Northbound US-101 toEastbound I-580 Direct Connector
Citizens Oversight CommitteeJuly 20, 2020
Existing ConditionsN
B U
S 10
1 to
EB
I-58
0 Di
rect
Con
nect
or P
roje
ct
Bellam Blvd
NB US-101 OFF RAMP TO BELLAM
Sir Francis Drake Blvd
SB US 101 / EB I-580 OFF RAMP
TO BELLAM
Through Sir Francis Drake
Existing: 7.0 min
2040 No-Build PM: 14.9 min
Through Bellam Blvd
Existing: 7.6 min
2040 No-Build PM: 15.7 min
Existing and Future No Build Travel TimesFrom Tamalpais Dr to RSR Bridge (Subject to Change)
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
Project Goals and Objectives
Improve connectivity between NB US 101 and EB I-580 for regional traffic
Improve operational efficiencies between NB US 101 and the Richmond-San Rafael Bridge
Separate local traffic from regional pass-through traffic
Reduce local traffic congestion
Enhance the active transportation network within the project area Bicycle, pedestrian, and bus transitN
B U
S 10
1 to
EB
I-58
0 Di
rect
Con
nect
or P
roje
ct
Project Development CommitteesN
B U
S 10
1 to
EB
I-58
0 Di
rect
Con
nect
or P
roje
ct
• Agency Technical Staff
• Community Interests
• Agency Executive Staff
• TAM Board Members
Ad Hoc Committee
Executive Steering Committee
Technical Advisory Committee
Stakeholder Working
Group
Agencies Caltrans Metropolitan Transportation
Commission (MTC)/BATA Transportation Authority
Marin (TAM) Contra Costa Transportation
Authority (CCTA) San Rafael Larkspur County of Marin
Project History & Upcoming WorkHistory Several studies over two decades Various alternatives considered Latest study (2017) used to secure funding through Regional Measure 3
Upcoming Work Review alternatives to identify feasible alternatives to carry forward into
environmental review Engage the community via SWG and briefings Work with Caltrans to obtain necessary approvals Obtain environmental clearance for selected alternative Craft a Memorandum of Understanding among agencies to document
agreement on the selected alternative Include conceptual design of future WB 580 to SB 101 connector
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
Regional Measure 3 (bridge toll funding):• $135M for project planning and construction
Local Funding (Marin County ½ cent transportation sales tax):• $16.5M to expedite project planning and to fund local improvements
Current Project Funding
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
Targeted Project ScheduleN
B U
S 10
1 to
EB
I-58
0 Di
rect
Con
nect
or P
roje
ct
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
Alternatives Summary SlideN
B U
S 10
1 to
EB
I-58
0 Di
rect
Con
nect
or P
roje
ct
Alternatives Naming Design Speed (mph) Cost Distance (miles)
Tamalpais Dr to RSR1A Hillside A 50 $ 323M 3.741B Hillside B 50 $ 446M 3.66
2 Simms St 45 $ 174M 4.22
3A Low Speed A 35 $ 131M 4.60
3B Low Speed B 35 $ 104M 4.60
4 Swing Out 35 $ 214M 5.075 Medium Speed 40 $ 179M 4.38
9
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
Preliminary 2040 PM Travel Time – Alternative 1AFrom Tamalpais Dr to RSR Bridge (Subject to Change)
No-Build:SFD: 14.9 minBellam: 15.7 min
Build:
Direct Connector: 5.3 min
SFD: >9.7 min
Bellam: 12.3 min
NB
US
101
to E
B I-
580
Dire
ct C
onne
ctor
Pro
ject
Preliminary 2040 PM Travel Time – Alternative 3AFrom Tamalpais Dr to RSR Bridge (Subject to Change)
Build:
Direct Connector: 7.6 min
No Build:SFD: 14.9 minBellam: 15.7 min
SFD: >10.4 min
Bellam: 10.6 min