  • 01 03/09/2010 Released M.Ierace Hu Xiaosong/S.Beretto

    ED DATE CHANGE NOTE APPROVAL AUTHORITY ORIGINATOR

    NT9.1 Management Domain Change Migration Guideline

    NT9.1 -SDH Network Takeover For TL1 NEs

    ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 1/31

    2010 Alcatel-Lucent - All rights reserved

    3CK

    0580

    1 00

    14 (

    0311

    ) E

    d.07

    - A

    4

    NT9.1

    Management Domain Change

    Migration Guideline

    SDH Network Takeover For TL1 NEs

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 2/31

    2010 Alcatel-Lucent - All rights reserved

    TABLE OF CONTENTS

    1 INTRODUCTION ........................................................................................................................................ 5

    1.1 OVERVIEW ............................................................................................................................................. 5

    1.2 REFERENCES........................................................................................................................................... 6

    1.3 GLOSSARY AND ABBREVIATIONS ............................................................................................................ 6

    2 SOFTWARE RELEASE AND NETWORK ASPECTS ............................................................................. 8

    2.1 APPLICABLE SOFTWARE RELEASES......................................................................................................... 8

    2.2 TESTED SOFTWARE RELEASES ................................................................................................................ 8

    2.3 NETWORK ASPECTS ................................................................................................................................ 9

    3 MIGRATION RESTRICTIONS ............................................................................................................... 10

    3.1 TRAFFIC IMPACT................................................................................................................................... 10

    3.2 EQUIPMENT RESTRICTION ..................................................................................................................... 10

    3.3 TMN RESTRICTION ............................................................................................................................... 10

    3.4 HARDWARE RESTRICTION..................................................................................................................... 11

    3.5 NETWORK TOPOLOGY RESTRICTION ..................................................................................................... 11

    3.6 NOT TESTED FEATURES ........................................................................................................................ 12

    4 MIGRATION PROCESS GENERAL INFORMATION ......................................................................... 13

    4.1 PRECONDITIONS ................................................................................................................................... 13

    4.2 ORGANISATION..................................................................................................................................... 15

    4.2.1 From organisation point of view ....................................................................................................... 15

    4.3 APPROXIMATE MIGRATION TIME .......................................................................................................... 16

    5 MIGRATION PROCEDURE .................................................................................................................... 17

    5.1 PREPARATION SEVERAL WEEKS BEFORE................................................................................................ 17

    5.2 PREPARATION JUST BEFORE THE MIGRATION......................................................................................... 17

    5.3 UPLOAD PHYSICAL LAYER .................................................................................................................... 18

    5.4 UPLOAD MULTIPLEX SECTION LAYER .................................................................................................. 21

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 3/31

    2010 Alcatel-Lucent - All rights reserved

    5.5 UPLOAD COMPLETE SDH PATHS & TRAILS ............................................................................................ 23

    5.6 NETWORK CHECKS ............................................................................................................................... 26

    5.7 POST MIGRATION ACTIVITIES ............................................................................................................... 27

    6 APPENDICES ............................................................................................................................................ 29

    6.1 APPENDIX A : ROLLBACK PROCEDURE............................................................................................... 29

    6.2 APPENDIX B : MISALIGNMENT ANALYSIS .......................................................................................... 31

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 4/31

    2010 Alcatel-Lucent - All rights reserved

    DOCUMENT HISTORY

    External

    Edition

    Edition Date Description of Change

    01 2010-08-26 Released

    1 02/09/2010 Delivery of the official migration Guideline.

    The technical part has been originated by NI department

    (Originator:Hu Xiaosong /).

    The Product/Project management part has been updated by

    S.Beretto (Product Manager).

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 5/31

    2010 Alcatel-Lucent - All rights reserved

    1 INTRODUCTION

    1.1 Overview

    Audience This document describes a transformation process defined for the Alcatel-Lucent

    Optics Network Release. The intended readers are:

    Alcatel-Lucent Product Managers

    Alcatel-Lucent Field Engineers

    Alcatel-Lucent employees who have to plan or to execute migration tasks.

    Alcatel-Lucent Project Managers

    This document contains Alcatel-Lucent proprietary information and shall not be

    released to customers without prior written confirmation Transformation Product

    Manager.

    Scope This document describes how to do SDH network takeover for Alcatel OND products on 1350OMS-SDH.

    Feedbacks

    mailing list

    A feedbacks mailing list is available in order to improve this guideline.

    In case of :

    errors

    misunderstandings

    ni-mig-guide-feedback@LIST.ALCATEL-LUCENT.COM

    Conventions

    and Notations

    In this document, Shell commands are described using following conventions :

    A string of characters in bold must be typed as written in this document.

    One or more letters in angle brackets represent command parameter(s) which value(s) must be specified by the operator.

    A string of characters in bold and Courier New represents a command line, see the following example :

    ...,alcatel> ./ cd /usr/Systems//script

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 6/31

    2010 Alcatel-Lucent - All rights reserved

    1.2 References

    Installation and

    Administration

    1 1350 OMS EML 9.1 Administration Guide 8DG 41925 LAAA VOL3

    2 1350 OMS SDH 9.1 Administration Guide 8DG 41925 LAAA VOL6

    Operator's

    Handbooks

    3 1350 OMS EML 9.1 User Guide 8DG 41925 BAAA

    4 1350 OMS SDH 9.1 User Guide Vol 1 Basic Management 8DG 41925 CAAA

    VOL1

    5 1350 OMS SDH 9.1 User Guide Vol 2 Enhanced Solutions 8DG 41925

    CAAA VOL2

    1.3 Glossary and Abbreviations

    Terms and

    Abbreviations

    Below is given a list of terms and/or abbreviations used in this document.

    AM Alarm Management

    CM Config Manager

    DCN Data Communication Network

    DDTs Distributed Defect Tracking System

    EHU Equipment Hardware Upgrade

    MDC Management Domain Change

    NE Network Element

    NRU Network Release Upgrade

    PM Performance Management

    R&D Research and Development

    RAM Random Access Memory

    TEC Technical Expertise Center

    TMN Transmission Management Network

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 7/31

    2010 Alcatel-Lucent - All rights reserved

    TNO Topology Network Optimization

  • ED 01 Released

    Optics 8DG 31501 AAAA TCZZA 8/31

    2010 Alcatel-Lucent - All rights reserved

    2 SOFTWARE RELEASE AND NETWORK ASPECTS

    2.1 Applicable Software Releases

    Scope This section provides information as to which products this migration procedure can be applied. Please consult the list below to find all the software releases to which it can be applied.

    TMN

    Software

    Releases

    NR9.2 1350 OMS-HPUX 9.1.1.14.6 or above

    EML 9.1.1.40 P12, RP4, RP5 ... RP16 or above

    SDH 9.1.1.41 P08, P10, P11, P12, P13, P14 or above

    NE

    Software

    Releases

    TSS320 3.23.21.60or above

    TSS160 3.2 3.21.60or above

    Migration Tools No migration tools was used

    2.2 Tested Software Releases

    Scope The following software releases were used during the validation tests. Below is a list of all the Software releases to which this procedure was applied.

    TMN & NE

    Software

    Releases

    1350 OMS-HPUX 9.1.1.14.6