“nucor road industrial corridor – sanitary sewer project”

29
Nucor Road Nucor Road Industrial Corridor – Industrial Corridor – Sanitary Sewer Sanitary Sewer Project” Project” Presented by: Presented by: Justin Longstreth, P.E. Justin Longstreth, P.E. Brian Hannon, P,E, Brian Hannon, P,E, Moore & Bruggink, Inc. Moore & Bruggink, Inc. October 14 th , 2010

Upload: oliver

Post on 01-Feb-2016

81 views

Category:

Documents


0 download

DESCRIPTION

“Nucor Road Industrial Corridor – Sanitary Sewer Project”. Presented by: Justin Longstreth, P.E. Brian Hannon, P,E, Moore & Bruggink, Inc. October 14 th , 2010. Design Team Introduction. ________________________. Brian Hannon, P.E. Moore & Bruggink, Inc. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

““Nucor Road Nucor Road Industrial Corridor – Industrial Corridor –

Sanitary Sewer Sanitary Sewer Project”Project”

Presented by:Presented by: Justin Longstreth, P.E.Justin Longstreth, P.E.

Brian Hannon, P,E,Brian Hannon, P,E,Moore & Bruggink, Inc.Moore & Bruggink, Inc.

October 14th, 2010

Page 2: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Design Team Introduction________________________Brian Hannon, P.E. Moore & Bruggink, Inc.

Justin Longstreth, P.E. Moore & Bruggink, Inc.

Matt Healy, P.L.S., E.I.T VS Engineering, Inc.

Doug Baldessari, CPA H.J. Umbaugh & Associates

Page 3: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Presentation Outline________________________

• Project Necessity

• Project Area Overview

• Sewer Collection & Treatment System Components

• Sustainable Design & Minimizing Environmental Impacts

• What does it cost?

• How do we pay for it?

Page 4: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Project Area Overview

____________

Page 5: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Groundwater Level

Drainfield

Well

Septic Tank

________________________

Septic Tanks,

Drainfields and Wells

Page 6: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Sanitary Sewer

(Gravity) Sanitary Sewer

(Gravity)

Sewage Lift Station

Sewage Lift Station

Sanitary Sewer

Forcemain (Pressurized)

Pump to Treatment Plant Sanitary Sewer

Forcemain (Pressurized)

Typical Sanitary Sewer Collection System________________________

Page 7: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Project Necessity________________________

•Soil Conditions

•Existing Septic Systems Failing

•Potential Future Growth

Page 8: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Project Necessity

__________

Page 9: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Alternative Design Considerations________________________

•Option 1: Do Nothing

•Option 2: Build Large, Centralized Wastewater

Treatment Facility

•Option 3: Pump Sewage To Crawfordsville

Wastewater Treatment Facility

•Option 4: Two Smaller Collection Systems And

Treatment Facilities

Page 10: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Project Phasing

____________

Page 11: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Phase I Sanitary Sewer System

____________

Page 12: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Chigger Hollow Sanitary Sewer

___________

Page 13: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Chigger Hollow Sanitary Sewer

___________

Page 14: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Phase I Sanitary Sewer System________________________

• 30,000 Feet of Gravity Sewer

• 3,000 Feet of Pressurized Forcemain

• 1 Lift Station

• 1 Sequencing Batch Reactor Waste Water Treatment Plant

Page 15: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Phase II Sanitary Sewer System________________________

Page 16: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Phase II Sanitary Sewer System________________________

• 13,000 Feet of Gravity Sewer

• 9,000 Feet of Pressurized Forcemain

• 2 Lift Stations

• 1 Sequencing Batch Reactor Waste Water Treatment Plants

Page 17: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

SBR Wastewater Treatment System________________________• Sequencing Batch Reactor

• 100,000 GPD

• Aerobic Digester

• Laboratory

• Tertiary Filtration

City of Grant SBR WWTP

Page 18: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Implementation of Sustainable Design________________________• Tertiary Filtration and Reuse at Nucor

• Maximize use of gravity in collection system

• Variable Frequency Drives on Premium Efficiency Motors

• Use of Stabilized Sludge as Fertilizer

Page 19: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Minimization of Environmental Impacts________________________•Reuse of Water

•Energy Efficiency

•Will improve water quality

•No destruction of habitat

•No structures in wetlands

•Quiet Enclosures on Generators

Page 20: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Estimated Project Costs - Phase I________________________

Phase I Collection/Transport System Cost: $2,300,000

Phase I Sanitary Treatment System Cost: $2,309,000

Phase I Design & Construction Engineering Cost: $ 855,000

Phase I Contingency Cost: $ 455,000

Phase I Total Cost: $5,920,000

Phase I Land Acquisition Cost TBD

Page 21: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Estimated Project Costs – Phase II________________________

Phase II Collection/Transport System Cost: $2,776,000

Phase II Sanitary Treatment System Cost: $2,100,000

Phase II Design & Construction Engineering Cost: $ 908,000

Phase II Contingency Cost: $ 481,000

Phase II Total Cost: $6,265,000

Phase II Land Acquisition Cost: TBD

Page 22: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Montgomery County Regional Montgomery County Regional Sewer DistrictSewer District

Proposed ConstructionProposed Construction Project and Financing Project and Financing

- October 14, 2010 -- October 14, 2010 -

Page 23: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Proposed Phase I Proposed Phase I Project and FinancingProject and Financing

Proposed project financing through the Indiana State Revolving Fund Loan Program (“SRF”)

Phase I – $6,365,000 SRF subsidized interest rate bonds Interest rate assumed at 3% (current rate 2%) SRF interest rates adjust quarterly 20-year bond issue with amortization structured to match

the estimated Tax Increment Financing (“TIF”) available revenues

Anticipated bond closing in early 2011, subject to availability of funding

23

Page 24: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Proposed Phase I Project Proposed Phase I Project Project and Financing (Cont’d)Project and Financing (Cont’d)

$100,000 Grant

Cash on Hand of $100,000 for use in Land & Rights of Way Acquisition which cannot be financed through SRF

24

Page 25: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Proposed Phase II Proposed Phase II Project and FinancingProject and Financing

Proposed project also assumed to be financed through SRF

Financing – $6,560,000 SRF subsidized interest rate bonds Interest rate assumed at 3.50% 20-year bond issue with amortization structured to

match the estimated Tax Increment Financing (“TIF”) available revenues

Anticipated bond closing in mid-2011, subject to availability of funding

25

Page 26: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Proposed Phase II Proposed Phase II Project and Financing (Cont’d)Project and Financing (Cont’d)

Cash on Hand of $80,000 for use in Land & Rights of Way Acquisition which cannot be financed through SRF

26

Page 27: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Estimated Available TIF Revenues Estimated Available TIF Revenues and SRF Debt Serviceand SRF Debt Service

27

Page 28: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

Estimated Monthly Sewer Bills Estimated Monthly Sewer Bills for Assumed EDUsfor Assumed EDUs

75% Residential Connection

50% Residential Connection

1 Equivalent Dwelling Unit (“EDUs”) $76.00 $87.00

25 EDUs $1,900.00 $2,175.00

75 EDUs $5,700.00 $6,525.00

100 EDUs $7,600.00 $8,700.00

125 EDUs $9,500.00 $10,875.00

28

Note: Interim sewer rates during construction or non-SRF available funds may be required to pay for interest during construction.

Page 29: “Nucor Road Industrial Corridor – Sanitary Sewer Project”

““Nucor Road Nucor Road Industrial Industrial Corridor”Corridor”

Questions or Comments?Questions or Comments?