NuclearpowerprograminPoland
DrJózefSobolewski
DirectorDepartmentofNuclearEnergyMinistryofEnergy,Poland
2
PolishPowerSystemThetotalmaximumcapacityinPolishPowerSystem(PPS)reached43 421 MW (asof 31December2017).
• Coal-firedpowerplants– 20 247 MW• Lignite-firedpowerplants– 9352MW• Gaspowerplants– 2341MW• Industrialpowerplants– 2813 MW• Hydroelectricpowerplants– 2328 MW• Renewableresources– 6341 MW• Nuclear:0MW
Energyconsumption:168 139 GWh/year(2017)4,37 MWh/percitizen/year;oneofthelowestinEurope.AccordingtoallestimationsenergyconsumptioninPolandwillgrowincomingdecades.
Transmissiongrid - 14195 km:• 1lineof750kV(114km),• 93 linesof400kV(6 326 km),• 164 linesof220kV(7755 km),Under-sea450kVDCconnectionbetweenPolandandSweden(245km)
Bełchatów12x370MW1x858MW
Kozienice2x500MW8x225MW1x1075MW
StalowaWola2x125MW
DolnaOdra6x220MW
Rybnik8x225MW
Adamów5x120MW
Łaziska2x125MW4x225MW
Ostrołęka3x220MW
Jaworzno6x225MW
Siersza2x150MW2x120MW
Turów3x260MW3x235MW
Porąbka-Żar4x135MW
Żarnowiec4x180MW
Żydowo3x60MW
Opole4x380MW
Pątnów1x460MW6x200MW
Łagisza1x460MW2x120MW
Dychów3x30MW
Solina2x70MW2x30MW
Połaniec7x225MW
2050
coalandlignite nuclearpower gasfuels other renewables
Goal50%?
Currentandfutureenergygenerationstructure
Goal60%
6%
6%
8%
20%
2031
Assumptions:ü slightdeclineofconsumptionof
coalby2031andwithoutchangesafter2031
ü 1,5GWbyNPPin2031,6-9GWby2050
ü Averageincreaseofproductionby0,86%y/y(acceleratedincreaseby2030,slowdownby2050)
78%
5%3%
14%
2016
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.03.6 4.7 6.2 7.3 9.1
0.5 0.8 0.6 0.90.0 0.1 0.4 0.7 1.0 1.3 1.6 2.3 3.0 3.7 5.0 5.4 5.5 5.5 5.6 5.6
0
5
10
15
20
25
30
35
40
0
5
10
15
20
25
30
35
40
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
nonDispatchable
Moc dysp. wiatru (el. istniejące)
Dispatchable
Reserve gap
Demand gap
Capacity demand
Capacity demand plus reserve
5,8 GW * 0,9
[GW]
Dispatchable power plants
Last coal power plants under construction
Wind power plantsdispatchable capacity
Dispachablecapacity of wind
Dispatchable capacity of small power plants and renewables without wind
Peakloadandcurrentandplanedcapacity
SOURCE:ME,PSE
Mainchallenges
11.47.4 9.5
1725
3240
4450
0
10
20
30
40
50
60EUR/tCO2
Source:PolishEnergyMarketAgency2017.Projectionbasedon:1) OECD/IEA,WorldEnergyOutlook2016,Paris,
November2016.2) EuropeanCommission:EUReferenceScenario2016.
Energy,transportandGHGemissionstrendsto2050,July2016.
3) “ThomsonReutersCarbonMarketSurvey2016”,Nordeng,A.etal.,May,2016.
4) KfW/ZEWCO2Barometer2016– CarbonEdition.
Aging structure of the existingpower plants in Poland (2016)
Ligniteresourcesalreadyminedout (2040)
Increasingcostsofcoalpowergeneration(CO2,airpollutants)
Source:EuropeanEnvironmentAgency
Electricitygeneration– CO2 emissionintensity
0
5000
10000
15000
20000
25000
1 25 49 73 97 121 145 169 193 217 241 265 289 313 337 361 385 409 433 457 481 505 529 553 577 601 625 649 673 697 721
PolishPowerSystem- July2018(hourlyinMW)
WindPower Consumption InstaledWindPower
14%
PolishNuclearPowerProgram
• PNPPwasapprovedon January 28th2014 bytheCouncilofMinisters.ItskeygoalsresultingfromtheEnergyPolicyofPolanduntil2030arefollowing:
ü assuringlong-termsecurityofelectricitysupplyü maintainingelectricitypricesatlevelsacceptablebythenational
economyandthesocietyü reducingemissionsofCO2 andotherairpollutants
• 2NPPplannedwithtotalinstalledcapacity:6000MWe• Currentstatus:
The government is working on update of the document and newbusiness model for the first NPPs.
8
892862
836821
804787 782 774 775 766 758
745713 702
634 634
576 574
520 510 505 495 486 481
400
500
600
700
800
900
1000[kg CO2/MWh] Assumptions:
ü 1,5GWsince2031,further2unitsafter2and4years
ü 7,5-10GWinstalledcapacityinwindturbines
ü IncludedCCGT,newcoalpowerunits,gasunits,oilunitsandotherrenewables.
Źródło:PSE/ME9
AverageCO2 emissionper1MWh
Thankyouforattention