    NTPC came into existence on November 7, 1975.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    3/30

    Approval granted for the

    first pit-head SuperThermal Power Project at

    Singrauli in Uttar Pradesh.

    First patch of land was acquired for theSingrauli project.

    First batch of executive trainees joined the

    Company.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    4/30

    BadarpurThermal Power Project handed over

    to NTPC in April. Construction activities forSingrauli took of in

    February.

    Approval granted forKorba Project.

    Approval granted for

    Ramagundam Project.

    Approved granted for the Farakka Project.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    5/30

    First unit of Singrauli

    commissioned on February13th.

    Approval granted for Rihand

    Project.

    First unit of Korba Projectcommissioned in 48

    months on March 1st.

    Ramagundam Projectbecame operational.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    6/30

    High Voltage Direct

    Current Technologyfor transmission from

    Rihand to Delhi

    introduced.

    Foundation stone for Balco Captive PowerProject was laid by Prime Minister of India

    late Smt. Indira Gandhi on October 22nd.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    7/30

    NTPC completed a decade of excellence.

    NTPCs generating capacity reached 2200 MW with the

    commissioning of 11 units of 200 MW each at variousprojects in the country.

    NTPC heralds the 500 MW era in

    the country by synchronizing its

    first 500 MW unit at Singrauli inDecember.

    Farakka Project became

    operational.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    8/30

    Singrauli Project achieved

    total installed capacity of

    2000 MW.

    First 500 MW unit was

    commissioned at Korba.

    First 210 MW unit wascommissioned at

    Vindhyachal.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    9/30

    First 500 MW unit was

    commissioned at Ramagundam First 500 MW unit was

    commissioned at Rihand.

    Foundation stone for the 1000 MW Talcher

    Project in Orissa was laid by Prime Minister

    late Sh. Rajiv Gandhi.

    Singrauli Super Thermal Power Station wasdedicated to the nation.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    10/30

    Korba achieved the ultimate

    capacity on March 23. Ramagundam achieved the

    ultimate capacity on

    October 16.

    Countrys first Combined Cycle Gas Power

    Project commissioned at Anta. Four Gas Turbines of 112 MW each and a Steam

    Turbine of 102 MW commissioned at Auraiya.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    11/30

    First combined cycle

    power project at AntaCompleted.

    Over 17,000 CKT kms of

    transmission network

    transferred to Power GridCorporation of India Ltd.

    First unit of Dadri

    commissioned.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    12/30

    420 MW Unchahar Thermal

    Power Station was takenover from Uttar Pradesh

    Rajya Vidyut Nigam.

    Main plant package for

    Jhanor Gandhar was

    awarded on 26th March.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    13/30

    Kawas project became

    fully operational.

    GT#1 unit ofJhanor Gandhar

    synchronized on 17th March.

    GT#2 unit ofJhanor Gandharsynchronized on 31st March.

    GT#3 unit ofJhanor Gandhar

    synchronized on 20th May.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    14/30

    NTPCs generating capacityreached 15200 MW.

    First 500 MW unit at Talcher

    Kaniha Project became

    operational.

    Talcher Thermal was taken

    over from Orissa State

    Electricity Board.

    ST unit of Jhanor Gandhar

    synchronized on 30th March.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    15/30

    Second 500 MW unit

    commissioned at TalcherKaniha.

    Approval granted for

    Simhadri Project.

    Approval granted forFaridabad Project.

    TEC forTalcher Stage II (4 x

    500 MW) accorded inOctober.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    16/30

    First unit (115 MW) of

    Kayamkulam CCPP becameoperational on November

    28th.

    Main plant award of Simhadri was placed i

    November.

    Main Plant award of

    Faridabad was placed on

    January 9th.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    17/30

    First unit of 210 MW of FGUTPP Stage II

    commissioned in January.

    2nd Gas Turbine (115 MW) of Kayamkulam

    commissioned in February.

    First unit (500 MW) of

    VSTPP commissioned inMarch in a record time of 48

    months creating new

    benchmark.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    18/30

    First unit (143 MW) of

    Faridabad GPP becameoperational in June in a

    record time of 17 months

    and 20 days. Steam Turbine (120 MW) of Kayamkulam

    commissioned in October.

    Second unit (210 MW) of Unchahar Stage II

    commissioned in October.

    GT II (143 MW) of Faridabad commissioned inOctober.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    19/30

    Main plant award of SG

    package for Talcher(4 x500 MW) placed in

    November.

    second unit of Vindhyachal Project, Stage - II

    commissioned in February. With this Vindhyachal

    became the largest power station of 2260 MW

    Capacity in the country .

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    20/30

    Maiden start of Hydro Project activities with the

    agreement forKoldam Project (4 x 200 MW) betweenNTPC & Govt. of HP in February.

    Foundation stone ofKoldam

    Project laid by the PrimeMinister Sh. Atal Bihari

    Vajpai in June.

    Faridabad Project got

    completed with

    commissioning of its steam

    turbine (144 MW) in July.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    21/30

    Main Plant award of Rihand

    Stage II (2 x 500 MW) placed to

    BHEL in August. Main Plant award of

    Ramagundam Stage II (1 x 500

    MW) placed to BHEL in August.

    First unit (500 MW) of Simhadri

    commissioned in February in arecord time of 39 months (earlier

    best achieved was 49 months)

    creating a new benchmark for 500MW units in the country.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    22/30

    Three wholly owned subsidiaries of NTPC viz.

    NTPC Electric Supply Company Limited, NTPC

    Hydro Limited and NTPC Vidyut Vyapar Nigam

    Limited were incorporated.

    Diversion tunnel work of Koldam Hydro Projectawarded in June.

    Second unit (500 MW) of

    Simhadri commissioned in

    August.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    23/30

    First unit (500 MW) of Talcher Stage-II

    commissioned in January in a record time of 38

    months (earlier best achieved for a Greenfieldproject was 39 months) creating new benchmark

    for 500 MW set in the country.

    Main Plant award of

    Vindhyachal stage III (2 x 500

    MW) placed to BHEL inMarch.

    Main Plant award of

    Kahalgaon Stage II, Phase-I(2 x 500 MW) placed in July.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    24/30

    Second unit (500 MW) of Talcher Stage II

    commissioned in October.

    Main Plant award of UnchaharStage III (1 x 210

    MW) placed in December.

    Main Plant award ofKahalgaon Stage II, Phase-II(1 x 500 MW) placed in December.

    Main Plant award of Sipat

    Stage II placed in December.

    Main dam work of Koldam

    was awarded to Italian Thai

    Development in December.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    25/30

    Main Plant award of Sipat

    Stage I (3 x 660 MW)

    placed in April commencing

    an era of super critical

    technology in the country

    having unit size of 660 MW.

    3rd Unit of Talcher (500 MW) Stage II

    commissioned in May.

    Agreement for Loharinagpala (4 x 150 MW) and

    Tapovan Vishnugad (4 x 130 MW) signed with

    Govt. of Uttaranchal in July.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    26/30

    Ramagundam Stage II (500

    MW) commissioned in August

    in a record time of 36 months(earlier best achieved in 38

    months). With this

    Ramagundam became thelargest power station of 2600

    MW capacity in the country.

    NTPC successfully completed the IPO which

    received overwhelming response. NTPC IPO wasoversubscribed by 13.14 times.

    Diversion of river for Koldam Project achieved

    successfully in October in a record time of 26

    months

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    27/30

    4th and last unit of Talcher (500 MW) Stage II

    commissioned in February. With this Talcher

    became the largest power station of 3000 MW in

    the country.

    2

    nd

    and last unit (500 MW) of Rihand Stage IIcommissioned in September.

    Main Plant award ofBarh (3

    x 660 MW) placed in March. First Unit ofRihand Stage

    II (2 x 500 MW)

    commissioned in January.

  • 8/6/2019 NTPC SAGA 30 YEARS[1]

    28/30

    NTPC (%),

    20.15

    OHTERS

    (%), 79.85

    NTPC (%),

    27.10

    OTHERS

    (%), 72.90

    TOTAL CAPACITY

    AS ON 31.03.05

    TOTAL GENERATION

    AS ON 31.03.05