Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 Public Meeting #5 June 3, 2014 June 3, 2014

Upload: others

Post on 20-Jul-2020

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Norman Utilities Authorityy2060 Strategic Water Supply Plan

Public Meeting #5Public Meeting #5ggJune 3, 2014June 3, 2014

Page 2: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

AGENDAAGENDA

Introductions and Goals for This Meeting

Status and Progress Update

Recent State and National Regulatory and Policy Developments

Questions and Feedback on Preferred Portfolios

Path Forward for 2060 SWSP

Page 3: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

AGENDAAGENDA

Introductions and Goals for This Meeting

Status and Progress Update

Recent State and National Regulatory and Policy Developments

Questions and Feedback on Preferred Portfolios

Path Forward for 2060 SWSP

Page 4: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Projected Water UseProjected Water UsejjActual & projected demands are i ifi tl l th th 2040significantly lower than the 2040 Plan (2001):• Revised growth projections • Reductions in per‐capita demand

(Annual Average Demands)

Page 5: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Use Already Exceeds Local SupplyUse Already Exceeds Local Supply

60

70• Reflects Norman’s existing conservation measures & programs

• Includes 10% supply reserve

50

60 • Includes 10% supply reserve• Service area is City of Norman only

40

nd (m

gd)

astru

ctur

e Ga

p

20

30

Dem

an

pply

ap

Existing Peak Supply without OKCExisting Peak Supply without OKC Infra

10

20

Sup Ga

Existing Annual Supply without OKCExisting Annual Supply without OKC

02015 2020 2025 2030 2035 2040 2045 2050 2055 2060

Further supply losses possible due to groundwater quality issues

Page 6: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

SWSP Planning ProcessSWSP Planning ProcessSWSP Planning ProcessSWSP Planning Process

Source Options (Phase 1)Source Options (Phase 1) Supply Portfolios (Phase 2)Supply Portfolios (Phase 2)Source Options (Phase 1)Source Options (Phase 1) Supply Portfolios (Phase 2)Supply Portfolios (Phase 2)Source 3

Source 2Source 1 Source 3

Source 2 Source 2

Source 1 Source 3

Source 1Source 4 Source 5

Source 2

Source 5

Source 2

Source 4

Source 1

Source 5

…PUBLIC PUBLIC MTG #1MTG #1

PUBLIC PUBLIC MTG #3MTG #3

Screening Criteria

Short List of Viable

Detailed Evaluation Process

2 3 Preferred

MTG #1MTG #1

PUBLICPUBLIC PUBLICPUBLICShort-List of Viable Source Options

2-3 Preferred Supply Portfolios

PUBLIC PUBLIC MTG #2MTG #2

PUBLIC PUBLIC MTG #4MTG #4

PUBLIC PUBLIC MTGMTG #5#5

Recommend Supply Portfolio

Page 7: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Water Supply Options ConsideredWater Supply Options ConsideredExisting Sources New Local Sources New Regional SourcesLake Thunderbird (at firm yield)

Additional conservation Co-owner with OKC for SE Oklahoma treated water

Garber Wellington Aquifer Wells (with treatment)

Direct non-potable reuse (purple pipe)

Co-owner with OKC for SE Oklahoma raw waterraw water

Intermittent purchase of treated water from OKC (wholesale)

Lake Thunderbird Augmentation (indirect potable reuse)

Scissortail Reservoir

Conservation and reuse Groundwater recharge (indirect potable reuse)

Parker Reservoir

Stormwater capture and Kaw LakereuseCanadian River diversionCapture Lake Thunderbird

6/5/2014

spillageDredging Lake Thunderbird

Page 8: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Water Supply Options ConsideredWater Supply Options ConsideredExisting Sources New Local Sources New Regional SourcesLake Thunderbird (at firm yield)

Additional conservation Co-owner with OKC for SE Oklahoma treated water

Garber Wellington Aquifer Wells (with treatment)

Direct non-potable reuse (purple pipe)

Co-owner with OKC for SE Oklahoma raw waterraw water

Intermittent purchase of treated water from OKC (wholesale)

Lake Thunderbird Augmentation (indirect potable reuse)

Scissortail Reservoir

Conservation and reuse Groundwater recharge (indirect potable reuse)

Parker Reservoir

Stormwater capture and Kaw LakereuseCanadian River diversion

Capture Lake Thunderbird

The most viable and costThe most viable and cost--effective effective supply options supply options became the became the

spillageDredging Lake Thunderbird

“building blocks” for water supply portfolios“building blocks” for water supply portfolios

Page 9: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Weighted Criteria Were Used to Weighted Criteria Were Used to Compare 14 Different Supply PortfoliosCompare 14 Different Supply Portfolios

Community Community ValuesValues

Compare 14 Different Supply PortfoliosCompare 14 Different Supply Portfolios

AffordabilityAffordability

TreatedTreated Water Water Quality Quality

Values Values

LongLong--Term Term Supply Supply

ReliabilityReliabilityEnvironmental Environmental

Aesthetics Aesthetics

Reliability Reliability Stewardship Stewardship

Phasing Phasing Potential Potential

Timely Timely

Efficient Use of Efficient Use of Water Water

Resources Resources Implementation Implementation and Certaintyand Certainty

Page 10: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Portfolios that Best Meet Portfolios that Best Meet Norman’s CriteriaNorman’s CriteriaNorman’s CriteriaNorman’s Criteria

bird

bi

rd

Wel

lsW

ells

Wel

lsW

ells

n&

eu

se

bird

on pl

ies

City

&M

$)

Thun

derb

Thun

derb

loca

tion

loca

tion

xist

ing

xist

ing

dwat

er W

dwat

er W

New

N

ew

dwat

er W

dwat

er W

serv

atio

not

able

Re

Thun

derb

men

tatio

nalS

upp

laho

ma

C

al a

nd O

&ts

(201

2$

Lake

TLa

ke T All

All EE

Gro

und

Gro

und

Gro

und

Gro

und

Con

sN

on-p

o

Lake

TA

ugm

Reg

ion

via

Ok

Cap

itaC

ost

P1 Max

Local

$250M$21M/yr

P13

66 88 22 1313P1P1 Eliminated: Public / Council feedback indicates strong preference forEliminated: Public / Council feedback indicates strong preference forincluding new wells to maintain existing groundwater supply proportionsincluding new wells to maintain existing groundwater supply proportions

P13Regional

OKC

$340M $23M/yr

P14

66 88 22 1313

P14 Wells +

TBird Aug.

$270M$22M/yr

66 222288 1111

Values are 2060 Annual Avg. Use (mgd) OKC deliveries are raw water treated by NormValues are 2060 Annual Avg. Use (mgd) OKC deliveries are raw water treated by Normanan

Page 11: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Key Difference: Source of Water Key Difference: Source of Water for Increasing Demandfor Increasing Demandfor Increasing Demandfor Increasing Demand

P13P13: Regional Raw Water : Regional Raw Water (( ith OKC)ith OKC)T t tT t t (co(co--owner with OKC)owner with OKC)Treat at Treat at

Norman Norman WTPWTP

Page 12: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Key Difference: Source of Water Key Difference: Source of Water for Increasing Demandfor Increasing Demandfor Increasing Demandfor Increasing Demand

P14:P14: New Wells and New Wells and Thunderbird AugmentationThunderbird Augmentation

Treat Lake Treat Lake

Thunderbird AugmentationThunderbird Augmentation

Thunderbird Thunderbird water at WTPwater at WTP

Ad dAd dAdvanced Advanced treatment attreatment at

WRFWRF: : AddAdd biofiltrationbiofiltrationAdd Add biofiltrationbiofiltration

and ozoneand ozone

Page 13: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

600

Comparison of Capital CostsComparison of Capital Costs

500

600

Rehab/Replacement of New Infrastructure

400

2 $M

) New Infrastructure Required for Capacity Increases

300

Cap

ital (

2012

o Capac ty c eases

New Infrastructure Improvements Required by

100

200C Improvements Required by Regulatory Changes (2)

Rehab/Replacement of Existing Infrastructure (1)

0P13: Regional Raw Water P14: New wells and

Existing Infrastructure (1)

(co-owner with OKC) Thunderbird AugmentationNotes:1. Existing infrastructure includes Vernon Campbell WTP, raw water piping, and treated water connection to OKC.2. Infrastructure required because of anticipated regulatory changes includes treatment for active Garber‐Wellington Aquifer wells.

Page 14: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Phased Capacity Increases toPhased Capacity Increases toM t D d P tf li 13M t D d P tf li 13

30

Raw Water from Oklahoma City (co-owner)

Meet Demand: Portfolio 13Meet Demand: Portfolio 13

20

25

Oklahoma City (co owner)

Treated Water from OKC (demand service rate)

15

20

. Use

(mgd

) Direct Non-potable Reuse

Additional Conservation

Raw Water from OKC (co-owner)

10

Avg. Additional Conservation

Inactive Garber Wellington Wells (with

)

-

5 treatment in 2018)

Lake Thunderbird

Active Garber Wellington Wells (with treatment in 2018)

Page 15: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

olio

13

–m

a C

ity fo

r aw

Wat

er$30M in 2020: Expansion to Norman WTP to treat Southeast Oklahoma Water (initial 9 mgd), Atoka pipeline comes online

$38M in 2025: Extend line from Kiamichi Basin to Atoka pipeline (0 mgd)

$17M in 2057: WTP expansion to 13.1mgd

ject

s fo

r Por

tfow

ith O

klah

omO

klah

oma

Ra

$23M in 2019: Pipeline and pump station from Atoka pipeline to Norman WTP (0 mgd)

$126M in 2049: New terminal storage and WTP expansion to 11.7 mgd

$104M in 2013: Bonds issued for parallel Atoka pipeline and pump stations (0 mgd)C

apita

l Pro

jP

artn

ersh

ip

Sou

thea

st O

f the

2010 2020 2030 2040 2050 2060

mm

on to

All

ofd

Por

tfolio

s 2014: Initiate expanded conservation (1 mgd by 2060)

$14M in 2028: Expand non-potable reuse to 0.80 mgd$12M in 2023:

Expand non-potable reuse to 0 54 mgd

$99M in ~2018: Treat active and inactive groundwater wells (8 1l Pro

ject

s C

omR

ecom

men

de

Capital projects common to all recommended portfoliosCapital projects unique to Portfolio 13

~2016: Lake Thunderbird allocation reduced to 6.1 mgd

reuse to 0.54 mgd

inactive groundwater wells (8.1 mgd)------------------------------------------------$22M in 2018: Initial non-potable reuse system (0.27 mgd)

Cap

ital R Capital projects unique to Portfolio 13

Capital projects unique to Portfolio 14Note: All supplies are listed in annual average flow. Rehabilitation/replacement projects not shown. Capital expenditures shown in escalated (future) dollars.

Page 16: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Phased Capacity Increases toPhased Capacity Increases toM t D d P tf li 14M t D d P tf li 14

30 Treated Water from Oklahoma City (demand

Meet Demand: Portfolio 14Meet Demand: Portfolio 14

20

25

Oklahoma City (demand service rate)

Indirect Potable Reuse (Supply Augmentation)

Di t N t bl R

15

20

Use

(mgd

)

Direct Non-potable Reuse

Additional Conservation

Lake Thunderbird Augmentation

New Garber-Wellington Wells

10

Avg.

New Garber Wellington Wells (with treatment in 2018)

Inactive Garber

-

5 Wellington Wells (with treatment in 2018)

Lake Thunderbird

Active Garber Wellington Wells (with treatment in 2018)

Page 17: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

o 14

–N

ew

d La

ke

tatio

n

$39M in 2036: Expand Lake Thunderbird Augmentation to 6.5 mgd

$41M in 2056: Expand Lake Thunderbird Augmentation to 11.5 mgd

cts

for P

ortfo

lioat

er W

ells

and

rbird

Aug

men

t

$63M in 2025: Lake Thunderbird Augmentation (Initial 3 mgd)

$56M in 2046: Expand Lake Thunderbird Augmentation to 9.5 mgd

Cap

ital P

roje

cG

roun

dwa

Thun

der

$37M between 2018-2023: Wellfield expansion (2 Garber-Wellington wells per year through 2023)

f the

2010 2020 2030 2040 2050 2060

Cm

mon

to A

ll of

d P

ortfo

lios 2014: Initiate

expanded conservation (1 mgd by 2060)

$14M in 2028: Expand non-potable reuse to 0.80 mgd$12M in 2023:

Expand non-potable reuse to 0 54 mgd

$99M in ~2018: Treat active and inactive groundwater wells (8 1l Pro

ject

s C

omR

ecom

men

de ~2016: Lake Thunderbird allocation reduced to 6.1 mgd

reuse to 0.54 mgd

Capital projects common to all recommended portfoliosCapital projects unique to Portfolio 13inactive groundwater wells (8.1

mgd)------------------------------------------------$22M in 2018: Initial non-potable reuse system (0.27 mgd)

Cap

ital R Capital projects unique to Portfolio 13

Capital projects unique to Portfolio 14Note: All supplies are listed in annual average flow. Rehabilitation/replacement projects not shown. Capital expenditures shown in escalated (future) dollars.

Page 18: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

AGENDAAGENDA

Introductions and Goals for This Meeting

Status and Progress Update

Recent State and National Regulatory and Policy Developments

Questions and Feedback on Preferred Portfolios

Path Forward for 2060 SWSP

Page 19: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Recent State and National Recent State and National R l & P li D lR l & P li D lRegulatory & Policy DevelopmentsRegulatory & Policy Developments

National:National: ChromiumChromium--6 regulations6 regulations ChromiumChromium 6 regulations6 regulations

Oklahoma:Oklahoma: Water for 2060Water for 2060 Water for 2060Water for 2060 Potable reuse regulationsPotable reuse regulations

S iti t l d i tiS iti t l d i ti Sensitive water supply designationSensitive water supply designation

Page 20: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

ChromiumChromium--66 CaliforniaCalifornia Cr6Cr6 limit of limit of

1010 ugug/L sent to Office/L sent to Office10 10 ugug/L sent to Office /L sent to Office of Administrative Law of Administrative Law 4/20144/2014

EPA EPA Cr6Cr6 limit (likely limit (likely >10 >10 ugug/L)/L) expected in expected in gg )) pp20172017

Most of Norman’s Most of Norman’s wells will not meet wells will not meet new new Cr6Cr6 regulations regulations

ith t t t tith t t t twithout treatmentwithout treatment

Page 21: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

OklahomaOklahomaOklahomaOklahoma

Page 22: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Water for 2060 Act passed in 2012Water for 2060 Act passed in 2012 Water for 2060 Act passed in 2012Water for 2060 Act passed in 2012

Advisory Council appointed toAdvisory Council appointed to Advisory Council appointed to Advisory Council appointed to recommend recommend incentives and incentives and voluntary initiativesvoluntary initiatives for water for water

www.owrb.ok.gov/2060

yyefficiencyefficiency

Focus: water conservation and reuseFocus: water conservation and reuse

Local conservation and marginal Local conservation and marginal quality water analyses being quality water analyses being

d d b OWRB l i 2014d d b OWRB l i 2014conducted by OWRB later in 2014conducted by OWRB later in 2014

Page 23: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Cultural Shifts are Happening in the Cultural Shifts are Happening in the Water Industry and in OurWater Industry and in OurWater Industry and in Our Water Industry and in Our

CommunitiesCommunities

Page 24: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Nonpotable reuse is already meeting Nonpotable reuse is already meeting di d Okl hdi d Okl hdiverse needs across Oklahomadiverse needs across Oklahoma

Page 25: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Indirect Potable Reuse:Surface Water Augmentation

Page 26: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Direct Potable Reuse

What’s different? Direct potable reuse has no “environmental buffer ”Direct potable reuse has no environmental buffer.

Page 27: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Why is POTABLE Reuse Attractive Why is POTABLE Reuse Attractive i Okl h ?i Okl h ?in Oklahoma?in Oklahoma?

Direct potable reuse

IPR – Groundwater augmentation Year-round

IPR – Surface water augmentation

augmentation Year-round

Other nonpotable uses

augmentation

Year-round

Landscape Irrigation

Other nonpotable uses Year round

Landscape IrrigationSeasonal

Page 28: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June
Page 29: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Indirect Potable Reuse is Indirect Potable Reuse is Becoming CommonplaceBecoming CommonplaceBecoming CommonplaceBecoming Commonplace

ExamplesExamples of prominent IPR projectsof prominent IPR projects

San Diego: ReservoirReservoir Augmentation Demonstration

Aurora: Recapture of Return Flows

Upper Occoquan: Surface Water Augmentation

Orange County Water District: G d t

Augmentation

Gilbert: G d t

NTMWD: Groundwater Replenishment

Groundwater Recharge Ponds

Surface Water Augmentation

Page 30: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Direct Potable Reuse is Direct Potable Reuse is Getting “Closer to Home”Getting “Closer to Home”

[YOU ARE HERE][YOU ARE HERE][YOU ARE HERE][YOU ARE HERE]

Coming soon!Coming soon!Wichita FallsWichita Falls

Page 31: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Applied Research is Paving the Way for Potable Applied Research is Paving the Way for Potable Reuse Outreach Treatment and MonitoringReuse Outreach Treatment and MonitoringReuse Outreach, Treatment, and MonitoringReuse Outreach, Treatment, and Monitoring

$6 million $6 million for cutting for cutting d DPRd DPRedge DPR edge DPR research research

Page 32: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

From Raw Wastewater From Raw Wastewater to Potable Waterto Potable Water

1212 l il i 1212--log viruslog virus 99--log bacterialog bacteria 1010--log protozoalog protozoa

Page 33: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Oklahoma’s Reuse Regulations Are Being Oklahoma’s Reuse Regulations Are Being Expanded to Include Potable ReuseExpanded to Include Potable ReuseExpanded to Include Potable ReuseExpanded to Include Potable Reuse

Category Examples of Authorized Uses1 [RESERVED]

2Public access landscape irrigation, toilet flushing, fire protection vehicle/equipment washing range

Potable

MP

sM

Ps

2 fire protection, vehicle/equipment washing, range cattle watering, drip irrigation of vineyards/ orchards

Restricted access landscape irrigation, new restricted access golf co rses cooling to ers andbl

e

ality

ality

, , BM

BM

3restricted access golf courses, cooling towers and various nonpotable commercial/industrial uses, livestock pasture, subsurface irrigation of vineyards/ orchardsn-

Pota

b

nt,

nt, Q

uaQ

ua

orchards

4 Soil compaction and existing restricted access golfcoursesN

on

eatm

enea

tmen

5 Restricted access pasture irrigation and restricted access non-food crop irrigation Tr

eTr

e

Page 34: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Senate Bill 1187 (enrolled)Senate Bill 1187 (enrolled) requires ODEQ to reviewand evaluate permit applications for waterapplications for water reuse and approve water reuse discharges into sensitive water supplies (e.g., Lake Thunderbird).

Page 35: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

AGENDAAGENDA

Introductions and Goals for This Meeting

Status and Progress Update

Recent State and National Regulatory and Policy Developments

Questions and Feedback on Preferred Portfolios

Path Forward for 2060 SWSP

Page 36: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Discussion and InputDiscussion and InputDiscussion and InputDiscussion and Input

“Do nothing” alternative?“Do nothing” alternative? Do nothing alternative?Do nothing alternative? Increase treated water purchases from Increase treated water purchases from

Oklahoma CityOklahoma CityOklahoma CityOklahoma City Physical constraint of existing connectionPhysical constraint of existing connection Purchase costs higher than sales costPurchase costs higher than sales costgg

Lose existing groundwater wells when future Lose existing groundwater wells when future chromiumchromium--6 groundwater regulations 6 groundwater regulations implementedimplemented

6/5/2014

Page 37: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Discussion and InputDiscussion and Input What concerns you aboutWhat concerns you about Which portfolio best meetsWhich portfolio best meets What concerns you about What concerns you about

these portfolios?these portfolios? How critical is local control?How critical is local control?

Which portfolio best meets Which portfolio best meets the community’s priority the community’s priority objectives? Why?objectives? Why?

Will the community support Will the community support potable reuse?potable reuse?Additi l ti & idAdditi l ti & id

Long term reliabilityLong term reliability Efficient use of suppliesEfficient use of supplies Timely implementation and Timely implementation and

Additional questions & ideasAdditional questions & ideas

rd

rd

nn er

er

er

er

n&

le

rd

on ia

City d ts

y py pcertaintycertainty

Lake

La

ke

Thun

derb

irTh

unde

rbir

Allo

catio

nA

lloca

tion

Exis

ting

Exis

ting

Gro

undw

ate

Gro

undw

ate

Wel

lsW

ells

New

N

ew

Gro

undw

ate

Gro

undw

ate

Wel

lsW

ells

onse

rvat

ion

Non

-pot

abl

Reu

se

Lake

Th

unde

rbir

ugm

enta

tio

Reg

iona

lSu

pplie

s vi

klah

oma

C

Cap

ital a

ndO

&M

Cos

t(2

012$

)

TT GG GG Co N T A S Ok C O

P13Regional

OKC

$340M $23M/yr66 88 22 1313

P14 Wells + TBird

Aug.

$270M$22M/yr66 222288 1111

Values are 2060 Annual Avg. Use (mgd)Values are 2060 Annual Avg. Use (mgd)

Page 38: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

AGENDAAGENDA

Introductions and Goals for This Meeting

Status and Progress Update

Recent State and National Regulatory and Policy Developments

Questions and Feedback on Preferred Portfolios

Path Forward for 2060 SWSP

Page 39: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Path ForwardPath ForwardPath ForwardPath Forward

Public meeting todayPublic meeting today Public meeting todayPublic meeting today Water supply portfolio recommendation to Water supply portfolio recommendation to

C CC CCity CouncilCity Council Council actionCouncil action Finalize Strategic Water Supply PlanFinalize Strategic Water Supply Plan Implement planImplement plan Implement planImplement plan

Page 40: Norman Utilities Authority - 164.58.87.100164.58.87.100/filebrowser_download/681/Utilities... · Norman Utilities Authority 2060 Strategic Water Supply Plan Public Meeting #5 June

Norman Utilities Authorityy2060 Strategic Water Supply Plan

June 3, 2014June 3, 2014