obermeyer firmenportraet irak 06-11-2009 eng -...

14
Company Portrait Data. Facts. References.

Upload: doanlien

Post on 24-Apr-2018

226 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

Company PortraitData. Facts. References.

Page 2: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

CORPORATE DIVISIONS

BUILDINGS

Architecture und Urban Planning

Industrial Facilities

Airports

Military Infrastructure

Structural Engineering

Energy and Building Services Engineering

Electrical and Information Engineering

Energy Systems

Project Management and Development

TRANSPORT

Traffic Planning

Roads

Railways

Traffic Structures and Bridges

Tunnels and Underground Engineering

Site Supervision/Transport

Geographic Information Systems

ENVIRONMENT

Noise, Exhaust Air, Building Physics

Room and Building Acoustics

Environmental Impact Assessments

Water and Waste Management

Site Development Planning

Page 3: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

OBERMEYER Planen + Beraten GmbHOBERMEYER Albis-Bauplan GmbHFaust Consult GmbH

FMC Facility Management Consulting GmbHAlbis Project Management GmbH

LOCATIONS IN GERMANY

Page 4: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

OBERMEYER INTERNATIONAL

Countries with project experience

Subsidiaries / Offices

Czech RepublicSlovak Republic

HungaryKosovoAlbaniaAlgeriaRussia

BulgariaRomania

GreeceTurkey

BahrainQatarUAE

AfghanistanKazakhstan

PR China

Page 5: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

OBERMEYER METRO ENGINEERING

Page 6: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

OBERMEYER RAILWAYS / ROADS

Page 7: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

DONGGUAN RALWAY STATION EAST AREA

Dongguan Railway Station East Area, China

ClientGuangzhou Hongda Projektberatung GmbH

Project period2006 - 2007

Services providedInvited international competition

Technical detailsTraffic planning, urban development concept, railway station planning for the future railway station east area, size approx. 370 hectares.Core area approx. 76 hectares, southern area for passenger traffic,northern area for goods transport including logistics centre andindustrial estate.

Page 8: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

GUANGZHOU RAILWAY STATION

New Guangzhou Railway Stationof Guangzhou Railway Hub, China

Project period 2004 - 2004

Services providedUrban development competition,in collaboration with LandscapeArchitects Rainer Schmidt.Architectural design of station building, urban development concept, landscaping and traffic.

Technical details Planning of a new traffic hub(planning zone approx. 80 ha) forthe Pearl River Delta, as centre ofa new urban district extending overapproximately 266 ha to the southof Guangzhou.

Page 9: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

2ND PRINCIPAL RAPID TRANSIT LINE, MUNICH

3D Model 2nd Principal RapidTransit Line, Munich CentralStation, Germany

Project period July 2003

Services provided Development of a 3D model as abasis for competitions and planning

Technical details 3D layered model of principalconstruction elements (existing andin planning) below street level in thearea of Munich Central Station, based on paper drawings (dating back over 100 years), and digitaldata of current projects (2nd principal rapid transit line, “Munich21”). Prepared by means of project-related CAD software (ArchitecturalDesktop 2004)

Page 10: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

MILITARY INFRASTRUCTURE

Page 11: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

Terminals

Aprons

Airport SpecificBuildings

Engineering Structures

LandsideDevelopment

EnvironmentalPlanning

Consulting

Runway Systems

Project Management

AIRPORT PLANNING

Page 12: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

NEW RAILWAY LINE, HIGH PLATEAU, ALGERIA

Page 13: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan

PREFERRED VARIANT

Page 14: Obermeyer Firmenportraet Irak 06-11-2009 eng - dafg.eudafg.eu/fileadmin/dafg/09-11-07_Investorenkonferenz_Irak_München... · OBERMEYER Planen + Beraten GmbH OBERMEYER Albis-Bauplan