Objective COM11

ESSIP Plan 2014

Adriatik KOKONADSS/EIPR

19.09.2014

Page 2: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 2

Objective COM11

Comprehensive Explanation Link to European ATM Master Plan Most important SLoA(s) Finalisation Criteria and Closed Questions Supporting Material ESSIP Report 2013 Objective Coordinator’s Analysis, recommendations, tips & tricks Conclusions Links and contacts

Page 3: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 3

Comprehensive Explanation

The initiative covers inter centre (encompassing all type of ATM Units) voice communication and the links with the ground radio Stations;

The objective forecasts that all ECAC States migrate their ATM voice services to VoIP by the specified Full Operational Capability 12/2020;

Initial Operational Capability (Forward fit) date is 01/2013 for both inter-centre telephony and the links to the ground radio stations on the ground segment of the Air-Ground voice.

Inter centres voice communications are currently mainly performed via analogue and partially digital circuits (ATS-QSIG) since 2003.

At present VoIP is identified as being the medium term standard for ground telephony and ground segment of the Air-Ground voice.

Page 4: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 4

Link to European ATM Master Plan

Digital Voice/VoIP for ground telephony CTE-C8

Page 5: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 5

Most important SLoA(s)

COM11-ASP03 Upgrade and put into service Voice Communication Systems to support VoIP inter-centre telephony (12/2020)

COM11-ASP04 Upgrade and put into service Voice Communication Systems to support VoIP links to the ground radio stations (12/2020)

Page 6: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 6

Finalisation Criteria and Closed Questions

Voice communications systems have been upgraded; The technical file (TF) with evidences of compliance and the EC

declaration of verification of systems (DoV) has been delivered to the competent National Supervisory Authority (NSA);

Upgraded voice communication systems have been put into service

Page 7: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 7

Regulation and Supporting Material

EUROCONTROL - ESARR 4 Risk Assessment and Mitigation in ATM EUROCAE - ED-136 - Voice over Internet Protocol (VoIP) Air Traffic Managem

ent (ATM) System Operational and Technical Requirements 02/2009;

EUROCAE - ED-137B - Interoperability Standards for VoIP ATM Components (Volume 1: Radio - Volume 2: Telephone - Volume 3: European Legacy Telephone Interworking - Volume 4: Recording - Volume 5: Supervision) 01/2012;

EUROCAE - ED-138 - Network Requirements and Performances for Voice over Internet Protocol (VoIP) Air Traffic Management (ATM) Systems (Part 1: Network Specification – Part 2: Network Design Guideline) - 28.02.2009;

EUROCONTROL - SIP v ATS-QSIG Gateway Interworking Test Specification - Edition 2 / 12/2013;

EUROCONTROL - SIP v ATS-R2 Gateway Interworking Test Specification - Edition 2 / 12/2013;

EUROCONTROL - VOTER - Edition 2.7 / 02/2014; EUROCONTROL - VoIP in ATM Cross-Reference Matrix - Edition 2 / 12/2013; EUROCONTROL - VoIP in ATM Telephony Test case specification - Edition 2 /

12/2013.

Page 8: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 8

ESSIP Report 2013

Majority of States have an implementation plan. Five States consider the objective not mature enough to start planning the implementation;

35 States have reported the objective ‘Planned’, while one State has reported it as Late. Five States (DE, DK, HR, LU and NO) have reported ‘No Plan’ for the time being;

The progress compared with the last cycle is as follows: Two States (HR & NO) have changed the status from Planned to No Plan. MAS, MD, MT & TR have postponed the planninng for completion by one year and AM, IE & MK by two years.

Page 9: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 9

Objective Coordinator’s Analysis, recommendations, tips & tricks

Early implementation Allows to get the benefit of the IP infrastructure, and

to get early return on investment Increases Airspace flexibility within functional airspace

blocks in a multi-vendor operational setting. Facilitates business continuity as Telecom service

providers are phasing out their legacy analogue, 64kBit/s based and later 2MBit/s based services.

Page 10: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 10

Conclusions

VoIP in ATM is a mature standard referenced by ICAO;

VoIP in ATM is ready to be deployed over the IP infrastructure (PENS and ANSPs IP networks);

VoIP in ATM will increase Airspace flexibility; VoIP in ATM will support and facilitate business

continuity.

Page 11: Objective COM11 ESSIP Plan 2014 Adriatik KOKONA DSS/EIPR 19.09.2014

ESSIP Plan 2014 / Objective COM11 11

Links and contacts

Objective Coordinator: Adriatik Kokona, +32 2 729 3556

[email protected]

DNM Objective Expert(s): L. POPESCU, +32 2 729 3757

[email protected]