Sr No NAME OF ENTITIES NOS OF ABT METER INSTALLED L & T MAKE SEMS MAKE WALLABY MAKE 1 GSECL 252 87 165 0 2 UGVCL 102 0 102 0 3 MGVCL 80 0 80 0 4 DGVCL 73 0 73 0 5 PGVCL 259 194 65 0 6 CPP 41 5 36 0 7 MPP 95 95 0 0 8 IPP 101 16 85 0 9 MINI HYDEL 5 0 5 0 10 WF 101 92 9 0 11 SOLAR 126 32 87 7 12 BIOMASS 3 1 2 0 13 SECO 6 6 0 0 14 AECO 15 0 15 0 15 KPT 2 2 0 0 16 TEL-SEZ 1 1 0 0 17 RIL-SEZ 1 1 0 0 18 MUNDRA-SEZ 3 3 0 0 TOTAL 1266 535 724 7 Number of ABT Meters Installed as on July - 2013

Upload: danganh

Post on 18-Jun-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Sr NoNAME OF

ENTITIES

NOS OF ABT

METER

INSTALLED

L & T

MAKE

SEMS

MAKE

WALLABY

MAKE

1 GSECL 252 87 165 0

2 UGVCL 102 0 102 0

3 MGVCL 80 0 80 0

4 DGVCL 73 0 73 0

5 PGVCL 259 194 65 0

6 CPP 41 5 36 0

7 MPP 95 95 0 0

8 IPP 101 16 85 0

9 MINI HYDEL 5 0 5 0

10 WF 101 92 9 0

11 SOLAR 126 32 87 7

12 BIOMASS 3 1 2 0

13 SECO 6 6 0 0

14 AECO 15 0 15 0

15 KPT 2 2 0 0

16 TEL-SEZ 1 1 0 0

17 RIL-SEZ 1 1 0 0

18 MUNDRA-SEZ 3 3 0 0

TOTAL 1266 535 724 7

Number of ABT Meters Installed as on July - 2013

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

1 Dhuvaran TPS 132 KV Side of GT-1 at Dhuvaran TPS(S) DTP1GTS1 GJ-2245-B 600/5 132000/110

2 Dhuvaran TPS 132 KV Side of GT-2 at Dhuvaran TPS(S) DTP1GTS2 GJ-2246-B 600/5 132000/110

3 Dhuvaran TPS 132 KV Side of GT-3 at Dhuvaran TPS(S) DTP1GTS3 GJ-2247-B 600/5 132000/110

4 Dhuvaran TPS 132 KV Side of GT-4 at Dhuvaran TPS(S) DTP1GTS4 GJ-2248-B 600/5 132000/110

5 Dhuvaran TPS 132 KV Side of GT-5 at Dhuvaran TPS(S) DTP1GTS5 GJ-2234-B 1200/5 132000/110

6 Dhuvaran TPS 132 KV Side of GT-6 at Dhuvaran TPS(S) DTP1GTS6 GJ-2237-B 1200/5 132000/110

7 Dhuvaran TPS 132 KV Side OF 12.5 MVA SST-4 at Dhuvaran TPS(M) DTPSSTS4 GJ-2171-A 100/1 132000/110

8 Dhuvaran TPS 132 KV Side of SST-1 at Dhuvaran TPS(S) DTP1STS1 GJ-2226-B 100/5 132000/110

9 Dhuvaran TPS 132 KV Side of SST-2 at Dhuvaran TPS(S) DTP1STS2 GJ-2229-B 100/5 132000/110

10 Dhuvaran TPS 132 KV Side of SST-3 at Dhuvaran TPS(S) DTP1STS3 GJ-2238-B 300/5 132000/110

11 Dhuvaran TPS 132 KV BUS TIE Line -1 at Dhuvaran TPS (C) DTPBUTC1 GJ-2231-B 600/5 132000/110

12 Dhuvaran TPS 132 KV BUS TIE Line -2 at Dhuvaran TPS (C) DTPBUTC2 GJ-2244-B 600/5 132000/110

13 Dhuvaran TPS 132 KV BUS TIE Line -1 at Dhuvaran TPS (M) DTPBUTM1 GJ-2230-B 600/5 132000/110

14 Dhuvaran TPS 132 KV BUS TIE Line -2 at Dhuvaran TPS (M) DTPBUTM2 GJ-2241-B 600/5 132000/110

15 Dhuvaran TPS 132 KV Duvaran GBPS Line -1 at Dhuvaran TPS (C) DTPDGPC1 GJ-2217-B 600/5 132000/110

16 Dhuvaran TPS 132 KV Duvaran GBPS Line -2 at Dhuvaran TPS (C) DTPDGPC2 GJ-2220-B 600/5 132000/110

17 Dhuvaran TPS 132 KV Duvaran GBPS Line -1 at Dhuvaran TPS (M) DTPDGPM1 GJ-2216-B 600/5 132000/110

18 Dhuvaran TPS 132 KV Duvaran GBPS Line -2 at Dhuvaran TPS (M) DTPDGPM2 GJ-2219-B 600/5 132000/110

19 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -3 at Dhuvaran TPS (C) DTPDGPC3 GJ-2221-B 600/5 132000/110

20 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -4 at Dhuvaran TPS (C) DTPDGPC4 GJ-2223-B 600/5 132000/110

21 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -3 at Dhuvaran TPS (M) DTPDGPM3 GJ-2218-B 600/5 132000/110

22 Dhuvaran TPS 132 KV Dhuvaran GBPS Line -4 at Dhuvaran TPS (M) DTPDGPM4 GJ-2222-B 600/5 132000/110

23 Dhuvaran TPS 132 KV Undel Line -1 at Dhuvaran TPS (C) DTPUNDC1 GJ-2173-A 600/1 132000/110

24 Dhuvaran TPS 132 KV Undel Line -1 at Dhuvaran TPS (M) DTPUNDM1 GJ-2172-A 600/1 132000/110

25 Dhuvaran TPS 132 KV Vatva Line -1 at Dhuvaran TPS (C) DTPVATC1 GJ-2225-B 600/5 132000/110

26 Dhuvaran TPS 132 KV Vatva Line -2 at Dhuvaran TPS (C) DTPVATC2 GJ-2228-B 600/5 132000/110

27 Dhuvaran TPS 132 KV Vatva Line -1 at Dhuvaran TPS (M) DTPVATM1 GJ-2224-B 600/5 132000/110

28 Dhuvaran TPS 132 KV Vatva Line -2 at Dhuvaran TPS (M) DTPVATM2 GJ-2227-B 600/5 132000/110

29 Dhuvaran TPS 11 KV Colony line-1 at DTPS DTPCLNM1 GJ-2243-A 150/5 11000/110

30 Duvaran GPS 132 KV Side of GT -1 at Duvaran GBPS-1 (S) DGP1GTS1 GJ-2190-A 600/1 132000/110

31 Duvaran GPS 132 KV Side of GT -2 at Duvaran GBPS-2 (S) DGP1GTS2 GJ-2195-A 600/1 132000/110

32 Duvaran GPS 132 KV Side of STG -1 at Duvaran GBPS-1 (S) DGP1SGS1 GJ-2189-A 300/1 132000/110

33 Duvaran GPS 132 KV Side of STG -2 at Duvaran GBPS-2 (S) DGP1SGS2 GJ-2194-A 300/1 132000/110

34 Duvaran GPS 132 KV Dhandhuka line -1 at Duvaran GBPS (C) DGPDHAC1 GJ-2185-A 600/1 132000/110

35 Duvaran GPS 132 KV Dhandhuka line -2 at Duvaran GBPS (C) DGPDHAC2 GJ-2182-A 600/1 132000/110

36 Duvaran GPS 132 KV Dhandhuka line -1 at Duvaran GBPS (M) DGPDHAM1 GJ-2184-A 600/1 132000/110

Updated Details Of ABT Meters As On on JULY - 2013

METER INSTALLED IN GUJARAT STATE ELECTRICITY COMPANY LTD.

Page 2 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

37 Duvaran GPS 132 KV Dhandhuka line -2 at Duvaran GBPS (M) DGPDHAM2 GJ-2174-A 600/1 132000/110

38 Duvaran GPS 132 KV Dhuvaran TPS Line -1 at Duvaran GBPS (C) DGPDTPC1 GJ-2177-A 600/1 132000/110

39 Duvaran GPS 132 KV Dhuvaran TPS Line -2 at Duvaran GBPS (C) DGPDTPC2 GJ-2180-A 600/1 132000/110

40 Duvaran GPS 132 KV Dhuvaran TPS Line -3 at Duvaran GBPS (C) DGPDTPC3 GJ-2188-A 600/1 132000/110

41 Duvaran GPS 132 KV Dhuvaran TPS Line -4 at Duvaran GBPS (C) DGPDTPC4 GJ-2186-A 600/1 132000/110

42 Duvaran GPS 132 KV Dhuvaran TPS Line -1 at Duvaran GBPS (M) DGPDTPM1 GJ-2176-A 600/1 132000/110

43 Duvaran GPS 132 KV Dhuvaran TPS Line -2 at Duvaran GBPS (M) DGPDTPM2 GJ-2179-A 600/1 132000/110

44 Duvaran GPS 132 KV Dhuvaran TPS Line -3 at Duvaran GBPS (M) DGPDTPM3 GJ-2187-A 600/1 132000/110

45 Duvaran GPS 132 KV Dhuvaran TPS Line -4 at Duvaran GBPS (M) DGPDTPM4 GJ-2178-A 600/1 132000/110

46 Duvaran GPS 132 KV Limbadi line -1 at Duvaran GBPS (C) DGPLMDC1 GJ-2192-A 600/1 132000/110

47 Duvaran GPS 132 KV Limbadi line -2 at Duvaran GBPS (C) DGPLMDC2 GJ-2191-A 600/1 132000/110

48 Duvaran GPS 132 KV Limbadi line -1 at Duvaran GBPS (M) DGPLMDM1 GJ-2193-A 600/1 132000/110

49 Duvaran GPS 132 KV Limbadi line -2 at Duvaran GBPS (M) DGPLMDM2 GJ-2183-A 600/1 132000/110

50 Gandhinagar TPS220 KV Side of GT-1 at Gandhinagar TPS GTP2GTS1 GJ-0425-A 500/1 220000/110

51 Gandhinagar TPS220 KV Side of GT-2 at Gandhinagar TPS GTP2GTS2 GJ-0429-A 500/1 220000/110

52 Gandhinagar TPS220 KV Side of GT-3 at Gandhinagar TPS GTP2GTS3 GJ-0418-A 800/1 220000/110

53 Gandhinagar TPS220 KV Side of GT-4 at Gandhinagar TPS GTP2GTS4 GJ-0396-A 800/1 220000/110

54 Gandhinagar TPS220 KV Side of GT-5 at Gandhinagar TPS GTP2GTS5 GJ-0394-A 1000/1 220000/110

55 Gandhinagar TPS220 KV Side of ST-2A at Gandhinagar TPS GTP2SAS2 GJ-0393-A 100/1 220000/110

56 Gandhinagar TPS220 KV Side of ST-2B at Gandhinagar TPS GTP2SBS2 GJ-0422-A 100/1 220000/110

57 Gandhinagar TPS220 KV Side of ST-1 at Gandhinagar TPS GTP2STS1 GJ-0427-A 75/1 220000/110

58 Gandhinagar TPS220 KV Side of ST-3 at Gandhinagar TPS GTP2STS3 GJ-0417-A 100/1 220000/110

59 Gandhinagar TPS220 KV Chhagtral line -1 at Gandhinagar TPS(C) GTPCHHC1 GJ-0399-A 1000/1 220000/110

60 Gandhinagar TPS220 KV Chhatral Line -2 at Gandhinagar TPS(C) GTPCHHC2 GJ-0383-A 1000/1 220000/110

61 Gandhinagar TPS220 KV Chhatral Line -1 at Gandhinagar TPS(M) GTPCHHM1 GJ-0401-A 1000/1 220000/110

62 Gandhinagar TPS220 KV Chhatral Line -2 at Gandhinagar TPS(M) GTPCHHM2 GJ-0392-A 1000/1 220000/110

63 Gandhinagar TPS220 KV Jamla Line -1 at Gandhinagar TPS(C) GTPJMLC1 GJ-0420-A 1000/1 220000/110

64 Gandhinagar TPS220 KV Jamla Line -2 at Gandhinagar TPS(C) GTPJMLC2 GJ-0395-A 1000/1 220000/110

65 Gandhinagar TPS220 KV Jamla Line -1 at Gandhinagar TPS(M) GTPJMLM1 GJ-0415-A 1000/1 220000/110

66 Gandhinagar TPS220 KV Jamla Line -2 at Gandhinagar TPS(M) GTPJMLM2 GJ-0416-A 1000/1 220000/110

67 Gandhinagar TPS220 KV Mehsana Line -1 at Gandhinagar TPS(C) GTPMSNC1 GJ-0419-A 1000/1 220000/110

68 Gandhinagar TPS220 KV Mehsana Line -2 at Gandhinagar TPS(C) GTPMSNC2 GJ-0414-A 1000/1 220000/110

69 Gandhinagar TPS220 KV Mehsana Line -1 at Gandhinagar TPS(M) GTPMSNM1 GJ-0421-A 1000/1 220000/110

70 Gandhinagar TPS220 KV Mehsana Line -2 at Gandhinagar TPS(M) GTPMSNM2 GJ-0424-A 1000/1 220000/110

71 Gandhinagar TPS220 KV Ranasan Line -1 at Gandhinagar TPS(C) GTPRSNC1 GJ-0382-A 1000/1 220000/110

72 Gandhinagar TPS220 KV Ranasan Line -2 at Gandhinagar TPS(C) GTPRSNC2 GJ-0384-A 1000/1 220000/110

73 Gandhinagar TPS220 KV Ranasan Line -1 at Gandhinagar TPS(M) GTPRSNM1 GJ-0430-A 1000/1 220000/110

74 Gandhinagar TPS220 KV Ranasan Line -2 at Gandhinagar TPS(M) GTPRSNM2 GJ-0400-A 1000/1 220000/110

75 Gandhinagar TPS220 KV Soja Line -1 at Gandhinagar TPS(C) GTPSOJC1 GJ-0428-A 1000/1 220000/110

76 Gandhinagar TPS220 KV Soja Line -2 at Gandhinagar TPS(C) GTPSOJC2 GJ-0397-A 1000/1 220000/110

77 Gandhinagar TPS220 KV Soja Line -1 at Gandhinagar TPS(M) GTPSOJM1 GJ-0426-A 1000/1 220000/110

78 Gandhinagar TPS220 KV Soja Line -2 at Gandhinagar TPS(M) GTPSOJM2 GJ-0398-A 1000/1 220000/110

79 Kachchh TPS 220 KV Side of GT-1 at Kachchh TPS(S) KTP2GTS1 GJ-2039-A 300/1 220000/110

80 Kachchh TPS 220 KV Side of GT-2 at Kachchh TPS(S) KTP2GTS2 GJ-2040-A 300/1 220000/110

81 Kachchh TPS 220 KV Side of GT-3 at Kachchh TPS(S) KTP2GTS3 GJ-2041-A 300/1 220000/110

82 Kachchh TPS 220 KV Side of GT-4 at Kachchh TPS(S) KTP2GTS4 GJ-0709-A 300/1 220000/110

83 Kachchh TPS 220 KV Side of ICT-1 at Kachchh TPS(M) KTP2ICM1 GJ-2045-A 150/1 220000/110

84 Kachchh TPS 220 KV Side of ST-1 at Kachchh TPS(S) KTP2STS1 GJ-2043-A 150/1 220000/110

85 Kachchh TPS 220 KV Side of ST-2 at Kachchh TPS(S) KTP2STS2 GJ-2044-A 150/1 220000/110

86 Kachchh TPS 66 KV Side of ICT-1 at Kachchh TPS(S) KTP6ICS1 GJ-2046-A 600/1 66000/110

87 Kachchh TPS 220 KV Kukma Line -1 at Kachchh TPS (C) KTPKUKC1 GJ-2050-A 600/1 220000/110

88 Kachchh TPS 220 KV Kukma Line -2 at Kachchh TPS (C) KTPKUKC2 GJ-2058-A 600/1 220000/110

89 Kachchh TPS 220 KV Kukma Line -1 at Kachchh TPS (M) KTPKUKM1 GJ-2047-A 600/1 220000/110

90 Kachchh TPS 220 KV Kukma Line -2 at Kachchh TPS (M) KTPKUKM2 GJ-2056-A 600/1 220000/110

91 Kachchh TPS 220 KV Akrimota TPS Line -1 at Kachchh TPS (C) KTPATPC1 GJ-2057-A 600/1 220000/110

92 Kachchh TPS 220 KV Akrimota TPS Line -2 at Kachchh TPS (C) KTPATPC2 GJ-2058-A 600/1 220000/110

93 Kachchh TPS 220 KV Akrimota TPS Line -1 at Kachchh TPS (M) KTPATPM1 GJ-2055-A 600/1 220000/110

Page 3 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

94 Kachchh TPS 220 KV Akrimota TPS Line -2 at Kachchh TPS (M) KTPATPM2 GJ-2056-A 600/1 220000/110

95 Kachchh TPS 220 KV Nakhatrana Line -1 at Kachchh TPS (C) KTPNKTC1 GJ-2052-A 600/1 220000/110

96 Kachchh TPS 220 KV Nakhatrana Line -2 at Kachchh TPS (C) KTPNKTC2 GJ-2054-A 600/1 220000/110

97 Kachchh TPS 220 KV Nakhatrana Line -1 at Kachchh TPS (M) KTPNKTM1 GJ-2049-A 600/1 220000/110

98 Kachchh TPS 220 KV Nakhatrana Line -2 at Kachchh TPS (M) KTPNKTM2 GJ-2053-A 600/1 220000/110

99 Kadana (Hyd) 220 KV Side of GT-1 at Kadana(S) KHP2GTS1 GJ-0576-A 200/1 220000/110

100 Kadana (Hyd) 220 KV Side of GT-2 at Kadana(S) KHP2GTS2 GJ-0577-A 200/1 220000/110

101 Kadana (Hyd) 220 KV Side of GT-3 at Kadana(S) KHP2GTS3 GJ-0578-A 200/1 220000/110

102 Kadana (Hyd) 220 KV Side of GT-4 at Kadana(S) KHP2GTS4 GJ-0579-A 200/1 220000/110

103 Kadana (Hyd) 220 KV Side of SST-1 at Kadana(S) KHP2STS1 GJ-0580-A 200/1 220000/110

104 Kadana (Hyd) 220 KV Dhansura line-1 at Kadana HPS(C) KHPDHNC1 GJ-0573-A 800/1 220000/110

105 Kadana (Hyd) 220 KV Dhansura line-2 at Kadana HPS(C) KHPDHNC2 GJ-0575-A 800/1 220000/110

106 Kadana (Hyd) 220 KV Dhansura line-1 at Kadana HPS(M) KHPDHNM1 GJ-0500-A 800/1 220000/110

107 Kadana (Hyd) 220 KV Dhansura line-2 at Kadana HPS(M) KHPDHNM2 GJ-0574-A 800/1 220000/110

108 Kadana (Hyd) 220 KV Godhara line-1 at Kadana HPS(C) KHPGDHC1 GJ-0469-A 800/1 220000/110

109 Kadana (Hyd) 220 KV Godhara line-1 at Kadana HPS(M) KHPGDHM1 GJ-0468-A 800/1 220000/110

110 Kadana (Hyd) 220 KV Sausad na Muvada line no.2 at Kadana M2 KHPSUDM2 GJ-0571-A 800/1 220000/110

111 Kadana (Hyd) 220 KV Sausad na Muvada line no.2 at Kadana C2 KHPSUDC2 GJ-0572-A 800/1 220000/100

112 Panam 11 KV Shehra line-1 at Panam LBPH(C) PANSHRC1 GJ-0007-B 300/5 11000/110

113 Panam 11 KV Shehra line-1 at Panam LBPH(M) PANSHRM1 GJ-0010-B 300/5 11000/110

114 Sikka TPS 132 KV Side of GT-1 at Sikka TPS(S) STP1GTS1 GJ-2061-A 1000/1 132000/110

115 Sikka TPS 132 KV Side of GT-2 at Sikka TPS(S) STP1GTS2 GJ-2062-A 1000/1 132000/110

116 Sikka TPS 132 KV Side of ICT-1 at Sikka TPS(M) STP1ICM1 GJ-2077-A 300/1 132000/110

117 Sikka TPS 132 KV Side of SST-1 at Sikka TPS(S) STP1STS1 GJ-2063-A 150/1 132000/110

118 Sikka TPS 132 KV Side of SST-2 at Sikka TPS(S) STP1STS2 GJ-2064-A 150/1 132000/110

119 Sikka TPS 66 KV Side of ICT-1 at Sikka TPS(S) STP6ICS1 GJ-2078-A 600/1 66000/110

120 Sikka TPS 132 KV Bhatia Line - 1 at Sikka TPS(C) STPBHTC1 GJ-2066-A 1000/1 132000/110

121 Sikka TPS 132 KV Bhatia Line - 1 at Sikka TPS(M) STPBHTM1 GJ-2065-A 1000/1 132000/110

122 Sikka TPS 132 KV Dhrol Line - 1 at Sikka TPS(C) STPDHLC1 GJ-2070-A 1000/1 132000/110

123 Sikka TPS 132 KV Jamnagar Line - 2 at Sikka TPS(C) STPJMNC2 GJ-2072-A 1000/1 132000/110

124 Sikka TPS 132 KV Dhrol Line - 1 at Sikka TPS(M) STPDHLM1 GJ-2069-A 1000/1 132000/110

125 Sikka TPS 132 KV Jamnagar Line - 2 at Sikka TPS(M) STPJMNM2 GJ-2071-A 1000/1 132000/110

126 Sikka TPS 132 KV Nagedi Line - 1 at Sikka TPS(C) STPNGDC1 GJ-2076-A 1000/1 132000/110

127 Sikka TPS 132 KV Nagedi Line - 1 at Sikka TPS(M) STPNGDM1 GJ-2075-A 1000/1 132000/110

128 Sikka TPS 132 KV Bhomiyavdar Line - 1 at Sikka TPS(C) STPBHMC1 GJ-2068-A 1000/1 132000/110

129 Sikka TPS 132KV Bhomiyavdar line no.1 at Sikka STPBHMM1 GJ-2067-A 1000/1 132000/110

130 Sikka TPS 132 KV RPL Line - 1 at Sikka TPS(C) STPRPLC1 GJ-2074-A 1000/1 132000/110

131 Sikka TPS 132 KV RPL Line - 1 at Sikka TPS(M) STPRPLM1 GJ-2073-A 1000/1 132000/110

132 Ukai (Mini Hyd) 66KV Side of GT-1 at LBCHP Ukai(S) LBC6GTS1 GJ-0064-A 75/1 66000/110

133 Ukai (Mini Hyd) 66 KV Side of GT-2 at LBCHP Ukai(S) LBC6GTS2 GJ-0069-A 75/1 66000/110

134 Ukai (Mini Hyd) 66kV UHPS line-1 at LBCHP Ukai (C) LBCUHPC1 GJ-0073-A 75/1 66000/110

135 Ukai (Mini Hyd) 66kV UHPS line-2 at LBCHP Ukai (C) LBCUHPC2 GJ-0072-A 75/1 66000/110

136 Ukai (Mini Hyd) 66kV UHPS line-1 at LBCHP Ukai (M) LBCUHPM1 GJ-0070-A 75/1 66000/110

137 Ukai (Mini Hyd) 66kV UHPS line-2 at LBCHP Ukai (M) LBCUHPM2 GJ-0071-A 75/1 66000/110

138 Ukai Hydro 220 KV Side of GT-1 at Ukai Hydro UHP2GTS1 GJ-0065-A 500/1 220000/110

139 Ukai Hydro 220 KV Side of GT-2 at Ukai Hydro UHP2GTS2 GJ-0066-A 500/1 220000/110

140 Ukai Hydro 220 KV Side of GT-3 at Ukai Hydro UHP2GTS3 GJ-0067-A 500/1 220000/110

141 Ukai Hydro 220 KV Side of GT-4 at Ukai Hydro UHP2GTS4 GJ-0068-A 500/1 220000/110

142 Ukai Hydro 220 KV Side of ICT-1at Ukai Hydro UHP2ICS1 GJ-0084-A 500/1 220000/110

143 Ukai Hydro 220 KV Side of ICT-2 at Ukai Hydro UHP2ICS2 GJ-0085-A 500/1 220000/110

144 Ukai Hydro 66 KV Side of ICT-1 at Ukai Hydro UHP6ICS1 GJ-0134-A 600/1 66000/110

145 Ukai Hydro 66 KV Side of ICT-2 at Ukai Hydro UHP6ICS2 GJ-0135-A 600/1 66000/110

146 Ukai Hydro 220 KV Achhslia line-1 at Ukai Hydro (C) UHPACHC1 GJ-0091-A 1000/1 220000/110

147 Ukai Hydro 220 KV Achhalia line-2 at Ukai Hydro (C) UHPACHC2 GJ-0093-A 1000/1 220000/110

Page 4 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

148 Ukai Hydro 220 KV Achhalia line-1 at Ukai Hydro (M) UHPACHM1 GJ-0088-A 1000/1 220000/110

149 Ukai Hydro 220 KV Achhalia line-2 at Ukai Hydro(M) UHPACHM2 GJ-0092-A 1000/1 220000/110

150 Ukai Hydro 11 KV Colony line-1 at UHPS UHPCLNM1 GJ-0136-A 200/1 11000/110

151 Ukai Hydro 11 KV Dam line-1 at UHPS UHPDAMM1 GJ-0137-A 100/1 11000/110

152 Ukai Hydro 220 KV Ukai TPS line-1 at Ukai Hydro(C) UHPUTPC1 GJ-0087-A 1000/1 220000/110

153 Ukai Hydro 220 KV Ukai TPS line-2 at Ukai Hydro (C) UHPUTPC2 GJ-0090-A 1000/1 220000/110

154 Ukai Hydro 220 KV Ukai TPS line-1 at Ukai Hydro (M) UHPUTPM1 GJ-0086-A 1000/1 220000/110

155 Ukai Hydro 220 KV Ukai TPS line-2 at Ukai Hydro (M) UHPUTPM2 GJ-0089-A 1000/1 220000/110

156 Ukai Hydro 66 KV Side of (AUX 66/11)ICT-3 at Ukai Hydro(M) UHP6ICM3 GJ-0005-A 100/1 66000/110

157 Ukai Hydro 66 KV Side of (AUX 66/11)ICT-4 at Ukai Hydro(M) UHP6ICM4 GJ-0004-A 100/1 66000/110

158 Ukai TPS 220kV Side of GT-1 at Ukai TPS UTP2GTS1 GJ-0120-A 500/1 220000/110

159 Ukai TPS 220 KV Side of GT-2 at Ukai TPS UTP2GTS2 GJ-0121-A 500/1 220000/110

160 Ukai TPS 220 KV Side of GT-3 at Ukai TPS UTP2GTS3 GJ-0122-A 1000/1 220000/110

161 Ukai TPS 220 KV Side of GT-4 at Ukai TPS UTP2GTS4 GJ-0123-A 1000/1 220000/110

162 Ukai TPS 220 KV Side of GT-5 at Ukai TPS UTP2GTS5 GJ-0151-A 1000/1 220000/110

163 Ukai TPS 220 KV Side of ICT-1 at Ukai TPS UTP2ICS1 GJ-0118-A 1000/1 220000/110

164 Ukai TPS 220 KV Side of SST-1 at Ukai TPS UTP2STS1 GJ-0150-A 75/1 220000/110

165 Ukai TPS 220 KV Side of SST-2at Ukai TPS UTP2STS2 GJ-0119-A 75/1 220000/110

166 Ukai TPS 220 KV Side of SST-3 at Ukai TPS UTP2STS3 GJ-0154-A 75/1 220000/110

167 Ukai TPS 400 KV Side of ICT-1 at Ukai TPS UTP4ICM1 GJ-0149-A 500/1 400000/110

168 Ukai TPS 220 KV Achhalia line-1 at Ukai TPS(C) UTPACHC1 GJ-0029-A 1000/1 220000/110

169 Ukai TPS 220 KV Achhalia line-2 at Ukai TPS(C) UTPACHC2 GJ-0031-A 1000/1 220000/110

170 Ukai TPS 220 KV Achhalia line-3 at Ukai TPS(C) UTPACHC3 GJ-0117-A 1000/1 220000/110

171 Ukai TPS 220 KV Achhalia line-1 at Ukai TPS(M) UTPACHM1 GJ-0026-A 1000/1 220000/110

172 Ukai TPS 220 KV Achhalia line-2 at Ukai TPS(M) UTPACHM2 GJ-0030-A 1000/1 220000/110

173 Ukai TPS 220 KV Achhalia line-3 at Ukai TPS(M) UTPACHM3 GJ-0114-A 1000/1 220000/110

174 Ukai TPS 220 KV Mota line-2 at Ukai TPS(C) UTPMOTC2 GJ-0116-A 1000/1 220000/110

175 Ukai TPS 220 KV Mota line-2 at Ukai TPS(M) UTPMOTM2 GJ-0115-A 1000/1 220000/110

176 Ukai TPS 220 KV Ukai(Hy) line-1 at Ukai TPS(C) UTPUHPC1 GJ-0025-A 1000/1 220000/110

177 Ukai TPS 220 KV Ukai(Hy) line-2 at Ukai TPS(C) UTPUHPC2 GJ-0028-A 1000/1 220000/110

178 Ukai TPS 220 KV Ukai(Hy) line-1 at Ukai TPS(M) UTPUHPM1 GJ-0024-A 1000/1 220000/110

179 Ukai TPS 220 KV Ukai(Hy) line-2 at Ukai TPS(M) UTPUHPM2 GJ-0027-A 1000/1 220000/110

180 Ukai TPS 220 KV Mota line-1 at Ukai TPS(C) UTPMOTC1 GJ-0033-A 1000/1 220000/110

181 Ukai TPS 220 KV Mota line-1 at Ukai TPS(M) UTPMOTM1 GJ-0032-A 1000/1 220000/110

182 Ukai TPS 400 KV Kosmaba line -1 at Ukai TPS (M) UTPKOSM1 GJ-0568-A 1000/1 400000/110

183 Ukai TPS 400 KV Kosmaba line -1 at Ukai TPS (M) UTPKOSC1 GJ-0569-A 1000/1 400000/110

184 Ukai TPS 400 KV Kosmaba line -2 at Ukai TPS (M) UTPKOSM1 GJ-1298-A 1000/1 400000/110

185 Ukai TPS 400 KV Kosmaba line -2 at Ukai TPS (M) UTPKOSC2 GJ-1306-A 1000/1 400000/110

186 Ukai TPS 220 KV Side of SST-4 at Ukai TPS UTP2STS4 GJ-1296-A 300/1 220000/110

187 Ukai TPS 400KV Side of GT-6 at Ukai TPS UTP4GTS6 GJ-1226-A 1000/1 400000/110

188 Ukai TPS 400KV Side of ST-5 at Ukai TPS UTP4STS5 GJ-1292-A 500/1 400000/110

189 Utran GBPS-I 220 KV Side of GT-1 at UTRAN GBPS UGP2GTS1 GJ-0079-A 200/1 220000/110

190 Utran GBPS-I 220 KV Side of GT-2 at UTRAN GBPS UGP2GTS2 GJ-0080-A 200/1 220000/110

191 Utran GBPS-I 220 KV Side of GT-3 at UTRAN GBPS UGP2GTS3 GJ-0131-A 200/1 220000/110

192 Utran GBPS-I 220 KV Side of ICT-1 at UTRAN GBPS(M) UGP2ICM1 GJ-0124-A 300/1 220000/110

193 Utran GBPS-I 220 KV Side of ICT-2 at UTRAN GBPS(M) UGP2ICM2 GJ-0125-A 500/1 220000/110

194 Utran GBPS-I 220 KV Side of ICT-3 at UTRAN GBPS(M) UGP2ICM3 GJ-0126-A 300/1 220000/110

195 Utran GBPS-I 220 KV Side of STG-1 at UTRAN GBPS UGP2SGS1 GJ-0132-A 200/1 220000/110

196 Utran GBPS-I 220 KV Side of SST-1 at UTRAN GBPS UGP2STS1 GJ-0076-A 100/1 220000/110

197 Utran GBPS-I 66 KV Side of ICT-1 at UTRAN GBPS(C) UGP6ICC1 GJ-0074-A 1200/1 66000/110

198 Utran GBPS-I 66 KV Side of ICT-2 at UTRAN GBPS(C) UGP6ICC2 GJ-0075-A 1200/1 66000/110

199 Utran GBPS-I 66 KV Side of ICT-3 at UTRAN GBPS(C) UGP6ICC3 GJ-0142-A 1200/1 66000/110

Page 5 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

200 Utran GBPS-I 220 KV Kim line-1 at UTRAN GBPS(C) UGPKIMC1 GJ-0039-A 500/1 220000/110

201 Utran GBPS-I 220 KV Kim line-2 at UTRAN GBPS(C) UGPKIMC2 GJ-0040-A 500/1 220000/110

202 Utran GBPS-I 220 KV Kim line-1 at UTRAN GBPS(M) UGPKIMM1 GJ-0129-A 500/1 220000/110

203 Utran GBPS-I 220 KV Kim line-2 at UTRAN GBPS(M) UGPKIMM2 GJ-0130-A 500/1 220000/110

204 Utran GBPS-I Interconnecting Line-1 (M) at Utran-II UGPUG2M1 GJ-0582-A 500/1 220000/110

205 Utran GBPS-I Interconnecting Line-1 (C) at Utran-II UGPUG2C1 GJ-0584-A 500/1 220000/110

206 Utran GBPS-I Interconnecting Line-2 (M) at Utran-II UGPUG2M2 GJ-0583-A 500/1 220000/110

207 Utran GBPS-I Interconnecting Line-2 (C) at Utran-II UGPUG2C2 GJ-0585-A 500/1 220000/110

208 Utran GBPS-I 66 KV Side of 10 MVA 66/11 KV ICT at UTRAN GBPS(M) UGP6ICS1 GJ-0109-A 100/1 220000/110

209 Utran GBPS-I 66 KV Side of 15 MVA 66/11 KV ICT at UTRAN GBPS(M) UGP6ICS2 GJ-0504-A 150/1 220000/110

210 Utran-GBPS-II 220 KV side of STG-1 UG22SGS1 GJ-0556-A 1000/1 220000/110

211 Utran-GBPS-II 220 KV side of GTG-1 UG22GTS1 GJ-0554-A 1000/1 220000/110

212 Utran-GBPS-II 220 KV Vav Line-1 at Utran-II (M) UG2VAVM2 GJ-0535-A 1000/1 220000/110

213 Utran-GBPS-II 220 KV Vav Line-1 at Utran-II (C) UG2VAVC2 GJ-0536-A 1000/1 220000/110

214 Utran-GBPS-II Interconnecting Line-1 (M) at Utran-I UG2UGPM1 GJ-0531-A 1000/1 220000/110

215 Utran-GBPS-II Interconnecting Line-1 (C) at Utran-I UG2UGPC1 GJ-0532-A 1000/1 220000/110

216 Utran-GBPS-II Interconnecting Line-2 (M) at Utran-I UG2UGPM2 GJ-0501-A 1000/1 220000/110

217 Utran-GBPS-II Interconnecting Line-2 (C) at Utran-I UG2UGPC2 GJ-0502-A 1000/1 220000/110

218 Utran-GBPS-II 220 KV Kosamba line-1 at Utran-II (M) UG2KOSM1 GJ-0533-A 1000/1 220000/110

219 Utran-GBPS-II 220 KV Kosamba line-1 at Utran-II (C) UG2KOSC1 GJ-0534-A 1000/1 220000/110

220 Wanakbori TPS 220 KV Side of GT-1 at Wanakbori TPS WTP2GTS1 GJ-0280-A 1000/1 220000/110

221 Wanakbori TPS 220 KV Side of GT-2 at Wanakbori TPS WTP2GTS2 GJ-0281-A 1000/1 220000/110

222 Wanakbori TPS 220 KV Side of GT-3 at Wanakbori TPS WTP2GTS3 GJ-0282-A 1000/1 220000/110

223 Wanakbori TPS 220 KV Side of ICT-1 at Wanakbori TPS WTP2ICS1 GJ-0279-A 1000/1 220000/110

224 Wanakbori TPS 220 KV Side of ST-1 at Wanakbori TPS WTP2STS1 GJ-0340-A 100/1 220000/110

225 Wanakbori TPS 220 KV Side of ST-2 at Wanakbori TPS WTP2STS2 GJ-0341-A 100/1 220000/110

226 Wanakbori TPS 220 KV Side of ST-3 at Wanakbori TPS WTP2STS3 GJ-0342-A 100/1 220000/110

227 Wanakbori TPS 220 KV Side of ST-4 at Wanakbori TPS WTP2STS4 GJ-0343-A 100/1 220000/110

228 Wanakbori TPS 400 KV side of GT-4 at Wanakbori TPS WTP4GTS4 GJ-0283-A 500/1 400000/110

229 Wanakbori TPS 400 KV side of GT-5 at Wanakbori TPS WTP4GTS5 GJ-0334-A 500/1 400000/110

230 Wanakbori TPS 400 KV side of GT-6 at Wanakbori TPS WTP4GTS6 GJ-0325-A 500/1 400000/110

231 Wanakbori TPS 400 KV side of GT-7 at Wanakbori TPS WTP4GTS7 GJ-0326-A 500/1 400000/110

232 Wanakbori TPS 400 KV side of ICT-1 at Wanakbori TPS(M) WTP4ICM1 GJ-0333-A 500/1 400000/110

233 Wanakbori TPS 400 KV Asoj line-1 at Wanakbori TPS(C) WTPAS4C1 GJ-0330-A 1000/1 400000/110

234 Wanakbori TPS 400 KV Asoj line-1 at Wanakbori TPS(M) WTPAS4M1 GJ-0327-A 1000/1 400000/110

235 Wanakbori TPS 220 KV Asoj line-1 at Wanakbori TPS(C) WTPASOC1 GJ-0269-A 1000/1 220000/110

236 Wanakbori TPS 220 KV Asoj line-2 at Wanakbori TPS(C) WTPASOC2 GJ-0270-A 1000/1 220000/110

237 Wanakbori TPS 220 KV Asoj line-1 at Wanakbori TPS(M) WTPASOM1 GJ-0266-A 1000/1 220000/110

238 Wanakbori TPS 220 KV Asoj line-2 at Wanakbori TPS(M) WTPASOM2 GJ-0267-A 1000/1 220000/110

239 Wanakbori TPS 400 KV Dehgam line-1 at Wanakbori TPS(C) WTPDEHC1 GJ-0331-A 1000/1 400000/110

240 Wanakbori TPS 400 KV Dehgam line-1 at Wanakbori TPS(M) WTPDEHM1 GJ-0328-A 1000/1 400000/110

241 Wanakbori TPS 220 KV Dhansura line-1 at Wanakbori TPS(C) WTPDHNC1 GJ-0277-A 1000/1 220000/110

242 Wanakbori TPS 220 KV Dhansura line-2 at Wanakbori TPS(C) WTPDHNC2 GJ-0278-A 1000/1 220000/110

243 Wanakbori TPS 220 KV Dhansura line-1 at Wanakbori TPS(M) WTPDHNM1 GJ-0274-A 1000/1 220000/110

244 Wanakbori TPS 220 KV Dhansura line-2 at Wanakbori TPS(M) WTPDHNM2 GJ-0275-A 1000/1 220000/110

245 Wanakbori TPS 220 KV Godhra line-1 at Wanakbori TPS(C) WTPGDHC1 GJ-0268-A 1000/1 220000/110

246 Wanakbori TPS 220 KV Godhra line-1 at Wanakbori TPS(M) WTPGDHM1 GJ-0265-A 1000/1 220000/110

247 Wanakbori TPS 220 KV Kapadwanj line-1 at Wanakbori TPS(C) WTPKPDC1 GJ-0276-A 1000/1 220000/110

248 Wanakbori TPS 220 KV Kapadwanj line-1 at Wanakbori TPS(M) WTPKPDM1 GJ-0273-A 1000/1 220000/110

Page 6 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

249 Wanakbori TPS 220 KV Kapadwanj line-2 at Wanakbori TPS(C) WTPKPDC2 GJ-0272-A 1000/1 220000/110

250 Wanakbori TPS 220 KV Kapadwanj line-2 at Wanakbori TPS(M) WTPKPDM2 GJ-0271-A 1000/1 220000/110

251 Wanakbori TPS 400 KV Soja line-1 at Wanakbori TPS(C) WTPSOJC1 GJ-0332-A 1000/1 400000/110

252 Wanakbori TPS 400 KV Soja line-1 at Wanakbori TPS(M) WTPSOJM1 GJ-0329-A 1000/1 400000/110

1 Akrimota TPS 220 KV Side of GT-1 at Akrimota TPS(S) ATP2GTS1 GJ-2169-A 1000/1 220000/110

2 Akrimota TPS 220 KV Side of GT-2 at Akrimota TPS(S) ATP2GTS2 GJ-2170-A 1000/1 220000/110

3 Akrimota TPS 220 KV Kachchh TPS line-1 at Akrimota TPS(C) ATPKTPC1 GJ-2168-A 500/1 220000/110

4 Akrimota TPS 220 KV Kachchh TPS line-1 at Akrimota TPS(M) ATPKTPM1 GJ-2167-A 500/1 220000/110

5 Akrimota TPS 220 KV Nakhatrana line-1 at Akrimota TPS(C) ATPNKTC1 GJ-2162-A 500/1 220000/110

6 Akrimota TPS 220 KV Jamanvada wind farm line-1 at Akrimota(C) ATPJMVC1 GJ-2165-A 500/1 220000/110

7 Akrimota TPS 220 KV Nakhatrana line-1 at Akrimota TPS(M) ATPNKTM1 GJ-2161-A 500/1 220000/110

8 Akrimota TPS 220 KV Jamanvada wind farm line-1 at Akrimota ATPJMVM1 GJ-2164-A 500/1 220000/110

9 Essar 220 KV Side of GT-1 at Essar-1 (S) ESR2GTS1 GJ-0047-A 400/1 220000/110

10 Essar 220 KV Side of GT-2 at Essar -1 (S) ESR2GTS2 GJ-0048-A 400/1 220000/110

11 Essar 220 KV Side of GT-3 at Essar -1 (S) ESR2GTS3 GJ-0051-A 400/1 220000/110

12 Essar 220 KV Side of STG-1 at Essar -1 (S) ESR2SGS1 GJ-0052-A 800/1 220000/110

13 Essar 220 KV Ichchhapur line-1 at Essar (M) ESRICHM1 GJ-0016-A 400/1 220000/110

14 Essar 220 KV Ichchhapur line-2 at Essar (M) ESRICHM2 GJ-0019-A 400/1 220000/110

15 Essar 220 KV Sachin(Talangpur) line-1 at Essar(C) ESRSCNC1 GJ-0015-A 400/1 220000/110

16 Essar 220 KV Sachin(Talangpur) line-2 at Essar(C) ESRSCNC2 GJ-0018-A 400/1 220000/110

17 Essar 220 KV Sachin(Talangpur) line-1 at Essar(M) ESRSCNM1 GJ-0014-A 400/1 220000/110

18 Essar 220 KV Sachin(Talangpur) line-2 at Essar(M) ESRSCNM2 GJ-0017-A 400/1 220000/110

19 Essar 220 KV Ichchhapur line-1 at Essar (C) ESRICHC1 GJ-0503-A 400/1 220000/110

20 Essar 220 KV Ichchhapur line-2 at Essar (C) ESRICHC2 GJ-0505-A 400/1 220000/110

21 Essar 220 KV Side of SST (16 MVA)-1 at Essar Power ESR2STS1 GJ-0596-A 75/1 220000/110

22 Essar 220 KV Side of SST (16 MVA)-2 at Essar Power ESR2STS2 GJ-0597-A 75/1 220000/110

23 GIPCL-1 132 KV Side of GT-1 at GIPCL-1(S) GPL1GTS1 GJ-0515-A 250/1 132000/110

24 GIPCL-1 132 KV Side of GT-2 at GIPCL-1(S) GPL1GTS2 GJ-0516-A 250/1 132000/110

25 GIPCL-1 132 KV Side of GT-3 at GIPCL-1(S) GPL1GTS3 GJ-0517-A 250/1 132000/110

26 GIPCL-1 132 KV Side of STG-1 at GIPCL-1(S) GPL1SGS1 GJ-0518-A 400/1 132000/110

27 GIPCL-1 132 KV Nandesari line-1 at GIPCL(C) GPLNSRC1 GJ-0512-A 1000/1 132000/110

28 GIPCL-1 132 KV Nandesari line-2 at GIPCL(C) GPLNSRC2 GJ-0514-A 1000/1 132000/110

29 GIPCL-1 132 KV Nandesari line-1 at GIPCL(M) GPLNSRM1 GJ-0511-A 1000/1 132000/110

30 GIPCL-1 132 KV Nandesari line-2 at GIPCL(M) GPLNSRM2 GJ-0513-A 1000/1 132000/110

31 GIPCL-2 132 KV Side of GT-4 at GIPCL-2(S) GPL1GTS4 GJ-0478-A 1000/1 132000/110

32 GIPCL-2 132 KV Side of STG-2 at GIPCL-2(S) GPL1SGS2 GJ-0479-A 400/1 132000/110

33 GIPCL-2 132 KV Jawaharnagar line-3 at GIPCL(C) GPLJWNC3 GJ-0473-A 1000/1 132000/110

34 GIPCL-2 132 KV Jawaharnagar line-4 at GIPCL(C) GPLJWNC4 GJ-0475-A 1000/1 132000/110

35 GIPCL-2 132 KV Jawaharnagar line-3 at GIPCL(M) GPLJWNM3 GJ-0472-A 1000/1 132000/110

36 GIPCL-2 132 KV Jawaharnagar line-4 at GIPCL(M) GPLJWNM4 GJ-0474-A 1000/1 132000/110

37 GPEC 220 KV Halderva Line -1 at GPEC(IPP) (C) GPEHALC1 GJ-0197-A 1200/1 220000/110

38 GPEC 220 KV Halderva Line -2 at GPEC(IPP) (C) GPEHALC2 GJ-0205-A 1200/1 220000/110

39 GPEC 220 KV Halderva Line -1 at GPEC(IPP) (M) GPEHALM1 GJ-0202-A 1200/1 220000/110

40 GPEC 220 KV Halderva Line -2 at GPEC(IPP) (M) GPEHALM2 GJ-0203-A 1200/1 220000/110

41 GPEC 220 KV IBT Line -1 at GPEC(IPP) (C) GPEIBTC1 GJ-0206-A 1600/1 220000/110

42 GPEC 220 KV IBT Line -1 at GPEC(IPP) (M) GPEIBTM1 GJ-0204-A 1600/1 220000/110

43 GPEC 220 KV Karamsad Line -1 at GPEC(IPP) (C) GPEKRMC1 GJ-0195-A 1200/1 220000/110

44 GPEC 220 KV Karamsad Line -2 at GPEC(IPP) (C) GPEKRMC2 GJ-0196-A 1200/1 220000/110

45 GPEC 220 KV Karamsad Line -1 at GPEC(IPP) (M) GPEKRMM1 GJ-0186-A 1200/1 220000/110

46 GPEC 220 KV Karamsad Line -2 at GPEC(IPP) (M) GPEKRMM2 GJ-0187-A 1200/1 220000/110

47 GPEC 220 KV Side of GT-1 at GPEC (S) GPE2GTS1 GJ-0207-A 1200/1 220000/110

48 GPEC 220 KV Side of GT-2 at GPEC (S) GPE2GTS2 GJ-0208-A 1200/1 220000/110

49 GPEC 220 KV Side of GT-3 at GPEC (S) GPE2GTS3 GJ-0209-A 1200/1 220000/110

50 GPEC 220 KV Side of STG-1 at GPEC (S) GPE2SGS1 GJ-0214-A 1600/1 220000/110

51 GSEG 220 KV Side of GT - 1 at GSEG(S) GSG2GTS1 GJ-0156-A 200/1 220000/110

52 GSEG 220 KV Side of GT - 2 at GSEG(S) GSG2GTS2 GJ-0157-A 200/1 220000/110

53 GSEG 220 KV Side of STG - 1 at GSEG(S) GSG2SGS1 GJ-0158-A 200/1 220000/110

54 GSEG 220 KV Kim line - 1 at GSEG(C) GSGKIMC1 GJ-0043-A 600/1 220000/110

55 GSEG 220 KV Mora line - 1 at GSEG(C) GSGMORC1 GJ-0155-A 600/1 220000/110

56 GSEG 220 KV Kim line - 1 at GSEG(M) GSGKIMM1 GJ-0008-A 600/1 220000/110

57 GSEG 220 KV Mora line - 1 at GSEG(M) GSGMORM1 GJ-0144-A 600/1 220000/110

58 GSEG(NEW) 220 KV Kosamba line-1 at GSEG(NEW) (M) GS2KOSM1 GJ-1218-A 300/1 220000/110

59 GSEG(NEW) 220 KV Kosamba line-1 at GSEG(NEW) (C) GS2KOSC1 GJ-1215-A 300/1 220000/110

60 GSEG(NEW) 220 KV Kosamba line-2 at GSEG(NEW) (M) GS2KOSM2 GJ-1217-A 300/1 220000/110

61 GSEG(NEW) 220 KV Kosamba line-2 at GSEG(NEW) (C) GS2KOSC2 GJ-1216-A 300/1 220000/110

62 GSEG(NEW) 220 KV Side of GT-1 at GSEG(NEW) (S) GS22GTS1 GJ-1213-A 1000/1 220000/110

63 GSEG(NEW) 220 KV Side of STG at GSEG(NEW) (S) GS22SGS1 GJ-1214-A 1000/1 220000/110

64 Gujarat Piavav 22O KV Savarkundla Line no.2 at GPPC M2 GPCSKDM2 GJ-0868-A 600/1 220000/110

65 Gujarat Piavav 22O KV Savarkundla Line no.2 at GPPC C2 GPCSKDC2 GJ-0869-A 600/1 220000/110

66 Gujarat Piavav 22O KV Otha Line no.2 at GPPC M2 GPCOTHM2 GJ-0873-A 600/1 220000/110

67 Gujarat Piavav 22O KV Otha Line no.2 at GPPC C2 GPCOTHC2 GJ-0874-A 600/1 220000/110

68 Gujarat Piavav 220 KV Dhokadava Line no.1 at Guj Pipavav [GPPC] M1 GPCDKWM1 GJ-0875-A 600/1 220000/110

69 Gujarat Piavav 220 KV Dhokadava Line no.1 at Guj Pipavav [GPPC] C1 GPCDKWC1 GJ-0878-A 600/1 220000/110

70 Gujarat Piavav 220 KV Dhokadava Line no.2 at Guj Pipavav [GPPC] M2 GPCDKWM2 GJ-0879-A 600/1 220000/110

71 Gujarat Piavav 220 KV Dhokadava Line no.2 at Guj Pipavav [GPPC] C2 GPCDKWC2 GJ-0880-A 600/1 220000/110

72 Gujarat Piavav 220 KV Side of GT-2 at Guj Pipavav [GPPC] S2 GPC2GTS2 GJ-0876-A 1000/1 220000/110

73 Gujarat Piavav 22O KV Side of STG-2 at Guj Pipavav [GPPC] S2 GPC2SGS2 GJ-0870-A 1000/1 220000/110

74 Gujarat Piavav 220 KV Side of GT-1 at Guj Pipavav [GPPC] S1 GPC2GTS1 GJ-0886-A 1000/1 220000/110

75 Gujarat Piavav 22O KV Side of STG-1 at Guj Pipavav [GPPC] S1 GPC2SGS1 GJ-0865-A 1000/1 220000/110

METER INSTALLED AT INDEPENDENT POWER PRODUCER PLANT .

Page 7 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

76 SLPP(Mangrol)-I 220 KV Side of GT-1 at SLPP (Mangrol) SLP2GTS1 GJ-0198-A 450/1 220000/110

77 SLPP(Mangrol)-I 220 KV Side of GT-2 at SLPP (Mangrol) SLP2GTS2 GJ-0199-A 450/1 220000/110

78 SLPP(Mangrol)-I 220 KV Side of ST-1 at SLPP (Mangrol) SLP2STS1 GJ-0200-A 100/1 220000/110

79 SLPP(Mangrol)-I 220 KV Side of ST-2 at SLPP (Mangrol) SLP2STS2 GJ-0201-A 100/1 220000/110

80 SLPP(Mangrol)-I 220 KV Gavasad(Mobha) line-3 at SLPP (Mangrol)(C) SLPGAVC3 GJ-0225-A 800/1 220000/110

81 SLPP(Mangrol)-I 220 KV Gavasad(Mobha) line-4 at SLPP (Mangrol)(C) SLPGAVC4 GJ-0233-A 800/1 220000/110

82 SLPP(Mangrol)-I 220 KV Gavasad(Mobha) line-3 at SLPP (Mangrol)(M) SLPGAVM3 GJ-0234-A 800/1 220000/110

83 SLPP(Mangrol)-I 220 KV Gavasad(Mobha) line-4 at SLPP (Mangrol)(M) SLPGAVM4 GJ-0231-A 800/1 220000/110

84 SLPP(Mangrol)-I 220 KV Jhagadia line-1 at SLPP (Mangrol)(C) SLPJGDC1 GJ-0232-A 800/1 220000/110

85 SLPP(Mangrol)-I 220 KV Jhagadia line-1 at SLPP (Mangrol)(M) SLPJGDM1 GJ-0230-A 800/1 220000/110

86 SLPP(Mangrol)-I 220KV Bus-A Phase-1 and Phase-2 interconnection Bay(M1) SLPSL2M1 GJ-0613-A 800/1 220000/110

87 SLPP(Mangrol)-I 220KV Bus-A Phase-1 and Phase-2 interconnection Bay(C1) SLPSL2C1 GJ-0594-A 800/1 220000/110

88 SLPP(Mangrol)-I 220KV Bus-B Phase-1 and Phase-2 interconnection Bay(M2) SLPSL2M2 GJ-1229-A 800/1 220000/110

89 SLPP(Mangrol)-I 220KV Bus-B Phase-1 and Phase-2 interconnection Bay(C2) SLPSL2C2 GJ-1257-A 800/1 220000/110

90 SLPP(Mangrol)-II 220 KV Jhagadia line-2 at SLPP (Mangrol)(C) SL2JGDC2 GJ-0227-A 800/1 220000/110

91 SLPP(Mangrol)-II 220 KV Jhagadia line-2 at SLPP (Mangrol)(M) SL2JGDM2 GJ-0226-A 800/1 220000/110

92 SLPP(Mangrol)-II 220 KV Gavasad(Mobha) line-1 at SLPP (Mangrol)(M) SL2GAVM1 GJ-0581-A 800/1 220000/110

93 SLPP(Mangrol)-II 220 KV Gavasad(Mobha) line-2 at SLPP (Mangrol)(M) SL2GAVM2 GJ-0587-A 800/1 220000/110

94 SLPP(Mangrol)-II 220 KV Gavasad(Mobha) line-1 at SLPP (Mangrol)(C) SL2GAVC1 GJ-0586-A 800/1 220000/110

95 SLPP(Mangrol)-II 220 KV Gavasad(Mobha) line-2 at SLPP (Mangrol)(C) SL2GAVC2 GJ-0593-A 800/1 220000/110

96 SLPP(Mangrol)-II 220 KV Side of GT-3 at SLPP (Mangrol) SL22GTS3 GJ-0588-A 450/1 220000/110

97 SLPP(Mangrol)-II 220 KV Side of GT-4 at SLPP (Mangrol) SL22GTS4 GJ-0589-A 450/1 220000/110

98 Vadinar(Essar) 400 KV Hadala line - 1 at Vadinar(ESSAR)(M) VDNHADM1 GJ-0787-A 1000/1 400000/110

99 Vadinar(Essar) 400 KV Hadala line - 2 at Vadinar(ESSAR)(M) VDNHADM2 GJ-0786-A 1000/1 400000/110

100 Vadinar(Essar) 400 KV Hadala line - 1 at Vadinar(ESSAR)(C) VDNHADC1 GJ-0791-A 1000/1 400000/110

101 Vadinar(Essar) 400 KV Hadala line - 2 at Vadinar(ESSAR)(C) VDNHADC2 GJ-0790-A 1000/1 400000/110

1 Madhuban Dam 66 KV Motapondha line at Madhuban Dam MDHMPDM1 GJ-0508-A 60/1 66000/110

2 Kishankanaiya 66 KV Rajpipala line-1 at Kishankanaiya (M) KKNRJPM1 GJ-0520-A 40/1 66000/110

3 Kishankanaiya 66 KV Rajpipala line-2 at Kishankanaiya (M) KKNRJPM2 GJ-0519-A 40/1 66000/110

4 Kishankanaiya 66 KV Rajpipala Line - 1 at Kishankanaiya(Mini Hyd.)(C1) KKNRJPC1 GJ-1247-A 40/1 66000/110

5 Kishankanaiya 66 KV Rajpipala Line - 2 at Kishankanaiya(Mini Hyd.)(C2) KKNRJPC2 GJ-1233-A 40/1 66000/110

1 Avtar Solar Charnka66 KV Side of ICT-1 at Avtar Solar Charnka (M1) AVT6ICM1 GJ-1260-A 50/1 66000/110

2 Avtar Solar Charnka66 KV Side of ICT-1 at Avtar Solar Charnka (C1) AVT6ICC1 GJ-1259-A 50/1 66000/110

3 Azure(Hariyana) 66 KV Dhama Line - 2 at Azure(Hariyana) AZUDHMM2 GJ-1162-A 60/1 66000/110

4 Aatash Solar 66KV Gabat line no.1 at Aatash Solar(M1) ATSGBTM1 GJ-1280-A 50/1 66000/110

5 Aatash Solar 66KV Gabat line no.2 at Aatash Solar(M2) ATSGBTM2 GJ-1236-A 50/1 66000/110

6 ACME 66 KV Undel solar line-1 at ACME (M) ACMUNDM1 GJ-1301-A 150/1 66000/110

7 ACME 66 KV Undel solar line-2 at ACME (M) ACMUNDM2 GJ-1302-A 150/1 66000/110

8 Adani Solar 66 KV Netra line -1 at Adani Solar (M) AELNTSM1 GJ-1799-A 400/1 66000/110

9 Adani Solar 66 KV Netra line -2 at Adani Solar (M) AELNTSM2 GJ-1800-A 400/1 66000/110

10 AES Solar Energy Pvt.Ltd.66 KV Side of AES Solar Energy Pvt.Ltd.(Bay-1) AES6ICM1 GJ-1091-A 100/1 66000/110

11 AES Solar Energy Pvt.Ltd.66 KV Side ICT at AES Solar Energy Pvt Ltd. [Bay-1] C AES6ICC1 GJ-1095-A 100/1 66000/110

12 Alex Astral Powr Pvt.Ltd66 KV Side of Alex Astral Powr Pvt.Ltd.(Bay-1) ALX6ICM1 GJ-1072-A 150/1 66000/110

13 Alex Astral Powr Pvt.Ltd66 KV Side of Alex Astral Power Pvt.Ltd.(Bay-2) ALX6ICM2 GJ-1063-A 100/1 66000/110

14 Alex Astral Powr Pvt.Ltd66 KV Side ICT at Alex Astral Power Pvt. Ltd [BAY-1] C1 ALX6ICC1 GJ-1075-A 150/1 66000/110

15 Alex Astral Powr Pvt.Ltd66 KV Side ICT at Alex Astral Power Pvt. Ltd [Bay-2] C2 ALX6ICC2 GJ-1064-A 100/1 66000/110

16 APCA [Vadekhan]66 KV Khangeshri Line no.1 at APCA [Vadekhan] Solar M1 APCKHGM1 GJ-0968-A 60/1 66000/110

17 APCA [Vadekhan]66 KV Khangeshri Line no.2 at APCA [Vadekhan] Solar M1 APCKHGM2 GJ-1038-A 60/1 66000/110

18 Aravali Solar 66 KV Tanasava line-2 at Aravali (SOLAR) AVLTSVM2 GJ-0958-A 60/1 66000/110

19 Aravalli 66 KV Tanasava Line No.1 at Aravalli Solar M1 AVLTSVM1 GJ-0956-A 60/1 66000/110

20 Astonfield 66 KV Bhadrada Line no.1 at Astonfield [SOLAR] M1 ATNBDRM1 GJ-1191-A 125/1 66000/110

21 Astonfield 66 KV Bhadrada Line no.2 at Astonfield [SOLAR] M2 ATNBDRM2 GJ-1090-A 125/1 66000/110

22 Azure (Solar) 66 KV Bayal(Dhankrol) line-1 at Azure AZUBAYM1 GJ-1077-A 100/1 66000/110

23 Azure (Solar) 66 KV Bayal(Dhankrol) line-2 at Azure AZUBAYM2 GJ-1076-A 100/1 66000/110

24 Backbone Solar 66 KV Shivlakha line -1 at Backbone Solar(M) BKBSLKM1 GJ-0997-A 75/1 66000/110

25 Backbone Solar 66 KV Shivlakha line -2 at Backbone Solar(M) BKBSLKM2 GJ-1018-A 75/1 66000/110

26 CBC Solar 66 KV Mervadar Line at CBC STPL [SOLAR] M1 CBCMNVM1 GJ-1331-A 100/1 66000/110

27 Chandiyana (Lanco)66 KV Bhadarada line -1 at Chandiyana (Lanco)(M) CDRBDRM1 GJ-1084-A 150/1 66000/110

28 Chandiyana (Lanco)66 KV Bhadarada line -2 at Chandiyana (Lanco)(M) CDRBDRM2 GJ-1085-A 150/1 66000/110

29 Chattel Solar 66KV Patdi Line no.1 at Chattel Solar(M1) CTLPATM1 GJ-1339-A 250/1 66000/110

30 Chattel Solar 66KV Patdi Line no.2 at Chattel Solar(M2) CTLPATM2 GJ-1346-A 250/1 66000/110

31 Dreisatz Solar 66 KV Dhama line no.2 at Dreisatz Solar DMSDHMM2 GJ-1737-A 150/1 66000/110

32 Emami Cement Ltd66 KV Side of Emami Cement Ltd. (Bay-1) EMM6ICM1 GJ-1068-A 150/1 66000/110

33 Emami Cement Ltd66 KV Side ICT at Emami Cement Ltd. [Bay-1] C EMM6ICC1 GJ-1201-A 150/1 66000/110

34 EMCO 66 KV DHAMA Line no.1 at EMCO [SOLAR] EMCDHMM1 GJ-1225-A 60/1 66000/110

35 EMCO 66 KV DHAMA Line no.2 at EMCO [SOLAR] EMCDHMM2 GJ-1356-A 60/1 66000/110

36 ESP Solar 66 KV Dhama line-1 at ESP Solar (M) ESSDHMM1 GJ-1160-A 60/1 66000/110

37 Euro Solar 66KV Shivlakha Line no.1 at Euro Solar(M1) EROSLKM1 GJ-0998-A 50/1 66000/110

38 Euro Solar 66KV Shivlakha Line no.2 at Euro Solar(M2) EROSLKM2 GJ-1000-A 50/1 66000/110

METER INSTALLED AT SOLAR POWER PLANT

METER INSTALLED AT HYDEL POWER PLANT

Page 8 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

39 Gangesh Solar 66 KV Meravdar line no. 1 at Gangesh Solar GGSMNVM1 GJ-1344-A 300/1 66000/110

40 Gangesh Solar 66 KV Meravdar line no. 2 at Gangesh Solar GGSMNVM2 GJ-1334-A 300/1 66000/110

41 GIPCL Mangrol Solar (66 KV Mosali line -1 at GIPCL Mangrol Solar (M) GMSMSLM1 GJ-1308-A 50/1 66000/110

42 GIPCL Mangrol Solar (66 KV Mosali line No.2 at GIPCL Mangrol Solar(M) GMSMSLM2 GJ-1304-A 50/1 66000/110

43 GMDC solar 66 KV PANNDHRO [KTP] Line no.1 at GMDC [SOLAR] GMDKTPM1 GJ-1014-A 50/1 66000/110

44 GMDC solar 66 KV PANNDHRO [KTP] Line no.2 at GMDC [SOLAR] GMDKTPM2 GJ-1013-A 50/1 66000/110

45 GMPL Solar 66 KV Mervadar Line at GMP [SOLAR] M1 GMPMNVM1 GJ-1353-A 50/1 66000/110

46 GMR Power infra Ltd66KV Side ICT at GMR Power infra Ltd (Bay-1) GMR6ICM1 GJ-1819-A 150/1 66000/110

47 GMR Power infra Ltd66KV Side ICT at GMR Power infra Ltd(Bay-2) GMR6ICM2 GJ-1820-A 150/1 66000/110

48 GMR Power infra Ltd66KV Side ICT at GMR Power infra Ltd(Bay-3) GMR6ICM3 GJ-1818-A 75/1 66000/110

49 GPCL limited 66KV Side ICT at GPCL limited(M) GCL6ICM1 GJ-1453-A 50/1 66000/110

50 GPCL limited 66 KV Side ICT at GPCL Limited [C] GCL6ICC1 GJ-1454-A 50/1 66000/110

51 Green Infra Solar 66 KV Tanasva line -1 at Green Infra Solar(M) GRNTSVM1 GJ-0952-A 100/1 66000/110

52 Green Infra Solar 66 KV Tanasva line -2 at Green Infra Solar(M) GRNTSVM2 GJ-0953-A 100/1 66000/110

53 GSPC Pipavav Ltd66 KV Side of ICT at GSPC Pipavav Ltd (Bay-1) GPP6ICM1 GJ-1212-A 50/1 66000/110

54 GSPC Pipavav Ltd66 KV Side ICT at GSPC Pipavav Ltd [Bay-1] C GPP6ICC1 GJ-1166-A 50/1 66000/110

55 Helabeli 66 KV Khageshri line -1 at Helabeli Solar(M) HLBKHGM1 GJ-2667-A 300/1 66000/110

56 Helabeli 66 KV Khegeshri line -2 at Helabeli Solar(M) HLBKHGM2 GJ-2668-A 300/1 66000/110

57 Hiraco 66 KV Ranakandora Line at Hiraco [SOLAR] M1 HRCRKDM1 GJ-1256-A 200/1 66000/110

58 Hiraco 66 KV Ranakandora Line at Hiraco [SOLAR] M1 HRCRKDM1 GJ-1251-A 200/1 66000/110

59 ICML 66 KV Shivlakha-Rapar Tap Line at ICML [SOLAR] M1 ICMSLKM1 GJ-0993-A 150/1 66000/110

60 ICML 66 KV Shivlakha-Rapar Tap Line at ICML [SOLAR]C1 ICMSLKC1 GJ-0994-A 150/1 66000/110

61 Jayhind 66 KV Bhadrada line no.1 at Jayhind [SOLAR] M1 JHIBDRM1 GJ-1434-A 50/1 66000/110

62 Jayhind 66 KV Bhadrada line no.2 at Jayhind [SOLAR] M2 JHIBDRM2 GJ-1435-A 50/1 66000/110

63 Konark [SOLAR] 66 KV Chirod Line no.1 at Konark [SOLAR] M1 KNRCRDM1 GJ-1022-A 50/1 66000/110

64 Konark [SOLAR] 66 KV Chirod Line no.2 at Konark [SOLAR] M2 KNRCRDM2 GJ-1021-A 50/1 66000/110

65 Lanco 66 KV Bhdrada line -1 at Lanco LANBDRM1 GJ-0409-A 60/1 66000/110

66 Lanco 66 KV Bhdrada line -2 at Lanco LANBDRM2 GJ-0363-A 60/1 66000/110

67 Lanco Solar Energy Pvt. Ltd66 KV Lanco Solar Energy Pvt. Ltd (Bay-1) M1 Charnka LSE6ICM1 GJ-1067-A 150/1 66000/110

68 Lanco Solar Energy Pvt. Ltd66 KV Lanco Solar Energy Pvt. Ltd (Bay-2) M2 Charnka LSE6ICM2 GJ-1096-A 150/1 66000/110

69 Lanco Solar Energy Pvt. Ltd66 KV Lanco Solar Energy Pvt. Ltd (Bay-1) C1 Charnka LSE6ICC1 GJ-1069-A 150/1 66000/110

70 Lanco Solar Energy Pvt. Ltd66 KV Lanco Solar Energy Pvt. Ltd (Bay-1) C2 Charnka LSE6ICC2 GJ-1097-A 150/1 66000/110

71 Lourex 66 KV KUNTALPUR LINE-1 AT LOUREX SOLAR(M) LOUKUNM1 GJ-1228-A 250/1 66000/110

72 Lourex 66 KV KUNTALPUR LINE-2 AT LOUREX SOLAR(M) LOUKUNM2 GJ-1252-A 250/1 66000/110

73 Millenium Solar 66 KV Dhama line -1 at Millenium Solar(M) MSSDHMM1 GJ-1165-A 100/1 66000/110

74 Millenium Solar 66 KV Dhama Line No.2 at Millenium Solar M2 MSSDHMM2 GJ-1154-A 100/1 66000/110

75 Mithapur 66 KV Varvala line -1 at Mithapur(M) MHPVVLM1 GJ-0982-A 250/1 66000/110

76 Mithapur 66 KV Varvala line-2 at Mithapur(M) MHPVVLM2 GJ-1047-A 250/1 66000/110

77 Monosteel 66 KV Kesariya Line no.1 at Monosteel [SOLAR] M1 MNSKSRM1 GJ-0974-A 100/1 66000/110

78 Monosteel 66 KV Kesariya Line no.2 at Monosteel [SOLAR] M2 MNSKSRM2 GJ-0975-A 100/1 66000/110

79 Moser baer 66 KV Ranakandorana Line at Moser baer [SOLAR] MBRRKDM1 GJ-1357-A 150/1 66000/110

80 My Solar 1 [SOLAR]66 KV Dhama Line no.1 at My Solar 1 [SOLAR] MYSDHMM1 GJ-1736-A 150/1 66000/110

81 NKG Infra Ltd 66KV Side of NKG Infra Ltd (Bay-1) NKG6ICM1 GJ-1428-A 100/1 66000/110

82 NKG Infra Ltd 66 KV Side ICT at NKG Infra Ltd. [Bay-1] C NKG6ICC1 GJ-1430-A 100/1 66000/110

83 Palace Solar Energy Pvt.Ltd.66 KV Side of Palace Solar Energy Pvt.Ltd.(Bay-1) PLS6ICM1 GJ-1070-A 150/1 66000/110

84 Palace Solar Energy Pvt.Ltd.66 KV Side ICT at Palace Solar Energy Pvt Ltd. [Bay-1] C PLS6ICC1 GJ-1071-A 150/1 66000/110

85 Photovoltaic [PLG]66 KV Dahisar Line -1 at Photovoltaic [PLG] PLGDSRM1 GJ-1098-A 200/1 66000/110

86 Photovoltaic [PLG]66 KV Dahisar Line -2 at Photovoltaic [PLG] PLGDSRM2 GJ-1099-A 200/1 66000/110

87 Pricious(Moserbear)66 KV Dunawada line -1 at Pricious(M) PRCDNWM1 GJ-1078-A 150/1 66000/110

88 Pricious(Moserbear)66 KV Dunawada line -2 at Pricious(M) PRCDNWM2 GJ-1081-A 150/1 66000/110

89 Responsive Sutip66KV Kamalpur Line no.2 at Responsive Sutip Solar(M2) RTPKMLM2 GJ-1274-A 250/1 66000/110

90 Roha Dychem 66KV Side ICT at Roha Dychem Solar(M) RDS6ICM1 GJ-1211-A 300/1 66000/110

91 Roha Dychem 66 KV Side ICT at Roha Dychem Solar [C] RDS6ICC1 GJ-1210-A 300/1 66000/110

92 S J Green Park Solar66KV Sadla line no.1 at S J Green Park Solar(M1) SGPSDLM1 GJ-1103-A 50/1 66000/110

93 Sand Land 66 KV Khimat Line no.1 at Sand land [SOLAR] M1 SLSKMTM1 GJ-1183-A 300/1 66000/110

94 Sand Land 66 KV Khimat Line no.2 at Sand land [SOLAR] M2 SLSKMTM2 GJ-1182-A 300/1 66000/110

95 Semiconductor 66KV Chirod line no.1 at Semiconductor Solar(M1) SMICRDM1 GJ-1037-A 200/1 66000/110

96 Semiconductor 66KV Chirod line no.2 at Semiconductor Solar(M2) SMICRDM2 GJ-1001-A 200/1 66000/110

97 SIE Power Gujarat Pvt. Ltd66 KV Side of SIE Power Gujarat Pvt. Ltd (Bay-1) SIE6ICM1 GJ-1100-A 150/1 66000/110

98 SIE Power Gujarat Pvt. Ltd66 KV Side ICT at SIE Power Gujarat Pvt. Ltd [Bay-2] M SIE6ICM2 GJ-1437-A 150/1 66000/110

99 SIE Power Gujarat Pvt. Ltd66 KV Side ICT at SIE Power Gujarat Pvt. Ltd [Bay-1] C SIE6ICC1 GJ-1206-A 150/1 66000/110

100 SIE Power Gujarat Pvt. Ltd66 KV Side ICT at SIE Power Gujarat Pvt. Ltd [Bay-2] C SIE6ICC2 GJ-1438-A 150/1 66000/110

101 Solarfield Energy Pvt. Ltd66 KV Side of ICT at Solarfield Energy Pvt. Ltd(Bay-1) SEL6ICM1 GJ-1093-A 200/1 66000/110

102 Solarfield Energy Pvt. Ltd66 KV Side of ICT at Solarfield Energy Pvt. Ltd(Bay-2) SEL6ICM2 GJ-1452-A 200/1 66000/110

103 Solarfield Energy Pvt. Ltd66 KV Side ICT at Solarfield Energy Pvt Ltd [Bay-1] C1 SEL6ICC1 GJ-1094-A 200/1 66000/110

104 Solarfield Energy Pvt. Ltd66 KV Side ICT at Solarfield Energy Pvt Ltd [Bay-2] C2 SEL6ICC2 GJ-1450-A 200/1 66000/110

105 Solitiare(Moserbear)66 KV Aganwada line -1 at Solitiare(M) SLTAGWM1 GJ-1089-A 150/1 66000/110

106 Solitiare(Moserbear)66 KV Aganwada line -2 at Solitiare(M) SLTAGWM2 GJ-1447-A 150/1 66000/110

107 Sun Clean Renewable Power Ltd.66 KV Side of Sun Clean Renewable Power Ltd. (Bay-1) SCR6ICM1 GJ-1065-A 60/1 66000/110

108 Sun Clean Renewable Power Ltd.66 KV Side ICT at Sun Clean Renewable Power Ltd.[Bay-1]C SCR6ICC1 GJ-1066-A 60/1 66000/110

109 Sunborne Solar 66KV Sikra line no.1 at Sunborne Solar M1 SNBSIKM1 GJ-0985-A 200/1 66000/110

110 Sunborne Solar 66KV Sikar line no.2 at Sunborne Solar M2 SNBSIKM2 GJ-0986-A 200/1 66000/110

111 Sunkon 66 KV Motabarman Line no.1 at at Sunkon [SOLAR] M1 SUNMBNM1 GJ-0111-A 100/1 66000/110

112 Sunkon 66 KV Motabarman Line no.1 at at Sunkon [SOLAR] M2 SUNMBNM2 GJ-1222-A 100/1 66000/110

113 Surana Telecom & power Ltd66KV Side ICT at Surana Telecom & power Ltd(M) SPL6ICM1 GJ-1073-A 50/1 66000/110

114 Surana Telecom & power Ltd66 KV Side ICT at Surana Telecom & Power Ltd [C] SPL6ICC1 GJ-1447-A 50/1 66000/110

115 Taxus 66 KV Kanaiyabee Line No.1 at Taxus SOLAR M1 TXSKBEM1 GJ-1027-A 60/1 66000/110

116 Taxus 66 KV Kanaiyabee Line No.2 at Taxus SOLAR M2 TXSKBEM2 GJ-1017-A 60/1 66000/110

117 Ujjawala 66 KV Kamalpur Line at Ujjawala SOLAR M1 UJWKMLM1 GJ-1342-A 250/1 66000/110

118 Unity Power Pvt Ltd (SOLAR)66 KV Dudhai line -1 at Unity Power Pvt Ltd (SOLAR) UNPDUHM1 GJ-1010-A 50/1 66000/110

119 Visual Solar 66 KV Dhama line -2 at Visual Solar (M) VPSDHMM2 GJ-1159-A 250/1 66000/110

120 Visual Solar(M) 66 KV Dhama line -1 at Visual Solar(M) VPSDHMM1 GJ-1168-A 250/1 66000/110

121 WAA solar 66 KV Sadla Line - 2 at WAA solar WAASDLM2 GJ-1200-A 100/1 66000/110

122 Welspun 66 KV Dhudhai line -1 at Welspun Solar (M) WSSDUHM1 GJ-0940-A 150/1 66000/110

Page 9 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

123 Yantra 66 KV Yantra eSolarindia Pvt Ltd M1 Charanka [SOLAR] YTR6ICM1 GJ-1447-A 50/1 66000/110

124 Yantra 66 KV Yantra eSolarindia Pvt Ltd C1 Charanka [SOLAR] YTR6ICC1 GJ-1142-A 50/1 66000/110

125 ZFS Gear India Ltd 66 KV Side of ZFS Gear India Ltd (Bay-1) ZFS6ICM1 GJ-1449-A 50/1 66000/110

126 ZFS Gear India Ltd 66 KV Side ICT at ZFS Ger India Ltd [Bay-1] C ZFS6ICC1 GJ-1172-A 50/1 66000/110

1 APPL 66 KV Simran at APPL APPSIMM1 GJ-2127-A 100/1 66000/110

2 JPPL 66 KV Kanza line-1 at JPPL BIOMASS JPPKAZM1 GJ-0385-A 300/1 66000/110

3 BPPL 66 KV Sanosra Line at BPPL [BIAOMAS] [M] BPPSNSM1 GJ-1492-A 100/1 66000/110

1 Amrapur 66 KV Side ICT at Amrapur M1 AMP6ICM1 GJ-1446-A 400/1 66000/110

2 Amrapur 22O KV Tharad Line no.1 at Amrapur M1 AMPTRDM1 GJ-1188-A 900/1 220000/110

3 Amrapur 22O KV Tharad Line no.1 at Amrapur C1 AMPTRDC1 GJ-1192-A 900/1 220000/110

4 Amrapur 22O KV Tharad Line no.1 at Amrapur M2 AMPTRDM2 GJ-1195-A 900/1 220000/110

5 Amrapur 22O KV Tharad Line no.1 at Amrapur C2 AMPTRDC2 GJ-0389-A 900/1 220000/110

6 Balambha 66 KV Latipar line-1 at Balambha BLMLTPM1 GJ-0743-A 300/1 66000/110

7 Balambha 66 KV Latipar line-2 at Balambha BLMLTPM2 GJ-0745-A 300/1 66000/110

8 Baradiya 66 KV Varvala Line-1 at Baradiya BDYVVLM1 GJ-0729-A 150/1 66000/110

9 Baradiya 66 KV Varvala Line-2 at Baradiya BDYVVLM2 GJ-0730-A 150/1 66000/110

10 Beta Valadia 66 KV Khedoi Line-1 at Beta Valadia BTVKDIM1 GJ-0684-A 600/1 66000/110

11 Beta Valadia 66 KV Khedoi Line-2 at Beta Valadia BTVKDIM2 GJ-0685-A 600/1 66000/110

12 Bhogat 66 KV Side of ICT-1 at Bhogat(WF)(S) BGT6ICS1 GJ-2083-A 200/1 66000/110

13 Bhogat 66 KV Side of ICT-2 at Bhogat(WF)(S) BGT6ICS2 GJ-2035-A 200/1 66000/110

14 Chandrodi Veer 66 KV Shivlakha Line-1 at Chandrodi Veer VIRSLKM1 GJ-0663-A 600/1 66000/110

15 Chandrodi Veer 66 KV Shivlakha Line-2 at Chandrodi Veer VIRSLKM2 GJ-0664-A 600/1 66000/110

16 Changdai(WF) 66 KV Bayath line-1 at Changdai(Suzlon)(WF)(M) CHGBYTM1 GJ-2155-A 300/1 66000/110

17 Dhank(WF) 66 KV Side of ICT -2 at Dhank SS [W/F] S1 DNK6ICS2 GJ-1039-A 150/1 66000/110

18 Dhank(WF) 66 KV Side of ICT-3 at Dhank S/s (W/F)S3 DNK6ICS3 GJ-0944-A 150/1 66000/110

19 Dhank(WF) 66 KV Side of ICT -4 at Dhank S/s (W/F)S4 DNK6ICS4 GJ-2003-A 150/1 66000/110

20 Elecon(WF) 66 KV MotaGunda line-1 at Elecon(WF) ELEMTGM1 GJ-2131-A 250/1 66000/110

21 Elecon(WF) 66 KV MotaGunda line-2 at Elecon(WF) ELEMTGM2 GJ-2132-A 250/1 66000/110

22 Enercon(WF) 132 KV Side of ICT-1 at Enercon(WF)(M) ENR1ICM1 GJ-2036-A 250/1 132000/110

23 Enercon(WF) 132 KV Side of ICT-2 at Enercon(WF)(M) ENR1ICM2 GJ-2094-A 350/1 132000/110

24 Enercon(WF) 132 KV Side of ICT-3 at Enercon(WF)(M) ENR1ICM3 GJ-1007-A 350/1 132000/110

25 Gala 66KV Pipartoda line no.1 at Gala(W/F) M1 GALPIPM1 GJ-1059-A 300/1 66000/110

26 Gala 66KV Pipartoda line no.2 at Gala (W/F) M2 GALPIPM2 GJ-1060-A 300/1 66000/110

27 Gandhvi(WF) 66 KV Side of ICT-1 at Gandhvi(WF)(S) GNV6ICS1 GJ-2030-A 150/1 66000/110

28 Gandhvi(WF) 66 KV Side of ICT-2 at Gandhvi(WF)(S) GNV6ICS2 GJ-2031-A 300/1 66000/110

29 GFL(W) 66 KV Jasdan line-1 at GFL(WF) GFWJSDM1 GJ-2101-A 250/1 66000/110

30 GFL(W) 66 KV Jasdan line-2 at GFL(WF) GFWJSDM2 GJ-2014-A 250/1 66000/110

31 Gorsar 66 KV Madhavpura line-1 at Gorsar GORMDVM1 GJ-0751-A 300/1 66000/110

32 Gorsar 66 KV Madhavpura line-2 at Gorsar GORMDVM2 GJ-0753-A 300/1 66000/110

33 Halenda 66 KV Mota dadva line-1 at Halenda HLNMTDM1 GJ-0945-A 500/1 66000/110

34 Halenda 66 KV Mota dadva line-2at Halenda HLNMTDM2 GJ-0946-A 500/1 66000/110

35 Jamanvada 220 KV Akrimota line-1 at Jamanvada(M) JMVATPM1 GJ-1023-A 900/1 66000/110

36 Jamanvada 220 KV Nakhatrana line -1 at Jamanvada(M) JMVNKTM1 GJ-1024-A 1200/1 66000/110

37 Jamanvada 220 KV Side ICT at Jamanvada(W) JMV2ICM1 GJ-1025-A 900/1 66000/110

38 Jangi 66 KV Samkhiyali Line-1 at Jangi JGISMKM1 GJ-0699-A 600/1 66000/110

39 Jangi 67 KV Samkhiyali Line-1 at Jangi JGISMKM2 GJ-0700-A 600/1 66000/110

40 Kuchhdi 66 KV Bokhira Line -1 at Kuchhdi KUCBKHM1 GJ-0719-A 300/1 66000/110

41 Kuchhdi 66 KV Bokhira Line -2 at Kuchhdi KUCBKHM2 GJ-0718-A 300/1 66000/110

42 Kundhda 66KV Thadach line no.1 at Kundhda(W/F) M1 KDDTDCM1 GJ-1143-A 300/1 66000/110

43 Kundhda 66KV Thadach line no.2 at Kundhda(W/F) M2 KDDTDCM2 GJ-1439-A 300/1 66000/110

44 Lamba(WF) 66 KV Side of ICT-1 at Lamba(WF)(S) LBA6ICS1 GJ-2033-A 200/1 66000/110

45 Lamba(WF) 66 KV Side of ICT-4 at Lamba(WF)(S) LBA6ICS2 GJ-2037-A 200/1 66000/110

46 Lamba(WF) 66 KV Side of ICT-3 at Lamba(WF)(S) LBA6ICS3 GJ-2032-A 200/1 66000/110

47 Layja 66 KV Don Line-1 at Layja LYJDONM1 GJ-0692-A 300/1 66000/110

48 Layja 66 KV Don Line-2 at Layja LYJDONM2 GJ-0694-A 300/1 66000/110

49 Mahidad(WF) 66 KV Rajpara line-1 at Mahidad (WF) MHDRPRM1 GJ-1003-A 500/1 66000/110

50 Mahidad(WF) 66 KV Rajpara line-2 at Mahidad (WF) MHDRPRM2 GJ-1004-A 500/1 66000/110

51 Menavadar(WF) 66 KV Side of ICT-1 at Meravdar(WF) MNV6ICS1 GJ-2005-A 150/1 66000/110

52 Menavadar(WF) 66 KV Side of ICT -2 at Meravadar S/S S2 MNV6ICS2 GJ-1921-A 150/1 66000/110

53 Motagunda 132 KV Bomiyavadar Line no. 1 at Motagunda M1 MTGBHMM1 GJ-1341-A 500/1 132000/110

54 Motagunda 132 KV Bomiyavadar Line no. 2 at Motagunda M2 MTGBHMM2 GJ-1345-A 500/1 132000/110

55 Navadara(WF) 66 KV Side of ICT-1 at Navadara(WF)(S) NVD6ICS1 GJ-2029-A 200/1 66000/110

56 Navadara(WF) 66 KV Side of ICT-2 at Navadara(WF)(S) NVD6ICS2 GJ-2038-A 200/1 66000/110

57 Navadara(WF) 66 KV Side of ICT-3 at Navadara(WF)(S) NVD6ICS3 GJ-2060-A 200/1 66000/110

58 Odadara 66 KV Chhaya line-1 at Odadara ODRCHYM1 GJ-0739-A 300/1 66000/110

59 Odadara 66 KV Chhaya line-2 at Odadara ODRCHYM2 GJ-0740-A 300/1 66000/110

60 Parewada 66KV Bhadla line no.1 at Parevada(W/F) M1 PRWBHLM1 GJ-1045-A 250/1 66000/110

61 Parewada 66KV Bhadla line no.2 at Parevada(W/F) M2 PRWBHLM2 GJ-1046-A 250/1 66000/110

62 Patleka(WF) 66 KV Kalyanpur line-1 at Patleka(WF)(M) PTLKLNM1 GJ-2034-A 250/1 66000/110

63 Pionner Wincom [W/F]66 KV Side of ICT- 1 at Pionner Wincom Pvt Ltd [W/F] M1 PWP6ICM1 GJ-1924-A 250/1 66000/110

64 Rasaliya 66 KV Nakhatrana Line no.1 at Rasaliya [W/F] M1 RASNKTM1 GJ-0978-A 500/1 66000/110

65 Rasaliya 66 KV Nakhatrana Line no.1 at Rasaliya [W/F] M2 RASNKTM2 GJ-0979-A 500/1 66000/110

66 Ratabher 66KV Side of ICT at Ratabher M1 RAT6ICM1 GJ-1151-A 600/1 66000/110

67 RRB 66 KV Shivlakha Line-1 at RRB(WF) RRBSLKM1 GJ-0665-A 600/1 66000/110

68 RRB 66 KV Shivlakha Line-2 at RRB(WF) RRBSLKM2 GJ-0705-A 600/1 66000/110

69 Sadodar 220 KV Motipaneli Line-1 at Sadodar SADMPLM1 GJ-0732-A 600/1 220000/110

70 Sadodar 220 KV Motipaneli Line-2 at Sadodar SADMPLM2 GJ-0731-A 600/1 220000/110

71 Sanodar 66 kV Tansa line-1 at Sanodar(M) SNDTSAM1 GJ-2126-A 200/1 66000/110

72 SEPC (WF) 66 KV Kotdapitha line-1 at SEPC SEPKTDM1 GJ-0744-A 400/1 66000/110

73 SEPC (WF) 66 KV Kotdapitha line-2 at SEPC SEPKTDM2 GJ-0911-A 600/1 66000/110

74 Sherdivadar 66KV Kadamgiri line no.1 at Sherdivdar(W/F) M1 SHDKDMM1 GJ-1221-A 300/1 66000/110

METER INSTALLED AT BIOMASS PLANT

METER INSTALLED AT WIND FARM

Page 10 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

75 Sherdivadar 66KV Kadamgiri line no.2 at Sherdivdar(W/F) M2 SHDKDMM2 GJ-0110-A 300/1 66000/110

76 Shikarpur(WF) 132 KV Samkhiyali Line -1 at Shikarpur(WF)(M) SKRSMKM1 GJ-2144-A 150/1 132000/110

77 Shikarpur(WF) 132 KV Samkhiyali Line -2 at Shikarpur (WF) (M) SKRSMKM2 GJ-2136-A 300/1 132000/110

78 Shikarpur(WF) 66 KV Shivlakha Line-1 at Shikarpur(WF) SKRSLKM1 GJ-0675-A 600/1 66000/110

79 Shikarpur(WF) 66 KV Shivlakha Line-2 at Shikarpur(WF) SKRSLKM2 GJ-0687-A 600/1 66000/110

80 Sindhodi 220 KV Nanikhakhar Line-1 at Sindhodi SINNKHM1 GJ-0703-A 1200/1 220000/110

81 Sindhodi 220 KV Nanikhakhar Line-2 at Sindhodi SINNKHM2 GJ-0704-A 1200/1 220000/110

82 Suthari 220 KV Khakhar line-1 at Suthari SUTNKHM1 GJ-2104-A 600/1 220000/110

83 Suthari 220 KV Khakhar line-2 at Suthari SUTNKHM2 GJ-2110-A 600/1 220000/110

84 Tebhda 220 KV Nyara Line-1 at Tebhda(M) TBDNYRM1 GJ-0947-A 900/1 220000/110

85 Tebhda 220 KV Nyara Line-1 at Tebhda(M) TBDNYRM2 GJ-0950-A 900/1 220000/110

86 Theolia 132 KV Jasdan Line no.2 at Theolia [W/F] TOLJSDM2 GJ-0937-A 200/1 132000/110

87 Theolia 132 KV Jasdan Line no.1 at Theolia [W/F] M1 TOLJSDM1 GJ-0936-A 200/1 66000/110

88 Theolia 66 KV Side of ICT-1 at Theolia [W/F] TOL6ICS1 GJ-1311-A 300/1 66000/110

89 Tithva(WF) 66 KV Jadeshwar line-1 at Tithva(WF) THVJDSM1 GJ-0386-A 350/1 66000/110

90 Tithva(WF) 66 KV Jadeshwar line-2 at Tithva(WF) THVJDSM2 GJ-0387-A 350/1 66000/110

91 Ukharala 66kV Mamsa line-1 at Ukharala(M) UKRMMSM1 GJ-2129-A 150/1 66000/110

92 Vandiya 220 KV Shivlakha Line-1 at Vandiya VDYSLKM1 GJ-0670-A 600/1 220000/110

93 Vandiya 220 KV Shivlakha Line-2 at Vandiya VDYSLKM2 GJ-0671-A 600/1 220000/110

94 Vanku(WF) 66 KV Kothara line-1 at Vanku(Suzlon)(WF)(M) VNKKOTM1 GJ-2123-A 300/1 66000/110

95 Vanku(WF) 66 KV Kothara line-2 at Vanku(Suzlon)(WF)(M) VNKKOTM2 GJ-2150-A 300/1 66000/110

96 Varsamadi 132 KV Wankaner Line-1 at Varsamadi VRSWKNM1 GJ-0723-A 600/1 132000/110

97 Varsamadi 132 KV Wankaner Line-2 at Varsamadi VRSWKNM2 GJ-0724-A 600/1 132000/110

98 Vasai(WF) 66 KV Side of ICT-1 AT Vasai(WF) VSI6ICS1 GJ-0757-A 250/1 66000/110

99 Vasai(WF) 66 KV Side of ICT-2 AT VASAI (WF) VSI6ICS2 GJ-0758-A 250/1 66000/110

100 Vinjalpar 66 KV Bhadther Line no.1 at Vinjalpar [W/F] M1 VJPBDHM1 GJ-0991-A 300/1 66000/110

101 Vinjalpar 66 KV Bhadther Line no.2 at Vinjalpar [W/F] M2 VJPBDHM2 GJ-0990-A 300/1 66000/110

1 Arvind Mill 66 KV Santej line-1 at Arvind Mill(M) ARVSTJM1 GJ-0375-A 150/1 66000/110

2 Arvind Mill 66 KV Santej line-1 at Arvind Mill(M) GJ-0799-A 150/1 66000/110

3 Essar Oil 220 KV Jamnagar line -1 at Essar Oil EOLJMNS1 GJ-0818-A 150/1 220000/110

4 Essar Oil 220 KV Jamnagar line -2 at Essar Oil EOLJMNS2 GJ-0819-A 150/1 220000/110

5 GACL 220 KV Dahej line-1 at GACL(M) GACDHJM1 GJ-0216-A 150/1 220000/110

6 GACL 220 KV Dahej line-2 at GACL(M) GACDHJM2 GJ-0611-A 150/1 220000/110

7 Gallant metal 66 KV Samakhiyali line -1 at Gallant metal (M) GMLSMKM1 GJ-0805-A 150/1 66000/110

8 Gallant metal 66 KV Samakhiyali line -1 at Gallant metal (M) GMLSMKM1 GJ-0697-A 150/1 66000/110

9 GFL 66 KV Dahej line-1 at GFL GFLDHJM1 GJ-0833-A 300/1 66000/110

10 GFL 66 KV Dahej line-2 at GFL GFLDHJM2 GJ-0824-A 300/1 66000/110

11 HindalCo. 220 KV Dahej line-1 at Hindalco. HINDHJM1 GJ-0800-A 100/1 220000/110

12 HindalCo. 220 KV Dahej line-2 at Hindalco. HINDHJM2 GJ-0801-A 100/1 220000/110

13 IPCL Reliance 220kV Halderwa line -1 at IPCL Reliance(M) IPHHALM1 GJ-0523-A 100/1 220000/110

14 IPCL Reliance 220kV Halderwa line -2 at IPCL Reliance(M) IPHHALM2 GJ-0605-A 100/1 220000/111

15 J K Paper Mill 66 KV Songadh line-1 at J K Paper Mill JKPSONM1 GJ-0826-A 75/1 66000/110

16 Jindal 66 KV Samaghogha line -1 at Jindal(L&T) JINSMGM1 GJ-2159-A 150/1 66000/110

17 Mid India Ltd 66 KV Mithirohar line-1 at Mid India Ltd.(C)(L&T) MIDMTHC1 GJ-0681-A 150/1 66000/110

18 Mid India Ltd 66 KV Mithirohar line-1 at Mid India Ltd.(M)(SECURE-APEX) MIDMTHM1 GJ-0822-A 150/1 66000/110

19 Nirma 66 KV Nari road Line at Nirma M1 NRMNRIM1 GJ-1470-A 150/1 66000/110

20 ONGC(Ichchhapur)66 KV Ichchhapur line-1 at ONGC(M) ONIICHM1 GJ-0049-A 250/1 66000/110

21 ONGC(Ichchhapur)66 KV Ichchhapur line-2 at ONGC(M) ONIICHM2 GJ-0050-A 250/1 66000/110

22 ONGC(Wagra) 66 KV Wagra line-1 at ONGC (M) ONWWGRM1 GJ-0188-A 125/1 66000/110

23 ONGC(Wagra) 66 KV Wagra line-2 at ONGC (M) ONWWGRM2 GJ-0189-A 125/1 66000/110

24 PCBL(Mokha) 66 KV Mokha line-1 at PCBL(M) PCMMOKM1 GJ-0804-A 150/1 66000/110

25 PCBL(Palej) 66 KV Palej line-1 at PCBL(M) PCBPLJM1 GJ-0221-A 100/1 66000/110

26 Reliance 66 KV Ranasan line-1 at Reliance Indu.Ltd.(M) RILRSNM1 GJ-0319-A 300/1 66000/110

27 Renuka Sugar 66 KV Kidana Line at Renuka Sugar M1 RNSKIDM1 GJ-1419-A 300/1 66000/110

28 SAL (CPP) 66 KV FTZ line-1 at SAL SALBHRM1 GJ-0652-A 400/1 66000/110

29 Saurashtra Cement132 KV Ranavav Line-1 at Saurashtra Cement SUCRNVM1 GJ-0820-A 150/1 132000/110

30 Saurashtra Cement132 KV Ranavav Line-2 at Saurashtra Cement SUCRNVM2 GJ-0821-A 150/1 132000/110

31 Search Chem 66 KV Jhagadia line-1 at Search Chem(M) SRCJGDM1 GJ-0830-A 300/1 66000/110

32 Shah Alloy 66 KV Santej line-2 at SAL (CPP)(M) SALSTJM1 GJ-0651-A 250/1 66000/110

33 Siddhi Vinayak 66 KV Mora Line no.1 at Siddhi Vinayak M1 SVYMORM1 GJ-1459-A 300/1 66000/110

34 Siddhi Vinayak 66 KV Mora Line no.2 at Siddhi Vinayak M2 SVYMORM2 GJ-1508-A 300/1 66000/110

35 Solaris 66 KV Khavada line at Solaris SOLKHVM1 GJ-0825-A 50/1 66000/110

36 Ultra Tech 220 KV Savarkundla line-1 at Ultra tech KVYSKDM1 GJ-0796-A 200/1 220000/110

37 Ultra Tech 220 KV Savarkundla line-2 at Ultra tech KVYSKDM2 GJ-0797-A 200/1 220000/110

38 Varsana Ispat 66 KV Varsana Ispat-Varsasna IPTVARM1 GJ-0802-A 300/1 66000/110

39 Welspun 220 KV Tie Breaker at Welspun WLSANJC1 GJ-0655-A 100/1 220000/110

40 Welspun(WCPGL)22O KV Welspun [GETCO] Line at Welspun [WCPGL] M1 WPGWLGM1 GJ-1028-A 250/1 220000/110

41 Welspun(WSL) 220 KV Welspun [GETCO] Line at Welspun [WSL] M1 WSLWLGM1 GJ-1026-A 150/1 220000/110

METER INSTALLED AT CAPTIVE POWER PLANT .

Page 11 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

1 Achhalia 220 KV Jambuva line-1 at Achhalia(M) ACHJMBM1 GJ-0180-A 600/1 220000/110

2 Achhalia 220 KV Jambuva line-2 at Achhalia(M) ACHJMBM2 GJ-0181-A 600/1 220000/110

3 Achhalia 220 KV Jambuva line-3 at Achhalia(M) ACHJMBM3 GJ-0182-A 600/1 220000/110

4 Achhalia 220 KV Jambuva line-4 at Achhalia(M) ACHJMBM4 GJ-0183-A 600/1 220000/110

5 Achhalia 220 KV Ukai HPS line-1 at Achhalia(S) ACHUHPS1 GJ-0174-A 600/1 220000/110

6 Achhalia 220 KV Ukai HPS line-2 at Achhalia(S) ACHUHPS2 GJ-0175-A 600/1 220000/110

7 Achhalia 220 KV Ukai TPS line-1 at Achhalia(S) ACHUTPS1 GJ-0176-A 600/1 220000/110

8 Achhalia 220 KV Ukai TPS line-2 at Achhalia(S) ACHUTPS2 GJ-0177-A 600/1 220000/110

9 Achhalia 220 KV Ukai TPS line-3 at Achhalia(S) ACHUTPS3 GJ-0178-A 600/1 220000/110

10 Dahej 220 KV GACL line-1 at Dahej(S) DHJGACS1 GJ-0169-A 300/1 220000/110

11 Dahej 220 KV GACL line-2 at Dahej(S) DHJGACS2 GJ-0170-A 300/1 220000/110

12 Dahej 220 KV Hindalco Line-1 at Dahej DHJGACS1 GJ-0529-A 300/1 220000/110

13 Dahej 220 KV Hindalco Line-2 at Dahej DHJGACS2 GJ-0528-A 300/1 220000/110

14 Dahej 66 KV GFL Line-1 at Dahej DHJGFLS1 GJ-0590-A 300/1 66000/110

15 Dahej 66 KV TEL Line-1 at Dahej(M) DHJTELM1 GJ-0592-A 150/1 66000/110

16 Dahej 67 KV TEL Line-1 at Dahej(C ) DHJTELC1 GJ-0591-A 150/1 66000/110

17 Dahej 66 KV GFL Line-2 at Dahej DHJGFLS2 GJ-0164-A 300/1 66000/110

18 Haldarva 220 KV GPEC line-1 at Haldarva(S) HALGPES1 GJ-0193-A 1200/1 220000/110

19 Haldarva 220 KV GPEC line-2 at Haldarva(S) HALGPES2 GJ-0194-A 1200/1 220000/110

20 Haldarva 220 KV Jambuva line-1 at Haldarva(M) HALJMBM1 GJ-0165-A 1200/1 220000/110

21 Haldarva 132 KV Karajan line-1 at Haldarva(M) HALKRJM1 GJ-0166-A 600/1 132000/110

22 Haldarva 66 KV Rarod line-1 at Haldarva(M) HALRRDM1 GJ-0185-A 300/1 66000/110

23 Haldarva 220kV IPCL Reliance line -1 at Halderwa(S) HALIPHS1 GJ-0524-A 300/1 220000/110

24 Haldarva 220kV IPCL Reliance line -2 at Halderwa(S) HALIPHS2 GJ-0525-A 300/1 220000/110

25 Ichchhapur 220 KV Essar line-1 at Ichchhapur(S) ICHESRS1 GJ-0041-A 600/1 220000/110

26 Ichchhapur 220 KV Essar line-2 at Ichchhapur(S) ICHESRS2 GJ-0042-A 600/1 220000/110

27 Ichchhapur 66 KV ONGC line-1 at Ichchhapur(S) ICHONIS1 GJ-0145-A 300/1 66000/110

28 Ichchhapur 66 KV ONGC line-2 at Ichchhapur(S) ICHONIS2 GJ-0146-A 300/1 66000/110

29 Jhagadia 220 KV Jambuva line-1 at Jhagadia(M) JGDJMBM1 GJ-0171-A 1200/1 220000/110

30 Jhagadia 220 KV SLPP (Mangrol) line-1 at Jhagadia(S) JGDSLPS1 GJ-0172-A 1200/1 220000/110

31 Jhagadia 220 KV SLPP (Mangrol) line-2 at Jhagadia(S) JGDSLPS2 GJ-0173-A 1200/1 220000/110

32 Jhagadia 66 KV Search Chem line-1 at Jhagadia(S) JGDSRCS1 GJ-0222-A 300/1 66000/110

33 Kim 220 KV GSEG line-1 at Kim(S) KIMGSGS1 GJ-0046-A 600/1 220000/110

34 Kim 220 KV GSEG line-2 at Kim(S) KIMGSGS2 GJ-0103-A 600/1 220000/110

35 Kim 220 KV Utran GBPS line-1 at Kim(S) KIMUGPS1 GJ-0044-A 600/1 220000/110

36 Kim 220 KV Utran GBPS line-2 at Kim(S) KIMUGPS2 GJ-0045-A 600/1 220000/110

37 Kim 220 kV Sugen(SECo.) line-1 at Kim(S) KIMSUZS1 GJ-0606-A 300/1 220000/110

38 Kim 220 kV Sugen(SECo.) line-2 at Kim(S) KIMSUZS2 GJ-0567-A 300/1 220000/110

39 Kosamba 220 KV Utran (NEW) line-1 at Kosmaba KOSUG2S1 GJ-0402-A 600/1 220000/110

40 Kosamba 220 KV GSEG(IPP) line-1 at Kosmaba KOSGS2S1 GJ-1361-A 600/1 220000/110

41 Kosamba 220 KV GSEG(IPP) line-2 at Kosmaba KOSGS2S2 GJ-1362-A 600/1 220000/110

42 Kosamba 220 KV Utran-II line -2 at Kosamba KOSUG2S2 GJ-0378-A 600/1 220000/110

43 Kosamba 400KV Ukai line no 1 at Kosamba S1 KOSUTPS1 GJ-1513-A 1000/1 400000/110

44 Kosamba 400KV Asoj line no.1 at Kosamba S1 KOSASOS1 GJ-1515-A 1000/1 400000/110

45 Kosamba 400KV Ukai line no.2 at Kosamba S2 KOSUTPS2 GJ-1514-A 1000/1 400000/110

46 Kosamba 22O KV Gavasad Line no.1 at Kosamba M1 KOSGAVM1 GJ-1272-A 600/1 220000/110

47 Kosamba 22O KV Gavasad Line no.2 at Kosamba M2 KOSGAVM2 GJ-1348-A 600/1 220000/110

48 Mora 220 KV GSEG line-1 at Mora MORGSGS1 GJ-0212-A 1200/1 220000/110

49 Mora 66 KV Siddhi Vinayak Line no.1 at Mora end S1 MORSVYS1 GJ-1261-A 300/1 66000/110

50 Mora 66 KV Siddhi Vinayak Line no.2 at Mora end S2 MORSVYS2 GJ-1265-A 300/1 66000/110

51 Mosali 66 KV GIPCL Mangrol Solar line -1 at Mosali (S) MSLGMSS1 GJ-1303-A 300/1 66000/110

52 Mosali 66 KV GIPCL Mangrol Solar line -2 at Mosali (S) MSLGMSS2 GJ-1300-A 300/1 66000/110

53 Mota 220 KV UTPS line-1 at Mota (S) MOTUTPS1 GJ-0094-A 1200/1 220000/110

54 Mota 220 KV UTPS line-2 at Mota (S) MOTUTPS2 GJ-0102-A 1200/1 220000/110

55 Motapondha 66 KV Madhuban Dam line at Motapondha MPDMDHS1 GJ-0507-A 60/1 66000/110

56 Palej 66 KV Karajan line-1 at Palej(M) PLJKRJM1 GJ-0167-A 300/1 66000/110

57 Palej 66 KV PCBL line-1 at Palej(S) PLJPCBS1 GJ-0168-A 300/1 66000/110

58 Palej 66 KV Rarod line-1 at Palej(M) PLJRRDM1 GJ-0192-A 300/1 66000/110

59 Rajpipala 66 KV Chandod line-1 at Rajpipala(M) RJPCHDM1 GJ-0219-A 300/1 66000/110

60 Rajpipala 66 KV Kishankanaiya line-1 at Rajpipala RJPKKNS1 GJ-0405-A 100/1 66000/110

61 Rajpipala 66 KV Kishankanaiya line-2 at Rajpipala RJPKKNS2 GJ-0465-A 100/1 66000/110

62 Sachin 220 KV Essar line-1 at Sachin(Talangpur)(S) SCNESRS1 GJ-0035-A 600/1 220000/110

63 Sachin 220 KV Essar line-2 at Sachin(Talangpur)(S) SCNESRS2 GJ-0036-A 600/1 220000/110

64 Sachin 66 KV SECo. D line-1 at Sachin(Talangpur)(M) SCNSEDM1 GJ-0038-A 600/1 66000/110

65 Sachin 66 KV SECo. D line-2 at Sachin(Talangpur)(M) SCNSEDM2 GJ-0022-A 600/1 66000/110

66 Sagbara 66 KV Ukai HPS line-1 at Sagbara(S) SBRUHPS1 GJ-0223-A 100/1 66000/110

METER INSTALLED IN DAKSHIN GUJARAT VIJ COMPANY LTD.

Page 12 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

67 Sarbhan 66 KV Bodka line-1 at Sarbhan(M) SRBBDKM1 GJ-0224-A 300/1 66000/110

68 Songadh 66 KV JK Paper Mill line at Songadh SONJKPS1 GJ-0112-A 100/1 66000/110

69 Tilakwada 22 KV Side of ICT-1 at Tilakwada(DGVCL)(M) TLK5ICM1 GJ-1244-A 100/1 22000/110

70 Tilakwada 22 KV Side of ICT-2 at Tilakwada(DGVCL)(M) TLK5ICM2 GJ-1382-B 100/5 22000/110

71 Vav 220 KV Utran Line-2 (Old VAV-Kim L2)(06/11/09 at 20.55) VAVUG2S2 GJ-0551-A 1200/1 220000/110

72 Wagra 66 KV ONGC line-1 at Wagra (S) WGRONWS1 GJ-0190-A 150/1 66000/110

73 Wagra 66 KV ONGC line-2 at Wagra (S) WGRONWS2 GJ-0191-A 150/1 66000/110

1 Asoj 400 KV Wanakbori TPS line-1 at Asoj AS4WTPS1 GJ-0482-A 1000/1 400000/110

2 Asoj 400 KV Side of ICT-1 at Asoj(M) ASO4ICM1 GJ-0486-A 1500/1 400000/110

3 Asoj 400 KV Side of ICT-2 at Asoj(M) ASO4ICM2 GJ-0485-A 1500/1 400000/110

4 Asoj 400KV Amreli line no.2 at Asoj(M2) ASOAMRM2 GJ-0480-A 1000/1 400000/110

5 Asoj 400 KV Chorania line-1 at Asoj(M) ASOCHNM1 GJ-0483-A 1000/1 400000/110

6 Asoj 400 KV Ukai TPS line -1 at Asoj (M) ASOKOSM1 GJ-0481-A 1000/1 400000/110

7 Asoj 220 KV Wanakbori TPS line-1 at Asoj ASOWTPS1 GJ-0487-A 600/1 220000/110

8 Asoj 220 KV Wanakbori TPS line-2 at Asoj ASOWTPS2 GJ-0488-A 600/1 220000/110

9 Asoj 400kV SSP line at Asoj ASOSSPS1 GJ-0484-A 1000/1 400000/110

10 Bodaka 66 KV Sarbhan line-1 at Bodaka(M) BDKSRBM1 GJ-0444-A 300/1 66000/110

11 Chandod 66 KV Rajpipala line-1 at Chandod(M) CHDRJPM1 GJ-0452-A 300/1 66000/110

12 Fertilizer Nagar 66 KV Side of ICT-1 at Fertilizer Nagar(M) FNG6ICM1 GJ-0464-A 600/1 66000/110

13 Fertilizer Nagar 66 KV Side of ICT-2 at Fertilizer Nagar(M) FNG6ICM2 GJ-0467-A 600/1 66000/110

14 Fertilizer Nagar 66 KV Side of ICT-3 at Fertilizer Nagar(M) FNG6ICM3 GJ-0466-A 600/1 66000/110

15 Fertilizer Nagar 132 KV GSFC(Vadodara) line-1 at Fertilizer Nagar(M) FNGGSVM1 GJ-0462-A 300/1 132000/110

16 Fertilizer Nagar 132 KV GSFC(Vadodara) line-2 at Fertilizer Nagar(M) FNGGSVM2 GJ-0463-A 300/1 132000/110

17 Fertilizer Nagar 66 KV HWP line-1 at Fertiliser Nagar (M) FNGHWPM1 GJ-0005-B 100/5 66000/110

18 Gavasad 220 KV SLPP(Mangrol) line-1 at Gavasad(S) GAVSLPS1 GJ-0446-A 600/1 220000/110

19 Gavasad 220 KV SLPP(Mangrol) line-2 at Gavasad(S) GAVSLPS2 GJ-0445-A 600/1 220000/110

20 Gavasad 66 KV Masor Road line-1 at Gavasad(M) GAVMSRM1 GJ-0437-A 300/1 66000/110

21 Gavasad 220 KV SLPP(Mangrol) line-3 at Gavasad(S) GAVSLPS3 GJ-0600-A 1200/1 220000/110

22 Gavasad 220 KV SLPP(Mangrol) line-4 at Gavasad(S) GAVSLPS4 GJ-0599-A 1200/1 220000/110

23 Gavasad 22O KV Kosamba Line no.1 at Gavasad M1 GAVKOSM1 GJ-1323-A 600/1 220000/110

24 Gavasad 22O KV Kosamba Line no.2 at Gavasad M2 GAVKOSM2 GJ-1325-A 600/1 220000/110

25 Godhara 220 KV Kadana HPS line-1 at Godhara GDHKHPS1 GJ-0447-A 600/1 220000/110

26 Godhara 220 KV Wanakbori TPS line-1 at Godhara GDHWTPS1 GJ-0449-A 600/1 220000/110

27 Gotri 132 KV Dhuvaran TPS line-1 at Gotri GTRDTPS1 GJ-0442-A 600/1 132000/110

28 Gotri 132 KV Dhuvaran TPS line-2 at Gotri GTRDTPS2 GJ-0443-A 600/1 132000/110

29 Jambuva 220 KV Achhalia line-1 at Jambuva(M) JMBACHM1 GJ-0431-A 600/1 220000/110

30 Jambuva 220 KV Achhalia line-2 at Jambuva(M) JMBACHM2 GJ-0432-A 600/1 220000/110

31 Jambuva 220 KV Achhalia line-3 at Jambuva(M) JMBACHM3 GJ-0433-A 600/1 220000/110

32 Jambuva 220 KV Achhalia line-4 at Jambuva(M) JMBACHM4 GJ-0434-A 600/1 220000/110

33 Jambuva 220 KV Haldarwa line-1 at Jambuva(M) JMBHALM1 GJ-0564-A 600/1 220000/110

34 Jambuva 220 KV Zagadia line-1 at Jambuva(M) JMBJGDM1 GJ-0565-A 600/1 220000/110

35 Jambuva 132 KV Tilakvada line-1 at Jambuva(M) JMBTLKM1 GJ-0435-A 300/1 132000/110

36 Jawaharnagar 132 KV GIPCL line-3 at Jawaharnagar JWNGPLS3 GJ-0470-A 1200/1 132000/110

37 Jawaharnagar 132 KV GIPCL line-4 at Jawaharnagar JWNGPLS4 GJ-0477-A 1200/1 132000/110

38 Jawaharnagar 33 KV IPCL line -1 at Jawaharnagar. JWNIPCS1 GJ-0436-A 1800/1 33000/110

39 Jorapura 66 KV Sathamba line-1 at Jorapura(M) JORSTHM1 GJ-0253-A 300/1 66000/110

40 Kapadwanj 220 KV Khanpur line-1 at Kapadwanj(M) KPDKNPM1 GJ-0321-A 600/1 220000/110

41 Kapadwanj 220 KV Khanpur line-2 at Kapadwanj(M) KPDKNPM2 GJ-0322-A 600/1 220000/110

42 Kapadwanj 220 KV Ranasan line-1 at Kapadwanj(M) KPDRSNM1 GJ-0308-A 600/1 220000/110

43 Kapadwanj 220 KV Wanakbori TPS line-1 at Kapadwanj(S) KPDWTPS1 GJ-0259-A 1200/1 220000/110

44 Kapadwanj 220 KV Ranasan line-2 at Kapadwanj(M) KPDRSNM2 GJ-0315-A 600/1 220000/110

45 Kapadwanj 220 KV Wanakbori TPS line-2 at Kapadwanj(S) KPDWTPS2 GJ-0320-A 1200/1 220000/110

46 Karamsad 132 KV Dhuvaran TPS line-1 at Karamsad KRMDTPS1 GJ-0456-A 600/1 132000/110

47 Karamsad 132 KV Dhuvaran TPS line-2 at Karamsad KRMDTPS2 GJ-0457-A 600/1 132000/110

48 Karamsad 220 KV GPEC line-1 at Karamsad KRMGPES1 GJ-0455-A 600/1 220000/110

49 Karamsad 220 KV GPEC line-2 at Karamsad KRMGPES2 GJ-0458-A 600/1 220000/110

50 Karamsad 220 KV Ranasan line-1 at Karamsad(M) KRMRSNM1 GJ-0453-A 600/1 220000/110

51 Karamsad 220 KV Ranasan line-2 at Karamsad(M) KRMRSNM2 GJ-0454-A 600/1 220000/110

52 Karamsad 220 KV Salejada line-1 at Karamsad(M) KRMSLJM1 GJ-0460-A 600/1 220000/110

53 Karjan 132 KV Haldarva line-1 at Karjan(M) KRJHALM1 GJ-0438-A 600/1 132000/110

54 Karjan 66 KV PCBL line-1 at Karjan(S) KRJPCBS1 GJ-0441-A 300/1 66000/110

55 Karjan 66 KV Palej line-1 at Karjan(M) KRJPLJM1 GJ-0440-A 300/1 66000/110

56 Kasor 220 KV Vartej line-1 at Kasor(M) KASVRTM1 GJ-0459-A 600/1 220000/110

57 Kasor 220 KV Side of ICT-1 at Kasor(M) KAS2ICM1 GJ-0494-A 1200/1 220000/110

58 Kasor 220 KV Side of ICT-2 at Kasor(M) KAS2ICM2 GJ-0495-A 1200/1 220000/110

59 Kasor 400 KV Chorania line-1 at Kasor(M) KASCHNM1 GJ-0492-A 1000/1 400000/110

60 Kasor 400 KV GPEC line-1 at Kasor KASGPES1 GJ-0491-A 1000/1 400000/110

61 Kasor 400kV SSP line-1 at Kasor KASSSPS1 GJ-0493-A 1000/1 400000/110

METER INSTALLED IN MADHYA GUJRAT VIJ COMPANY LTD.

Page 13 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

62 Kasor 220 KV Botad line-1 at Kasor(M) KASBOTM1 GJ-0496-A 600/1 220000/110

63 Kheda 66 KV Samadra Line at Kheda(M) KDASMDM1 GJ-0293-A 300/1 66000/110

64 Masor Road 11 KV Abhor line-1 at Masor Road(M) MSRABRM1 GJ-1380-B 150/5 11000/110

65 Masor Road 11 KV Station X;mer-1 at Masor Road(M) MSRSSTM1 GJ-1384-B 200/5 11000/110

66 Masor Road 11 KV Masor line-1 at Masor Road(M) MSRMSRM1 GJ-1387-B 200/5 11000/110

67 Mehmedabad 66 KV Barejadi line-1 at Mehmedabad(M) MHEBRJM1 GJ-0292-A 300/1 66000/110

68 Mehmedabad 66 KV Hirapura line-1 at Mehmedabad(M) MHEHIRM1 GJ-0290-A 300/1 66000/110

69 Mehmedabad 132 KV Vatava line-1 at Mehmedabad(M) MHEVATM1 GJ-0291-A 600/1 132000/110

70 Nandesari 132 KV GIPCL line-1 at Nandesari NSRGPLS1 GJ-0471-A 1200/1 132000/110

71 Nandesari 132 KV GIPCL line-2 at Nandesari NSRGPLS2 GJ-0476-A 1200/1 132000/110

72 Nirmali 66 KV Ambaliyara line-1 at Nirmali(M) NMLABLM1 GJ-0254-A 300/1 66000/110

73 Rarod 66 KV Haldarva line-1 at Rarod(M) RRDHALM1 GJ-0217-A 100/1 66000/110

74 Sausad na Muvada220 KV Kadana line no.2 at Sausad na Muvada S2 SUDKHPS2 GJ-1243-A 600/1 220000/110

75 Shehra 11 KV Panam LBPH line-1 at Shehra SHRPANS1 GJ-0004-B 200/5 11000/110

76 Tilakwada 66 KV Side of ICT-1 at Tilakwada(C) TLK6ICC1 GJ-0526-A 100/1 66000/110

77 Tilakwada 66 KV Side of ICT-2 at Tilakwada(C) TLK6ICC2 GJ-0527-A 100/1 66000/110

78 Undel 132 KV Dhuvaran TPS line-1 at Undel UNDDTPS1 GJ-0461-A 600/1 132000/110

79 Undel 66 KV ACME Solar Line -1 at Undel (S) UNDACMS1 GJ-1301-A 150/1 66000/110

80 Undel 66 KV ACME Solar Line -2 at Undel (S) UNDACMS2 GJ-1302-A 150/1 66000/110

1 Amreli 220 KV Side of ICT-1 at Amreli(S) AMR2ICS1 GJ-2015-A 1200/1 220000/110

2 Amreli 220 KV Side of ICT-2 at Amreli(S) AMR2ICS2 GJ-2016-A 1200/1 220000/110

3 Amreli 400 KV Chorania line-1 at Amreli AMRCHNM1 GJ-0760-A 1000/1 400000/110

4 Amreli 400KV Asoj line no.2 at Amreli(M2) AMRASOM2 GJ-0760-A 1000/1 400000/110

5 Anjar 66 KV Kandala Port Trust Line -1 at Anjar (M) ANJKPTM1 GJ-2156-A 100/1 66000/110

6 Anjar 220 KV Welspun(CPP) Line -1 at Anjar (M) ANJWLSS1 GJ-2105-A 600/1 220000/110

7 Barwala 132 KV Dhandhuka line-1 at Barwala BRVDHAM1 GJ-2121-A 300/1 132000/110

8 Bayath 66 KV Changdai(Suzlon)(WF) line-1 at Bayath(S) BYTCHGS1 GJ-0708-A 300/1 66000/110

9 Bhachau 220 KV Halvad line no.-1 at Bhachau M1 BCUHLVM1 GJ-1362-A 800/1 220000/110

10 Bhachau 220 KV Halvad line no.-2 at Bhachau M2 BCUHLVM2 GJ-1144-A 800/1 220000/110

11 Bhachau 220 KV Lalpar line no.-1 at Bhachau M1 BCULALM1 GJ-1146-A 800/1 220000/110

12 Bhachau 220 KV Morbi line no.-1 at Bhachau M1 BCUMRBM1 GJ-1153-A 800/1 220000/110

13 Bhadla 66KV Parevada line no.1 at Bhadla BHLPRWS1 GJ-1044-A 300/1 66000/110

14 Bhadla 66KV Parevada line no.2 at Bhadla BHLPRWS2 GJ-1043-A 300/1 66000/110

15 Bhadther 66 KV Vinjalpar [W/F] Line no.2 at Bhadther S2 BDHVJPS2 GJ-0989-A 300/1 66000/110

16 Bhadther 66 KV Vinjalpar [W/F] Line no.1 at Bhadther S1 BDHVJPS1 GJ-0988-A 300/1 66000/110

17 Bharapara(Kidana)66 KV SAL line-1 at Kidana(S) BHRSALS1 GJ-2142-A 300/1 66000/110

18 Bhatiya 66 KV Bhogat(WF) line-1 at Bhatiya(S) BHTBGTS1 GJ-2087-A 600/1 66000/110

19 Bhatiya 132 KV Enercon(WF) line-1 at Bhatiya(S) BHTENRS1 GJ-2085-A 600/1 132000/110

20 Bhatiya 66 KV Navadra(WF) line-1 at Bhatiya(S) BHTNVDS1 GJ-2088-A 600/1 66000/110

21 Bhatiya 11 KV Okhamadhi(WF) line-1 at Bhatiya(S) BHTOKHS1 GJ-2199-B 150/5 11000/110

22 Bhatiya 11 KV Okhamadhi(WF) line-2 at Bhatiya(S) BHTOKHS2 GJ-2200-B 150/5 11000/110

23 Bhatiya 132 KV sikka TPS line-1 at Bhatiya(S) BHTSTPS1 GJ-2086-A 600/1 132000/110

24 Bhatiya 132 KV Enercon(WF) line-2 at Bhatiya(S) BHTENRS2 GJ-2079-A 600/1 132000/110

25 Bhomiyavadar 132 KV Motagunda Line no. 1 at Bhomiyavadar S1 BHMMTGS1 GJ-1327-A 600/1 132000/110

26 Bhomiyavadar 132 KV Motagunda Line no. 2 at Bhomiyavadar S2 BHMMTGS2 GJ-1328-A 600/1 132000/110

27 Bhomiyavdar 132KV Sikka line no.1 at Bhomiyavdar BHMSTPS1 GJ-2012-A 600/1 132000/110

28 Bokhira 66 KV Kuchhdi Line -1 BKHKUCS1 GJ-0712-A 300/1 66000/110

29 Bokhira 66 KV Kuchhdi Line -2 BKHKUCS2 GJ-0711-A 300/1 66000/110

30 Botad 220 KV Kasor Line - 1 at Botad(M) BOTKASM1 GJ-2134-A 600/1 220000/110

31 Chhaya 66 KV Odadara line-1 at Chhaya CHYODRS1 GJ-0721-A 300/1 66000/110

32 Chhaya 66 KV Odadara line-2 at Chhaya CHYODRS2 GJ-0722-A 300/1 66000/110

33 Chitrod 66 KV Konark Solar Line No. 1 at Chirod S/S S1 CRDKNRS1 GJ-0996-A 300/1 66000/110

34 Chitrod 66 KV Konark Solar Line No. 2 at Chirod S/S S2 CRDKNRS2 GJ-1020-A 300/1 66000/110

35 Chitrod 66 KV Semi Solar Line No. 2 at Chirod S/S S2 CRDSMIS2 GJ-1034-A 300/1 66000/110

36 Chitrod 66 KV Semi Solar Line No. 1 at Chirod S/S S1 CRDSMIS1 GJ-1033-A 300/1 66000/110

37 Chitrod 66 KV ICML Solar Line No.1 at Chirod S/S S1 CRDICMS1 GJ-1035-A 300/1 66000/110

38 Chitrod 66 KV ICML Solar Line No.2 at Chirod S/S S2 CRDICMS2 GJ-0987-A 300/1 66000/110

39 Chorania 220 KV Side of ICT-1 at Chorania CHN2ICS1 GJ-0247-A 1500/1 220000/110

40 Chorania 220 KV Side of ICT-2 at Chorania CHN2ICS2 GJ-0248-A 1500/1 220000/110

41 Chorania 400 KV Asoj line-1 at Chorania(M) CHNASOM1 GJ-0245-A 1000/1 400000/110

42 Chorania 400 KV Kasor line-1 at Chorania(M) CHNKASM1 GJ-0246-A 1000/1 400000/110

43 Chorania 220 KV Salejada line-1 at Chorania(M) CHNSLJM1 GJ-0250-A 600/1 220000/110

44 Chorania 220 KV Viramgam line-1 at Chorania(M) CHNVGMM1 GJ-0249-A 600/1 220000/110

45 Chorania 400 KV Amreli line-1 at Chorania(M) CHNAMRM1 GJ-0252-A 1000/1 400000/110

46 Chorania 400 KV Asoj line-2 at Chorania(M) CHNASOM2 GJ-0251-A 1000/1 400000/110

47 Chorania 400 KV Vadavi Line-1 at Chorania CHNVDVM1 GJ-1195-A 1000/1 400000/110

48 Chorania 400 KV Vadavi Line-2 at Chorania CHNVDVM2 GJ-0356-A 1000/1 400000/110

49 Dhama 66 KV Dreisatz Solar line no.2 at Dhama S2 DHMDMSS2 GJ-1175-A 300/1 66000/110

50 Dhama 66 KV Millanium [SOLAR] Line no.1 at Dhama S1 DHMMSSS1 GJ-1101-A 300/1 66000/110

51 Dhama 66 KV My Solar Line no.1 at Dhama S1 DHMMYSS1 GJ-1170-A 300/1 66000/110

52 Dhama 66 KV Millanium [SOLAR] Line no.2 at Dhama S2 DHMMSSS2 GJ-1108-A 300/1 66000/110

53 Dhama 66 KV Visual Percept [SOLAR] Line no.2 at Dhama S2 DHMVPSS2 GJ-1104-A 300/1 66000/110

54 Dhama 66 KV Azure [SOLAR] Line no.2 at Dhama S2 DHMAZUS2 GJ-1169-A 300/1 66000/110

55 Dhama 66 KV EMCO [SOLAR] Line no.1 at Dhama S1 DHMEMCS1 GJ-1171-A 300/1 66000/110

56 Dhama 66 KV EMCO [SOLAR] Line no.2 at Dhama S2 DHMEMCS2 GJ-1145-A 300/1 66000/110

57 Dhama 66 KV Azure [SOLAR] Line no.1 at Dhama S1 DHMAZUS1 GJ-1107-A 300/1 66000/110

METER INSTALLED IN PASCHIM GUJRAT VIJ COMPANY LTD.

Page 14 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

58 Dhama 66 KV Visual Percept [SOLAR] Line no.1 at Dhama S1 DHMVPSS1 GJ-1176-A 300/1 66000/110

59 Dhama 66 KV ESP [SOLAR] Line no.1 at Dhama S1 DHMESSS1 GJ-1157-A 300/1 66000/110

60 Dhama 66 KV ESP [SOLAR] Line no.2 at Dhama S2 DHMESSS2 GJ-1156-A 300/1 66000/110

61 Dhanki 220 KV Viramgam line-1 at Dhanki(M) DHKVGMM1 GJ-0312-A 600/1 220000/110

62 Dhanki 220 KV Viramgam line-2 at Dhanki(M) DHKVGMM2 GJ-0260-A 600/1 220000/110

63 Dhokadwa 66kV Diu line at Dhokadwa DKWDIUS1 GJ-2006-A 300/1 66000/110

64 Dhrol 132 KV Sikka TPS Line - 1 at Dhrol(S) DHLSTPS1 GJ-2115-A 600/1 132000/110

65 Dhudhai 66 KV Welspun Solar line -1 at Dhudhai (S) DUHWSSS1 GJ-0938-A 300/1 66000/110

66 Dhudhai 66 KV Unity Power Pvt (solar) line -1 at Dudhai (S) DUHUNPS1 GJ-0939-A 300/1 66000/110

67 Don 66 KV Layja line-1 at Don DONLYJS1 GJ-0691-A 300/1 66000/110

68 Don 66 KV Layja line-2 at Don DONLYJS2 GJ-0693-A 300/1 66000/110

69 Dungarpur 66 KV Ratabher (W/F) line no.1 at Dungarpur S1 DUNRATS1 GJ-1150-A 600/1 66000/110

70 Dungarpur 66KV Ratabher (W/F) line no. 2 at Dungarpur S2 DUNRATS2 GJ-1110-A 600/1 66000/110

71 FTZ 11 KV FTZ (WF) line-1 at FTZ(S) FTZFTWS1 GJ-2213-B 150/5 11000/110

72 FTZ 66 KV KPT line - 1 at FTZ FTZKPTM GJ-2158-A 100/1 66000/110

73 Hadala 220 KV Side of ICT-1 at Hadala (S) HAD2ICS1 GJ-2022-A 1200/1 220000/110

74 Hadala 220 KV Side of ICT-2 at Hadala (S) HAD2ICS2 GJ-2023-A 1200/1 220000/110

75 Hadala 400 KV APL(Mundra) line-1 at Hadala HADAPLS1 GJ-0734-A 1000/1 400000/110

76 Hadala 400 KV Vadinar(ESSAR) line-1 at Hadala HADVDNS1 GJ-2048-A 1000/1 400000/110

77 Hadala 400 KV Vadinar(ESSAR) line-2 at Hadala HADVDNS2 GJ-2130-A 1000/1 400000/110

78 Halvad 220 KV Bhachau line no.-1 at Halvad M1 HLVBCUM1 GJ-1263-A 600/1 220000/110

79 Halvad 220 KV Bhachau line no.2 at Halvad M2 HLVBCUM2 GJ-1336-A 600/1 220000/110

80 Jadeshwar 66 Kv Tithva(WF) Line-1 at Jadeshwr JDSTHVS1 GJ-0371-A 350/1 66000/110

81 Jadeshwar 67 Kv Tithva(WF) Line-2 at Jadeshwr JDSTHVS2 GJ-0391-A 350/1 66000/110

82 Jafrabad 66 KV Side of ICT-1 at Jafrabad(S) JFR6ICS1 GJ-2131-A 50/1 66000/110

83 Jafrabad 66 KV Side of ICT-2 at Jafrabad(S) JFR6ICS2 GJ-2132-A 100/1 66000/110

84 Jamnagar 132 KV Sikka TPS Line - 2 at Jamnagar(S) JMNSTPS2 GJ-2025-A 600/1 132000/110

85 Jamnagar 220 KV Essar Line(CPP) - 1 at Jamnagar(S) JMNESRS1 GJ-2116-A 300/1 220000/110

86 Jamnagar 221 KV Essar Line(CPP) - 1 at Jamnagar(S) JMNESRS2 GJ-2102-A 300/1 220000/110

87 Jamnagar 220 KV Essar Oil line-1 at Jamnagar JMNEOLS1 GJ-2116-A 300/1 220000/110

88 Jamnagar 220 KV Essar Oil line-1 at Jamnagar JMNEOLS2 GJ-2102-A 300/1 220000/110

89 Jasdan 132 KV Dhandhuka line-1 at Jasdan(M) JSDDHAM1 GJ-2059-A 600/1 132000/110

90 Jasdan 66 KV GFL(WF) line-1 at Jasdan JSDGFWS1 GJ-0864-A 300/1 66000/110

91 Jasdan 66 KV GFL(WF) line-2 at Jasdan JSDGFWS2 GJ-0863-A 300/1 66000/110

92 Jasdan 132 KV Theolia [W/F] Line no.2 at Jasdan S2 JSDTOLS2 GJ-0935-A 150/1 132000/110

93 Jasdan 132 KV Theolia [W/F] Line no.1 at Jasdan S1 JSDTOLS1 GJ-0934-A 150/1 132000/110

94 Jetpur 220 KV Side of ICT-1 at Jetpur(S) JET2ICS1 GJ-2080-A 1200/1 220000/110

95 Jetpur 220 KV Side of ICT-2 at Jetpur(S) JET2ICS2 GJ-2081-A 1200/1 220000/110

96 Jetpur 220 KV Side of ICT-3 at Jetpur(S) JET2ICS3 GJ-2082-A 1200/1 220000/110

97 Kadamgiri 66KV Sherdivdar line no.1 at Kadamgiri S1 KDMSHDS1 GJ-1429-A 300/1 66000/110

98 Kadamgiri 66KV Sherdivdar line no.2 at Kadamgiri S2 KDMSHDS2 GJ-1219-A 300/1 66000/110

99 Kalyanpur 66 KV Patleka(WF) line-1 at Kalyanpur(M) KLNPTLM1 GJ-0735-A 300/1 66000/110

100 Kamalpur 66 KV Parewada line -1 at Kamalapur KMPPRWS1 GJ-1044-A 300/1 66000/110

101 Kamalpur 66 KV Parewada line -2 at Kamalapur KMPPRWS2 GJ-1043-A 300/1 66000/110

102 Kamalpur 66 KV Viramgam line-1 at Kamalpur(M) KMLVGMM1 GJ-0310-A 300/1 66000/110

103 Kamalpur 66 KV Responsive Sutip Solar Line no.2 at Kamalpur S2 KMLRTPS2 GJ-1178-A 600/1 66000/110

104 Kamalpur 66 KV Ujjawala SOLAR at Kamalpur S1 KMLUJWS1 GJ-1235-A 600/1 66000/110

105 Kanaiyabee 66 KV Taxus SOLAR Line No.1 at Kanaiyabee S1 KBETXSS1 GJ-1016-A 300/1 66000/110

106 Kanaiyabee 66 KV Taxus SOLAR Line No.2 at Kanaiyabee S2 KBETXSS2 GJ-1015-A 300/1 66000/110

107 Kandla 11 KV Port Feeder line at Kandla KDLPRTM1 GJ-0769-B 150/5 11000/110

108 Kanza 66 KV JPPL BIOMASS line at Kanza KAZJPPS1 GJ-0350-A 300/1 66000/110

109 Kesariya 66 KV Monosteel Line no.1 [SOLAR] at Kesariya S1 KSRMNSS1 GJ-0973-A 300/1 66000/110

110 Kesariya 66 KV Monosteel Line no.2 [SOLAR] at Kesariya S2 KSRMNSS2 GJ-0972-A 300/1 66000/110

111 Khageshri 66 KV Helabeli Solar line -1 at Khageshri(S) KHGHLBS1 GJ-0970-A 300/1 66000/110

112 Khageshri 66 KV Helabeli Solar line -2 at Khageshri(S) KHGHLBS2 GJ-0971-A 300/1 66000/110

113 Khambhala 66 KV Theolia [W/F] Line no.1 at Khambhala KBLTOLS1 GJ-1309-A 300/1 66000/110

114 Khambhala 66 KV Theolia [W/F] Line no.2 at Khambhala KBLTOLS2 GJ-1314-A 300/1 66000/110

115 Khangeshri 66 KV APCA [Vadekhan] Solar Line no.1 at Khangeshri S1 KHGAPCS1 GJ-0966-A 300/1 66000/110

116 Khangeshri 66 KV APCA [Vadekhan] Solar Line no.2 at Khangeshri S2 KHGAPCS2 GJ-0964-A 300/1 66000/110

117 Khavada 66 KV Solaris Chem Tech Line-1 at Khavada KHVSOLS1 GJ-0678-A 50/1 66000/110

118 Khedoi 66 KV Betavaladia Line-1 at Khedoi KDIBTVS1 GJ-0682-A 600/1 66000/110

119 Khedoi 66 KV Betavaladia Line-2 at Khedoi KDIBTVS2 GJ-0683-A 600/1 66000/110

120 Khimat 66 KV Sand Land [SOLAR] line no.1 at Khimat S1 KMTSLSS1 GJ-1184-A 300/1 66000/110

121 Khimat 66 KV Sand Land [SOLAR] line no.1 at Khimat S2 KMTSLSS2 GJ-1185-A 300/1 66000/110

122 Kidana 66 KV Renuka Sugar Line at Kidana S1 KIDRNSS1 GJ-1009-A 300/1 66000/110

123 Kotdapitha 66 KV SEPC line-1 at Kotdapitha KTDSEPS1 GJ-0752-A 600/1 66000/110

Page 15 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

124 Kotdapitha 66 KV SEPC line-2 at Kotdapitha KTDSEPS2 GJ-0912-A 600/1 66000/110

125 Kothara 66 KV Vanku(Suzlon)(WF) line-2 at Kothara(S) KOTVNKS2 GJ-2148-A 300/1 66000/110

126 Kothara 66 KV Vanku(Suzlon)(WF) line-1 at Kothara(S) KOTVNKS1 GJ-2147-A 300/1 66000/110

127 Kukma 220 KV Panandhro(Kachchha) TPS Line -1 at Kukma (S) KUKKTPS1 GJ-2108-A 600/1 220000/110

128 Kukma 220 KV Panandhro(Kachchha) TPS Line -2 at Kukma (S) KUKKTPS2 GJ-2160-A 600/1 220000/110

129 KUNTALPUR 66 KV LOUREX LINE-1 AT KUNTALPUR(S) KUNLOUS1 GJ-1155-A 300/1 66000/110

130 KUNTALPUR 66 KV LOUREX LINE-2 AT KUNTALPUR(S) KUNLOUS2 GJ-1109-A 300/1 66000/110

131 Lakhtar 66 KV Zamp line-1 at Lakhtar(M) LKTZMPM1 GJ-0339-A 300/1 66000/110

132 Lalpar 220 KV Bhachau line no.1 at Lalpar M1 LALBCUM1 GJ-1030-A 600/1 220000/110

133 Lamba 66 KV Lamba(WF) Line - 1 at Lamba(GETCO)(m) LBALBAS1 GJ-2089-A 300/1 66000/110

134 Latipar 66 KV Balambha line-1 at Latipar LTPBLMS1 GJ-0741-A 300/1 66000/110

135 Latipar 66 KV Balambha line-2 at Latipar LTPBLMS2 GJ-0742-A 300/1 66000/110

136 Limbadi 132 KV Dhuvaran GBPS line-1 at Limbadi LMDDGPS1 GJ-0255-A 600/1 132000/110

137 Limbadi 132 KV Dhuvaran GBPS line-2 at Limbadi LMDDGPS2 GJ-0256-A 600/1 132000/110

138 Madhvpura 66 KV Gorsar line-1 at Madhavpur MDVGORS1 GJ-0755-A 300/1 66000/110

139 Madhvpura 66 KV Gorsar line-2 at Madhavpur MDVGORS2 GJ-0754-A 300/1 66000/110

140 Mamsa 66 KV Ukharala(Suzlon)(WF) line-1 at Mamsa(S) MMSUKRS1 GJ-2009-A 300/1 66000/110

141 Meravdar 66 KV Gangesh Solar line no. 1 at Meravdar MNVGGSS1 GJ-1351-A 300/1 66000/110

142 Meravdar 66 KV Gangesh SOlar line no. 2 at Meravdar MNVGGSS2 GJ-1352-A 300/1 66000/110

143 Meravdar 66 KV CBC STPL [SOLAR] Line at Mervadar S1 MNVCBCS1 GJ-1355-A 125/1 66000/110

144 Meravdar 66 KV GMP [SOLAR] Line at Mervadar S1 MNVGMPS1 GJ-1253-A 300/1 66000/110

145 Mithirohar 66 KV MidIndia line-1 at Mithirohar MTHMIDC1 GJ-0710-A 300/1 66000/110

146 Modpar 66 KV Pionner Wincom Pvt Ltd [W/F] Line no.1 at Modpar S1 MDPPWPS1 GJ-1925-A 300/1 66000/110

147 Modpar 66 KV Pionner Wincom Pvt Ltd [W/F] Line no.2 at Modpar S2 MDPPWPS2 GJ-1926-A 300/1 66000/110

148 Mokha 66 KV PCBL(Mokha) Line at Motha MOKPCMS1 GJ-0680-A 150/1 66000/110

149 Morbi 220 KV Bhachau line no.1 at Morbi M1 MRBBCUM1 GJ-1029-A 600/1 220000/110

150 Mota dadva 66 KV Halenda line-1 at Mota dadva MTDHLNS1 GJ-0942-A 600/1 66000/110

151 Mota dadva 66 KV Halenda line-2 at Mota dadva MTDHLNS2 GJ-0943-A 600/1 66000/110

152 Motabarman 66 KV Sunkon [SOLAR] Line no.1 at Motabarman S1 MBNSUNS1 GJ-1224-A 300/1 66000/110

153 Motabarman 66 KV Sunkon [SOLAR] Line no.1 at Motabarman S2 MBNSUNS2 GJ-1223-A 300/1 66000/110

154 MotaGunda 66 KV Elecon(WF) Line-1 at MotaGunda MTGELES1 GJ-0887-A 300/1 66000/110

155 MotaGunda 66 KV Elecon(WF) Line-2 at MotaGunda MTGELES2 GJ-0888-A 300/1 66000/110

156 Motipandeli 220 KV Sadodar line-1 at Motipaneli MPLSADM1 GJ-0714-A 600/1 220000/110

157 Motipandeli 220 KV Sadodar line-2 at Motipaneli MPLSADM2 GJ-0715-A 600/1 220000/110

158 Mundra Industrial 66 KV Mitap line at Mundra Industrial M1 MUIMTPM1 GJ-0737-A 150/1 66000/110

159 Nagedi 132 KV Sikka TPS Line - 1 at Nagedi(S) NGDSTPS1 GJ-1927-A 600/1 132000/110

160 Nakhatrana 220 KV Akrimota TPS Line -1 at Nakhatrana (S) NKTATPS1 GJ-2153-A 600/1 220000/110

161 Nakhatrana 220 KV Akrimota TPS Line -2 at Nakhatrana (S) NKTATPS2 GJ-2154-A 600/1 220000/110

162 Nakhatrana 220 KV Panandhro(Kachchha) TPS Line -1 at Nakhatrana (S) NKTKTPS1 GJ-2151-A 600/1 220000/110

163 Nakhatrana 220 KV Panandhro(Kachchha) TPS Line -2 at Nakhatrana (S) NKTKTPS2 GJ-2152-A 600/1 220000/110

164 Nakhatrana 220 KV Jamanvada wind farm line-1 at Nakhatrana NKTJMVS1 GJ-2154-A 600/1 220000/110

165 Nakhatrana 66 KV Rasaliya [W/F] Line no.2 at Nakhatrana S2 NKTRASS2 GJ-0977-A 600/1 66000/110

166 Nakhatrana 66 KV Rasaliya [W/F] Line no.1 at Nakhatrana S1 NKTRASS1 GJ-0976-A 600/1 66000/110

167 Nanikhakhar 220kV Suthari line -1 at Nanikhakhar(S) NKHSUTS1 GJ-2100-A 600/1 220000/110

168 Nanikhakhar 220kV Suthari line -2 at Nanikhakhar(S) NKHSUTS2 GJ-2103-A 600/1 220000/110

169 Nanikhakhar 220 KV Sindhodi Line-1 at Nanikhakhar NKHSINS1 GJ-0701-A 600/1 220000/110

170 Nanikhakhar 220 KV Sindhodi Line-2 at Nanikhakhar NKHSINS2 GJ-0702-A 600/1 220000/110

171 Nanikhakhar 220 KV APL line-1 at Nanikhakhar NKHAPLS1 GJ-0706-A 1200/1 220000/110

172 Nanikhakhar 220 KV APL line-2 at Nanikhakhar NKHAPLS2 GJ-0707-A 1200/1 220000/110

173 Nari road 66 KV Nirma line at Nari road end S1 NRINRMS1 GJ-1053-A 150/1 66000/110

174 Netra 66 KV Adani Solar line -1 at Netra (S) NTRAELS1 GJ-0961-A 300/1 66000/110

175 Netra 66 KV Adani Solar line -2 at Netra (S) NTRAELS2 GJ-0960-A 300/1 66000/110

176 Nyara 220 KV Tebhda Line - 1 at Nyara(S) NYRTBDS1 GJ-0951-A 600/1 220000/110

177 Nyara 220 KV Tebhda line no.2 at Nyara end S2 NYRTBDS2 GJ-0948-A 600/1 220000/110

178 Otha 220 KV GPPC Line no.2 at Otha S2 OTHGPCS2 GJ-0882-A 600/1 220000/110

179 Paliyad 132 KV Side of ICT-1 at Paliyad (M) PLD1ICM1 GJ-2098-A 300/1 132000/110

180 Paliyad 132 KV Side of ICT-2 at Paliyad (M) PLD1ICM2 GJ-2097-A 300/1 132000/110

181 Paliyad 132 KV Side of ICT-3 at Paliyad (M) PLD1ICM3 GJ-2111-A 75/1 132000/110

182 Paliyad 132 KV Side of ICT-4 at Paliyad (M) PLD1ICM3 GJ-2122-A 150/1 132000/110

183 PANNDHRO [KTP]66 KV GMDC [SOLAR] Line no.1 at PANNDHRO [KTP] KTPGMDS1 GJ-1011-A 100/1 66000/110

184 PANNDHRO [KTP]66 KV GMDC [SOLAR] Line no.2 at PANNDHRO [KTP] KTPGMDS2 GJ-1012-A 100/1 66000/110

185 Patadi(Mandal) 66 KV Viramgam line-1 at Patadi(Mandal)(M) PATVGMM1 GJ-1234-A 300/1 66000/110

186 Patdi 66 KV Chattel Solar Line no. 1 at Patdi [S1] PATCTLS1 GJ-1273-A 300/1 66000/110

187 Patdi 66 KV Chattel Solar Line no. 2 at Patdi [S2] PATCTLS2 GJ-1312-A 300/1 66000/110

188 Pipartoda 66KV Gala (W/F) line no.1 at Pipartoda S1 PIPGALS1 GJ-1061-A 300/1 66000/110

189 Pipartoda 66KV Gala (W/F) line no.2 at Pipartoda S2 PIPGALS2 GJ-1062-A 300/1 66000/110

190 Rajpara 66 KV Mahidad [W/F] Line no.1 at Rajpara RPRMHDS1 GJ-1005-A 600/1 66000/110

191 Rajpara 66 KV Mahidad [W/F] Line no.2 at Rajpara RPRMHDS2 GJ-1006-A 600/1 66000/110

192 Ranakandorana 66 KV Hiraco [SOLAR] Line at Ranakandora S1 RKDHRCS1 GJ-1258-A 300/1 66000/110

193 Ranakandorana 66 KV Moser baer [SOLAR] Line at Ranakandorana S1 RKDMBRS1 GJ-1255-A 300/1 66000/110

194 Ranavav 132 KV Saurastra cement CPP Line-1 at Ranavav RNVSUCS1 GJ-0933-A 150/1 132000/110

195 Ranavav 133 KV Saurastra cement CPP Line-2 at Ranavav RNVSUCS2 GJ-0932-A 150/1 132000/110

196 Rojmal 66 KV Raipur [W/F] Line no.1 at Rojmal S1 ROJRAIS1 GJ-1313-A 300/1 66000/110

197 Rojmal 66 KV Raipur [W/F] Line no.2 at Rojmal S2 ROJRAIS2 GJ-1317-A 300/1 66000/110

198 RPL 132 KV Sikka TPS Line - 1 at RPL(S) RPLSTPS1 GJ-2096-A 600/1 132000/110

199 Sadla 66KV S J Green Park Solar line no.1 at Sadla(S1) SDLSGPS1 GJ-1164-A 600/1 66000/110

200 Sadla 66KV WAA Solar line -2 at Sadla(S) SDLWAAS2 GJ-1167-A 300/1 66000/110

201 Samaghogha 66 KV Pragpar line-1 at Samaghogha SMGJINS1 GJ-0660-A 150/1 66000/110

202 Samakhiyali 132 KV Shikarpur(WF) Line -1 at Samkhiyali (S) SMKSKRS1 GJ-2143-A 150/1 132000/110

203 Samakhiyali 132 KV Gallent Metal Ltd. Line -1 at Samkhiyali (S) SMKGMLS1 GJ-2107-A 300/1 66000/110

204 Samakhiyali 66 KV Samkhiyali-Jungi Line-1 SMKJGIS1 GJ-0689-A 600/1 66000/110

205 Samakhiyali 66 KV Samkhiyali-Jungi Line-2 SMKJGIS2 GJ-0696-A 600/1 66000/110

206 Samakhiyali 132 KV Samkhiyali-Shikarpur Line-2 SMKSKRS2 GJ-0688-A 150/1 132000/110

207 Sanosra 66 KV BPPL [BIAOMAS] Line at Sanosra [S] SNSBPPS1 GJ-1220-A 300/1 66000/110

Page 16 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

208 Sardargadh 66kV Dhank(WF) Line-1 at Sardargadh(S) SRDDNKS1 GJ-2011-A 300/1 66000/110

209 Sardargadh 66kV Menavadar(WF) line-1 at Sardargadh(S) SRDMNVS1 GJ-2010-A 300/1 66000/110

210 Sardargadh 66 KV Meravdar line no. 2 at Sardargadh SRDMNVS2 GJ-0967-A 300/1 66000/110

211 Savarkundala 66 KV Jafarabad Line - 2 at Savarkundala(M) SKDJFRM2 GJ-2133-A 150/1 66000/110

212 Savarkundala 220 KV Kovaya Line - 1 at Savarkundala(M) SKDKVYM1 GJ-2017-A 300/1 220000/110

213 Savarkundala 220 KV Kovaya Line - 2 at Savarkundala(M) SKDKVYM2 GJ-2018-A 300/1 220000/110

214 Savarkundala 220 KV GPPC Line no.2 at Savarkundla S2 SKDGPCS2 GJ-0884-A 600/1 220000/110

215 Shivlakha 220 KV Charnka Line -1 at Shivlakha (M) SLKCHKM1 GJ-2157-A 600/1 220000/110

216 Shivlakha 220 KV Sankhari line-1 at Shivlakha(M) SLKSANM1 GJ-2013-A 600/1 220000/110

217 Shivlakha 220 KV Welspun(CPP) Line -1 at Shivlaka (M) SLKWLSS1 GJ-2106-A 600/1 220000/110

218 Shivlakha 66 KV RRB Westas(WF) line-1 at Shivlakha(S) SLKRRBS1 GJ-2112-A 600/1 66000/110

219 Shivlakha 66 KV RRB Vestas(WF) line-2 at Shivlakha(S) SLKRRBS2 GJ-2119-A 600/1 66000/110

220 Shivlakha 66 kV Veer line-1 at Shivlakha SVKVIRS1 GJ-0666-A 600/1 66000/110

221 Shivlakha 66 kV Veer line-2 at Shivlakha SVKVIRS2 GJ-0674-A 600/1 66000/110

222 Shivlakha 220 KV Vandiya Line-1 at Shivlakha SLKVDYS1 GJ-0672-A 600/1 220000/110

223 Shivlakha 220 KV Vandiya Line-2 at Shivlakha SLKVDYS2 GJ-0673-A 600/1 220000/110

224 Shivlakha 66 kV Shikarpur line-1 at Shivlakha SLKSKRS1 GJ-0668-A 600/1 66000/110

225 Shivlakha 66 kV Shikarpur line-2 at Shivlakha SLKSKRS2 GJ-0669-A 600/1 66000/110

226 Shivlakha 66 KV Konark Solar line-1 at Shivlakha(S) SLKKNRS1 GJ-1019-A 300/1 66000/110

227 Shivlakha 66 KV Backbone Solar line - 1 at Shivlakha(S) SLKBKBS1 GJ-0995-A 300/1 66000/110

228 Shivlakha 66KV Euro Line no.2 at Shivlakha(S2) SLKEROS2 GJ-1036-A 300/1 66000/110

229 Shivlakha 66KV Euro Line no.1 at Shivlakha(S1) SLKEROS1 GJ-0999-A 300/1 66000/110

230 Sikra 66KV Sunborne Solar no.1 at Sikra S1 SIKSNBS1 GJ-0983-A 300/1 66000/110

231 Sikra 66KV Sunborne solar no.2 at Sikra S2 SIKSNBS2 GJ-0984-A 300/1 66000/110

232 Simran 66 KV APPL line at Simran SIMAPPS1 GJ-2135-A 300/1 66000/110

233 Tanasava 66 KV Aravali Solar line -2 at Tanasava TSVAVLS2 GJ-1922-A 300/1 66000/110

234 Tanasava 66 KV Aravalli Solar Line No.1 at Tanasava S1 TSVAVLS1 GJ-0959-A 300/1 66000/110

235 Tanasava 66 KV Green Infra Solar line -1 at Tanasva (S) TSVGRNS1 GJ-0954-A 300/1 66000/110

236 Tanasava 66 KV Green Infra Solar line -2 at Tanasva (S) TSVGRNS2 GJ-0955-A 300/1 66000/110

237 Tanasava 66 KV Dhank(WF) line-1 at Tansava(S) TSVDNKS1 GJ-1057-A 300/1 66000/110

238 Tansa 66 kV Sanodar(Suzlon)(WF) line-1 at Tansa(S) TSASNDS1 GJ-2020-A 300/1 66000/110

239 Tappar 220 KV APL line-1 at Tappar TPRAPLS1 GJ-0750-A 1200/1 220000/110

240 Tappar 220 KV APL line-2 at Tappar TPRAPLS2 GJ-0759-A 1200/1 220000/110

241 Thadach 66KV Kundhada line no.1 at Thadach S1 TDCKDDS1 GJ-1209-A 300/1 66000/110

242 Thadach 66KV Kundhada line no.2 at Thadach S2 TDCKDDS2 GJ-1205-A 300/1 66000/110

243 Timbdi 66 KV CCGL line-1 at Timbdi TMBCCGS1 GJ-2125-A 150/1 132000/110

244 Una 66kV Diu line at Una UNADIUS1 GJ-2128-A 100/1 66000/110

245 Vanod 66 KV Kanz line-1 at Vanod(M) VNDKNZM1 GJ-0317-A 300/1 66000/110

246 Varsana 66 KV Varsana Ispat line-1 at Varsasna VARIPTS1 GJ-0686-A 300/1 66000/110

247 Varsana 400 KV APL(Mundra) line-1 at Varsana VARAPLS1 GJ-0667-A 1000/1 400000/110

248 Vartej 220 KV Karamsad Line - 1 at Vartej(M) VRTKRMM1 GJ-2019-A 600/1 220000/110

249 Varvala 66 KV Baradiya Line-1 at Varvala VVLBDYS1 GJ-0720-A 300/1 66000/110

250 Varvala 66 KV Baradiya Line-2 at Varvala VVLBDYS2 GJ-0728-A 300/1 66000/110

251 Varvala 66 KV Vasai(WF) Line-1 at Varvala VVLVSIS1 GJ-0736-A 300/1 66000/110

252 Varvala 66 KV Vasai(WF) Line-2 at Varvala VVLVSIS2 GJ-0756-A 300/1 66000/110

253 Varvala 66 KV Mithapur line - 1at Varvala(S) VVLMHPS1 GJ-0980-A 300/1 66000/110

254 Varvala 66 KV Mithapur line -2 at Varvala(S) VVLMHPS2 GJ-0981-A 300/1 66000/110

255 Vikram 132 KV Dhandhuka line-1 at Vikram(M) VKMDHAM1 GJ-2021-A 600/1 132000/110

256 Wankaner 132 KV Varsamedi Line-1 at Wankaner WKNVRSS1 GJ-0726-A 600/1 132000/110

257 Wankaner 132 KV Varsamedi Line-2 at Wankaner WKNVRSS2 GJ-0727-A 600/1 132000/110

258 Welspun(GETCO)22O KV Welspun [WSL] Line at Welspun [GETCO] S1 WLGWSLS1 GJ-1002-A 300/1 220000/110

259 Welspun(GETCO)22O KV Welspun [WCPGL] Line at 22O KV Welspun [GETCO] S1 WLGWPGS1 GJ-1031-A 400/1 220000/110

1 Ambaliyara 66 KV Nirmali line-1 at Ambaliyara(M) ABLNMLM1 GJ-0372-A 300/1 66000/110

2 Anganwada 66 KV Solitiare(Moserbear) line-1 at Anganwada(S) AGWSLTS1 GJ-1080-A 300/1 66000/110

3 Anganwada 66 KV Solitiare(Moserbear) line-2 at Anganwada(S) AGWSLTS2 GJ-1079-A 300/1 66000/110

4 Bayal 66 KV Azure (Solar) line-1 at Bayal(Dhankrol) BAYAZUS1 GJ-1073-A 300/1 66000/110

5 Bayal 66 KV Azure (Solar) line-2 at Bayal(Dhankrol) BAYAZUS2 GJ-1074-A 300/1 66000/110

6 Bhadrada 66 KV Chandiyana(LANCO) line -1 at Bhadrada(S) BDRCDYS1 GJ-1086-A 300/1 66000/110

7 Bhadrada 66 KV Chandiyana(LANCO) line -2 at Bhadrada(S) BDRCDYS2 GJ-1087-A 300/1 66000/110

8 Bhadrada 66 KV Astonfield [SOLAR] Line no.1 at Bhadrada S1 BDRATNS1 GJ-1444-A 125/1 66000/110

9 Bhadrada 66 KV Astonfield [SOLAR] Line no.2 at Bhadrada S2 BDRATNS2 GJ-1092-A 125/1 66000/110

10 Bhadrada 66 KV Jayhind [SOLAR] Line no.1 at Bhadrada S1 BDRJHIS1 GJ-1139-A 300/1 66000/110

11 Bhadrada 66 KV Jayhind [SOLAR] Line no.2 at Bhadrada S2 BDRJHIS2 GJ-0388-A 300/1 66000/110

12 Bhat 220 KV Kamod(PGCIL) line-1 at Bhat BHAKMDM1 GJ-0348-A 600/1 220000/110

13 Bhat 220 KV Kamod(PGCIL) line-2 at Bhat BHAKMDM2 GJ-0349-A 600/1 220000/110

14 Bhadrada 66 KV Lanco line-1 at Bhdrada BDRLANS1 GJ-0367-A 300/1 66000/110

15 Bhadrada 66 KV Lanco line-2 at Bhdrada BDRLANS2 GJ-0411-A 300/1 66000/110

16 CHARNKA 66 KV ALEX-AES Feeder at CHARNKA S1 CHKAESS1 GJ-1148-A 600/1 66000/110

17 CHARNKA 66 KV YANTRA-SURANA-GPCL Feeder at CHARNKA S1 CHKSPLS1 GJ-1181-A 600/1 66000/110

18 CHARNKA 66 KV EMAMI-SUN CLEAN-SOLAR Feeder at CHARNKA S1 CHKSELS1 GJ-1071-A 600/1 66000/110

19 CHARNKA 66 KV SUN EDITION-GPPC-LANCO Feeder at CHARNKA S1 CHKLSES1 GJ-1141-A 600/1 66000/110

20 CHARNKA 220 KV SHIVLAKHA Feeder at CHARNKA M1 CHKSLKM1 GJ-1186-A 600/1 66000/110

21 CHARNKA 66 KV PALACE-ROHA-AVTAR Feeder at CHARNKA S1 CHKRDSS1 GJ-1432-A 600/1 66000/110

22 CHARNKA 66 KV NKG-ZF-GMR Feeder at CHARNKA S1 CHKZFSS1 GJ-1437-A 600/1 66000/110

23 Chhatral 220 KV GTPS line-1 at Chhatral(S) CHHGTPS1 GJ-0353-A 600/1 220000/110

24 Chhatral 220 KV GTPS line-2 at Chhatral(S) CHHGTPS2 GJ-0354-A 600/1 220000/110

25 Dahisar 66 KV Photovoltaic [PLG] Line-1 at Dahisar(S) DSRPLGS1 GJ-1442-A 300/1 66000/110

26 Dahisar 66 KV Photovoltaic [PLG] Line -2 at Dahisar (S) DSRPLGS2 GJ-1443-A 300/1 66000/110

27 Deodar 220 KV Shivlakha line-1 at Deodar(M) DEOSLKM1 GJ-0345-A 600/1 220000/110

28 Dhandhuka 132 KV Barvala line-1 at Dhandhuka DHABRVM1 GJ-0159-A 300/1 132000/110

29 Dhandhuka 132 KV Dhuvaran GPS line-1 at Dhandhuka DHADGPS1 GJ-0258-A 600/1 132000/110

30 Dhandhuka 132 KV Dhuvaran GPS line-2 at Dhandhuka DHADGPS2 GJ-0163-A 600/1 132000/110

31 Dhandhuka 132 KV Paliyad line-1 at Dhandhuka DHAPLDM1 GJ-0162-A 600/1 132000/110

32 Dhandhuka 132 KV Vikram line-1 at Dhandhuka DHAVKMM1 GJ-0257-A 600/1 132000/110

33 Dhansura 220 KV KHPS line-1 at Dhansura(S) DHNKHPS1 GJ-0362-A 600/1 220000/110

METER INSTALLED IN UTTAR GUJRAT VIJ COMPANY LTD.

Page 17 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

34 Dhansura 220 KV KHPS line-2 at Dhansura(S) DHNKHPS2 GJ-0408-A 600/1 220000/110

35 Dhansura 220 KV WTPS line-1 at Dhansura(S) DHNWTPS1 GJ-0370-A 600/1 220000/110

36 Dhansura 220 KV WTPS line-2 at Dhansura(S) DHNWTPS2 GJ-0364-A 600/1 220000/110

37 Dholka GIDC 66 KV Kheda line-1 at Dholka GIDC DLKKDAM1 GJ-0306-A 300/1 66000/110

38 Dunawada 66 KV Pricious line -1 at Dunawada(S) DNWPRCS1 GJ-1082-A 300/1 66000/110

39 Dunawada 66KV Pricious line -2 at Dunawada(S) DNWPRCS2 GJ-1083-A 300/1 66000/110

40 Gabat 66KV Aatash Solar Line no.1 at Gabat(S1) GBTATSS1 GJ-1241-A 300/1 66000/110

41 Gabat 66KV Aatash Solar Line no.2 at Gabat(S2) GBTATSS2 GJ-1240-A 300/1 66000/110

42 Hirapura 66 KV Mehmedabad line-1 at Hirapura(M) HIRMHEM1 GJ-0295-A 300/1 66000/110

43 Jamla 220 KV GTPS line-1 at Jamla(S) JMLGTPS1 GJ-0406-A 600/1 220000/110

44 Jamla 220 KV GTPS line-2 at Jamla(S) JMLGTPS2 GJ-0404-A 600/1 220000/110

45 Kanz 66 KV Vanod line-1 at Kanz(M) KNZVNDM1 GJ-0318-A 300/1 66000/110

46 Khanpur 220 KV Dehgam(PGCIL) line-1 at Khanpur(M) KNPDEHM1 GJ-0289-A 600/1 220000/110

47 Khanpur 220 KV Dehgam(PGCIL) line-2 at Khanpur(M) KNPDEHM2 GJ-0294-A 600/1 220000/110

48 Khanpur 220 KV Kapadwanj line-1 at Khanpur(M) KNPKPDM1 GJ-0287-A 600/1 220000/110

49 Khanpur 220 KV Kapadwanj line-2 at Khanpur(M) KNPKPDM2 GJ-0288-A 600/1 220000/110

50 Khanpur 220 KV Nicol line-1 at Khanpur(S) KNPNICS1 GJ-0285-A 600/1 220000/110

51 Khanpur 220 KV Nicol line-2 at Khanpur(S) KNPNICS2 GJ-0286-A 600/1 220000/110

52 Mandal 66 KV Viramgam(Patadi) line-1 at Mandal MDLPATM1 GJ-0313-A 300/1 66000/110

53 Mehsana 220 KV GTPS line-1 at Mehsana(S) MSNGTPS1 GJ-0412-A 1200/1 220000/110

54 Mehsana 220 KV GTPS line-2 at Mehsana(S) MSNGTPS2 GJ-0413-A 1200/1 220000/110

55 Muthiya 66 KV Reliance line at Muthia S1 MUTRILS1 GJ-0566-A 150/1 66000/110

56 Naroda 66 RIL CPP line-1 at Naroda NRDRILS1 GJ-0336-A 300/1 66000/110

57 Radhanpur 66 KV Amarapur line no.1 at Radhanpur S1 RDNAMPS1 GJ-1193-A 300/1 66000/110

58 Ranasan 132 KV Side of ICT-1 at Ranasan RSN1ICS1 GJ-0236-A 600/1 132000/110

59 Ranasan 132 KV Side of ICT-2 at Ranasan RSN1ICS2 GJ-0237-A 600/1 132000/110

60 Ranasan 132 KV Side of ICT-3 at Ranasan RSN1ICS3 GJ-0238-A 600/1 132000/110

61 Ranasan 132 KV Side of ICT-4 at Ranasan RSN1ICS4 GJ-0239-A 600/1 132000/110

62 Ranasan 66 KV Side of ICT-1 at Ranasan RSN6ICS1 GJ-0241-A 300/1 66000/110

63 Ranasan 220 KV Dehgam(PGCIL) line-1 at Ranasan(M) RSNDEHM1 GJ-0302-A 600/1 220000/110

64 Ranasan 220 KV Dehgam(PGCIL) line-2 at Ranasan(M) RSNDEHM2 GJ-0303-A 600/1 220000/110

65 Ranasan 220 KV Gandhinagar TPS line-1 at Ranasan RSNGTPS1 GJ-0242-A 1200/1 220000/110

66 Ranasan 220 KV Gandhinagar TPS line-2 at Ranasan RSNGTPS2 GJ-0243-A 1200/1 220000/110

67 Ranasan 220 KV Kapadwanj line-1 at Ranasan(M) RSNKPDM1 GJ-0301-A 1200/1 220000/110

68 Ranasan 220 KV Karamsad line-1 at Ranasan(M) RSNKRMM1 GJ-0298-A 600/1 220000/110

69 Ranasan 220 KV Karamsad line-2 at Ranasan(M) RSNKRMM2 GJ-0299-A 600/1 220000/110

70 Ranasan 66 KV Reliance Indu.Ltd. line-1 at Ranasan(S) RSNRILS1 GJ-0304-A 600/1 66000/110

71 Ranasan 66 KV Reliance Indu.Ltd. line-2 at Ranasan(S) RSNRILS2 GJ-0235-A 600/1 66000/110

72 Ranasan 220 KV Kapadwanj line-2 at Ranasan RSNKPDM2 GJ-0300-A 600/1 220000/110

73 Randheja 66 KV AECo. line-1 at Randheja(S) RNDAECS1 GJ-0377-A 300/1 66000/110

74 Sabarmati 132 KV AECo. line-1 at Sabarmati SBTAECS1 GJ-0296-A 600/1 132000/110

75 Sabarmati 132 KV AECo. line-2 at Sabarmati SBTAECS2 GJ-0297-A 600/1 132000/110

76 Salejada 220 KV Chorania line-1 at Salejada(M) SLJCHNM1 GJ-0307-A 600/1 220000/110

77 Salejada 220 KV Karamsad line-1 at Salejada(M) SLJKRMM1 GJ-0160-A 600/1 220000/110

78 Samadara 66 Kv Kheda(Dholka) line -1 at Samadara SMDKDAM1 GJ-0610-A 300/1 66000/110

79 Sankhari 220 KV Shivlakha line-1 at Sankhari(M) SANSLKM1 GJ-0347-A 600/1 220000/110

80 Santej 66 KV Arvind Mill line-1 at Santej(S) STJARVS1 GJ-0379-A 300/1 66000/110

81 Santej 66 kv Santej-Shah Alloys Ltd. STJSALS1 GJ-0358-A 300/1 66000/110

82 Sathmbha 66 KV Jorapura line-1 at Sathmbha(M) STHJORM1 GJ-0368-A 150/1 66000/110

83 Soja 400 KV Dehgam(PGCIL) line-1 at Soja(M) SOJDEHM1 GJ-0360-A 1000/1 400000/110

84 Soja 220KV Gandhinagar TPS line-1 at Soja(S) SOJGTPS1 GJ-0366-A 1200/1 220000/110

85 Soja 220KV Gandhinagar TPS line-2 at Soja(S) SOJGTPS2 GJ-0361-A 1200/1 220000/110

86 Soja 400 KV Wanakbori TPS line-1 at Soja(S) SOJWTPS1 GJ-0359-A 1000/1 400000/110

87 Tharad 220 KV Amrapur Line no.1 at Tharad S1 TRDAMPS1 GJ-1193-A 600/1 220000/110

88 Tharad 220 KV Amrapur Line no.2 at Tharad S2 TRDAMPS2 GJ-1140-A 600/1 220000/110

89 Vadavi 400 KV Dehgam PGCIL - 1 at Vadavi(M) VDVDEHM1 GJ-0489-A 1000/1 400000/110

90 Vadavi 400 KV Dehgam PGCIL - 2 at Vadavi(M) VDVDEHM2 GJ-0490-A 1000/1 400000/110

91 Varahi 66 KV Amrapur line no. 1 at Varahi S1 VRHAMPS1 GJ-1140-A 300/1 66000/110

92 Vatava 132 KV Dhuvaran TPS line-1 at Vatava VATDTPS1 GJ-0316-A 600/1 132000/110

93 Vatava 132 KV Dhuvaran TPS line-2 at Vatava VATDTPS2 GJ-0309-A 600/1 132000/110

94 Vatava 132 KV Mehmedabad line-1 at Vatava(M) VATMHEM1 GJ-0161-A 600/1 132000/110

95 Vatava 66 KV Naranpura line-2 at Vatava(M) VATNRNM1 GJ-0498-A 300/1 66000/110

96 Viramgam 220 KV Chorania line-1 at Viramgam(M) VGMCHNM1 GJ-0305-A 600/1 220000/110

97 Viramgam 220 KV Dhanki line-1 at Viramgam(M) VGMDHKM1 GJ-0261-A 600/1 220000/110

98 Viramgam 220 KV Dhanki line-2 at Viramgam(M) VGMDHKM2 GJ-0335-A 600/1 220000/110

99 Viramgam 66 KV Kamalpur line-1 at Viramgam(M) VGMKMLM1 GJ-0264-A 300/1 66000/110

100 Viramgam 66 KV Lakhtar line-1 at Viramgam(M) VGMLKTM1 GJ-0338-A 300/1 66000/110

101 Viramgam 66 KV Patadi(Mandal) line-1 at Viramgam(M) VGMPATM1 GJ-0337-A 300/1 66000/110

102 Zamp 66 KV Lakhtar line-1 at Zamp(M) ZMPLKTM1 GJ-0311-A 300/1 66000/110

1 SECo.(VED) 220 KV Sugen(SECo.) line-1 at Ved(S) VEDSUZS1 GJ-2284-A 800/1 220000/110

2 SECo.(VED) 220 KV Sugen(SECo.) line-2 at Ved(S) VEDSUZS2 GJ-1421-A 800/1 220000/110

3 SECo.(PUNA) 220 KV Sugen(SECo.) at Puna-1(S) PUNSUZS1 GJ-2286-A 800/1 220000/110

4 SECo.(PUNA) 220 KV Sugen(SECo.) at Puna-2(S) PUNSUZS2 GJ-2287-A 800/1 220000/110

5 SECo.(BHATAR) 220 KV Sugen(SECo.) at Bhatar-1(S) BTRSUZS1 GJ-2288-A 800/1 220000/110

6 SECo.(BHATAR) 220 KV Sugen(SECo.) at Bhatar-2(S) BTRSUZS2 GJ-2289-A 800/1 220000/110

1 TEL-SEZ 66 KV Dahej Line-1 at TEL TELDHJM1 GJ-2259-A 300/1 66000/110

METER INSTALLED AT TORRENT ENERGY LTD. (SEZ)

METER INSTALLED AT TORRENT POWER SURAT ELECTRICITY CO.

Page 18 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

1 Mitap 66 KV Mundra Industrial at Mitap M1 MTPMUIM1 GJ-0738-A 100/1 66000/110

2 MUPL 220 KV Side of APL FGD line-1 at MRSS (MUPL) (M) MUPFGDM1 GJ-1056-A 800/1 220000/110

3 MUPL 220 KV Side of APL FGD line-2 at MRSS (MUPL) (M) MUPFGDM2 GJ-1055-A 800/1 220000/110

1 RUPL 132 KV RPL(Jamnagar) line-1 at RUPL RULRPLM1 GJ-0717-A 300/1 132000/110

1 APL 220 KV Nanikhakhar line-1 at APL (M) APLNKHM1 GJ-0676-A 800/1 220000/110

2 APL 220 KV Nanikhakhar line-1 at APL ( C) APLNKHC1 GJ-0677-A 800/1 220000/110

3 APL 220 KV Nanikhakhar line-2 at APL (M) APLNKHM2 GJ-0661-A 800/1 220000/110

4 APL 220 KV Nanikhakhar line-2 at APL ( C) APLNKHC2 GJ-0662-A 800/1 220000/110

5 APL 220 KV Tappar line-1 at APL (M) APLTPRM1 GJ-0746-A 800/1 220000/110

6 APL 220 KV Tappar line-1 at APL (C) APLTPRC1 GJ-0747-A 800/1 220000/110

7 APL 220 KV Tappar line-2 at APL (M) APLTPRM2 GJ-0748-A 800/1 220000/110

8 APL 220 KV Tappar line-2 at APL (C) APLTPRC2 GJ-0749-A 800/1 220000/110

9 APL 220 KV Side of GT-1 at APL (M) APL2GTS1 NP-6395-A 1250/1 220000/110

10 APL 220 KV Side of GT-2 at APL (S) APL2GTS2 NP-6407-A 1250/1 220000/110

11 APL 400 KV Side of GT-3 at APL (S) APL4GTS3 NP-6402-A 800/1 400000/110

12 APL 400 KV Sami line-1 at APL (M) APLSAMM1 NP-6391-A 1600/1 400000/110

13 APL 400 KV Sami line-1 at APL ( C) APLSAMC1 NP-6392-A 1600/1 400000/110

14 APL 400 KV Sami line-2 at APL (M) APLSAMM2 NP-6393-A 1600/1 400000/110

15 APL 400 KV Sami line-2 at APL ( C) APLSAMC2 NP-6394-A 1600/1 400000/110

16 APL 220 KV Side of ICT-1 at APL APL2ICS1 NP-6389-A 1250/1 220000/110

17 APL 220 KV Side of ICT-2 at APL APL2ICS2 NP-6390-A 1250/1 220000/110

18 APL 400 KV Side of ICT-1 at APL APL4ICS1 NP-6396-A 800/1 400000/110

19 APL 400 KV Side of ICT-2 at APL APL4ICS2 NP-6397-A 800/1 400000/110

20 APL 400 KV Side of GT-4 at APL (S) APL4GTS4 NP-6409-A 800/1 400000/110

21 APL 400 KV Side of GT-5 at APL (S) APL4GTS5 GJ-0891-A 2000/1 400000/110

22 APL 220 KV Side of SST-1 at APL (S) APL2STS1 NP-6388-A 200/1 220000/110

23 APL 220 KV Side of SST-3 at APL (S) APL2STS3 NP-6405-A 200/1 220000/110

24 APL 400 KV Hadala line-1 at APL (M) APLHADM1 NP-6401-A 1600/1 400000/110

25 APL 400 KV Hadala line-1 at APL (C) APLHADC1 NP-6404-A 1600/1 400000/110

26 APL 400 KV Varsana line-1 at APL (M) APLVARM1 NP-6387-A 1600/1 400000/110

27 APL 400 KV Varsana line-1 at APL (C) APLVARC1 NP-6398-A 1600/1 400000/110

28 APL 400 KV Side of GT-6 at APL (S) APL4GTS6 GJ-0910-A 2000/1 400000/110

29 APL 400 KV Side of GT-7 at APL (S) APL4GTS7 GJ-0927-A 2000/1 400000/110

30 APL 220 KV Side of SST-2 at APL (S) APL2STS2 GJ-0913-A 200/1 220000/110

31 APL 400 KV Side of GT-8 at APL(S) APL4GTS8 GJ-0928-A 2000/1 400000/110

32 APL 400KV Side of GT-9 at APL(S) APL4GTS9 GJ-0929-A 2000/1 400000/110

33 APL 400 KV AC SWYARD OF HVDC DIA 4 AT APL M4 APLHVDM4 GJ-0896-A 2000/1 400000/110

34 APL 400 KV AC SWYARD OF HVDC DIA 4 AT APL C4 APLHVDC4 GJ-0897-A 2000/1 400000/110

35 APL 400 KV AC SWYARD OF HVDC DIA 5 AT APL M5 APLHVDM5 GJ-0914-A 2000/1 400000/110

36 APL 400 KV AC SWYARD OF HVDC DIA 5 AT APL C5 APLHVDC5 GJ-0915-A 2000/1 400000/110

37 APL 400 KV AC SWYARD OF HVDC DIA 6 AT APL M6 APLHVDM6 GJ-0916-A 2000/1 400000/110

38 APL 400 KV AC SWYARD OF HVDC DIA 6 AT APL C6 APLHVDC6 GJ-0917-A 2000/1 400000/110

39 APL 400 KV AC SWYARD OF HVDC DIA 3 AT APL M3 APLHVDM3 GJ-0918-A 2000/1 400000/110

40 APL 400 KV AC SWYARD OF HVDC DIA 3 AT APL C3 APLHVDC3 GJ-0919-A 2000/1 400000/110

41 APL 400 KV BUS SECTIONALIZER-4 AT APL M4 APLBSBM4 GJ-0894-A 3000/1 400000/110

42 APL 400 KV STATION TRANSFORMER 7 AT APL M7 APL4STS7 GJ-0895-A 150/1 400000/110

43 APL 400 KV BUS SECTIONALIZER-3 AT APL C3 APLBSBC3 GJ-0902-A 3000/1 400000/110

44 APL 400 KV BUS SECTIONALIZER-4 AT APL C4 APLBSBC4 GJ-0903-A 3000/1 400000/110

45 APL 400 KV BUS SECTIONALIZER-3 AT APL M3 APLBSBM3 GJ-0893-A 3000/1 400000/110

46 APL 400 KV Station Trasnsformer No.8 at APL S8 APL4STS8 GJ-0925-A 150/1 400000/110

47 APL 400 KV Bus Reactor No.3 at APL PH 4 S3 APLBURS3 GJ-0926-A 2000/1 400000/110

48 APL 220 KV MRSS line-1 at APL FGD (M) FGDMUPM1 GJ-1050-A 800/1 220000/110

49 APL 220 KV MRSS line-2 at APL FGD (M) FGDMUPM2 GJ-1052-A 800/1 220000/110

50 APL 220 KV MRSS line-1 at APL FGD (C) FGDMUPC1 GJ-1051-A 800/1 220000/110

51 APL 220 KV MRSS line-2 at APL FGD (C) FGDMUPC2 GJ-0924-A 800/1 220000/110

52 APL 220 KV MRSS line-2 at APL FGD (C) FGDMUPC2 GJ-1054-A 800/1 220000/110

53 APL 220 KV Side of ICT-1 at APL FGD (M) FGD2ICM1 GJ-1049-A 300/1 220000/110

54 APL 220 KV Side of ICT-2 at APL FGD (M) FGD2ICM2 GJ-1048-A 300/1 220000/110

55 APL 220 KV APL FGD line -1 at APL(M) APLFGDM1 NP-6399-A 800/1 220000/110

56 APL 220 KV APL FGD line -1 at APL(C) APLFGDC1 NP-6408-A 800/1 220000/110

57 APL 220 KV APL FGD line -2 at APL(M) APLFGDM2 GJ-0890-A 800/1 220000/110

58 Sugen 400 KV Side of GT -10 at Sugen(SECo.) (S) SUZ4GTS1 GJ-2251-A 1000/1 400000/110

59 Sugen 400 KV Pirana line-2 at Sugen(SECo.)(M) SUZPRNM2 GJ-2254-A 1000/1 400000/110

60 Sugen 400 KV Pirana line-2 at Sugen(SECo.)(C ) SUZPRNC2 GJ-2255-A 1000/1 400000/110

61 Sugen 400 KV Pirana line-1 at Sugen(SECo.)(M) (Sugen-Unosugen-Pirana) SUZPRNM1 GJ-2252-A 1000/1 400000/110

62 Sugen 400 KV Pirana line-1 at Sugen(SECo.)(C )(Sugen-Unosugen-Pirana) SUZPRNC1 GJ-2299-A 1000/1 400000/110

63 Sugen 400 KV Jhanor line-1 at Sugen(SECo.)(M) SUZGANM1 GJ-2292-A 1000/1 400000/110

64 Sugen 400 KV Jhanor line-1 at Sugen(SECo.)(C) SUZGANC1 GJ-2293-A 1000/1 400000/110

65 Sugen 400 KV Vapi(PG) line-1 at Sugen(SECo.)(M) SUZVAIM1 GJ-2294-A 1000/1 400000/110

66 Sugen 400 KV Vapi(PG) line-1 at Sugen(SECo.)(C) SUZVAIC1 GJ-2298-A 1000/1 400000/110

67 Sugen 400 KV Side of GT -20 at Sugen(SECo.) (S) SUZ4GTS2 GJ-2295-A 1000/1 400000/110

68 Sugen 400 KV Side of GT -30 at Sugen(SECo.) (S) SUZ4GTS3 GJ-2261-A 1000/1 400000/110

69 Sugen 400 KV Side of ICT -1 at Sugen(SECo.) (M) SUZ4ICM1 GJ-2262-A 1000/1 400000/110

70 Sugen 400 KV Side of ICT -2 at Sugen(SECo.) (M) SUZ4ICM2 GJ-2263-A 1000/1 400000/110

71 Sugen 400 KV Side of ICT -3 at Sugen(SECo.) (M) SUZ4ICM3 GJ-2296-A 1000/1 400000/110

72 Sugen 220 KV Bhatar line-1 at Sugen(SECo.)(M) SUZBTRM1 GJ-2265-A 800/1 220000/110

METER INSTALLED AT RELIANCE (SEZ)

METER INSTALLED AT MEGA POWER PLANTS

METER INSTALLED AT MUNDRA (SEZ)

Page 19 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

73 Sugen 220 KV Bhatar line-1 at Sugen(SECo.)(C) SUZBTRC1 GJ-2266-A 800/1 220000/110

74 Sugen 220 KV Bhatar line-2 at Sugen(SECo.)(M) SUZBTRM2 GJ-2267-A 800/1 220000/110

75 Sugen 220 KV Bhatar line-2 at Sugen(SECo.)(C) SUZBTRC2 GJ-2268-A 800/1 220000/110

76 Sugen 220 KV Puna line-1 at Sugen(SECo.)(M) SUZPUNM1 GJ-2269-A 800/1 220000/110

77 Sugen 220 KV Puna line-1 at Sugen(SECo.)(C) SUZPUNC1 GJ-2270-A 800/1 220000/110

78 Sugen 220 KV Puna line-2 at Sugen(SECo.)(M) SUZPUNM2 GJ-2271-A 800/1 220000/110

79 Sugen 220 KV Puna line-2 at Sugen(SECo.)(C) SUZPUNC2 GJ-2272-A 800/1 220000/110

80 Sugen 220 KV Side of ICT -1 at Sugen(SECo.)(M) SUZ2ICM1 GJ-2273-A 1600/1 220000/110

81 Sugen 220 KV Side of ICT -2 at Sugen(SECo.)(M) SUZ2ICM2 GJ-2274-A 1600/1 220000/110

82 Sugen 220 KV Side of ICT -3 at Sugen(SECo.)(M) SUZ2ICM3 GJ-2275-A 1600/1 220000/110

83 Sugen 220 KV Ved line-1 at Sugen(SECo.)(M) SUZVEDM1 GJ-2300-A 800/1 220000/110

84 Sugen 220 KV Ved line-1 at Sugen(SECo.)(C) SUZVEDC1 GJ-2277-A 800/1 220000/110

85 Sugen 220 KV Ved line-2 at Sugen(SECo.)(M) SUZVEDM2 GJ-2278-A 800/1 220000/110

86 Sugen 220 KV Ved line-2 at Sugen(SECo.)(C) SUZVEDC2 GJ-2279-A 800/1 220000/110

87 Sugen 220 KV Kim line-1 at Sugen(SECo.)(M) SUZKIMM1 GJ-2280-A 800/1 220000/110

88 Sugen 220 KV Kim line-1 at Sugen(SECo.)(C) SUZKIMC1 GJ-2291-A 800/1 220000/110

89 Sugen 220 KV Kim line-2 at Sugen(SECo.)(M) SUZKIMM2 GJ-2282-A 800/1 220000/110

90 Sugen 220 KV Kim line-2 at Sugen(SECo.)(C) SUZKIMC2 GJ-2290-A 800/1 220000/110

91 Unosugen 400 KV Side of GT- 1 AT UNOSUGEN S1 UNO4GTS1 GJ-1660-A 1000/1 400000/110

92 Unosugen 400 KV Sugen Line no.1 at Unosugen M1 UNOSUZM1 GJ-1662-A 1000/1 400000/110

93 Unosugen 400 KV Sugen Line no.1 at Unosugen C1 UNOSUZC1 GJ-1663-A 1000/1 400000/110

94 Unosugen 4OO KV Pirana Line no.1 at Unosugen M1 UNOPRNM1 GJ-1664-A 1000/1 400000/110

95 Unosugen 4OO KV Pirana Line no.1 at Unosugen C1 UNOPRNC1 GJ-1665-A 1000/1 400000/110

1 AEC (Nicol) 220 KV Khanpur Line -1 at Nicol (AEC)(M) NICKNPM1 GJ-0323-A 400/1 220000/110

2 AEC (Nicol) 220 KV Khanpur Line -2 at Nicol (AEC)(M) NICKNPM2 GJ-0324-A 400/1 220000/110

3 AEC TPS 132 KV Sabarmati line-1 at AECo.(M) AECSBTM1 GJ-0240-A 600/1 132000/110

4 AEC TPS 132 KV Sabarmati line-2 at AECo.(M) AECSBTM2 GJ-0244-A 600/1 132000/110

5 AEC(Gandhinagar)66 KV Randheja line-1 at AECo.(Gandhinagar)(M) AECRNDM1 GJ-0373-A 200/1 66000/110

6 Pirana (Torrent) 400 KV Sugen(TPL) line-1 at Pirana (Torrent)(Pirana-Unosugen) PRNSUZS1 GJ-0849-A 1000/1 400000/110

7 Pirana (Torrent) 400 KV Sugen(TPL) line-2 at Pirana (Torrent) PRNSUZS2 GJ-0852-A 1000/1 400000/110

8 Pirana (Torrent) 400 KV Side of ICT-1 at Pirana(Torrent) (M) PRN4ICM1 GJ-0848-A 600/1 400000/110

9 Pirana (Torrent) 400 KV Side of ICT-2 at Pirana(Torrent) (M) PRN4ICM2 GJ-0853-A 600/1 400000/110

10 Pirana (Torrent) 132 KV Side of ICT-1 at Pirana(Torrent) (C) PRN1ICC1 GJ-0855-A 1600/1 132000/110

11 Pirana (Torrent) 132 KV Side of ICT-2 at Pirana(Torrent) (C) PRN1ICC2 GJ-0854-A 1600/1 132000/110

12 Pirana (Torrent) 400 KV Kamod(PGCIL) line-1 at Pirana(Torrent) (M) PRNKMDM1 GJ-0850-A 1000/1 400000/110

13 Pirana (Torrent) 400 KV Kamod(PGCIL) line-2 at Pirana(Torrent) (M) PRNKMDM2 GJ-0851-A 1000/1 400000/110

14 Pirana (Torrent) 400 KV Side of ICT-3 at Pirana(TGL)(M) PRN4ICM3 GJ-0861-A 600/1 400000/110

15 Pirana (Torrent) 132 KV Side of ICT-3 at Pirana(TGL)(C) PRN1ICC3 GJ-0856-A 1600/1 132000/110

1 Kandala Port Trust66 KV Anjar line-1 at KPT(M) KPTANJM1 GJ-2140-A 75/1 66000/110

2 Kandala Port Trust66 KV FTZ (Gandhidham) line-1 at KPT(M) KPTFTZM1 GJ-2139-A 75/1 66000/110

1 Asoj 400 KV Indore line-1 at Asoj ASOINDM1 NP-2331-A 1000/1 400000/110

2 Asoj 400 KV Indore line-2 at Asoj ASOINDM2 NP-2127-A 1000/1 400000/110

3 Asoj 400 KV SSP line at Asoj ASOSSPS1 NP-2528-A 1000/1 400000/110

4 Bhachau 400 KV Vadavi line-1 at Bhachau (M) BCUVDVM1 NP-6430-A 2000/1 400000/110

5 Bhachau 400 KV Vadavi lline-2 at Bhachau (M) BCUVDVM2 NP-6422-A 2000/1 400000/110

6 Bhachau 400 KV Side of ICT-2 at Bhachau BCU4ICM2 NP-6384-A 600/1 400000/110

7 Bhachau 400 KV Side of ICT-1 at Bhachau BCU4ICM1 NP-6433-A 600/1 400000/110

8 Bhachau 220 KV Side of ICT-1 at Bhachau BCU2ICS1 NP-6386-A 1000/1 220000/110

9 Bhachau 220 KV Side of ICT-2 at Bhachau BCU2ICS2 NP-6385-A 1000/1 220000/110

10 Bhilad 66 KV Khadoli line at Bhilad BLDKHLS1 NP-4177-A 600/1 66000/110

11 Bhilad 66 KV Silvassa line-1 at Bhilad BLDSILS1 NP-4195-A 600/1 66000/110

12 Bhilad 66 KV Silvassa line-2 at Bhilad BLDSILS2 NP-4196-A 600/1 66000/110

13 Bhilad 220 KV TAPS - BHILAD at Bhilad BLDTA1S1 NP-4191-A 800/1 220000/110

14 Bhinmal 400 KV Kansari Line-1 at Bhinmal BNMZERM1 NP-9915-A 1000/1 400000/110

15 Bhiwani [PG] 400 KV Mahendragarh Line -1 at Bhiwani [PG] M1 BWNMDGM1 NP-7520-A 1000/1 400000/110

16 Bhiwani [PG] 400 KV Mohindargadh Line-2 at Bhiwani [PG] M2 BWNMDGM2 NP-7519-A 1000/1 400000/110

17 Chorania 400 KV Mundra line at Chorania M1 CHNMUNM1 NP-6345-A 2000/1 400000/110

18 Chorania 400 KV Mundra line at Chorania M1 CHNMUNM2 NP-6428-A 2000/1 400000/110

19 Dabhel 66 KV Vapi-1 at Dabhel DBLVAPM1 NP-4188-A 600/1 66000/110

20 Dadara 66 KV Vapi line-1 at Dadra DADVAPM1 NP-4198-A 600/1 66000/110

21 Dadara 66 KV Vapi line-2 at Dadra DADVAPM2 NP-4197-A 600/1 66000/110

22 Dalwada 66 KV Vapi line-I at Dalwada DALVAPM1 NP-4187-A 600/1 66000/110

23 Dehgam 400 KV Gandhar line-1 at Dehgam DEHGANM1 NP-5766-A 1000/1 400000/110

24 Dehgam 400 KV Gandhar line-2 at Dehgam DEHGANM2 NP-5767-A 1000/1 400000/110

25 Dehgam 400 KV Nagda line-1 at Dehgam(PGCIL)(M) DEHNAGM1 NP-5764-A 1000/1 400000/110

26 Dehgam 400 KV Nagda line-2 at Dehgam(PGCIL)(M) DEHNAGM2 NP-5765-A 1000/1 400000/110

27 Dehgam 400 KV Kamod(PGCIL) line-1 at Dehgam DEHKMDM1 NP-6426-A 1000/1 400000/110

28 Dehgam 400 KV Kamod(PGCIL) line-2 at Dehgam DEHKMDM2 NP-6427-A 1000/1 400000/110

29 Dhanonda 4OO KV Mohindargarh Line no.1 at Dhanonda [HR] M1 DNDMDGM1 NP-3121-A 2000/1 400000/110

30 Dhanonda 4OO KV Mohindargarh Line no.2 at Dhanonda [HR] M2 DNDMDGM2 NP-1436-A 2000/1 400000/110

31 Dhokadwa 66 KV Diu line at Dhokadwa DKWDIUS1 NP-2472-A 300/1 66000/110

32 Diu 66 KV Dhokadwa at Diu DIUDKWM1 NP-2350-A 300/1 66000/110

METER INSTALLED AT TORRENT POWER AHEMEDABAD ELECTRICITY CO.

KANDLA PORT TRUST

METER INSTALLED AT ISTS

Page 20 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

33 Diu 66 KV Una line at Diu DIUUNAM1 NP-2399-A 150/1 66000/110

34 Durgapur Master Frequency at Durgapur DRGFRQS1 NP-6461-A 500/1 400000/110

35 Gandhar 400 KV Dehgam line-1 at Gandhar GANDEHS1 NP-2342-A 1000/1 400000/110

36 Gandhar 400 KV Dehgam line-2 at Gandhar GANDEHS2 NP-2407-A 1000/1 400000/110

37 Gandhar 400 KV GPEC line at Gandhar GANGPES1 NP-2402-A 1000/1 400000/110

38 Gandhar 220 KV Haldarwa line-1 at Gandhar GANHALC1 NP-2431-A 1000/1 220000/110

39 Gandhar 220 KV Haldarwa line-2 at Gandhar GANHALC2 NP-2408-A 1000/1 220000/110

40 Gandhar 220 KV Halderva line-1 at Gandhar GPS(M) GANHALM1 NP-2341-A 1000/1 220000/110

41 Gandhar 220 KV Halderva line-2 at Gandhar GPS(M) GANHALM2 NP-2344-A 1000/1 220000/110

42 Gandhar 400 KV Sugen(SECo.) line-1 at Gandhar(S) GANSUZS1 NP-2340-A 1000/1 400000/110

43 GPEC 400 KV Gandhar line at GPEC GPEGANM1 NP-4166-A 1000/1 400000/110

44 Halderva 220 KV Gandhar line-1 at Haldarwa HALGANM1 NP-4167-A 600/1 220000/110

45 Halderva 220 KV Gandhar line-2 at Haldarwa HALGANM2 NP-2544-A 600/1 220000/110

46 Halderva 220 KV KAPS-1 at Haldarwa(M) HALKAPM1 NP-4160-A 600/1 220000/110

47 Halderva 220 KV KAPS-2 at Haldarwa(M) HALKAPM2 NP-4161-A 600/1 220000/110

48 Halderva 220 KV Kawas-1 at Haldarwa(M) HALKAWM1 NP-4163-A 600/1 220000/110

49 Halderva 220 KV Kawas-2 at Haldarwa(M) HALKAWM2 NP-4164-A 600/1 220000/110

50 Ichchhapur 220 KV Kawas-1 line at Icchapur ICHKAWM1 NP-4168-A 1200/1 220000/110

51 Ichchhapur 220 KV Kawas-2 line at Icchapur ICHKAWM2 NP-2604-A 1200/1 220000/110

52 Indor 400 KV Asoj line-1 at Indore INDASOM1 NP-2184-A 1000/1 400000/110

53 Indor 400 KV Asoj line-2 at Indore INDASOM2 NP-2141-A 1000/1 400000/110

54 Jetpur 400 KV Mundra Line at Jetpur M1 JETMUNM1 NP-2785-A 2000/1 400000/110

55 Jetpur 400KV Mundra line no. 2 at Jetpur M2 JETMUNM2 NP-2784-A 2000/1 400000/110

56 Kamod(Pirana) 400 KV Pirana(Torrent) line-1 at Kamod(Pirana-PGCIL) KMDPRNM1 NP-6431-A 1000/1 400000/110

57 Kamod(Pirana) 400 KV Pirana(Torrent) line-1 at Kamod(Pirana-PGCIL) KMDPRNM2 NP-6432-A 1000/1 400000/110

58 Kamod(Pirana) 400 KV Dehgam(PGCIL) line-1 at Kamod(PGCIL) KMDDEHM1 NP-6416-A 1000/1 400000/110

59 Kamod(Pirana) 400 KV Dehgam(PGCIL) line-2 at Kamod(PGCIL) KMDDEHM2 NP-6417-A 1000/1 400000/110

60 Kamod(Pirana) 400 KV Side of ICT-1 at Kamod(PGCIL) KMD4ICM1 NP-6420-A 1000/1 400000/110

61 Kamod(Pirana) 400 KV Side of ICT-2 at Kamod(PGCIL) KMD4ICM2 NP-6419-A 1000/1 400000/110

62 Kamod(Pirana) 220 KV Side of ICT-1 at Kamod(PGCIL)(C) KMD2ICC1 NP-6418-A 1000/1 220000/110

63 Kamod(Pirana) 220 KV Side of ICT-2 at Kamod(PGCIL)(C) KMD2ICC2 NP-6421-A 1000/1 220000/110

64 Kamod(Pirana) 220 KV Bhat line-1 at Kamod(PGCIL) KMDBHAM1 GJ-0380-A 800/1 220000/110

65 Kamod(Pirana) 220 KV Bhat line-2 at Kamod(PGCIL) KMDBHAM2 GJ-0355-A 800/1 220000/110

66 Kankroli 400 KV Kansari Line-1 at Kankroli KNKZERM1 NP-5354-A 1000/1 400000/110

67 Kansari 400 KV Kansari-Kankroli Line-1 ZERKNKM1 NP-6381-A 1000/1 400000/110

68 Kansari 400 KV Kansari-Bhinmal Line-1 ZERBNMM1 NP-6382-A 1000/1 400000/110

69 KAPS 220 KV Haldarwa line-1 at KAPS KAPHALS1 NP-2347-A 800/1 220000/110

70 KAPS 220 KV Haldarwa line-2 at KAPS KAPHALS2 NP-2343-A 800/1 220000/110

71 KAPS 220 KV Vapi line-1 at KAPS KAPVAPS1 NP-2289-A 800/1 220000/110

72 KAPS 220 KV Vapi line-2 at KAPS KAPVAPS2 NP-2280-A 800/1 220000/110

73 KAPS 220 KV Vav line-1 at KAPS KAPVAVS1 NP-2295-A 800/1 220000/110

74 KAPS 220 KV Vav line-2 at KAPS KAPVAVS2 NP-2290-A 800/1 220000/110

75 Karadpada 220 KV Vapi(PGCIL) line-1 at Karadpada KDPVAIM1 NP-4185-A 800/1 220000/110

76 Karadpada 220 KV Vapi(PGCIL) line-2 at Karadpada KDPVAIM2 NP-4186-A 800/1 220000/110

77 Kasor 400 KV SSP line-1 at Kasor KASSSPS1 NP-2442-A 1000/1 400000/110

78 Kawas 220 KV Haldarwa line-1 at Kawas KAWHALM1 NP-2555-A 600/1 220000/110

79 Kawas 220 KV Haldarwa line-2 at Kawas KAWHALM2 NP-2193-A 600/1 220000/110

80 Kawas 220 KV Ichhapur line-1 at Kawas KAWICHM1 NP-2603-A 600/1 220000/110

81 Kawas 220 KV Ichhapur line-2 at Kawas KAWICHM2 NP-2602-A 600/1 220000/110

82 Kawas 220 KV Navsari line-1 at Kawas KAWNAVM1 NP-2275-A 600/1 220000/110

83 Kawas 220 KV Navsari line-2 at Kawas KAWNAVM2 NP-2179-A 600/1 220000/110

84 Kawas 220 KV Vav line at Kawas KAWVAVM1 NP-2180-A 600/1 220000/110

85 Kawas 220 KV Vav line-2 at Kawas (M) KAWVAVM2 NP-2113-A 600/1 220000/110

86 Khadoli 66 KV Bhilad line at Khadoli KHLBLDM1 NP-4199-A 600/1 66000/110

87 Khadoli 220 KV Vapi(PGCIL) line-2 at Khadoli KHLVAIM2 NP-6412-A 800/1 220000/110

88 Korba STPS 400 KV Vindhychal line-1 at Korba STPS KORVINM1 NP-2465-A 1000/1 400000/110

89 Korba STPS 400 KV Vindhyachal line-2 at Korba STPS KORVINM2 NP-2174-A 1000/1 400000/110

90 Magarwada 220 KV Vapi(PGCIL) line -1 at Magarwada MGDVAIM1 NP-4190-A 400/1 220000/110

91 Magarwada 220 KV Vapi(PGCIL) line -2 at Magarwada MGDVAIM2 NP-4189-A 400/1 220000/110

92 Mohindargarh 400 KV Dhanonda [HR] Line no.2 at Mohindargarh M2 MDGDNDM2 NP-1664-A 2000/1 400000/110

93 Mohindargarh 400 KV Dhanonda [HR] Line no.1 at Mohindargarh M1 MDGDNDM1 NP-7131-A 2000/1 400000/110

94 Mohindargarh 400 KV Bhiwani Line-1 at Mahendragarh M1 MDGBWNM1 NP-7138-A 2000/1 400000/110

95 Mohindargarh 400 KV Bhiwani Line-2 at Mahendragarh M1 MDGBWPM1 NP-7139-A 2000/1 400000/110

96 Mundra 400KV Jetpur line no. 1 at Mundra M1 MUNJETM1 CG-1006-A 1250/1 400000/110

97 Mundra 400KV Jetpur line no. 2 at Mundra M2 MUNJETM2 CG-1008-A 1250/1 400000/110

98 Mundra 400KV Chorania line no. 1 at Mundra M1 MUNCHNM1 CG-1001-A 1250/1 400000/110

99 Mundra 400KV Chorania line no. 2 at Mundra M2 MUNCHNM2 CG-1004-A 1250/1 400000/110

100 Nagda 400 KV Dehgam(PGCIL) line-1 at Nagda(M) NAGDEHM1 NP-2281-A 1000/1 400000/110

101 Nagda 400 KV Dehgam(PGCIL) line-2 at Nagda(M) NAGDEHM2 NP-2238-A 1000/1 400000/110

102 Nasik 220 KV Navsari line-1 at Nasik NSKNAVM1 NP-2345-A 800/1 220000/110

103 Nasik 220 KV Navsari line-2 at Nasik NSKNAVM2 NP-2199-A 800/1 220000/110

104 Navsari 220 KV Kawas line-1 at Navsari NAVKAWM1 NP-4173-A 1600/1 220000/110

105 Navsari 220 KV Kawas line-2 at Navsari NAVKAWM2 NP-4174-A 1200/1 220000/110

106 Navsari 220 KV Nasik line-1 at Navsari NAVNSKM1 NP-4171-A 1200/1 220000/110

107 Navsari 220 KV Nasik line-2 at Navsari NAVNSKM2 NP-4172-A 1200/1 220000/110

108 Silvasa 66 KV Bhilad line-1 at Silvassa SILBLDM1 NP-4178-A 600/1 66000/110

109 Silvasa 66 KV Bhilad line-2 at Silvassa SILBLDM2 NP-2448-A 600/1 66000/110

110 SSP 400 KV Asoj line at SSP(Main) SSPASOM1 NP-2550-A 1000/1 400000/110

111 SSP 400 KV Kasor line-1 at SSP(Main) SSPKASM1 NP-2554-A 1000/1 400000/110

112 TAPS 220 KV Bhilad line at TAPS TA1BLDM1 NP-2558-A 800/1 220000/110

113 TAPS 220 KV Vapi line at TAPS TA1VAPM1 NP-2438-A 800/1 220000/110

114 Una 66 KV Diu line at Una UNADIUS1 NP-2288-A 300/1 66000/110

115 Vadadvi 400 KV Bhachau line-1 at Vadavi (M) VDVBCUM1 NP-6424-A 1000/1 400000/110

116 Vadadvi 400 KV Bhachau line-2 at Vadavi(M) VDVBCUM2 NP-6425-A 1000/1 400000/110

117 Vadavi 400 KV Chorania line-1 at Vadavi VDVCHNM1 NP-6434-A 1000/1 400000/110

118 Vadavi 400 KV Chorania line-2 at Vadavi VDVCHNM2 NP-6435-A 1000/1 400000/110

119 Vadavi 400 KV Zarda(Kansari) line-1 at Vadavi (M) VDVZERM1 NP-6383-A 1000/1 400000/110

Page 21 of 22

Sr.

No.

Name of Sub

Station /

Power

Location DescriptionLocation

ID

Meter

NumberCTR PTR

120 Vadavi 400 KV Zarda(Kansari) line-2 at Vadavi (M) VDVZERM2 NP-6436-A 1000/1 400000/110

121 Vapi 66 KV Dadra line-1 at Vapi VAPDADS1 NP-2539-A 600/1 66000/110

122 Vapi 66 KV Dadra line-2 at Vapi VAPDADS2 NP-2304-A 600/1 66000/110

123 Vapi 66kV Dalwada-1 at Vapi VAPDALS1 NP-4183-A 600/1 66000/110

124 Vapi 66 KV Dabhel-1 at Vapi VAPDBLS1 NP-4184-A 600/1 66000/110

125 Vapi 220 KV KAPS line-1 at Vapi VAPKAPM1 NP-4182-A 1200/1 220000/110

126 Vapi 220 KV KAPS line-2 at Vapi VAPKAPM2 NP-4181-A 1200/1 220000/110

127 Vapi 220 KV TAPS line at Vapi VAPTA1S1 NP-4180-A 1200/1 220000/110

128 Vapi 400 KV Sugen(SECo.) at Vapi(PG)(S) VAISUZS1 GJ-2290-A 1000/1 400000/110

129 Vapi 400 KV Side of ICT3 at VAPI M3 VAI4ICM3 NP-2930-A 800/1 220000/110

130 Vapi 220 KV Side of ICT 3 at VAPI S3 VAI2ICS3 NP-2931-A 800/1 220000/110

131 Vapi(PG) 220 KV side of ICT-1 at VAPI(PG) VAI2ICS1 NP-2206-A 1000/1 220000/110

132 Vapi(PG) 220 KV side of ICT-2 at VAPI(PG) VAI2ICS2 NP-4179-A 1000/1 220000/110

133 Vapi(PG) 400 KV side of ICT-1 at VAPI(PG) VAI4ICM1 NP-2205-A 600/1 400000/110

134 Vapi(PG) 400 KV side of ICT-2 at VAPI(PG) VAI4ICM2 NP-2223-A 600/1 400000/110

135 Vapi(PG) 220 KV Magarwada line -1 at Vapi(PGCIL) VAIMGDS1 NP-4194-A 800/1 220000/110

136 Vapi(PG) 220 KV Magarwada line -2 at Vapi(PGCIL) VAIMGDS2 NP-4193-A 800/1 220000/110

137 Vapi(PG) 220 KV Karadpada line -1 at Vapi(PGCIL) VAIKDPS1 NP-4192-A 800/1 220000/110

138 Vapi(PG) 220 KV Karadpada line -2 at Vapi(PGCIL) VAIKDPS2 NP-2191-A 800/1 220000/110

139 Vapi(PG) 220 KV Khadoli line-1 at VAPI(PGCIL) VAIKHLS1 NP-6415-A 800/1 220000/110

140 Vapi(PG) 220 KV Khadoli line-2 at VAPI(PGCIL) VAIKHLS2 NP-6411-A 800/1 220000/110

141 Vav 220 KV KAPS line-1 at Vav VAVKAPM1 NP-4169-A 1200/1 220000/110

142 Vav 220 KV KAPS line-2 at Vav VAVKAPM2 NP-4170-A 1200/1 220000/110

143 Vav 220 KV Kawas line-1 at Vav VAVKAWM1 NP-2732-A 1200/1 220000/110

144 Vav 220 KV Kawas line-2 at Vav VAVKAWM2 NP-2557-A 1200/1 220000/110

145 Zerda(Kansari) 400 KV Vadavi line- 1 at Zerda(Kansari) ZERVDVM1 NP-6347-A 1000/1 400000/110

146 Zerda(Kansari) 400 KV Vadavi line- 2 at Zerda(Kansari) ZERVDVM2 NP-6348-A 1000/1 400000/110

Page 22 of 22