nrc-03-082 1 ocfr50.55a august 6, 2003 kewaunee nuclear power plant · 2012. 11. 18. · docket...

168
NPi_ Committed to Nuclear Excellence Kewaunee Nuclear Power Plant Operated by Nuclear Management Company, LLC NRC-03-082 1 OCFR50.55a August 6, 2003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 KEWAUNEE NUCLEAR POWER PLANT DOCKET 50-305 LICENSE No. DPR-43 2003 INSERVICE INSPECTION (ISI) SUMMARY REPORT As required by ASME Boiler and Pressure Vessel Code, Section Xl; Code of Federal Regulation 1 OCFR50.55a; and Wisconsin Administrative Code Department of Commerce, Subchapter V: Chapter Comm. 41.55(3), various ISI examinations were performed as part of the 2003 Refueling Outage. The outage took place from April 5, 2003 through May 11, 2003; i.e. closing of G1. This letter transmits the Inservice Inspection Summary Report as required by paragraph IWA-6230 of Section Xl. Two separate ASME Section Xl inservice examination programs are implemented at the KNPP. One program is for pressure retaining piping/vessel and component supports and the other program for the metal containment. The 2003 refueling outage constituted the second inspection year of the third period of the third interval for the piping/vessel and component support program. The 2003 refueling outage was also the second inspection year of the second period of the first interval for the metal containment program. Examinations for the piping/vessel and component support program were performed in accordance with the ASME Boiler and Pressure Vessel Code Section Xl 1989 Edition. Examinations for the metal containment program were performed in accordance with the 1992 Edition up to and including the 1992 Addenda of Section Xl of the ASME Boiler and Pressure Vessel Code. These requirements were implemented in accordance with the "Kewaunee Nuclear Power Plant Third Ten-Year Inservice Inspection (ISI) Program 1994-2004," "Kewaunee Nuclear Power Plant First 10-Year Inservice Inspection Class MC (ISI) Program 1996-2006," Plant Technical Specifications, and nondestructive examination procedures. N490 Highway 42 * Kewaunee, Wisconsin 54216-9510 Telephone: 920.388.2560

Upload: others

Post on 25-Jan-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

  • NPi_Committed to Nuclear Excellence Kewaunee Nuclear Power Plant

    Operated by Nuclear Management Company, LLC

    NRC-03-082 1 OCFR50.55a

    August 6, 2003

    U.S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555

    KEWAUNEE NUCLEAR POWER PLANTDOCKET 50-305LICENSE No. DPR-432003 INSERVICE INSPECTION (ISI) SUMMARY REPORT

    As required by ASME Boiler and Pressure Vessel Code, Section Xl; Code of Federal Regulation1 OCFR50.55a; and Wisconsin Administrative Code Department of Commerce, Subchapter V:Chapter Comm. 41.55(3), various ISI examinations were performed as part of the 2003Refueling Outage. The outage took place from April 5, 2003 through May 11, 2003; i.e. closingof G1. This letter transmits the Inservice Inspection Summary Report as required by paragraphIWA-6230 of Section Xl.

    Two separate ASME Section Xl inservice examination programs are implemented at the KNPP.One program is for pressure retaining piping/vessel and component supports and the otherprogram for the metal containment. The 2003 refueling outage constituted the secondinspection year of the third period of the third interval for the piping/vessel and componentsupport program. The 2003 refueling outage was also the second inspection year of the secondperiod of the first interval for the metal containment program. Examinations for the piping/vesseland component support program were performed in accordance with the ASME Boiler andPressure Vessel Code Section Xl 1989 Edition. Examinations for the metal containmentprogram were performed in accordance with the 1992 Edition up to and including the 1992Addenda of Section Xl of the ASME Boiler and Pressure Vessel Code. These requirementswere implemented in accordance with the "Kewaunee Nuclear Power Plant Third Ten-YearInservice Inspection (ISI) Program 1994-2004," "Kewaunee Nuclear Power Plant First 10-YearInservice Inspection Class MC (ISI) Program 1996-2006," Plant Technical Specifications, andnondestructive examination procedures.

    N490 Highway 42 * Kewaunee, Wisconsin 54216-9510Telephone: 920.388.2560

  • Docket 50-305NRC-03-082August 6, 2003Page 2

    The following items were examined for Class 1, Class 2, Class 3 Components, and theirsupports:

    1. Reactor Vessel Control Rod Drive Mechanisms and 3/4" Head Vent Line2. Regenerative Heat Exchanger Tubesheet to Shell Weld3. Reactor Coolant Pump Main Flange Bolting, Flange Surfaces, and No. 1 Seal Housing

    Bolting4. Reactor Coolant Pump External Casing Weld and Casing Internal Surfaces5. Reactor Coolant Pump Flywheel6. Class 1 and Class 2 Piping Welds7. Class 1, Class 2, Class 3 Piping and Component Supports and Hangers8. Class 1 and Class 2 Reactor Vessel Conoseal Bolting, Steam Generator Primary Side

    Manway Bolting, Pressurizer Manway Bolting, Flange Bolting, and Valve Bonnet Bolting9. Preservice Examination of Class 1 Reactor Coolant Pump Main Flange Bolt

    10. Preservice Examination of Class 1 Piping Welds11. Preservice Examination of Class 1 Valve Bonnet Bolting12. Preservice Examination of Component Cooling Water Heat Exchangers 1A and 1 B

    Supports13. Accumulator Tanks 1A and 1 B 2", 1," and 3/" Coupling Base Metal14. Class 1 System Leakage Test15. Class 2 and Class 3 System Inservice and Functional System Pressure Tests

    The following items were examined for the Class MC Reactor Building Containment Vessel:

    1. Accessible Surface Areas2. Circumferential Weld3. Containment Penetration Bellows4. Airlocks5. Seals and Gaskets

    The following items were examined in accordance with Kewaunee Nuclear Power PlantTechnical Specifications:

    1. Eddy Current Testing of Steam Generators

    In addition, the following examinations were performed in excess of ASME Boiler and PressureVessel Code Section Xi 1989 Edition Requirements and included:

    1. Portions of the Service Water System were radiographed for wall loss, pits, nodules, andsand, mud or other sediments

    2. Balance of plant piping subject to erosion/corrosion was examined by radiographic,ultrasonic, and visual techniques

    3. Nuclear Regulatory Commission Order EA-03-009-lssuance of Order Establishing InterimInspection Requirements For Reactor Pressure Vessel Heads at Pressurized WaterReactors

  • Docket 50-305NRC-03-082August 6, 2003Page 3

    Please find attached a copy of the following documentation that summarizes the inserviceinspection activities and results for the Kewaunee Nuclear Power Plant 2003 Refueling Outage.

    1. Summary of recordable indications and a description of how they were dispositioned(Attachment 1)

    2. Summary of Class 1 and 2 Repairs and Replacements of Components 1 inch in diameter orsmaller (Attachment 2)

    3. Form NIS-1 Owners Report for Inservice Inspections of Class 1, Class 2, and Class 3Components (Attachment 3)

    4. Form NIS-1 Owners Report for Inservice Inspections for Class MC Components(Attachment 4)

    5. Form NIS-2 Owner's Report for Repair or Replacements (61 Total) (Attachment 5)6. Examination Summary for Scheduled and Augmented Inservice Inspection (ISI) Program

    (Attachment 6)7. Examination Summary for Inservice Inspection (ISI) Class MC Program (Attachment 7)8. Examination Summary for Steam Generator Eddy Current (Attachment 8)9. Examination Summary for Nuclear Regulatory Commission Order EA-03-009 (Attachment 9)

    10. A summary of examinations which were limited by geometric, metallurgical, ordesign/access restrictions and their associated data sheets (Attachment 10)

    The final reports for each of these examinations are on file in the QA/QC Records Vault at theKewaunee Nuclear Power Plant. These records are available for review as deemed necessary.

    Additional Comments

    The next Refueling Outage at the Kewaunee Nuclear Power Plant is tentatively scheduled forSeptember 2004.

    Thomas CoutuSite Vice-President, Kewaunee Plant

    PEB

    Attachment

    cc - U.S. NRC - Region IlIl (w/o attach)U.S. NRC - Senior Resident Inspector (w/o attach)

  • ATTACHMENT 1

    NUCLEAR MANAGEMENT COMPANY, LLCKEWAUNEE NUCLEAR PLANT

    DOCKET 50-305

    August 6, 2003

    Letter from Thomas Coutu (NMC)

    To

    Document Control Desk (NRC)

    Summary of Recordable Indications and Description of Disposition

  • Docket 50-305NRC-03-082August 6, 2003Attachment 1, Page 1

    TABLE 1TYPE OR LOCATION OF RECORDABLE INDICATION METHOD NO. OF RI'S

    (RI) l M.Reactor Vessel Conoseal Bolting Visual (VT-3) 2 ConosealsSteam Generator Primary Manway Bolting Visual (VT-I) 1 Stud2" Piping Socket Weld Surface (PT) 1 WeldComponent Supports and Hangers Visual (VT-3) 12 SupportsPiping Flange Bolting Visual (VT-3) 3 FlangesValve Bonnet Bolting Visual (VT-3) 6 ValvesSystem Pressure Tests Visual (VT-2) 16 Items

    Disposition of Class 1, Class 2, and Class 3 indications have been completed in accordancewith the rules of ASME Boiler and Pressure Vessel Code Section Xl 1989 Edition and ASMEBoiler and Pressure Vessel Code Section Xl 1992 Edition up to and including 1992 Addenda forClass MC Components. Applicable codes, standards, and engineering criteria were used todisposition indications associated with the non-code-required examinations. Recordableindications for Class 1, Class 2, Class 3 and Class MC have been dispositioned as summarizedbelow:

    1. A 0.375" long linear indication (identified as a forging lap) on 2" socket weld RTD-W70Swas recorded during performance of liquid penetrant examinations. This LinearIndication was unacceptable per ASME Boiler and Pressure Vessel Code Section Xl1989 Edition Table IWB-3514-2. The linear indication was reduced in size under workorder 03-004115 by light filing with a small file, reexamined and accepted with a 0.100"linear acceptable ASME Boiler and Pressure Vessel Code Section Xl 1989 Edition TableIWB-3514-2 indication.

    2. Visual (VT-1, VT-2, and VT-3) indications recorded on reactor vessel conoseal bolting,steam generator primary side manway bolting, piping flange bolting, valve bonnetbolting, component and piping supports and hangers during system pressure tests were:(1) evaluated and accepted, or (2) repaired, reexamined and accepted by: NuclearManagement Company, LLC; Maintenance, Quality Control, Engineering and TechnicalSupport, or Inservice Inspection Personnel and reviewed by the Authorized NuclearInservice Inspector.

  • ATTACHMENT 2

    NUCLEAR MANAGEMENT COMPANY, LLCKEWAUNEE NUCLEAR PLANT

    DOCKET 50-305

    August 6, 2003

    Letter from Thomas Coutu (NMC)

    To

    Document Control Desk (NRC)

    Summary of Class 1 and 2 ReDairs and Replacement of Components 1 inch in Diameter ofSmaller

  • Docket 50-305NRC-03-082August 6, 2003Attachment 2, Page 1

    The following summarizes the repairs and replacements performed following the 2001 RefuelingOutage and during the 2003 Refueling Outage by grinding, buffing, filing, cutting, or welding onthe Class 1 and Class 2 pressure boundary. These repairs and replacements are in addition tothose itemized on the attached Forms "NIS-2 Owner's Report for Repairs or Replacements."

    Comronent Class Reference Reeair/Replacement Method

    /2 Rupture Disc. XK-100-18 Welding of Replacement Rupture Disc.

  • ATTACHMENT 3

    NUCLEAR MANAGEMENT COMPANY, LLCKEWAUNEE NUCLEAR PLANT

    DOCKET 50-305

    August 6, 2003

    Letter from Thomas Coutu (N MC)

    To

    Document Control Desk (NRC)

    Form NIS-1 Owner's Report for Inservice Inspections of Class 1, Class 2, and Class 3Components

  • Page 1 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16, 1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    Reactor Vessel RV

    Pressurizer PZR

    Steam Generator SG-1A

    Steam Generator SG-1B

    Excess Letdown HeatExchanger AHEL-1A

    Excess Letdown HeatExchanger AHEL-IB

    Class 1 Piping

    Reactor CoolantPump RCP-1A

    Reactor CoolantPump RCP-1B

    MANUFACTUREROR INSTALLER

    CombustionEngineering

    Westinghouse

    Westinghouse/Ansaldo EnergiaMilano

    Westinghouse/Ansaldo EnergiaMilano

    Sentry

    Sentry

    Texas PipeBending

    Westinghouse

    Westinghouse

    MANUFACTUREROR INSTALLER

    SERIAL NO.

    CE69202

    1151

    1141/0202

    1142/0201

    3996-5E

    3996-6E

    STATE ORPROVINCE NO.

    U11480

    U11402

    U11400

    U11401

    U11407

    U11408

    NATIONALBOARD NO.

    21010

    68-23

    68-28/151

    68-29/150

    364

    365

    1A-1-618J871-GO1

    1B-2-618J871-G02

  • Page 2 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Residual HeatExchangerAHRS1-1A

    Residual HeatExchangerAHRS2-1B

    Charging PumpPulsation DampenerAPD-1A

    Charging PumpPulsation DampenerAPD-1B

    Charging PumpPulsation DampenerAPD-1C

    Seal Water HeatExchanger AHSW

    Volume Control TankVCT

    Joseph Oat andSons

    Joseph Oat andSons

    Greer Hydraulics

    Greer Hydraulics

    Greer Hydraulics

    Atlas

    Joseph Oat andSons

    1817-1E

    1817-1F

    U11046

    U11424

    344

    345

    GNI-1848

    GNI-1846

    GNI-1847

    734

    1787-1C

    U11404

    U11425

    596

    376

    Regenerative HeatExchanger ARG

    Joseph Oat andSons

    1831-13 U11409U11410U11411

    413414415

  • Page 3 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Letdown HeatExchanger AHLD

    Atlas 1206 U11405 1031

    Seal Water InjectionFilter AFSI-1A

    Seal Water InjectionFilter AFSI-1B

    Reactor CoolantFilter AFRC

    Seal Water FilterAFSW

    Class 2 Piping

    Charging PumpAPCH-1A

    Charging PumpAPCH-1B

    Charging PumpAPCH-1C

    CommercialFilters

    CommercialFilters

    AMF Cuno

    AMF Cuno

    Texas PipeBending

    Ajax Iron Works

    Ajax Iron Works

    Ajax Iron Works

    101072 1172

    101073 1173

    121 2616

    123 2618

    6578

    6576

    6577

    Charging PumpAPCH-1A SuctionStabilizer

    Greer Hydraulics GH1-10234 568

  • Page 4 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO.1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Charging PumpAPCH-1B SuctionStablizer

    Charging PumpAPCH-1C SuctionStablizer

    Greer Hydraulics

    Greer Hydraulics

    GH1-10235

    GH1-10236

    569

    570

    Residual HeatRemoval PumpAPRH1-1A

    Residual HeatRemoval PumpAPRH2-1B

    Byron Jackson

    Byron Jackson

    681N0277

    681N0276

    Refueling WaterStorage Tank

    Diesel GeneratorAHDG-1A CoolingWater Exchangers (2)

    Diesel GeneratorAHDG-1B CoolingWater Exchangers (2)

    General AmericanTransportationCompany

    ITT StandardCorp.

    ITT StandardCorp.

    C-8297/1969

    750797-01-2&

    750797-01-3

    750797-01-1&

    750797-01-4

  • Page 5 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Auxiliary FeedwaterPump APFM-1AMotor Driven

    Auxiliary FeedwaterPump APFM-1BMotor Driven

    Auxiliary FeedwaterPump APFT TurbineDriven

    Reactor CoolantPump RCPC-1ALube Oil Cooler

    Pacific Pump

    Pacific Pump

    Pacific Pump

    PerfexCorporation

    46573

    46574

    46575

    723701-1 4014

    Reactor CoolantPump RCPC-1B LubeOil Cooler

    Class 3 Piping

    Containment FanCooler AHCF-1A

    PerfexCorporation

    Texas PipeBending

    JoyManufacturingand American AirFilter

    723701-2 4015

    GF14402

  • Page 6 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16, 1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Containment FanCooler AHCF-1B

    JoyManufacturingand American AirFilter

    GF14399

    Containment FanCooler AHCF-1C

    Containment FanCooler AHCF-1D

    Safety Injection PumpAPSI-1A

    Safety Injection PumpAPSI-1B

    Safety Injection PumpLube Oil CoolerAHSC-1A

    Safety Injection PumpLube Oil CoolerAHSC-1B

    JoyManufacturingand American AirFilter

    JoyManufacturingand American AirFilter

    Bingham Pump

    Bingham Pump

    Thermxchanger

    Thermxchanger

    GF14401

    GF14400

    290696

    290697

    X10199A2

    X10199A3

  • Page 7 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Safety Injection PumpHeat Exchangers (2)AHSC-1A

    Safety Injection PumpHeat Exchangers (2)AHSC-1B

    Borg Warner

    Borg Warner

    854030:854030

    854030:854030

    Residual HeatRemoval PumpAHRHRP-1A ShaftSeal Heat Exchanger

    Residual HeatRemoval PumpAHRHRP-1B ShaftSeal Heat Exchanger

    Accumulator TankACC-1A

    Accumulator TankACC-1B

    Containment SprayPump APCS-1A

    Borg Warner

    Borg Warner

    Wyatt

    Wyatt

    Ingersoll Rand

    681N0276

    681N0276

    H-5645-69

    H-5644-69

    U11397

    U11398

    0670-74

  • Page 8 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Containment SprayPump APCS-1B

    Containment SprayPump APCS-1AGland Seal Cooler

    Containment SprayPump APCS-1BGland Seal Cooler

    Component CoolingPump APCC-1A

    Component CoolingPump APCC-1B

    Service Water PumpAPSW-1A1

    Ingersoll Rand

    Helliflow

    Helliflow

    Ingersoll DresserPump Flow Serv.

    0670-75

    49486938

    6080694

    0600009

    Ingersoll DresserPump Flow Serv.

    WorthingtonPump

    0600010

    VTP27737

    Service Water PumpAPSW-1A2

    WorthingtonPump

    75 TU-1719-1

    Service Water PumpAPSW-1B1

    Service Water PumpAPSW-1B2

    WorthingtonPump

    WorthingtonPump

    VTP27736

    VTP27738

  • Page 9 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Spent Fuel Pool HeatExchanger AHSF

    Main Steam MoistureSeparator

    Spent Fuel Pool PumpAPSF-1A

    Struther Wells 1-68-06-1519 U11445

    Wright Austin

    Gould Pumps

    6230 X.R. 6008

    786A519.1

    Spent Fuel Pool PumpAPSF-1B

    Gould Pumps 786A519.2

    Service Water PumpStrainer ASSW-1A1

    Service Water PumpStrainer ASSW-1A2

    Service Water PumpStrainer ASSW-1B1

    Service Water PumpStrainer ASSW-1B2

    Component CoolingHeat ExchangerAHCC1-1A

    S.P. KinneyEngineers

    S.P. KinneyEngineers

    S.P. KinneyEngineers

    S.P. KinneyEngineers

    Engineers andFabricators Co.

    2278

    2279

    2280

    2281

    S-26125 U39499 3269

  • Page 10 of 10

    FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16, 1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    MANUFACTUREROR INSTALLER

    MANUFACTUREROR INSTALLER

    SERIAL NO.STATE OR

    PROVINCE NO.NATIONALBOARD NO.

    Component CoolingHeat ExchangerAHCC2-1B

    Component CoolingSurge Tank ATCS

    Engineers andFabricators

    Sharpsville Steel

    S-26126

    714

    U39500

    U11421

    3270

    714

    Control Room AirConditioning Unit 1ACoil

    Control Room AirConditioning Unit 1BCoil

    Trane Company

    Trane Company

    K11H202002

    K11H202003

    Control Room AirConditioning ExpansionTank 1A

    Control Room AirConditioning ExpansionTank 1B

    ITT Bell and Gossett

    ITT Bell and Gossett 116013

  • FORM NIS-1 (Back)

    8. Examination Dates: May 8, 2002 to May 11, 2003

    9. Inspection Period Identification:

    10. Inspection Interval Identification:

    3rd

    3rd

    11. Applicable Edition of Section XI: 1989 Addenda: None

    12. Date/Revision of Inspection Plan: November 27, 2000/Revision 2

    13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statementconcerning status of work required for the Inspection Plan. Reference Tab C

    14. Abstract of Results of Examinations and Tests. Reference Tab B and Tab F

    15. Abstract of Corrective Measures. Reference Tab B and Tab FUtilization of ASME Boiler and Pressure vessel Code Section XI: Code Cases: N-416-1, N-416-2,N-460, N-48 1, N-49 1, N-498 and N-498- 1.

    We certify that a) the statements made in this report are correct, b) the examinations and tests meetthe Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures takenconform to the rules of the ASME Code, Section XI.

    Certificate of Authorization No. (If applicable): /V14 Expiration Date: Ho

    Date: St4 a Zy 23 20 Q93 Signed: WGconi. PAlti SeevJe By:Owner

    CERTIFICATE OF INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and theState or Province of £daseeo'SJ.. and employed by i44er$e eb r64 ,, o1.r- -r of

    W4,e eg C r. have inspected the components described in this Owner's Report during the periodA yf4v 8 Rev to MuAy /, 0403 , and state that to the best of my knowledge and belief, the Owner has

    performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with theInspection Plan and as required by the ASME Code, Section XI.

    By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning theexaminations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor hisemployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connectedwith this inspction.

    W 4A, Commissions A'S77s/ 7 iJ1s /0o02 Xs .5. A/ Inspfctor's Signature National Board, State. Province, and Endorsements

    Date: A14,f 23 20 &.3I

  • ATTACHMENT 4

    NUCLEAR MANAGEMENT COMPANY, LLCKEWAUNEE NUCLEAR PLANT

    DOCKET 50-305

    August 6, 2003

    Letter from Thomas Coutu (NIMC)

    To

    Document Control Desk (NRC)

    Form NIS-1 Owner's ReDort for Inservice Inspections for Class MC Comoonents

  • FORM NIS-1 OWNER'S REPORT FOR INSERVICE INSPECTIONSAS REQUIRED BY THE PROVISIONS OF THE ASME CODE RULES

    1. OWNER - WISCONSIN PUBLIC SERVICE CORPORATION, 700 NORTH ADAMS,P.O. BOX 19001, GREEN BAY, WISCONSIN 54307- 9001

    2. PLANT - KEWAUNEE, N490 HIGHWAY 42, KEWAUNEE, WISCONSIN 54216-9511

    3. PLANT UNIT - NO. 1

    4. OWNER CERTIFICATE OF AUTHORIZATION - N/A

    5. COMMERCIAL SERVICE DATE - JUNE 16,1974

    6. NATIONAL BOARD NUMBER FOR UNIT - N/A

    7. COMPONENTS INSPECTED -

    COMPONENT ORAPPURTENANCE

    Reactor BuildingContainment Vessel

    Personnel Airlock

    MANUFACTUREROR INSTALLER

    Chicago Bridgeand IronCompany

    Chicago Bridgeand IronCompany

    MANUFACTUREROR INSTALLER

    SERIAL NO.

    C4454

    C4454

    STATE OR NATIONALPROVINCE NO. BOARD NO.

    U11423 ...

    U11423 ---

  • FORM NIS-1 (Back)

    8. Examination Dates: April 5, 2003 to May 11, 2003

    9. Inspection Period Identification:

    10. Inspection Interval Identification:

    2nd

    1st

    11. Applicable Edition of Section XI: 1992 Addenda: 1992

    12. Date/Revision of Inspection Plan: September 25, 2000/Revision 1

    13. Abstract of Examinations and Tests. Include a list of examinations and tests and a statementconcerning status of work required for the Inspection Plan. Reference Tab C

    14. Abstract of Results of Examinations and Tests. Reference Tab B and Tab F

    15. Abstract of Corrective Measures. Reference Tab B and Tab F

    We certify that a) the statements made in this report are correct, b) the examinations and tests meetthe Inspection Plan as required by the ASME Code, Section XI, and c) corrective measures takenconform to the rules of the ASME Code, Section XI.

    Certificate of Authorization No. (If appli

    Date: A4aY 2 3 20 o 3

    A/A Expiration Date: Am4

    Signed: PXAi, lc rse By:Owner

    CERTIFICATE OF INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and theState or Province of 6 and employed by 9.4,ereroC t Sg4o" /j3w (i, Cr of

    #40cretaf C7 . have inspected the components described in this Owner's Report during the periodApttc T. 2zo 3 to AlAy go 20o03 ,and state that to the best of my knowledge and belief, the Owner has

    performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with theInspection Plan and as required by the ASME Code, Section XI.

    By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning theexaminations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor hisemployer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connectedwith this inspectn.

    ___ /1 Commissions 1e-zdi2/ gJis/~oozj( zs A/ Inspector's 3tgnature National Board, State. P~roince, ahd Endorsements

    Date: 414 2 3 20 v3

  • ATTACHMENT 5

    NUCLEAR MANAGEMENT COMPANY, LLCKEWAUNEE NUCLEAR PLANT

    DOCKET 50-305

    August 6, 2003

    Letter from Thomas Coutu (NMC)

    To

    Document Control Desk (NRC)

    Form NIS-2 Owner's Report for Repair or Replacement (61 Total)

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay, WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee, WI 54216-9511

    3. Work Performed By Nuclear Management Companv, LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 02 Class 3 SERVICE WATER

    5. (a) Applicable Construction Code B16.34

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 3/6/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 01-011101

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case N-416-1

    Name of Name of ManufacturerComponent Manufacturer Serial No.

    SW-1041A-2 CONBRACO INDUSTRIES NAINC.

    NationalBoard No.

    NA

    Other YearID Built

    SW 134-217 2002

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    N

    7. Description of Work INSTALL NEW CLASS 3 AIR CONDITIONING COOLING WATER SYSTEM 2 1/2' VALVE SW-1041A-2, 2 - 2 1/2"FLANGES AND 2 -2 1/2" BUTT WELDS.

    8. Tests conducted Hydrostatic g Pneumatic g

    Other EJ Pressure 69 psiNominal Operating Pressure p

    Test Temp. 40 deg. F

    Exempt n

    9. Remarks UTILIZATION OF ASME BOILER AND PRESSURE VESSEL CODE SECTION XI: CODE CASE N-416-1.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 3/6/2003

    Name of Component: SW-1041A-2

    Work Order Number: 01-011101

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed f4 C.A M L, * Date god .20 Q3Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period ,,1-/- O to G -"'3, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspectors Signature National Board, State, Province, and Endorsements

    Date 6 - lo 20o 3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson. Wisconsin 54016

    4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/13/2003

    Sheet 1 of 2

    Unit No. I

    Work Order 01-016562

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    RHR-F3

    Name ofManufacturer

    NF

    ManufacturerSerial No.

    NA

    NationalBoard No.

    NA

    OtherID

    NA

    YearBuilt

    1967

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    7. Description of Work REPAIR LEAK ON CLASS 2 RESIDUAL HEAT REMOVAL SYSTEM 10 SUCTION FLANGE RHR-F3.

    8. Tests conducted Hydrostatic

    Other [

    Pneumatic r] Nominal Operating Pressure [x]Pressure 375 psi Test Temp. 112 deg. F

    Exempt n

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturers Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 5/13/2003

    Name of Component: RHR-F3

    Work Order Number: 01-016562

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section Xi. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed bAf4C. L;kOMuAA l Date ,20 03Owner or Owners Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period . /-OZ to C - -03, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    go G o -iature Commissions NB7741, I, N, IS, A WIS 100024

    Inspec s Signature National Board, State, Province, and Endorsements

    Date 64 - /a 20 0

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xl

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay, WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee, WI 54216-9511

    3. Work Performed By Nuclear Management Company, LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 4/25/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 01-022099

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    Name ofManufacturer

    VICKERY-SIMMSINC.

    ManufacturerSerial No.

    NF

    NationalBoard No.

    NA

    OtherID

    YearBuilt

    Repaired,Replaced, orReplacement

    ASMECode

    Stampedl

    FE-626

    27020 1970 REPAIRED N

    7. Description of Work REPAIR DUE TO LEAKAGE CLASS 2 RESIDUAL HEAT REMOVAL SYSTEM 10" FLANGE FE-626.

    8. Tests conducted Hydrostatic 2

    Other [n

    Pneumatic Nominal Operating Pressure 1-3

    Pressure .150 psi Test Temp. 93 deg. F

    Exempt n

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 4/25/2003

    Name of Component: FE-626

    Work Order Number: 01-022099

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section XI. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed 0 eAh CW AC4v & Date ,20 a 3Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period A -/-dZ to 6 -A -°3, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspectors Signature National Board, State, Province, and Endorsements

    Date C - /0 ,20 CO,3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section XI

    1. Owner Wisconsin Public Service Cormoration

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management ComDany. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 34 Class 2 RESIDUAL HEAT REMOVAL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/13/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-003489

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    RHR-3B

    Name ofManufacturer

    CRANECOMPANY

    ManufacturerSerial No.

    NF

    NationalBoard No.

    NA

    Other YearDD Built

    AC034-002 1972

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    7. Description of Work REPAIR BONNET TO BODY LEAK ON CLASS 2 RESIDUAL HEAT REMOVAL SYSTEM 8 VALVE RHR-3B.

    8. Tests conducted Hydrostatic Dl

    Other ElPneumatic U Nominal Operating Pressure f77Pressure 375 psi Test Temp. 112 deg. F

    Exempt U

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturers Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 5/1 3/2003

    Name of Component: RHR-3B

    Work Order Number: 02-003489

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed Gil & idhA 1AUV 4 G~L ln 60t6v Date e ,20 QkOwner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period o? -1 2 to __-_-__3_, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspects Signature National Board, State, Province, and Endorsements

    Date 6 -/0 ,20 CZ

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTSAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code SEC. Vil DIV.1-1975

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 9/24/2002

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-004201

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    APD-1C

    Name ofManufacturer

    GREERHYDRAULICS

    ManufacturerSerial No.

    GHI-1849

    NationalBoard No.

    NA

    OtherID

    07002

    YearBuilt

    1975

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    Y

    .

    7. Description of Work REPLACE DAMPENER SPRING ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP iCPULSATION DAMPENER.

    8. Tests conducted Hydrostatic Cl

    Other nPneumatic F] Nominal Operating Pressure MPressure 2240 psi Test Temp. 114 deg. F

    Exempt LI

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 9/2412002

    Name of Component: APD-1 C

    Work Order Number: 02-004201

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed 4 A £JtWJOli/ Date .4 , 20 03Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period o2-/-O 2 to 4 -6 - ,and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    /7 sh ^ - - Commissions NB7741, I, N. IS, A WIS 100024Inspectors Signature National Board, State, Province, and Endorsements

    Date 6 -/0 ,20 CZ3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTSAs Required by the Provisions of the ASME Code Section Xl

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay, WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee, WI 54216-9511

    3. Work Performed By Nuclear Manaaement Company. LLC

    700 First Street. Hudson. Wisconsin 54016

    4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code SEC. VIII DIV.1-1 975

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 9/24/2002

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-004262

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Repaired, ASMEName of Name of Manufacturer National Other Year Replaced, or Code

    Component Manufacturer Serial No. Board No. ID Built Replacement Stamped

    APD-1A GREER GHI-1848 NA 07000 1975 REPLACEMENT YHYDRAULICS

    7. Description of Work REPLACE DAMPENER SPRING ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP lAPULSATION DAMPENER.

    8. Tests conducted Hydrostatic []

    Other []Pneumatic U Nominal Operating Pressure MPressure 2240 psi Test Temp. 114 deg. F

    Exempt C

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturers Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 9/24/2002

    Name of Component: APO-1A

    Work Order Number: 02-004262

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed &X/rw 1 f f i 7 Date ,20 03Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford. CT

    have inspected the components described in the Owners Report during the period - -/-O 'Z to c 4 -a03, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspector's Signature National Board, State, Province, and Endorsements

    Date 6 - /o ,20 d'-3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xl

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay, WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code SEC. VIII DIV.1-1975

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 8/21/2002

    Sheet I of 2

    Unit No. 1

    Work Order 02-004263

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    APD-11B

    Name ofManufacturer

    GREERHYDRAULICS

    ManufacturerSerial No.

    GHI-1846

    NationalBoard No.

    NA

    OtherID

    07001

    YearBuilt

    1975

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    Y-

    7. Descripion of Work REPLACE DAMPENER SPRING ON CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM CHARGING PUMP 1 BPULSATION DAMPENER.

    8. Tests conducted Hydrostatic

    Other :]

    L Pneumatic ElPressure 2240 psi

    Nominal Operating Pressure [ 3

    Test Temp. 115 deg. F

    Exempt :

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 8/21/2002

    Name of Component: APD-IB

    Work Order Number: 02-004263

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed e &bLAJ 0 LU Date 4 ,20 aiOwner or Owner's Designee. Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period A '/-OZ to 6 ' -03, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS i10024

    Inspector's Signature National Board, State, Province, and Endorsements

    Date 6e -O ,20 03

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 23 Class 2 CONTAINMENT SPRAY

    5. (a) Applicable Construction Code B1 6.5-1967

    (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/113/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007269

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    CI-1003

    Name ofManufacturer

    WILLIAM POWELLCO.

    ManufacturerSerial No.

    NF

    NationalBoard No.

    NA

    Other YearID Built

    ICS022-001 1968

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N---

    7. Description of Work OPEN FOR INSPECTION CLASS 2 INTERNAL CONTAINMENT SPRAY SYSTEM 2" VALVE CI-1003.

    8. Tests conducted Hydrostatic []

    Other nPneumatic [1 Nominal Operating Pressure E3

    Pressure 17.3 psi Test Temp. 78 deg. F

    Exempt n

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 5/13/2003

    Name of Component: Cl-1003

    Work Order Number: 02-007269

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section XI. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed B4,cp A 6ZLilt1I, Date t r 20 0 3Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period 6- j- . to 6 - -p3, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspectors Signature National Board, State, Province, and Endorsements

    Date & -/O 20 03

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 36 Class 1 REACTOR COOLANT

    5. (a) Applicable Construction Code ASME ill-1 968

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/9/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007295

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    PR-3B

    Name of ManufacturerManufacturer Serial No.

    CROSBY, ASHTON GAGE NFCOMPANY

    NationalBoard No.

    NA

    Other YearID Built

    RC008-002 1972

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    7. Description of Work REMOVE CLASS 1 REACTOR COOLANT SYSTEM 6 VALVE PR-3B FOR SETPOINT TESTING.

    8. Tests conducted Hydrostatic LIOther E1

    Pneumatic LI Nominal Operating Pressure RlPressure 2240 psi Test Temp. 543 deg. F

    Exempt [L

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturers Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 5/9/2003

    Name of Component: PR-3B

    Work Order Number: 02-007295

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section XI. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed _____ Date 4 20 o3Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period : /-02 to 6 -' ° and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    1nqnsctonr' Rinnature National Board, State, Province, and Endorsements

    Date 6 - /0 ,20 0

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson. Wisconsin 54016

    4. Identification of System 35 Class 2 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/20/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007418

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    CVC-10

    Name ofManufacturer

    KEROTEST MFGCORP

    ManufacturerSerial No.

    NV-143

    NationalBoard No.

    NA

    OtherED

    CS100-005

    YearBuilt

    1973

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    7. Description of Work OPEN FOR INSPECTION CLASS 2 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE CVC-10.

    8. Tests conducted Hydrostatic [

    Other LIPneumatic [] Nominal Operating Pressure [x]

    Pressure 2245 psi Test Temp. 548 deg.F

    Exempt [

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 5/20/2003

    Name of Component: CVC-10

    Work Order Number: 02-007418

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section Xi. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed CPX J1 &M,2"V &LM/l Date 20 03Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period '1 -IO to 4 -6 03, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    ,_z' G oet-~ - Commissions NB7741, I, N. IS, A WIS 100024Inspectors Signature National Board, State, Province, and Endorsements

    Date t- /° , 20 03

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay, WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company, LLC

    700 First Street. Hudson. Wisconsin 54016

    4. Identification of System 35 Class 1 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/13/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007419

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    CVC-205B

    Name ofManufacturer

    KEROTESTMANUFACTURING

    ManufacturerSerial No.

    NU321

    NationalBoard No.

    NA

    Other YearID Built

    CS100-001 1973

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    .

    7. Description of Work OPEN FOR INSPECTION CLASS 1 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE CVC-205B.

    8. Tests conducted Hydrostatic nOther [

    Pneumatic n Nominal Operating Pressure 3Pressure 2240 psi Test Temp. 543 deg. F

    Exempt LI

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 5/13/2003

    Name of Component: CVC-205B

    Work Order Number: 02-007419

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed get "O aaJ4 I4l &WL Date .20 aOwner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period c} '/- 1' . to / -6 -Al, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    & _ 7 1*1,_ .Commissions NB7741, I, N, IS, A WIS 100024InspectoF sSignature National Board, State, Province, and Endorsements

    Date 6-/0 ,20 03

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-900t

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 35 Class 1 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/13/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007420

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    CVC-206A

    Name ofManufacturer

    KEROTESTMANUFACTURING

    ManufacturerSerial No.

    NF

    NationalBoard No.

    NA

    Other YearID Built

    CS100-004 1973

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    7. Description of Work OPEN FOR INSPECTION CLASS 1 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE CVC-206A.

    8. Tests conducted Hydrostatic 2

    Other El

    Pneumatic n Nominal Operating Pressure 3Pressure 2240 psi Test Temp. 543 deg. F

    Exempt 1

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 5/13/2003

    Name of Component: CVC-206A

    Work Order Number: 02-007420

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section Xi. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed (e' IIM 0 Date .i 20 03Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period .7 -/- A to 6~ -' ° 3, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    - X L ^ Commissions NB7741, I, N, IS, A WIS 100024

    Inspector's Signature National Board, State, Province, and Endorsements

    Date 6/O - 0 3 ,20 O 3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 35 Class 1 CHEMICAL AND VOLUME CONTROL

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/13/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007421

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    CVC-206B

    Name ofManufacturer

    KEROTESTMANUFACTURING

    ManufacturerSerial No.

    NU139

    NationalBoard No.

    NA

    Other YearID Built

    CS 100-003 1973

    Repaired,Replaced, orReplacement

    REPAIRED

    ASMECode

    Stamped

    N

    7. Description of Work OPEN FOR INSPECTiON CLASS 1 CHEMICAL AND VOLUME CONTROL SYSTEM 2" VALVE CVC-206B.

    8. Tests conducted Hydrostatic DOther []

    Pneumatic Nominal Operating Pressure [23

    Pressure 2240 psi Test Temp. 543 deg. F

    Exempt l

    9. Remarks NOT APPLICABLE

    Applicable Manufacturers Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 5/13t2003

    Name of Component: CVC-206B

    Work Order Number: 02-007421

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPAIRED conforms to the rules of the

    ASME Code Section XI. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed Ca eAA cb~u? 6l Date 6 4 2003Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period J -/ - ° Z to 6 6 -. 3 and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owners Report in accordance with the requirements of the ASME Code, Section XI.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    U Inspectorlsignature National Board, State, Province, and Endorsements

    Date 6- /4p ,20 O3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corooration

    700 North Adams P.O.Box 19001 Green Say. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Comoany. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 36 Class 1 REACTOR COOLANT

    5. (a) Applicable Construction Code SEC. III-1987 ADD.

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/9/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007509

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Repaired, ASMEName of Name of Manufacturer National Other Year Replaced, or Code

    Component Manufacturer Serial No. Board No. ED Built Replacement Stamped

    SG-1A- ANSALDO ENERGIA 0202 151 00035 2000 REPLACEMENT NHLMWB MILANO

    7 -l ,nf W-rL, 09OI aV', r~i AQQ I I.~O.a~II REACTOR COOLANT SYSTEM STEAM GENERATOR 1A HOTLEG MANWAY STUD (1)I. -tb~lplI Vl --1 rroAvx was,

    8. Tests conducted Hydrostatic D

    Other nPneumatic n Nominal Operating Pressure nXPressure 2240 psi Test Temp. 543 deg. F

    Exempt

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturers Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 5/9/2003

    Name of Component: SG-1A-HLMWB

    Work Order Number: 02-007509

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xi. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed )% ggi e. )PAO LO &&bi Date .L ,20 o3Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owner's Report during the period e -/%O to L -Z -L , and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described In this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    t_ _ _ _ _ _ Commissions NB7741, I, N, IS, A WIS 100024

    Inspector's Signature National Board, State, Province, and Endorsements

    Date eV /° 20 OJ3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Manaaement Company. LLC

    700 First Street. Hudson. Wisconsin 54016

    4. Identification of System 36 Class 1 REACTOR COOLANT

    5. (a) Applicable Construction Code SEC.111-1987 ADD.

    (b) Applicable Edition of Section Xi Utilized for Repairs or Replacements 1989

    Date 5/9/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007509

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    6. Identification of Components Repaired or Replaced and Replacement Components

    Name ofComponent

    SG-1A-CLMWB

    Name ofManufacturer

    ANSALDO ENERGIAMILANO

    ManufacturerSerial No.

    0202

    NationalBoard No.

    151

    Other

    ID

    00035

    YearBuilt

    2000

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    N

    .

    -

    7. Description of Work REPLACE CLASS 1 REACTOR COLLANT SYSTEM STEAM GENERATOR lA COLDLEG MANWAY STUDS (21 AND1 MANWAY NUT..

    8. Tests conducted Hydrostatic n Pneumatic aOther 1I Pressure 2240 psi

    Nominal Operating Pressure pi Exempt LITest Temp. 543 deg. F

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 519/2003

    Name of Component: SG-1A-CLMWB

    Work Order Number: 02-007509

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xl. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed &Aaa/n0h2it &flv C0IXV Date 6n.L4,20 aOwner or Owners Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period c(; /-1-OX to & -' -O'3, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section Xi.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspectors Signature National Board, State, Province, and Endorsements

    Date 6 - /O ,20 03

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section XI

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 36 Class 1 REACTOR COOLANT

    5. (a) Applicable Construction Code SEC. 111-1987 ADD

    (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/9/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007509

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    SG-1 B-HLMWB

    Name ofManufacturer

    ANSALDO ENERGIAMILANO

    ManufacturerSerial No.

    0201

    NationalBoard No.

    150

    Other

    ED

    00036

    YearBuilt

    2000

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    N

    7. Description of Work REPLACE CLASS 1 REACTOR COOLANT SYSTEM STEAM GENERATOR I1 HOT LEG MANWAY NUT.

    8. Tests conducted Hydrostatic nOther [1

    Pneumatic El Nominal Operating Pressure RPressure 2240 psi Test Temp. 543 deg. F

    Exempt []

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 5/9/2003

    Name of Component: SG-1 B-HLMWB

    Work Order Number: 02-007509

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section XI. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed ° CCirnv tl, Date ,20 0 kOwner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period a2 -/-02 to 4 - -03, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspector's Signature National Board, State, Province, and Endorsements

    Date 6 -/0 ,2o 3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company, LLC

    700 First Street. Hudson. Wisconsin 54016

    4. Identification of System 36 Class 1 REACTOR COOLANT

    5. (a) Applicable Construction Code SEC. 1l1-1 987 ADD.

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/9/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007509

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    SG-1 B-CLMWB

    Name ofManufacturer

    ANSALDO ENERGIAMILANO

    ManufacturerSerial No.

    0201

    NationalBoard No.

    150

    OtherID

    00036

    YearBuilt

    2000

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    N-

    7. Description of Work REPLACE CLASS 1 REACTOR COOLANT SYSTEM STEAM GENERATOR 18 COLD LEG MANWAY STUD (1) AND4 MANWAY NUTS.

    8. Tests conducted Hydrostatic [] Pneumatic []Other n Pressure 2240 psi

    Nominal Operating Pressure EJii Test Temp. 543 deg. F

    Exempt D

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)

    Sheet 2 of 2

    Date: 5/9/2003

    Name of Component: SG-1B-CLMWB

    Work Order Number 02-007509

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xi. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed e A : . P 0ALWrf Date 4 20 0Owner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period A?-/ -03 to ; -' -t-3, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    Commissions NB7741, I, N, IS, A WIS 100024

    Inspector's ignature National Board, State, Province, and Endorsements

    Date 6- /O ,20 0k3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nudear Power PlantN490 HWY 42 Kewaunee. WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 21 Class 2 SPENT FUEL POOL COOLING

    5. (a) Applicable Construction Code B31.1-1967

    (b) Applicable Edition of Section Xl Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/30/2002

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-007734

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Repaired, ASMEName of Name of Manufacturer National Other Year Replaced, or Code

    Component Manufacturer Serial No. Board No. ID Built Replacement Stamped

    FPC-1100 ITT GRINNEL VALVE NF NA FPCO07-00 1970 REPLACEMENT NCOMPANY

    7. Description of Work REPLACE DIAPHRAGM ON CLASS 2 SPENT FUEL POOL COOLING AND CLEAN-UP SYSTEM 2" VALVE FPC-1100.

    8. Tests conducted Hydrostatic [] Pneumatic j1

    Other [ Pressure 64 psNominal Operating Pressure M

    ;i Test Temp. 60 deg. F

    Exempt R

    9. Remarks NOT APPLICABLE.

    Applicable Manufacturer's Data Reports to be Attached

  • NIS-2 (Back)Sheet 2 of 2

    Date: 5/30/2002

    Name of Component: FPC-1100

    Work Order Number. 02-007734

    Certificate of Compliance

    We Certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the

    ASME Code Section Xi. Repair or Replacement

    Type Code Symbol Stamp NA

    Certificate of Authorization No. NA Expiration Date NA

    Signed I9L4 l pZ d4tW Date .20 dOwner or Owner's Designee, Title

    Certificate of INSERVICE INSPECTION

    I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors

    and the State or Province of Wisconsin and employed by Hartford Steam Boiler Inspection and Ins. Co. of Hartford, CT

    have inspected the components described in the Owners Report during the period on -/-O.Z to G -6 0-, and state that

    to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described

    in this Owners Report in accordance with the requirements of the ASME Code, Section Xi.

    By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning

    the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor

    his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising

    from or connected with this inspection.

    4 1 aL-* Commissions NB7741, I, N, IS, A WIS 100024Inspector's signature National Board, State, Province, and Endorsements

    Date C ' /° ,2o0°3

  • FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTAs Required by the Provisions of the ASME Code Section Xi

    1. Owner Wisconsin Public Service Corporation

    700 North Adams P.O.Box 19001 Green Bay. WI 54307-9001

    2. Plant Kewaunee Nuclear Power Plant

    N490 HWY 42 Kewaunee, WI 54216-9511

    3. Work Performed By Nuclear Management Company. LLC

    700 First Street. Hudson, Wisconsin 54016

    4. Identification of System 36 Class 1 REACTOR COOLANT

    5. (a) Applicable Construction Code NA

    (b) Applicable Edition of Section XI Utilized for Repairs or Replacements 1989

    6. Identification of Components Repaired or Replaced and Replacement Components

    Date 5/9/2003

    Sheet 1 of 2

    Unit No. 1

    Work Order 02-008856

    Type Code Sym. Stamp NA

    Authorization No. NA

    Expiration Date NA

    Code Case NA

    Name ofComponent

    RCP-1A

    Name ofManufacturer

    WESTINGHOUSE

    ManufacturerSerial No.

    1-618J871-GO1

    NationalBoard No.

    NA

    Other

    ED

    00037

    YearBuilt

    1970

    Repaired,Replaced, orReplacement

    REPLACEMENT

    ASMECode

    Stamped

    N-

    7. Description of Work REPLACE CLASS 1 REACTOR COOLANT PUMP lA SHAFT. INTERNALS. SEAL PACKAGE AND MOTORINCLUDING FLANGE CONNECTIONS TO CLASS 1 SEAL WATER CVC SYSTEM (3 TOTAL). CLASS 3COMPON