NOTICE SUBMISSIONS
Requirements and Procedures
1
![Page 2: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/2.jpg)
PROJECTS COVERED
Part 12
![Page 3: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/3.jpg)
Equipment Replacement
Medical and Non-Medical Used for similar purposes as
equipment being replaced“Substantially equivalent” technologyFDA-approved, if applicable.
3
![Page 4: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/4.jpg)
Nonclinical Infrastructure
Including but not limited to HVAC, fire alarm and call bell systems, exterior building envelope, parking garages and elevators.
Others that do not relate to: Clinical space or service Renovation or reconfiguration of patient rooms Renovation or reconfiguration of resident rooms.
4
![Page 5: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/5.jpg)
Non-Clinical Construction 5
Administrative OfficesUtility StructuresMaintenance ShopCentral KitchenCafeteria Gift ShopDedicated Worship SpaceHospital Lobbies
![Page 6: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/6.jpg)
Clinical Impact 6
Limited Review (710.1(c)(5)) still required for projects that impact clinical space, such as Operating rooms Treatment and procedure rooms ICU’s Special care units (e. g., cardiac) Isolation rooms Laboratories
![Page 7: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/7.jpg)
Clinical Impact
Limited Review (710.1(c)(5)) still required for projects to: Renovate or reconfigure patient rooms Renovate or reconfigure resident rooms. Notice required for painting, replacement
of floor coverings, etc., which are repair and maintenance
7
![Page 8: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/8.jpg)
NOTICE SUBMISSION
PROCESS
Part 2
8
![Page 9: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/9.jpg)
“Written” Notice
Electronic Submission via NYSE-CON
9
![Page 10: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/10.jpg)
Notice Submission to NYSE-CON
Format Similar to Limited Review Application, but streamlined:Project DescriptionArchitecture/Engineering
Certification, where applicable.
10
![Page 11: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/11.jpg)
Patient Safety Plan
Required for projects that implicate patient safety
Submission of plan document required
11
![Page 12: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/12.jpg)
Timing and Acknowledgements
No timeframe for submission in advance of project
No formal approval will be issued by the Department for Notices
An acknowledgement will be generated by NYSE-CON when a notice is uploaded.
12
![Page 13: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/13.jpg)
Compliance
Pre-opening and /or Post-opening inspections will be conducted selectively.
All projects must be fully compliant with applicable codes and regulations.
Full citation and correction of any violations.
13
![Page 14: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/14.jpg)
Certification Documents
Initial Submission: Architect/Engineer Certification
Patient Safety Plan
Physicist Certification
14
![Page 15: NOTICE SUBMISSIONS Requirements and Procedures 1](https://reader035.vdocuments.net/reader035/viewer/2022070306/55169e0e550346f6208b4b8e/html5/thumbnails/15.jpg)
Certification Documents15
Project Closeout
Architect/Engineer Certification
Installer’s Certification
Balancing Report