NRC INFORMATION NOTICE 93-96: IMPROPER RESET CAUSES EMERGENCY DIESELGENERATOR FAILURES
Addressees
All holders of operating licenses or construction permits for nuclear powerreactors.
- Purpose
The U.S. Nuclear Regulatory Commission (NRC) is issuing this informationnotice to alert addressees to the potential for an emergency diesel generator(EDG) to fail to start on demand or to trip during operation due to improperexecution of the reset operation at the conclusion of the previous run. It isexpected that recipients will review the information for applicability totheir facilities and consider actions as appropriate to avoid similarproblems. However, suggestions contained in this information notice are notNRC requirements; therefore, no specific action or written response isrequired.
Description of Circumstances
H.B. Robinson
In August of 1987 at the H.B. Robinson plant, startup trips occurred on theKA" EDG. With the assistance of a vendor representative, several steps weretaken in an effort to preclude such trips, including replacement of thegovernor, replacement of the governor oil, replacement of sticky fuelinjection pumps, checking of injection pump timing, and rebalancing fuel racksettings. In February of 1988, startup trips were again experienced. It wasconcluded, after detailed inspection of the latch mechanism parts, that therewas a possibility of wear on the tip of the latch, which may have been acontributing factor to the trips. These parts were replaced with new parts.
On June 3, 1992, during the performance of a test activity, the TAw EDGtripped on mechanical overspeed after the engine had been operatingapproximately one half hour. After detailed consideration of possiblescenarios for the trips and considering prior actions taken, it was determinedthat the most probable cause was a failure to properly reset the tripmechanism after the previous run. It was concluded that operations personnelapparently were unaware of the importance of moving the reset lever throughits full travel. In addition, resettirg was difficult for shorter individualsdue to the location of the reset lever, which is positioned over the exhaust
9312080261 PbR ZtE N o q cq; 1s (tat
RoII
<-N 93-96December 14, 1993Page 2 of 3
manifold. Operations personnel were subsequently trained on the proper methodfor actuating the reset lever. Also, a step was provided to permit easieraccess to the lever.
Duane Arnold
On June 11, 1993, while the Duane Arnold plant was operating at 85 percent offull power, the 'A" EDG tripped approximately 3 seconds after the initialstart signal during an operability surveillance test. An evaluation wasconducted by the licensee of possible EDG trip causes, including occurrence ofan actual overspeed condition, failure of the overspeed mechanism, actuationof the emergency stop pushbutton, failure of the emergency stop pushbutton,latch assembly not fully latched, latch assembly failure, mechanical tripmechanism failure, and annunciator circuit or trip lever microswitch failure.It was concluded that the most probable cause of the trip was that the latch
--assembly was not fully engaged from the previous reset operation and enginestartup vibration unlatched the trip mechanism. Less than complete engagementof the latch assembly could be caused by an inadequate reset operation.Corrective actions adopted by the licensee included procedure revisions toensure a more positive latching operation, improved physical access to thereset lever, and operator training.
The procedure revision directs operators to perform the reset operation asecond time following the initial resetting of the trip. The second reset issomewhat easier to perform and should ensure that the latch is fully engagedin the event that the initial latching sequence resulted in a partiallylatched condition. Verification that the latch is fully seated isaccomplished by checking that the reset lever subsequently moves freely.
Discussion
In response to experience with previous trips during fast starts, the dieselmanufacturer for both plants, (Coltec/Fairbanks Morse Engine Division), hadpreviously issued a service information letter (SIL, Volume A, Issue 25, datedAugust 1, 1991) addressing a revised overspeed trip adjustment. The SILrecommended that the overspeed trip setting be raised from the range of 112 to115 percent to the range of 115 to 117 percent. In light of events thatoccurred at H.B. Robinson and Duane Arnold, the manufacturer has now advisedthese licensees that proper resetting of the trip mechanism would be enhancedby slowly moving the reset lever fully to the reset position and back, twice.The inadvertent partial reset latching operations described above may alsooccur on other units having similar mechanical trip mechanisms.
- IN 93-96December 14, 1993Page 3 of 3
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Larry(404)
Garner, RII331-4663
Chris(319)
G. Miller,851-5111
RIII
Walter P. Haass, NRR(301) 504-3219
Attachment:List of Recently Issued NRC Information Notices
Att'achmentIN 93-96December 14, 1993Page 1 of 1
LIST OF RECENTLY ISSUEDNRC INFORMATION NOTICES
Information Date ofNotice No. Subject Issuance Issued to
93-93
93-92
91-21,Supp. 1
89-77,Supp. 1
93-91
Storm-Related Loss ofOffsite Power Eventsdue to Salt Buildupon Switchyard Insulators
Unauthorized ForcedEntry into the Pro-tected Area at ThreeMile Island Unit 1 onFebruary 7, 1993
Inadequate Control ofReactor Coolant SystemConditions During Shutdown
Plant Improvements toMitigate Common Depend-encies in ComponentCooling Water Systems
Inadequate QualityAssurance Program ofVendor SupplyingSafety-Related Equipment
Debris in ContainmentEmergency Sumps andIncorrect ScreenConfigurations
Misadjustment BetweenGeneral Electric 4.16-KVCircuit Breakers and TheirAssociated Cubicles
12/13/93
12/09/93
12/08/93
12/07/93
12/07/93
12/03/93
12/03/93
All holders of OLs or CPsfor nuclear power reactorslocated close to a largebody of salt water.
All holders of OLs or CPsfor nuclear power reactors.
All holders of OLs or CPsfor nuclear power reactors.
All holders of OLs or CPsfor nuclear power reactors.
All holders of OLs or CPsfor nuclear power reactorsand all recipients ofNUREG-0040, license Con-tractor and Vendor Inspec-tion Status Report' (WhiteBook).
All holders of OLs or CPsfor nuclear power reactors.
All holders of OLs or CPsfor nuclear power reactors.
. OL = Operating LicenseCP - Construction Permit
IN 93-96December 14, 1993Page 3 of 3
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Larry(404)
Garner, RII331-4663
Chris(319)
G. Miller,851-5111
RIII
Walter P. Haass, NRR(301) 504-3219
Attachment:List of Recently Issued NRC Information Notices
*SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL* | REGION III* REGION II* VIB/DRIL* VIB/DRIL*
NAME WHaass CHiller LGarner UPotapovs LNorrholm
DATE 09/09/93 09/09/93 08/30/93 09/10/93 09/15/93
TECH ED* DRIL/NRR* EEKB/NRR* OGCB/DORS* 1 C:OGCB/DORS* D: N
DGable CERossi CBerlinger PCWen GHMarcus |
09/14/93- 09/20/93 10/21/93 11/10/93 11/16/93 12/7/93OFIICIAL --- U~ KJUL4 4NL s~~r
I
OFFICIAL RECORD COPY WULUMMNT NAME: VJ-V0.1N
IN 93-XXDecember xx,Page 3 of 3
1993
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Larry Garner, RII(404) 331-4663
Chris(319)
G. Miller, RIII851-5111
Walter P. Haass, NRR(301) 504-3219
Attachment:List of Recently Issued NRC Information Notices
*SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL* REGION III* REGION II* VIB/DRIL* | VIB/DRIL*
NAME WHaass CMiller LGarner I UPotapovs LNorrholm
DATE 09/09/93 09/09/93 08/30/93 09/10/93 09/15/93
TECH ED* DRIL/NRR* FEEKB/NRR* OGCB/DORS* C:OGCB DORS* |D:DORS/NRR
DGable CERossi CBerlinger PCWen GHMarcus BKGrimes
09/14/93 09/20/93 10/21/93 11/10/93 11/16/93 12/ /93UIIILIRL nrLLUrU Luryv UULrIs~r~II slaver. 1NrrubrT.wen..._MtLUAL KtLUKU LUFT 00CUMEN1 NAME: Mtubbl.wen
IN 93-XXNovember xx,Page 3 of 3
1993
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Larry Garner, RII(404) 331-4663
Chris(319)
G. Miller, RIII851-5111
Walter P. Haass,(301) 504-3219
NRR
Attachment:List of Recently Issued NRC Information Notices
r III.1,*SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL* REGION I* REGION II* VIB/DRIL* VIB/DRIL*
NAME WHaass CMiller LGarner UPotapovs LNorrholm
DATE 09/09/93 109/09/93 08/30/93 09/10/93 9/15/93
TECH ED* DRIL/NRR* EEKB/NRR* OGCB/DORS* C:OGCB/DORS D:DORS/NRR
DGable CERossi CBerlinger PCWen GHMarcu l r- BKGrimes t
09/14/93 09/20/93 10/21/93 11/10/93 11/16/93 11/ /93%rrTrTAI TA pretinn FAnu r%^Opalkdr-af,- ,IAar T.urr ll.1lL KKORD^ COPY UUUUMLN I NAME: INEDGi3 I.wen
IN 93-XXOctober xx, 1993Page 3 of 3
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Larry Garner, R11(404) 331-4663
Chris G. Miller, RIII(319) 851-5111
Walter P. Haass, NRR(301) 504-3219
Attachment:1. List of Recently Issued Information Notices
*SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL* REGIONX* REGION II* VIB/DRIL* VIB/DRIL*
NAME WHaass CMiller LGarner UPotapovs LNorrholm
DATE 09/09/93 09/09/93 08/30/93 09/10/93 09/15/93
TECH ED* DRIL/NRR* | EEKB/NRR* |OGCB/DORS C:OGCB/DORS D:DORS/NRR
DGable CERossi CBerlinger PCWen10| GHMarcus BKGrimes
09/14/93 09/20/93 10/21/93 1 11/10/93 11/ /93 11/ /93OFFICIAL RECORD COPYDOCUMENT NAME: INEDGST.wen
J re I' P:1 4. 14"3 r0 'S'0 Cf;' c m.1&4,rt ) e Ads L44 (^ MosP; f"JA )
WtA,. bftVgJz wltu coca d e4 4 * Sa
' She ver1s! COMal A 4aC, kry04;tr-
peIIo
IN 93-XXOctober xx, 1993Page 3 of 3
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Larry Garner, RII(404) 331-4663
Chris G. Miller, RIII(319) 851-5111
Walter P. Haass, NRR(301) 504-3219
Attachment:1. List of Recently Issued Information Notices
*SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL* REGION I* REGION II* VIB/DRIL* VIB/DRIL*
NAME WHaass CMiller LGarner UPotapovs LNorrholm
DATE 09/09/93 09/09/93 08/30/93 1 09/10/93 09/15/93
TECH ED* DRIL/NRR* J EEKB/NROM OGCB/DORS C:OGCB/DORS D:DORS/NRR
DGable CERossi CBerlinger PCWen GHMarcus BKGrimes
09/14/93 09/20/93 10/13/93 10/ /93 10/ /93 10/ /93OFFICIAL RECORD COPYDOCUMENT NAME: INEDGST.wen
IN 93-XXOctober xx, 1993Page 3 of 3
Discussion
The staff is continuing its review of the above events with the manufacturerof the diesel engines, Coltec/Fairbanks Morse Engine Division, to arrive at amore detailed and consistent set of procedures to assure a positive latchingoperation. In addition, it should be noted that other diesel enginemanufacturers may have similar mechanical trip mechanisms, and licenseesshould be aware that potential inadvertent partial reset latching operationsmay also occur on those units.
This notice requires no specific action or written response. If you have anyquestions about the information in this notice, please contact one of thetechnical contacts listed below or the appropriate Office of Nuclear ReactorRegulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Chris G. Miller, RI at Duane Arnold(319) 851-5111
Larry Garner, R11(404) 331-4663
Walter P. Haass, NRR(301) 504-3219
Attachment:1. List of Recently Issued Information Notices* SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL REGION I REGION II VIB/DRIL VI5/YOL
NAME WHaass CMiller LGarner UPotapovs 1; R holm
DATE 9 / 9/93* 9/9/93* 8/30/93* 9/10/93* l C//) /93
COPY YES NO YES NO YES NO YES NO 6 NODOC
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - r- 1II
OFFICF I TFCH FDTTOR DRTI /NRR OGCE/NRR EELB/NRR DORS/NRR-o -vo . *v.--f""--- --- - I------ -|i~~ -i -~~ -I~ ~- -- -- -
NAME C AiiI7%iiiI GMarcus CBerlinger BGrimes
DATE ) p /93 1 61A/93 / /93 / /93 / /93
COPY YES NO YES NO YES NO YES NO YES NOD O C _ _ _ _ _ _ _ _ __ __ _ __ _._ 1 1 _ _ _ _ _ . _ _ _ _ _
~~~~~~~~~~I........ ----- ---- % - ..- - I - P - T hu rni-FTUttLLIAL KtLUKU LUFY UOCUMenll Namie: U\lnCUva1
IN 93-XXOctober xx, 1993Page.4 of 3
Attachment:
1. List of Recently Issued Information Notices
* SEE PREVIOUS CONCURRENCE
OFFICE VIB/DRIL REGION I REGION II VIB/DRIL VIB/DRIL
NAME WHaass CMiller LGarner UPotapovs LNorrholm
DATE 9 / 9/93* 9/9/93* 8/30/93* 9/10/93* / /93
COPY YES NO YES NO YES NO YES NO YES NO
DOC
OFFICE TECH EDITOR DRIL/NRR OGCB/NRR EELB/NRR DORS/NRR
NAME a 44, CERossi GMarcus CBerlinger BGrimes
DATE 7 / 9 / /93 / /93 / /93 / /93
COPY YES NO YES NO YES NO YES NO YES NO
DOC
U-II IEODCP DouetNm:G\NDSOFFICIAL RECORD COPY Document Name: G:\INEDGST
IN 93-XXOctober xx, 1993Page 3 of 3
Discussion
The staff is continuing its review of the above events with the manufacturerof the diesel engines, Coltec/Fairbanks Morse Engine Division, to arrive at amore detailed and consistent set of procedures to assure a positive latchingoperation. In addition, it should be noted that other diesel enginemanufacturers may have similar mechanical trip mechanisms, and licenseesshould be aware that potential inadvertent partial reset latching operationsmay also occur on those units.
This information notice requires no specific action or written response. Ifyou have any questions about the information in this notice, please contactone of the technical contacts listed below or the appropriate Office ofNuclear Reactor Regulation (NRR) project manager.
Brian K. Grimes, DirectorDivision of Operating Reactor SupportOffice of Nuclear Reactor Regulation
Technical contacts: Chris G. Miller, RI at Duane Arnold(319) 851-5111
Larry Garner, RII(404) 331-4663
Walter P. Haass, NRR(301) 504-3219 a.?
Attachment:1. List of Recently Issued Information Notices '� CL1-e
OFFICE VIBDRIL E VIBD VIB/DRIL
NAME WHaass amfil F 4It _f arne r A UPot V LNorrholm
DATE 9/ 9/93 ?9//93 93 / /93 93/ /93
COPY Y NO E NO Y NO YE NO YES NOD o c_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
OFFICE DRIL/NRR OGCB/NRR EELB/NRR DORS/NRR
NAME CERossi GMarcus CBerlinger BGrimes
DATE I /93 I /93 I /93 I /93
COPY YES NO YES NO YES NO YES NODO .J__ __ _ _ _ _ _ _ _ ___ ., __ __ __ _ _ . ___________A _ _ i_ __ _ _ _ _ _DO-CIA EODCP ouetNm:G\NDS
MFICIAL RECORD COPY Document Name: 6:\INEUGST