 Lay-down Area October 03, 2013 Findings / *Correctiv e Action Photos Findings / *Correcti ve Action Photos Timbers scattered around the area (lay- down1). *arrange the compliant timbers.. Timbers scattered around the area (lay- down1). *arrange the compliant timbers.

Upload: asantubigko

Post on 04-Nov-2015

214 views

Category:

Documents


0 download

DESCRIPTION

Oct 3,2013 Daily Inspection

TRANSCRIPT

Lay-down AreaOctober 03, 2013Findings / *Corrective ActionPhotosFindings / *Corrective ActionPhotos

Timbers scattered around the area (lay-down1). *arrange the compliant timbers..Timbers scattered around the area (lay-down1). *arrange the compliant timbers.

Main FabricationOctober 03, 2013Findings / *Corrective ActionPhotosFindings / *Corrective ActionPhotos

Scaffolding pipe, plastic straws and candy wrappers were found in the area.*Talked to Mr. Gonzalvo regarding this matter. Scaffolding pipe, plastic straws and candy wrappers were found in the area. *Talked to Mr. Gonzalvo regarding this matter. n the area.

Lay-out and CuttingOctober 03, 2013Findings / *Corrective ActionPhotosFindings / *Corrective ActionPhotos

Pool of water infront of the shop. * advise to sweep out water from the shop.

Weeds near the shop* advise for pulling of weeds.

Taken after the weeds have been removed.