NTPC came into existence on November 7, 1975.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
3/30
Approval granted for the
first pit-head SuperThermal Power Project at
Singrauli in Uttar Pradesh.
First patch of land was acquired for theSingrauli project.
First batch of executive trainees joined the
Company.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
4/30
BadarpurThermal Power Project handed over
to NTPC in April. Construction activities forSingrauli took of in
February.
Approval granted forKorba Project.
Approval granted for
Ramagundam Project.
Approved granted for the Farakka Project.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
5/30
First unit of Singrauli
commissioned on February13th.
Approval granted for Rihand
Project.
First unit of Korba Projectcommissioned in 48
months on March 1st.
Ramagundam Projectbecame operational.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
6/30
High Voltage Direct
Current Technologyfor transmission from
Rihand to Delhi
introduced.
Foundation stone for Balco Captive PowerProject was laid by Prime Minister of India
late Smt. Indira Gandhi on October 22nd.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
7/30
NTPC completed a decade of excellence.
NTPCs generating capacity reached 2200 MW with the
commissioning of 11 units of 200 MW each at variousprojects in the country.
NTPC heralds the 500 MW era in
the country by synchronizing its
first 500 MW unit at Singrauli inDecember.
Farakka Project became
operational.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
8/30
Singrauli Project achieved
total installed capacity of
2000 MW.
First 500 MW unit was
commissioned at Korba.
First 210 MW unit wascommissioned at
Vindhyachal.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
9/30
First 500 MW unit was
commissioned at Ramagundam First 500 MW unit was
commissioned at Rihand.
Foundation stone for the 1000 MW Talcher
Project in Orissa was laid by Prime Minister
late Sh. Rajiv Gandhi.
Singrauli Super Thermal Power Station wasdedicated to the nation.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
10/30
Korba achieved the ultimate
capacity on March 23. Ramagundam achieved the
ultimate capacity on
October 16.
Countrys first Combined Cycle Gas Power
Project commissioned at Anta. Four Gas Turbines of 112 MW each and a Steam
Turbine of 102 MW commissioned at Auraiya.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
11/30
First combined cycle
power project at AntaCompleted.
Over 17,000 CKT kms of
transmission network
transferred to Power GridCorporation of India Ltd.
First unit of Dadri
commissioned.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
12/30
420 MW Unchahar Thermal
Power Station was takenover from Uttar Pradesh
Rajya Vidyut Nigam.
Main plant package for
Jhanor Gandhar was
awarded on 26th March.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
13/30
Kawas project became
fully operational.
GT#1 unit ofJhanor Gandhar
synchronized on 17th March.
GT#2 unit ofJhanor Gandharsynchronized on 31st March.
GT#3 unit ofJhanor Gandhar
synchronized on 20th May.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
14/30
NTPCs generating capacityreached 15200 MW.
First 500 MW unit at Talcher
Kaniha Project became
operational.
Talcher Thermal was taken
over from Orissa State
Electricity Board.
ST unit of Jhanor Gandhar
synchronized on 30th March.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
15/30
Second 500 MW unit
commissioned at TalcherKaniha.
Approval granted for
Simhadri Project.
Approval granted forFaridabad Project.
TEC forTalcher Stage II (4 x
500 MW) accorded inOctober.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
16/30
First unit (115 MW) of
Kayamkulam CCPP becameoperational on November
28th.
Main plant award of Simhadri was placed i
November.
Main Plant award of
Faridabad was placed on
January 9th.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
17/30
First unit of 210 MW of FGUTPP Stage II
commissioned in January.
2nd Gas Turbine (115 MW) of Kayamkulam
commissioned in February.
First unit (500 MW) of
VSTPP commissioned inMarch in a record time of 48
months creating new
benchmark.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
18/30
First unit (143 MW) of
Faridabad GPP becameoperational in June in a
record time of 17 months
and 20 days. Steam Turbine (120 MW) of Kayamkulam
commissioned in October.
Second unit (210 MW) of Unchahar Stage II
commissioned in October.
GT II (143 MW) of Faridabad commissioned inOctober.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
19/30
Main plant award of SG
package for Talcher(4 x500 MW) placed in
November.
second unit of Vindhyachal Project, Stage - II
commissioned in February. With this Vindhyachal
became the largest power station of 2260 MW
Capacity in the country .
-
8/6/2019 NTPC SAGA 30 YEARS[1]
20/30
Maiden start of Hydro Project activities with the
agreement forKoldam Project (4 x 200 MW) betweenNTPC & Govt. of HP in February.
Foundation stone ofKoldam
Project laid by the PrimeMinister Sh. Atal Bihari
Vajpai in June.
Faridabad Project got
completed with
commissioning of its steam
turbine (144 MW) in July.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
21/30
Main Plant award of Rihand
Stage II (2 x 500 MW) placed to
BHEL in August. Main Plant award of
Ramagundam Stage II (1 x 500
MW) placed to BHEL in August.
First unit (500 MW) of Simhadri
commissioned in February in arecord time of 39 months (earlier
best achieved was 49 months)
creating a new benchmark for 500MW units in the country.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
22/30
Three wholly owned subsidiaries of NTPC viz.
NTPC Electric Supply Company Limited, NTPC
Hydro Limited and NTPC Vidyut Vyapar Nigam
Limited were incorporated.
Diversion tunnel work of Koldam Hydro Projectawarded in June.
Second unit (500 MW) of
Simhadri commissioned in
August.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
23/30
First unit (500 MW) of Talcher Stage-II
commissioned in January in a record time of 38
months (earlier best achieved for a Greenfieldproject was 39 months) creating new benchmark
for 500 MW set in the country.
Main Plant award of
Vindhyachal stage III (2 x 500
MW) placed to BHEL inMarch.
Main Plant award of
Kahalgaon Stage II, Phase-I(2 x 500 MW) placed in July.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
24/30
Second unit (500 MW) of Talcher Stage II
commissioned in October.
Main Plant award of UnchaharStage III (1 x 210
MW) placed in December.
Main Plant award ofKahalgaon Stage II, Phase-II(1 x 500 MW) placed in December.
Main Plant award of Sipat
Stage II placed in December.
Main dam work of Koldam
was awarded to Italian Thai
Development in December.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
25/30
Main Plant award of Sipat
Stage I (3 x 660 MW)
placed in April commencing
an era of super critical
technology in the country
having unit size of 660 MW.
3rd Unit of Talcher (500 MW) Stage II
commissioned in May.
Agreement for Loharinagpala (4 x 150 MW) and
Tapovan Vishnugad (4 x 130 MW) signed with
Govt. of Uttaranchal in July.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
26/30
Ramagundam Stage II (500
MW) commissioned in August
in a record time of 36 months(earlier best achieved in 38
months). With this
Ramagundam became thelargest power station of 2600
MW capacity in the country.
NTPC successfully completed the IPO which
received overwhelming response. NTPC IPO wasoversubscribed by 13.14 times.
Diversion of river for Koldam Project achieved
successfully in October in a record time of 26
months
-
8/6/2019 NTPC SAGA 30 YEARS[1]
27/30
4th and last unit of Talcher (500 MW) Stage II
commissioned in February. With this Talcher
became the largest power station of 3000 MW in
the country.
2
nd
and last unit (500 MW) of Rihand Stage IIcommissioned in September.
Main Plant award ofBarh (3
x 660 MW) placed in March. First Unit ofRihand Stage
II (2 x 500 MW)
commissioned in January.
-
8/6/2019 NTPC SAGA 30 YEARS[1]
28/30
NTPC (%),
20.15
OHTERS
(%), 79.85
NTPC (%),
27.10
OTHERS
(%), 72.90
TOTAL CAPACITY
AS ON 31.03.05
TOTAL GENERATION
AS ON 31.03.05
-