WORK STUDY
Methods engineering includes worksimplification, job design, valueanalysis and the like.
Work study method was developed toimprove performance of a given work.
Work study is the body of knowledge
concerned with analysis of theworkmethods and the standard ofproposed work methods.
-
7/31/2019 Objectives of Work Stydy
2/15
OBJECTIVES OF WORKSTYDY 1.To analyse the present method of
doing a job, systematically in order todevelop a new and better method
2.To measure the work content of ajob by measuring the time required todo the job for a qualified worker andhence to establish standard time.
3.To increase the productivity atminimum cost.
4. to improve operational efficiency
-
7/31/2019 Objectives of Work Stydy
3/15
BASIC WORK STUDYPROCEDURE
1.Select the job or the process or the operation tobe studied. 2. Record all relevant facts about the job or
process. 3. Examine critically all the recorded facts. 4. Develop the new method for thejob/process/operation.
5. Measure the work content and establish thestandard time.
6. Define the new method for thejob/process/operation.
7. Install the new method. 8. Maintain the new method.
-
7/31/2019 Objectives of Work Stydy
4/15
Method study methodsimprovement Prime objectives of method study is to
eliminate wasteful and inefficientmotions.
- To study the existing method- Develop improved method
- Work simplification
- Better product quality
- Better material handling
- Better working conditions
-
7/31/2019 Objectives of Work Stydy
5/15
Method study procedure
1. Select
2. Record
3. Examine
4. Develop
5. Install
6. maintain
-
7/31/2019 Objectives of Work Stydy
6/15
-
7/31/2019 Objectives of Work Stydy
7/15
Motion study
Motion study is the science ofeliminating wastefulness resultingfrom using unnecessary, ill-directed
and inefficient motion.The aim of motion study is to find and
perpetuate the scheme of least waste
methods of labour.
-
7/31/2019 Objectives of Work Stydy
8/15
Micro motion study
It is a valuable technique for makingminute analysis of those operationsthat are short in cycle.
Micro motions are THERBLIGS
-
7/31/2019 Objectives of Work Stydy
9/15
Memomotion study
Developed by mundal.
It is a special form of micro-motionstudy
Multi-man and machine relationship
-
7/31/2019 Objectives of Work Stydy
10/15
Work measurement
Measuring the work content of anyactivity under study.
Definition
work measurement is defined as theapplication of techniques designed toestablish the work content of aspecified task by determining the time
required for carrying out the task at adefined standard of performance by aqualified worker.
-
7/31/2019 Objectives of Work Stydy
11/15
OBJECTIVES OF WORKMEAURESMENT Improved planning and control of
activities
More efficient manning of the plan
Reliable indices for labourperformance;
Reliable basis for labour cost control;
Basis for sound incentive schemes.
-
7/31/2019 Objectives of Work Stydy
12/15
Techniques of WorkMeasurement
The main techniques used to measurework are:
Direct Time Study-centiminute stop
watch Synthesis Method
Analytical Estimating
Pre determined Motion TimeSystem(PMTS)
Work sampling or Activity Sampling or
Radio Delay Method
-
7/31/2019 Objectives of Work Stydy
13/15
PRODUCTIVITY ANDEMPLOYEES Productivity: The amount of goods and
services produced with resourcesused
Formula:Quantity of goods and
Productivity = services produced
Amount of Resourcesused
-
7/31/2019 Objectives of Work Stydy
14/15
MEASURINGPRODUCTIVITY
Partial productivity: Output in a given perioddivided by labour hours used in the period
Formula:Output in a given period
1.Partial productivity =Labour hours used in the period
Output in a given period
2.Total productivity =
Labour+Capital+Materials+Energyused in the same period
-
7/31/2019 Objectives of Work Stydy
15/15
LABOUR PRODUCTIVITY
There are atleast three ways of measuring labourproductivity
Output per man-hour
Output
Labour productivity =
Man-hours used Labours hours per unit of Output
Total labour hours used
Labour productivity =
Ouput
Added value per unit of labour cost
Added value for the product
Labour productivity =
Total wages