NORDcanopy Installation, use and maintenance manual

Upload: others

Post on 01-Oct-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

NORDcanopyInstallation, use and maintenance manual

Page 2: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

®

www.etsnord.com2

®

Installation, use and maintenance manual

54 6 8

1111 1212 141313 1610

1 77

15

92 3

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 1 OF 4

A3

WEIGHT:

G4.00.00

1- - Front panel2- - Ozonator3- - Regulating damper4- – Supply air connection5- - Supply air adjusting plate6- - Lighting7- - Suspension points8- - Exhaust air connection9- - Adjusting plate for exhaust air10- - Front panel lock11- - Auxiliary supply openings12- - Turbo Grip air intake13- - Air flow measuring nozzles14- - HFK grease filter15- - Blind panel for grease filter16- - Grease collection container

1. Hanging the kitchen hood ........................................................................... 31.1 Positioning fastening points ......................................................................3

2. Connecting kitchen hood modules ............................................................ 42.1 Fastening modules ......................................................................................42.2 Fastening sides back-to-back ....................................................................4

3. Installation of the adjuster of supply openings ........................................ 54. Installtion of the the grease chute and collection container ................... 55. InstallingHFKgreasefilters........................................................................ 56. Measuring ..................................................................................................... 6

6.1 K-factorformeasuringairflow ..................................................................6

7. Safety ............................................................................................................ 68. Replacing the light ...................................................................................... 69. Kitchen hood maintenance ......................................................................... 7

Page 3: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

®

3Images are for illustrative purposesWe reserve the right to make changes

®

1. Hanging the kitchen hood

1.1 Positioning fastening points

Do not use smaller than M8 threaded rods for hanging the kitchen hood on the ceiling. Distributed bearing points are used for connecting modules.

A

B

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 3 OF 4

A3

WEIGHT:

G4.00.00

L L-37

1 2

4 3

W

DETAIL WSCALE 1 : 18

AA

12

47

DETAIL AASCALE 1 : 3

L-24

B-9

4 B

L

A

B

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 2 OF 3

A3

WEIGHT:

G4.00.03

Page 4: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

®

www.etsnord.com4

®

2. Connecting kitchen hood modules

Before installing the next module, the special silicone included in the kitchen hood box must be applied on the surfaces indicated in the drawing. Upon connecting modules, each subsequent module is supported with the teeth located on the kitchen hood chamber end.

2.1 Fastening modules

Modules are fastened to one another with M4 stainless steel screws, using the spe-cified holes in the side and ceiling panels.

2.2 Fastening sides back-to-back

When connecting modules back-to-back, each module is suspended on separate bearing points. Rear walls are fastened to one another using M4 stainless steel screws. The edge of the opening connecting the chambers is lined with a special U-profile gasket.

L

DETAIL LSCALE 1 : 1.5

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 4 OF 4

A3

WEIGHT:

G4.00.00

A

M4

V

DETAIL VSCALE 1 : 1.8

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 1 OF 7

A3

WEIGHT:

G4.00.01

D

LL

M

SECTION L-L

DETAIL MSCALE 2 : 1.3

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 3 OF 6

A3

WEIGHT:

G4.00.01

D

LL

M

SECTION L-L

DETAIL MSCALE 2 : 1.3

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 3 OF 6

A3

WEIGHT:

G4.00.01

Page 5: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

®

5Images are for illustrative purposesWe reserve the right to make changes

®

3. Installation of the adjuster of supply openings

The kitchen hood front panel lock opens with an Allen key. The same tool is used for removing the supply panel, pulling it out of the open-ing located above the lock. Auxiliary supply adjusting plate is installed in the bot-tom of the supply chamber.

4. Installtion of the the grease chute and collection container

The grease chute swivels into the intended slot in the grease trap. Upon installation and maintenance, make sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath the grease trap.

5. InstallingHFKgreasefilters

HFK grease filter is installed on the teeth of the upper edge profile of the exhaust cham-ber. The grease filter is placed using the handles or a special installation tool.

E

J J

K

SECTION J-J

DETAIL KSCALE 1 : 2

N N

P

SECTION N-N

N NRR

T

SECTION R-R

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 4 OF 6

A3

WEIGHT:

Osa 2

C

DETAIL CSCALE 1 : 1

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 2 OF 6

A3

WEIGHT:

Osa 2

Y

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 3 OF 3

A3

WEIGHT:

G4.00.03

G

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 5 OF 6

A3

WEIGHT:

G4.00.01

Page 6: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

®

www.etsnord.com6

®

6. Measuring

NORDcanopy kitchen hoods are fitted with measuring nozzles located in the lower section of the chamber. NB! During measurement, HFK grease filters must be fitted and the front panel must be closed. In order to adjust supply airflow, the position of the adjusting plate located in the supply chamber is adjusted. Adjusting plate located behind the HFK grease filters is used for adjusting exhaust airflow.

6.1 K-factorformeasuringairflow

• Exhaust K-factor = 22,3 (per 1 filter)• Supply, auxiliary supply in a closed position, per 1 m of front panel:

K-factorSPx0 SPx1 SPx2 SPx3 SPxK

Front panel - 16,8 29,9 48,0 -Turbo Gripp 2,4 - - - -Side panel* - - - - 6,6

*If the side panel has perforation, add the side panel k-value to the front panel k-value.

7. Safety

It is prohibited to hold or add additional weight on the top of the canopy.

8. Replacing the light

Integrated light fittings with protection class IP 66 are used in NORDcanopy kitchen hoods. Each light fitting is fitted with a power cable (3x1.5 mm, length 1,5 m) and a junction box.To remove the light fitting, the screws fastening the protective glass over the light fitting are unfastened and the protective glass is removed.

B

C

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 1 OF 1

A3

WEIGHT:

G4.00.02

B

C

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 1 OF 1

A3

WEIGHT:

G4.00.02

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 2 OF 2

A3

WEIGHT:

G4.00.02

A A

B B

C C

D D

E E

F F

8

8

7

7

6

6

5

5

4

4

3

3

2

2

1

1

DRAWN

CHK'D

APPV'D

MFG

Q.A

UNLESS OTHERWISE SPECIFIED:DIMENSIONS ARE IN MILLIMETERSSURFACE FINISH:TOLERANCES: LINEAR: ANGULAR:

FINISH: DEBURR AND BREAK SHARP EDGES

NAME SIGNATURE DATE

MATERIAL:

DO NOT SCALE DRAWING REVISION

TITLE:

DWG NO.

SCALE:1:20 SHEET 6 OF 6

A3

WEIGHT:

P4 rasvafilter G4.00.01

Page 7: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

®

7Images are for illustrative purposesWe reserve the right to make changes

®

9. Kitchen hood maintenance

DEPENDING ON THE FREQUENCY

OF KITCHEN MAINTENANCE

All internal and external surfaces of the kitchen hood, incl. the light fitting, are cleaned using soap and water or neutral cleaning agents. Carefully rinse the surfaces after clea-ning in order to avoid a harmful interaction of cleaning agents and high temperatures. NB! Do not clean the kitchen hood using rough or abrasive cleaning agents, chlorine or bleach.NB! Never clean the kitchen hood when any of its surfaces are hot. To clean the exhaust chamber, HFK filters and the grease chute are removed from the kitchen hood. To clean the supply chamber, the front panel of the kitchen hood is removed.

DAILY

To clean HFK grease filters, these are removed from the kitchen hood. Fluid grease is poured down the sewerage and grease filters are washed by hand, in a dishwas-her or steam-cleaned. Grease collector is removed at the same time as cleaning the grease filters, emptied into the sewerage and washed by hand, in a dishwasher or steam-cleaned. NB! Grease trap must be inspected regularly and emptied if necessary.

Page 8: NORDcanopy - ETS NORD Danmark...sure that the U-profile gasket lining the chamber edge maintains its position. The grease collection container is installed on horizontal rails underneath

ETS NORD AS

Address: Peterburi tee 53 11415 Tallinn Estonia

Phone: +372 680 7360 [email protected] www.etsnord.ee

ETS NORD Finland

Address: Pakkasraitti 4 04360 Tuusula Finland

Phone: +358 0401 842 842 [email protected] www.etsnord.fi

ETS NORD Denmark

Address: Nordholmen 6 2650 Hvidovre Denmark

Address: Nygade 109 B 7430 Ikast Denmark

Phone: +45 9712 1314

[email protected] www.etsnord.dk

ETS NORD Sweden

Address: Järsjögatan 7 69235 Kumla Sweden

Phone: +46 707 80 50 16 [email protected] www.etsnord.se