Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020

Upload: others

Post on 17-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

Northbound US-101 toEastbound I-580 Direct Connector

Citizens Oversight CommitteeJuly 20, 2020

Presenter
Presentation Notes
Charles opens meeting and introduces Anne – Anne 2 minutes
Page 2: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

Existing ConditionsN

B U

S 10

1 to

EB

I-58

0 Di

rect

Con

nect

or P

roje

ct

Bellam Blvd

NB US-101 OFF RAMP TO BELLAM

Sir Francis Drake Blvd

SB US 101 / EB I-580 OFF RAMP

TO BELLAM

Presenter
Presentation Notes
Potential Additional Improvements Construct auxiliary lane on EB I-580 from new connector to RSR Bridge Potentially replace the existing Sir Francis Drake Blvd off-ramp bridge Improve SFD/Andersen intersection, if SFD bridge is replaced Ramp metering SFD EB on-ramp Improvements to Bellam Blvd.
Page 3: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

Through Sir Francis Drake

Existing: 7.0 min

2040 No-Build PM: 14.9 min

Through Bellam Blvd

Existing: 7.6 min

2040 No-Build PM: 15.7 min

Existing and Future No Build Travel TimesFrom Tamalpais Dr to RSR Bridge (Subject to Change)

Page 4: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Project Goals and Objectives

Improve connectivity between NB US 101 and EB I-580 for regional traffic

Improve operational efficiencies between NB US 101 and the Richmond-San Rafael Bridge

Separate local traffic from regional pass-through traffic

Reduce local traffic congestion

Enhance the active transportation network within the project area Bicycle, pedestrian, and bus transitN

B U

S 10

1 to

EB

I-58

0 Di

rect

Con

nect

or P

roje

ct

Presenter
Presentation Notes
Connie
Page 5: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

Project Development CommitteesN

B U

S 10

1 to

EB

I-58

0 Di

rect

Con

nect

or P

roje

ct

• Agency Technical Staff

• Community Interests

• Agency Executive Staff

• TAM Board Members

Ad Hoc Committee

Executive Steering Committee

Technical Advisory Committee

Stakeholder Working

Group

Agencies Caltrans Metropolitan Transportation

Commission (MTC)/BATA Transportation Authority

Marin (TAM) Contra Costa Transportation

Authority (CCTA) San Rafael Larkspur County of Marin

Presenter
Presentation Notes
Anne Ad Hoc Committee Role: Forum for building consensus on alternatives; provide input on project challenges; guide development of MOU between TAM and City of San Rafael. Membership: Four Elected Officials that serve on TAM Commission - Damon Connolly, Dennis Rodoni, Gary Phillips, Dan Hilmer. Executive Steering Committee Role: Forum for building consensus on alternatives; provide input on project challenges and solutions from the community view; each member to provide input to their associated elected body. Membership: Executive staff from agencies. Technical Advisory Committee (TAC) Role: Forum for building consensus on project alternatives; provide technical guidance to the project team. Membership: Technical staff from Caltrans, MTC/BATA, TAM, CCTA, San Rafael, Larkspur, County of Marin. Stakeholder Working Group (SWG) Role: Forum for building consensus on project alternatives; provide public input to project team to be shared with the Ad Hoc, Executive Steering Committee, and Technical Advisory Committee. Membership: Broad spectrum of community interests.
Page 6: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

Project History & Upcoming WorkHistory Several studies over two decades Various alternatives considered Latest study (2017) used to secure funding through Regional Measure 3

Upcoming Work Review alternatives to identify feasible alternatives to carry forward into

environmental review Engage the community via SWG and briefings Work with Caltrans to obtain necessary approvals Obtain environmental clearance for selected alternative Craft a Memorandum of Understanding among agencies to document

agreement on the selected alternative Include conceptual design of future WB 580 to SB 101 connector

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Presenter
Presentation Notes
Dan
Page 7: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Regional Measure 3 (bridge toll funding):• $135M for project planning and construction

Local Funding (Marin County ½ cent transportation sales tax):• $16.5M to expedite project planning and to fund local improvements

Current Project Funding

Presenter
Presentation Notes
Dan
Page 8: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Targeted Project ScheduleN

B U

S 10

1 to

EB

I-58

0 Di

rect

Con

nect

or P

roje

ct

Page 9: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Alternatives Summary SlideN

B U

S 10

1 to

EB

I-58

0 Di

rect

Con

nect

or P

roje

ct

Alternatives Naming Design Speed (mph) Cost Distance (miles)

Tamalpais Dr to RSR1A Hillside A 50 $ 323M 3.741B Hillside B 50 $ 446M 3.66

2 Simms St 45 $ 174M 4.22

3A Low Speed A 35 $ 131M 4.60

3B Low Speed B 35 $ 104M 4.60

4 Swing Out 35 $ 214M 5.075 Medium Speed 40 $ 179M 4.38

9

Page 10: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Preliminary 2040 PM Travel Time – Alternative 1AFrom Tamalpais Dr to RSR Bridge (Subject to Change)

No-Build:SFD: 14.9 minBellam: 15.7 min

Build:

Direct Connector: 5.3 min

SFD: >9.7 min

Bellam: 12.3 min

Page 11: Northbound US-101 to Eastbound I-580 Direct …...2020/07/06  · Northbound US-101 to Eastbound I-580 Direct Connector Citizens Oversight Committee July 20, 2020 Charles opens meeting

NB

US

101

to E

B I-

580

Dire

ct C

onne

ctor

Pro

ject

Preliminary 2040 PM Travel Time – Alternative 3AFrom Tamalpais Dr to RSR Bridge (Subject to Change)

Build:

Direct Connector: 7.6 min

No Build:SFD: 14.9 minBellam: 15.7 min

SFD: >10.4 min

Bellam: 10.6 min