notes for design, construction and operation of waste

17
Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018 Notes for Design, Construction and Operation of Waste Water Treatment Plants in Albania Prof. Dr.-eng. Jens Nowak University of Applied Sciences Potsdam AKUT Umweltschutz Ingenieure Burkard und Partner, Berlin Tirana, November 2018

Upload: others

Post on 23-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Notes for Design, Construction and Operation of Waste Water Treatment Plants

in Albania Prof. Dr.-eng. Jens Nowak

University of Applied Sciences PotsdamAKUT Umweltschutz Ingenieure Burkard und

Partner, BerlinTirana, November 2018

Page 2: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Design of a waste water treatment plant:

questions: for how much population equivalents (p.e.)

expansion stages!

which technology

ensuring a stable power supply

what happens with the sludge

Page 3: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Possiblesavings ofcosts

executionProject planningGeneral development andconcept planning

Single projectsTotal aerea

Page 4: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Selection of the basic form of wastewater disposal

Which towns/villages are to be developed and how

Where should which sewage treatment plants be built?

How should the resulting sludge be treated?

Page 5: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Centralized system

On-site treatmentSemi-centralized

system

Combined on-site and centralized

system

Page 6: Notes for Design, Construction and Operation of Waste

6

1.000 p.e

8 m sewer/p.e.150 p.e.

15 m sewer/p.e.

3 p.e50 m sewer/p.e.

more than10 m Kanal per p.e. or 30 m per property necessary→ no sewer, separate smallwwtps on site

Page 7: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

60 m

100 mmain sewer

long distances

Problems:- costs- depth because of thenecessary slope of sewer

houseconnection

Page 8: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

30 40 50 60 70 80 90 100

Anschlussgrad [%]

spez

ifisc

he K

oste

n [€

/E]

Cut costs

Target- connectiondegree

Page 9: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

30 40 50 60 70 80 90 100

Anschlussgrad [%]

spez

ifisc

he K

oste

n [€

/E]

Target- connectiondegree

socially acceptable costs

Page 10: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

40.000 E

3.000 p.e.

2.000 p.e.

8.000 p.e.

wwtp

8.000 m

16.000 m

2.000 m

1 m/ p.e.

5,3 m/ p.e.

1 m/ p.e. distance > 10 m/ p.e.

always separate wwtpfavorable

distance < 1 m/ E

always separate wwtpunfavorable

eventual wwtp

Page 11: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Errect sewage system?

Average groundslope?

Building ground?Space?

Profitability?Specfic sewagelength < 30 m/

property or10 m/p.e.

Waste water treatment on the property

Small sewage works

drainless pit

Errect semi-centrale wwtp‘s?

Receiving wateravailable?

Building ground?Space?

Profitability?

Receiving wateravailable?

Building ground?Space?

Errect district-wwtp?

Receiving wateravailable?

Building ground?Space?

Profitability?

Transition to a central wwtp?

wwtp exists/ underconstruction/

planned ? capacity?

Profitability?(distance)

yes noyes no

yes no

yes no

yes no

yes no

yes no

yes no

yes no

Page 12: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Size of the wwtp

Number of inhabitants * target connection degree

+ (realistic increase of population ???)

+ Population equivalents for tourism, industry, trades

Page 13: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Technical design of the wwtp

Treatment technology depends on size and boundaryconditions (receiving water, ...), as similar as possible

minimum two parallel treatment lines(totaly separately opreable, that means also the aerationsystem)

with significant tourism: four parallel treatment lines(totaly separately opreable, that means also the aerationsystem)

Page 14: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Technical design of the wwtp

Fine screen 3 mm

corrosion-resistant equipment (no galvanized steel)

separate regulation of oxygen supply for eachtreatment line (for activated sludge systems)

...

Page 15: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Screenings in different parts of wwtp

Aeratoion grid after one year of operation

Page 16: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Operation of the WWTP

Technical documentation in Albanian language

Maintenance, service and repair of technicalequipement

Maintenance specifications and storage system

Information exchange „WWTP-neighbourhoods“

Page 17: Notes for Design, Construction and Operation of Waste

Balkans Joint Conference and Exhibition, Tirana 7-9 November 2018

Thanks for your attention