 15kl/hr), MEE (13.5 kl/hr)&
ATFD(3.5kl/hr)
Stripper for Separation of organic coumpound
and separated organic shall be disposedto cement
plants for co processing & distilled effluents
shall be recycled .
Stripped effluents shall be forced evaporated in
MEE
Condensate from MEE & ATFD shall be sent to
ATFD.
ATFD salts to TSDF
2 High COD
Shall be stripped in stripper followed by
treatment in the exisiting ETP Shall be disposed to sea after meeting the marine
discharge stanadards
3 LTDS Stream & domestic
Shall be treated in ETP consisting of
Physical , chemical & biological treatment
4 Cyanide bearing effluents
Shall be detoxified and treated
Treated in etp-then disposed to sea
5 Heavey metal bearing effluents
Shall be isolated and treated
Treated in etp-then disposed to sea
6
Boiler blow down , cooling tower blwo down , Dm plant regenearation /Ro plant rejects ( Raw Water)
Neutralization, Central monitoring
basin
Shall be disposed to sea after meeting the marine
discharge stanadards
As per CFE Order No APPCB /VSP/VSP/196/CFE/HO/2015 date 14.09.2015
7. Rehabilitation and Resettlement (R & R) Plan:
No R&R activities envisaged.
8. Project Schedule and Cost Estimation:
The total cost of the Modernizationproject is Rs. 100 Crores, which also included the cost towards
Operation andMaintenance Cost of Air Pollution Control Devices, Effluent Treatment Plant, Solid
WasteTreatment and Disposal
Pre-Feasibility Report for Modernization of M/s. Divi's Laboratories Limited (Unit - 2) -- Bulk Drug Unit at Chippada and Annavaram Villages,
Annavaram Taluka, Bheemunipatnam Mandal, Visakhapatnam District, Andhra Pradesh
Page 21 of 21
As per an initial estimate around 9-12 months will be needed for implementation of the project from
the starting date i.e. from the date of receiving all the statutory clearances for starting the project.
9. Analysis of Proposal:
9.1. Financial Socio-Economic Benefits:
The proposed project is expected to bring significant socio-economic and environmental
benefits both at local level as listed below:
9.1.1. Social Infrastructure:
Social awareness programs will be improved by the local authority such assanitation
and hygiene, HIV Prevention Program.
Adult education and female education programme is planned to the illiterateadults
and backward females of the villages in the project surrounding area.
9.1.2. Employment Potential:
The project is going to create some employment. Due to this project activity, some
persons in the project area will be recruited as skilled and semi-skilled workers by
thecompany as per its policy. Therefore, some employment and income are likely to
begenerated for the local people. So, the project will contribute in a positive
mannertowards direct employment in the project area.
9.1.3. Benifits to the region:
The company will supply its product to the domestic market which is likely to improve
the regional economy.