nrcs pond construction

96
POND Construction P LOk PE Perry L. Oakes, PE State Conservation Engineer Natural Resources Conservation Service

Upload: grant-schultz

Post on 11-Jul-2015

367 views

Category:

Government & Nonprofit


1 download

TRANSCRIPT

Page 1: NRCS Pond Construction

POND Construction

P L O k PEPerry L. Oakes, PEState Conservation Engineer

Natural Resources Conservation Service

Page 2: NRCS Pond Construction
Page 3: NRCS Pond Construction
Page 4: NRCS Pond Construction

D d Y K ?Did You Know?

• Alabama is the only state without any safe dams legislation.Al b h i d t d i t• Alabama has a very inadequate dams inventory and doesn’t know where most dams are in the event of an emergency.

• As long as a landowner satisfies the COE for wetlands and ADEM for construction, they can build a pond without any design, construction, orbuild a pond without any design, construction, or maintenance requirements.

• Would you like to live below an Alabama dam?

Page 5: NRCS Pond Construction

Citronelle - 09

St. Clair Co.St. Clair Co.

Page 6: NRCS Pond Construction
Page 7: NRCS Pond Construction
Page 8: NRCS Pond Construction
Page 9: NRCS Pond Construction
Page 10: NRCS Pond Construction
Page 11: NRCS Pond Construction
Page 12: NRCS Pond Construction

A M ll iAnnap Mall u.s. view

Page 13: NRCS Pond Construction
Page 14: NRCS Pond Construction
Page 15: NRCS Pond Construction
Page 16: NRCS Pond Construction
Page 17: NRCS Pond Construction
Page 18: NRCS Pond Construction
Page 19: NRCS Pond Construction

P d N lPond Nomenclature

Page 20: NRCS Pond Construction

P d N lPond Nomenclature

Top Width

Side SlopeSide Slope

x

1

x

Page 21: NRCS Pond Construction

P d N lPond Nomenclature

Berm

Page 22: NRCS Pond Construction
Page 23: NRCS Pond Construction

P d N lPond Nomenclature

Cut-off (core)Trench

“Relatively” Impermeable

LayerLayer

8 ft. 1

1.5

Page 24: NRCS Pond Construction
Page 25: NRCS Pond Construction
Page 26: NRCS Pond Construction

P d N lPond Nomenclature

Embankment

Core

Shell

Page 27: NRCS Pond Construction

P d N lPond Nomenclature

Riser PipePrincipal Spillway

Barrel Pipe

Page 28: NRCS Pond Construction

P d N lPond Nomenclature

Trash RackValve

Anti-seep collars

Page 29: NRCS Pond Construction

Diaphragm DrainDiaphragm Drainp gp g

Sand

Barrel PipeGravel

RiRiprap

Cut-off trench located just up stream

Page 30: NRCS Pond Construction
Page 31: NRCS Pond Construction
Page 32: NRCS Pond Construction
Page 33: NRCS Pond Construction
Page 34: NRCS Pond Construction
Page 35: NRCS Pond Construction

FILTER DIAPHRAGM

Page 36: NRCS Pond Construction

Centennial Park dam chimneyCentennial Park dam chimney drain construction

Page 37: NRCS Pond Construction

Filter Diaphragmflooding with water for

compactioncompaction

Page 38: NRCS Pond Construction

Merkle Filter Diaphragm withMerkle Filter Diaphragm with vibrator

Page 39: NRCS Pond Construction

P d N lPond Nomenclature

ConcreteBallast

Page 40: NRCS Pond Construction
Page 41: NRCS Pond Construction
Page 42: NRCS Pond Construction
Page 43: NRCS Pond Construction
Page 44: NRCS Pond Construction
Page 45: NRCS Pond Construction

P d N lPond Nomenclature

StorageVs

Emergency Spillway Crest (level section) Elevation

Permanent Pool orInlet Elevation

Page 46: NRCS Pond Construction

P d N lPond Nomenclature

FreeboardMaximum heightof water

Hpof water

through spillway

Page 47: NRCS Pond Construction

P d H d Cl fPond Hazard Classification

• “a” - low hazard.A d i l- A dam in a rural area.

- No loss of life potential. p- Failure may damage farm buildings,

agricultural land or country roadsagricultural land or country roads.

Page 48: NRCS Pond Construction

P d H d Cl fPond Hazard Classification• “b” medium hazard• “b” - medium hazard. - A dam in a predominately rural

area. - No loss of life potential- No loss of life potential.- Failure may damage isolated homes,

main highways, railroads and interrupt public utilities.p p

Page 49: NRCS Pond Construction

P d H d Cl fPond Hazard Classification

• “c” - high hazard.F il l f lif• Failure may cause loss of life.

• Serious damage to homes, industrial g ,buildings, public utilities, main highways, or railroads.highways, or railroads.

Page 50: NRCS Pond Construction

Sh lShorelines

• Deepen shorelines on all catfish ponds and other ponds as needed to at least 3 feet to avoid psubmerged aquatic vegetation problems.

• If shoreline aquatic vegetation is desired, parts of the shoreline can be left < 3 feet deep.

• Always estimate shoreline deepening yardage because excess may need to be spoiled.

• Shorelines can be shaped to be curvilinear to h h h i f h denhance the aesthetics of the pond.

Page 51: NRCS Pond Construction

E h l dEstimating shoreline deepening.

Permanent Pool Stage (el.) Storage (ac.)87.5 097 8

100 12103 17.5

97.0100.0 103.0

87.5

[(12 - 8) x 1.5 x 43560] / 27 = yd39,680

Page 52: NRCS Pond Construction

E d S d C lErosion and Sediment Control

Page 53: NRCS Pond Construction

Disturb the least amount of land f h l ffor the least amount of time.

• Construct the pond without delay.• Disturb the pool area only after the• Disturb the pool area only after the

embankment can serve as a sediment basin.E d th b l d d• Expand the borrow area only as needed.

Page 54: NRCS Pond Construction

D lDivert clean water

• Install barrel pipe away from natural ditch so the clean water can be diverted throughso the clean water can be diverted through the pipe during construction.

• Use diversions to divert clean runoff water• Use diversions to divert clean runoff water from disturbed areas.

Page 55: NRCS Pond Construction

S dStop sediment at its source.

• Soil exposed for periods of more than one week without on-going construction shouldweek without on going construction should be mulched.

• Remove mulch when resuming work• Remove mulch when resuming work.

Page 56: NRCS Pond Construction

C l dControl sediment

• Leave the valve barely open so the pond will act as an sediment basinwill act as an sediment basin.

• Shape borrow areas to retain runoff.I t ll ilt f d b h i d• Install silt fences and brush windrows where needed.

• Leave at least 20 ft of vegetation around the ditch in the pond. Clear this area last.

Page 57: NRCS Pond Construction

E bl hEstablish permanent vegetation

•• Vegetate as soon as final grading is Vegetate as soon as final grading is completed.completed.

•• Use temporary seeding and mulching until Use temporary seeding and mulching until permanent seeding dates can be met.permanent seeding dates can be met.

Page 58: NRCS Pond Construction

O & Mf d d lfor erosion and sediment control

• Inspect site after rainfall events of 3/4 inch or moreor more.

• Repair areas that have eroded.R d l di f di t• Remove and properly dispose of sediment accumulations.

Page 59: NRCS Pond Construction

Sequence of construction ford d lerosion and sediment control

• Clear the work area immediately adjacent to the barrel pipe location.p p

• Excavate the cut off underneath the barrel pipe location.

• Expose a small borrow area while controlling potential sediment from leaving the site.p g

• Backfill the cutoff underneath the barrel pipe location.

Page 60: NRCS Pond Construction

Sequence of construction ford d lerosion and sediment control

• Install the barrel pipe and anti-seep collars or filter and drainage diaphragm.g p g

• Backfill the barrel pipe (minimum of 2 feet over the pipe).

• Install the valve, riser pipe, and trash rack.• Install riser ballast.• Divert the drainage ditch in the pond bottom

to the valve inlet.

Page 61: NRCS Pond Construction

Sequence of construction ford d lerosion and sediment control

• Clear the remainder of the embankment footprint.p

• Place brush windrows as sediment barriers on the contour below cleared areas

• Place silt fence barriers where necessary.• Excavate the remainder of the cutoff on both

sides of the barrel pipe.

Page 62: NRCS Pond Construction

Sequence of construction ford d lerosion and sediment control

• Expose more borrow area as earth fill is required.q

• Backfill the below-ground core.• Begin above-ground core and embankment g g

earth fill placement.• Leave the valve cracked open to allow for p

storm water detention.• Clear the pool area as needed while

maintaining a 20-foot vegetative strip next to the drainage ditch.

Page 63: NRCS Pond Construction

Sequence of construction ford d lerosion and sediment control

• Complete embankment earth fill placement and excavation of emergency spillway.g y p y

• Close the valve.• Clear the 20-foot vegetative strip next to the g p

drainage ditch if needed.• Remove all silt fences and brush windrows.

Remove and/or spread silt accumulations.

Page 64: NRCS Pond Construction

Sequence of construction ford d lerosion and sediment control

• Vegetate the site.• Inspect vegetation and make repairs as• Inspect vegetation and make repairs as

needed after the first few rain events.

• JOB FINISHED.

Page 65: NRCS Pond Construction

Sl k b kSlope staking an embankment

What should be built.

Too SteepToo Flat

Page 66: NRCS Pond Construction

S l CSoil Compaction

• Main keys to good soil compaction:Moisture- Moisture

- Moisture- Moisture- Moisture- Moisture

Page 67: NRCS Pond Construction

K d lKeys to good soil compaction

•• Soil that is too dry or too Soil that is too dry or too wet will not compact wet will not compact ppproperly.properly.

•• Soil is too wet when the soil Soil is too wet when the soil sticks to the equipment, sticks to the equipment, when the soil “pumps” when the soil “pumps”

d h h i hd h h i hunderneath the tires of heavy underneath the tires of heavy equipment, or when clods equipment, or when clods cannot be easily blendedcannot be easily blendedcannot be easily blended cannot be easily blended with other material.with other material.

Page 68: NRCS Pond Construction

K d lKeys to good soil compaction•• Soil is too dry when it cannot be easily molded inSoil is too dry when it cannot be easily molded in•• Soil is too dry when it cannot be easily molded in Soil is too dry when it cannot be easily molded in

the hand.the hand.•• Every square foot of the 8” uncompacted horizontalEvery square foot of the 8” uncompacted horizontalEvery square foot of the 8 uncompacted horizontal Every square foot of the 8 uncompacted horizontal

layer should be traversed with at two passes of layer should be traversed with at two passes of heavy equipment (preferably a sheepsfoot or heavy equipment (preferably a sheepsfoot or y q p (p y py q p (p y ppneumatic tired equipment).pneumatic tired equipment).

•• The finished surface of the compacted layer should The finished surface of the compacted layer should be roughened before the next layer is placed.be roughened before the next layer is placed.

Page 69: NRCS Pond Construction

Compaction Equipment CComparison

• Bulldozer• Compaction is fromCompaction is from

the top of the lift only.• 1-2 psi ground p g

pressure• POOR Compactionp

Page 70: NRCS Pond Construction

Compaction Equipment CComparison

• Scraper (Pan)• Compaction is from the top

f h lif lof the lift only.• Minimum 2 passes.• Has the same ground

pressure as the air pressure in the tires (30 40 psi)in the tires (30 - 40 psi)

• MARGINAL Compaction

Page 71: NRCS Pond Construction

Compaction Equipment CComparison

Sh f t R ll• Sheepsfoot Roller• Works from the bottom of the

lift uplift up.• Requires 6 -10 passes per 9”

loose liftloose lift.• Works at 4 - 6 mph. • 150 300 psi ground pressure• 150-300 psi ground pressure.• Best implement to use for

clayey soilsclayey soils.• GOOD Compaction

Page 72: NRCS Pond Construction

Compaction Equipment CComparison

• Vibratory Roller• Can compact thick

lif i 2 3lifts in 2 - 3 passes.• Slow travel speed

(1 5 3 h)(1.5- 3 mph)• 150 - 300 psi ground

pressure plus vibrationpressure plus vibration to help rearrange and compact soil particles.compact soil particles.

• GOOD Compaction

Page 73: NRCS Pond Construction

D S f F dDam on Soft Foundation

Page 74: NRCS Pond Construction

Spillway pipe atend of construction

Page 75: NRCS Pond Construction
Page 76: NRCS Pond Construction

Same pipe after excessive fo ndation settlementfoundation settlement

Page 77: NRCS Pond Construction

S k l lStockpiling topsoil

•• Organics and surface soil (topsoil) from the Organics and surface soil (topsoil) from the embankment footprint emergency spillwayembankment footprint emergency spillwayembankment footprint, emergency spillway, embankment footprint, emergency spillway, shoreline deepening, and any borrow area shoreline deepening, and any borrow area should be stockpiled to utilize in theshould be stockpiled to utilize in theshould be stockpiled to utilize in the should be stockpiled to utilize in the vegetation establishment process.vegetation establishment process.

•• This material can be spread on the shell ofThis material can be spread on the shell of•• This material can be spread on the shell of This material can be spread on the shell of the dam, surface of the finished emergency the dam, surface of the finished emergency spillway and over any borrow area tospillway and over any borrow area tospillway and over any borrow area to spillway and over any borrow area to enhance vegetation establishment.enhance vegetation establishment.

Page 78: NRCS Pond Construction

Wh d d l k?Why do some ponds leak?

• The pond is built in a poor site.• Inadequate compaction around pipe• Inadequate compaction around pipe.• Cut-off not excavated into impervious

t i lmaterial.• Core is not constructed of good clay.• Poor compaction.• Lack of bondage between layers.Lack of bondage between layers.• ALL PONDS LEAK TO SOME EXTENT.

Page 79: NRCS Pond Construction

All P d L kAll Ponds Leak

Homogeneous fill with good foundation

Phreatic Line Dry soil

Saturated soil

Page 80: NRCS Pond Construction

All P d L kAll Ponds Leak

Dam built with a clay core.

Page 81: NRCS Pond Construction

All P d L kAll Ponds Leak

Dam built with a clay core but inadequate cut-off.

A SolutionA Solution.

Page 82: NRCS Pond Construction

All P d L kAll Ponds Leak

Toe Drain (sand, gravel and pipe)

Page 83: NRCS Pond Construction

All P d L kAll Ponds Leak

• Some pond have a good cut-off, core and dam but leak through the bottom of thedam, but leak through the bottom of the pond into a sand layer, gravel pocket, or limestone fracturelimestone fracture.

• These must be sealed with bentonite, soil dispersant or synthetic linerdispersant, or synthetic liner.

• $$$$$$$$$$$$$$

Page 84: NRCS Pond Construction

What causes leakage at the abutments?What causes leakage at the abutments?

The bottom of the cut-off should always extend up the abutmentsto at least one foot higher than the permanent water elevationto at least one foot higher than the permanent water elevation.

Imperviouslayer Excavation

limits

Page 85: NRCS Pond Construction

Ponds as a water sourcePonds as a water sourcef lf lfor cattlefor cattle

•• Ponds should be fence so cattle do not Ponds should be fence so cattle do not have uncontrolled access to the pond.have uncontrolled access to the pond.have uncontrolled access to the pond.have uncontrolled access to the pond.

•• Install a watering ramp with heavy use Install a watering ramp with heavy use protection or aprotection or aprotection, or aprotection, or a

•• trough or tank below the dam.trough or tank below the dam.

Page 86: NRCS Pond Construction
Page 87: NRCS Pond Construction
Page 88: NRCS Pond Construction

P d S fPond Safety

• Be sure that no buried pipelines or cables cross the proposed pond sitecross the proposed pond site.

• Make sure the landowner calls the Alabama Line Location Center at 1 800 292 8525Line Location Center at 1-800-292-8525.

• Avoid sites under powerlines. The wires b ithi h f fi hi d h ld bmay be within reach of a fishing rod held by

someone fishing on the pond.

Page 89: NRCS Pond Construction

P d S fPond Safety

• Pond owners may need to protect themselves with liability insurance coveragewith liability insurance coverage.

• If the pond is to be used for swimming, guards over pipe openings are requiredover pipe openings are required.

• All undesirable trees, stumps, brush, rubbish, j k d f th t i ht b h d tjunk, and fences that might be hazardous to boating or swimming should be removed.

Page 90: NRCS Pond Construction

P d S fPond Safety

• Mark safe swimming areas and place warning signs at all danger pointswarning signs at all danger points.

• Life saving devices should be properly located to facilitate rescue operations shouldlocated to facilitate rescue operations should the need arise.

Page 91: NRCS Pond Construction

P d C ShPond Cost-Share

• Livestock and irrigation Ponds ONLY.• Must be “least cost alternative”• Must be least cost alternative .• No cost-share for recreational ponds.• Generally, no technical assistance for

recreational ponds.

Page 92: NRCS Pond Construction

S ll L k P dSmall Livestock Pond

• Excavated Pond - $2,700

Page 93: NRCS Pond Construction

L L k P d E hf llLarge Livestock Pond - Earthfill

• $5,832

Page 94: NRCS Pond Construction

AWEPAWEP

• $2 - $4 / cu.yd. depending on type of irrigation pondirrigation pond.

Page 95: NRCS Pond Construction

S f fSources of information

• http://www.aces.edu/pubs/docs/A/ANR-1114/

Page 96: NRCS Pond Construction

S f fSources of information

• http://www.techtransfer.osmre.gov/nttmainsite/Library/pub/ppdc/ppdc.pdfy p pp pp p