nys dot trolley blvd bridge inspection, 11-17-2014
TRANSCRIPT
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
1/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Bridge Ratings
Inspection Date: 11/17/2014
Inspection Agency: 13 - Consultant Type of Inspection: 1 - BIENNIAL
GTMS: 302 -- Steel - Stringer/Multi-Beam or Girder
POSTINGS: See Gen Rec Page 1 for Postings at time of inspection.Further Investigation Needed: No
State Highway Number: 67-9 Milepoint: 1.05 AADT/Yr: 48935 / 2012
Orientation: 1 - North Political Unit: 0316 - Town of GATES Year Built: 1971
Total Spans: 4 Ramp Bridge Attached To Span: NA BIN: NA
General Recommendation: 3 Computed Condition Rating: 3.578
Abutment Ratings: Beg Abut End Abut
Joint with Deck 8 8Bearings, Bolts, Pads 3 4Seats and Pedestals 6 4
Backwall 3 5Stem (Breastwall) 8 8Erosion or Scour 5 4Footings 9 9Piles 8 8Recommendation 4 4
Wingwall Ratings: Beg Abut End AbutWalls 5 5Footings 9 9Erosion or Scour 5 4Piles 8 8
Channel Ratings: Channel
Stream Alignment 8Erosion and Scour 8Waterway Opening 8Bank Protection 8
Approach Ratings: Approaches
Drainage 5Embankment 6
Settlement 5Erosion 5Pavement 4Guide Railing 3
Number of Flags Issued:
RED: 1 Yellow: 3 Safety: 2
Vulnerability Reviews Recommended: 1=Yes, 2=No, 3=NA, X=NotActive
Hydraulic: 3 Overload: X Steel: 2
Collision: 2 Concrete: X Seismic: X
Inspector's Signature: CheckValue: 1,829,015,406 Date: 11/17/2014
Leo M. Campagna,PE () (Inspector ID:4110041)
Signed copy of this inspection report is available
in the appropriate NYSDOT Regional Office
Reviewed By: Date: 12/11/2014
Michael J. Peters,PE () (QC ID:4110051)
Signed copy of this inspection report is availablein the appropriate NYSDOT Regional Office
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
2/85
RC: 43 BIN: 1062542
Span Ratings
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Deck Element Ratings: 001 002 003 004 Wearing Surface 5 5 5 5
Curbs 4 4 5 4Sidewalks, Fascias 4 4 4 4Railings, Parapets 5 5 5 5Scuppers 8 8 8 8Gratings 8 8 8 8Median 8 8 8 8Mono Deck Surface 8 8 8 8
Superstructure Ratings: 001 002 003 004
Structural Deck 4 3 3 4Primary Members 4 4 4 4Secondary Members 5 5 5 5Paint 3 3 3 3Joints 2 2 2 8Recommendation 4 3 3 4
Pier Ratings: 001 002 003 004 Bearings, Bolts, Pads 3 3 3 8Pedestals 3 3 3 8Top of Cap or Beam 5 4 4 8Stem Solid Pier 8 8 8 8Cap Beam 3 4 3 8Pier Columns 4 4 3 8Footings 9 9 9 8Erosion or Scour 6 6 6 8Piles 8 8 8 8Recommendation 3 4 3 8
Utility Ratings: 001 002 003 004
Lighting 8 4 8 8Sign Structure 3 8 8 8Utilities and Support 8 8 8 8
Field Notes:Field Date Arrival Departure Temp (C) Temp (F) Weather Conditions10/21/2014 2:00:00 PM 5:00:00 PM 55 light rain10/24/2014 12:30:00 PM 4:30:00 PM 53 mostly sunny11/13/2014 8:00:00 AM 12:00:00 PM 42 cloudy11/17/2014 8:30:00 AM 10:30:00 AM 35 snow
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
3/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K1410625420030
General Note for Bridge Referenced Photos:
2014 - All S.E. items were given 100% hands on inspection and no defects were detectedexcept as spelled out in report. (1) Category E welds at ends of partial length cover plates; (2) >25% section loss to fascia girder webs at Pier support. (L. M. Campagna PE # 044297)
Note ID: 4K1410625420005
Beg Abut -- Abutment: Bearings, Bolts, Pads -- Rated 3, Was 3
Referenced Photos: "1", "2" 2014 - Begin: Construction is steel sliding plate type with bronze sheet. All bearings are heavily
rusted and appear frozen in contracted position. G-7 bearing is most contracted to about 1/2"past edge of masonry plate. (Photo 2) The G-5 & G-6 bearings have their left anchor boltsheared. (Photo 1) The other bearings are only in slightly better condition. All bearings warrant a3 Rating.
Note ID: 4K1410625420009
Beg Abut -- Abutment: Backwall -- Rated 3, Was 3 Referenced Photos: "5" 2014 - Begin: Backwall is spalled about 16' wide by 3' high by 4" deep with exposed rebar
between G-2 and G-4. (Photo 5) Upper part in this area is sheared off about 6" deep. Othersmaller spalls were noted near right side. Balance is mostly intact. A 3 Rating is warranted.
Note ID: 4K141062542000A
Approaches: Drainage -- Rated 5, Was 4
Referenced Photos: "8" 2014 - (Photo 8) Broken up begin right curb around radius near bridge is now rated with curbs per
new manual. No other significant drainage problem was noted so Rating is raised to 5 in allquadrants.
Note ID: 4K1410625420028
Approaches: Pavement -- Rated 4, Was 5 Referenced Photos: "9", "10", "50"
2014 - Asphalt concrete pavement at begin and end of bridge has alligator cracking progressingto breaking up of pavement. (Full width x 2' long) Scattered small potholes were noted in theselocations. In addition a few spots near right side at end has mud pumping out of pavement. Therewas also moderate alligator cracking along lane line on begin & end approach. A high 4 iswarranted.
Note ID: 4K1410625420000
Approaches: Guide Railing -- Rated 3, Was 3
Referenced Photos: "8", "11", "12", "13", "14", "15", "45", "46" 2014 - Approach rail has significant damage or deterioration at all 4 quadrants. Safety Flag
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
4/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K1410625420000 - continued
4K140050 is included for condition. (Supersedes SF 4B130120) Construction is galvanized box beam on weak posts with transition to 2 tube bridge rail.
Approach box beam rail is damaged or deteriorated at the following locations:(1) Begin Right: Posts 1 through 4 from bridge rail transition are bent over & detached from boxbeam. Box beam is kinked in this area with rust holes near rail splice. (Photos 8 & 45)
(2) Begin Left: Most of rail run is affected by impact damage. Box beam is torn near bridge. Post5 from bridge is bent & disconnected from box beam. Posts 23 through 26 & post 32 are bent &disconnected from box beam leaving about 30' of rail unsupported. (Photos 11, 12 & 13)
(3) End Right: Box beam adjacent to bridge is heavily rusted with holes in bottom for 10' to 15'length. There are also rust holes in vertical faces at rail splices. (Photos 14 & 15)
(4) End Left: Box beam adjacent to bridge is heavily rusted with holes in bottom for about 4'length. Box beam terminus section also has bottom rust hole about 1' length.(Photo 46)
Note ID: 4K141062542000B
Span 001 -- Deck Elements: Curbs -- Rated 4, Was 4 Span 002 -- Deck Elements: Curbs -- Rated 4, Was 4 Referenced Photos: "8", "16" 2014 - Right side curb is pushed out up to 3" over Pier 1 jont at end Span 1 & begin Span 2.
(Photo 16) Curb on begin approach is also now rated here per new manual. Curb is settled andshifted at radius near bridge. (Photo 8) A 4 Rating is warranted for right curb. Left side curbwould Rate 5.
Note ID: 4K141062542000D
Span 001 -- Deck Elements: Sidewalks, Fascias -- Rated 4, Was 4 Referenced Photos: "47" 2014 - Span 1: Vertical face of left fascia is spalled 2 to 3 inches deep over about 10% of span
length. Top of fascia & sidewalk is spalled within 2' of pier joints 1 & 3. Right fascia is crackedwith efflorescence along its length. There is a 2' long by 6" high spall at Pier 1 joint. (Photo 47)Pier joint is compromised by spall. Left & right fascia both warrant a 4 Rating.
Note ID: 4K1410625420010
Span 001 -- Superstructure: Structural Deck -- Rated 4, Was 4 Span 004 -- Superstructure: Structural Deck -- Rated 4, Was 4
Referenced Photos: "21" 2014 - Spans 1 & 4: Underside of deck has dampness, leakage staining, mapcracking withefflorescence, and a scattered areas of delamination. A 4 Rating is warranted for both spans.
(See Deck Sketch)
Note ID: 4K141062542001D
Span 001 -- Superstructure: Primary Members -- Rated 4, Was 4 Span 002 -- Superstructure: Primary Members -- Rated 4, Was 4
Span 003 -- Superstructure: Primary Members -- Rated 4, Was 4 Referenced Photos: "60", "61", "62", "22", "27", "23", "24", "25", "26" 2014 - The following girder ends are heavily rusted with section loss. Temporary repairs
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
5/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K141062542001D - continued
consisting of 3" by 5" steel tubes are welded in place between the flanges on both sides of theweb: (See separate tab for flag 4K140051 details)
(1) Pier 1, span 1, girder 1 has section loss over the height of the web and is bowed slightly tothe left. The temporary repairs are tight to the flanges. (Photo 60)
(2) Pier 1, span 1, girder 7 has section loss over the height of the web. The temporary repairs aretight to the flanges.(Photo 61)
(3) Pier 1, span 2, girder 1 has section loss over the height of the web. The temporary repairs aretight to the flanges. (Photo 60)
(4) Pier 1, span 2, girder 7 has section loss over the height of the web. The temporary repairs aretight to the flanges.(Photo 61)
(5) Pier 2, span 2, girder 1 has section loss over the height of the web and is slightly buckled.The temporary repairs are tight to the flanges. (Photo 27)
(6) Pier 2, span 3, girder 7 has section loss over the height of the web and is slightly buckled.The temporary repairs are tight to the flanges. (Photo 22)
(7) Pier 3, span 3, girder 7 has section loss over the height of the web and is slightly buckled.The temporary repairs are tight to the flanges. (Photo 23)No D-Meters possible due to location of temporary supports.
Balance of girders have areas of rusting with some pitting on bottom flange and lower web butare otherwise in fair condition.
Deck supporting diaphragms at piers are also rated here. Heavy joint leakage has resulted inrust, delamination and section loss on diaphragms adjacent to joints. Worst locations are at Pier3 in Bay 1 (Photo 25) & Bay 6 (Photo 26) where very heavy rusting, delamination & section losswas noted. Pier 2 in Bay 1 also had fairly heavy botttom flange & lower web section loss.Diaphragm at Pier 3 in Bay 6 rises to level of a Yellow Flag due to large hole at connection to G-
7. (See Separate tab for YF4K140037 details) Interior diaphragms over pier in somewhat bettercondition.
Note ID: 4K141062542002F
Span 001 -- Superstructure: Primary Members -- Rated 4, Was 4 Span 003 -- Superstructure: Primary Members -- Rated 4, Was 4 Referenced Photos: "60", "61", "62", "22", "23", "24", "25", "26", "27" 2014 - YF4K140037 (Supersedes 4B130124) TP 350 Item 28 Primary Span 3 (Rated 4) Deck supporting diaphragm at end span 3 in Bay 6 is rusted out full height of web at right side.
This amounts to 100% web loss adjacent to connection plate. There is also heavy flange loss at
midpoint of diaphragm. Control for flag is 100% web loss. Bridge is oriented north. YF4K140051 (Supersedes 4B130122) TP 350 Item 28 Primary Rated 4 Seven rusted girder ends are red structural flag conditions due to heavy section loss &
deformation on web over supports. (No D-Meters possible due to location of temporary supports)Each of these locations has two 3"x 5" box beams welded in place as temporary repairs: (Alltemporary supports appeared intact)(1) G-1 @ Pier 1 for Span 1
(2) G-7 @ Pier 1 for Span 1 (3) G-1 @ Pier 1 for Span 2 (4) G-7 @ Pier 1 for Span 2
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
6/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K141062542002F - continued
(5) G-1 @ Pier 2 for Span 3 (6) G-7 @ Pier 2 for Span 3 (7) G-7 @ Pier 3 for Span 3 Note: Different photo dates due to special access needs in different spans. Orientation is North.
Note ID: 4K1410625420015
Span 001 -- Superstructure: Paint -- Rated 3, Was 3 Span 002 -- Superstructure: Paint -- Rated 3, Was 3 Span 003 -- Superstructure: Paint -- Rated 3, Was 3 Span 004 -- Superstructure: Paint -- Rated 3, Was 3 Referenced Photos: "62", "26", "21" 2014 - (Photos 21, 26 & 62) Spans 1 through 4: In all spans, paint is missing or peeling over
about 30% of the total area. Condition is worse under and around abutment and pier joints andalso along both flanges where moderate to heavy rust & section loss has developed. Much ofremaining paint has multiple small rust spots.
Note ID: 4K1410625420016
Span 001 -- Superstructure: Joints -- Rated 2, Was 3 Referenced Photos: "47", "51" 2014 - Pier 1: Joint is paved over. surface has partly sealed alligator cracks and scattered small
potholes. (Photo 51) Sealer is completely compromised at right side due to deep spall insidewalk & fascia. (Photo 47) Damp dirt & debris on pier below is evidence of leakage through
joint. Rusting of girders, diaphragms & bearings below is also evidence of long term leakage.During wet snowy day at bridge joint was leaking heavily especially at left & right sides. Rating islowered to 2.
Note ID: 4K1410625420017
Span 001 -- Pier: Bearings, Bolts, Pads -- Rated 3, Was 3 Referenced Photos: "53", "54" 2014 - (Photos 53 & 54) Pier 1: Construction is steel fixed type with rocker bottom for Span 1 &
steel sliding plate type with bronze sheet for Span 2. Expansion bearings are heavily rusted andfrozen in an expanded position. This warrants a 3 Rating. Fixed bearings are heavily rusted withrust pack under the rockers. These would Rate 4.
Note ID: 4K1410625420018
Span 001 -- Pier: Pedestals -- Rated 3, Was 3 Referenced Photos: "55" 2014 - (Photo 55) Pier 1: G-1 pedestal is spalled 36" wide by 11" high by 2 1/2" to 5" deep with
exposed rebar on the left face. Pedestals 2, 4, & 5 are spalled 12" wide by 4" high by 2" deep onthe end side of the span 1 stepped pedestal. Pedestal 7 is spalled to rebar around its right face.
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
7/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K1410625420018 - continued
Pedestals 1, 2, 4, & 5 rate 3, Pedestal 7 would rate 4 and Pedestals 3 & 6 would rate 5.
Note ID: 4K141062542002D
Span 001 -- Pier: Top of Cap or Beam -- Rated 5, Was 5 Referenced Photos: "56" 2014 - (Photo 56) Pier 1: There is a moderate buildup of dirt & debris on top of capbeam but
underlying concrete sounds mostly solid. A 5 Rating is considered appropriate.
Note ID: 4K1410625420002
Span 001 -- Pier: Cap Beam -- Rated 3, Was 3 Span 003 -- Pier: Cap Beam -- Rated 3, Was 3 Referenced Photos: "35", "36", "58", "59", "34", "38", "39" 2014 - Pier 1: (Photos 35, 36, 58 & 59) Pier 3: (Photos 34, 38 & 39) Undersides of both
capbeams are spalled as deep as 3" for 75% to nearly 100% of their areas in Column Bays 1 &3. (4 locations total). Rusty reinforcing bars are exposed and some stirrups are rusted through.Adjacent concrete is cracked and delaminated. Yellow Flag 4K140036 is included for condition.
(Supersedes YF4B130123)Faces of cap beams have areas of hollow or delaminated concrete and a few spalls. An overall 3Rating is warranted.
Note ID: 4K1410625420019
Span 001 -- Pier: Pier Columns -- Rated 4, Was 4 Referenced Photos: "66" 2014 - (Photo 66) Pier 1: Column 1 is cracked and delaminated over about half its exposed
height on end and right faces. Column 2 is delaminated over about 10% of its circumference overits top half. Column 4 is spalled 2' high by 2' wide by 2" deep on begin and left faces at the topand is spalled 2 1/2' high by 1 1/2' wide by 2" deep on end face at top. Columns 1, 2, & 4 rate 4while the rest would rate 5.
Note ID: 4K1410625420012
Span 001 -- Utilities: Sign Structure -- Rated 3, Was 4 Referenced Photos: "63"
2014 - (Photo 63) Begin right HCM sign is low & leaning out and back but is still visible tooncoming traffic. Rating is lowered to 3. No flag necessary as rail is continuous & barrels are inplace on approach. Balance of signs would rate 5.
Note ID: 4K141062542000E
Span 002 -- Deck Elements: Sidewalks, Fascias -- Rated 4, Was 4 Referenced Photos: "47", "48" 2014 - Span 2: Vertical face of left fascia is spalled 2 to 3 inches deep over about 10% of the
span length. (Photo 48) Top of fascia & sidewalk is spalled within 2' of pier joints 1 & 3. The rightfascia is spalled at the pier 1 joint for about 10" by 10" by 2 1/2" deep to rebar. (Photo 47) At the
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
8/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K141062542000E - continued
end half of the span, there are cracks with efflorescence and some small spalls. Left & rightfascia both warrant a 4 Rating.
Note ID: 4K1410625420011
Span 002 -- Superstructure: Structural Deck -- Rated 3, Was 3 Referenced Photos: "21"
2014 - Span 2: Underside of deck has dampness, leakage staining, mapcracking withefflorescence, and a hollow sounding concrete over 90% of the area in bays 2 through 5. Thiswarrants a 3 Rating. (See Deck Sketch)
Note ID: 4K141062542002B
Span 002 -- Superstructure: Primary Members -- Rated 4, Was 4 Referenced Photos: "22", "27", "60", "61" 2014
Note ID: 4K1410625420003
Span 002 -- Superstructure: Joints -- Rated 2, Was 3 Referenced Photos: "30", "51" 2014 - Pier 2: Joint is paved over. surface has partly sealed alligator cracks and scattered small
potholes. (Photo 51) Damp dirt & debris on pier below is evidence of leakage through joint.Rusting of girders, diaphragms & bearings below is also evidence of long term leakage. Duringwet snowy day at bridge joint was leaking heavily especially at left & right sides. Previously
reported sink hole in asphalt at joint was repaired in 2013. Timber was wedged under joint,braced to top of pier and holes were patched. (Photo 30) A Removal report for Safety Flag4B130121 is included. No holes through joint were noted at time of inspection. Only smallsurface potholes were noted. Rating is lowered to 2.
Note ID: 4K141062542001A
Span 002 -- Pier: Bearings, Bolts, Pads -- Rated 3, Was 3 Referenced Photos: "27"
2014 - (Photo 27) Pier 2: Construction is steel fixed type with rocker bottom for Span 2 & steelsliding plate type with bronze sheet for Span 3. Expansion bearings are heavily rusted and frozenin an expanded position. This warrants a 3 Rating. Fixed bearings are heavily rusted with rustpack under the rockers. These would Rate 4.
Note ID: 4K141062542001B
Span 002 -- Pier: Pedestals -- Rated 3, Was 3 Referenced Photos: "30"
2014 - (Photo 30) G-1 pedestal 1 is spalled 36" wide by 11" high by 2 1/2" deep to exposedrebar on the left face. Pedestal 3 is spalled 30" long by 3" high by 2" deep on the top left corner.
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
9/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K141062542001B - continued
Pedestal 4 is spalled and cracked along the begin and right top corners with one exposed rebar.Pedestal 5 is spalled 30" by 8" high by 2 1/2" deep on the right face. Pedestal 6 is spalled 30"long by 10" high by 2 1/2" deep on the right face. Pedestal 7 is spalled 36" wide by 11" high by 21/2" deep to exposed rebar on the right face. Pedestals 1, 3, 5, 6, & 7 rate 3, pedestal 4 wouldrate 4 and pedestals 2 would rate 5.
Note ID: 4K141062542001C
Span 002 -- Pier: Top of Cap or Beam -- Rated 4, Was 5
Referenced Photos: "33", "57" 2014 - (Photos 33 & 57) Pier 2: There is a moderate buildup of dirt & debris on top of capbeam.
Bay 6 has a full width begin top corner spall. (About 4" deep) Balance has scattereddeterioration. A 4 Rating is considered appropriate.
Note ID: 4K141062542001E
Span 002 -- Pier: Cap Beam -- Rated 4, Was 4 Referenced Photos: "37"
2014 - Pier 2: (Photo37) Bottom of cap beam is spalled 18" long by 5' wide by 2 1/2" deep withexposed rebar between columns 2 & 3 at right. The bottom is spalled 3' long by 6' wide by 3"deep with exposed rebar between columns 3 & 4 at right. On the end face, there is an 18" wideby 18" high by 2" deep spall to rebar between pedestals 3 & 4. Other areas have cracks withefflorescence and rust staining. A 4 Rating is warranted.
Note ID: 4K141062542001F
Span 002 -- Pier: Pier Columns -- Rated 4, Was 4
Referenced Photos: "40" 2014 - (Photo 40) Column 1 is spalled 18" wide by 2 1/2" deep over about 80% of the height of
the exposed column on the end and left faces. Column 3 is cracked and delaminated over anarea 8' high by 2' wide on the begin face and at the top of the column at each face. Columns 1 &3 rate 4 and columns 2 & 4 would rate 5.
Note ID: 4K1410625420013
Span 002 -- Utilities: Lighting -- Rated 4, Was 4
Referenced Photos: "64" 2014 - (Photo 64) Light pole 330M at right is missing its handhole cover and has a dent on its
begin face. This warrants a 4 Rating. Balance would Rate 5.
Note ID: 4K141062542000F
Span 003 -- Deck Elements: Sidewalks, Fascias -- Rated 4, Was 4 Span 004 -- Deck Elements: Sidewalks, Fascias -- Rated 4, Was 4 Referenced Photos: "65", "18", "49"
2014 - (Photo 65) Vertical face of Span 3 & 4 left fascia is spalled 2 to 3 inches deep withexposed rusty bars over about 10% of the span length. (Photo 49) The top of fascia & sidewalk
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
10/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K141062542000F - continued
is spalled within 2' of pier 3 joint. (Photo 18) Spall has compromised joint sealer. A 4 Rating iswarranted. Right side would Rate 5.
Note ID: 4K1410625420029
Span 003 -- Superstructure: Structural Deck -- Rated 3, Was 3 Referenced Photos: "19", "20" 2014 - Span 3: Underside of deck has dampness, leakage staining, mapcracking with
efflorescence, and a hollow sounding concrete over 90% of the area in bays 2 through 5. (Photo
19) This warrants a 3 Rating. One area over traffic lane had a dead sound indicating coverconcrete was separated from main deck & bars above. Safety Flag K0140038 is included withreport. About 50 sf of deck bottom concrete is delaminated. Location is in Bay 4 over edge ofwestbound lane & adjacent shoulder. (Photo 20) Concrete sounds very dull under hammer blowsindicating cover concrete is separated at rebar level. This large section could fall onto traffic lanebelow.(See Deck Sketch)
Note ID: 4K141062542002A
Span 003 -- Superstructure: Joints -- Rated 2, Was 3 Referenced Photos: "18", "34", "52" 2014 - Pier 3: Joint is paved over. surface has partly sealed alligator cracks and scattered small
potholes. (Photo 52) Sealer is partly compromised at left side due to spall in sidewalk & fascia.(Photo 18) Damp dirt & debris on pier below is evidence of leakage through joint. Rusting ofgirders, diaphragms & bearings below is also evidence of long term leakage. During wet snowyday at bridge joint was leaking heavily especially at left & right sides. Previously reported sinkhole in asphalt at joint was repaired in 2013. Timber was wedged under joint, braced to top ofpier and holes were patched. (Photo 34) A Removal report for Safety Flag 4B130121 is included.No holes in joint were noted at time of inspection. Rating is lowered to 2.
Note ID: 4K1410625420021
Span 003 -- Pier: Bearings, Bolts, Pads -- Rated 3, Was 3 Referenced Photos: "27", "28", "29" 2014 - (Photos 27, 28 & 29) Pier 3: Construction is steel fixed type with rocker bottom for Span
1 & steel sliding plate type with bronze sheet for Span 2. Expansion bearings are heavily rustedand frozen in an expanded position. This warrants a 3 Rating. Fixed bearings are heavily rustedwith rust pack under the rockers. These would Rate 4.
Note ID: 4K1410625420022
Span 003 -- Pier: Pedestals -- Rated 3, Was 3 Referenced Photos: "31", "32" 2014 - (Photos 31 & 32) Pier 3: G-1 pedestal is spalled 21" by 6" by 2" to exposed rebar at the
begin bottom corner. Pedestal 7 is spalled 27" by 6" by 6" with completely exposed rebar withabout 10% section loss. The spall is within 1" of the corner of the bearing. Pedestal 7 rates 3,
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
11/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K1410625420022 - continued
Pedestal 1 would rate 4 and rest would rate 5.
Note ID: 4K141062542002E
Span 003 -- Pier: Top of Cap or Beam -- Rated 4, Was 5 Referenced Photos: "34" 2014 - (Photo 34) Pier 3: There is a moderate buildup of dirt & debris on top of capbeam. Bay 1
has a full width begin top corner spall. (About 5" deep) Balance has scattered deterioration. A 4Rating is considered appropriate.
Note ID: 4K1410625420004
Span 003 -- Pier: Pier Columns -- Rated 3, Was 3 Referenced Photos: "41", "42", "43", "44" 2014 - Pier 3: Columns 1 (Photos 42 & 43) and 4 (Photos 41 & 44) are spalled up to 3" deep for
a 2'- to 3'-wide strip for their full heights. These strips are located at left on column 1 and at beginright on column 4. Spalls are surrounded by a 1'- to 2'-wide strip on each side of cracked andhollow concrete. Rusty reinforcing bars are exposed at spalls. Hoop bars have an average of
50% section loss, and two consecutive hoop bars near mid-height on column 4 are severed.Vertical bars appear to have 10% to 20% section loss at spalls. Both these columns warrant a 3Rating. Yellow Flag 4K140035 is included for condition. (Supersedes YF4B130125) Column 2has full height vertical cracking and an area of delaminated concrete with a small spall on endface near bottom. This would Rate 4. Column 3 would Rate 5.
Note ID: 4K141062542000C
Span 004 -- Deck Elements: Curbs -- Rated 4, Was 4
Referenced Photos: "17" 2014 - Right side curb is pushed out 2' to 3" for 3' length at end span. (Photo 17) Right curb
warrants a 4 Rating. Left side curb would Rate 5.
Note ID: 4K141062542002C
Span 004 -- Superstructure: Primary Members -- Rated 4, Was 4 Referenced Photos: "3" 2014 - (Photo 3) Girders at end abutment are rusted with some delamination & minor section
loss. Girders supported by Pier 3 at begin Span 4 are rusted with delamination and section lossbut condition is less severe than in Spans 1 through 3. Fascia girders have > 25% web loss atpier support but do not rise to level of a flag. A 4 Rating is warranted.
Note ID: 4K1410625420006
End Abut -- Abutment: Bearings, Bolts, Pads -- Rated 4, Was 4 Referenced Photos: "3" 2014 - End: Construction is low steel fixed type with rocker bottom. All bearings are rusted with
delamination. Pack rust under rockers may impede rotation. The G-4 & G-5 Bearings havesheared right anchor bolts. (Photo 3) All of the bearings warrant a 4 Rating.
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
12/85
RC: 43 BIN: 1062542
Inspection Notes
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Note ID: 4K1410625420006 - continued
Note ID: 4K1410625420007
End Abut -- Abutment: Seats and Pedestals -- Rated 4, Was 4 Referenced Photos: "4" 2014 - End: Pedestal 2 begin top corner is spalled full width x up to 6" high by 2 1/2" deep with
exposed rusty rebar. (Photo 4) No infringement on bearing was noted. This warrants a 4 Rating.Balance of pedestals would Rate 5. Stub abutment has no ratable bridge seat.
Note ID: 4K1410625420027
End Abut -- Abutment: Backwall -- Rated 5, Was 5 Referenced Photos: "6" 2014 - End: About 8 sf of backwall near top is hollow or delaminated near G-5. (Photo 6) Other
locations have small hollow sections. No spalls have started yet so a low 5 Rating is stillconsidered appropriate.
Note ID: 4K1410625420008 End Abut -- Abutment: Erosion or Scour -- Rated 4, Was 4 Referenced Photos: "7" 2014 - End: Concrete block paving are disintegrating and eroding away under both fascias.
(Photo 7) Portion involved is about 20% of total paved area. This warrants a 4 Rating.
Note ID: 4K1410625420014
End Abut -- Wingwalls: Erosion or Scour -- Rated 4, Was 4 Referenced Photos: "7" 2014 - End: Concrete block paving in front of left wing wall is disintegrating and eroding away.
Surface is also overgrown with weeds for most of slope. (Photo 7) This warrants a 4 Rating.
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
13/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Abutment Begin Bearing
5
Photo Number: 1 Photo Filename: 14_01_AbutBeg_Be
Abutment Begin Bearing7
Photo Number: 2 Photo Filename: 14_02_AbutBeg_Be
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
14/85
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
15/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Abutment Begin
Backwall Bearing 3
Photo Number: 5 Photo Filename: 14_05_AbutBeg_Ba
Abutment End BackwallNear G5
Photo Number: 6 Photo Filename: 14_06_AbutEnd_Ba
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
16/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Abutment End Erosion
Photo Number: 7 Photo Filename: 14_07_AbutEnd_Er
Approach Rail BeginRight (Note shiftedapproach curb)
Photo Number: 8 Photo Filename: 14_08_ApprRail_Be
RC 3 BIN 062 2I i D / /20
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
17/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Approach Pavment Begin
Photo Number: 9 Photo Filename: 14_09_ApprPav_Be
Approach Pavment End
Photo Number: 10 Photo Filename: 14_10_ApprPav_E
RC 43 BIN 1062542I ti D t 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
18/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Approach Rail Begin Left
Photo Number: 11 Photo Filename: 14_11_ApprRail_B
Approach Rail Begin Left
Photo Number: 12 Photo Filename: 14_12_ApprRail_B
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
19/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Approach Rail Begin Left
Photo Number: 13 Photo Filename: 14_13_ApprRail_B
Approach Rail End Right
Photo Number: 14 Photo Filename: 14_14_ApprRail_E
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
20/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Approach Rail End Right
Photo Number: 15 Photo Filename: 14_15_ApprRail_E
Curb Span 1 and Span 2Right
Photo Number: 16 Photo Filename: 14_16_Curb_Span
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
21/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Curb End Right
Photo Number: 17 Photo Filename: 14_17_Curb_EndR
Fascia Span 4 Leftside
Photo Number: 18 Photo Filename: 14_18_Fasc_Span
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
22/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Deck Span 3 Bays 3, 4,
and 5 Over East BoundLanes
Photo Number: 19 Photo Filename: 14_19_Deck_Span
Deck Span 3 End Bays3, and 4 over west boundtravel lanes
Photo Number: 20 Photo Filename: 14_20_Deck_Span
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
23/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
Deck Span 4 (Typical
Span 1)
Photo Number: 21 Photo Filename: 14_21_Deck_Span
Pier 2 G7 PrimaryMember and Fascia
Photo Number: 22 Photo Filename: 14_22_Pier2_G7_
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
24/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
p
Primary Members Pier 3
G7
Photo Number: 23 Photo Filename: 14_23_PM_Pier3_
Primary memberdiaphragm Pier 3 Span 3G7
Photo Number: 24 Photo Filename: 14_24_PM_Pier3_
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
25/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
p
Primary Member
diaphragm Pier 3 Span 3G1
Photo Number: 25 Photo Filename: 14_25_PM_Pier3_
Primary Member PaintSpan 3 Bay 6
Photo Number: 26 Photo Filename: 14_26_PM_Paint_
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
26/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 2 G1 Bearings And
Primary Members
Photo Number: 27 Photo Filename: 14_27_Pier2_G1_
Pier 3 G3 Bearings
Photo Number: 28 Photo Filename: 14_28_Pier3_G3_
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
27/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 3 G5 Bearings
Photo Number: 29 Photo Filename: 14_29_Pier3_G5_
Pier 2 G3 Pedestal
Photo Number: 30 Photo Filename: 14_30_Pier2_Ped_
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
28/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 3 Pedestal 1
Photo Number: 31 Photo Filename: 14_31_Pier3_Ped1
Pier 3 Pedastal 7
Photo Number: 32 Photo Filename: 14_32_Pier3_Ped7
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
29/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 2 Top of Cap Beam
Bay 2
Photo Number: 33 Photo Filename: 14_33_Pier2_Topo
Pier 3 Top of Cap BeamBay 1
Photo Number: 34 Photo Filename: 14_34_Pier3_Top_
RC: 43 BIN: 1062542Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
30/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 1 Bay 1 Cap Beam
Photo Number: 35 Photo Filename: 14_35_Pier1_Bay1
Pier 1 Bay 3 Cap Beam
Photo Number: 36 Photo Filename: 14_36_Pier1_Bay3
RC: 43 BIN: 1062542
I ti Ph t i Ph t N b O d
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
31/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 2 Bay 3 Cap Beam
Photo Number: 37 Photo Filename: 14_37_Pier2_ Bay
Pier 3 Bay 1 Cap Beam
Photo Number: 38 Photo Filename: 14_38_Pier3_Bay1
RC: 43 BIN: 1062542
I ti Ph t i Ph t N b O d
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
32/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 3 Bay 3 Cap Beam
Photo Number: 39 Photo Filename: 14_39_Pier3_Bay3
Pier 2 Column 1
Photo Number: 40 Photo Filename: 14_40_Pier2_Col1
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
33/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 3 Column 4
Photo Number: 41 Photo Filename: 14_41_Pier3_Col4
Pier 3 Column 1
Photo Number: 42 Photo Filename: 14_42_Pier3_Col 1
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
34/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Pier 3 Column 1
Photo Number: 43 Photo Filename: 14_43_Pier3_Col1
Pier 3 Column 4 UpClose
Photo Number: 44 Photo Filename: 14_44_Pier3_Col4
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
35/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Approach Rail Begin
Right
Photo Number: 45 Photo Filename: 14_45_ApprRail_B
Approach Rail End Left
Photo Number: 46 Photo Filename: 14_46_ApprRail_E
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
36/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Fascia At Pier 1
Rightside
Photo Number: 47 Photo Filename: 14_47_Fasc_Pier1
Fascia Span 2 Leftside
Photo Number: 48 Photo Filename: 14_48_Fasc_Span
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
37/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Inspection Photos in Photo Number Order
Fascia Span 4 Leftside
Photo Number: 49 Photo Filename: 14_49_Fasc_Span
Approach PavementBegin
Photo Number: 50 Photo Filename: 14_50_Joint_Beg_
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
38/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
p
Joint Over Pier 2
Scattered small surfacepotholes noted (TypicalPier 1)
Photo Number: 51 Photo Filename: 14_51_Joint_Pier2
Joint over Pier 3
Photo Number: 52 Photo Filename: 14_52_Joint_Pier3
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
39/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
p
Pier 1 Bearing G5
Photo Number: 53 Photo Filename: 14_53_Pier1_Beari
Pier 1 G3 Bearings
Photo Number: 54 Photo Filename: 14_54_Pier1_G3_
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
40/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Pier 1 Pedestal 7 Right
Side
Photo Number: 55 Photo Filename: 14_55_Pier1_Ped7
Pier 1 Top of Cap BeamBay 7
Photo Number: 56 Photo Filename: 14_56_Pier1_Topo
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
41/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Pier 2 Top of Cap Beam
Bay 6
Photo Number: 57 Photo Filename: 14_57_Pier2_Topo
Pier 1 Cap Beam
Photo Number: 58 Photo Filename: 14_58_Pier1_Cap
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
42/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Pier 1 Cap Beam Right
Side
Photo Number: 59 Photo Filename: 14_59_Pier1_Cap
Primary Member Pier 1G1
Photo Number: 60 Photo Filename: 14_60_PM_Pier1_
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
43/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Primary Member Pier 1
G7
Photo Number: 61 Photo Filename: 14_61_PM_Pier1_
Primary Member Span 1G1 End Span
Photo Number: 62 Photo Filename: 14_62_PM_Span1
C i d 390 390 43011009 C d TROLLEY BOULEVARD Ch kV l 1 829 015 406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
44/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Sign Structure BeginRight
Photo Number: 63 Photo Filename: 14_63_Sign_BegRt
Light Span 2 Right side
Photo Number: 64 Photo Filename: 14_64_Light_Span
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1 829 015 406
RC: 43 BIN: 1062542
Inspection Photos in Photo Number Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
45/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Fascia Span 3 Left Side
Photo Number: 65 Photo Filename: 14_65_Fasc_Span
Pier 1 Column 3 and 4
Photo Number: 66 Photo Filename: 14_66_Pier1_Col3
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1 829 015 406
RC: 43 BIN: 1062542
Inspection Sketches in Sketch SysID Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
46/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Sketch ID: 4K1410625420000 Sketch Filename: 14DS_Spans1and2.wpd
Span 001 -- Superstructure: Structural Deck -- Rated 4, Was 4 Span 002 -- Superstructure: Structural Deck -- Rated 3, Was 3 Referenced Photos: "21"
Deck Sketch Spans 1 and 2
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Sketches in Sketch SysID Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
47/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
Sketch ID: 4K1410625420001 Sketch Filename: 14DS_Span3and4.wpd
Span 003 -- Superstructure: Structural Deck -- Rated 3, Was 3 Span 004 -- Superstructure: Structural Deck -- Rated 4, Was 4 Referenced Photos: "19", "20", "21"
Deck Sketch Spans 3 and 4
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Sketches in Sketch SysID Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
48/85
, , ,
Sketch ID: 4K1410625420002 Sketch Filename: 14BD186 Photo.wpd
General Sketch for Bridge Referenced Photos:
Photo Location Plan
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Sketches in Sketch SysID Order
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
49/85
Sketch ID: 4K1410625420003 Sketch Filename: 14-Flag Removal Form.wpd
General Sketch for Bridge Referenced Photos:
Safety Flag 4B130121 Removal
RC: 43 BIN: 1062542
Gen. Rec., Postings, Federal Ratings, etc.
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
50/85
Overall Condition:
GENERAL RECOMMENDATION: 3
Computed Condition Rating: 3.578
Problems Requiring Action:
NO Further Investigation Needed
RED, YELLOW, and SAFETY Flags Issued
POSTINGS:
Inspector Confirmed existing Posting data as correct. Posted Vertical Clearance ON the bridge is: No Posting Posted Vertical Clearance UNDER the bridge is: No Posting No Load Restriction is posted on this bridge
Overloads Observed:
NO Overload Vehicles were observed on this bridge
FEDERAL RATINGS: NBI Deck Condition: 3 NBI Superstruct Condition: 4 NBI Substruct Condition: 4 NBI Channel Condition: N NBI Culvert Condition: N
Diving Inspection Needs:
Diving Inspection Required? No Date of Last Diving Inspection: No Date
Inventory Problems:
Inventory Problems Exist? No
Miscellaneous:
Time Required to Inspect Bridge: 19 Hours
Lane Closure Needs: By Contract for 6 Hours
No Railroad Flagging Required
No Pedestrian Fence
No Snow Fence
The BIN Plate is in OK condition
RC: 43 BIN: 1062542
Gen. Rec., Postings, Federal Ratings, etc.
Inspection Date: 11/17/2014
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
51/85
Special Emphasis Inspection Required:
Non-Redundant/Fracture Critical Members - No
Pin and Hangers - No Fatigue-Prone Welds - Yes Non-Categorized Fatigue-Prone Details - No Other (Specified in Text) - Yes
Special Emphasis Details:
(1) Partial length cover plate end welds (2) Selected girder ends. Specifically, the span 3, G-1 atpier 3 & span 4, G-1 at pier 3 girder ends have about 30% web section loss over the bearing andare considered special emphasis items.
General Notes To the Next Inspector:
BIN plate on begin backwall between pedestals 4 and 5. Desirable to schedule a part day at bridge before special access is done. (Time is needed to organize
multiple flags) Special Emphasis: Span 3 can be done with bucket truck. Span 2 (over abandoned RR bed) is overgrown and needs UBIU to inspect. This also allows safe
inspection of top side. (390 has heavy traffic & narrow shoulders)
Improvements Observed:
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Review Progress and Personnel Present at Inspection
Inspection Date: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
52/85
Inspection Submission Status:
Submitted to QC Engineer on: 12/10/2014 QC Submission Number: K0442401
QC Review Completed: 12/11/2014 QC Engineer: Michael J. Peters
Submitted to Liaison Engineer on: 12/11/2014 Liaison Submission Number: 04451
Liaison Review Completed: 1/8/2015 Liaison Engineer: TODD M. HERMANN
Submitted for BIIS Processing on: 1/8/2015 BIIS Submission Number: .kp1
Current Status: Keypunched, Sent to BIIS Check Value: 1,829,015,406
Personnel Present During Inspection:
Leo M. Campagna - Team Leader Brian Boehm - Assistant Team Leader Dave (10/21 & 24) Bareis (C.P. Ward) - drive attenuator truck Brian (11/13) Kjar (NYSDOT) - Operate UBIU Joe (11/13) Mitrano (C.P. Ward) - Provide work zone Paul (10/21 & 24) Siclare (C.P. Ward) - Provide work zone Sherrie (10/21/& 24) Siclare (C.P. Ward) - Flag traffic Dave (11/13) Tiede (C.P. Ward) - Assist with work zone
Dan (11/13) Washburn (C.P. Ward) - drive attenuator truck
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140035
Discovery Date: 10/24/2014
Prompt Interim Action Recommended: No
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
53/85
Prompt Interim Action Recommended: No
Inspector: Campagna, Leo M. Date Discovered: 10/24/2014
Flag Number: 4K140035 Supersedes Flag Number: 4B130125
Bridge Description:
BIN: 1062542 Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
Region: 4 - Rochester County: 3 - Monroe
Political Unit: 0316 - Town of GATES
Residency Code: - N/A
Primary Owner: 10 - State Department of Transportation
Secondary Owner: 99 - One Agency - Listed in first subfield
Primary Maintenance: 10 - State - Highway Maintenance
Secondary Maintenance: 99 - One Agency - Listed in first subfield Year Built: 1971 Not Posted For Load
Number of Spans by Type: Num Type Description
004 - 109 - Steel - Rolled Beam, Multi-Girder
Bridge is wholly or partially owned or maintained by NYSDOT.
Description of Flagged Condition:
TP 350 Item 38 Pier 3 Columns (Rated 3)
Pier 3: Columns 1 and 4 are spalled up to 4" deep for a 2'- to 3'-wide strip for full height.
Spalls are surrounded by a 1' to 2' wide strip of cracked and hollow or delaminated
concrete. Rusty reinforcing bars are exposed in spall areas. Hoop bars have an average
of 50% section loss. Vertical bars appear to have 10% to 20% section loss in spall
areas.
(1) Condition located on left of column 1.
(2) Condition located at begin & right on column 4. Two consecutive hoop bars near
mid-height on column 4 are severed.
NOTE: Columns are taller than normal because bridge originally spanned a RR track.
Plan shows columns are almost 30' in height from footing to bottom of capbeam.
(Contract FASH 67-9, sheet 139R1)
Bridge is oriented North.
2 Photos/Sketches Attached
Verbal Notifications: (For RED Flags and Safety Flags with PIA only)
To: ____________________ of Regional Office on ________ at ________
Signature: (a signed copy of this report will be placed in the BIN folder)
Flagged Bridge Report Completed By: Campagna, Leo M. on 10/24/2014
Flagged Bridge Report Signed By: ______________________________ on ________
Campagna, Leo M.
(This PDF Report Created: 2/10/2015 9:53:23 AM)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140035 Attachment
Discovery Date: 10/24/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
54/85
14_F12_Pier3_Col4_UpClose_735.JPG - Attached to Yellow Flag 4K140035
Pier 3 Column 4 spall area (Closer view)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140035 Attachment
Discovery Date: 10/24/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
55/85
14_F2_Pier3_Col4_706.JPG - Attached to Yellow Flag 4K140035
Pier 3 Column 4 spall area (Overall view)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140036
Discovery Date: 10/24/2014
Prompt Interim Action Recommended: No
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
56/85
Inspector: Campagna, Leo M. Date Discovered: 10/24/2014
Flag Number: 4K140036 Supersedes Flag Number: 4B130123
Bridge Description:
BIN: 1062542 Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
Region: 4 - Rochester County: 3 - Monroe
Political Unit: 0316 - Town of GATES
Residency Code: - N/A
Primary Owner: 10 - State Department of Transportation
Secondary Owner: 99 - One Agency - Listed in first subfield
Primary Maintenance: 10 - State - Highway Maintenance
Secondary Maintenance: 99 - One Agency - Listed in first subfield Year Built: 1971 Not Posted For Load
Number of Spans by Type: Num Type Description
004 - 109 - Steel - Rolled Beam, Multi-Girder
Bridge is wholly or partially owned or maintained by NYSDOT.
Description of Flagged Condition:
TP 350 Item 37 Capbeam Piers 1 & 3 (Both rated 3)
Bottom surface of capbeams are spalled up to 4" deep over 75% to 100% of area
between columns. Rusty reinforcing bars are exposed and some stirrups are rusted
through. Adjacent concrete is cracked and hollow or delaminated
Locations are:
(1) Pier 1: Column Bay 1 & Column Bay 3.
(2) Pier 3: Column Bay 1 & Column Bay 3.
Bridge is oriented north.
2 Photos/Sketches Attached
Verbal Notifications: (For RED Flags and Safety Flags with PIA only)
To: ____________________ of Regional Office on ________ at ________
Signature: (a signed copy of this report will be placed in the BIN folder)
Flagged Bridge Report Completed By: Campagna, Leo M. on 10/24/2014
Flagged Bridge Report Signed By: ______________________________ on ________
Campagna, Leo M.
(This PDF Report Created: 2/10/2015 9:53:23 AM)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140036 Attachment
Discovery Date: 10/24/2014
14 F4 Pi 3 B 3 0719 JPG Att h d t Y ll Fl 4K140036
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
57/85
14_F4_Pier3_Bay3_0719.JPG - Attached to Yellow Flag 4K140036
Pier 3 Girder Bay 3 Bottom capbeam (Girder Bay 1 similar)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140036 Attachment
Discovery Date: 10/24/2014
14 F5 Pier1 Bay3 733 JPG - Attached to Yellow Flag 4K140036
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
58/85
14_F5_Pier1_Bay3_733.JPG - Attached to Yellow Flag 4K140036
Pier 1 Girder Bay 3 Bottom capbeam (Girder Bay 1 similar)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Yellow Flag 4K140037
Discovery Date: 10/24/2014
Prompt Interim Action Recommended: No
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
59/85
Inspector: Campagna, Leo M. Date Discovered: 10/24/2014
Flag Number: 4K140037 Supersedes Flag Number: 4B130124
Bridge Description:
BIN: 1062542 Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
Region: 4 - Rochester County: 3 - Monroe
Political Unit: 0316 - Town of GATES
Residency Code: - N/A
Primary Owner: 10 - State Department of Transportation
Secondary Owner: 99 - One Agency - Listed in first subfield
Primary Maintenance: 10 - State - Highway Maintenance
Secondary Maintenance: 99 - One Agency - Listed in first subfield Year Built: 1971 Not Posted For Load
Number of Spans by Type: Num Type Description
004 - 109 - Steel - Rolled Beam, Multi-Girder
Bridge is wholly or partially owned or maintained by NYSDOT.
Description of Flagged Condition:
TP 350 Item 28 Primary Span 3 (Rated 4)
Deck supporting diaphragm at end span 3 in Bay 6 is rusted out full height of web at
right side. This amounts to 100% web loss adjacent to connection plate. There is also
heavy flange loss at midpoint of diaphragm. Control for flag is 100% web loss.
Bridge is oriented north.
1 Photos/Sketches Attached
Verbal Notifications: (For RED Flags and Safety Flags with PIA only)
To: ____________________ of Regional Office on ________ at ________
Signature: (a signed copy of this report will be placed in the BIN folder) Flagged Bridge Report Completed By: Campagna, Leo M. on 10/24/2014
Flagged Bridge Report Signed By: ______________________________ on ________
Campagna, Leo M.
(This PDF Report Created: 2/10/2015 9:53:23 AM)
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
60/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140038
Discovery Date: 10/24/2014
Prompt Interim Action Recommended: No
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
61/85
Inspector: Campagna, Leo M. Date Discovered: 10/24/2014
Flag Number: 4K140038 Supersedes Flag Number: __________
Bridge Description:
BIN: 1062542 Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
Region: 4 - Rochester County: 3 - Monroe
Political Unit: 0316 - Town of GATES
Residency Code: - N/A
Primary Owner: 10 - State Department of Transportation
Secondary Owner: 99 - One Agency - Listed in first subfield
Primary Maintenance: 10 - State - Highway Maintenance
Secondary Maintenance: 99 - One Agency - Listed in first subfield Year Built: 1971 Not Posted For Load
Number of Spans by Type: Num Type Description
004 - 109 - Steel - Rolled Beam, Multi-Girder
Bridge is wholly or partially owned or maintained by NYSDOT.
Description of Flagged Condition:
TP350 Item 27 Deck Span 3 Rated 4
About 50 sf of deck bottom concrete is delaminated. Location is in Bay 4 over edge of
westbound lane & adjacent shoulder. Concrete sounds very dull under hammer blows
indicating cover concrete is separated at rebar level. This large section could fall onto
traffic lane below.
Bridge is oriented North.
1 Photos/Sketches Attached
Verbal Notifications: (For RED Flags and Safety Flags with PIA only)
To: ____________________ of Regional Office on ________ at ________
Signature: (a signed copy of this report will be placed in the BIN folder)
Flagged Bridge Report Completed By: Campagna, Leo M. on 10/24/2014
Flagged Bridge Report Signed By: ______________________________ on ________
Campagna, Leo M.
(This PDF Report Created: 2/10/2015 9:53:23 AM)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140038 Attachment
Discovery Date: 10/24/2014
14_F7_Deck_Span3_WB_Bays 3 and4_0718.JPG - Attached to Safety Flag 4K140038
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
62/85
Span 3 near end Bays 3 & 4 deck bottom (Looking toward end)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140050
Discovery Date: 11/13/2014
Prompt Interim Action Recommended: No
I t C L M D t Di d 11/13/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
63/85
Inspector: Campagna, Leo M. Date Discovered: 11/13/2014
Flag Number: 4K140050 Supersedes Flag Number: 4B130120
Bridge Description:
BIN: 1062542 Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
Region: 4 - Rochester County: 3 - Monroe
Political Unit: 0316 - Town of GATES
Residency Code: - N/A
Primary Owner: 10 - State Department of Transportation
Secondary Owner: 99 - One Agency - Listed in first subfield
Primary Maintenance: 10 - State - Highway Maintenance
Secondary Maintenance: 99 - One Agency - Listed in first subfield Year Built: 1971 Not Posted For Load
Number of Spans by Type: Num Type Description
004 - 109 - Steel - Rolled Beam, Multi-Girder
Bridge is wholly or partially owned or maintained by NYSDOT.
Description of Flagged Condition:
TP 350 Item 58 Approach Rail (Rated 3)
Construction is galvanized box beam on weak posts with transition to 2 tube bridge rail.
Approach box beam rail is damaged or deteriorated at the following locations:(1) Begin Right: Posts 1 through 4 from bridge rail transition are bent over & detached
from box beam. Box beam is kinked in this area with rust holes near rail splice.
(2) Begin Left: Most of rail run is affected by impact damage. Box beam is torn near
bridge. Post 5 from bridge is bent & disconnected from box beam. Posts 23 through 26
& post 32 are bent & disconnected from box beam leaving about 30' of rail unsupported.
(3) End Right: Box beam adjacent to bridge is heavily rusted with holes in bottom for
10' to 15' length. There are also rust holes in vertical faces at rail splices.
(4) End Left: Box beam adjacent to bridge is heavily rusted with holes in bottom for
about 4' length. Box beam terminus section also has bottom rust hole about 1' length.
Note: Different photo dates due to access problems to topside on 390. Orientation is North.
4 Photos/Sketches Attached
Verbal Notifications: (For RED Flags and Safety Flags with PIA only)
To: ____________________ of Regional Office on ________ at ________
Signature: (a signed copy of this report will be placed in the BIN folder)
Flagged Bridge Report Completed By: Campagna, Leo M. on 11/13/2014
Flagged Bridge Report Signed By: ______________________________ on ________ Campagna, Leo M.
(This PDF Report Created: 2/10/2015 9:53:23 AM)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140050 Attachment
Discovery Date: 11/13/2014
14_11_ApprRail_BegLT_0588.JPG - Attached to Safety Flag 4K140050
B i l ft h il f d
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
64/85
Begin left approach rail from across road
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140050 Attachment
Discovery Date: 11/13/2014
14_14_ApprRail_EndRt_0__578.JPG - Attached to Safety Flag 4K140050
End right approach rail looking toward bridge
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
65/85
End right approach rail looking toward bridge
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140050 Attachment
Discovery Date: 11/13/2014
14_15_ApprRail_EndRt_0577.JPG - Attached to Safety Flag 4K140050
End right approach rail (Similar end left)
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
66/85
End right approach rail (Similar end left)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
Safety Flag 4K140050 Attachment
Discovery Date: 11/13/2014
14_45_ApprRail_BegRt_1310.JPG - Attached to Safety Flag 4K140050
Begin right rail looking right
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
67/85
g g g g
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
RED Flag 4K140051
Discovery Date: 11/17/2014
Prompt Interim Action Recommended: No
Inspector: Campagna, Leo M. Date Discovered: 11/17/2014
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
68/85
Flag Number: 4K140051 Supersedes Flag Number: 4B130122
Bridge Description:
BIN: 1062542 Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
Region: 4 - Rochester County: 3 - Monroe
Political Unit: 0316 - Town of GATES
Residency Code: - N/A
Primary Owner: 10 - State Department of Transportation
Secondary Owner: 99 - One Agency - Listed in first subfield
Primary Maintenance: 10 - State - Highway Maintenance
Secondary Maintenance: 99 - One Agency - Listed in first subfield Year Built: 1971 Not Posted For Load
Number of Spans by Type: Num Type Description
004 - 109 - Steel - Rolled Beam, Multi-Girder
Bridge is wholly or partially owned or maintained by NYSDOT.
Description of Flagged Condition:
TP 350 Item 28 Primary Rated 4
Seven rusted girder ends are red structural flag conditions due to heavy section loss &
deformation on web over supports. (No D-Meters possible due to location of temporarysupports) Each of these locations has two 3"x 5" box beams welded in place as
temporary repairs: (All temporary supports appeared intact)
(1) G-1 @ Pier 1 for Span 1
(2) G-7 @ Pier 1 for Span 1
(3) G-1 @ Pier 1 for Span 2
(4) G-7 @ Pier 1 for Span 2
(5) G-1 @ Pier 2 for Span 3
(6) G-7 @ Pier 2 for Span 3
(7) G-7 @ Pier 3 for Span 3
Note: Different photo dates due to special access needs in different spans. Orientation is North.
3 Photos/Sketches Attached
Verbal Notifications: (For RED Flags and Safety Flags with PIA only)
To: D. Brown of Regional Office on 11/17/2014 at 9:15:00 AM
Signature: (a signed copy of this report will be placed in the BIN folder)
Flagged Bridge Report Completed By: Campagna, Leo M. on 11/17/2014
Flagged Bridge Report Signed By: ______________________________ on ________ Campagna, Leo M.
(This PDF Report Created: 2/10/2015 9:53:23 AM)
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
RED Flag 4K140051 Attachment
Discovery Date: 11/17/2014
14_22_Pier2_G7_PM_Fasc_0557.JPG - Attached to RED Flag 4K140051
G7 right side @ Pier 2 (Temp support for Span 3)
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
69/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
RED Flag 4K140051 Attachment
Discovery Date: 11/17/2014
14_23_PM_Pier3_G7_0681.JPG - Attached to RED Flag 4K140051
G7 right side @ Pier 3 (Temp support for Span 3)
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
70/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542
RED Flag 4K140051 Attachment
Discovery Date: 11/17/2014
14_60_PM_Pier1_G1_1288.JPG - Attached to RED Flag 4K140051
G1 left side @ pier 1 (Temp support for both spans)
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
71/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Inspection Access Requirements
Inspection Date: 11/17/2014
Equipment Required for Inspection
Access Requirement Changes WERE Noted During This Inspection. This Listing is from the Inspection.
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
72/85
ACCESS CATEGORIES FOR ENTIRE BRIDGE
Required: Walking, Step Ladder, 60 Ft UBIU (18 m), Small Lift Required: Lane Closure, Shadow Vehicle
ACCESS CATEGORIES FOR SPAN 1 Required: Walking, 60 Ft UBIU (18 m), Lane Closure Required: Shadow Vehicle
ACCESS CATEGORIES FOR SPAN 2
Required: Walking, 60 Ft UBIU (18 m), Lane Closure Required: Shadow Vehicle
ACCESS CATEGORIES FOR SPAN 3 Required: Walking, Small Lift, Lane Closure, Shadow Vehicle
ACCESS CATEGORIES FOR SPAN 4 Required: Walking, Step Ladder, 60 Ft UBIU (18 m), Lane Closure Required: Shadow Vehicle
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD CheckValue: 1,829,015,406
RC: 43 BIN: 1062542
Culvert Measurements
Inspection Date: 11/17/2014
Culvert Measurements
NO CULVERT DATA FOR BIN 1062542
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
73/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
ApproachEnd.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
74/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
Framing_Span4.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
75/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
ElevationLeft.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
76/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
ElevationRight.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
77/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
1062542_QUAD_MAP.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
78/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
1062542_LOCATION_MAP.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
79/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
F2CrossedRight.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
80/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
AbutmentBegin.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
81/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
Pier2.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
82/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
F2CrossedLeft.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
83/85
Carried: 390 390 43011009 Crossed: TROLLEY BOULEVARD
RC: 43 BIN: 1062542Standard Photos
ApproachBegin.JPG
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
84/85
-
7/21/2019 NYS DOT Trolley Blvd Bridge Inspection, 11-17-2014
85/85