Page 1: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Common Boiler Installation Problems

Page 2: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Mailing Address

North Dakota Insurance DepartmentBoiler Inspection Program600 East Boulevard AveBismarck ND58505-0320

Page 3: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Robert Reetz 701-328-9607 [email protected] 701-400-1043

Trevor S Seime 701-220-4723 [email protected]

Nicolle Fowler 701-541-2113 [email protected]

Bismarck Fax 701-328-9610

Fargo Fax 701-328-0317

WWW.ND.GOV/NDINS◦ Click on Special Funds◦ Click on Boiler Inspections

Contact Info and Website

Page 4: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Any size of boiler in a six-unit apartment or larger.

Any size of boiler in buildings where the public is invited. Exemptions are federally controlled buildings and farm use buildings.

Any water heater or pool heater larger than 200,000 Btu/hr input at above locations.

Antique/historical boilers at public shows.

Where do we have jurisdiction?

Page 5: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

New boiler types and controlsTop boiler installation problems on hot water heating systems

Our installation form – a requirement

Introduction

Page 6: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

New Boiler Designs

Giannoni France SAS•Water Tube Boiler

PMU, AIC, Bosal•Vertical Fire Tube Boiler

Page 7: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

• Code stamped boilers, but some not always acceptable to State due to internal piping and control issues.

Other New Boiler Designs

• Please call us before installing a boiler you have not used before as new products come on the market all the time and may not meet State Boiler Code even with the correct ASME and National Board stamping.

Page 8: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Water tube boiler – requires flow switch for low water protection. No low-water cutoff required.

Manual reset high limit temperature control is required – must have dial range not to exceed MAWT (210 deg F). An acceptable external control is the Honeywell L4006E1125/U 100-200F range.

The manual reset high limit temperature control is built-in to the Lochinvar, Trinity (set to lockout, most models). HTP, Triangle Tube and others require the external control.

Safety relief valve, pressure/temperature gauge, boiler drain, stop valves, electrical switch, etc are all the same as other boilers.

Giannoni France SAS Controls

Page 9: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Giannoni France SAS Water Tube Boiler In HTP Jacket

Page 10: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

AIC, PMU and Bosal Vertical fire tube boilers – require a low-water fuel

cutoff installed in a tee under the safety relief valve on top of the boiler.

Manual reset high limit temperature control is required – must have dial range not to exceed MAWT (200F). An acceptable external control is the Honeywell L4006E1125/U 100-200F range.

The manual reset high limit temperature control is built-in to the Lochinvar and Trinity (set to lockout, most models). HTP, Triangle Tube and others require the external control.

Safety relief valve, pressure/temperature gauge, boiler drain, stop valves, electrical switch, etc are all the same as other boilers.

Page 11: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

AIC, PMU, and Bosal Fire Tube

Page 12: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Two temperature controls – one with manual reset and lockout

Testable low-water cut off with manual reset and lockout, or flow switch

Safety relief valve Temperature and pressure gauge Isolation valves Expansion tank Drain valve Makeup water system – not always required (RPZ,

regulator with bypass, and feed line stop valve) Electrical Switch + E-stop (if required)

Required Boiler Controls and Devices

Page 13: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

VentingType B chimneys are not to be used for solid

fuel or oil.Solid fuel and gas or oil equipment can not

vent to the same venting system.Single-wall metal venting must be at least 6”

from combustible material for gas.For common venting, you must upsize 50%

of the area for any additional vent.Horizontal piping must have at least a 2% up

slope.Cutting down vent hoods to fit is not

allowed.Consult local jurisdiction if necessary.

Page 14: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Electric Boilers and Low-Water Protection Electric boilers must be ASME stamped. National

Board registration is also required unless they are cast iron.

Low-Water Protection◦ For those with a vertical element design (Electro

Industries, for example) a low-water fuel cutoff is usually acceptable.

◦ For those with a horizontal element design (Slant Fin Monitron, for example) a flow switch is required by the manufacturer.

Page 15: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Pool Heaters

Pool heaters smaller than 200,000 Btu/hr input do not fall under our jurisdiction.

Pool heaters must be ASME constructed with an “H” or “HLW” designation and be National Board registered.

Pool heaters with stop valves installed between the boiler and pool must have a flow switch.

Page 16: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

AsbestosIf asbestos containing insulation is in good condition, it is fine to be left alone. If it is breaking loose and friable it must be abated properly by a licensed abatement contractor.

Page 17: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Our Common Installation Problems:

Top 10++ List…

Page 18: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

•Either they are not installed or are installed too far from the boiler proper on the supply and the return.•Boiler isolation valves may not isolate any of the controls from the boiler. •Zone isolation valves are not the required isolation valves.

1. Boiler Isolation Valves

• Should only be closing one valve on supply and one on return to isolate the boiler.

Page 19: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

•Missing or improperly located. •Required if the boiler is over 400,000 Btu/hr input. •Must be outside the enclosure unless allowed by the Inspector for practical reasons. Plastic flip covers are a good idea to prevent incidental tripping and tampering.

2. Emergency Stop Switch

Page 20: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

A low-water fuel cutoff is required on all cast iron, cast aluminum and fire tube boilers. ◦Must be installed on the boiler proper above the

safe water line or on the boiler supply outlet piping (hot side) before the first isolation valve.

A flow switch is required for all water tube boilers, fired coil boilers and pool heaters.◦Consideration should be made for flow switches

to match the flow rate and piping size to the type of flow switch. Test once installed to make sure it works. Must be installed tight to the piping.

3. Low-Water Fuel Cutoff vs. Flow Switch for Low Water Protection

Page 21: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Incorrect Installation of LowWater Cutoffs and Flow Switches

Piping comes out bottom of boiler goes around and loops back to top.

Flow switch too far off the piping; no room for paddle to move.

Page 22: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

All safety valves must be installed in the vertical position.

Horizontal installation is only permitted on a storage water heater T&P valve and only if the temperature element is installed within the top six inches of the tank.

This would not be an acceptable installation.

4. Horizontally Installed Safety and Safety Relief Valves.

Page 23: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

•Boilers installed in a shop where vehicles can be stored or used must be 18” off the floor. If the boiler is in a mechanical room with a shop door entrance it must still be 18” off the floor.

5. Shop Installation

Page 24: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Controls and piping not updated. The replacement boilers must be installed to current code and any re-used controls must meet current code.

Clearances must meet the listing. You cannot exchange like for like and not make updates to the system.

6. Replacement Boilers

Page 25: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

If a boiler has a non-ASME stamped expansion tank, the maximum safety relief valve set pressure allowed is 30 psig.

If you want to use a higher set safety relief valve (that may be shipped with the boiler) you must install an ASME stamped expansion tank.

If more than one boiler is installed and interconnected with the system, the lowest boiler MAWP determines the safety relief valve setting for all of the boilers in the system.

7. Wrong Safety Relief Valve Set Pressure.

Page 26: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Non-ASME Tanks VS. ASME Tanks

Non-ASME ASME

Page 27: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Most new high efficiency boilers are direct vented to the outside and are not a problem.

Many conventional replacement and new boiler installations have incorrect combustion air.

Combustion air is figured at 1 sq. in. per 4,000 Btu/hr input – two openings required, or 1 sq. in. per 3,000 Btu/hr of input – one opening.

Professionally designed combustion air required for any other design.

All dampers, louvers or supply fans must be interlocked with the burner in a fail-safe manner.

Mechanical air exhausting must also be considered when sizing combustion air.

8. Inadequate Combustion Air and Poor Combustion Air Designs.

Page 28: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

9. Incorrect or Missing Manual Reset High Limit Temperature Control

•Most stainless steel boilers have a MAWT of 200F for fire tube and 210F for water tube designs. Most cast aluminum are 200F. Most cast iron boilers are 250F.

•The dial range of your manual reset high limit temperature control cannot exceed the MAWT of the boiler.

•The lowest MAWT is the determining factor for the setting of the manual reset high limit controls on all boilers in the system.

The Honeywell L4006E1125/U or equivalent with a dial range of 100-200F is the correct control for high efficiency boilers.

Page 29: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

We require each boiler to be installed such that either one can operate independent of the other.

We require parallel installation. Boilers that flow through each other in series are not permitted. If a flow through design is desired, alternate piping may be installed as bypass.

Adding a new boiler to an old system may require isolation valves to be added to the old boiler which was previously “grandfathered” without valves.

10. Off Peak or Dual-Fuel Systems

Page 30: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

• Heating boilers shall have a minimum distance of at least 36” between all sides of the heating boiler and adjacent walls, structures, or other equipment. • Alternative clearances in accordance with the

manufacturer’s service and maintenance recommendations are subject to acceptance by the Chief Inspector. • If it will not fit, it cannot be installed. • It will not be easier to obtain forgiveness after

the fact than to get permission beforehand.

11. Incorrect Clearances

Page 31: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Clearance Problems

No room to pull elements for service

No room to even get through the door.

Page 32: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

A boiler needs low-water protection. A low water cutoff or flow switch satisfy that requirement for new boilers. No feed water regulator is required, and it may be turned off if desired.

Old boilers – low-water cutoffs were first required in 1994. If the boiler is installed prior to that and does not have low water protection a feed water regulator is required and it must be left on.

Broken feed lines require, at a minimum, a vacuum breaker on the city water side. (See Plumbing Code)

12. Automatic Water Feeder On vs. Off (or not at all)…

Page 33: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

• Going from right to left into the system.

• RPZ backflow preventer

• Feed water regulator with piped bypass line

• Feed line stop valve before entering the boiler system.

• Feed water must enter the boiler system on the return, or line to the expansion tank.

Correct Water Feed Regulator with RPZ Backflow Preventer

Page 34: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

• Small non-ASME expansion tanks are permitted for hot water supply systems. If the tank is over the 5 gallon size it must be an ASME expansion tank. All systems in service over 30 psi must have ASME expansion tanks.

• A non-ASME tank is shown.

13. Hot Water Supply Expansion Tanks

Page 35: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

•This is the typical installation of an air eliminator.

•The air eliminator must be installed on the supply (outlet) side of the boiler.

•It must be installed on the low pressure side of the circulating pump.

•The expansion tank should be installed on the bottom connection of the air eliminator.

14. Expansion Tanks and Air Eliminators

Page 36: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

• Great example of primary/

secondary piping as shown in the Burnham Apex Installer Guide.

Air eliminator and expansion tank are on the supply piping on the suction side of the pump.

Primary/Secondary Piping – (very common on new installations)

Page 37: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

• When adding a new boiler to a low pressure steam system. The new boiler must have the same water level as the existing boiler. A new boiler may have to be built on a stand to achieve the same water level on installation.

• We will accept an engineered solution.

15. Low Pressure Steam – Same Water Level.

Note: Soldered copper fittings may not be used on steam boilers and steam piping.

Page 38: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

16. ProPress and Aquatherm

ProPress “aquatherm”

Page 39: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Good – The flow switch is threaded into the fitting and tight to the piping.

Not so good - The safety relief valve and gauge must be threaded fittings and tight to the piping. The safety relief valve must always come first followed by the T & P gage.

ProPress: Planning Your Installation

Page 40: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Cast iron and cast aluminum boilers must have an ASME stamp.

Steel, stainless steel, and electric boilers must have an ASME stamp and be National Board registered. (NB registration not required for cast.)

Most new high efficiency boilers are stainless.

17. Stamping of Boilers

Page 41: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Using a storage water heater or other hot water supply boiler for space heating, or for dual use domestic and sanitary purposes and space heating, is prohibited.

18. Hot Water Supply Boilers Used for Space Heating or for Dual Use

Page 42: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

This form is now a requirement, not an option, and must be filed with the Chief Boiler Inspector. Verbal reports are nice, but do not meet the requirements of Code. This form is available on our website.

The completed form must be mailed, scanned, emailed or faxed to the Chief Inspector.

19. Boiler or Water Heater Installation Report.

Page 43: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Installation Report Form

Page 44: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Many items must be taken into consideration on every boiler installation.

Use Manufacturer’s Installation Manual to help organize process and what you need.

Call with any questions prior to starting an installation.

Summary

Page 45: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

QUESTIONS?

Page 46: North Dakota Insurance Department Boiler Inspection Program 600 East Boulevard Ave Bismarck ND 58505-0320

Thank you for coming!