Page 1: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

NSNFP TechnicalExchange Meeting

Bethesda, MDApril 14, 2005

Savannah River SiteSpent Fuel Program

Status

Page 2: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

L-Basin

Page 3: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

ReceiptsSince Last Meeting

Foreign: 5 casks from Japan

Domestic: 7 casks HFIR/MURR/MIT

Page 4: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

Work in Process

• L-Area Storage Racks (temp. hold)

• RBOF Cask Pad Cleanup

• Treatment and Storage Facility

Page 5: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

02 04 06 08 10 12 14 16 18 20 22 24 26

5000

10000

15000

20000

25000

30000

Fiscal Year

Eq

uiv

alen

t M

TR

Es

Capacity with LASR ~ 19000 MTRE

L-Basin Inventory – Without TSF

LASR = L-Area Storage Rack project (FY00-06)MTRE = Material Test Reactor Equivalent

Page 6: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

L-Basin HFIR Projection – Without TSF

02 04 06 08 10 12 14 16 18 20 22 24 26

50

100

150

200

250

300

Fiscal Year

HF

IR C

ore

s

Capacity After LASR 208 cores

350

LASR = L-Area Storage Rack project (FY00-06)HFIR = High Flux Isotope Reactor (Oak Ridge)

Page 7: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

Work in Process

• L-Area Storage Racks (temp. hold)

• RBOF Cask Pad Cleanup

• Treatment and Storage Facility

Page 8: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

RBOF Cask Pad

Page 9: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

Work in Process

• L-Area Storage Racks (temp. hold)

• RBOF Cask Pad Cleanup

• Treatment and Storage Capability

Page 10: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

Status:SNF Treatment and Storage Facility

• CD-O package in approval process

Page 11: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

Spent Nuclear Fuel Program Schedule

Final closure/Disposition

Basin Operations

TSF Project

Foreign SNF Receipt Program

Domestic SNF Receipt Program

TSC Operations

Shipments to Repository

Deactivate

(By FY)

Page 12: NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005

Issues

• Lack of formal, written program direction

• No TSF funding Identified

• Global Threat Reduction Initiative impacts

• Potential receipt of INEEL FRR shipments

• H-Canyon processing – near term decision