nsamp northwest area - home - minneapolis park ... · minneapolis park and recreation board north...

22
NORTHWEST SECTION CONTENTS: CLEVELAND PARK FOLWELL PARK RYAN LAKE PARK VICTORY PARK VICTORY PRAIRIE DOG PARK

Upload: others

Post on 06-Jul-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

NORTHWEST SECTION CONTENTS:

• CLEVELAND PARK

• FOLWELL PARK

• RYAN LAKE PARK

• VICTORY PARK

• VICTORY PRAIRIE DOG PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

MULTI-USE DIAMOND + FIELD

LUCY LANEY COMMUNITY SCHOOL

N 33RD AVE N 33RD AVE

HORSESHOES

The diamond is used inf requently.

SINGLE-FAMILY RESIDENTIAL

The park is not visible from Penn Avenue. Previously identifed for redevelopment.

Existing horseshoe courts used infrequently.

BASKETBALL

Half Court limits ability for games.

PARK BUILDING

Central placement reduces visibility across the park

WADING POOL

Closed during the school year.

RUSSELL AVE N

QUEEN AVE N

PENN

AVE

N

UNITED STATES POSTAL SERVICE UNION LIQUORS

Existing Conditions: WillardEXISTING CONDITIONS: CLEVELAND PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

UPDATED PLAYGROUND

N 33

RD A

VE

NEW NATURAL AREA

QUEE

N AV

E N

RELOCATED PARK BUILDING N 33RD AVE

NEW SPLASH PAD

RECONFIGURED SHARED PARKING LOT

MULTI-USE FIELD

NEW ADULT FITNESS AREA

PICNIC AREA

NEW SKATE PARK

NEW AMPHITHEATER

RELOCATED + EXPANDED BASKETBALL COURTS

PENN

AVE

N

RUSS

ELL

AVE

N

POTENTIAL NEW DEVELOPMENT AREA

Proposed Plan: WillardPROPOSED PLAN: CLEVELAND PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

CLEVELAND

PROCESSES

1: General Input 2: Initial Concepts 3: The Preferred Concept Spring-Fall 2017 Winter 2018 Now Input themes prior to initial concepts Input themes on initial concepts Key elements of the concept

aqua

tics

Wading pool well liked Support for splash pad New splash pad, associated with play areas

play Mixed comments on playground no comments New traditional play areas

athl

etic

s

Football (field sports) preferred to baseball

no comments Removal of diamond in favor of multiuse field space

cour

ts

Desire for full basketball court Two courts for basketball are needed New basketball courts: 2 full-court, 1 half-court

win

ter

no comments Suggest ice rink in winter No winter activities planned for this park

land

scap

e

no comments no comments Natural areas included around southern edges of park

Visibility from Penn Avenue important Expansion of park toward Penn, incljding removal of existing housing

Interest in a rec center Reconfigured shared parking lot with two entrances

Remove liquor store (from Penn/Lowry corner)

Support for skate park

Support for amphitheater

Enlarge building and use for activities Relocated park building to serve as restrooms, storage, and li ited mmi

Significant support for Concept B, with expansion of park to Penn and down Queen to Lowry

othe

r

New skate park / amphitheater combination

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

HUMBOLDT AVE N

N DO

WLI

NG A

VE

WADING POOL

DIAMONDS + MULTI-USE FIELDS PASTORAL WOODED TRAILS

Pool is far from recreation center and in poor condition.

BASKETBALL

PARK SHELTER

Court is highly used but in an isolated location

DIAMOND + OPEN LAWN

PLAYGROUND

N KNOX AVE TENNIS

Courts - Poor condition

EXISTING CONDITIONS: FOLWELL PARK

N 36

TH A

VE

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

IMPROVED MULTI-USE FIELDS/DIAMONDS

NEW NATURAL AREA

NEW ORCHARD

WETLAND RESTORATION

IMPROVED MULTI-USE FIELD

RELOCATED PARKING LOT ACCESS

HUMBOLDT AVE N

POTENTIAL BUILDING EXPANSION

NEW STORMWATER AREA

RELOCATED + IMPROVED WADING POOL

NEW PLAYGROUNDS

NEW TERRACE SEATING + STAGE

RELOCATED AND EXPANDED BASKETBALL

N DO

WLI

NG A

VE

NEW PUBLIC ART

Boardwalk feature

NEW MULTI-USE FIELD

N KNOX AVE EX. TENNIS COURTS

NEW ALL-WHEEL PARK

PROPOSED PLAN: FOLWELL PARK

N 36

TH A

VE

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

FOLWELL

PROCESSES aq

uatic

spl

ay

athl

etic

sco

urts

w

inte

rnd

scap

e

1: General Input Spring-Fall 2017 Input themes prior to initial concepts

Both liked and disliked, most people want larger pool

Playgrounds are disliked due to equipment quality

Desire for more "pick-up" games like 4-square, ping pong

Multi-use diamonds are liked

Suggestion that more field sports are played, like soccer

Basketball court universally loved, though location sometimes a concern

Tennis courts in very poor condition, but desire for them exists

no comments

Desire for reforestation

2: Initial Concepts Winter 2018 Input themes on initial concepts

Wading pool needs improvement, and probably better location

Play areas should not be reduced in size

Support for reduction of diamonds to create more field space

Support for increasing basketball

Significant support for refurbishing tennis, but 4 courts, as existing

Support for pond to address water issues and provide skating

Support for pond to address water issues and provide skating

3: The Preferred Concept Now Key elements of the concept

New wading pool relocated adjacent to recreation center

New traditional play areas consolidated and relocated nearer the recreation center

Removal of a total of two diamonds to create more multi-use field space

Additional new multi-use field south of tennis courts

Basketball courts relocated within park: 2 full-court and 1 half-court

Four tennis courts retained in existing location and improved

Creation of new pond to manage drainage issue at southern end of park, with possibility of skating in winter

Retain open forested area in southern portion of park, enhanced with flowering and fruiting trees

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

FOLWELL

PROCESSES ot

her

1: General Input Spring-Fall 2017 Input themes prior to initial concepts

More drinking fountains and benches

Desire for dance/performance space

2: Initial Concepts Winter 2018 Input themes on initial concepts

General support for bike/skate parks

Support for amphitheater

Improve pathways

Consider adding public art

Add Northside Greenway along eastern side of park Suggestion for adult fitness Significant opposition to additional parking

3: The Preferred Concept Now Key elements of the concept

New bicycle/BMX/mountain bike/skate areas for various skill levels utilizing slope in center of park

Inclusion of amphitheater as part of bicycle/skate facility

Enhanced and reorganized pathways to ensure walking loops in southern half of park Public art opportunities along walking loops in southern half of park Northside Greenway along eastern edge of park, connecting to Irving Ave

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

OSSEO RD

PARK PROPERTY BOUNDARY

DOCK Dock is hidden by overgrown foliage and lacks a defned path/ entrance.

RYAN LAKE

47TH AVE N

XERX

ES A

VE N

EXISTING CONDITIONS: RYAN LAKE PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

BOARDWALK EVENT SPACE

NEW CANOE/KAYAK LAUNCH AND STORAGE

STORMWATER WETLAND TREATMENT

IMPROVED PICNIC AREA

NEW BOARDWALK

environmental education, picnicking, or art performance space

Scenic pedestrian connection to Brooklyn Center trails

PARK PROPERTY BOUNDARY

RYAN LAKE

EX. DOCK

NEW NEIGHBORHOOD PLAY AREA

NEW SHELTER

PROPOSED PLAN: RYAN LAKE PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

RYAN LAKE

PROCESSES

1: General Input 2: Initial Concepts 3: The Preferred Concept Spring-Fall 2017 Winter 2018 Now Input themes prior to initial concepts Input themes on initial concepts Key elements of the concept

aqua

tics

no comments no comments No aquatic facilities planned for this park

play Add a small play structure?

Suggest adding a playground near lakeshore

New small play area on city-owned land near Osseo Road

athl

etic

s

no comments no comments No athletic facilities planned for this park

cour

ts

no comments no comments No court facilities planned for this park

win

ter

no comments Suggest cross country ski trail on or around lake

No formal winter activities planned for this park

land

scap

e

Clear woods of invasive species Shoreline rehabilitation Natural resournec and lake management plan recommended

Canoe-kayak storage and launch and/or rentals

Support for kayak kiosk New canoe/kayak racks for community storage

Additional trails to Victory Dog Park and around lake to Three Rivers trails

Like connection between Victory Dog Park and Ryan Lake

New trail connection to Victory Prairie Dog Park, pending coordination with railroad

Yes to the boardwalk New boardwalk connecting across northern end of lake to trails in Brooklyn Center

othe

r

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

45TH AVE N BASKETBALL

MULTI-USE FIELD

The felds get used frequently during gym and recess by the school

TENNIS COURTS

The existing Tennis courts get insignifcant use.

LORING ELEMENTARY

SCHOOL

PLAYGROUND

the playgrounds are highly used, but dilapidated and in need of updates.

WADING POOL

UPTO

N AV

E N

N 44TH AVE

The existing wading pool’s central location prevents open circulation and is closed/unusable during the school year.

EXISTING CONDITIONS: VICTORY PARK

N SHERIDAN AVE

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

-

45TH AVE N

UPDATED BASKETBALL

Half court for elementary users. Update surfacing.

NEW GAGA BALL PIT

MULTI-USE FIELD

NEW CLIMBING/ ADVENTURE PLAY

NEW NATURE PLAY

NEW BIKE PLAY GROUND LOOP

NEW SPLASH PAD

UPTO

N AV

E N

IMPROVED PLAY AREA

NEW ORCHARD N 44TH AVE

Can double as an amphitheater/outdoor classroom with water off.

PROPOSED PLAN: VICTORY PARK

N SHERIDAN AVE

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

VICTORY

PROCESSES aq

uatic

spl

ayat

hlet

ics

cour

ts

win

ter

land

scap

eot

her

1: General Input Spring-Fall 2017 Input themes prior to initial concepts

Desire more interactive pool with fountains and zero depth entry

Mixed opinions on playground

Need for multi-use field in better condition

Like basketball court, but want higher hoops

Tennis courts not well used or liked

no comments

Keep the schoolyard garden and orchard

Suggestion for skateboard and BMX bike park

2: Initial Concepts Winter 2018 Input themes on initial concepts

Comments split between wading pool and splash pad

Support for nature/adventure play area

Limited comments on fields

Mixed opinions on full- or half-court basketball

Few comments on tennis, and no expressed concern about removal

no comments

Preserve the landscaped berm around park

Support for bike loop

Include something unique for this park

3: The Preferred Concept Now Key elements of the concept

New combination splash pad/amphitheater/outdoor classroom in same general location as wading pool

Improved traditional play areas relocated to provide more space for school entry

New adventure play area in general location of tennis court

Improved multi-use field

Retain 2 half-court basketball

Remove tennis court in favor of expanded adventure play area and bike loop

No winter activities planned for this park

Natural areas included around edges of park

New bike loops with tricks

New gaga ball pit

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

OSSEO RD

EXISTING FENCE SEPARATING

NATIVE PRAIRIE

Restored prairie within fence not part of offcial dog park - used frequently by dog park users.

EXISTING DOG PARK

EXISTING PRAIRIE MAINTENANCE ENTRANCE

Frequently used

47TH AVE N

EXISTING DOG PARK ENTRANCE

EXISTING CONDITIONS: VICTORY PRAIRIE DOG PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

47TH AVE N

OSSEO RD

SHELTER + WATER STATION

DOG PLAYGROUND

ALL DOG AREA

ALL DOG AREA

SPECIAL USE DOG AREA

FENCING

NEW ENTRANCE

PEDESTRIAN UNDERPASS

EXISTING EMERGENCY/ MAINTENANCE ENTRANCE

ACCESSIBLE ENTRY

PROPOSED PLAN: VICTORY PRAIRIE DOG PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

OSSEO RD

NEW EXTERNAL PATH

NEW ENTRANCE

PEDESTRIAN UNDERPASS

FENCING

ALL DOG AREA

47TH AVE N

DOG PLAYGROUND

ALL DOG AREA

SPECIAL USE DOG AREAEXISTING EMERGENCY/

MAINTENANCE ENTRANCE

SHELTER + WATER STATION

ACCESSIBLE ENTRY

ALTERNATE A PROPOSED PLAN: VICTORY PRAIRIE DOG PARK A

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

-

OSSEO RD

BERM INSIDE FENCE

NEW ENTRANCE

PEDESTRIAN UNDERPASS

ALL DOG AREA

FENCING

ALL DOG AREA

DOG PLAYGROUND

EXISTING EMERGENCY/ MAIN TENANCE ENTRANCE

SHELTER + WATER STATION

ACCESSIBLE ENTRY

SPECIAL USE DOG AREA

47TH AVE N

ALTERNATE B PROPOSED PLAN: VICTORY PRAIRIE DOG PARK

MINNEAPOLIS PARK AND RECREATION BOARD NORTH SERVICE AREA MASTER PLAN

VICTORY PRAIRIE AND DOG PARK

PROCESSES

1: General Input 2: Initial Concepts 3: The Preferred Concept Spring-Fall 2017 Winter 2018 Now Input themes prior to initial concepts Input themes on initial concepts Key elements of the concept

aqua

tic

no comments no comments No aquatic facilities planned for this park

play no comments no comments No (human) play facilities planned for this park

athl

etic

no comments no comments No (human) athletic facilities planned for this park

cour

ts

no comments no comments No court facilities planned for this park

win

ter

no comments no comments No formal winter activities planned for this park

land

scap

e

no comments

Most comments suggest or support entire park being a dog park. Many consider the prairie portion a dog park already.

Increased overstory trees throughout park area

Expansion of off leash dog area to include entire property

Mostly supportive of sectioned dog areas, but more for shy/quiet dogs versus playful dogs, not by size

Separation of park into two areas by dog temperment

Some support for agility area Some agility equipment included within park

Desire for water and shade New group gathering/shade shelter serving both dog areas, with water available

Mixed opinions of parking, some do not want park space lost for parking, others think it would be a good idea

No parking included in this park, but enhanced entry from street with accessibility improvements

othe

r

no comments