                                  Introduction        1 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 

    Northern Regional Map        2 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐         Expansion Projects        3 ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐  Rehabilitation Projects        5 

 

NORTHERN HIGHWAYS  PROGRAM 2013 ‐ 2017  INTRODUCTION Creating Jobs and Building a Stronger Ontario  

In 2013/14, the Ontario government will be investing $2.2 billion to repair and expand provincial highways and bridges.  This includes $513 million for northern Ontario creating or sustaining more than 5,000 direct and indirect jobs.  Improving Ontario's transportation network is part of the government’s plan to strengthen the economy.  

2013 Planned Accomplishments Northern Ontario 

New highways  71 km 

New bridges                            2 

Highways rehabilitated  371 km

Bridges rehabilitated                      37 

 The timing of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.    

Northern Highways Program 2013-2017 1

 

Northern Highways Program 2013-2017 2

NORTHERN EXPANSION 2013 – 2017  

NORTHEASTERN ONTARIO EXPANSION 2013‐2017 

 

Hwy  Status  Location Type of Work 

Target Completion Date 

66  Planned  Hwy 66 at Virginiatown  Re‐alignment  2015 

69  Underway  Hwy 64 northerly, north of Alban 

Four‐lane widening / new four‐lane highway 

2015 

69  Underway  Hwy 522 to Hwy 64, French River Four‐lane widening 

Beyond 2016 

69  Planned North of  Hwy 559 to Hwy 522, Pointe au Baril Station 

Four‐lane widening 

Beyond 2016 

69  Planned  Hwy 559 northerly, north of Nobel Four‐lane widening 

Beyond 2016 

69  Planned Connection of Hwy 69 to Sudbury southeast bypass Hwy 17 

Four‐lane widening 

Beyond 2016 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

 

 

 

 

 

 

 

Northern Highways Program 2013-2017 3

 

NORTHWESTERN ONTARIO EXPANSION 2013‐2017 

Hwy  Status  Location  Type of Work 

Target Completion Date 

17  Planned  Manitoba border easterly (BCF)* 

Four‐lane widening / new four‐lane highway 

Beyond 2017 

11/17  Underway Mackenzie Station Road to Birch Beach Road, east of Thunder Bay 

Four‐lane widening 

2013 

11/17  Underway  Hwy 527 easterly to Mackenzie Station Road Four‐lane widening 

2015 

11/17  Planned  South Trout Creek Bridge, west of Nipigon Four‐lane widening 

2014 

11/17  Planned  Stillwater Creek, Nipigon,  westerly Four‐lane widening 

2017 

11/17  Underway  Nipigon River Bridge and approaches Four‐lane widening 

2017 

11/17  Planned  5.0 km west Hwy 587,  easterly  Four‐lane widening 

2016 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

* BCF: Building Canada Fund 

 

 

 

 

 

 

Northern Highways Program 2013-2017 4

 

NORTHERN REHABILITATION 2013‐2017  

NORTHEASTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

11  Underway White Clay River Bridge, north of Hwy 66, Sesekinika 

Bridge replacement  2013  n/a 

11  Underway Mattawishkwia River Bridge, east of Hearst 

Bridge replacement  2013  n/a 

11  Underway Hwy 112 northerly, South of Kenogami Lake 

Resurfacing  2013  13 

11  Underway  North Bay to Colbalt Highway improvements 

2013  n/a 

11  Underway South of Kenogami Lake to Cochrane 

New passing lanes  2013  11 

11  Underway Montcalm Creek Bridge, Crow Creek Bridge, west of Opasatika 

Bridge replacement  2014  n/a 

11  Underway Otasawian River Bridge, west of Calstock 

Bridge replacement  2013  n/a 

11  Underway  Sundridge to South River  Wildlife fencing  2013  9 

11  Underway South of Hwy 534 to Hwy 654, Powassan 

Resurfacing / Culvert rehabilitation and replacement 

2013  16 

11  Planned North of Hwy 64, north of Marten River 

Resurfacing  2013  10 

 

Northern Highways Program 2013-2017 5

NORTHEASTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

11 & 17 

Planned O'Brien Street westerly to Gormanville Road, North Bay 

Resurfacing  2013  3 

11 & 573 

Planned Englehart River, Aidie Creek Bridges, Earlton northerly 

Bridge rehabilitation  2014  n/a 

11, 636 & 652 

Underway  West and east of Cochrane  Culvert replacement  2013  n/a 

17  Underway Structures, west of Hwy 144 easterly, Sudbury 

Bridge rehabilitation  2013  n/a 

17  Planned Batchawana River Bridge, Carp River Bridge, Batchawana Bay 

Bridge rehabilitation  2013  n/a 

17  Underway West of west junction Municipal Road 55, Nairn Centre 

Culvert rehabilitation  2013  n/a 

17  Planned Magpie River, Michipicoten River, Catfish Creek, Wawa 

Bridge rehabilitation  2013  n/a 

17  Planned Hwy 17B easterly, east of Echo Bay 

Resurfacing  2013  16 

17  Planned East of Hwy 519 easterly, west of Wawa 

Resurfacing  2013  15 

17  Planned West  of Hwy 553 westerly, Massey 

Resurfacing  2013  8 

17 & 538 

Underway Mississagi River and Lauzon Creek Bridges, Iron Bridge 

Bridge rehabilitation / Bridge replacement 

2013  n/a 

60  Planned West Gate to Station Road, Algonquin Park 

Resurfacing  2013  24 

65  Underway  North of Hwy 560, Elk Lake  Realignment  2013  2 

Northern Highways Program 2013-2017 6

 

NORTHEASTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

65  Planned Blanche River, Wright Creek, east of New Liskeard 

Bridge rehabilitation  2013  n/a 

65  Planned South junction Hwy 11 westerly, New Liskeard 

Resurfacing  2013  35 

66  Planned Hwy 11 easterly to Chaput Hughes Road, Kirkland Lake 

Resurfacing  2013  12 

69  Planned North of Hwy 559 Interchange northerly, north of Nobel 

Preventive resurfacing 

2013  13 

69  Planned North junction Hwy 529 to Hwy 607, Britt to French River 

Resurfacing  2013  33 

124  Planned  Hwy 510 easterly, Magnetawan  Resurfacing  2013  18 

144  Underway South of Hwy 560 northerly, south of Gogama 

Resurfacing  2013  24 

144  Planned  Cartier northerly  Resurfacing  2013  25 

518 & 520 

Planned Haines Creek east of Orrville, Jenkins Creek at Magnetawan 

Culvert rehabilitation  2014  n/a 

535  Planned North of Hwy 64 northerly, Noelville 

Resurfacing  2013  12 

535  Planned  Veuve River Bridge, Hagar  Bridge replacement  2013  n/a 

573  Planned Blanche River Bridges, Charlton northerly 

Bridge replacement  2014  n/a 

Northern Highways Program 2013-2017 7

 

NORTHEASTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

592  Underway  Hwy 518 northerly, Emsdale  Reconstruction  2013  2 

607  Underway Murdock River Bridge, French River 

Bridge replacement  2013  n/a 

630  Planned  Amable Dufond River, Kiosk  Bridge replacement  2013  n/a 

634  Underway North of Hwy 11, Smooth Rock Falls 

Culvert replacement  2013  n/a 

7088  Planned Stokley Creek Bridge, north of Hwy 552, Goulais River 

Bridge replacement  2014  n/a 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

 

 

 

 

 

 

 

 

 

 

 

Northern Highways Program 2013-2017 8

NORTHEASTERN ONTARIO REHABILITATION 2014 

Hwy  Location  Type of Work 

Target Completion Date 

Project Length (km) 

11  Mattice to Hearst Resurfacing / culvert rehabilitation / replacement 

2015  31 

17  Hwy 94 easterly to Hwy 531, Corbeil  Resurfacing  2015  12 

17  East of Hwy 548 easterly, Bruce Mines Resurfacing / culvert replacement 

2014  17 

101  West of Hwy 144 westerly, Timmins  Resurfacing  2015  31 

101  Hwy 144 westerly, west of Timmins  Resurfacing  2014  17 

101  Borden Lake Culvert, east of Chapleau  Culvert replacement  2014  n/a 

101  Shawmere River Bridge easterly, Foleyet  Resurfacing  2015  48 

124 West junction Hwy 520 easterly to Distress River, Dunchurch 

Resurfacing  2014  21 

141  Hwy 69 easterly, west of Rosseau  Resurfacing  2014  19 

144  Onaping northerly to Cartier Resurfacing / culvert rehabilitation / replacement 

2014  18 

552  Hwy 17 westerly, Goulais River  Resurfacing  2014  5 

540 & 542 

Mud Creek, Culverts, west of Little Current 

Culvert replacement / rehabilitation 

2014  n/a 

Northern Highways Program 2013-2017 9

NORTHEASTERN ONTARIO REHABILITATION 2014 

Hwy  Location  Type of Work 

Target Completion Date 

Project Length (km) 

554 Devees Creek, north of Hwy 546, north of Iron Bridge 

Culvert replacement  2014  n/a 

560 Gowganda East Limits to Gowganda West Limits 

Resurfacing  2014  3 

583 Jessie River, Prune Creek, south of Hwy 11, south of Hearst 

Bridge replacement  2015  n/a 

592 Little East River Bridges, north of Hwy 11, Novar 

Bridge replacement  2015  n/a 

654  Hwy 534 easterly to Hwy 11, Nipissing Resurfacing / structure rehabilitation 

2015  23 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

                       

Northern Highways Program 2013-2017 10

NORTHEASTERN ONTARIO REHABILITATION 2015‐2017  

Hwy  Location  Type of Work 

Project Length (km) 

6 & 17  West of Hwy 6 easterly to Nairn Centre Resurfacing / bridge rehabilitation 

21 

11  Meadow Creek, south Hwy 579, Cochrane  Culvert replacement  n/a 

11 Mondor Creek Culvert, south of Hwy 579, Cochrane 

Culvert replacement  n/a 

11 Duchesnay Creek and Chippewa Creek, north of North Bay 

Bridge replacement / culvert rehabilitation 

n/a 

11  CNR Overhead at Earlton  Bridge replacement  n/a 

11  South of Hwy 64 northerly, Marten River Resurfacing / bridge rehabilitation 

29 

11  Kapuskasing to Opasatika  Resurfacing  32 

11  Opasatika River Bridge westerly, Opasatika  Resurfacing  32 

11  Solomon Creek Bridge, east of Opasatika  Bridge rehabilitation  n/a 

11  West of Hwy 631 easterly, west of Calstock  Resurfacing  31 

11  South of Lakeshore Dr southerly, Temagami  Resurfacing  11 

11  Groundhog River Bridge,  Fauquier Bridge replacement/culvert rehabilitation 

n/a 

                                                

  

Northern Highways Program 2013-2017 11

NORTHEASTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

11B South junction Hwy 11B northerly to Haileybury 

Resurfacing  7 

17  Sturgeon Falls westerly to Verner  Resurfacing  15 

17 Speckled Trout Creek, north of Montreal River 

Culvert rehabilitation  n/a 

17 Aux Sables River Bridge, east of Hwy 553, Massey 

Bridge rehabilitation  n/a 

17 Agawa River culverts lining, north of Sault Ste. Marie 

Culvert rehabilitation  n/a 

17 Municipal Road 55 interchange westerly, Sudbury 

Resurfacing  22 

17  CPR Overhead, west of Hwy 6,  Webbwood  Bridge replacement  n/a 

17  Hwy 539 Warren to Hwy 64 Verner Resurfacing / culvert rehabilitation 

14 

17  Hwy 631 easterly 59 km, White River  Resurfacing  59 

17 Santala, CPR, Municipal Road 3 underpass, Hwy 17, Sudbury 

Bridge rehabilitation  n/a 

17  CPR overhead, west of Hwy 537, Coniston  Bridge rehabilitation  n/a 

17 East junction Municipal Road 55 easterly to Hwy 535, Sudbury to Hagar 

Resurfacing / bridge rehabilitation 

39 

  

Northern Highways Program 2013-2017 12

NORTHEASTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

17 Sand River and Barrett River Bridges, south of Wawa 

Bridge rehabilitation  n/a 

17 & 101 

South of Hwy 101 northerly, Wawa Resurfacing / culvert rehabilitation 

33 

17 & 532 

Chippewa River, Harmony River, Goulais , south of Batchawana Bay 

Bridge rehabilitation / culvert rehabilitation 

n/a 

17 & 546 

Hwy 546 easterly, Iron Bridge to Blind River Resurfacing / culvert rehabilitation 

24 

17 & 631 

Culverts, south and north of Hornpayne Culvert replacement  / rehabilitation 

n/a 

17B Duchesnay Creek Bridge, CNR overhead, North Bay 

Resurfacing / bridge replacement 

n/a 

60  Hwy 127 easterly, east of Whitney Resurfacing / bridge rehabilitation / culvert replacement 

19 

60  Station Road easterly, Algonquin Park  Resurfacing  14 

63 Ottawa River Bridge (West Channel) at Ontario/Quebec Border 

Bridge replacement  n/a 

65 Sutton Creek, east of Hwy 11B, east of New Liskeard 

Culvert replacement  n/a 

65 Ontario / Quebec boundary westerly, east of New Liskeard 

Resurfacing / bridge rehabilitation 

22 

65 South of Hwy 66 northerly, north of Englehart 

Resurfacing  15 

 

Northern Highways Program 2013-2017 13

  

NORTHEASTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

66 Crooked Creek, west of Hwy 11, Kenogami Lake 

Culvert replacement  n/a 

101  Foleyet easterly  Resurfacing  21 

101 & 129 

Sideburned, Nemegosenda, Nebskawash Bridges, Chapleau 

Bridge rehabilitation  n/a 

108  Hwy 17 northerly to Elliot Lake  Resurfacing   25 

112 & 650 

Hwy 11 northerly, Kirkland Lake  Resurfacing  21 

129  Hwy 129 Culverts, Thessalon northerly Culvert replacement / rehabilitation 

n/a 

129 & 546 

Culverts, north of Iron Bridge, north of Thessalon 

Culvert replacement / rehabilitation 

n/a 

144  South of Hwy 560 northerly, north of Cartier  Resurfacing  17 

144  Regional Rd 12 northerly, Dowling  Resurfacing  12 

144  Half Way Lake northerly, north of Cartier  Resurfacing  19 

144 Municipal Roads 35/15 northerly, Chelmsford 

Resurfacing  5 

 

 

Northern Highways Program 2013-2017 14

NORTHEASTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

519  Hwy 17 easterly, Dubreuilville Resurfacing / bridge and culvert rehabilitation 

31 

522 Hwy 11/McFadden Line interchange westerly, Trout Creek 

Resurfacing / bridge replacement 

529  Two Structures, north of Pointe au Baril  Bridge rehabilitation  n/a 

531 & 533 

Hwy 533 Mattawa northerly and Hwy 531 southerly, Bonfield 

Resurfacing  7 

538 CPR Subway, east of west junction Hwy 17, east of Blind River 

Bridge rehabilitation  n/a 

540  Little Current westerly  Resurfacing  18 

540 & 540B 

West of Hwy 551, Kagawong westerly  Resurfacing  18 

542 & 551 

East junction Hwy 542 northerly, Mindemoya 

Resurfacing  14 

551  Mindemoya Creek Bridge at Providence Bay  Bridge replacement  n/a 

560 Little Mollie Creek, east of Hwy 144, Westree 

Culvert replacement  n/a 

560  Structures, west of Elk Lake Bridge rehabilitation / culvert replacement / rehabilitation 

n/a 

577  Driftwood River Bridges, north of Shillington Bridge rehabilitation / bridge replacement 

n/a 

Northern Highways Program 2013-2017 15

NORTHEASTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

579  Gilles (Brower) Creek Bridge, north of Clute  Bridge replacement  n/a 

583  Obijou River Culvert, south of Hearst  Culvert replacement  n/a 

592 CNR overhead bridge and Ragged Creek Bridge, north of Novar 

Bridge replacement  n/a 

631  Hwy 17 northerly, White River  Resurfacing  50 

634  North of Hwy 11, north of Smooth Rock Falls Culvert replacement / rehabilitation 

n/a 

639  Christian Creek Culvert, north of Elliot Lake Bridge rehabilitation / culvert replacement 

n/a 

655 Jocko Creek, north of Hwy 101, north of Timmins 

Culvert replacement  n/a 

668 Deception Creek and Smith Creek Bridges, south of Hunta 

Bridge rehabilitation / bridge replacement 

n/a 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

 

 

 

 

 

 

Northern Highways Program 2013-2017 16

NORTHWESTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

11  Underway  Beardmore westerly  Resurfacing  2013  29 

11  Underway Blackwater River Bridge at Beardmore 

Bridge replacement  2014  n/a 

11  Underway McCauley Creek Bridge, west of Atikokan 

Bridge replacement  2013  n/a 

11  Underway Noden Causeway, east of Fort Frances 

Bridge rehabilitation  2014  n/a 

11  Underway Sturgeon River Bridge, west of Geraldton 

Bridge rehabilitation  2013  n/a 

11  Planned  East of Longlac easterly  Resurfacing  2013  21 

11  Planned French River Bridge, east of Atikokan 

Bridge replacement  2014  n/a 

11  Planned Pickerel River Bridge, east of Atikokan 

Bridge replacement  2014  n/a 

11  Planned Seven Mile Bridge, east of Fort Frances 

Bridge replacement  2014  n/a 

11  Planned  West of Atikokan westerly  Resurfacing  2014  21 

11  Planned  West of Geraldton westerly Resurfacing and culvert replacements 

2014  28 

17  Underway Beaver Creek Bridge, west of Dryden 

Bridge replacement  2013  n/a 

17  Underway Little Pic River Bridge, west of Marathon 

Bridge rehabilitation  2013  n/a 

17  Underway Little Wabigoon River Bridge, west of Hwy 603 

Bridge replacement  2014  n/a 

17  Underway Melgund River Bridge, east of Hwy 72 

Bridge replacement  2014  n/a 

17  Underway Nugget Creek Bridge, west of Hwy 72 

Bridge replacement  2013  n/a 

17  Underway  Terrace Bay easterly  Resurfacing  2013  17 

17  Planned Beaver Creek Bridge, west of Upsala 

Bridge rehabilitation  2013  n/a 

17  Planned Big Firesteel River Bridge, west of Upsala 

Bridge rehabilitation  2013  n/a 

Northern Highways Program 2013-2017 17

NORTHWESTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

17  Planned  CPR overhead at Rossport  Bridge rehabilitation  2014  n/a 

17  Planned CPR overhead, east of Hwy 614 to Manitouwadge 

Structure removal  2013  n/a 

17  Planned Cypress River Bridge, east of Nipigon 

Bridge replacement  2014  n/a 

17  Planned  East of Nipigon easterly  Resurfacing   2014  17 

17  Planned English River Bridge at English River 

Bridge replacement  2014  n/a 

17  Planned Gulliver River Bridge, east of Ignace 

Bridge replacement  2014  n/a 

17  Planned Jackfish River Bridge, east of Nipigon 

Bridge rehabilitation  2014  n/a 

17  Planned Jackpine River Bridge, east of Nipigon 

Bridge rehabilitation  2014  n/a 

17  Planned Little Gravel River Bridge, east of Nipigon 

Bridge replacement  2014  n/a 

17  Planned Little Rest Creek Culvert, west of Raith 

Culvert replacement  2013  n/a 

17  Planned Pic River Bridge, east of Marathon  

Bridge replacement  2015  n/a 

17  Planned Raleigh Lake Culvert, west of Ignace 

Culvert replacement  2015  n/a 

61  Underway  Cloud River Culvert, south of Thunder Bay 

Culvert replacement  2013  n/a 

72  Planned Abram Lake Culvert, south of Sioux Lookout 

Culvert replacement  2015  n/a 

105  Underway Bug River Bridge, south of Hwy 125 

Bridge rehabilitation  2013  n/a 

105  Planned Trout Lake River Bridge, north of Ear Falls 

Bridge replacement  2015  n/a 

516  Underway  Sioux Lookout easterly  Resurfacing  2013  30 

 

 

 

Northern Highways Program 2013-2017 18

 

NORTHWESTERN ONTARIO REHABILITATION 2013 

Hwy  Status  Location  Type of Work 

Target Completion Date 

Project Length (km) 

527  Underway 56 km north of Hwy 11/17 northerly 

Resurfacing  2013  15 

527  Underway 97 km north of Hwy 11/17 northerly 

Resurfacing  2013  25 

527  Underway  8 km north of Hwy 811 northerly  Resurfacing  2013  25 

587  Planned Sibley Creek Bridge at Lake Superior 

Bridge rehabilitation  2014  n/a 

588  Planned Whitefish River Bridge, west of Thunder Bay 

Bridge replacement  2014  n/a 

594  Underway  Beaver Creek Bridge, west of Dryden 

Bridge replacement  2013  n/a 

599  Planned Medcalf Lake Narrows Bridge, north of Savant Lake 

Bridge rehabilitation  2014  n/a 

600  Planned Little Grassy River Bridge, east of Bergland 

Bridge rehabilitation  2014  n/a 

614  Underway  Manitouwadge southerly  Resurfacing  2013  25 

614  Planned Phillips Culvert,  south of Manitouwadge 

Culvert replacement  2015  n/a 

614  Planned Barabara Culvert, south of Manitouwadge 

Culvert replacement  2015  n/a 

614  Planned Barehead Culvert, south of Manitouwadge 

Culvert replacement  2015  n/a 

615  Planned Off Lake Bridge, north of Hwy 11 at Emo 

Bridge rehabilitation  2014  n/a 

621  Planned Little Grassy River Bridge, at Bergland 

Bridge replacement  2014  n/a 

627  Underway  Hwy 17 southerly  Resurfacing  2013  13 

664  Planned Vermillion Lake Narrows Bridge, west of Hwy 72 

Bridge replacement  2014  n/a 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

Northern Highways Program 2013-2017 19

NORTHWESTERN ONTARIO REHABILITATION 2014 

Hwy  Location  Type of Work 

Target Completion Date 

Project Length (km) 

11  Beardmore easterly  Resurfacing  2014  23 

11 Everett Creek Culvert, west of Fort Frances 

Culvert replacement  2014  n/a 

11  Ramsdale Creek Culvert, east of Emo  Culvert replacement  2014  n/a 

11  Dilke Creek Culvert, east of Pinewood  Culvert replacement  2014  n/a 

11 Kabaigon River Bridge, west of Shebandowan 

Bridge replacement  2015  n/a 

11  Westovers Creek Culvert, west of Barwick  Culvert replacement  2014  n/a 

17  CPR Overhead, west of Schreiber  Rehabilitation  2015  n/a 

17 Cedar Creek Bridge, west of Hwy 614 to Manitouwadge 

Bridge rehabilitation  2015  n/a 

17 Pays Plat River Bridges, east of Nipigon at Pays Plat 

Bridge rehabilitation  2016  n/a 

17  Revell River Culvert, west of Ignace  Culvert replacement  2015  n/a 

17  Ozone Creek Bridge, east of Nipigon  Bridge rehabilitation  2015  n/a 

17  CPR overhead at Schreiber  Bridge replacement  2015  n/a 

17  Gravel River Bridge, east of Nipigon  Rehabilitation  2015  n/a 

17  East of  Hwy 71 easterly  Resurfacing  2014  28 

Northern Highways Program 2013-2017 20

NORTHWESTERN ONTARIO REHABILITATION 2014 

Hwy  Location  Type of Work 

Target Completion Date 

Project Length (km) 

17  West of Ignace,  westerly to Hwy 622  Rehabilitation  2014  31 

71 Black River Culvert, north of Sioux Narrows 

Culvert replacement  2015  n/a 

71  Pine Lake Culvert, south of Caliper Lake  Culvert replacement  2014  n/a 

71 Log R Tributary Culvert, south of Caliper Lake 

Bridge replacement  2014  n/a 

72 Moose Creek Bridge, south of Sioux Lookout 

Bridge rehabilitation  2015  n/a 

102 Strawberry Creek Bridges, west of Thunder Bay 

Rehabilitation  2015  n/a 

527 Lachapelle Creek Culvert, south of Hwy 811 

Culvert replacement  2015  n/a 

527 Kabitotikwia  River Bridge, north of Hwy 811 

Bridge rehabilitation  2015  n/a 

527  Kopka River Bridge,  north of Hwy 811  Bridge rehabilitation  2015  n/a 

527  Gull River Bridge,  north of Hwy 811  Bridge rehabilitation  2015  n/a 

588 Whitefish River Bridge, west of Thunder Bay 

Bridge rehabilitation  2014  n/a 

594  Dryden westerly  Resurfacing  2014  5 

599 Sturgeon River Bridge, north of Silver Dollar 

Bridge rehabilitation  2015  n/a 

599 Medcalf Lake Narrows, 85 km north of Hwy 516 

Bridge rehabilitation  2015  n/a 

 

Northern Highways Program 2013-2017 21

NORTHWESTERN ONTARIO REHABILITATION 2014 

Hwy  Location  Type of Work 

Target Completion Date 

Project Length (km) 

599  Elbow Creek Bridge, north of Silver Dollar  Bridge rehabilitation  2015  n/a 

601  Dryden northerly  Resurfacing  2014  5 

628  Big Trout Creek Culvert, north of Red Rock  Culvert replacement  2015  n/a 

658  Black River Bridge at Redditt  Bridge replacement  2014  n/a 

658  Hwy 17A northerly  Resurfacing  2015  26 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

 

 

 

 

 

 

 

 

 

 

 

 

 

Northern Highways Program 2013-2017 22

NORTHWESTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

11  Baudette Rainy River International Bridge to U.S.  Bridge replacement  n/a 

11  Pagwachuan River Culverts, east of Longlac  Culvert replacement  n/a 

11  Kakabeka Falls Bridge at Kakabeka   Bridge rehabilitation  n/a 

11  Longlac easterly  Resurfacing  22 

11  Atikokan easterly and Hwy 11B to Atikokan  Resurfacing  20 

11  Fort Frances easterly  Resurfacing  27 

11  Fort Frances westerly  Resurfacing  18 

11  Noden Causeway, east of Fort Frances  Bridge rehabilitation  n/a 

11  Helen Lake Culvert, north of Nipigon  Culvert replacement  n/a 

11 Shamrock Lake East Culvert,  west of Macdiarmid 

Culvert replacement  n/a 

11 Shamrock Lake Centre Culvert, west of Macdiarmid 

Culvert replacement  n/a 

11 Shamrock Lake West Culvert, west of  Macdiarmid 

Culvert replacement  n/a 

11  Swamp River Bridge, west of Shabaqua  Bridge replacement  n/a 

11  Brule Creek Culvert, west of Thunder Bay  Culvert replacement  n/a 

   

Northern Highways Program 2013-2017 23

NORTHWESTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

17  Ignace westerly  Resurfacing  20 

17  White Lake Narrows Bridge, west of White River  Bridge rehabilitation  n/a 

17  Marathon westerly  Resurfacing  27 

17  Shabaqua Corners westerly  Bridge rehabilitation  13 

61  Park Road Overhead, north of the U.S. border  Bridge replacement  n/a 

61  Pine River Bridge, south of Thunder Bay  Bridge replacement  n/a 

71  Hwy 17 southerly  Resurfacing  23 

71  Nestor Falls northerly  Resurfacing  28 

72  Pelican River Bridge, Sioux Lookout  Bridge rehabilitation  n/a 

72  CNR overhead at Sioux Lookout  Bridge rehabilitation  n/a 

105  Hwy 17 at Vermilion Bay northerly  Resurfacing  31 

105  18 km north of Hwy 609 northerly  Resurfacing  30 

502  66 km north Hwy 11 northerly  Resurfacing  38 

516  Mills Creek Culvert, east of Sioux Lookout  Culvert replacement  n/a 

   

Northern Highways Program 2013-2017 24

NORTHWESTERN ONTARIO REHABILITATION 2015‐2017 

Hwy  Location  Type of Work 

Project Length (km) 

527  39 km north Hwy 11/17 northerly  Resurfacing  22 

588  Hwy 11/17 southerly  Resurfacing  7 

589  Surprise Lake Narrows Bridge, north of Lappe  Bridge rehabilitation  n/a 

590  Hwy 11/17 at Kakabeka southerly  Resurfacing  24 

599 Albany River Overflow(Cedar Rapids), south of Pickle Lake 

Bridge rehabilitation  n/a 

599  Crow River (July Falls) Bridge north Hwy 599  Bridge replacement  n/a 

613  Hastie River Bridge, north of Hwy 11, Devlin  Bridge rehabilitation  n/a 

613  Munro River Bridge, north of Hwy 11, Devlin  Bridge rehabilitation  n/a 

614  Black River Bridge,  north of Hwy 17  Bridge rehabilitation  n/a 

617  Pinewood River Bridge, north of Hwy 11  Bridge replacement  n/a 

642  Minnikau River Culverts, east of Sioux Lookout  Culvert replacement  n/a 

 

 

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements. 

 

 

Northern Highways Program 2013-2017 25

Published August 2013 ISSN 1913-4568