nsamp northwest area - home - minneapolis park ... · minneapolis park and recreation board north...
TRANSCRIPT
NORTHWEST SECTION CONTENTS:
• CLEVELAND PARK
• FOLWELL PARK
• RYAN LAKE PARK
• VICTORY PARK
• VICTORY PRAIRIE DOG PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
MULTI-USE DIAMOND + FIELD
LUCY LANEY COMMUNITY SCHOOL
N 33RD AVE N 33RD AVE
HORSESHOES
The diamond is used inf requently.
SINGLE-FAMILY RESIDENTIAL
The park is not visible from Penn Avenue. Previously identifed for redevelopment.
Existing horseshoe courts used infrequently.
BASKETBALL
Half Court limits ability for games.
PARK BUILDING
Central placement reduces visibility across the park
WADING POOL
Closed during the school year.
RUSSELL AVE N
QUEEN AVE N
PENN
AVE
N
UNITED STATES POSTAL SERVICE UNION LIQUORS
Existing Conditions: WillardEXISTING CONDITIONS: CLEVELAND PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
UPDATED PLAYGROUND
N 33
RD A
VE
NEW NATURAL AREA
QUEE
N AV
E N
RELOCATED PARK BUILDING N 33RD AVE
NEW SPLASH PAD
RECONFIGURED SHARED PARKING LOT
MULTI-USE FIELD
NEW ADULT FITNESS AREA
PICNIC AREA
NEW SKATE PARK
NEW AMPHITHEATER
RELOCATED + EXPANDED BASKETBALL COURTS
PENN
AVE
N
RUSS
ELL
AVE
N
POTENTIAL NEW DEVELOPMENT AREA
Proposed Plan: WillardPROPOSED PLAN: CLEVELAND PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
CLEVELAND
PROCESSES
1: General Input 2: Initial Concepts 3: The Preferred Concept Spring-Fall 2017 Winter 2018 Now Input themes prior to initial concepts Input themes on initial concepts Key elements of the concept
aqua
tics
Wading pool well liked Support for splash pad New splash pad, associated with play areas
play Mixed comments on playground no comments New traditional play areas
athl
etic
s
Football (field sports) preferred to baseball
no comments Removal of diamond in favor of multiuse field space
cour
ts
Desire for full basketball court Two courts for basketball are needed New basketball courts: 2 full-court, 1 half-court
win
ter
no comments Suggest ice rink in winter No winter activities planned for this park
land
scap
e
no comments no comments Natural areas included around southern edges of park
Visibility from Penn Avenue important Expansion of park toward Penn, incljding removal of existing housing
Interest in a rec center Reconfigured shared parking lot with two entrances
Remove liquor store (from Penn/Lowry corner)
Support for skate park
Support for amphitheater
Enlarge building and use for activities Relocated park building to serve as restrooms, storage, and li ited mmi
Significant support for Concept B, with expansion of park to Penn and down Queen to Lowry
othe
r
New skate park / amphitheater combination
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
HUMBOLDT AVE N
N DO
WLI
NG A
VE
WADING POOL
DIAMONDS + MULTI-USE FIELDS PASTORAL WOODED TRAILS
Pool is far from recreation center and in poor condition.
BASKETBALL
PARK SHELTER
Court is highly used but in an isolated location
DIAMOND + OPEN LAWN
PLAYGROUND
N KNOX AVE TENNIS
Courts - Poor condition
EXISTING CONDITIONS: FOLWELL PARK
N 36
TH A
VE
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
IMPROVED MULTI-USE FIELDS/DIAMONDS
NEW NATURAL AREA
NEW ORCHARD
WETLAND RESTORATION
IMPROVED MULTI-USE FIELD
RELOCATED PARKING LOT ACCESS
HUMBOLDT AVE N
POTENTIAL BUILDING EXPANSION
NEW STORMWATER AREA
RELOCATED + IMPROVED WADING POOL
NEW PLAYGROUNDS
NEW TERRACE SEATING + STAGE
RELOCATED AND EXPANDED BASKETBALL
N DO
WLI
NG A
VE
NEW PUBLIC ART
Boardwalk feature
NEW MULTI-USE FIELD
N KNOX AVE EX. TENNIS COURTS
NEW ALL-WHEEL PARK
PROPOSED PLAN: FOLWELL PARK
N 36
TH A
VE
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
FOLWELL
PROCESSES aq
uatic
spl
ay
athl
etic
sco
urts
w
inte
rnd
scap
e
1: General Input Spring-Fall 2017 Input themes prior to initial concepts
Both liked and disliked, most people want larger pool
Playgrounds are disliked due to equipment quality
Desire for more "pick-up" games like 4-square, ping pong
Multi-use diamonds are liked
Suggestion that more field sports are played, like soccer
Basketball court universally loved, though location sometimes a concern
Tennis courts in very poor condition, but desire for them exists
no comments
Desire for reforestation
2: Initial Concepts Winter 2018 Input themes on initial concepts
Wading pool needs improvement, and probably better location
Play areas should not be reduced in size
Support for reduction of diamonds to create more field space
Support for increasing basketball
Significant support for refurbishing tennis, but 4 courts, as existing
Support for pond to address water issues and provide skating
Support for pond to address water issues and provide skating
3: The Preferred Concept Now Key elements of the concept
New wading pool relocated adjacent to recreation center
New traditional play areas consolidated and relocated nearer the recreation center
Removal of a total of two diamonds to create more multi-use field space
Additional new multi-use field south of tennis courts
Basketball courts relocated within park: 2 full-court and 1 half-court
Four tennis courts retained in existing location and improved
Creation of new pond to manage drainage issue at southern end of park, with possibility of skating in winter
Retain open forested area in southern portion of park, enhanced with flowering and fruiting trees
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
FOLWELL
PROCESSES ot
her
1: General Input Spring-Fall 2017 Input themes prior to initial concepts
More drinking fountains and benches
Desire for dance/performance space
2: Initial Concepts Winter 2018 Input themes on initial concepts
General support for bike/skate parks
Support for amphitheater
Improve pathways
Consider adding public art
Add Northside Greenway along eastern side of park Suggestion for adult fitness Significant opposition to additional parking
3: The Preferred Concept Now Key elements of the concept
New bicycle/BMX/mountain bike/skate areas for various skill levels utilizing slope in center of park
Inclusion of amphitheater as part of bicycle/skate facility
Enhanced and reorganized pathways to ensure walking loops in southern half of park Public art opportunities along walking loops in southern half of park Northside Greenway along eastern edge of park, connecting to Irving Ave
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
OSSEO RD
PARK PROPERTY BOUNDARY
DOCK Dock is hidden by overgrown foliage and lacks a defned path/ entrance.
RYAN LAKE
47TH AVE N
XERX
ES A
VE N
EXISTING CONDITIONS: RYAN LAKE PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
BOARDWALK EVENT SPACE
NEW CANOE/KAYAK LAUNCH AND STORAGE
STORMWATER WETLAND TREATMENT
IMPROVED PICNIC AREA
NEW BOARDWALK
environmental education, picnicking, or art performance space
Scenic pedestrian connection to Brooklyn Center trails
PARK PROPERTY BOUNDARY
RYAN LAKE
EX. DOCK
NEW NEIGHBORHOOD PLAY AREA
NEW SHELTER
PROPOSED PLAN: RYAN LAKE PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
RYAN LAKE
PROCESSES
1: General Input 2: Initial Concepts 3: The Preferred Concept Spring-Fall 2017 Winter 2018 Now Input themes prior to initial concepts Input themes on initial concepts Key elements of the concept
aqua
tics
no comments no comments No aquatic facilities planned for this park
play Add a small play structure?
Suggest adding a playground near lakeshore
New small play area on city-owned land near Osseo Road
athl
etic
s
no comments no comments No athletic facilities planned for this park
cour
ts
no comments no comments No court facilities planned for this park
win
ter
no comments Suggest cross country ski trail on or around lake
No formal winter activities planned for this park
land
scap
e
Clear woods of invasive species Shoreline rehabilitation Natural resournec and lake management plan recommended
Canoe-kayak storage and launch and/or rentals
Support for kayak kiosk New canoe/kayak racks for community storage
Additional trails to Victory Dog Park and around lake to Three Rivers trails
Like connection between Victory Dog Park and Ryan Lake
New trail connection to Victory Prairie Dog Park, pending coordination with railroad
Yes to the boardwalk New boardwalk connecting across northern end of lake to trails in Brooklyn Center
othe
r
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
45TH AVE N BASKETBALL
MULTI-USE FIELD
The felds get used frequently during gym and recess by the school
TENNIS COURTS
The existing Tennis courts get insignifcant use.
LORING ELEMENTARY
SCHOOL
PLAYGROUND
the playgrounds are highly used, but dilapidated and in need of updates.
WADING POOL
UPTO
N AV
E N
N 44TH AVE
The existing wading pool’s central location prevents open circulation and is closed/unusable during the school year.
EXISTING CONDITIONS: VICTORY PARK
N SHERIDAN AVE
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
-
45TH AVE N
UPDATED BASKETBALL
Half court for elementary users. Update surfacing.
NEW GAGA BALL PIT
MULTI-USE FIELD
NEW CLIMBING/ ADVENTURE PLAY
NEW NATURE PLAY
NEW BIKE PLAY GROUND LOOP
NEW SPLASH PAD
UPTO
N AV
E N
IMPROVED PLAY AREA
NEW ORCHARD N 44TH AVE
Can double as an amphitheater/outdoor classroom with water off.
PROPOSED PLAN: VICTORY PARK
N SHERIDAN AVE
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
VICTORY
PROCESSES aq
uatic
spl
ayat
hlet
ics
cour
ts
win
ter
land
scap
eot
her
1: General Input Spring-Fall 2017 Input themes prior to initial concepts
Desire more interactive pool with fountains and zero depth entry
Mixed opinions on playground
Need for multi-use field in better condition
Like basketball court, but want higher hoops
Tennis courts not well used or liked
no comments
Keep the schoolyard garden and orchard
Suggestion for skateboard and BMX bike park
2: Initial Concepts Winter 2018 Input themes on initial concepts
Comments split between wading pool and splash pad
Support for nature/adventure play area
Limited comments on fields
Mixed opinions on full- or half-court basketball
Few comments on tennis, and no expressed concern about removal
no comments
Preserve the landscaped berm around park
Support for bike loop
Include something unique for this park
3: The Preferred Concept Now Key elements of the concept
New combination splash pad/amphitheater/outdoor classroom in same general location as wading pool
Improved traditional play areas relocated to provide more space for school entry
New adventure play area in general location of tennis court
Improved multi-use field
Retain 2 half-court basketball
Remove tennis court in favor of expanded adventure play area and bike loop
No winter activities planned for this park
Natural areas included around edges of park
New bike loops with tricks
New gaga ball pit
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
OSSEO RD
EXISTING FENCE SEPARATING
NATIVE PRAIRIE
Restored prairie within fence not part of offcial dog park - used frequently by dog park users.
EXISTING DOG PARK
EXISTING PRAIRIE MAINTENANCE ENTRANCE
Frequently used
47TH AVE N
EXISTING DOG PARK ENTRANCE
EXISTING CONDITIONS: VICTORY PRAIRIE DOG PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
47TH AVE N
OSSEO RD
SHELTER + WATER STATION
DOG PLAYGROUND
ALL DOG AREA
ALL DOG AREA
SPECIAL USE DOG AREA
FENCING
NEW ENTRANCE
PEDESTRIAN UNDERPASS
EXISTING EMERGENCY/ MAINTENANCE ENTRANCE
ACCESSIBLE ENTRY
PROPOSED PLAN: VICTORY PRAIRIE DOG PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
OSSEO RD
NEW EXTERNAL PATH
NEW ENTRANCE
PEDESTRIAN UNDERPASS
FENCING
ALL DOG AREA
47TH AVE N
DOG PLAYGROUND
ALL DOG AREA
SPECIAL USE DOG AREAEXISTING EMERGENCY/
MAINTENANCE ENTRANCE
SHELTER + WATER STATION
ACCESSIBLE ENTRY
ALTERNATE A PROPOSED PLAN: VICTORY PRAIRIE DOG PARK A
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
-
OSSEO RD
BERM INSIDE FENCE
NEW ENTRANCE
PEDESTRIAN UNDERPASS
ALL DOG AREA
FENCING
ALL DOG AREA
DOG PLAYGROUND
EXISTING EMERGENCY/ MAIN TENANCE ENTRANCE
SHELTER + WATER STATION
ACCESSIBLE ENTRY
SPECIAL USE DOG AREA
47TH AVE N
ALTERNATE B PROPOSED PLAN: VICTORY PRAIRIE DOG PARK
MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN
VICTORY PRAIRIE AND DOG PARK
PROCESSES
1: General Input 2: Initial Concepts 3: The Preferred Concept Spring-Fall 2017 Winter 2018 Now Input themes prior to initial concepts Input themes on initial concepts Key elements of the concept
aqua
tic
no comments no comments No aquatic facilities planned for this park
play no comments no comments No (human) play facilities planned for this park
athl
etic
no comments no comments No (human) athletic facilities planned for this park
cour
ts
no comments no comments No court facilities planned for this park
win
ter
no comments no comments No formal winter activities planned for this park
land
scap
e
no comments
Most comments suggest or support entire park being a dog park. Many consider the prairie portion a dog park already.
Increased overstory trees throughout park area
Expansion of off leash dog area to include entire property
Mostly supportive of sectioned dog areas, but more for shy/quiet dogs versus playful dogs, not by size
Separation of park into two areas by dog temperment
Some support for agility area Some agility equipment included within park
Desire for water and shade New group gathering/shade shelter serving both dog areas, with water available
Mixed opinions of parking, some do not want park space lost for parking, others think it would be a good idea
No parking included in this park, but enhanced entry from street with accessibility improvements
othe
r
no comments