Quest for World-Class Traffic Signals

Mark Taylor Traffic Signal Operations Engineer

[email protected]

Utah Department of Transportation

Northern California Section – ITE June 15, 2016

Page 2: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Agenda

• About UDOT & UDOT Traffic Operations Center

• Innovative ideas

• Reflectorized backplates

• Custom controller logic

• Generator plug transfer switch; Key switch for crossing guards

• Vehicle Detection – UDOT’s use of Wavetronix radar

• Automated Traffic Signal Performance Metrics (SPMs)

• How they work, how to get them, case studies

• Impacts on operations in Utah

Page 3: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

UDOT Traffic Operations Center

Page 4: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

TOC Control Room Operators (24/7 coverage)

4

Page 5: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Variable Message Signs (96 Freeway, 49 surface street)

Page 6: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Monday Safety Message

Page 7: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

CCTV Cameras (1125 statewide – Shared by all Agencies)

Page 8: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Remote Weather Information Systems (97 devices statewide)

Page 9: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

In-House Meteorologists

Page 10: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Accurate Road Weather Forecasts help with

Mobility and Safety

Page 11: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Traffic Signal Desk Coverage – 12 hours/day

Page 12: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Special Event, 29%

Field Timing Downloads,

25%

Congestion Responses,

20%

Crash Responses,

13%

Construction, 9%

Other, 4%

UDOT

Signal Desk

Activity

2003 to 2016

Page 13: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

0

200

400

600

800

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016*

Special Event Plans Enabled

*As of 5/25/2016

Page 14: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

53% 31%

84% Connected

UDOT Partner

Agencies

Traffic Signals

in Utah

59% 41%

1995 Traffic Signals

UDOT Partner

Agencies

Page 15: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Reflectorized Tape – Proven Safety Countermeasure

15% reduction in all crashes at urban, signalized intersections. Source: Insurance Corporation of British Columbia & Canadian National Committee on Uniform Traffic Control

Big advantage during power outages when signal is dark.

UDOT policy to provide 2 inch tape.

16

Page 16: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Reflectorized Backplate Tape

17

Page 17: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Generator Plugs on Signal Cabinets Signal electricians are few in number and centralized at region

headquarters

Leverage existing resources at maintenance sheds scattered throughout

Utah Equip sheds with generators (3 per shed)

Shed personnel assist with blackouts

Much faster response time

Better use of resources i.e. don’t need battery backup systems everywhere

Page 18: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6
Page 19: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Custom Logic in Signal Controllers

Custom programming in Signal Controller not possible with built in parameters Transit Priority Innovative Intersections (CFI, DDI, SPUI, Etc.) Railroad preemption Flex Lanes Advanced Warning Systems Delayed-Start of Flashing Yellow Arrow

IF…THEN…ELSE…AND...OR

Page 20: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Example Problem: 11400 S & 3200 W

New intersection built with Protected Left for Westbound and FYA for Eastbound.

Protected left generated red light violation problems and numerous delay complaints.

FYA

Protected Left

Page 21: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Example Problem: 11400 S & 3200 W

• If there is a car in the EB-to-NB left turn lane, it may be hard for a driver in WB-to-SB left turn lane to see EB traffic.

Page 22: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Example Problem: 11400 S & 3200 W

• View from perspective of WB-to-SB left turn lane

Page 23: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Example Problem: 11400 S & 3200 W Westbound was changed from a protected left to a FYA.

Logic used to delay or omit the FYA if a vehicle is in the opposite left turn lane.

Page 24: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6
Page 25: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Key Switch

Activating the

switch with a

key will enable

Walk 2 for

Phases 4 & 8.

Page 26: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Mounting

Key switch installed with weather proof cover plate

Page 27: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Key Switch

With the key in Switch – Key doesn’t come out when turned on.

Page 28: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Operation

• When key

switch is

on, WALK

goes from

5 s to 15 s

and PED

CLEAR

stays the

same. Training Crossing Guard

Page 29: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Detection Technologies Used

Some Inductive Loops – wired in series & grouped by

Lane Groups

Some Video – Traficon, AutoScope, Iteris, Gridsmart

Some Sensys Networks Magnetometers

Mostly Wavetronix Radar

• Advance: 715 intersections & 1470 approaches

• Matrix: 783 intersections & 2196 approaches

30

Page 30: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Advanced Detection – Arterials Ch. 1 (Installed at speeds 40 mph+)

Large Trucks – DZ Small Trucks/Vehicles- DZ Queue Clearance of

Waiting Vehicles

1.0 S Passage time is used in controller

If stop bar detection is present, queue clearance is not used.

Page 31: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Advanced Detection – Arterials Ch. 2 (Installed at speeds 40 mph+)

Channel 2 used for

approach volume

counts with a 10

foot zone

approximately 400

feet from the

stopbar.

Page 32: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

UDOT Detection Setup StopBar (Sidestreet & Most MainLine)

Wavetronix Matrix Smartsensor Radar

140 ft

65 ft

15 ft

Queue Ch.: 15 ft Long @

50’ Back

• 3 second delay

• Count ch. at Stopbar

• Ex. Ch. 5–8 (underneath)

• YRA ch. at stopbar

• Yellow & Red Actuations

• Ex. Ch. 9-11.

• 15 mph speed filter

Page 33: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Depending on the

sensor positioning,

layout, and available

channels, sometimes

we use exit counting

channels.

Page 34: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Signal Timing Manual Ver.1 Figure 5-4

35

The larger the detection zone, the smaller the passage time

(PT). Smaller PT reduces vehicle delay for waiting vehicles on

other phases.

Page 35: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Signal Timing Manual Ver. 1 – Table 5-10

36

25 mph: 2.2 - .4 = 1.8 s.

30 mph: 2.3 - .8 = 1.5 s.

35 mph: 2.4 – 1.1 = 1.3 s.

40 mph: 2.5 – 1.4 = 1.1 s.

45 mph: 2.6 – 1.5 = 1.1 s.

Ave: 1.4 S savings with 65 foot zone.

Page 36: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

37

Page 37: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Lower Upper Lower Upper Lower Upper

2 97.6 103.9 97.3 104.6 95.3 104.8

3 97.5 102.0 94.6 102.5 97.4 99.9

4 94.1 100.1 91.7 100.1 90.8 98.6

5 91.9 97.2 88.8 96.3 80.3 98.0

6 93.8 96.8 79.7 88.6 74.9 90.2

Radar Wavetronix Matrix - Volume Accuracy: 95 Percent Confidence Interval of the Mean

– Report No. UT-15.14 Table 5-1 b. – Volume Level vs. Number of Approach Lanes

Number of

Approach

Lanes

Volume Level

Low (%)

(≤100 v/h/ln)

Mid (%)

(101-250 v/h/ln)

High (%)

(>250 v/h/ln)

Matrix Wavetronix Counting Accuracy Results

Page 38: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Lower Upper Lower Upper Lower Upper

1 94.7 116.7 98.1 104.7 86.6 100.4

2 87.6 104.0 86.9 94.1 83.4 92.2

3 85.7 94.9 80.6 90.2 74.1 81.5

Radar Wavetronix Advance - Volume Accuracy – Report No. UT-16.05 Table 5-4. –

Combined 95% Confidence Interval of the Mean

Number of

Approach

Lanes

Volume Level

Low (%) Mid (%) High (%)

(≤100 v/h/ln) (101-250 v/h/ln) (>250 v/h/ln)

Wavetronix Advance Counting Accuracy Results)

Speed Accuracy

Page 39: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

ITE 3-part Webinar

April, May, June 2014

ITE Journal, March 2014

Page 40: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Opportunity from UDOT Executive Leaders (2011)

“What would it take for UDOT’s traffic signals to be world class?”

“What’s the trend – are signal operations improving, staying the

same or getting worse?”

“What are our areas of

most need?”

Quality

Improvement

Team

Page 41: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

QIT Recommendations (July 2011)

• Communications and

detection maintained

during projects

• Proactive signal

maintenance

• Real-time monitoring

of system health and

quality of operations

Page 42: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6
Page 43: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

http://udottraffic.utah.gov/signalperformancemetrics

Page 44: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Agencies using UDOT SPMs Overland Park, KS,

MnDOT

GDOT

FDOT

Seminole County, FL

Tucson AZ

Las Vegas

VDOT

WISDOT

College Station,Texas

Pocatello, ID

PennDOT

Richardson, TX

College Station, TX

MnDOT

Overland

Park, KS All of Utah

INDOT

FDOT Seminole

Cty, FL

WISDOT

VDOT

GDOT Tuscon, AZ

College Station, TX

Richardson, TX

PennDOT

Pocatello, ID

Las Vegas

Page 45: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

SPM Basic Concept

- Signal controller - Probe source

- Signal - Corridor - System

Automated Data Collection

Useful Information about Performance

A Central Signal System is NOT used or Needed for these SPM’s.

Why Model what you can Measure?

Page 46: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

System Requirements

Detection Server Software

Communications

Photo courtesy of the Indiana Department of Transportation

(optional)

High-resolution Controller

Page 47: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Objective: Vendor Neutrality

Page 48: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Metrics & Detection

Requirements Controller high-resolution data only

Purdue Phase Termination

Split Monitor Pedestrian Delay (Ped Buttons)

Page 49: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Phase Termination Chart

Metric: Phase Termination Chart

Detection Requirements: None

Free Free Coordination

Coordinated phases

Page 50: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

BEFORE: Video detection not working at night

Nighttime detection problem

Metric: Purdue Phase Termination

Detection Requirements: None

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Minor street through & left turn max out at night only

Page 51: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

AFTER: New detection technology installed

Nighttime detection problem – Fixed!

Metric: Purdue Phase Termination

Detection Requirements: None

Phases are rarely used at night

Gap out

Max out

Force off

Pedestrian activation

Skip

(shown above phase line)

Page 52: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Daily email at 7 a.m.

Uses Purdue Phase Termination chart data

Flags phases with >90% max-outs on each phase

between 1 a.m. and 5 a.m. after 20 occurrences

Compare to previous day’s list. Only phases with new

flags are sent in the email.

Alert Example: 100% Max Out

Metric: Purdue Phase Termination

Detection Requirements: None

Example

Page 53: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Split Monitor Phase 6

Metric: Split Monitor

Detection Requirements: None

Page 54: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Impact of Sequence change w/ Split Monitor

• Before:

1 2 | 3 4

5 6 | 7 8

• After:

1 2 | 4 3

5 6 | 7 8

Ø3 WBL

Ø4 EBT

Ø3 WBL

Ø4 EBT

Page 55: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Pedestrian Delay (Time from pedestrian call received to start of the walk indication)

Metric: Pedestrian Delay

Detection Requirements: Ped Buttons

36 56 21

Page 56: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Metrics & Detection

Requirements Controller high-resolution data only

Purdue Phase Termination

Split Monitor Pedestrian Delay (ped buttons)

Advanced Count Detection (~400 ft behind stop bar)

Purdue Coordination Diagram Arrivals on Red

Approach Volume Approach Delay

Platoon Ratio Executive Summary Reports

Page 57: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Progression Quality

Metric: Purdue Coordination Diagram Detection Requirements: Advance Counters

Vehicles arriving on green Vehicles arriving on red

Page 58: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Purdue Coordination Diagram Bangerter & 5400 S (3/7/2013)

Metric: Purdue Coordination Diagram Detection Requirements: Advance Counters

Bad Good

Left turns from upstream signal

Page 59: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

PCD – TOD Coordination Mountain View & 12600 S - Westbound

Metric: Purdue Coordination Diagram Detection Requirements: Advance Counters

Page 60: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

PCD – Peer to Peer Logic Mountain View & 12600 S - Westbound

Metric: Purdue Coordination Diagram Detection Requirements: Advance Counters

Page 61: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Offset Optimization using Purdue Link Pivot

Village

Blvd

Bates

Canyon Rd

Erda Way

2400 N

2000 N

SR-36

Page 62: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Purdue Link Pivot

Page 63: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Metrics & Detection

Requirements Controller high-resolution data only

Purdue Phase Termination

Split Monitor Pedestrian Delay (Ped Buttons)

Advanced Count Detection (~400 ft behind stop bar)

Purdue Coordination Diagram Arrivals on Red

Approach Volume Approach Delay

Platoon Ratio Executive Summary Reports

Advanced Detection with Speed

Approach Speed

Page 64: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Approach Speeds Use for traffic studies, models, setting speed limits, Yellows, Red Clearance

Metric: Approach Speeds Detection Requirements: Wavetronix Advance Radar

78

43% of Intersections

Page 65: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Approach Speeds and Snow

Snow storm starts

Progression speed for snow plans?

Metric: Approach Speeds Detection Requirements: Wavetronix Advance Radar

Page 66: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Metrics & Detection

Requirements Controller high-resolution data only

Purdue Phase Termination

Split Monitor Pedestrian Delay (ped buttons)

Advanced Count Detection (~400 ft behind stop bar)

Purdue Coordination Diagram Arrivals on Red

Approach Volume Approach Delay

Platoon Ratio Executive Summary Reports

Advanced Detection with Speed

Approach Speed

Lane-by-lane Presence Detection

Purdue Split Failure

Page 67: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Purdue Split Failure – 24-hr Format

Occu

pa

ncy (

%)

Phase 4 EBT

Coordinated Phase

Metric: Purdue Split Failure Detection Requirements: Stop bar presence

Page 68: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Moab, Utah – The Adventure Capital of the United States (Two National Parks within 20 miles)

Page 69: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Purdue Split Failure – NB Center St & Main St – Moab, Utah

(Memorial Day Weekend – Saturday)

Metric: Purdue Split Failure Detection Requirements: Stop bar presence

2015

2016

Page 70: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Purdue Split Failure – SB Center St & Main St – Moab, Utah

(Memorial Day Weekend – Saturday)

Metric: Purdue Split Failure Detection Requirements: Stop bar presence

2015

2016

Page 71: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Lane-by-lane Count Detection

Turning Movement Counts

Metrics & Detection

Requirements Controller high-resolution data only

Purdue Phase Termination

Split Monitor Pedestrian Delay (Ped buttons)

Advanced Count Detection (~400 ft behind stop bar)

Purdue Coordination Diagram Arrivals on Red

Approach Volume Approach Delay

Platoon Ratio Executive Summary Reports

Advanced Detection with Speed

Approach Speed

Lane-by-lane Presence Detection

Purdue Split Failure

Page 72: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Lane-by-lane Volume Counts

87

Metric: Turning Movement Counts Detection Requirements: Stop Bar Counters

Page 73: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Impact of SPMs on

Signal Operations in Utah

Page 74: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Performance Metrics Uses

• Daily Operations

• Basic parameters

• Detection problems

• Complaint response/

troubleshooting

• Coordination

• Events, Incidents,

Weather, & Construction

• Alerts

• Modeling/planning

• Approach Volumes

• Turning Movement

Counts

• Speed

• Reporting

• Prioritize signal needs

• Communicate system

status to region/senior

leaders and public

Page 75: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

0

50

100

150

200

250

300

DetectorIssue

Modeling SplitAdjustment

CycleLength

Time OfDay

Offset CoordOn/Off

ActuatedCoord

Force OffType

Sequence

# A

cti

on

s T

ak

en

Actions Resulting from

Signal Performance Metrics January 1 - June 18, 2014

Phase Termination Split Monitor Purdue Coordination Diagram Other

Page 76: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Traditional Process Modified Process with SPMs

Collect Data

Model

Optimize

Implement &

Fine-tune

Time-of-day

Cycle Length

Splits

Offsets

Review SPMs

& Field

Observation

Model

Optimize

Implement &

Fine-tune

Time-of-day

Cycle Length

Splits

Offsets

Optimization with SPMs

Page 77: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Monitoring Trends 100

Retiming Project

Page 78: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

UDOT Signal Timing Focus Group (July 2014)

• How do you feel about UDOT?

• How do traffic signals make you feel?

Page 79: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

Focus Group Key Findings (July 2014)

UDOT is perceived positively, with innovation

as the primary driver of positive impressions.

Drivers believe traffic signal synchronization

is improving.

Drivers feel UDOT should be open about its

accomplishments in a way that protects its

credibility.

102

Page 80: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

60 S Commercial – Green Lights

Page 81: Northern California Section ITE - Norcal ITE · Northern California Section – ITE June 15, ... 1.0 S Passage time is used in controller ... 4 94.1 100.1 91.7 100.1 90.8 98.6

udottraffic.utah.gov/signalperformancemetrics

Mark Taylor –

[email protected]