1
Nuclear Management Company’sReactor Pressure Vessel Head
Replacement Project
July 2003United States NuclearRegulatory CommissionRegion III
![Page 2: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/2.jpg)
2
Agenda� Project Organization� Project Status� Fabrication� Quality Oversight� Installation� Summary
![Page 3: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/3.jpg)
3
Purpose Communicate to NRC Region III the scope
and schedule of the NMC ReactorPressure Vessel Head ReplacementProject.
![Page 4: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/4.jpg)
4
Objectives� Identify required NRC regulatory
activities� Establish periodic updates to the NRC
![Page 5: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/5.jpg)
5
Project Organization
![Page 6: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/6.jpg)
6
Organization
� Multi-site capital project for NMC
� Common fabrication organization
� Site specific installation organization
Background
![Page 7: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/7.jpg)
7
Project Organization
Mike WadleySr. VP Support
Programs
Ron KuhnProject Manager
Point Beach RVHR
Tim OlsonProject Manager
KewauneeRVHR
Chuck TomesFleet Engineering
Lead RVHR
Steve ForshaOversight Lead
RVHR
ProjectManagement
JapanLewis McKenzie
Hank HoelscherFleet Project
Manager
Leo GanserManager Supplier
Assessment
John Paul CowanCNO
Mano NazarSr VP
Dave JantosikDirector Nuclear
Oversight
Gary VanMiddlesworth VP
NuclearAssessment
Programs
Project OversightReview PanelDave JantosikMike WadleyMano Nazar
Tom CoutuSite VP Kewaunee
Fred Cayia SiteVP Point Beach
Organization
![Page 8: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/8.jpg)
8
Project Status
![Page 9: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/9.jpg)
9
Contractors� Westinghouse is prime contractor
providing new replacement reactorpressure vessel (RPV) heads
� Mitsubishi Heavy Industries (MHI), KobeJapan, subcontracted to design andfabricate RPV heads
Project Status
![Page 10: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/10.jpg)
10
Scope� Kewaunee – New RPV head and CRDM
� No Head Assembly Upgrade Package (HAUP)� Point Beach – New RPV heads and CRDMs
� HAUP� Control Rod Drive Mechanism (CRDM) coil stacks� Thermocouple cables� Rod Position Indicator (RPI) and CRDM cables
Project Status
![Page 11: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/11.jpg)
11
Scope (continued)� New heads and CRDMs will be made and
fabricated in Japan under MitsubishiHeavy Industries’ quality program
� HAUP will be fabricated in Pittsburghunder Westinghouse’s quality program
Project Status
![Page 12: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/12.jpg)
12
Details of RPV Head Scope� Single Piece Forging� Electro-Slag Welded Strip cladding� Alloy 600 Prohibited� Use alloy 690 tubing versus alloy 600 tubing� Use alloy 690 weld material versus alloy 600 weld material� Use narrow J-groove weld bevel� One piece L-106A CRDM’s (one butt weld on latch mechanism)� Eliminate vent on each CRDM� Eliminate all seal welds� Eliminate spare and part length penetrations� Vent and Reactor Vessel Level Indication System Taps� Core Exit Thermocouple Nozzle Assembly (CETNA)
Project Status
![Page 13: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/13.jpg)
13
Details of Scope (continued)Plant specific differences� Kewaunee has eliminated plutonium recycle ports
and part length penetrations� Kewaunee will have four capped spare
penetrations on the new RPV head
Project Status
![Page 14: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/14.jpg)
14
Project Schedule - Kewaunee� Reactor Vessel Head Forging Complete� Fabrication CRDM Head
Adapter & Housing 12/13/03� Shrink Fitting of the head
penetration tubing 12/15/03� Hydro Test 05/01/04� Site Delivery 09/01/04� Outage 09/25/04
Project Status
![Page 15: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/15.jpg)
15
Project Schedule – Point Beach
� Reactor Vessel Forging 8/23/03 1/15/04� Fabrication CRDM Head
Adapter & Housing 4/10/04 9/25/04� Shrink Fitting of the head
penetration tubing 4/15/04 9/30/04� Hydro Test 9/15/04 2/20/05� Site Delivery 2/01/05 7/01/05� Outage 4/02/05 10/08/05
Unit 2 Unit 1
Project Status
![Page 16: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/16.jpg)
16
Fabrication
![Page 17: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/17.jpg)
17
Overall ResponsibilitiesRPV Head and CRDMs� Design Specification – Westinghouse� Material Procurement – Mitsubishi
Heavy Industries� Design Review – Westinghouse� Technical and Quality Oversight - NMC
Fabrication
![Page 18: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/18.jpg)
18
Overall Responsibilities (continued)
RPV Head and CRDMs� Mitsubishi Heavy Industries
� Fabrication� Certified Design Report� Stamping� Preservice Inspection� Packaging and Shipping
� Installation - Westinghouse
Fabrication
![Page 19: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/19.jpg)
19
Overall Responsibilities (continued)
Head Assembly Upgrade Package� Fabrication-Westinghouse� Design-Westinghouse� Installation-Westinghouse� Technical and Quality Oversight - NMC
Fabrication
![Page 20: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/20.jpg)
20
Design Responsibilities� NMC – Scope and Technical Specification� Westinghouse (Original Equipment
Manufacturer) – Design Specification� Mitsubishi Heavy Industries
� Certified Design Report� ASME NPT Stamp
Fabrication
![Page 21: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/21.jpg)
21
Fabrication StatusKewaunee� Long Lead Time Items Delivered
� Forging – Japan Steel Works� CRDM Alloy 690 Penetrations – Sumitomo
� Design Specifications Issued� CRDM Stainless Steel Pressure Boundary - Hitachi� Fabrication in progress
� Cladding� Latch housing & rod travel housing machining� Latch arm machining
Fabrication
![Page 22: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/22.jpg)
22
Fabrication StatusPoint Beach – Unit 2� Long Lead Time Items Ordered
� Forging – Japan Steel Works� CRDM Alloy 690 Penetrations – Sumitomo
� Design Specifications Issued
Fabrication
![Page 23: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/23.jpg)
23
Sub Vendor Fabrication Locations
� Mitsubishi Heavy Industries� Futami Plant – Reactor Vessel Head� Kobe Shipyard & Machinery Works – CRDMs
Fabrication
![Page 24: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/24.jpg)
24
Sub Vendor Fabrication Locations(continued)
� Sub Vendor Facilities� Japan Steel Works - Forging� Sumitomo - CRDM Alloy 690 Penetrations tubing� Hitachi – Stainless Steel CRDM Pressure Boundary
Components� Kanaski Steel - Lifting Lugs� Kobe Steel LTD. - Weld Material� Nippon Welding Rod – Alloy 690 Weld Material
![Page 25: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/25.jpg)
25
MHI
Japan SteelWorks
HitachiSumitomo
Fabrication
Kawasaki
NIPPON
![Page 26: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/26.jpg)
26
Licensing Requirements� Planned to be done pursuant to 10CFR
50.59� Additional NRC reviews or prior approvals
not expected
Fabrication
![Page 27: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/27.jpg)
27
Applicable ASME Codes andStandardsASME Boiler and Pressure Vessel Code� Section II, Section III, Section V, Section XI ASME 1998 Edition
thru 2000 Addendum� Section IX, Latest Edition
Code cases� ASME Code Case 2142-1, Ni-Cr-Fe (UNS N06052), November 25,
1992� ASME Code Case 2143-1, Ni-Cr-Fe (UNS W86152), November 25,
1992
Fabrication
![Page 28: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/28.jpg)
28
Applicable ASME Codes andStandards (continued)� NRC Issued Flaw Evaluation Criteria for Examination of CRDM
Tubing and J-groove Welds� US NRC Regulatory Guide 1.28, Rev 3 - Quality Assurance
Program Requirements� US NRC Regulatory Guide 1.31, Rev 3 – Control of Ferrite Content
in Stainless Steel Metal� US NRC Regulatory Guide 1.43, May 1973 – Control of Stainless
Steel Weld Cladding of Low Alloy Steel and Components� US NRC Regulatory Guide 1.50, May 1973 – Control of Preheat
Temperature for Welding of Low Alloy Steel
Fabrication
![Page 29: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/29.jpg)
29
Non Destructive Testing� Section XI, ASME 1998 Edition thru 2000 Addendum� Section III, ASME 1998 Edition thru 2000 Addendum� Additional NDE Requirements Imposed By NMC
� NRC Developed Acceptance Criteria Used forPreservice Examination of Alloy 690 Tubing and J-groove Welds
� Capability of Examining the Alloy 690 Tubing and J-groove Welds To Be Verified With NDE & RepairMockups
Fabrication
![Page 30: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/30.jpg)
30
Quality Oversight
![Page 31: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/31.jpg)
31
Quality Oversight� NMC Project Oversight Plan
� Establishes the program oversight andresponsibilities for the project• Supplier qualification• Stop Work Authority• Inspections• Nonconformances• Personnel Qualification• Reporting
![Page 32: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/32.jpg)
32
Oversight Plan� Establishes an Oversight Review Panel
� Purpose to provide an integrated review of theproject oversight
� Panel consists of:• Director of Nuclear Oversight• Senior Vice President of Support Programs• One additional Vice President
� Panel meets biannually or as conditions require
Quality Oversight
![Page 33: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/33.jpg)
33
Resident Oversight Personnel� Resident Oversight Personnel for NMC
and Westinghouse� Monitor work activities� Verify critical attributes at witness and hold
points� Follow-up on corrective actions
� Resident inspector is bilingual Japanesenational
Quality Oversight
![Page 34: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/34.jpg)
34
Communication and Issue ResolutionForm (CIRF)
� Project Specific Process� Documents and communicates issues found by
NMC, Westinghouse and MHI� Reviewed each day in Kobe by NMC,
Westinghouse and MHI Project Managers forcause determination, corrective action andresolution.
� Quality issues tracked via MHI/W QA Programs.Other issues tracked via project letter, as needed.
Quality Oversight
![Page 35: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/35.jpg)
35
Installation
![Page 36: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/36.jpg)
36
Installation� Westinghouse/ Mitsubishi Heavy Industries to
arrange transportation of the new heads� Replacement RPV heads fit through equipment
hatches at Point Beach and Kewaunee – NoIntegrated Leak Rate Testing required
� Both sites will require interference removal
![Page 37: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/37.jpg)
37
Installation Overview(continued)� Westinghouse to supervise old RPV head
removal and new RPV head installation� NMC provide tools, craft labor and
oversight� Head removal and reinstallation
performed per standard outagerequirements
![Page 38: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/38.jpg)
38
Installation Overview(continued)� Westinghouse provides the Department of
Transportation (DOT) shipping containerfor old RPV heads and CRDMs
� NMC will select a disposal contractor forold RPV heads
![Page 39: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/39.jpg)
39
Summary
![Page 40: Nuclear Management Company’s Reactor Pressure Vessel Head ... · Use alloy 690 weld material versus alloy 600 weld material Use narrow J-groove weld bevel One piece L-106A CRDM’s](https://reader030.vdocuments.net/reader030/viewer/2022040500/5e1b5904c070970e2d7fe823/html5/thumbnails/40.jpg)
40
Summary� Technical/quality oversight is in
place� Fabrication of RPV heads is
underway� Installation planning is just starting