northeast gas association spring operations conference

97
1 Construction Issues Northeast Gas Association Spring Operations Conference April 2-3, 2020 Saratoga Hilton Saratoga Springs, NY

Upload: others

Post on 02-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Northeast Gas Association Spring Operations Conference

1Construction Issues

Northeast Gas Association

Spring Operations

Conference

April 2-3, 2020

Saratoga Hilton

Saratoga Springs, NY

Page 2: Northeast Gas Association Spring Operations Conference

2

Safety – Where are you standing?

Page 3: Northeast Gas Association Spring Operations Conference

3

Pipe on skids can move and fall.

You want to park where!

Page 4: Northeast Gas Association Spring Operations Conference

4

Do you want to be under these

wires or near this equipment?

Page 5: Northeast Gas Association Spring Operations Conference

5

Patch Stick Issues• Poor application practices.

• Soil stress can remove poorly installed patch stick

repairs.

• Heating the patch stick and dripping the product on the

coating holiday is not acceptable.

The photo shows a poorly

adhered patch stick repair.

This was found while

uncovering a newly built

pipeline.

Page 6: Northeast Gas Association Spring Operations Conference

6

Manufacturer’s procedures for patch stick application

must be followed. The photo shows that a fingernail was

able to scratch off an applied patch stick repair

Page 7: Northeast Gas Association Spring Operations Conference

7

Good patch stick application - notice heated/discolored

area around patch, this indicates that the pipe was heated

before and during patch stick application

Page 8: Northeast Gas Association Spring Operations Conference

8

Patch Sticks are only for

pinhole or abrasion repair.

2 part epoxy should have

been used.

Page 9: Northeast Gas Association Spring Operations Conference

Seriously!!!!

9

Page 10: Northeast Gas Association Spring Operations Conference

10

Page 11: Northeast Gas Association Spring Operations Conference

11

2 part epoxy

• Follow manufacturers instructions

• Preparation required (Sanding = anchor pattern)

• Thoroughly mix product

• Use promptly

• If products starts to cure before application

the repair presents the appearance of the

next slide

Page 12: Northeast Gas Association Spring Operations Conference

12

2 Part Epoxy

Page 13: Northeast Gas Association Spring Operations Conference

13

Page 14: Northeast Gas Association Spring Operations Conference

14

Electronic Holiday Detection (Jeeping)

• Visual inspection must supplement jeeping

• Problems identified

– Bent defective spring

– Not identifying and repairing all “jeeps”

– Passing over visible holiday without the jeep sounding

– Based on experience, jeep voltage may need to be set as high as 3500v to detect coating defects

Page 15: Northeast Gas Association Spring Operations Conference

15

Are the workmen finding coating holidays? Do the

workmen operating the jeep have time to find and

repair coating holidays?

Page 16: Northeast Gas Association Spring Operations Conference

16

A bent jeep spring can miss coating holidays

Page 17: Northeast Gas Association Spring Operations Conference

17

Page 18: Northeast Gas Association Spring Operations Conference

18

Duct tape can shield coating holidays

Page 19: Northeast Gas Association Spring Operations Conference

19

• Manipulating

the jeep spring

over building

fiberboard

stuck to the

pipe is poor

practice

Page 20: Northeast Gas Association Spring Operations Conference

20

Just jeeping at skids only on lowering in is not

usually per construction procedures

Page 21: Northeast Gas Association Spring Operations Conference

21

• Look for

coating

holidays in

the ditch.

• Observing

these

indicates a

problem.

Page 22: Northeast Gas Association Spring Operations Conference

22

Page 23: Northeast Gas Association Spring Operations Conference

23

Thin Film Epoxy Issues

• Insufficient heating (3M procedure specify

425 – 488 degrees F - lower temperatures

could mean improper curing)

• Over heating during application can be a

problem (the coating looks burnt and is

unacceptable)

• Poor sandblasting

Page 24: Northeast Gas Association Spring Operations Conference

425°F to 488°F

Page 25: Northeast Gas Association Spring Operations Conference
Page 26: Northeast Gas Association Spring Operations Conference

26

Page 27: Northeast Gas Association Spring Operations Conference

27

Page 28: Northeast Gas Association Spring Operations Conference
Page 29: Northeast Gas Association Spring Operations Conference
Page 30: Northeast Gas Association Spring Operations Conference

30

Gouges and Bending

• Gouges – consult procedures

• Acceptable wall thickness?

• < 1% diameter?

Page 31: Northeast Gas Association Spring Operations Conference

31

Proper burial depth on bores?

Page 32: Northeast Gas Association Spring Operations Conference

32

Is the pipeline buried deep enough

and protected from erosion?

Page 33: Northeast Gas Association Spring Operations Conference

33

High Mechanized Defect Rate

• Causes

• Pipe sizing issues

• Inexperienced welders

• Start up issues

• X-ray or AUT falling behind eliminates

timely feed back. Feed back is a valuable

tool to improve weld quality.

Page 34: Northeast Gas Association Spring Operations Conference

34

The welding procedure allows how much high-low?

Page 35: Northeast Gas Association Spring Operations Conference

35

High Mechanized Defect Rate

• PHMSA Concerns:

• Having defects not an issue.

• Defect repair, NDT and tracking is an issue.

• Industry experience usually shows

10% defect rate on mechanized welding

7% for semi-automatic welding

5% on manual welding

Page 36: Northeast Gas Association Spring Operations Conference

36

Laminations can be an issue especially

associated with an 80% waiver

Page 37: Northeast Gas Association Spring Operations Conference

37

AUT, automated ultrasonic testing,

easily shows laminations

Page 38: Northeast Gas Association Spring Operations Conference

38

Preheat

• Heating the weld joint before welding

• Temperature of the weld joint immediately

before the arc is struck.

• Procedures state Contact Pyrometer, or

Temperature Indicating Crayon

• Range of preheat values found in the

welding procedure

Page 39: Northeast Gas Association Spring Operations Conference

39

Use of Temperature Indicating Crayon

• Temperature indicating crayons (Tempilstik) are specially formulated to melt at a specific temperature.

• On a cold pipe surface upon heating the mark changes color and melts at the specific temperature

• Used on a hot surface the crayon only indicates the temperature is greater than the specified temperature on the crayon if the crayon melts

Page 40: Northeast Gas Association Spring Operations Conference

Use of Temperature Indicating Crayon

• Applying the crayon on an area adjacent to a weld joint and then heating with a propane torch directed on the mark will give a false temperature indication. In this case the flame heats the crayon mark faster than the pipe. The pipe will not be up to the required temperature.

• The crayon should be used after heating and two different temperature crayons may be necessary to determine the preheat is within the welding procedure.

40

Page 41: Northeast Gas Association Spring Operations Conference

41

Temperature Indicating CrayonsThe crayon holder specifies the melt temperature.

Page 42: Northeast Gas Association Spring Operations Conference

42

Preheat

• What should workman do if the weld joint is too cool? (add more

heat)

• What does welder do if the weld joint is too hot? (allow joint to cool)

Page 43: Northeast Gas Association Spring Operations Conference

43

Interpass Temperature

• The temperature at a location near the start position of the welding arc(s) recorded immediately before initiating consecutive pass or passes. (from Appendix A)

• Minimum Inter-pass Temperature –generally preheat temperature

• Maximum Inter-pass Temperature –highest temperature allowed to start welding.

Page 44: Northeast Gas Association Spring Operations Conference

44

• If the procedure states the Maximum Inter-

pass Temperature is 350 degrees F and

the pipe measures 360 degrees F – What

should welder do before starting to weld?

Page 45: Northeast Gas Association Spring Operations Conference

45

Must follow welding procedure

• Some items to check

– Bevel configuration

– Electrodes – rods – filler metals

– Electrical parameters

– Speed of travel

– Weld dimensions

Page 46: Northeast Gas Association Spring Operations Conference

46

Welding ProceduresThe procedure states 20 – 40 cfh shielding gas flow

rate. Does the photo show an acceptable value?

Page 47: Northeast Gas Association Spring Operations Conference

47

Electrical Characteristics

• Values displayed on welding machines should be within the range of the WPS.

• Machine is not calibrated but usually close.

• If outside procedure use calibrated clamp-on.

Page 48: Northeast Gas Association Spring Operations Conference

Welding

procedure

required

250°F

preheat

Page 49: Northeast Gas Association Spring Operations Conference

49

Band Damage

Page 50: Northeast Gas Association Spring Operations Conference

Welding Band Damage to Coating

Page 51: Northeast Gas Association Spring Operations Conference

Inspection Requirements

• Large variation in inspector competency

• What are the inspectors responsibilities?

– Welding inspector must be knowledgeable and

competent

– Verify welding procedure is followed

– Observe

– Document

– Report

– Correct

– Work stoppage

51

Page 52: Northeast Gas Association Spring Operations Conference
Page 53: Northeast Gas Association Spring Operations Conference
Page 54: Northeast Gas Association Spring Operations Conference
Page 55: Northeast Gas Association Spring Operations Conference
Page 56: Northeast Gas Association Spring Operations Conference
Page 57: Northeast Gas Association Spring Operations Conference

Seriously???

Page 58: Northeast Gas Association Spring Operations Conference
Page 59: Northeast Gas Association Spring Operations Conference
Page 60: Northeast Gas Association Spring Operations Conference
Page 61: Northeast Gas Association Spring Operations Conference
Page 62: Northeast Gas Association Spring Operations Conference
Page 63: Northeast Gas Association Spring Operations Conference
Page 64: Northeast Gas Association Spring Operations Conference

Pipe on Solid Rock

Anomaly

Dig

Page 65: Northeast Gas Association Spring Operations Conference

DCVG Dig on First Phase

Disbonded girth weld

coating – poor surface

preparation

Page 66: Northeast Gas Association Spring Operations Conference

DCVG Dig

15 Holidays

Page 67: Northeast Gas Association Spring Operations Conference

DCVG Dig

Page 68: Northeast Gas Association Spring Operations Conference

DCVG Dig on First Phase – Girth Weld Coating

Mixed with Backfill

Wet Epoxy Mixed

with Backfill

Page 69: Northeast Gas Association Spring Operations Conference

72

Protected from rocks in the ditch?

Page 70: Northeast Gas Association Spring Operations Conference

73

Pipe Defect – Does remaining wall thickness meet

requirements of API 5L?

Page 71: Northeast Gas Association Spring Operations Conference

74

Long Seam Location 195.212

Page 72: Northeast Gas Association Spring Operations Conference

75

Grinding Remaining W.T.

Page 73: Northeast Gas Association Spring Operations Conference

76

Hydrotest

• Procedures should include provisions for

cold weather testing (if not see next slide)

• Pressures should be maintained at least 8

hours for buried piping. Any pressure

decline should be investigated. A second

pressure test may be warranted. (See

chart of failed test)

Page 74: Northeast Gas Association Spring Operations Conference

77

Page 75: Northeast Gas Association Spring Operations Conference

78

Chart shows pressure loss last 3 ½ hours

Page 76: Northeast Gas Association Spring Operations Conference

79

Arc Burns

• Arc burns are not acceptable on high

pressure gas pipelines and liquid

pipelines.

• The following slides show that arc burns

can happen during internal back welding.

Page 77: Northeast Gas Association Spring Operations Conference

80

Page 78: Northeast Gas Association Spring Operations Conference

81

The external weld was completed in the trench box. Then the welder

crawled inside and completed the back weld. This was a transition weld

between 0.740 and 0.486 wall thickness pipe. The welder struck the arc

multiple times inside the pipe and missed the bevel multiple times.

Page 79: Northeast Gas Association Spring Operations Conference

82

Page 80: Northeast Gas Association Spring Operations Conference

Lessons Learned• Ineffective Contract Inspection - Much more Operator

Oversight Needed

• Some Jobs – Particularly Coating - are an Issue

• Mechanized Welding can Work Well – However, much

care and attention needed at Startup

• Some Spread Contractors Needed Extra Attention

• The Combination of Poor Inspection and a Contractor

Not Following Procedures Can Lead to Major Problems

• Deadline Urgency from the Operator is an Issue

• Contract Incentives for early completion

Page 81: Northeast Gas Association Spring Operations Conference

84

Quiz

Page 82: Northeast Gas Association Spring Operations Conference

85

Guess what’s wrong associated

with welder qualifications

Page 83: Northeast Gas Association Spring Operations Conference

86

What is wrong with this coated girth

weld?

Page 84: Northeast Gas Association Spring Operations Conference

87

What is wrong with this lowered-in

pipe?

Page 85: Northeast Gas Association Spring Operations Conference

88

Guess what’s wrong with this?

Page 86: Northeast Gas Association Spring Operations Conference

Any idea what happened?

Page 87: Northeast Gas Association Spring Operations Conference

90

What’s up here? Who’s at fault?

Page 88: Northeast Gas Association Spring Operations Conference

91

What is this?

Page 89: Northeast Gas Association Spring Operations Conference

92

Anything out of the ordinary?

Page 90: Northeast Gas Association Spring Operations Conference

93

What caused this coating damage

Page 91: Northeast Gas Association Spring Operations Conference

94

Page 92: Northeast Gas Association Spring Operations Conference

95

What caused this reoccurring coating

defect?

Page 93: Northeast Gas Association Spring Operations Conference

96

What’s up with this thin film epoxy coating ?

Page 94: Northeast Gas Association Spring Operations Conference

97

The gauge measures

7/16”. Is this okay?

Page 95: Northeast Gas Association Spring Operations Conference

98

Thoughts?

Page 96: Northeast Gas Association Spring Operations Conference

Distribution isn’t left out!!

Guess what it says on the top?

99

Page 97: Northeast Gas Association Spring Operations Conference

Contact Information

Wallace McGaughey

3/31/2020

405-820-1304 C

[email protected]