Page 1: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

1

Page 2: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

2

Page 3: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Nuclear Power Status in Korea

Page 4: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

업무처리 흐름 Operating 24 Units 23,116MW

업무처리 흐름 Constructing 5 Units 7,000 MW

업무처리 흐름 Planning(Holding) 4 Units 5,600 MW

Hanul

Operating : 6 Units

Constructing : 2 Units

Planning : 2 Units

Hanbit

Operating : 6 Unins Kori

Operating : 5 Units

Constructing : 3 Units

Wolsong

Operating : 6 Units

Cheonji

Planning : 2 Units

Page 5: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

02

Planned(Hold) Under Construction KOREA

Shin-Hanul

Shin-Kori 2018

APR1400

2021

APR1400

2022

APR1400

Shin-Hanul#1

APR1400

2018

신한울 2

APR1400

2019

APR1400

2022

APR1400

2023

UAE

Barakah 2017

APR1400

UAE 1

2018

UAE 2

APR1400

2019

UAE 3

APR1400

2020

UAE 4

APR1400

Cheonji 2026

APR+

2027

APR+

Shin-Hanul#2 Shin-Hanul#3 Shin-Hanul#4

Shin-Kori#4 Shin-Kori#5 Shin-Kori#6

Cheonji#1 Cheonji#2

Page 6: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

3

14

21.8%

30.3% 30.8%

13.2%

3.9%

Nuclear

161,995GWh

Coal

Gas

Oil Others

z Installed Capacity

3

2

14

30.0%

39.6%

22.4%

5.5%

2.6%

Nuclear

22,529MW

Coal

Gas

Oil

Others

Electricity Generation

※ Source : KPX (Korea Power Exchange, Dec.2016)

03

TOTAL : 540,442 GWh

TOTAL : 105,866 MW

Page 7: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Fuel

Supply

Maintenance

A/E + NSSS

Design

R & D

Equipment

Supply Waste

Management

04

Page 8: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

General Aspects of License Renewal

Page 9: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

NSSC

KINS

KINAC

NSSC : Nuclear Security & Safety Committee

KINS : Korea Institute of Nuclear Safety

KINAC : Korea Institute of Nuclear Nonproliferation

and Control

KHNP : Korea Hydro & Nuclear Power

MOTIE : Ministry of Trade, Industry and Energy

Local Office

Regional Nuclear

Safety Commission

Civil Environmental Monitoring Agency * Kori, Hanbit,

Hanul, Wolsong

KHNP MOTIE

Local Government

National Assembly

Nuclear Safety Regulatory

Nuclear Operation & Business The public

Page 10: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Units Design Life(years)

PHWRs 30

PWRs ( ~ 1,000 MWe) 40

PWRs (APR-1400, 1,400 Mwe) 60

02

Page 11: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

03

Safety Economic Public

Acceptance

Safety Public Acceptance Economics

• Mandatory requirement

• Safety assessment and

management over

continued operation

• Local Community

• Government, national

assembly, media

• Assess under Licensee

supervision

• Consider National Energy

Security and Supply/

Demand as a State-owned

Company

Page 12: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Kori unit 1 : reached its design life in June 2007. After 10-year

additional operation, went into permanent shutdown in June 2017

without second LR.

Wolsong unit 1 : reached its design life in November 2012. After

completing the 62 months-lasting regulatory review, restarted operation

in June of 2015

04

Page 13: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Safety Assessment for intensive PSR

Fuel Channel Refurbishment

‘08.02-’09.12 ’09.04-’11.07 ’09.12

Application for LR

` Preparation

(22M)

‘13.07-’14.12 ’12.02-’14.06 ’11.07-’15.12

Fukushima

Accident(’11.03)

Countermeasure for Fukushima

Accident IAEA Peer

Review

Stress test for LR

(New President’s Pledge)

Approval of NSSC

` Licensing

(62M)

’15.02

End of Design

Life(’12.11)

‘15.03-06 ’15.06 ’15.06.23 ` After

Licensing

(4M) Operation Regional

Agreement In-Service Inspection

05

Page 14: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Aging management program

Page 15: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

Nozzles(welds)

PWSCC RCS Piping

PWSCC/Fatigue/ Embrittlement

RCP

SCC/Fatigue

Reactor Internals

IASCC

RPV

SCC/Wear/Fatigue/ Embrittlement

SG Tube

PWSCC/ODSCC /Fatigue/Wear

SG Shell/Nozzles

SCC/Fatigue

2nd Piping

FAC

Generator

Corrosion

Turbine

Vibration

Pressurizer

SCC/ Env. Fatigue

Page 16: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

02

USA

NUREG–1800, Standard Review Plan for Review of License Renewal Applications for Nuclear Power Plant(July 2001)

NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001)

CFR, Title 10, Part 54, Requirements for Renewal of Operating

Licenses for Nuclear Power

IAEA

Safety Guide No. NS-G-2.12, Ageing Management for Nuclear Power Plants

Technical Reports Series No 338, , Methodology for the Management of Ageing of Management for Nuclear Power Plants Components Important to Safety

Safety Reports Series No.15, Implementation and Review of a Nuclear

Power Plant AMP

Page 17: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

03

IAEA Periodic Safety Review

(68 Items for 14 Areas)

NRC’s LR Regulations

(77 Items for 10 Areas)

① Plant design

② Actual condition of structures, systems and

components (SSCs) important to safety

③ Deterministic safety analysis

④ Probabilistic safety assessment ⑤ Hazard analysis

⑥ Equipment qualification ⑦ Ageing

⑧ Safety performance

⑨ Use of experience from other plants and research

findings

⑩ Organization, the management system and safety

culture

⑪ Procedures ⑫ Human factors

⑬ Emergency planning

⑭ Radiological impact on the environment

Lifetime Evaluation

Report (LER)

① Scoping and Screening

② Aging Management

Review

③ Time-Limited Aging

Analyses (TLAA)

④ Incorporation of

Operating Experiences

and Research Findings

Radiological

Environmental

Report(RER)

① The Proposed Action

② General Environment

Information

③ General Plant Inform.

④ Environment

Consequences of the

Proposed Action

⑤ Consequences of the

Accident

⑥ Environment Monitoring

Plan

Page 18: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

04

AMP 10 Element

1. Scope of the program 6. Acceptance criteria

2. Preventive actions 7. Corrective actions

3. Parameters monitored or

inspected

8. Confirmation process

4. Detection of aging effects 9. Administrative controls

5. Monitoring and trending 10. Operating experience

Page 19: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

04

Aging Management Program

(Plant Specific AMPs)

Data Management (Basic Information, Data

Analysis, etc.)

1. Scope of Program 2. Preventive Actions 3. Parameters Monitored/Inspected 4. Detection of Aging Effects 5. Monitoring and Trending 6. Acceptance Criteria 7. Corrective Actions 8. Confirmation Process 9. Administrative Controls 10. Operating Experience

Aging Management Program Guideline

(Plant Specific)

AMP

DB

Implementation Results (Test, Inspection,

Examination)

Aging Management Program Computer System

Server

Integrated Aging Management

Program

Integrated Guideline of Aging Management Program (Standard Procedure)

Management Browse Input

Page 20: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

Latest Issues of AMP in Korea NPP

Page 21: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01 Function of containment liner plate(CLP)

Inner mold for concrete pour during construction stage

Leaktight barrier for minimizing leakage of airborne radioactive

materials during operation

Nominal thickness of CLP in Korean PWR : 6mm

Page 22: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

First discovery of liner plate corrosion

Deterioration of coating and subsequent corrosion was observed on one of

containment liner plates during the refuel outage in 2016.

From the destructive examination, it was confirmed that the liner plate was

penetrated by corrosion.

The location of corrosion was near the upermost cold joint between concrete shell

and dome.

Fig. Photographs showing one of corrosion morphologies observed on a containment liner plate.

Page 23: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

Expansion of inspection

Similar area was inspected by ultrasonic test

By thickness measurement, suspected area was identified

Whether corrosion occurred or not was confirmed by destructive examination.

Fig. Photographs showing the corrosion status of one of liner plate backsides.

Page 24: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

Number of plants affected by CLP corrosion : 8 units

4 Westinghouse type units

2 Framatome type units

2 CE type units

Operation period : about 21 to 32 years

Material specifications of CLP : carbon steel

JIS3106 SM41B/SM41BN

ASME SA516 Gr.55

Material C Si Mn P S Fe

JIS SM41B/41BN Max 0.2

Max 0.35

0.60~ 1.20

Max 0.040

Max 0.040

Bal.

ASME SA516 Gr.55

Max 0.18

0.15~ 0.40

0.60~ 0.90

Max 0.035

Max 0.035

Bal.

Page 25: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

[Ref.] Darrell S. Dunn et al., Containment Liner Corrosion Operating Experience Summary Technical Letter Report – Revision 1, USNRC, 2011(NRCAdams Accession No. ML112070867)

Page 26: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

Proposed corrosion mechanism near the cold joint

The 1st stage : crevice corrosion during construction phase

Concrete

CLP (Fe)

Fe2+ +2e- Fe Fe2+

Cathode

Anode

: Cathode : Anode

Fe2+ + 2H2O + 2Cl- Fe(OH)2 + 2H+ + 2Cl-

H+

Cl-

Onset of crevice corrosion

• low pH • Autocatalytic reaction

Page 27: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01 Proposed corrosion mechanism near the CJ(continued)

The 2nd stage : macrocell accelerated localized corrosion

Concrete

CLP (Fe)

2Fe2+ +4e- 2Fe

O2 + 2H2O + 4e- 4OH-

OH-

e

Fe2+ + 2OH- Fe(OH)2

Fe2+

Cathode

Anode

: Cathode : Anode

Cathode

Construction and activation of macrocell Driving Potential > 0.25V

Page 28: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

Summary of plausible CLP corrosion mechanisms for Korean nuclear

power plants

Ingress of chlorides from marine atmosphere

• It is presumed to be responsible for all CLP corrosion cases near the CJ

• Corrosion initiation by crevice corrosion mechanism

• Corrosion may proceeds further by macrocell accelerated localized

corrosion

Presence of foreign objects

• Foreign objects of wood were identified only at two locations

• Corrosion may proceeds by macrocell accelerated localized corrosion

Concrete voids by poor consolidation

• Liners can not be protected from corrosion if they are not in high alkaline

condition.

Page 29: Nuclear Power Status in Korea · Applications for Nuclear Power Plant(July 2001) NUREG–1801, Generic Aging Lessons Learned (GALL) Report(July 2001) CFR, Title 10, Part 54, Requirements

01

CLP maintenance process(corrective action)