nuvoco vistas corporation ltd.environmentclearance.nic.in/writereaddata/online/... · a name of the...

30
FORM – 2 APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE Of SONADIH CEMENT PLANT INCREASE OF PRODUCTION CLINKER: FROM 3.5 TO 5.1 MTPA CEMENT: FROM 1.0 TO 3.0 MTPA (BY INSTALLATION OF UNIT – III) & INSTALLATION OF 75 MW COAL BASED THERMAL POWER PLANT At SONADIH VILLAGE, P.O. RASEDA, BALODABAZAR TEHSIL BALODABAZAR- BHATAPARA DISTRICT, CHHATTISGARH By NUVOCO VISTAS CORPORATION LTD.

Upload: others

Post on 26-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

FORM – 2

APPLICATIONFOR

PRIOR ENVIRONMENTAL CLEARANCE

OfSONADIH CEMENT PLANT

INCREASE OF PRODUCTIONCLINKER: FROM 3.5 TO 5.1 MTPACEMENT: FROM 1.0 TO 3.0 MTPA

(BY INSTALLATION OF UNIT – III)&

INSTALLATION OF 75 MW COAL BASEDTHERMAL POWER PLANT

AtSONADIH VILLAGE, P.O. RASEDA, BALODABAZAR TEHSILBALODABAZAR- BHATAPARA DISTRICT, CHHATTISGARH

By

NUVOCO VISTAS CORPORATION LTD.

Page 2: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

FORM – 2APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE

1 Details of Projecta Name of the Project (s) : Sonadih Cement Plant-Increase of

Clinker production from 3.5 to 5.1MTPA, Cement from 1.0 to 3.0 MTPA (byInstallation of Unit – III) & Installation of75 MW Coal Based Thermal Power Plant

b Name of the Company / Organisation : M/s. Nuvoco vistas corp. Ltd (formerlyLafarge India Ltd.)

c Registered Address : Crecenzo, “B” Wing, 10th Floor, C 38 &C – 39, “G” Block, Bandra KurlaComplex, Bandra (East) Mumbai

d Legal Status of the Company : Public Limitede Joint Venture (Yes/No) No

If Yes, : -(i) No. of JV Partners (Multiple 1Entries Allowed)

Name of theJV Partner

Share of theJV Partner

Address of theJV Partner

Email Id of JVPartner

Mobile No. ofJV Partner

- - - - -2 Address for the correspondence

a Name of the applicant : Mr. Ramesh Warkeb Designation (Owner/Partner/CEO) : Sr Vice Presidentc Address M/s. NUVOCO VISTAS CORPORATION LTD

Sonadih Cement plantP.O. Raseda, District Baloda Bazar –Bhatapara, C.G.

d Pin code 493332e e-mail [email protected] Telephone No. 9771496196g Fax No. 07727 272227

3 Category of the Pro ject/Activity as per Schedule of EIA Notification, 2006a Project / Activity

[ 1 (a)(i) / l(a)(ii) / 1(b) / 1(c) / 1(d) /1(e) / 2(a) / 2(b) / 3(a) / 3(b) / 4(a) /4(b)(i)/ 4(b) (ii) / 4(c) / 4(d) / 4(e) /4(f) / 5(a) / 5(b) / 5(c) / 5(d) / 5(e) /5(f) / 5(g) / 5(h) / 5(i) / 5Q) / 6(a) /6(b) / 7(a) / 7(b)/ 7 (c) / 7 (d) / 7 (da)/ 7 (e) / 7 (f) / 7 (g) / 7 (h) / 7 (i) / 8(a) / 8 (b)

3(b)

b Category (A/B1/B2) AIf B1 or B2 -Reason for application at CentralLevel/State level (in case of B2projects)

-

If Others -c Please Specify

Page 3: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

d EAC concerned (for category AProjects only)(Coal Mining / Non-coal Mining /Thermal / River Valley & Hydro /Industry- I / Industry-II /Infrastructure-I / Infrastructure-II /Nuclear & Defence / CRZ

Industry-I

e New / Expansion / Modernization /One Time Capacity expansion (onlyfor Coal Mining) / Expansion underPara 7(ii) / Modernization under Para7(ii) / Change of Product Mix underPara 7(ii))

Expansion

4 Location of the Projecta. Plot / Survey / Khasra No. Enclosed as Annexure -2C in Chapter-1

of Final EIA report.b. Village Raseda villagec. Tehsil Balodabazard. District Balodabazar-Bhataparae. State Chhattisgarhf. Pin Code 493332g. Bounded Latitudes (North)

From 21°43'30.00"NTo 21°44'11.29"N

h. Bounded Longitudes (East)From 82°12'25.20"ETo 82°13'11.50"E

i. Survey of India Topo Sheet No. 64/ k/2i- Upload Topo Sheet File (Upload pdf

only)10 km radius around the Project Site isgiven in Chapter-2and enclosed asFig.2.3- in final EIA report

k. Maximum Elevation Above Means SeaLevel (AMSL)

260 m above MSL

1. Upload (kml) File (Upload km I only) kml File was uploaded on MoEFCCwebsite

m. Distance of Nearest HFL from theproject boundary within the studyarea

0.8 km

n. Seismic Zone (Zone: 1/2/3/4/5) The proposed project area is inland andfalls under Zone II (Least Active)

5 Whether project is executed inmultiple States (Yes / No)? No

If Yes NAa . Number of States in which Project will

be Executed (e.g. 1,2,3,4,5,6)NA

b. Main State of the Project NAc. Other State (.Multiple Entries Allowed)

(If the project to be executed, does notNA

Page 4: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

belong to any state, then statecategory could be selected as 'Other')

State District Tehsil Village

6 Details of Terms of Reference (ToR)a. Whether ToR is mandatory for

submitting application (Yes / No)?Yes

If Yesb. Date of issue of ToR / Standard ToR Letter No. No. J-11011/386/2005-IA.II

(I) dated 14.03.2017 and amendmentdated 20.10.2017

c. MoEF&CC / SEIAA File No. F.No. J-11011/386/2005-IA II (I)d. Upload ToR letter (PDF only) Enclosed as Annexure- 1A in final EIA

report.7 Details of Public Consultation

a. Whether the Project Exempted fromPublic Hearing (Yes/No)?

No

If yes,Reason -

b. Supporting Document (upload pdfonly)

-

c. Whether details of Public Hearingavailable (Yes/No)?

Yes

If No,d. Reason thereof -

Supporting Document (upload pdfonly)

-

If Yes,e. Date of Advertisement of Public

Hearing01.04.2018

f. Copy of advertisement in English(Upload PDF only)

Enclosed as Annexure- 7A in PHMinutes of Final EIA report.

g. Whether Public hearing was presidedover by an officer of the rank ofAdditional District Magistrate orabove (Yes/No)?

Yes

Smt. Leena Kamalesh Mandaavi

If yesh. Designation of Presiding Officer

(District Magistrate / DistrictCollector / Deputy Commissioner /others - please specify)

Additional Collector

i. Copy of duly signed Proceedings ofPublic Hearing in English (Upload pdfonly)_______________________________________________________

Copy of duly signed Proceedings ofPublic Hearing is in Annexure – 7A ofFinal EIA Report

j. Date of Public Hearing The public Hearing of the project wasconducted by Chhattisgarh EnvironmentConservation Board on 04.05.2018.

k. Venue of Public Hearing Raseda Bhata

Page 5: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Village RasedaTehsil Baloda Bazar TehsilDistrict Balodabazar-Bhatapara DistrictState Chhattisgarh

l. Distance of Public Hearing Venuefrom the Proposed Project (km)

0.5 km

m. No. of people attended 500n. If the multiple public hearings

conductedNo

o PI give the details of each PH as per(e) to (o) above

The details are given in Annexure – 7Aof Final EIA Report

8. Details of Project Configuration / Product (Multiple Entries Allowed)a. Whether the project is New (Yes/No?) No

If yesb. Project Configuration

NA

Plant / Equipment / Facility Configuration Remarks if any

c ProductProduct / Activity(Capacity / Area)

Quantity Unit Mode of Transport /Transmission of Product

NA- Unit:-(Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre pen

Day(KLD), Tons Crushed per Day(TCD), Cubic Meter per Day, Kilometers(Km),Million Liters per Day(MLD), Others)Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, PipeConveyor, Aial Ropeway, combination of two or three modes, Others)

9 If Expansion / Modernisation / One Time Capacity expansion (only for CoalMining) /Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) /Change of Product Mix under Clause 7(ii)a. Details of environmental clearance granted earlier

(i) Date of issue of environmentalclearance

05.05.2006

(ii) MoEFCC / SEIAA File Number F.No. J-11011/386/2005-IA-II(I)(iii) Upload EC Letter Details are given in Annexure 1D of

Final EIA Report.b. Details of certified report on

compliance of earlier environmentalclearance conditions

Details are given in Annexure 1E ofFinal EIA Report.

(i) Details of Regional Office ofMoEFCC / Zonal Office of CPCB/ SPCB / UTPCC from whichcertified report on compliance ofearlier environmental clearanceconditions obtained

(ii) Letter No(iii) Status of Compliance

Page 6: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

(iv) Certified report on compliance ofearlier environmental clearanceconditions (Including MonitoringReport) (Upload pdf only)

(v) Date of site visitc. Details of Consent to Operate

(i) Whether Consent to operateobtained (Yes/No)?

Yes

If yes,(ii) Upload Copies of all Consent to

operate obtained since inception(Upload pdf only)

Copies of all Consent to operate areenclosed as Annexure - 1F

(iii) Date of issue Lr No. 3008/TS/CECB/2017 dated30.08.2017 Valid up to 31/08/2018

Lr No. 1853/TS/CECB/2018 dated21.05.2018 Valid up to 31/08/2021

(iv) Valid up to

(v) File No. 660/CECB/2018 dated 16/04/2018(vi) Application No. -(vii) Upload Copy of Consent to

operate valid as on date (Uploadpdf only)

Copies of all Consent to operate areenclosed as Annexure - 1F

d Details of capacity expansionProduct /Activity(Capacity/Area)

QuantityFrom

QuantityTo

Unit Mode of Transport/Transmission ofproduct

Details are given in Chapter – 1, Table – 1.3 of Final EIA Report- Unit:-(Tons per Annum(TPA), Mega Watt(MW), Hectares(ha), Kilo Litre perDay(KLD),

Tons Crushed per Day(TCD), Cubic Meter per \Day, Kilometers(Km), Million Litersper Day(MLD), Others).

- Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, PipeConveyor, Arial Ropeway, combination of two or three modes. Others)e. Details of Configuration (.Multiple

Entries Allowed)Not Applicable

Plant /Equipment /

Facility

ExistingConfiguration

ProposedConfiguration

Finalconfiguration afterexpansion

Remarksif any

Details are given in Chapter – 2, Para 2.5 of Final EIA Report10 Project Cost

a. Total Cost of the Project at currentprice level (in Lakhs)

Rs. 1,64500 Lakhs

b. Funds Allocated for EnvironmentManagement (Capital) (in Lakhs)

Rs. 9000 Lakhs

c. Funds Allocated Towards ESC(Entrepreneur Social Responsibility)(in Lakhs)

Rs. 811 LakhsDetails are given in Chapter – 8, Table –8.3.2 of Final EIA Report

d. Funds Allocated for EnvironmentManagement Plan (EMP) (Recurring

Rs 625 Lakhs

Page 7: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

per Annum) (in Lakhs)11 Whether project attracts the General Condition specified in the Schedule of

EIA Notification (Yes/No)? [provide name of WL/CPA/ESA/Inter-stateboundary / International boundary and distance from the project

If Yes

NA

a. Protected Area Notified Under theWild Life(Protection) Act, 1972

b. Critically Polluted Areas as identifiedby the Central Pollution ControlBoard from Time to Time

c. Notified Eco-Sensitive Areasd. Inter-State Boundaries and

International Boundaries12 Whether projects attract the Specific Condition specified in the Schedule of

EIA Notification (Yes/No)?If Yes No

a. If any Industrial Estate / Complex /Export processing Zones / SpecialEconomic Zones / Biotech Parks /Leather Complex with homogeneoustype of industries such as Items 4(d),4(f), 5(e), 5(f), or those Industrialestates with pre-defined set ofactivities (not necessarilyhomogeneous, obtains priorenvironmental clearance, individualindustries including proposedindustrial housing within suchestates / complexes will not berequired to take prior environmentalclearance, so long as the Terms andConditions for the industrialestate/complex are complied with(Such estates/complexes must have aclearly identified management withthe legal responsibility of ensuringadherence to the Terms andConditions of prior environmentalclearance, who may be heldresponsible for violation of the samethroughout the life of thecomplex/estate

NA

13 Raw Material / Fuel Requirement (Multiple Entries Allowed)a. Details of Raw Material / Fuel RequirementRaw Material/ Fuel

QuantityperAnnum

Unit Source (incase ofImport, pleasespecify country andName of the portfrom which Raw

ModeofTransport

Type of Linkage (Linkage/Fuel Supply Agreement / e-auction / MoU/LOA/Captive / Open market /Others)

Page 8: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Material / Fuel isreceived)

Raw Material / Fuel Requirement details are given in Chapter – 2, Para 2.6 of Final EIAReport

In case of expansion proposals, total requirement of raw materia/ fuel shall begiven

- Unit:-(Tons per Annum(TPA), Mega Watt (MW), Hectares(ha), Kilo Litre perDay(KLD) Tons Crushed per Day (TCD), Cubic Meter per Day, Kilometers (Km),Million Litters Per Day (MLD), Others)

- Mode of Transport/Transmission of Product (Road, Rail, Conveyor Belt, PipeConveyor, Arial Ropeway, combination of two or three modes, Others)

b. Upload copy of Linkage / Fuel Supply Agreement/ e-auction / Memorandumof Understanding /Letter of Allocation / Captive source / others.

Fuel Requirement details are givenin Chapter – 2, Para 2.6 of FinalEIA Report

14 Baseline Data (Air / Water / Noise / Soil / Ground water table/ Others)a Period of Base Line Data Collection Winter season – 2016- 2017

covering the months of December’16 to February 2017.

From (DD/MM/YYYY) 05.12.2016To (DD/MM/YYYY) 25.02.2017

b Season (Summer / Pre-monsoon / Post-monsoon / Winter)

Winter season – 2016-2017

c No. of Ambient Air Quality (AAQ) MonitoringLocations

Eight Locations

d Details of AAQ Monitoring (.Multiple Entries Allowed)CriteriaPollutants

Unit MaximumValue

MinimumValue

98 PercentileValue

PrescribedStandard

PM10 µg/m3 50.2-56.6 41.8-45.5 49.3-56.2 100PM2.5 µg/m3 21.8-26.3 18.1-19.2 21.5-26.0 60SO2 µg/m3 12.6-13.9 8.0-10.0 12.2-13.5 80NOX µg/m3 14.0-14.9 9.1-11.3 13.6-14.8 80

Details Ambient Air Quality data is enclosed as Annexure - 3A in FinalEIA Report.

- Criteria Pollutants: - (PM10, PM2.5, S02, NOx, others parameters specific to sector).- Unit: - (Micro Gram per Meter Cube, Nano Gram per Meter Cube, Mili Gram per

Meter Cube, NA).e No. of Ground Water Monitoring Locations

(.Multiple Entries Allowed)Nine ground water samples

F Details of Ground Water MonitoringCriteriaPollutants

Unit MaximumValue

MinimumValue

98PercentileValue

PrescribedStandard

Details of Ground Water Monitoring data is enclosed as Annexure - 3B inFinal EIA Report

- Criteria Pollutants: - (pH, TSS, TDS, Total Hardness, Chlorides, Fluoride,

Page 9: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Heavy Metals, other parameters specific to the sector)- Unit: - (mg/1, NA)

g. No. of Surface Water Monitoring Locations Eight surface water sampleh Details of Ground Water Monitoring (.Multiple Entries Allowed)

CriteriaPollutants

Unit MaximumValue

MinimumValue

98Percentile Value

PrescribedStandard

Details of Surface Water Monitoring is enclosed as Annexure - 3B inFinal EIA Report

- Parameter :- (pH, DO, BOD, COD, Others parameters specific to the sector)- Unit(mg/1, NA)I No. of Ambient Noise Monitoring Locations 10 Noise Monitoring LocationsJ Details of Noise Monitoring (.Multiple Entries Allowed)Parameter Unit Maximum

ValueMinimumValue

98PercentileValue

PrescribedStandard

Noise Monitoring details are given in Chapter – 3, Para – 3.3.3 of Final EIAReport.

Parameter:- (Leq(Day), Leq(Night))Unit :- (A-weighted decibels(dB(Ak. No. of Soil Monitoring Locations (Multiple

Entries Allowed)Ten Soil Monitoring Locations

Parameter Unit MaximumValue

MinimumValue

98 PercentileValue

Details of Soil Monitoring Locations is enclosed as Annexure – 3E in FinalEIA Report

- Parameter :-(pH, N(Nitrogen), P(Phosphorus), K(Potassium), Electric Conductivity)- Unit :- (Millisiemens per Centimeter, Milligram per Litre, Percent, Centimeter per

Second, Milliequivalents per 100 Gram, Milligram per Kilogram, Parts per Million,Kilogram per hectare, Others)l. Ground Water TableI Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m

bgl)):From 5To 10

ii Range of Water Table Post-Monsoon Season (Meters Below Ground Level (mbgl)):From 3To 5

iii Whether Ground Water Intersection will be there (Yes / No)?

No

If Yes(i ) Upload Copy of Central Ground WaterAuthority Letter (Upload pdf only)

-

(ii) Letter No. -(iii) Date of issue -

Page 10: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

15 Details of Water Requirement (During Operation) (Multiple Entries Alloweda Details

Source Quantity inKLD

Method ofwaterwithdrawal

Distancefrom Source

Mode ofTransport

Total fresh water requirement is estimated at 4800 m3/day and this will bemet from Seonath River

- Source: Surface / Ground Water / Sea /Others- Mode of Transportation: Pipeline Canal/others- Method of water withdrawal: Barrage / Weir / Intake well / Jackwell / Tube

well / Open well / Othersb Upload Copy of Permission from Competent Authority (Upload pdf only)c Letter No. :

Given in Chapter-2 , Enclosed asAnnexure-2D

rd Date of issue :e Permitted quantity :f Whether Desalination is proposed

(Yes/ No):

If Yes,(i) Desalination capacity (KLD) :(ii) Quality of Brine (KLD) :(iii) Mode of Disposal of brine :

16 Waste Water Management (During Operation)Type /Source

Quantity ofWaste WaterGenerated(Kilo Litre perDay)

TreatmentCapacity (KiloLitre per Day)

TreatmentMethod

Mode ofDisposal

Quantity ofTreatedWater Usedin Recycling/ Reuse(Kilo Litreper Day)

Quantity ofDischargedWate (KiloLitre perDay)

Wastewater generation treatment and disposal details are given in Chapter – 4,Para – 4.3.1.1 of Final EIA Report.

a Total Waste Water Generation Chapter – 4, Para – 4.3.1.1, of Final EIAReport.b Total Discharged Water

c Total Reused Water17 Solid Waste Generation Management (.Multiple Entries Allowed)

- Item:- (industrial waste, Municipal Solid waste, Fly ash, Bottom Ash, HazardousWaste (as per Hazardous and Other Waste Management Rules 2016), E Waste, Bio-Medical waste, Construction & Demolition waste, Plastic Waste, Others)

- Unit:- (Tons, Kiloliter)- Mode of Disposal:-(Treatment, Storage and Disposal Facility(TSDF), Authorized Re-

cyclers, Landfills, Sanitary Landfills, Others)

Item

Quantityper Annum

Unit Distancefrom Site

Mode ofTransport

Mode ofDisposal

Solid Waste Generation details are given in Chapter – 4, Para – 4.6.3of Final EIA Report.

18 Air Quality Impact Prediction (.Multiple Entries Allowed)CriteriaPollutant

Unit BaselineConcentr

MinimumValue

Incremental

TotalGLC

Prescribed

Page 11: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

s ation Concentration

Air Quality Impact Prediction details are given in Chapter – 4, Para – 4.1.10,of Final EIA Report.

- Parameter:- (PM10, PM, S02, NOX, Others parameters specific to the sector)- Unit :- (Microgram per Meter Cube, NA)

19 Power RequirementA Quantity (Kilo Volt Amps (KVA)) : Power Requirement details are given in

Chapter – 2, Para 2.6.4, of Final EIAReport.

B Source :C Upload Copy of Agreement (Upload

pdf'only):

7 D Standby Arrangement (Details of DGSets)

:

E Stack Height (in m) :20 Land Ownership Pattern (Prior to the project proposal) in Ha

A Forest land :B Private Land : Private land (Owned by NUVOCO)C Government Land :D Revenue Land :E Other Land :

Total land 91.8867 Ha21 Present Land Use breakup in Ha

a. Agriculture Area : -b Waste/Barren Area : -c. Grazing / Community Area : -d Surface Water bodies : -e. Settlements : -f. Industrial : -g Forest : -h Mangroves : -i. Marine area : -j- Others (Specify) : NUVOCO proposes new Unit – III and

power plant within the existing cementplant complex.

Total 91.8867 Ha22 Land requirement for various activities

(Multiple entries allowed) in Ha91.8867 Ha

Description of Activity /Facility / Plant / Others

Land requirement Remarks

Land requirement for various activities are given in Chapter – 2, Para – 2.6.2,of Final EIA Report.Green BeltTotal

- Activity / Facility / Plant / Others include: Main Plant, Township, Greenbelt, Ashpond Quarry area, OB dump Area, Safety zone, salination plant, Area for solidwaste manage, ailing pond, Landfill, Water reservoir, De- lent, Built-up area,others

23 Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild LifeSuedes: NPA- Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs- Eco

Page 12: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Sensitive Zones)a. Details of Ecological Sensitivity Not Applicable

Details ofEcological (km)

Name Distance fromthe Project (km)

Remarks

Details of Ecological Sensitivity: - (Critically Polluted Area, WLS, NPA, ESZs,Corridor ESAs, Wildlife Corridors)

B Whether NBWL recommendation is required (Yes/No)?If yes NAUpload NBWL recommendation in PDF

c. Details of Environmental SensitivityDetails of EnvironmentalSensitivity

Name Remarks

Details of Environmental Sensitivity:- (Forest, Archaeological Sites, DefenceInstallations, Others)

d. Whether NOC / Permission from the competent authority is required (Yes/No)?If yesUpload NOC / Permission from the competentauthority in PDF

24 Forest Land1 Whether any Forest Land involved (Yes/No)? : Not Applicable

If Yesa. Forests Clearance Status (In-Principle(Stage-I)

Approval Obtained / Final (Stage-II) ApprovalObtained / Forest Clearance UnderProcess(Stage-I) / Forest Clearance UnderProcess(Stage-II) / Application for ForestClearance yet to be Submitted)

:

If In-Principle (Stage-I) Approval Obtained, :(i) MoEFCC file number :(ii) Date of In Principle (Stage-I) approval :(iii) Area diverted :(iv) Upload FC Letter (Upload pdf only andattach it as Annexure-FC letter)

:

If Final (Stage-II) Approval Obtained, :(i) MoEFCC file number :(ii) Date of Final Approval :(iii) Date of In-Principle Approval :(iv) Area diverted :(v) Upload FC Letter (Upload pdf only andattach it as Annexure-FC letter)

:

If Forest Clearance under process (Stage-I), :(i) MoEFCC file number :(ii) Area applied :If Forest Clearance under process (Stage-II), :

Page 13: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

(i) MoEFCC file number :(ii) Area applied :

b. Legal Status of Forest Land (Reserved,Protected, Private, Village, Others)If Others,Please Specify Others

25 Tree Cutting, if anyA No. of Trees Cut for the Project (if Forestland

not involved)None

B Details of Tree Cutting and Planting of Trees(Upload pdf Only)

NA

26 Land Acquisition Statusa. Acquired Land Private land(which is owned by

NUVOCO)B Land yet to be acquired -c. Status of Land acquisition if not acquired -

27 Rehabilitation and Resettlement (R&R) No Rehabilitation &Resettlement is involved inthe proposed project.

a. No. of Villages Private land(which is owned byNUVOCO)zB No. of Households

c. No. of PDFs (Project Displaced Families)D No. of PAFs (Project Affected Families)e. Funds Allocated for R&Rf. Status of R&R (Completed / In-progress / Yet

to start)

28 Whether there is Presence of Schedule-I Species (Yes/No)? YesIf yes, No, Not Applicable

a. Details of Schedule-I Species :b. Whether conservation plan for Schedule-I

Species has been prepared (Yes/ No)?:

If Yes, :(i) Upload conservation plan (Upload onlyPDF)

:

(ii) Fund Provision made :(iii) Period of Implementation :

c. Whether conservation plan for Schedule-ISpecies has been approved by competentauthority (Yes/ No)?

:

(i) Upload copy of approval (Upload PDF Only) :(ii) Letter No. :(iii) Date of issue :(iv) Recommendations if any :

29 Whether there is Presence of Water Bodies in Core Area (Yes/No)? NoIf yes, Not Applicable

a. Details of Water Bodies in Core Areab. Whether there is Diversion required (Yes/No)?

Page 14: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

If yes,c. Details of diversion requiredd. Details of study conductede. Whether permission has been obtained from

competent authority (Yes/No)?(i) Upload copy of permission (Upload PDFOnly)(ii) Letter No.(iii) Date of issue(iv) Recommendations if any

30 Whether there is Presence of Water Bodies in Buffer Area (Yes/No)?If Yes Yes

a. Details of Water Bodies in Buffer Area Seonath RiverJamunyaKhorsi Nala

b. Direction of Water Bodies in Buffer Area(North / South / East / West / North East /North West / South East / South West)

NNWSSE

c. Distance of Water Bodies in Buffer Area (kilometers)

2.1 km3.8 km3.3 km

31 Manpower Requirementa. Permanent employment during construction ---b Permanent employment during operation ---c. Temporary employment during construction ---d Temporary employment during operation ---e. No. of working days ---f. Total manpower Existing Man power : 450

Additional Man power : 5032 Green Belt in Ha

a. In case of new projects NAi. Total Area of Green Belt NAii. Percentage of Total Project Area NAiii No. of Plants to be Planted NAiv Funds Allocated for Plantation NAV Upload Green Belt Plan (Upload PDF Only) NAb. Incase of expansion / modernization /

change inproductmixetc.

i. Description Existing Proposed TotalTotal Area of GreenBelt Details of Green belt are Given in Chapter – 4 Para –

4.4.2, of Final EIA ReportPercentage of TotalProject AreaNo. of PlantsFunds Allocated

ii. Upload Green Belt Plan (Upload PDF Only)

Page 15: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

33 Project Benefit (Multiple entry allowed)Type of Project Benefits Details of Project BenefitDetails of Project Benefits are Given in Chapter – 8 Para – 8.1 & 8.2 of FinalEIA Report

(Project benefits shall include environmental, social and others)34 Whether the Project / Activity attracts the provisions of CRZ (Yes/No)?

If yes, Not Applicable1 Project Details

a. CRZ Classification: (CRZ I (A), CRZ 1(B),CRZ II, CRZ III, CRZ IV (A),CRZ IV(B))

b. Location type: (Non-Eroding Coast, Lowand Medium Eroding Coast, High ErodingCoast)

c. Details of Mangroves Land Involved, if Anyd. Area of Mangroves Land (hectare)e. EIA (Terrestrial) Studies: (Carried Out, Not

Carried Out)If Carried Out,1) Summary Details of EIA (Terrestrial)

Studies2) Upload Recommendation made in

EIAs (Upload pdf only)3) Period of Study from (EIA Terrestrial)4) Period of Study to (EIA Terrestrial)If Not Carried out

Give Reasonf. EIA (Marine) Studies: (Carried Out, Not

Carried Out)If carried out1) Summary Details of EIA (Marine)

Studies2) Upload Recommendation made in

EIAs3) Period of Study from (EIA Marine)4) Period of Study to (EIA Marine)If Not Carried out,Give Reason

g Disaster Management Plan/National OilSpill Disaster Contingency Plan (ifApplicable)

2 Description of the Project UnderConsideration

Not Applicable

a. Type of Project: (Resort/Buildings/civicamenities, Coastal Roads/Roads on Stilt,Pipelines from Thermal power Blow Down,Marine Disposal of Ireated Effluent,Facility for Storage of Goods/Chemicals,Offshore structures, Desalination Plant,

Page 16: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Mining of Rare Earth/Atomic Minerals,Sewage Treatment Plants, Lighthouse,Wind Mills, Others)If Resort/Buildings/civic amenities,1) Agency Name for Preparing CRZ

Maps2) Total Area/Built-up Area (hectare)3) Height of Structure4) FSI Ratio5) The governing Town Planning

Rules/Regulations6) Details of Provision of Car Parking

AreaIf Coastal Roads/Roads on stilt,i) Agency Name for Preparing CRZ

Maps2) Area of Land Reclamation3) Estimated Quantity of Muck/Earth

for Reclamation4) Carrying Capacity of TrafficIf Pipelines from Thermal Power BlowDown,1) Agency Name for Preparing CRZ

Maps2) Length of Pipeline3) Length Traversing CRZ Area4) Depth of Excavation5) Width of Excavation6) Length of Pipeline from Seashore to

Deep Sea7) Depth of Outfall Point from Surface

of Sea Water8) Temperature of effluent above

Ambient at Disposal PointIf Marine Disposal of Treated Effluent,1) Agency Name for Preparing CRZ

Maps2) Location of Intake/Outfall3) Depth of Outfall Point4) Length of Pipeline5) Length Traversing CRZ Area6) Depth of Excavation7) Width of Excavation8) Length of Pipeline from Seashore to

Deep Sea/Creek9) Depth of Outfall Point from Surface

of Sea Water10) Depth of Water at Disposal Point

Page 17: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

11) Type of DisposalIf Facility for Storage ofGoods/Chemicals,1) Agency Name for Preparing CRZ

Maps2) Name and Type of Chemical3) End use of the Chemical4) No. of Tanks for Storage5) Capacity of tanksIf offshore structures,i) Agency Name for Preparing CRZ

Maps2) Exploration or Development3) Depth of Sea Bed4) No. of Rigs/Platform5) Details of Group Gathering StationsIf Desalination Plant,i) Agency Name for Preparing CRZ

Maps2) Capacity of Desalination3) Total Brine Generation4) Temperature of Effluent above

Ambient at Disposal Point5) Ambient Salinity6) Disposal PointIf Mining of Rare Earth/Atomic Minerals,1) Agency Name for Preparing CRZ

Maps2) Capacity of Mining3) Volume/Area to be mined4) Type of Mineral to be Extracted5) End use of the MineralIf Sewage Treatment Plants,1) Agency Name for Preparing CRZ

Maps2) Capacity3) Total Area of Construction4) Compliance of effluent parameters as

laid down by CPCB/SPCB/otherauthorized agency

5) Whether discharge is in seawater/creek? If yes,Distance of Marine Outfall Pointfrom Shore/from the tidal river bankDepth of Outfall Point from SeaWater SurfaceDepth of Sea at Outfall Point

If Lighthouse,

Page 18: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

1) Agency Name for Preparing CRZMaps

2) Total Area of Construction3) Height of the StructureIf Wind Mills,1) Agency Name for Preparing CRZ

Maps2) Capacity (MW)3) Transmission Lines: (Overhead,

Underground)4) Diameter of Windmill5) Length of Blade6) Speed of Rotation7) Height of the StructureIf Others,1) Agency Name for Preparing CRZ

Maps2) Please Specify with salient features3) Upload relevant Document (Upload

pdf only)3. Distance of Project (In Meters) from LTL/HTL to be Stateda. Clause of CRZ Notification Under which

the Project is a Permissible/RegulatedActivity

Not Applicable

b. Whether CRZ Map Indicating HTL, LTLDemarcation in 1:4000 Scales Prepared?(Yes/No)

If Yes,1) Distance of Project (in meters) from

HTL to be Stated2) Upload Maps(£m/ File)3) Distance of Project(in meters) from

LTL to be Stated4) Upload Maps (kml File)

c. Whether Project Layout Superimposed onCRZ Map 1:4000 Scales?: (Yes/No)

If Yes,1) Upload Maps (kml File)

d. Whether CRZ Map 1:25000 Covering 7 kmRadius Around Project Site Prepared?(Yes/No)

If Yes,1) Upload Maps (kml File)

Page 19: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

e. Whether CRZ Map Indicating CRZ-I,II,IIIand IV Including Other Notified ESAsPrepared?: (Yes/No)

If Yes,1) Upload Copy of NOC (Upload pdf

only)g- Details of Rain Water Harvesting System4. Recommendation of State Coastal Zone

Management AuthorityNot Applicable

a. Jpload Copy of CZMA (Upload pdf'Only)b. State the Conditions Imposed

c. Social and Environmental Issues andMitigations Measures Suggested includingbut not Limited to R&R, Water, Air,Hazardous Wastes, Ecological aspects, etc.(Brief Details to be Provided)

35 Sector Specific DetailsI Whether the proposal is mining of minerals (coal / non-coal) project

(Yes/No)?If yes, Not Applicable1 No. of Mineral to be Mined (Multiple Entries

Allowed)Minerals To be Mined Major or Minor Mineral

2 Mine Capacity in ROM (Run of Mine)3 Upload 500 meters Cluster Certificate from

State Mines and Geology in case of minorminerals (Upload pdf Only)

4 Mining Plana. Approval Letter No.b. Date of Approvalc. Upload Approved Letter (Upload pdf only)d. Approved by State Mines & Geology

Department / Indian Bureau of Mines /Ministry of Coal / Ministry of Mines /State Government / Atomic MineralDirectorate / Others)

e. If Others,Please specify

f. Approved Mining Lease Areag- Approved Capacity

5 Technical Detailsa. Total Geological Reserves (Million Ton)b. Mineable Reserves (Million Ton)c. Extractable Reserves (Million Ton)d. Percent of Extraction (%)

Page 20: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

e. Grade of Coal /Ore /Mineralf. Stripping Ratiog- Category of Gaseousness (Only for Coal

Mining, Others may write Not applicable)h. Average Gradient(Degree)i. Maximum Thickness of Seams(meters)

(Only for Coal Mining, Others may writeNot applicable)

j- Mining Method (Opencast / Underground/ Mixed (Opencast + Underground) / Adit

k. Life of Mine (Years)6 Details of beneficiation (including crushing

/ screening/others)a. Whether it is proposed to install crusher

within the mining lease area (Yes/No)?If yes,

b. No. of crushersc. Details of crusher (Multiple entries

allowed)

Crusher ID Capacity (inTPH)

Remarks

d. Whether it is proposed to installbeneficiation plant / Coal washery withinthe mining lease area (Yes/No)?If yes,

e. Beneficiation / washing Technologyf. Capacity

8 Details of Mining Leasea. Details of Mining Leaseb. Upload Letter of Intent (Upload pdf only)c. Date of Execution of Mining Lease with

Reference Numberd. Validity of Mining Leasee. Upload Copy of Executed Lease deed

valid as on Date (Upload pdf only)f. Earlier Renewals (Multiple Entries

Allowed)

Uploaded Copy of EarlierLease

Date of Renewal

9 OB (Over Burden) Management (Only if Mining Method: Opencast)a. Details of External Dumps Not Applicable

i) No. of OB Dumpsii) Total Area (in Hectare)iii) Height (in meter)

Page 21: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

iv) Quantity (in Million Cubic meter)v) No. of year back fill up

b. Details of Internal Dumpi) No. of Internal Dumpsii) Total Area (in Hectare)iii) Height (in meter)iv) Quantity (in Million Cubic meter)

10 Details of Topsoil Managementa. Quantity of Topsoil excavated during the

entire life of the mine (in Million Cubicmeter)

Not Applicable

b. Quantity of Topsoil proposed forutilization for reclamation during theentire life of the mine (in Million Cubicmeter)

c. Quantity of Topsoil proposed forutilization for other activities during theentire life of the mine (in Million Cubicmeter)

11 Detail of Final Mine Void (Only if MiningMethod: Opencast)a. Area (in Hectare)b. Depth (in meter)c. Volume (in Million Cubic meter)

12 Details of Quarry (Only if Mining Method:Opencast)a. Final Void of (hectare)b. At a Depth of (meter which is proposed to

be converted into a Water Body.)c. Total Quarry Area (ha)

13 Details of Transportationa. In Pit/Underground to Surfaceb. Surface to Siding/Loadingc. Transportation / Conveyor Details

14 Details of Land Usage (Pre-Mining)

Land Use Within MLArea (Hectare)

Outside MLArea (Hectare)

Total

Agriculture LandForest LandWaste LandGrazing LandSurface Water BodiesSettlementsOthers(Specify)

15 Details of Transportation Not Applicable

a. In Pit/Underground to Surface

Page 22: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

b. Surface to Siding/Loading Not Applicablec. Transportation / Conveyor Details

16 Details of Land Usage (Pre-Mining)

Land Use Within MLArea(Hectare)

Outside MLArea(Hectare)

Total

Agriculture LandForest LandWaste LandGrazing LandSurface Water BodiesSettlementsOthers(Specify)

17 Details of Land Usage (Post-Mining) Not Applicable

Land Use Plantation Water Body Public Use

Excavation / quarryTop Soil StorageExternal OB dumpsInternal OB dumpsRoadsBuilt Up Area (Colony/Office)Green BeltVirgin AreaOtherTotal

18 Details of Reclamation ( ONLY IF Mining Method Opencast) TotalAfforestation Plan shal be Implemented Covering of Mining .This Willinclude:a. External OB Dump (in hectare) Not Applicableb. Internal Dump (in hectare)c. Quarry (in hectare)d. Safety Zone (in hectare)e. Final Void of (hectare)f. At a Depth of (meter which is proposed to

be converted into a Water Body.)g- Density of Tree Plantation per ha (in no.)h. Others in ha (such as Excavation Area

along ML Boundary, along Roads andInfrastructure, Embankment Area and inTownship Located outside the Lease etc.)

i. Total afforestation plant (in hectare)19 Status of Progressive Mining Closure Plan (For Expansion Projects only)

a. Implementation of Various Activities asper Approved Progressive Mine ClosurePlan (in Bar Chart) (pdf) (Upload pdf only)

Not Applicable

b. Any Deviation from the Approved

Page 23: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Progressive Mine Closure Planc. Total Area Excavated (in hectare)d. Total Area Backfilled after Excavation (in

hectare)e. Total Area Reclaimed (in hectare)

20 Actual Coal/Ore Production vis-a-vissanctioned capacity Since inception(Multiple Entries Allowed)

FinancialYear

SanctionedCapacity asper EC(MTPA)

Sanctionedcapacity asper CTO

Sanctionedcapacity asper approvedMining Plan

ActualProduction

II Whether proposal is for Thermal Project (including captive power plant andWaste Heat Recovery Plant) (Yes/No)?

If yes, YesThe details of Captive Powerplant is given in Chapter - 2 ofPara 2.7.2.

1 Specifications of the Planta. Technology proposed (Supercritical, Sub-

Critical, CFBC, AFBC, PFBC, IGCC,Incineration, Pyrolysis, Gasification, Bio-methanation, Others)

b. Plant Load Factor (%)c. Station Heat Rate (Kcal/Kwh)d. Steam Rate/Flow Ratee. Boiler Temperaturef. Boiler Pressureg- Type of Stack (Single flue / Bi-flue / Tri-

Flue)h. No. of Stacks

Stack ID Stackheight(m)

StackDiameter atexit (m)

Exit velocityof stack gas(m/s)

Exit temperature ofstack gas (°C)

2 Details of fuel linkage (please specify ifmultiple linkages are involved)

Details are given in Chapter – 2of Annexure – 2A.

a. Type of linkage (Linkage / Fuel SupplyAgreement / e-auction / MoU / LOA /Captive / Open market / Others)

b. Quantity of linkage grantedc. Date of Linkaged. Duration of linkage

3. Details of Transportation of fuel Details are given in Chapter – 2of Para 2.6.

Details / Mode Details / Mode Details / ModeRailRoad

Page 24: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

PipelineConveyorOther mode (Please specify)

4 Details of Fuel Characteristics Details are given in Chapter – 2Annexure – 2B.a. Gross Calorific Value (Kcal/Kg)

b. Ash content (%)c. Sulphur Content (%)d. Moisture (%)e. Mercury (mg/kg)f. Fixed Carbon (%)

5. Details of Cooling system The details are given in Chapter- 2 of Para 2.7.a. Type of cooling system: Air cooled/Water

cooledb. Type of draft: Natural draft/Forced draftc. Type of air circulation: Parallel flow/

Counter flowd. Cycles of Cooling (COC):e. Water requirement for cooling (m3/day):f. Boiler blow down temperature:

III Whether proposal is for River Valley &Hydroelectric Project (Yes/No)?

Not Applicable

If Yes,1 Sub Sector: (Multipurpose Project /

Hydroelectric Project / Irrigation project)2 Name of the River3 Whether Cumulative Impact Assessment and

Carrying Capacity Study of River BasinCarried Out? (Yes/No)If Yesa. Status of Cumulative Impact Assessment

and Carrying Capacity Study of RiverBasin: (Recommended / NotRecommended,)If Recommended

b. Details of Cumulative Impact Assessmentand Carrying Capacity Study of RiverBasin

c. Upload Relevant Document (Upload pdfonly)

4 Type of Project: (Construction of Dam Barrage/ Run of the River / Lift Irrigation Scheme)

5 Dam Height (meter) if applicable6 Dam Length (meter) if applicable7 Total Submergence Area (hectare)8 Details of Gross Command Area (GCA)

(hectare)9 Details of Irrigable Command Area (IC A)

(hectare)

Page 25: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

10 Details of Culturable Command Area (CCA)(hectare)

11 Total Command Area (hectare)12 Powerhouse Installed Capacity

a. Type of Powerhouse: (Underground /Surface)

b. Capacity (megawatts)c. No. of Tunnelsd. No. of Unitse. Bank of River: (Left /Right / Both)

13 Generation of Electricity Annuallya. Quantity of Generation of Electricity

Annually (in Giga Watt Hours (GWh))b. Water availability at various percentages

Percentage

Wateravailability(Cusecs)

Dependableyear

Remarks

At 50%At 75%At 90%

c. Machine Availability (%)d. Cost of Electricity Generation (in INR)e. Internal Rate of Return (%)f. Year of achievement of Internal Rate of

Return14 Catchment Area Treatment Plan (Upload PDF)15 Muck Management Plan

a. Upload Muck Management Plan in PDFb. Total Excavation Muck (Cubic Meter)c. Utilized for Construction (Cubic Meter)d. No. of Muck Disposal sitese. Total Muck Disposal Area (Ha)

16 Fishery Development and Management Plana. Upload Fishery Development and

Management Plan in PDFb. No. of Fingerlingsc. No. of Fish Speciesd. Name of the umbrella Fish Species

(Scientific Name)17 Status of Environmental Flow

Season Average Inflow(in MillionCubic Meter)

Percentof Flow

LeanNon-LeanMonsoon

Page 26: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

Non-Monsoon

18 Free Flow Stretch (km)19 Approval of Central Water Commission

a. Approval Reference No.b. Date of Approvalc. Upload Copy of Approval (Upload pdf

only)20 Approval of Central Electricity Authority

a. Approval Reference No.b. Date of Approvalc. Upload Copy of Approval (Upload pdf

only)21 Details of Coffer Dam (upstream) if applicable

a. Quantity of the material (m3)b. Length of the dam (m)c. Quantity of muck to be used (m3)d. Quantity of borrow material to be used

(m3)e. Decommissioning plan (upload in PDF)

22 Details of Coffer Dam (downstream) ifapplicablea. Quantity of the material (m3)b. Length of the dam (m)c. Quantity of muck to be used (m3)d. Quantity of borrow material to be used

(m3)e. Decommissioning plan (upload in PDF)

IV Whether the proposal is Infrastructure projects (Yes/No)If yes? Not Applicable1 Details of Building Construction

a. Maximum Height of the Building (Meters)b. Total No. of Flats to be Buildc. No. of Buildingsd. Total plot area (sqm)e. Total built up area (sqm)

2 Fores Not Applicablea. Whether Project Involves Foreshore

Activities and/or marine Disposal(Yes/No)?If Yes,

b. Upload Shoreline Study (Upload pdf only)c. Type of Cargod. Quantity of Cargoe. Control Measures of Cargof. Dust Control Measuresg- Quantumh. Quantity of Dredging (Cubic meter per

Page 27: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

day)i. Type of Dredging (Capital, Maintenance)j- Disposal of Dredge Materialk. Details of Outfall Diffusersm. No. of Dilution Expectedn. Distance at which the outlet will Reach

Ambient Parameterso Details of Monitoring at outfallp Copy of NoC from PCB in case of Marine

Disposal (Upload pdf only)3 Rain Water Harvesting Not Applicable

a. No. of Storageb. Capacityc. No. of Recharge Pitsd. Capacity

4 Parking Not Applicablea. Details of 4-Wheeler/ 2-Wheeler Parking

5 Energy Saving Measures Not Applicablea. Source/Modeb. Percentagec. Quantity

6. Other Details Not Applicablea. Details of impact on Water Bodies and

Drainage patters of catchment area, ifany

b. Details of Traffic Density ImpactAssessment and Modelling Study (Uploadpdf Only)

c. In case of Underground Tunnel projectsbelow the Forest Land - SubsidenceImpact Study report {Upload pdf Only)

7. Type of Industries to be established with Industrial Estate as per theircategory A/B

SI.No Type of Industry No. of Units Category A/B

8. Length of the alignment in case of highway projects9. Details Bridges/ROB/Interchanges,

Flyovers, Vehicle Underpass and trianUnderpass (in case of Highway Projects)

Not Applicable

a. Total No. of Bridgesb. Total No. of ROBc. Total No. of Interchangesd. Total No. of Flyoverse. Total No. of Vehicle Undeipassf. Total No of Pedestrian Underpassg- Details of other utilities rail and road

corridors36 Details of Court Cases if any

Page 28: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

a. Whether there is any Court Cases pendingagainst the project and/or land in which theproject is proposed to be set up (Yes/No)?

Not Applicable

If Yes,b. Name of the Court (Districts Court / High

Court / NGT / Tribunals / Supreme Court ofIndia)If name of Court: (Districts Court, High Court,NGT, Tribunals)

c. Name of the Sub-courtd. Case No.e. Orders / Directions of the court, if any and

its relevance with the proposed j)rojectf. Case DetailsG Upload Court Order if any (Upload pdf Only)

37 Details of direction issued under Environment (Protection) Act / Air(Prevention & Control of Pollution)) Act / Water (Prevention & Control ofPollution) Acta. Whether any direction issued under

Environment (Protection) Act / Air (Prevention& Control of Pollution)) Act / Water(Prevention & Control of Pollution) Act(Yes/No)?

Not Applicable

If yes,b. Details of directions issued under

Environment (Protection) Act / Air (Prevention& Control of Pollution)) Act / Water(Prevention & Control of Pollution) Act

Not Applicable

c. Upload copy of directions issued underEnvironment (Protection) Act / Air (Prevention& Control of Pollution)) Act / Water(Prevention & Control of Pollution) Act

Not Applicable

d. Compliance status of the directions Not Applicable38 Details of EIA Consultant

a. Have you hired Consultant for preparingdocument (Yes/No)?

Yes

If No,(i) Reason for not engaging the Consultant NAIf Yes,(i) Accreditation No. NABET/EIA/1619/SA 064(ii) Name of the EIA Consultant B.S. ENVI-TECH PVT. LTD(iii) Address 12-13-1270/71/73, Amity Ville,

4th Floor, Beside Spencer SuperMarket, St. Ann’s Road,Tarnaka, Secunderabad-500017

(iv) Mobile No. +91 9848053012(v) Landline No. 040-49783062.(vi) E-mail Id [email protected]

Page 29: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

(vii) Category of Accreditation (Eligible forCategory A / Eligible for Category B)

A

(viii) Sector of Accreditation 12(ix) Validity of Accreditation June 22 2018(x) Upload Certificate of Accreditation certifiedby QCI/NABET (Upload pdf Only)

Enclosed as Annexure -12A inFinal EIA Report

39 Documents to be attachedI If Project Type is New / Expansion / Modernization / one-time capacity

expansion for coal mining:a. Upload Copy of EIA/EMP Report

NA-

b. Upload Copy of Risk Assessment Reportc. Upload Copy of Feasibility Report/ Detailed

Project Report(DPR) /Detailed EngineeringReport /Detailed Conceptual Plan / ApprovedMining Plan (in case of Mining proposals)(Upload pdf only)

d. Upload Copy of Final Layout Plan (Upload pdfonly)

e. Upload Cover Letter (Upload pdf only andattach it as Annexure-document of Cover letter)

f. Upload a copy of documents in support of thecompetence/authority of the person makingthis application to make application on behalfof the User Agency (Upload pdf only andattach it as Annexure-authorization)

g- Upload copy of District Survey Report (formining of minor minerals only)Upload copy of Replenishment Study Report& Baseline Survey data (for river sand miningproposals only)

h Upload Additional File, if any (Upload pdfonly)

II If Project Type is other than New / Expansion / Modernization / one-timecapacity expansion for coal mining: -a. Upload Copy of Feasibility Report / Detailed

Project Report(DPR) /Detailed EngineeringReport /Detailed Conceptual Plan (Upload pdfonly)

Feasibility Report was uploadedon MoEFCC website.

b. Upload Copy of Final Layout Plan (Upload pdfonly)

Enclosed as Chapter – 2, Fig –2.7 in Final EIA Report

c. Upload Cover Letter (Upload pdf only andattach it as Annexure-document of Cover letter)

Cover Letter is attached

d. Upload a copy of documents in support of thecompetence/authority of the person makingthis application to make application on behalfof the User Agency (Upload pdf only andattach it as Annexure-authorization)

Uploaded

e. Upload Additional File, if any (Upload pdfonly)

Uploaded

Page 30: NUVOCO VISTAS CORPORATION LTD.environmentclearance.nic.in/writereaddata/online/... · a Name of the applicant : Mr. Ramesh Warke b Designation (Owner/Partner/CEO) : Sr Vice President

f. Upload Updated Forml (Upload pdf only)40 Undertaking

a. I hereby give undertaking that the data and information given in theapplication and enclosures are true to be best of my knowledge and belief andI am aware that if any part of the data and information found to be false ormisleading at any stage, the project will be rejected and clearance given, if anyto the project will be revoked at our risk and cost. In addition to above, Ihereby give undertaking that no activity / construction / expansion has sincebeen taken up.

b.

Name Ramesh Warkec. Designation Senior Vice Presidentd. Company NUVOCO VISTAS CORPORATION LTDe. Address Sonadih Cement Plant

Post – Raseda, Tehsil - Balodabazar