october 2018 · schaffner international ltd i nordstrasse 11 i 4542 luterbach i switzerland p +41...

10
Ecosine ® passive Harmonic Filter EVO Failure Analysis October 2018

Upload: others

Post on 06-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Ecosine® passive Harmonic Filter EVO

Failure Analysis

October 2018

Page 2: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 2 / 10

Failure Analysis

1. Intended use

DANGER

Dangerous voltage Risk of death due to short circuits and electric shock if the active filter is opened improperly. The discharge time of the intermediate circuit after disconnecting from the mains can be more than 5 minutes. All interventions involving opening the device cover or removing or installing the connection cable may only be performed by qualified personnel.

WARNING

High-frequency interferences In a residential environment, high-frequency interferences could occur, which necessitate interference suppression.

Note Please note that there are additional manuals for some product variants. For the latest versions of these manuals go to www.schaffner.com.

2. Personnel qualification Installation of the ECOsine® passive filter, inspections for proper operation, and certain troubleshooting measures may only be performed by qualified personnel. All other measures may be performed by people who have read these instructions.

Attention!

Before starting to work on the device, ensure that it is disconnected from the grid and capacitors are discharged

3. Tool list (minimum requirements) • Camera

• Multimeter with ohm and capacitance test (for example Fluke)

• Socket wrench set 5,5 - 7 mm

• Screw driver PH1 and PH2

• Combination wrench 17mm

Page 3: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 3 / 10

4. General condition

Take a picture of the label to get the device

datas.

Label

Take a picture of the Front cover includ near

surroundings, check the basic condition

outside.

Front Cover

Near sorrounding

Basic condition outside

Remove the front cover

Page 4: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 4 / 10

Take a picture of the fan or fans

Fan

Take a picture of the device without front

cover, check the basic condition inside

Without fron cover

Basic Condition

Remove the fan module

Page 5: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 5 / 10

Take a picture of the device without fan

module, check the basic condition inside

Without fan module

Basic Condition

5. Application & Installation

Check and indicate how the device is

connected. Specify the type & values of the

load & external fuses or forward a schematic

diagram.

Load:______________________________

Load Values:________________________

AC Line Choke:_______mH

DC Link Choke:_______mH

Check and indicate how the RWK is

connected.

- U1,V1,W1 connected to PHF?

Yes No

- U2,V2,W2 connected to VSD?

Yes No

Page 6: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 6 / 10

Specify the environmental conditions: Ambient

temperature in °C & humidity. Also indicate

device temperature during operation

Ambient temperature: _____°C

Humidity:_______%RH

Any other Schaffner filters are installed in

same application:

Type & Qty:_______________________

No:

Any other problems detected on these other

filters, same/other problems happen in the

past:

__________________________________

6. Measurements

In the case of an existing PQ meter, please

perform a short term measurement about 10-

15 Min. with logged values

- Voltage

- Current

- THDi

- Powerand provide the file with completed document to Schaffner

Note the name of used measurement

equipment:

___________________________________

Page 7: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 7 / 10

Specify the voltage value (True rms). Perform

a voltage measurement on the filter input.

Enter the voltage values between:

L1 - L2:_______Vac

L2 - L3:_______Vac

L1 - L3:_______Vac

Note the name of used measurement

equipment:

___________________________________

In case of several capacitors per phase,

measure the connection point from the trap

choke to the star point (neutral point).

Enter the measurement result of the total

capacity per phase.

1. __________µF

2. __________µF

3. __________µF

Page 8: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 8 / 10

In case of total capacity deviation per phase

greater than 10% please perform single

condenser measurement.

Remove all cables from the capacitors

Remove all cables from the capacitors

Check all capacitors with the capacitance

meter.

Choose capacitor test and connect the RED +

and the BLACK – probe to the capacitor.

Enter the measured value to the table below

Page 9: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 9 / 10

1. _______µF 7. _______µF

2. _______µF 8. _______µF

3. _______µF 9. _______µF

4. _______µF 10. _______µF

5. _______µF 11. _______µF

6. _______µF 12. _______µF

Perform the resistance measurement of the

temperature sensor.

Value_______

Page 10: October 2018 · Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland P +41 32 681 66 26 I F +41 32 681 66 30 I Created Changed Approved Doc-ID Rev Page Service

Schaffner International Ltd I Nordstrasse 11 I 4542 Luterbach I Switzerland

P +41 32 681 66 26 I F +41 32 681 66 30 I www.schaffner.com

Created Changed Approved Doc-ID Rev Page

Service Center 15.03.2018 Service Center 29.10.2018 Head of Service 02.11.2018 02-28101 B 10 / 10

Service & Repair Centers

Asia - China

Schaffner EMC Ltd. Shanghai

T20-3, No 565 Chuangye Road

Pudong New Area

Shanghai 201201

Europe - France

Schaffner EMC S.A.S.

Rue du Luxembourg 16

68310 Wittelsheim

India - India

Schaffner India Pvt. Ltd

Unit 59, Level, Mfar Greenheart 7

Manyata Tech Park, Hebbal Outer Ring Road

560045 Bangalore

United States - Edison

Schaffner EMC Inc.

52 Mayfield Avenue Edison New Jersey 08837

Schaffner International Ltd

Nordstrasse 11

4542 Luterbach

Switzerland

T +41 32 681 66 26

F +41 32 681 66 30

[email protected]

www.schaffner.com

To find your local partner within

Schaffner‘s global network, please go to

www.schaffner.com

® 2014 Schaffner Group

The content of this document has been carefully checked and understood. However, neither Schaffner nor its subsidiaries assume any liability whatsoever for any errors or inaccuracies of this document and the consequences thereof. Published specifications are subject to change without notice. Product suitability for any area of application must ultimately be determined by the customer. In all cases, products must never be operated outside their published specifications. Schaffner does not guarantee the availability of all published products. This disclaimer shall be governed by substantive Swiss law and resulting disputes shall be settled by the courts at the place of business of Schaffner Holding AG. Latest publications and a complete disclaimer can be downloaded from the Schaffner website. All trademarks recognized.