Project:Vietnam petroleum resoure management (VITRA2)
Cooperating institution:
Petrovietnam (PV)
Goals and objectives:
To ensure that the Vietnamese Authorities who deal with the management o
Energy resoures have a omprehensive knowledge o the total petroleum
resoures o the ountry and that they ontinue to use this knowledge at
management/poliy level or overall strategi planning or the urther
development o the energy setor.
To evaluate alternative data systems based on an evaluation o the PV needs. To establish reporting regulations/guidelines or resoure data. To establish proedures or ontinuously updating the resoure database
in a standard way (defning ormat, standards, and seurity levels o data/
onfdentiality) that allows users at dierent levels to aess, update and
maintain the database as well as use its output.
To enable PV to maintain, update, urther develop the system, implement,use, and ontinuously improve Vietnams Resoure inventory system (an
integrated geophysial and geologial - G&G - and tehnial, eonomial
analysis and planning system) ater ompleting the Projet.
To enable PV to make short- and long-term plans and senarios oreploration, developments and prodution ativities in Vietnam.
To integrate the VITRA results into a sustainable proess ollowed bythe Vietnamese Energy Authorities or management/poliy makingdeisions, by inreasing their awareness to the VITRA onept.
cOUNTRY FAcTS:Ofcial Name:Soialist Republi
o Vietnam
Capital:
Hanoi
Chie o state:
President
Nguyen Minh Triet
Head o government:
Prime Minister NguyenTan Dung
Population:
84 402 966 (2006)
Petroleum sector,
key fgures:
Average oil prodution:
370 000 bbl/day (2005)
Annual gas prodution:
6.8 bill m3 (2005)
Organisation o the sector:Petrovietnam
Ministry o Industry
Department o Energy
and Petroleum
Ministry o Planning and
Investments
Government ofe
Oil and Gas department
Prime Minister
Nguyen Tan Dung
-
8/14/2019 Norwegian Oil for development in Vietnam
2/5
Nowgan Pou Dcoa
O i l f O r D e v e l O P m e N t
2006-2007
64
6.16Total budget: NOK 9 mill
Project period: 2002 2007
Programme:The programme onsists o three main elements:
aquisition o hardware and sotware, training ourses,
seminars and workshops and onsultany servies.
Aquisition and maintenane ee or RMS tool or
interpretation o 3D seismi data, Geox sotware ortehno-eonomial evaluation o prospets and some
hardware or data base administration.
This is the way knowledge is transerred in the projet
and ourses/seminars and workshops are tied to all
the main ativities in the projet.
PV onduts most ativities in the projet. consultany
servies are used to inrease PV ompetene and to
some etent also its apaity. In this institutional o-
operation projet, NPD eperts are avourably used,
but supplemented by onsultants when NPD lak
relevant ompetene or apaity.
Contact:
PetroVietnam:
Dr. Minh, Projet Manager, [email protected]
Mr. Pham Gia Minh, Projet o-ordinator,
NPD:
Mr Gunnar V. Siland, chie tehnial adviser,
cooperating institutions in Norway:
Norwegian Petroleum Diretorate
Ativities in 2006 A workshop with industry representatives on the
resoure data reporting guidelines was organized in
January, 2006. The fnal version o resoure data
reporting guidelines was ompleted.
A workshop or Development o temporary databasewas organized in Vietnam with the help o NPDs
advisors. In the workshop, members o cWT with the
help rom Norwegian eperts drated the system
rame work and speifations. The design o the
temporary database system will be arried out by a
onsultant ompany in a bidding proess. A workshop on Guidelines and proedures or
approval o oil and gas feld development was
organized in Otober.
A workshop on Quality ontrol o reported datawas organized in Norway in July.
The olleting and inputting o ultural data tonew database have been aomplished.
The maintenane and support ees or Geoxsotware have been paid.
The maintenane and support ees or the RMSsotware or 2006 to ROxAR have been paid.
The plans or workshop on development o marginalfelds, whih was agreed to be optional in the 7th ScM,
were agreed to be hanged to workshop on
estimation o undisovered resoures.
Preparatory works was arried out or a workshop onomparing ontratual fsal terms.
1 person attended a 8-week PETRAD ourse onpetroleum management and operation in
Norway. The ourse ommened in August.
Two ScM were organized, one in Vietnam in Januaryand one in Norway in June.
Ms Inger Fjrtot served as projet oordinator or
Vitra 2 until summer o 2006 when she resigned her
position with NPD and Mr. Gunnar V. Siland took overresponsibility or the remainder o the projet whih is
planned to be ompleted by mid year 2007.
Plans 2007The remaining ativities o Vitra II is planned to be
ompleted by the frst hal o 2007. This inludes a
workshop on Undisovered resoures and a workshop
on comparing Fisal Terms. PetroVietnam will ontinue
to update their database with ultural data, fnalize their
Guidelines or development proedures, pay maintenane
ee or aquired sotware, design the temporary database
and prepare the fnal report. It is also requested that theprojet pays or Vietnamese partiipation to
Petrads 8-week ourse in 2007.
-
8/14/2019 Norwegian Oil for development in Vietnam
3/5
Nowgan Pou Dcoa
O i l f O r D e v e l O P m e N t
2006-2007
65
6.16
-
8/14/2019 Norwegian Oil for development in Vietnam
4/5
Nowgan Pou Dcoa
O i l f O r D e v e l O P m e N t
2006-2007
66
6.16
V I E T N A M
Project name:
Development o Management Systems on Saetyand Pollution control in the Vietnamese Petroleum Industry
Cooperating institution:
Vietnam Oil and Gas corporation, PetroVietnam (PV)
PetroVietnam (PV) is 100 per ent owned by the Vietnamese government and the
dominating institution in the Vietnamese petroleum setor. PV is entitled to arry
out upstream petroleum operations both onshore and oshore, alone, or in o-
operation with oreign ompanies under prodution sharing ontrats or in joint
ventures. PV also plays a leading role in the rest o the oil and gas hains, either
diretly or through its subsidiaries. In addition to being the governments major
ommerial instrument in the oil and gas setor, it perorms a number o regulatory
and administrative tasks, whih in most other petroleum produing ountries are
the responsibility o government agenies.
Goal:A sustained proess o urther development o health, saety and environment
management is established in the Vietnamese oil and gas industry to avoid
major aidents and environmental damage.
Objectives:
Suessully implement and enore the Saety Management Regulation andthe aompanying Petrovietnam guidelines
Enable Petrovietnam to urther develop, implement and ontinuously improvehealth, saety and environmental management system in Petrovietnam ater
the end o the projet period
Enable a seletion o Petrovietnam employees to ontinuously build health,saety and environment ompetene ater the end o the projet period
Project period: 2001 - 2005
Total budget: NOK 9 375 mill
ProgrammeA ontrat or phase two o the projet was signed on the 5th o September 2001.
The projet programme is split in two, where the Norwegian Pollution control Ageny
(SFT) is responsible or the pollution ontrol omponents, while NPD is responsible or
the saety management omponents. From 2004 this part o the projet has been
arried out by the Petroleum Saety Authority (PSA).
The saety management omponents are: Development and implementation o saety management
regulations and guidelines
Saety management training Tehnology transer and risk analysis training Development o saety management system and supervisory abilityContact:
Petrovietnam: Dao Duy Khu, Deputy General Manager e-mail: [email protected]
NPD: Programme Manager Dr Eirik Bjerkebk , [email protected]
Cooperating Institutions:SFT
NPD
NORAD
-
8/14/2019 Norwegian Oil for development in Vietnam
5/5
Nowgan Pou Dcoa
O i l f O r D e v e l O P m e N t
2006-2007
67
Brie History o the projetThe projet started in 1996 with assistane
in preparing the Saety Management Regulation.
This regulations has been prepared and wasormally issued by the Prime Minister on the
8th o Marh 1999.
Three corporate Guidelines have beenprepared, and are at present with the industryand relevant authorities or a ormal hearing
Four corporate Guidelines have beenprepared:
Guide on Risk and Emergeny Management
Guideline on working environment
Guideline on supervision
Guideline on proess saety
The guidelines have been made appliable or the
industry as corporate PV Issues. 18 Training courses
have been perormed under the saety manage-
ment programme. Tehnologial transer o sot-
ware tools, hardware omputers and knowledge
in how to perorm quantitative risk analyses have
been inluded in the programme. Several System
Audits have been perormed towards operators
in the Vietnamese oil and gas ativity. A orporate
HSE-Management System has been implemented
or Petrovietnam and its subsidiaries.
Ativities in 2006The seond phase o the projet was fnalised
early in 2006.
The fnal ativities have been: A study tour to Norway or the Petrovietnam
management (members o the implementation
ommitttee) to meet Norwegian managers on
a high level working in the petroleum setor
and to gather and systemise eperienes rom
the implementation o HES management
systems in Norwegian ompanies. This
ativity was organised by PSA, SFT and
the coastal Diretorate.
Workshop on eperiene gained in Hanoi.Important representatives rom the Petro-
vietnam top management and rom the HES
management implementing ommittees met
to present and disuss the eperiene so
ar. PSA and SFT assisted at the workshop.
From PSA the ollowing representatives have
partiipated in the projet: yvind Tuntland,
Eirik Bjerkebk (PSA projet manager), Hanne
Etterlid, Hans Anvik and Sigvart Zahariassen.
Plans 2007Petrovietnam is now in a ritial phase with respet
to seuring the urther institutional development
within management and HES. The ompany is
onsidering the implementation o the HES
management system to be one o the driving ores
or the development o modern management
systems or quality and risks onneted to their
ativity. Petrovietnam has or that partiular reason
applied or an etension o the projet or urther
three years (2007-2010). This request has also
support rom the Norwegian ooperating
partners the coast Diretorate, SFT and PSA and
it was ormally presented to the Norwegian
Embassy in Hanoi at the end o 2005.
A third third party assessment o the projet, as
well as an evaluation o the request or ontinued
support was arrried out late 2006. The deision on
etension is epeted early 2007.
Given that unding is provided as proposed,
the ativities proposed or 2007 will be losely
mathed to the plans or implementation o HSE
management system in Petrovietnam, i.e develop-
ment o doument ontrol system, development
o HSE-assurane systems, and development o
maintenane management systems.