North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Wide Masterplan
December 13, 2010
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Mission Statement:
"The mission of the North Scott Community School District, a unique blend of rural and metropolitan opportunities, is to produce graduates with the capacity to be successful in a changing world, by incorporating abundant resources and offering a broad-based curriculum in a respectful, safe environment."
Masterplan Process:
The North Scott Community School District is currently faced with several challenges. With continued growth of community populations, there is need for expansion or redirection of the current district facilities. The Masterplanning process has included input of District administration, building administrators, staff and school board. It was determined that Long Term growth would consist of building need in a period of ten or more years from present day. The focus group took on the challenge of reviewing current and future needs for long term growth. Through review of the needs assessment results and comments, this group structured a document that would consider all of the long term requirements for each school facility. This was treated as a “wish” list for the school facilities. In addition, the existing school facilities and property were tabulated for analysis. “Wish” list need includes both building spaces and outdoor spaces or concerns.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Facilities:
Senior High School
•Currently Grades 9-12•Constructed 1957•Numerous expansion, renovation, and remodeling projects•Building Population 967 students•206,000 square feet in size
Junior High School
•Currently Grades 7-8•Ed White sixth graders currently in this building•Constructed 1974•Expanded in 200 and 2008•Building Population 450 students•104,000 square feet in size
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Facilities:
Ed White Elementary
•Currently Grades K-5, serving Eldridge•White sixth graders currently at Junior High School•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 458 students•44,500 square feet in size
John Glenn Elementary
•Currently Grades K-6, serving Donahue and portion of Eldridge•Glenn houses preschool programs for the District•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 233 students•30,700 square feet in size
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Facilities:
Alan Shepard Elementary
•Currently Grades K-6, serving Long Grove and a portion of Eldridge•Shepard houses state based 4-yr old preschool program•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 310 students•43,700 square feet in size
Neil Armstrong Elementary
•Currently Grades K-6, serving Park View•Constructed 1975•Expanded in 2000 and renovated in 2005 and 2006•Building Population 321 students•40,900 square feet in size
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Facilities:
Virgil Grissom Elementary
•Currently Grades K-6, serving Princeton•Grissom houses preschool programs for the District•Constructed 1966•Numerous expansion, renovation, and remodeling projects•Building Population 229 students•29,850 square feet in size
District Administration
•Constructed in 1978•6 Private Offices•6 Workstations•Board Room•Conference room/break room•Superintendent currently in board room
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Facilities:
Vehicle Maintenance
•Pre-engineered metal building constructed in 1978•Three maintenance bays•Communications system•Transportation office•Buses stored in parking lot
District Maintenance, Grounds and Print Shop
•Constructed in 1979 and repaired in 2005•Wood frame structure•Houses print shop, maintenance offices, maintenance storage, grounds department operations and grounds storage.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
District Facilities:
Lancer Stadium
•Football field, track and grandstands reconstructed in 2009•Visitor bleachers•Ticket booths, rest rooms, storage and concessions
Sports Complex
•Soccer Field•Baseball Field•12 Tennis Courts•Softball field is located on High School grounds
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Masterplanning Goal:
•Plan for all facilities for use throughout the entire school district. •Masterplan to serve as Blueprint for facilities for next 10-15 years.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Long Term and Short Term Goals:
•Attract and accommodate population.•Elementary sites as community center. These buildings will have continued changing use.•Update the exterior appearance of facilities. Improve aesthetic of public appearance.•Update technology in all facilities.•Provide opportunities for multiple activities.•Educational facilities to adapt with changes in curriculum, technology, pathways, etc.•Desire to provide best educational space possible.•Desire to be environmentally friendly.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Programmatic Needs of Facilities:
•Safe planning of parking and access considerations (traffic flow). Separation of cars, busses and pedestrians for safety on site.
•Green space: Maintain or provide adequate green space for aesthetic as well ascurriculum based needs.
•Provision for adequate technology. Buildings and rooms shall be capable of housing the needed technology which is required by the changing curriculum.•Improve the appearance of each building and the district for visitors. Improved entrances
and exteriors. Possibly clean up or modify the area between the District Administration and the Senior High School.•Accessibility at all facilities within the district.•Rooms to allow easier implementation of co-teaching and interactivity. Adjoining doors or proximity of classroom doors to be considered.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Programmatic Needs at Elementary School Facilities:White, Shepard and Armstrong:
•These facilities potentially to serve as three section buildings.•All purpose room - Flexible space to be used for educational, meeting and other group functions. Possible to serve as cafeteria for these buildings.•Staff work/conference space - Provision for a meeting and work/task area for teachers and
staff within each building.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Adequate parking, safety of building access.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Programmatic Needs at Elementary School Facilities:Glenn and Grissom:
•These facilities potentially to serve as two section buildings.•All purpose room - Flexible space to be used for educational, meeting and other group functions.•Staff work space - Provision for a meeting and work/task area for teachers and staff within each building.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Adequate parking, safety of building access.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Programmatic Needs at Elementary School Facilities:Junior High School:
•Band/Orchestra/Choir rooms not meeting needs of the program. Need to define the programmatic needs of these spaces to determine changes required.•Concerns with PA system.•Staff work space - Provision for work/task area for teachers and staff.•Update of restroom spaces, and inclusion of faculty rest room.•Update/expand main office area.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Meeting room/conference space - flexible meeting/multi-purpose room. Possibility of team meeting room and teacher work space as a combined space.•Consideration for grouped teacher’s offices to allow teacher desk to be removed from classroom.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Programmatic Needs at Elementary School Facilities:Senior High School:
•Staff work space - Provision for work/task area for teachers and staff.•Update/expand main office area.•Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance.•Meeting room/conference space - flexible meeting/multi-purpose room. Possibility of team
meeting room and teacher work space as a combined space.•Consideration for grouped teacher’s offices to allow teacher desk to be removed from classroom.•Need for storage space - need to define what is to be stored.•Update/expand main building entrance and activities entrance. Update and expand main activities rest rooms and concessions areas.•Continued improvement of classrooms and building spaces - flooring, ceilings, lighting
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Programmatic Needs at Elementary School Facilities:Long Term Facility Spaces:
•Swimming Pool•Possible new Pilot Elementary School Facility - K-6•Grounds department building expansion - or possible re-location of grounds and transportation
department facilities.•Sports complex concession stand and restrooms, ticket booths•Football storage garage•Bleachers/press box at soccer fields•Administration building expansion/remodeling.•Wind/solar power generation - building specific to each site•Reconstruct baseball field•Field house facility•Remove “Silver Bullet” building to improve “front door” appearance to district. Relocate storage
to different area.•Repair or replace visitor bleachers, and expand home bleachers, at Lancer Stadium.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Long Term Needs Assessment
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE Senior High School
1. Administrative and Support Spaces:
a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
Rework/update existing central office areas Rework/expand existing main school entrance area Rework/expand existing main events entrance area (see item d) main office/secretary office area principal’s office assistant principal’s office counselor office with adjoining room for student observation nurse office and first aid and speech therapist file document storage room work room/copy room supply storage room faculty rest rooms
b. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 sf
Large meeting/multi purpose room: possible to be divided into 2 smallerconferencing rooms (400 sf)
sink and counter area, cabinets white board, screen, smart board Teacher office area, clustered office pool allowing teacher desk to be
removed from classroom (1,200 sf)
c. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 450 sf Existing
remodel existing main men/boys and women/girls handicapped accessible rest room capacity per plumbing code drinking fountains
d. Events Ticketing and Concessions: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
Remodel existing ticket booth and concessions stand areas Remodel/expand events entrance area handicapped accessible roll-up security doors sink, power, services for concessions
d. Events Ticketing and Concessions: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
Remodel existing ticket booth and concessions stand areas Remodel/expand events entrance area handicapped accessible roll-up security doors sink, power, services for concessions
e. Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
PE/athletic storage Large equipment storage Chair/table storage Band shell and riser storage Drama storage
1. Instructional Areas:
a. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11,300 sf Existing
Remodel and update existing Library/Media Center ? LF of bookshelves, low shelves (42" to 48" high) checkout desk lounge seating/café style setting for reading coffee bar operated by students study tables/work space for 60 students AV storage/computer charging area librarian’s office/library work room near or easy access to main entry of building
b. Computer/Media Lab: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf Existing
• 1 - Tech work lab• 1 - Video production lab• 1 - Small lab for 8-10 students
c. Wrestling Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf
• Remodel and expand wrestling room or convert existing wrestling roominto storage and construct new wrestling room (80'x40')
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
d. Locker Rooms:
Boys athletic locker room. . . . . . . . . . . . . . . . . . . 2,500 sf ExistingIncrease/utilize space from PE lockers for ? students shower/drying area rest rooms coach’s office storageBoys PE locker room . . . . . . . . . . . . . . . . . . . . . . 1,800 sf ExistingReduce/redistribute space to athletic1. lockers for ? students shower/drying area rest rooms PE instructor office
SUBTOTAL NEW SPACES . . . . . . . . . . . . . . . . . . . . . . . . 7,100 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . . 1,420 sf
NEW PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . 8,520 sf
SUBTOTAL REMODELED SPACES . . . . . . . . . . . . . . . 17,250 sf
TOTAL ALL SPACES. . . . . . . . . . . . . . . . 25,770 sf
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE New Senior High School
1. Administrative and Support Spaces:
a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf
principal’s office assistant principal’s office counselor office with adjoining room for student observation secretary central office area with waiting area nurse office and first aid and speech therapist conference room student observations area (in-school supervision) file document storage room work room/copy room supply storage room faculty/staff rest rooms
b. Main Entrance : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf
Main building entry Display area Gallery Weather lobby
c. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf
Large meeting/multi purpose room: possible to be divided into 2 smallerconferencing rooms (800 sf)
sink and counter area, cabinets white board, screen, smart board Teacher office area, clustered office pool allowing teacher desk to be
removed from classroom (1,200 sf)
d. Building Services: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
boiler room washer and dryer area repair work area storage utilities room janitorial closets
e. Cafeteria:
commons area . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7,500 sf seating for ? serving lines kitchen food preparation area . . . . . . . . . . . . . . . . . . . . . . . . 4,000 sf food/supplies storage area cooler/freezer dishwasher/cleaning rest room - kitchen staff
f. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 sf
boys/mens and girls/womens handicapped accessible capacity per plumbing code drinking fountains
g. Circulation:
visible hallways handicapped accessible ? quantity of student lockers display cabinets
1. Instructional Areas:
a. General Purpose Classrooms: . . . . 33 classrooms @ 900 sf per room = 29,700 sf
? math for ? students each ? social studies for ? students each ? language arts for ? students each ? foreign language for ? students each
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
? special education for ? students each teachers closet, clock, PA, phone, computer access storage closet
a. Science Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . 6 @ 1,400 sf each = 8,400 sf
biology, physics, chemistry, earth science room for ? students each water/two sinks in room general science application teacher demonstration area with water, gas and electricity student project areas plain lab tables in center, ? tables, ? students per table storage - general and prep . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf storage - chemicals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 sf
c. Art Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf
room for ? students ? activity/work areas painting/drawing studio supply room adjacent project supply area project storage area ceramics studio kiln area in adjacent room ? sink/clean-up areas
d. Band Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5,500 sf
band/orchestra room - seating ? students instrument storage uniform storage 4 practice rooms jazz band 2 small group rooms 2 band office marching band listening lab computer lab music library
e. Chorus Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,800 sf
seating ? students music storage uniform storage 4 practice rooms 2 small group rooms 2 chorus office vocal library
a. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8,000 sf
? LF of bookshelves, low shelves (42" to 48" high) checkout desk lounge seating/café style setting for reading coffee bar operated by students study tables/work space for 60 students AV storage/computer charging area librarian’s office/library work room near or easy access to main entry of building
g. Computer/Media Lab: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf
• 1 - Tech work lab• 1 - Video production lab• 1 - Small lab for 8-10 students
h. Gymnasium: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9,000 sf
regulation high school floor bleacher seating for ? storage athletic offices
i. Practice Gym: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11,000 sf
• (2) regulation high school courts• storage
j. Swimming Pool: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,000 sf
• ? lanes• diving• whirlpool
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
a. Wrestling Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,000 sf
• mat storage• temperature control/ventilation
l. Fitness Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,000 sf
m. Locker Rooms:
Boys athletic locker room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf lockers for ? students shower/drying area rest rooms coach’s office storage
Boys PE locker room . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,900 sf1. lockers for ? students shower/drying area rest rooms PE instructor office
Girls athletic locker room . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf2. lockers for ? students shower/drying area rest rooms coach’s office storage
Girls PE locker rom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,700 sf3. lockers for ? students shower/drying area rest rooms PE instructor office
n. Drama Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,500 sf
• platform/portable stage• seating ? students• drama office• storage
o. Industrial Arts: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf
wood working metal working
drafting (computer aided?) classroom office storage of various types
p. Agricultural Technologies:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf
equipment repair classroom laboratory
q. Photography: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
dark room chemical storage
r. At-Risk Student Tutoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350 sf
s. Study Hall: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf
t. Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
PE/athletic storage Large equipment storage Chair/table storage Band shell and riser storage Drama storage
SUBTOTAL ALL SPACES . . . . . . . . . . . . . . . . . . . . . . . 141,200 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . 28,240 sf
PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . 169,440 sf
3. Site:
a. Parking: . . . . . . . . . . . . . . . . . . . 450 vehicles @ 450 sf per vehicle = 202,500 sf
• off-street parking for teachers, staff, students, and visitors • access/exit on two streets
b. Bus Zone: . . . . . . . . . . . . . . . . . . . . . . . . . . 20 buses @ 600 sf per bus = 12,000 sf
• off-street school bus loading and unloading • separate from automobile traffic
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
a. Automobile: . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 cars @ 450 sf per car = 6,750 sf
• on-street loading and unloading of private automobiles will be atcurb
• service vehicles (supplies, garbage, etc.) • separated from school bus traffic• handicapped accessible
b. Outdoor Activity Areas: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100,000 sf
• outdoor teaching and learning centers• playfields, paved and grass• athletic practice field• physical education
e. Future Development:
• size of site allows for future expansion of building with purchaseof adjacent properties
f. Accessibility to Site:
g. Landscaping:
SUBTOTAL ALL PAVED AREAS. . . . . . . . . . . . . . . . . 221,250 sfSUBTOTAL UNPAVED AREAS . . . . . . . . . . . . . . . . . 100,000 sf20 % for future growth/expansion . . . . . . . . . . . . . . . . . . 45,000 sfOUTDOOR SPACES TOTAL . . . . . . . . . . . . . . . . . . . . . 366,250 sf
Summary of Total Project Area (building and property) . . . . . . . . . . . . . . . . . 535,690 sf (12.3 acres)
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE Junior High School
1. Administrative and Support Spaces:
a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,000 sf
rework/expand central office and main entrance area main office/secretary office area - increase to provide space for students principal’s office - increase to allow for meeting space offices are currently small - expand to allow for meeting space nurse office/first aid - possible to relocate elsewher file document storage room work room/copy room supply storage room faculty rest rooms
b. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,600 sf
Large meeting/multi purpose room - team meeting space: possible to bedivided into 2 smaller conferencing rooms
Lecture/task tables to seat ? sink and counter area, cabinets white board, screen, smart board Teacher office area, clustered office pool allowing teacher desk to be
removed from classroom (1,200 sf)
c. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (existing)
remodel existing men/boys and women/girls (3 total) handicapped accessible rest room capacity per plumbing code drinking fountains
1. Instructional Areas:
a. Music Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,425 sf
Need for new Choir room (30' x 40') Existing Band and Music Rooms to remain: existing tiered platform,
instrument storage, music storage - in need of additional storage (15' x 15') Music office
b. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . (existing)
Improve access and control. Currently multiple doorways in/out Better access/visibility from main building entry Existing size of space serves needs Improve access to computer lab
c. Book Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf
• Secured storage for language arts, text books, etc
d. Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,800 sf
• Tow general purpose classrooms, one for each grade level at 900 sf each
SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6,025 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . 1,205 sf
PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . . 7,230 sf
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINEEd White, Alan Shepard and Neil Armstrong Elementary Schools
1. Commons/All Purpose Room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,000 sf
seating for 130 - 150 serving lines for lunch kitchen food service area stage or presentation area rest room or close proximity to existing rest rooms at or near main entry to building
2. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf
Conference table to seat 20 (possibility of two separate rooms of equal size)
sink and counter area, cabinets white board, screen, smart board vending area or other equipment? Faculty rest room
3. Library: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf
? LF of bookshelves checkout desk story/group activity area - with smart board, and riser/seating area study tables for 30 students ? computer work stations for Internet research and automated library access AV storage librarian’s office/library work room near main entry to building
SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,700 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . 940 sf
PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . . 5,640 sf
PROGRAM OUTLINEJohn Glenn and Virgil Grissom Elementary Schools
1. Commons/All Purpose Room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf
seating for 85 - 95 serving lines for lunch kitchen food service area stage or presentation area rest room or close proximity to existing rest rooms at or near main entry to building
2. Faculty Work/Meeting Room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf
Conference table to seat 20 sink and counter area, cabinets white board, screen, smart board vending area or other equipment?
3. Library: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf
? LF of bookshelves checkout desk story/group activity area - with smart board, and risers for seating study tables for 30 students ? computer work stations for Internet research and automated library access AV storage librarian’s office/library work room near main entry to building
SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,700 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . . 740 sf
PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . . 4,440 sf
Note: Glenn Elementary would require one additional classroom to serve as full 2-section facilityGeneral purpose classroom. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 900 sf
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE Pilot/Prototype Elementary School
1. Administrative and Support Spaces:
a. Administrative Offices: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf
central office/secretary area with waiting area principal’s office counselor office with adjoining room for student observation nurse office and first aid conference room file document storage room work room/copy room curriculum storage room supply storage room book storage room faculty rest rooms
b. Commons/All Purpose Room. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3,000 sf
seating for 150 serving lines for lunch kitchen food service area rest rooms or near building rest rooms stage or presentation area at or near main entry to building
c. Faculty Work/Meeting Room:: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 200 sf
Conference table to seat 20 sink and counter area, cabinets white board, screen, smart board vending area or other equipment? Faculty rest room
a. Building Services: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf
boiler/mechanical room washer and dryer area repair work area storage utilities room janitorial closets
e. Rest Rooms:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf
men/boys and women/girls handicapped accessible capacity per plumbing code drinking fountains
f. Circulation:
visible hallways handicapped accessible student lockers for 3rd grade and above display cabinets
1. Instructional Areas:
a. General Purpose Classrooms:
2- preschool with adjoining rest rooms. . . . . . . . . . . . . . . . . . . . . . . 2,000 sf 3- kindergarten with adjoining rest rooms . . . . . . . . . . . . . . . . . . . . 3,000 sf 3- 1st grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 2nd grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 3rd grade . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 4th grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 5th grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 3- 6th grade. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,700 sf 2 special education for 15 or more depending on space requirements of the
individual . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf reading interventionist - 2 small room for up to 6 students each . . . . 500 sf specialist/consultants - 2 small rooms for up to 6 students each . . . . 500 sf storage closet, teachers closet, clock,
PA, phone, network server/hub. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 150 sf
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
a. Science Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf
1 rooms for 30 students water/two sinks general science application teacher demonstration area with water, gas and electricity student project areas/lab tables, 8 tables, 4 students per table storage
c. Art Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf
1 room for 30 students activity/work areas supply room adjacent project supply area project storage area kiln area in adjacent room sink/clean-up area
d. Music Classrooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,050 sf
1 music room for 30 students
e. Library/Media Center:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,500 sf
? LF of bookshelves checkout desk story/group activity area study tables for 30 students ? computer work stations for Internet research and automated library
access AV storage librarian’s office/library work room near main entry to building
f. Gymnasium: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5,500 sf
elementary or junior high sized floor storage also to serve as multi-purpose room adaptive space for special needs p/e instruction
g. Language Classroom: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 900 sf
• classroom for English language programs
SUBTOTAL SPACES . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42,050 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . 8,410 sf
PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . 50,460 sf
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE Transportation Department
1. Vehicle Storage and Maintenance:
a. Bus Storage:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19,400 sf
30 busses total one way - drive through operation
b. District Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8,300 sf
20 vehicles total
c. Maintenance: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4,500 sf
three bays total overhead door access vehicle lifts
2. Office and Operations Areas:
a. Dispatch office: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120 sf
b. Mechanics office:. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 120 sf
c. Break room/training room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf
d. Rest rooms: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 350 sf
• Men and women’s rest rooms
a. Mechanical room: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 300 sf
f. Loft storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2,000 sf
3. Other facilities and features:
a. Vehicle Wash Bay: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1,200 sf
b. Other features:
1. 10,000 gallon diesel fuel storage - card access system2. 1,000 gallon gasoline storage - card access system3. Staff parking for 40 cars4. Radiant heat in storage and maintenance areas5. Six foot high security fencing and gates6. Trench drains
SUBTOTAL ALL AREAS. . . . . . . . . . . . . . . . . . . 37,490 sf20% walls, circulations . . . . . . . . . . . . . . . . . . . . . . 7,498 sf
PROGRAM SPACES TOTAL. . . . . . . . . . . . . . . . . . . . . . 44,988 sf
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE Lancer Stadium, Athletic Fields and School Properties
1. Stadium:
a. Home Bleachers:
• Potential to expand home field bleachers to increaseseating capacity
b. Ticket Booths: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400 sf
two new ticket booths, one at each stadium entrance
c. Football Storage: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 400 sf
2. School Properties:
a. Remove existing “Silver Bullet” building and providedistrict storage in new location
b. Improve “Front Door” view of district, in areas between HighSchool and District Administration
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
PROGRAM OUTLINE Possible Field House Facility
Gymnasium:
regulation high school basketball floor vollyball court bleacher seating for ? storage athletic offices
Practice Gym:
• regulation high school floor• storage
Swimming Pool:
• ? lanes• diving• whirlpool• zero depth• water plan activities
Wrestling Room:
• mat storage• temperature control/ventilation
Other courts/activities:
• racquet ball• indoor track• fitness room/fitness equipment• dance, aerobics,
Locker Rooms:
2 locker rooms, mens and womens lockers for ? students each shower/drying area rest rooms storage
Offices/administration:
• ? Private offices• Control desk• Work/copy room
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Options for Plan of Action
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
List of Possible Masterplan Options
Option 1:
•Construct new Senior High School facility (10-12)•Existing Senior High to be remodeled and repurposed into Junior High Facility (7-9)•Existing Junior High facility to be repurposed into Elementary school•Existing Elementary schools to receive programmatic additions or be reorganized
Option 2:
•Selective demolition and reconstruction of portions of the existing Senior High School facility (10-12)•Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices•Existing Elementary schools to receive programmatic additions or be reorganized•Construct new Elementary school facility
Option 3:
•Existing Senior High school facility to be remodeled and expanded, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices•Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices•Existing Elementary schools to receive programmatic additions or be reorganized•Construct new Elementary school facility
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
List of Possible Masterplan Options
Option 4:
•Construct New Senior High school facility (10-12)•Selective demolition and reconstruction of existing High School building for use as events and activities center and supplemental programs•Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices•Existing Elementary schools to be reorganized or reclassified: K-2 or 3-6
Option 5:
•District to continue current path:*Continue maintenance program for each building in district
*Work towards pre-planned wish list items and long term goal items as developed through planning process *Needed expansion and remodeling of existing facilities sequentially
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Option 1
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 1
1. Senior High School
Existing Senior High school facility to be remodeled and re-purposed into a Junior High School facility for grades 7 through 9. Selective demolition and remodeling of existing building to accommodate junior high curriculum requirements.
PHASE I
PHASE II r emoveand
r econs t r uctr emove
andr econs t r uct
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
new j unior highs chool cons t r uct ion
exis t ingcons t r uct ion
t o r emain
exis t ingcons t r uct ion
t o r emain
exis t ingcons t r uct ion
t o r emain
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 1
2. Junior High School
Existing Junior High school to be remodeled and re-purposed into a new three section Elementary school. Selective remodeling of existing building to accommodate elementary school curriculum requirements.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 1
3. Existing Elementary Schools
Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.
Ed White
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Alan Shepard
LOT 1
LOT 1
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Neil Armstrong
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Virgil Grissom
John Glenn
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 1
4. New Senior High School
Construct new senior high school for grades 10 through 12 within the Eldridge city limits.
5. Transportation Department
Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.
meN
w omeN
COFFEEBAR
offi ce
offi ce
CONFERENCEmechanica l
br eak r oom
WASH BAY1200 SF
VEHICLE STORAGE ANDMAINTENANCE FACILITY
35,200 SF
PARK ING LOT30 VEHICLES
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 1
7. Lancer Stadium
Expand existing home bleachers. Construct new ticket booths and athletic storage.
Ticket Boothsfor Lancer Stadium
Lancer Stadium
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Option 2
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 2
1. Senior High School
Existing Senior High school facility to receive selective demolition and remodeling to allow re-purposing of building as senior high facility serving grades 10 through 12.
PHASE I
PHASE II r emoveand
r econs t r uctr emove
andr econs t r uct
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
new s enior highs chool cons t r uct ion
exis t ingcons t r uct ion
t o r emain
exis t ingcons t r uct ion
t o r emain
exis t ingcons t r uct ion
t o r emain
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 2
2. Junior High School
Existing Junior High school to be expanded to accommodate grade 9 and for additional music room, additional classroom space, office improvements and expansion of main offices. Improve building aesthetic and image of facility.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 2
3. Existing Elementary Schools
Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.
Ed White
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Alan Shepard
LOT 1
LOT 1
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Neil Armstrong
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Virgil Grissom
John Glenn
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 2
4. New Elementary School
Construct new elementary school as K-5 facility within the Eldridge city limits.
5. Transportation Department
Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.
meN
w omeN
COFFEEBAR
offi ce
offi ce
CONFERENCEmechanica l
br eak r oom
WASH BAY1200 SF
VEHICLE STORAGE ANDMAINTENANCE FACILITY
35,200 SF
PARK ING LOT30 VEHICLES
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 2
7. Lancer Stadium
Expand existing home bleachers. Construct new ticket booths and athletic storage.
Ticket Boothsfor Lancer Stadium
Lancer Stadium
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Option 3
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 3
1. Senior High School
Existing Senior High school facility to be remodeled and expanded, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices. Improve building aesthetic and image of facility.
exis t ings enior high
s chool
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 3
2. Junior High School
Existing Junior High school to be expanded for additional music room, additional classroom space, office improvements and expansion of main offices, and possible expansion for grade 6 or 9 if needed. Improve building aesthetic and image of facility.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 3
3. Existing Elementary Schools
Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.
Ed White
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Alan Shepard
LOT 1
LOT 1
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Neil Armstrong
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Virgil Grissom
John Glenn
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 3
4. New Elementary School
Construct new elementary school as K-5 facility within the Eldridge city limits.
5. Transportation Department
Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.
meN
w omeN
COFFEEBAR
offi ce
offi ce
CONFERENCEmechanica l
br eak r oom
WASH BAY1200 SF
VEHICLE STORAGE ANDMAINTENANCE FACILITY
35,200 SF
PARK ING LOT30 VEHICLES
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN – OPTION 3
7. Lancer Stadium
Expand existing home bleachers. Construct new ticket booths and athletic storage.
Ticket Boothsfor Lancer Stadium
Lancer Stadium
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Option 4
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 4
1. Senior High School
Existing Senior High school facility to receive selective demolition and remodeling to allow re-purposing of building as events and activities center. Re-purposed building would house athletic programs as well as arts and sciences programs.
PHASE I
PHASE II r emoveand
r econs t r uctr emove
andr econs t r uct
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
new event sat hl et ics and communit y
cons t r uct ion
exis t ingar t s and
per f or mance
exis t ingar t s ands ciences
exis t ingevent s
andat hl et ics
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 4
2. Junior High School
Existing Junior High school to be expanded to accommodate grade 9 and for additional music room, additional classroom space, office improvements and expansion of main offices. Improve building aesthetic and image of facility.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 4
3. Existing Elementary Schools
Consider potential re-alignment of building grade level organizations. Existing buildings to be reorganized into either K-2 or 3-6 facilities.
Ed White
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Alan Shepard
LOT 1
LOT 1
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Neil Armstrong
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Virgil Grissom
John Glenn
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 4
4. New Senior High School
Construct new senior high school for grades 10 through 12 within the Eldridge city limits.
5. Transportation Department
Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.
meN
w omeN
COFFEEBAR
offi ce
offi ce
CONFERENCEmechanica l
br eak r oom
WASH BAY1200 SF
VEHICLE STORAGE ANDMAINTENANCE FACILITY
35,200 SF
PARK ING LOT30 VEHICLES
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 4
7. Lancer Stadium
Expand existing home bleachers. Construct new ticket booths and athletic storage.
Ticket Boothsfor Lancer Stadium
Lancer Stadium
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Option 5
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 5
1. Senior High School
Existing Senior High school facility to be remain.Long term sequential remodeling and expansion to accommodate long term needs, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices. Improve building aesthetic and image of facility.
exis t ings enior high
s chool
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 5
2. Junior High School
Existing Junior High school to remain.Long term sequential remodeling and expansion to accommodate long term needs, including: additional music room, additional classroom space, office improvements and expansion of main offices, and possible expansion for grade 6 or 9 if needed. Improve building aesthetic and image of facility.
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 5
3. Existing Elementary Schools
Existing elementary school buildings to remain.Long term sequential remodeling and expansion to accommodate long term needs, including: Remodeling and expansion of existing building for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas.
Ed White
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Alan Shepard
LOT 1
LOT 1
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Neil Armstrong
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Virgil Grissom
John Glenn
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 5
4. New Elementary School
Construct new elementary school as K-5 facility within the Eldridge city limits.
5. Transportation Department
Future construction of new vehicle maintenance and storage facility within Eldridge city limits.Existing vehicle maintenance building to be used by District Grounds Department
meN
w omeN
COFFEEBAR
offi ce
offi ce
CONFERENCEmechanica l
br eak r oom
WASH BAY1200 SF
VEHICLE STORAGE ANDMAINTENANCE FACILITY
35,200 SF
PARK ING LOT30 VEHICLES
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 5
7. Lancer Stadium
Future expansion existing home bleachers. Future construction new ticket booths and athletic storage.
Ticket Boothsfor Lancer Stadium
Lancer Stadium
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
Opinion of Probable CostConsideration for Options 1, 2 & 3
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 1
PRELIMINARY OPINION OF PROBABLE COST
Existing Senior High SchoolSelective demolition of existing seniorhigh school facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 350,000Construction of New Junior High Schooladditions at existing senior high school; approx 50,000 sf @ $150/sf . . . . . . . . . . . . . . . . . . . . . $ 7,500,000
Existing Junior High SchoolExisting facility to be re-purposed into newelementary school facility. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 500,000
Expansion of existing elementary schoolsWhite, Shepard, Armstrong; 5,600 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,520,000Glenn, Grissom; 4,400 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,320,000Paving/site work at elementaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000
New Senior High SchoolNew facility construction; 169,440 sf @ $175/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 29,652,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 885,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000
Transportation DepartmentNew vehicle maintenance and storage facility; 35,000 sf @ $60/sf . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 240,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 150,000Vehicle wash/fueling stations; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200,000
Lancer StadiumNew ticket booths and athletic storage; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 250,000
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 46,227,000
Contingency Allowance @ 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 4,622,700
PROJECT TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 50,849,700
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 2
PRELIMINARY OPINION OF PROBABLE COST
Existing Senior High SchoolSelective demolition of existing seniorhigh school facility . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 350,000Construction of New Senior High Schooladditions at for grades 10 - 12; approx 80,000 sf @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 12,000,000
Existing Junior High SchoolExisting facility to be expanded toaccommodate grade 9; 18,000 sf @ $150/sf. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,700,000Remodeling of rest rooms/offices; 3,200 sf @ $105/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 336,000
Expansion of existing elementary schoolsWhite, Shepard, Armstrong; 5,600 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,520,000Glenn, Grissom; 4,400 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,320,000Paving/site work at elementaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000
New Elementary SchoolNew facility construction; 50,460 sf @ $175/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 8,830,500Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300,000
Transportation DepartmentNew vehicle maintenance and storage facility; 35,000 sf @ $60/sf . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 240,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 150,000Vehicle wash/fueling stations; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200,000
Lancer StadiumNew ticket booths and athletic storage; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 250,000
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $32,096,500
Contingency Allowance @ 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 3,209,650
PROJECT TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 35,306,150
North Scott Community School DistrictDistrict Wide Masterplan
BRACKE . HAYES . MILLER . MAHON , ARCHITECTS
MASTERPLAN - OPTION 3
PRELIMINARY OPINION OF PROBABLE COST
Existing Senior High SchoolRemodeling of portions of existing building;17,250 sf @ $105/sf . . . . . . . . . . . . . . . . . . . . . . . . $ 1,811,250Construction of new additions to existing building; 8,520 sf @ $150/sf . . . . . . . . . . . . . . . . . . . $ 1,278,000
Existing Junior High SchoolExisting facility to be expanded to accommodate music room, classrooms and expansion of main offices; 5,825 sf @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . $ 873,750Remodeling of rest rooms/offices; 3,200 sf @ $105/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 336,000
Expansion of existing elementary schoolsWhite, Shepard, Armstrong; 5,600 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,520,000Glenn, Grissom; 4,400 sf each @ $150/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 1,320,000Paving/site work at elementaries . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000
New Elementary SchoolNew facility construction; 50,460 sf @ $175/sf . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 8,830,500Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 400,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 300,000
Transportation DepartmentNew vehicle maintenance and storage facility; 35,000 sf @ $60/sf . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,000Paving/driveways/parking; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 240,000Site work/grading/utilities; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 150,000Vehicle wash/fueling stations; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 200,000
Lancer StadiumNew ticket booths and athletic storage; . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 250,000
Subtotal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 21,009,500
Contingency Allowance @ 10% . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 2,100,950
PROJECT TOTAL. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 23,110,450