NorthConnect: Delivering Scotland’s Sustainable Future
APM Conference 17th of April 2013Dr Richard BlanchfieldNorthConnect Head of Delivery
![Page 2: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/2.jpg)
Delivering the Vision
1.1. NorthConnect’s VisionNorthConnect’s Vision
2.2. The European VisionThe European Vision
3.3. Scotland’s VisionScotland’s Vision
4.4. ConclusionsConclusions
![Page 3: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/3.jpg)
NorthConnect’s Vision
![Page 4: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/4.jpg)
From Wind to Hydro & Back
+-
+-+-
+-
Security of SupplySecurity of Supply
SustainabilitySustainability
Market IntegrationMarket Integration
Reduce Price FluctuationsReduce Price Fluctuations
![Page 5: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/5.jpg)
From Wind to Hydro & Back
![Page 6: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/6.jpg)
The European Vision
![Page 7: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/7.jpg)
A Connected World?
![Page 8: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/8.jpg)
Scotland’s Vision
![Page 9: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/9.jpg)
A Sustainable Future
• UK 20% ▼ Carbon and UK 20% ▼ Carbon and ▲ Renewables by 2020▲ Renewables by 2020
• Scotland 100% domestic Scotland 100% domestic consumption from consumption from Renewables by 2020Renewables by 2020
• 175 TWH or 20 GW of 175 TWH or 20 GW of continuous generationcontinuous generation
1.4 GW1.4 GW
3.0 GW3.0 GW
1.3 GW1.3 GW 1.4 GW1.4 GW
££
£250bn£250bn
£955bn£955bn
![Page 10: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/10.jpg)
Conclusions
![Page 11: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/11.jpg)
Delivering the Vision
• ““I have not failed 10,000 times. I have not failed I have not failed 10,000 times. I have not failed once. I have succeeded in proving that those once. I have succeeded in proving that those 10,000 ways will not work. When I have 10,000 ways will not work. When I have eliminated the ways that will not work, I will find eliminated the ways that will not work, I will find the way that will work.”the way that will work.”
Thomas A. EdisonThomas A. Edison
CreateCreate CommunicateCommunicate RisksRisks LeadershipLeadership
DeterminationDetermination
![Page 12: NorthConnect - delivering Scotland’s sustainable future](https://reader034.vdocuments.net/reader034/viewer/2022051323/547b0069b4af9faf158b4d48/html5/thumbnails/12.jpg)
1212
Glen Coe Hardangerfjørden
“From Wind to Hydro and back”