![Page 1: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/1.jpg)
New York Building Congress November 7, 2013
Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM
![Page 2: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/2.jpg)
228 miles of structure 432 miles of tunnel lighting 722 miles of track
– (630 mainline) 6,300 subway cars 4,700 buses 468 stations
What is NYCT
194 fan plants 216 substations 230 pumping facilities 558 communication rooms 14 maintenance shops 25 support shops 23 yards
![Page 3: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/3.jpg)
NYCT Capital Program Revised Program 2010-2014
Track $1.4
Rolling Stock (Rail & Bus Fleets)
Track
Bus Facilities
Stations
Infrastructure & Facilities
Signals & Communication
Other
$11.6B
![Page 4: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/4.jpg)
![Page 5: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/5.jpg)
![Page 6: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/6.jpg)
![Page 7: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/7.jpg)
![Page 8: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/8.jpg)
MTA’s Sandy Repair and Restoration Program (December 2012)
Agency Amount
New York City Transit $3,449
Long Island Rail Road 267
Metro-North Railroad 188
MTA Bus 25
Bridges and Tunnels 778
Capital Construction Company 48
TOTAL $4,755
Show Me the Money!
![Page 9: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/9.jpg)
Volume of Added Sandy Work to Capital Program
Sandy work will increase design and construction activities - beyond the
current capital program
$ in Billions
$1.0
$2.0
$3.0
$4.0
2012 2013 2014 2015 2016 2017
Sandy Work
Expected Capital Program Pace
![Page 10: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/10.jpg)
Impact on Industry
• Numerous Contracts Issued in Short Time Frame (1M-200M)
• Competition for Labor, Subs, Material, and Equipment
![Page 11: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/11.jpg)
Program Areas
• Signals & Systems • Systems & Security • Station Rehabilitation • Infrastructure and Facilities • Recovery & Resiliency
![Page 12: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/12.jpg)
Signals and Systems Signals and Systems
![Page 13: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/13.jpg)
![Page 14: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/14.jpg)
![Page 15: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/15.jpg)
![Page 16: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/16.jpg)
Signals and Systems Construction
Goals Background/Goals Range Duration Projected/ Advertise
Award
S32764 Interlocking
Modern.: 34 St / 6th Avenue
This project will modernize and improve the reliability of the 34th St interlocking located on the IND 6th Avenue Line in the borough of Manhattan. Work will include replacement with a new conventional relay-based interlocking and the construction of new relay rooms to house all associated equipment.
$50 million or greater
53 months
October 2013 / December
2013
S32765 Interlocking
Modern.: W. 4th St / 6th Avenue
This project will modernize and improve the reliability of the West 4th Street interlocking located on the IND 6th Avenue Line in the borough of Manhattan. Work will include replacement with a new conventional relay-based interlocking and the construction of new relay rooms to house all associated equipment.
$50 million or greater
50 months
November 2013 /
February 2014
S-48002 CBTC
Equipment Supplier
Interoperability B-Division
This project will utilize the documentation and test facilities developed under the Culver Test Track project to develop and qualify additional interoperable CBTC suppliers. Culver Test Track Project technical documentation will be provided to these additional suppliers as soon as it is mature enough to be released. These suppliers systems and subsystems will be tested to all of the requirements (both on the interoperability test facility and test track) developed under the Culver Test Track Project.
$5 million or greater
24 months
December 2013 /
June 2014
S-48004 CBTC Queens
Boulevard West-50 Street to 71
Av: Phase 1
This project is the first phase of the installation of Communications Based Train Control (CBTC) on the Queens Boulevard Line in the boroughs of Queens and Manhattan. The extent of the project is from 50th St. in Manhattan to Union Turnpike in Queens. Phase I will procure and install CBTC carborne equipment and Automatic Train Supervision (ATS) system
$50 million or greater
61 months
May 2014 / November
2014
![Page 17: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/17.jpg)
Systems and Security Systems and Security
![Page 18: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/18.jpg)
![Page 19: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/19.jpg)
Construction Goals Background/Goals Range Duration
Projected/ Advertise
Award C-43038
HVAC Comm Rooms: 17 Locations
To provide HVAC cooling solution for 6 communication rooms and perform Architectural work and other miscellaneous work in 11 other communication room locations.
$2 million or greater
18 months
October 2013 / December
2013
W-32380 Passenger
Station LAN: 31 Stations
This project will provide a base communications infrastructure to support a multitude of projected technology initiatives that will improve security, fare collection, customer communications and service delivery.
$10 million or greater
26 months
November 2013 /
February 2014
C-43046 Hydrogen Gas Ventilation:19
Communications Rooms
This project will provide ventilation for 19 communication rooms at multiple locations in Brooklyn, Queens, Manhattan, and the Bronx to meet NYS Uniform Fire Prevention and Building Code's prescriptive requirement for hydrogen gas concentration thresholds.
$2 million or greater
11 months
November 2013 /
February 2014
W32695 PA/CIS: 87
Stations Furnish-Install
Cabinets
This project will install Public Address and Customer Information Screens (PA/CIS) at 87 stations system wide. These are the only remaining stations without any form of PA/CIS system. The systems to be installed under this project will feature digital audio and digital text-messaging capabilities, and will be connected to the NYCT communications network.
$10 million or greater
21 months
December 2013 /
March 2014
W-32372 Passenger
Station LAN: 20 Stations
This project will provide a base communications infrastructure to support a multitude of projected technology initiatives that will improve security, fare collection, customer communications and service delivery.
$10 million or greater TBD March 2014 /
June 2014
C-43753 Construct Bus
Command Center- DOB
This project will design, furnish, and construct a new Bus Command Center for NYCT Department of Buses and MTA Bus Company.
$25 million or greater
36 months
March 2014 / June 2014
Systems & Security
![Page 20: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/20.jpg)
Construction Goals Background/Goals Range Duration
Projected/ Advertise
Award
W-32355 Real Time Train
Arrival Information 'B' Division Ph 2
This project will provide real-time train arrival information at 288 stations on NYC Transit's B-Division (lettered) routes (except for Canarsie, which already has such service), plus all stations on the Flushing line. This project will also upgrade older station public address systems, install customer information screens at stations that currently lack them, and implement one or more technologies to identify the location of trains.
$50 million or greater TBD May 2014 /
July 2014
W-32366 Replace Bus Radio System
This project will replace NYC Transit's and MTA Bus' existing bus radio system with a new digital radio system. In addition, a new bus command center will be built at East New York.
$50 million or greater
66 months
May 2014 / November
2014
C-34827 Fire Alarm: 207 Street Overhaul
Shop
This project will replace the fire alarm system at the 207 St. Overhaul Shop, located in the borough of Manhattan. A new state-of-the-art system that ties together all of the buildings' fire protection systems will be installed. The new system will meet the National Fire Alarm Code, as well as all New York state and New York City fire codes.
$2 million or greater
18 months
October 2014 / December
2014
SS04-7229 Fire Alarm
System at 207 St Shop
This project will replace the fire alarm system at the 207 St. Overhaul Shop, located in Manhattan. A new state-of-the-art system that ties together all of the buildings' fire protection systems will be installed. The new system will meet the National Fire Alarm Code, as well as all New York state and New York City fire codes.
$2 million or greater
18 months
October 2014 / December
2014
C-43753 PBX Upgrade,
Phase I
This project will replace and upgrade obsolete or incompatible subsystems in the mission-critical Private Branch Exchanges (PBXs) that NYCT uses for voice and data communications routing.
$10 million or greater
36 months
July 2014 / January 2015
W-32784-P2 Integrated
Service Information &
Management B-Div: Module 1
This project will provide consistent and timely information about the current state of B Division service to staff and customers, moving the organization toward centralized monitoring and control. The successful delivery of integrated service information and management will lead to improved service, safety and security.
$10 million or greater TBD
December 2014 /
March 2015
Systems & Security
![Page 21: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/21.jpg)
Stations Stations
![Page 22: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/22.jpg)
Current Approach
• Condition Survey • Renewal Program
Sea Beach Line – 9 Stations 8th Ave., 18th Ave., 20th Ave., Fort Hamilton Parkway, Kings Highway, New Utrecht Ave., Bay Parkway, Avenue U, and 86th St. New Lots Line – 6 Stations Van Siclen Ave., Pennsylvania Ave., Rockaway Ave., Saratoga Ave., Junius Ave., and Sutter Ave.- Rutland Rd.
• Component Program – In design: 56 (for 2014 award) – In Construction: 32 – Completed: 38
![Page 23: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/23.jpg)
104 Street Jamaica Line Street stair and canopy
![Page 24: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/24.jpg)
Hunters Point Avenue Flushing Line Station renewal
![Page 25: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/25.jpg)
ADA Accessibility
![Page 26: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/26.jpg)
ADA Accessibility
• Goal of 100 key stations by 2020 Completed In Construction In Design In Planning
80 5 6 9
• Planned 2014 Awards – Ozone Park – Lefferts Blvd./Liberty Line A
– 68th St. – Hunter College/Lexington Ave. Line 6
![Page 27: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/27.jpg)
Construction Goals Background/Goals Range Duration
Projected/ Advertise
Award A-36199
ADA at Ozone Park-Lefferts Blvd- Liberty
This project will provide full ADA (Americans with Disabilities Act) accessibility at the Ozone Park - Lefferts Blvd Station on the IND Liberty Line located in Queens. The station has been identified as a key station.
$5 million or greater
19 months
November 2013/Feb 2014
A-36151 Access
Improvements at Grand Central
Station
This project will provide improved access at Grand Central Station on the IRT Lexington Avenue Line located in Manhattan. Work will include the installation of an additional stair on the west side of the 42nd Street entrance, platform improvements and improvements to a fare control area.
$10 million or greater
30 months
January 2014 / April 2014
A-36909 Component Repairs at 6
Stations / Canarsie
Component Repairs at 5 Stations on the Canarsie Line in Brooklyn. Stations include Graham Ave, Montrose Ave, Morgan Ave, Wilson Ave, Atlantic Ave & Livonia Ave.
$5 million or greater
15 months
December 2013 /
March 2014
A-36908 Component
Repairs at 5th Ave & 7th Ave / Queens Blvd
Component Repairs at 2 Stations on Queens Blvd line. Stations include 5th Ave and 7th Ave Line.
$5 million or greater
15 months
January 2014 / April 2014
A-36906 Component Repairs at 3
Stations / Lex
Component Repairs at 3 Stations on the Lexington Line in Manhattan. Stations include 59 St, 51 St, and Astor Place
$1 million or greater
10 months
January 2014 / April 2014
A-36884 Component
Repairs at 103 Street / Lex
This project will perform component repairs at 103rd Street station. Work include repair street stairs (treads, risers, walls, columns, railings, handrails, structure, etc…), platform stairs, platform floor, platform edge, wall and ceiling, mezzanine ceiling/wall, mezzanine floor as well as paint entire station and some minor electrical work.
$5 million or greater 9 months January 2014 /
April 2014
Stations
![Page 28: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/28.jpg)
Construction Goals Background/Goals Range Duration
Projected/ Advertise
Award A-46016
Station Renewal Culver Line - 7
Stations
This project consists of renewal of 7 Stations and Component Repairs at 2 Stations on the Culver Line in Brooklyn. Stations Renewals include Ditmas Ave, 18th Ave, Ave I, bay Pkwy, Ave P, Ave U, and Ave X. Component Repair locations are Ave N and Kings Hwy.
$50 million or greater
40 months
January 2014 / April 2014
A-36168 Component
Repairs: Ditmars Blvd / Astoria Line
his project will repair select station elements within the Astoria-Ditmars Boulevard, Broadway, and 39 Avenue Stations along the BMT Astoria Line in the borough of Queens. Work will vary by location and may include the repair or replacement of street stairs, platform edges and floors, and platform or mezzanine canopies. All deficiencies of the selected components within the stations will be eliminated.
$5 million or greater
13 months
March 2014 / June 2014
A-36164 ADA 68 St-
Hunter College Station - Lex
This project will provide full ADA (Americans with Disabilities Act) accessibility at the 68th Street-Hunter College Station on the IRT Lexington Avenue Line located in Manhattan.
$25 million or greater
38 months
April 2014 / July 2014
A-36891 Component Repairs at 2
Locations / 4th Ave
This project will repair select elements in 2 locations; 9th Street and 59th Street Stations on the 4th Ave Line in the borough of Brooklyn. Work will include the repair of structural deficiencies throughout the station and improvements to architectural treatments.
$2 million or greater
10 months
May 2014 / July 2014
A-36916 Component
Repairs at Dyre Ave & Morris Pk / Dyre Line
This project will perform component repairs at Component Repairs at Dyre Ave & Morris Pk / Dyre Line
$5 million or greater 13 May 2014 /
August 2014
A-36887 Component Repairs at Essex St /
Nassau Loop
This project will repair deteriorated conditions in a mezzanine area closed to the public at the Delancey St-Essex St station on the Nassau Loop Line in the borough of Manhattan.
$1 million or greater 8 months May 2014 /
August 2014
Stations
![Page 29: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/29.jpg)
Construction Goals Background/Goals Range Duration
Projected/ Advertise
Award A-36905
Component Repairs at 5
Stations Fulton
This project will repair select elements within the 5 stations on the Fulton Line. Stations include Clinton, Washington, Kingston-Throop, Ralph Ave, Rockaway Ave and Liberty Ave.
$5 million or greater
14 months
June 2014 / September
2014
A-36921 Component Repairs at 3 Locations / Cross-town
This project will repair select elements including painting within the 3 stations on the Cross-town Line. Stations include Broadway, Myrtle-Willoughby & Clinton-Washington.
$5 million or greater
11 months
June 2014 / September
2014
A-36091 Sea Beach Line Stations Rehab -
9 Stations
This project will rehabilitate 9 stations on Sea Beach line including, 8th Ave, 18th Av, 20th Ave, Fort Hamilton Parkway, Kings Highway, New Utrecht Avenue, Bay Parkway, Ave U, 86th Street, the borough of Brooklyn. All station elements will be rehabilitated during this project. Work will include rehabilitation of the street-level control houses, rehabilitation of tunnel structures supporting the control houses, replacement of one passageway enclosure and relocation of the other, relocation of one stair, replacement of platform metal stairs and canopy, and rehabilitation of platforms. In addition, station aesthetics will be remedied and artwork will be installed.
$100 million or greater
46 months
July 2014 / October 2014
ST21-0583 Component Repairs at 6 Stations/ 8th Avenue Line
This project will perform component repairs at 6 Stations on the 8th Avenue Line including 168th St, 145th St, 110th St, 103rd Rd, 50th St, and Spring Street
$5 million or greater TBD
August 2014/October
2014
A-36865 Component Repairs at 6
Stations/Jamaica
This project will replace the platform edges at the 121 Street, 111 Street, 104 Street, Woodhaven Boulevard, Cypress Hills and Myrtle Avenue stations; repair the platform columns at the 121 Street and 104 Street stations; and replace the mezzanine to platform stairs at the 104 Street station.
$10 million or greater
TBD September
2014/December 2104
A-36890 Component
Repairs at 49th St / Broadway
Component Repairs at 49th Station on the Broadway Line. $5 million or greater
15 months
September 2014 /
December 2014
Stations
![Page 30: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/30.jpg)
Construction Goals Background/Goals Range Duration
Projected/ Advertise
Award A-36949
Component Repairs at
Aqueduct-North Conduit Av / RKY
Component Repairs at Aqueduct-North Conduit Av / RKY $1 million or greater TBD
September 2014 /
December 2014
A-36150 ADA 57th St Ph 2 - 7th Ave / B'way
This is the second and final phase to provide full ADA (Americans with Disabilities Act) accessibility at the 57th St Station on the BMT Broadway Line in the borough of Manhattan. The station has been identified as an ADA Key Station.
$25 million or greater
32 months
October 2014 / December 2014
A-36871 Component Repairs at 2 Locations / Nostrand
This project will repair select elements within the Knickerbocker Avenue Station on the BMT Myrtle Line in the borough of Queens. Work will include the repair of structural deficiencies throughout the station and improvements to architectural treatments. Locations are President Street and Newkirk Ave Stations
$2 million or greater 8 months October 2014 /
December 2014
A-36907 Component
Repairs at New Lots Ave
This project will repair select elements within New Lots Ave Station on New Lots Line in the borough of Queens. Work will include the repair of structural deficiencies throughout the station and improvements to architectural treatments.
$1 million or greater
10 months
October 2014 / December 2014
A-46009 Station Renewal New Lots Line - 6
Stations
This project consists of renewal of 6 Stations on New Lots Line in Brooklyn by eliminating deficient conditions rated 3 or worse at these stations as rated by Station Condition Survey and existing field condition. Locations are Van Siclen aver, Pennsylvania Ave, Rockaway Ave, Saratoga, Junius Ave, and Sutter Ave-Rutland Rd.
$25 million or greater
15 months
October 2014 / December 2014
E-34022 Replace 7 Hydraulic Elevators
This project will replace ten hydraulic elevators system wide in order to achieve more reliable and efficient operations. Locations include three at Brooklyn Bridge Station, three at Grand Central Station, two at 125 St, and two at 51 St Station.
$25 million or greater
28 months
October 2014 / December 2014
Stations
![Page 31: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/31.jpg)
Infrastructure & Facilities Infrastructure & Facilities
![Page 32: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/32.jpg)
Upgrade HVAC systems
![Page 33: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/33.jpg)
Overcoat painting
![Page 34: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/34.jpg)
Infrastructure and Facilities Construction
Goals Background/Goals Range Duration Projected/ Advertise
Award
E-34813 Yard Lighting
Jerome Pelham
This project will replace yard lighting at the Jerome and Pelham railcar yards located in the Bronx. Work will include rehabilitation of the light fixtures and/or light towers to ensure operational safety.
$5 million or greater
24 months
November 2013 /
January 2014
C-33840 Overcoat Broadway
Junction to New Lots Ave / Canarsie
This project will paint a portion of the elevated steel structure of the BMT Canarsie Line from south of Broadway Junction to south of New Lots Avenue in the borough of Brooklyn.
$10 million or greater
22 months
December 2013 /
March 2014
A-37547 Structural Steel Repair, Lower Level, 9th Ave, West End Ln
This project will rehabilitate the Lower Level of the 9th Avenue Station on the West End Line (BMT D" train), Brooklyn, which also connected to NYCT's 38th St. Yard. Work will include repair/replacement of corroded structural steel (columns and Beams), concrete and west Portal. This project is part of an on-going MTA- NYCT program to achieve a state of good repair.
$5 million or greater TBD
November 2013 /
January 2014
T-80276 St. George
Interlocking - Phase 1
The work proposed under this project is as follows: west end of the tunnel to the east end of the station platforms on Track 1, 2, 3, 4, 5 and Track NS2 up to signal SG30. The project consists of replacing all the tracks, ties, contact rail, and switches within the limits of the project. The VA dwarf signals will be refurbished and the incandescent bulbs replaced with light emitting diode assemblies, LEDs by SIR In-House Personnel.
$50 million or greater
30 months
October 2013/Janaury
2014
C-33845 Structure
Repairs-Dyre Avenue Line
This project will repair thru-spans on the IRT Dyre Avenue Line in the Bronx from north of East 180th Street to Dyre Avenue.
$2 million or greater
18 months
December 2013 /
March 2014
C-33270 Overcoat: Church Av
Portal-W 8 - Culver Line
This project will paint a portion of the elevated steel structure of the IND Culver Line located from Church Avenue Portal to West 8th Street in Brooklyn.
$10 million or greater
32 months
December 2013 /
March 2014
![Page 35: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/35.jpg)
Infrastructure and Facilities Construction
Goals Background/Goals Range Duration Projected/ Advertise
Award C-34824
14th St. Signal Training Fire
Sprinkler/Second Means of
Egress
This project will install a new fire sprinkler system and a second means of egress at the employee training facility at the 14th St./Eighth Ave. Signal School.
$2 million or greater TBD
December 2013 /
March 2014
C-34911 East 180 St
Maintenance Shop: Facility Waterproofing
This project will repair of all building elements and walkway at E 180th. Street Car Maintenance Facility that are being damaged by continuous water infiltration.
$2 million or greater
22 months
December 2013 /
March 2014
E-31114 Replace Vent Controls: 26 Locations
This project will replace obsolete Programmable Logic Controller (PLC)-based fan controls with new PLC's at 26 vent plants. Work will include replacement of PLC control equipment hardware and software and to provide communications between the vent plants and the Remote Operations Center.
$5 million or greater
40 months
January 2014 / April 2014
E-40805 Pumps at 4 Locations /
Pelham-Jerome
This project will rehabilitate pump rooms at four locations system wide. Locations include Walton Ave and Brook Ave in the borough of the Bronx, and 146th Street and 148th Street in the borough of Manhattan. The pumps are used to pump out water from subway system into the city sewer system.
$10 million or greater
27 months
March 2014 / May 2014
C-33848 Perimeter Hardening:
RCC, PCC & Liv Plz
This project will enhance the security of NYC transit's Power Control Center (PCC) and Rail Control Center (RCC) in Manhattan and its 130 Livingston Plaza building in Brooklyn.
$5 million or greater
12 months
March 2014 / June 2014
C-43749 Livingston Plz
Elevators, Roof, Façade
This project will repair the elevators, facade, and roof of NYC Transit's 130 Livingston Plaza facility in Brooklyn.
$10 million or greater
28 months
March 2014 / June 2014
![Page 36: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/36.jpg)
Infrastructure and Facilities Construction
Goals Background/Goals Range Duration Projected/ Advertise
Award C30401
Rehabilitate Deep Wells:
Nostrand Ph 2
This project will rehabilitate eight deep wells on the IRT Nostrand Avenue Line in the borough of Brooklyn. The deep wells are installed for controlling ground water surrounding the subway tunnel to prevent water infiltration.
$5 million or greater
27 months
April 2014 / July 2014
C-34914 Shop Repairs/
Upgrades: Pitkin and Concourse
This project will repair high-priority deficient components at various railcar shops at locations system-wide. Work will vary depending on the individual needs at each location. This project enables immediate repair needs to be met as opposed to waiting for a full shop rehabilitation or reconstruction.
$10 million or greater TBD May 2014 /
July 2014
C-34829 RTO Facilities
Hardening Ph 2
This project will install equipment that will enhance access control at various NYC Transit facilities throughout the system as a part of the agency's security initiatives.
$5 million or greater
22 months
May 2014 / August 2014
C-43751 Power Upgrade:
RCC, PCC
This project will upgrade the heating, ventilation, air conditioning and the power distribution systems at NYC Transit's Rail Control Center (RCC) and Power Control Center (PCC) located in the borough of Manhattan.
$10 million or greater
24 months
June 2014 / September
2014
C-36337 Underground
SS Hatchways Ph
3 @ 12 Locations
This project will rehabilitation of Underground fourteen Substation Hatchways at twelve locations: Lenox - 113th Street SS, Lexington - 78th Street SS, St James Place SS, Lafayette Avenue SS, Avenue C SS, Bedford Park SS, E 184th Street SS, Bradford Street SS, Downing Street SS, Spencer Place SS, Schermerhorn Street SS, Flatbush - 5th Avenue SS.
$5 million or greater TBD July 2014 /
October 2014
P-80275 New Substation:
Prince's Bay
his project will install a new Power Substation at Prince's Bay in the Borough of Staten Island. Work will include furnishing and installing the high tension switchgear, power transformer, rectifier, DC feeder breakers, positive and negative cables, ventilation system, etc.
$10 million or greater
28 months
July 2014 / October 2014
C-34913 Car Washer Repairs: 3
Yards
This project will bring the car washer at three yards to a good state of repairs by receiving component replacement. The yards are 239th Street, Concourse and Pelham.
$5 million or greater TBD July 2014 /
October 2014
![Page 37: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/37.jpg)
Infrastructure and Facilities Construction
Goals Background/Goals Range Duration Projected/ Advertise
Award C-34912
Car Washer Repairs at
Coney Island Yard
This project will bring the car washer at Coney Island Yard to a good state of repairs by getting component replacement.
$2 million or greater TBD
August 2014 / November
2014
C-33835 Structure
Repair: Pacific to 59 St-4th Av
Line
This project is the first phase of the rehabilitation of subway structure of the 4th Avenue Line between 59th Street and Pacific Street stations, located in Brooklyn. Work will include sealing water leaks and leaking cracks in walls, ceilings & ventilators; repairing spalled concrete; repairing ventilator structures and emergency exits; replacing corroded steel members; and repairing a deteriorated duct bench.
$10 million or greater
20 months
August 2014 / November
2014
P-36415 Rehab CBH #275 Pearl
Street / Clark
This project will rehabilitate Circuit Breaker House (CBH) #275 on the IRT Clark Street Line in the borough of Manhattan.
$5 million or greater TBD
June 2014 / September
2014
![Page 38: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/38.jpg)
Infrastructure & Facilities Sandy Recovery & Resiliency
Infrastructure & Facilities Sandy Recovery & Resiliency
![Page 39: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/39.jpg)
![Page 40: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/40.jpg)
![Page 41: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/41.jpg)
Construction Goals Background/Goals Range Duration Projected/
Advertise Award
Clifton Rail Yard/Shop - Long Term
This project will provide mitigation measures to prevent future storm damages by construction elevated platform at design flood elevation to accommodate power transformer, emergency generators, shop Electrical Distribution and Communication Rooms. It will install permanent Con Edison transformer and will install HVAC, Fire Alarm, CCTV, and Intercom Systems.
$10 million or greater
28 months
July 2014/September
2014
T80276 St. George Interlocking
This project will replace the signal system, construct a new signal relay room at a higher design elevation, replace the track rails on all 12 tracks and install new yard drainage system.
$50 million or greater
30 months
November 2013 / March 2014
A37593 South Ferry
Station Complex
This project will rehabilitate the station finishes, replace the electrical, mechanical, data, fire alarm, CCTV, communication, elevators and escalators. Signal, tracks and traction power will be installed. Leak mitigation and long term flood protection measures will be installed.
$100 million or greater
24 months
December 2013 / Award April 2014
January 2014
Cranberry Tube Rehabilitation
This project will repair/ replace tunnel and emergency lighting, circuit breaker houses, fan plant, pump rooms and substations. Duct banks will be repaired and new power and communication cables will be installed. Signal system will be repaired.
$50 million or greater
36 months
January 2014/April 2014
Rutgers Tube Rehabilitation
This project will be combined with the Cranberry Tube Rehabilitation Project. It will repair/ replace tunnel and emergency lighting, circuit breaker houses, fan plant, pump rooms and substations. New power and communication cables will be installed. Track and signals will be rehabilitated.
$50 million or greater
36 months
January 2014/April 2014
Clark Street Tube
Rehabilitation
This project will repair/ replace tunnel and emergency lighting, circuit breaker houses, fan plant, pump rooms and substations. New power and communication cables will be installed. Track and signals will be rehabilitated.
$50 million or greater
24 months
April 2014/July 2014
53rd Street Tube
Rehabilitation
This project will repair/replace a circuit breaker house, install new power and communication cables, replace track rails and repair signal system.
$10 million or greater
17 months
May 2014/August 2014
Sandy Recovery & Resiliency
![Page 42: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/42.jpg)
Construction Goals Background/Goals Range Duration Projected/
Advertise Award D61154
Power Cable Rockaway Park
This project will replace damaged power cables, 500 & 2000 MCM cables, hand switches, third rail heaters and negative feeder cables in the Rockaway Park
$5 million or greater
10 months
June 2016/August
2014
P36449 Power Cable 148th Street
Yard
This project will replace damaged power cables at the 148th Street Yard. $5 million or greater
10 months
March 2014/June 2014
P36450 Power Cable 207th Street
Yard
This project will replace damaged power cables at the 207th Street Yard $5 million or greater
10 months
March 2014 / June 2014
P36451 Power Cable Coney Island
Yard
This project will replace damaged power cables at Coney Island Yard, Avenue Z, and will repair the third rails.
$15 million or greater
12 months
August 2014/November
2014
E40827 Pump Room Rehabilitation
207th St. & Dyckman
This project will rehabilitate the pump room at 207th Street/Dyckman Avenue $2 million or greater
10 months
January 2014/April 2014
MW17-1074 Communication
Cable at 8 Locations
This project will replace communication cables at 8 different locations other than Tubes & Yards.
$5 million or greater
22 months
March 2014/June 2014
Multiple Resiliency Contracts
Several contracts are planned for flood mitigations at various locations in flood prone areas including lower Manhattan Station Entrances, Fan Plants, Critical Facilities, Vent Grates, Watertight Doors, Mechanical Closures, Manhole Covers and Access Hatches.
$5 million or greater Various Various
Sandy Recovery & Resiliency
![Page 43: November 7, 2013 - New York Building CongressNovember 7, 2013 Frederick E. Smith, P.E. Senior Vice President and Chief Engineer, CPM 228 miles of structure 432 miles of tunnel lighting](https://reader035.vdocuments.net/reader035/viewer/2022070721/5ee20bbcad6a402d666cb19a/html5/thumbnails/43.jpg)
Construction Goals Background/Goals Range Duration Projected/
Advertise Award P36453
Circuit Breaker Houses
12 Locations
This project will rehabilitation 12 Circuit Breaker Houses at various locations that were damaged by super storm Sandy.
$20 million or greater TBD
June 2014/August
2014
E40819 Pump Room
Canarsie Line This project will replace the pump room equipment and controls at Canarsie.
$$0.5 million or greater
10 months
January 2014/April 2014
Sandy Recovery & Resiliency