NPOESS Preparatory Project (NPP)CERES Climate Analysis Research System
(CARS) Delta Critical Design Review (dCDR)
Aug 26, 2008NASA/GSFC, Greenbelt, MD, Building 8 Auditorim
rev 25-Aug-2008 CERES dCDR – 2
Logistics
• Time: 9:00 AM – 5:00 PM Eastern Time • WebEx (https://nasa.webex.com)
– Meeting number: 821787052– Meeting password: fun4sds!– Only One Screen will be on WebEx
• Dial-In– 1-866-732-3725– Pass code 3627839
rev 25-Aug-2008 CERES dCDR – 3
Introduction
rev 25-Aug-2008 CERES dCDR – 4
Purpose of Delta Review
• To assess the adequacy of the LaRC ASDC, SDS Land PEATE, and SD3E, requirements and designs to meet the additional requirements to generate, store, and distribute climate quality data products (i.e., SDR and EDR) for CERES Instrument.
rev 25-Aug-2008 CERES dCDR – 5
Agenda
Coffee SocialIntroduction / R. SchweissSD3E / Evelyn Ho Land PEATE / Ed MasuokaCERES Climate Analysis Research System (CARS) / Erika GeierLaunchCERES Climate Analysis Research System (CARS) (Continued) / Erika GeierSDS System Testing / Vic Buczkowski / SDSConcluding Remarks / R. SchweissMeeting Concluded
8:30 AM 9:00 AM 9:15 AM10:00 AM11:00 AM 12:00 PM1:00 PM4:00 PM 4:15 PM5:00 PM
rev 25-Aug-2008 CERES dCDR – 6
Review Panel Membership
1. Jim Gleason, Chair NASA NPP Science Team2. Christina Hsu NPP ST 3. Kelly Jeletic NPP Project Office (NASA)4. Pam Rinsland NASA/LaRC5. John Kusterer NASA/LaRC6. Don Garber NASA/LaRC7. Robert Schweiss SDS Project Manager
(NASA)8. TBD NASA/HQ
rev 25-Aug-2008 CERES dCDR – 7
Welcome & Logistics
• Bring Phone Bridge Up• Restrooms• Coffee the back (Lunch on your own)• Fire Exits• Wi-Fi Guest-CNE Access • Please mute cell phones • Speak loudly for folks on phone• Presenters please use wireless mic
rev 25-Aug-2008 CERES dCDR – 8
Requests for Action (RFA)
• RFAs must be written up or emailed to R. Schweiss: [email protected]
• All RFAs due today at the meeting. – State your questions clearly– Review Panel will disposition RFAs
rev 25-Aug-2008 CERES dCDR – 9
Goals of Meeting
• Meeting Goals– Generate CCRs for Level 3 requirements updates. – Walk away of end 2 end data flow concept.– Understand who is doing what, when, and where.– Identify any open issues and associated work off plans.
rev 25-Aug-2008 CERES dCDR – 10
NPP NPP SpaceSegmentSpaceSegment
NESDISCentral
AFWACentral
NPP System Architecture NPP System Architecture GPS
WSCLEO & A Backup T&C
TDRSS
LaunchSupportSegment
LaunchSupportSegment
Direct Broadcast User
Climate UserCommunity
I/F Data Proc
Segment
I/F Data Proc
Segment
InfraInfra
IngestIngest
Process
Process
Data DelData Del
InfraInfra
IngestIngest
DQMDQM
Process
Process
Data DelData Del
NPP Mission Data Command and TelemetryKey:
Archive & Dist
Segment
Archive & Dist
SegmentIngest
ArchiveInterchange
ArchiverRoboticStorage
Datastore
Inventory
Command,Cntrl & Comm
Segment
Command,Cntrl & Comm
Segment
GSE - SvalbardPrimary T&CNPP SMD
Mission Mgmt Center - Suitland
• Flight Operations Team• Enterprise Management• Mission Management• Satellite Operations• Data Monitoring & Recovery
Data HandlingNode
Data Routing & Retrieval
MSO - 10
Science Data
Segment
Science Data
SegmentSD3E
LandPEATE
OceanPEATE
OzonePEATE
AtmosPEATENICSE
SounderPEATE
I&TSE
Data MgtData Mgt Data MgtData Mgt
rev 25-Aug-2008 CERES dCDR – 11
NPP Mission Objectives & Requirements (1 of 2)
• NPP is a joint partnership between NASA & NPOESS Integrated Program Office (IPO) initiated in 1998.
• Partnership provides both organizations with considerable cost savings while achieving their key program objectives:
– Bridge Mission: Provide NASA with continuation of a group of global change observations initiated by EOS TERRA, AQUA, and Aura missions.
– NPOESS Risk Reduction: Provide NPOESS operational community with pre-operational risk reduction demo & validation for selected NPOESS instruments, algorithms, & ground processing.
• NPP programmatic requirements established by – NASA Mission Level 1 Requirements document and science performance by – NPOESS Integrated Operational Requirements Document (IORD).– Final Implementation Agreement (FIA)
rev 25-Aug-2008 CERES dCDR – 12
NPP Mission Objectives & Requirements (2 of 2)
• Key Level 1 requirements include:– 5 year mission lifetime with accommodation of ATMS, CrIS, OMPS, & VIIRS instruments.– Polar sun-synchronous orbit (824km, 20km ground track repeat, 16 day cycle, and ascending
equatorial crossing time of 10:30 AM +/- 10 minutes.– Science Data Segment shall be a research tool (with no operational requirements) used to test
the usefulness of NPP EDRs for accomplishing climate research.– Delta II Launch Vehicle with a September 30, 2009 Launch Readiness Date.
• Revised Level 1 requirements include:– 2.1.2.3 - In developing the SDS, the Project shall assume that EDRs produced by the
IDPS are climate quality.– 2.1.2.3.1 - The SDS shall have the capability to test the assumption in order to contribute
to improving the quality of future EDRs.– 2.1.2.3.2 - The SDS shall provide suggested algorithm improvements to the IDPS.– 2.1.2.3.3 - The SDS shall provide the capability to generate, store and disseminate
climate quality data products for OMPS limb (note: these products are not produced by the IDPS)
rev 25-Aug-2008 CERES dCDR – 13
Level 1 Requirement Changes (1 of 3)
• NPP path to launch– From: 2.2.1 – NPP observatory launch readiness date shall be no later than October
31, 2006. – To: 2.2.1 – NPP observatory launch readiness date shall be no later than October 30,
2009. • Transition to afternoon orbit
– From: 2.1.1.6.3 – Nominal descending equatorial crossing time of 10:30 AM + / - 10 minutes
– To: 2.1.1.6.3 – Nominal ascending equatorial crossing time of 1:30 PM + / - 10 minutes
• CERES accommodation– From: 2.1.1.1 – The NPP spacecraft shall be designed for a 5-year lifetime with a
probability of success of 0.85, and shall accommodate the VIIRS, CrIS, ATMS and OMPS sensors.
– To: 2.1.1.1 – The NPP spacecraft shall be designed for a 5-year lifetime with a probability of success of 0.85, and shall accommodate the VIIRS, CrIS, ATMS, OMPS and CERES sensors.
– From: 2.1.1.3 – The NPP spacecraft shall support concurrent operation for all 4 sensors, and be capable of downlinking all observed data each orbit to the mission ground system.
– To: 2.1.1.3 – The NPP spacecraft shall support concurrent operation for all 5 sensors, and be capable of downlinking all observed data each orbit to the mission ground system.
rev 25-Aug-2008 CERES dCDR – 14
• CERES Accommodation (continued)– From: 2.1.2.4 – The SDS shall use a fully distributed interoperable
architecture, with 5 (nominally) functionally independent elements (Climate Analysis Research System or CARS), organized around key EDRs (atmospheric sounding products, ocean products, land products, ozone products and atmospheric composition) in support of the ESE Science Focus Areas (Atmospheric Composition, Climate Change, Carbon/Ecosystems, Solid Earth, Weather, Water/Energy Cycle)…
– To: 2.1.2.4 – The SDS shall use a fully distributed interoperable architecture, with 6 (nominally) functionally independent elements (Climate Analysis Research System or CARS), organized around key EDRs (atmospheric sounding products, ocean products, land products, ozone products, atmospheric composition and Earth radiation budget) in support of the ESE Science Focus Areas (Atmospheric Composition, Climate Change, Carbon/Ecosystems, Solid Earth, Weather, Water/Energy Cycle)…
Level 1 Requirement Changes (2 of 3)
rev 25-Aug-2008 CERES dCDR – 15
• CERES Accommodation (continued) and OMPS limb re-manifest– From: 2.1.2.3 – In developing the SDS, the Project shall assume
that EDRs produced by the IDPS are climate quality and put in place the capability to test that hypothesis in order to contribute to improving the quality of future EDRs. The SDS shall provide suggested algorithm improvements to the IDPS.
– To: 2.1.2.3 – In developing the SDS, the Project shall assume that EDRs produced by the IDPS are climate quality.
• 2.1.2.3.1 – The SDS shall have the capability to test the assumption in order to contribute to improving the quality of future EDRs.
• 2.1.2.3.2 – The SDS shall provide suggested algorithm improvements to the IDPS.
• 2.1.2.3.3 – The SDS shall provide the capability to generate, store and disseminate climate quality data products for CERES and OMPS limb (note: these products are not produced by the IDPS)
Level 1 Requirement Changes (3 of 3)
rev 25-Aug-2008 CERES dCDR – 16
MRS Changes for CERES on NPP (1 of 2)
• Add CERES Flight Model 5 (FM5) instrument to NPP Mission
• Affected MRS sections/requirements:– 1.5, Reference Documents - added several documents– 2.2.5, SDS Overview - refined to include OMPS limb– Added CERES to list of instruments (with references, as needed)
• 2.2, included CERES on Figure 2-1, Mission Segments• 2.2.1, Space Segment• 3.2.3.1.1, Instrument Accommodation• 3.2.3.1.9, Spacecraft Contamination Requirements• 3.2.3.2.1, Spacecraft-Instrument Resource Accommodation• 3.2.3.2.2, Spacecraft-Instrument Interface Requirements• 3.2.3.5.1, Spacecraft-Instrument Interface Pointing Accuracy,
Knowledge, and Stability
– Modified Probability of Success (Ps)• 3.1.5, Mission Success - Changed Ps to include CERES
rev 25-Aug-2008 CERES dCDR – 17
• Affected sections/requirements (cont’d)– Section 3.2, Space Segment
• 3.2.9 - included new subsection for CERES
– Section 3.6, Science Data Segment• 3.6.1.7, modified SDS Ao to include CERES operational processing• 3.6.1.9, added new requirement for SDS Operational Processing of
CERES Data
– Appendix A, Rationale Matrix• 3.1.5, changed Ps to include CERES• 3.2.9…added entries for new requirements• 3.6.1.7, indicated that Ao reflects OMPS limb and CERES• 3.6.1.9, added entry for new requirement• 3.6.7.1, Product Storage in SDS; updated text to include CERES
and OMPS limb products
– Added CERES to acronym list
MRS Changes for CERES on NPP (2 of 2)
rev 25-Aug-2008 CERES dCDR – 18
Mission Context Diagram
rev 25-Aug-2008 CERES dCDR – 19
NPP Mission Segment (1 of 2)
Space Segment (SS): The NPP Space Segment (SS) consists of the satellite and ground test support equipment. The satellite is comprised of the BCP 2000 bus and the following instruments:
Visible-Infrared Imager Radiometer Suite (VIIRS), Cross-Track Infrared Sounder (CrIS) Ozone Mapping Profiling Suite (OMPS), Advanced Technology Microwave Sounder (ATMS).
Command, Control, and Communications Segment (C3S): Provides the NPP satellite operations capabilities, communication routing of mission data and the ground receive station, overall mission management, and coordinating the joint program operations needs.
Interface Data Processing Segment (IDPS): Pre-processes Stored Mission Data, process and generates Raw Data Records (RDRs), Sensor Data Records (SDRs) and Environmental Data Records (EDRs) for subsequent transfer the the NOAA CLASS and Weather Prediction
rev 25-Aug-2008 CERES dCDR – 20
NPP Mission Segment (2 of 2)
Archive and Distribution Segment (ADS): The main function of the ADS is to receive and archive RDRs, SDRs, and EDRs from the IDPS. xDRs are archived, as are the associated metadata, upon which users may
search, browse, and order data.
Launch Support Segment (LSS): The LSS provides those assets and services associated with the launch vehicle (LV) and the payload integration.
– This segment includes all ground support equipment, property, and facilities to integrate the spacecraft to the LV, verify their integration, and conduct pre-launch testing with the remainder of the ground system..
• Science Data Segment (SDS): The SDS is a prototype element of the future NASA Earth Science Enterprise distributed science data system.
– The role of the NPP SDS is limited to assess the quality of the NPP EDRs for accomplishing climate research.
rev 25-Aug-2008 CERES dCDR – 21
Ocean PEATE
Atmosphere PEATE(U of Wisconsin)
•Support EDR Assessment•Support NICSE CVAssessment Pre-/Post-Launch•Provide Data AnalysisTools to ST•Develop and DemonstrateAlgorithms enhancements
Land PEATE
Ozone PEATE
•Support EDR Assessment•Provide Data Analysis tools to ST•Develop and DemonstrateAlgorithms enhancements•Assess and Validate CrIS &ATMS Calibration Pre- andPost-Launch (TBD)
Sounder PEATE (JPL) •A Mini- Version of the IDPS•Demonstration of AlgorithmEnhancement•Generation of IntermediateProduct, if necessary•IDPS Production Algorithms /•Software
I&TSE
•Overall management directionand science guidance tothe PEATEs•Coordinates EDR Assessment,Algorithm, and Calibrationrecommendations forsubmission
PSOE
NESDISNSIPS
IntermediateProducts
NOAAADS
(CLASS)
NESDISIDPS
SDR, EDR, IP,TDR, LUTs,Algorithms
RDR
NPOESSAlgorithm
CCBEDR Assessment, Algorithm Enhancements
EDRAssessmentAlgorithmEnhancements
Statusreports,Managementdirection
Status reports, Management direction
Status reports,Managementdirection
NPPScienceTeam
NESDISC3S
(WRS)
Calibration Tasking
STA Report
Not all data flows shown here.
SDS Logical Block Diagram
Algorithm EnhancementsIP Gen. Request
Algorithm EnhancementsIP Gen. Request
•Support EDR Assessment•Provide Data Analysis tools to ST•Develop and DemonstrateAlgorithms enhancements•Assess and Validate OMPSRadiometric and GeometricCalibration Pre- and Post-Launch
•CERES CARS•Generate Climate Quality Data Products to Characterize Global Climate change
CERESScienceUsers
CERES RDRs, VIIRS SubsetSDRs
CERES RDRs
New due to Level 1 Requirements Changes
SD3E•32 Day Data Buffer for RDR, SDR, EDR,and 5 days of Retained Intermediate Products
RDR, SDR,EDR, IP
TDR, RDR, SDR,EDR, IP
RDR, SDREDR, IP
RDR, SDREDR, IP
QualityControl,
Cal. LUTand S/Wupdates
NICSE
•Assess and Validate VIIRSRadiometric and GeometricCalibration Pre- and Post-Launch•Provide Calibration updateRecommendations•Coordinate PEATEs CalRelated Analysis and AnomalyCharacterization
OzoneCommunity
OMPS LimbSDR EDR
•Perform OMPS Limb Cal/Val•Support OMPS Limb Ops.•Generate OMPS Limb SDR EDRs•Transition OMPS Limb Algorithm to NOAA for Operations
CasaNOSAPre Launch Data & Algorithms
rev 25-Aug-2008 CERES dCDR – 22
SDS Elements• SD3E – SDS Data Delivery & Depository Element
– Acquires data from NOAA/CLASS and NESDIS/IDPS– Provides ~32 days “rolling storage” for pick-up by PEATEs and the NICSE
• PEATEs – 5 Product Evaluation and Algorithm Test Elements– Performs EDR Evaluation / Characterization and algorithm improvements coordinated with External
Science Investigators– Ocean (VIIRS) leveraged off Ocean Data Processing System (ODPS)– Land (VIIRS) leveraged off MODIS Adaptive Processing System (MODAPS)– Atmosphere (VIIRS) leveraged off University of Wisconsin-Madison’s LEOCAT– Ozone (OMPS) leveraged off OMI Data Processing System (OMIDAPS)– Sounder (CrIS & ATMS) leveraged off JPL Atmospheric Infrared Sounder (AIRS) Project’s Team
Leader Science Computing Facility
• CERES CARS – Leverages existing processing capabilities and human resources across the Atmospheric Science
Data Center (ASDC), CERES Science group, and the Data Management group at the NASA Langley Research Center for characterization of Global Climate Change & CDR Production
• NICSE - NPP Instrument Calibration Support Element– VIIRS radiometric and geometric calibration and Instrument characterization support
• I&TSE – Integration and Test System Element– Mini-IDPS for demonstrating algorithm enhancements and / or calibration improvements
• PSOE - Project Science Office Element – Submits algorithm and calibration recommendations to NPP/NPOESS Algorithm CCB
rev 25-Aug-2008 CERES dCDR – 24
NPP Mission Requirements Hierarchy
rev 25-Aug-2008 CERES dCDR – 25
NPP SDS Requirements Hierarchy
SDSRequirements &
Ops Con
PEATEOcean
PEATELand
PEATEOzone
PEATESounder
PEATEAtmosphere
NICSESD3E
Level 3
Level 4
• SDS System Design Spec.• SDS Test Plan & Procedures
• NOAA CLASS IRD• NPOESS to SDS ICD• NSIPS to SDS ICD
System Eng. Notebook
SOP
SD3E-PEATES ICD
Requirements
Design Spec.
Ops. Concp.
Requirements
Design Spec.
Requirements
Design Spec.
Requirements
Design Spec.
Requirements
Design Spec. Design Spec.
CERESCARS
rev 25-Aug-2008 CERES dCDR – 26
Driving Requirements (1 of 2)
• The following Level 1 Requirements are considered key SDS design drivers:– The SDS is intended to be a research tool and as such has no
operational requirements. [Section 2.1.2]– The role of the NPP SDS is limited to assess the quality of the NPP
EDRs for accomplishing climate research. [Section 2.1.2]– The SDS shall be designed with the assumption that the
operational IPO IDPS generated NPP EDRs do not require reprocessing or re-computation in order to support climate research needs. [Req. 2.1.2.1]
rev 25-Aug-2008 CERES dCDR – 27
Driving Requirements (2 of 2)
– The SDS shall acquire RDRs, SDRs, and EDRs from the ADS. [Req. 2.1.2.2]
– The Project shall assume that EDRs produced by the IDPS are climate quality and put in place the capability to test that hypothesis in order to contribute to improving the quality of future EDRs. The SDS shall provide suggested algorithm improvements to the IDPS. [Req. 2.1.2.3]
– The SDS shall use a fully distributed interoperable architecture, with 5 (nominally) functionally independent elements organized around key EDRs in support of the ESE Science Focus Areas. [Req. 2.1.2.4]
rev 25-Aug-2008 CERES dCDR – 28
SDS Historical Milestones
Launch
Readiness Date• February 6, 2001 NPP SDS SRR 10/06• August 26, 2003 NPP Confirmation Readiness Review 10/06• October 28, 2003 Signed Level 1 NPP Requirements 10/06• April 28, 2004 SDS Steering Committee Meeting @ HQ 10/06• June 23, 2004 NPP SDS Approach Confirmation Review 10/06• October 1, 2004 NPP SDS SRR Reloaded 10/06• April 21, 2005 NPP SDS SRR Take 3 8/08• August 15-17, 2005 NPP Pre-MOR 8/08• Fall 2005 NPP SDS Peer Design Reviews 8/08• September 19, 2006 NPP SDS PDR 9/09• Oct 31 - Nov 1, 2007 NPP SDS CDR 9/09
rev 25-Aug-2008 CERES dCDR – 29
Stake Holders• NASA HQ
– Enabling Measurement Based Discipline Environment– Continuing the Science Record– Level 1 Requirements, Implementations Agreement, Mission Success Criteria
• NPP Project Office– Mission Requirements Specification (Level 2 Requirements), Budget, Schedule etc.– Mission Success depends on the continuing the Science Record
• NPP Science Team– Capabilities of the SDS Research Tool
• EDR Assessment, calibration testing, and algorithm enhancements
• IPO– EDR Assessment and algorithms enhancement results, CV Support
• NOAA / NESDIS / CLASS– Key Data provider to the SDS– EDR Assessment Results and Algorithm Enhancements Recommendations
• User Community– Continuing the Science Data Record
rev 25-Aug-2008 CERES dCDR – 30
SDS Organization Chart
Bob SchweissSDS Task Lead
S/EM. Hunter
SD3EE. HoE. EngGSFC
PEATEOcean
G. FeldmanGSFC
PEATELand
E. MasuokaGSFC
PEATEOzone
C. TilmesGSFC
PEATESounder
S. FriedmanJPL
PEATEAtmosphereL. GumleyU. Wisconsin
NICSEM. Schwaller
GSFC
S/EK. North
CARSCERES
Erika GeierLaRC
I&TSEK. North
P. SweatmanC. Whitaker
S/TV. Buczkowski
rev 25-Aug-2008 CERES dCDR – 31
Approach and Methodology
• Using Mission Systems Engineering (MSE) Methodology tailored for SDS
• Analysis of SDS system requirements and operations concept
• Functional decomposition of SDS system requirements to Elements
• Development and analysis of SDS– System architecture– Hardware configuration alternatives– Software architecture / Design
• Performing technical analysis and trade studies
rev 25-Aug-2008 CERES dCDR – 32
Interfaces Review
SDSIDPS
NSIPS
CLASS
Data Product Query / Request
Data Products (RDRs)
Data Delivery Report
Data Delivery Notification
Ad Hoc Requests for xDRs
Browse/Search/Order/Subscribe
xDRs
Ancillary Data, Auxiliary Data
Sensor Cal Data, Data Documentation
Software Packages
C3STEU Request
TEU / LRV data
Work Request
Browse/Search Request
Retained IPs
SD3E
PEATESPEATESPEATESPEATESPEATESStatus
Request Status
File Errors
xDRs
Data Product Requests
NICSEData Request
xDRsStatus Request
Status
Data Products (xDRs)