october 8, 2013 | nepool markets committee

10
OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE ISO NEW ENGLAND - MARKET DEVELOPMENT Walk-Through of Tariff Structure and Summary of Key Concepts NCPC Payments – Tariff Overview Chris Hamlen, Matt Brewster & Jon Lowell

Upload: haile

Post on 17-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

October 8, 2013 | NEPOOL markets committee. ISO New England - market development. Walk-Through of Tariff Structure and Summary of Key Concepts. NCPC Payments – Tariff Overview. Chris Hamlen, Matt Brewster & Jon Lowell. NCPC Payments – Structure of the New Tariff. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: October 8, 2013 | NEPOOL markets committee

OCTOBER 8, 2013 | NEPOOL MARKETS COMMITTEE

ISO NEW ENGLAND - MARKET DEVELOPMENT

Walk-Through of Tariff Structure and Summary of Key Concepts

NCPC Payments – Tariff Overview

Chris Hamlen, Matt Brewster & Jon Lowell

Page 2: October 8, 2013 | NEPOOL markets committee

NCPC Payments – Structure of the New Tariff

2

• New tariff language for NCPC Credits will completely replace the current MR-1 Appendix F sections III.F.1 and III.F.2

• Section III.F.3 (NCPC Cost Allocation) is untouched

• Several new defined terms are added to Section I.2.2– Commitment Period– Economic Dispatch Point (EDP)– Effective Offer

Page 3: October 8, 2013 | NEPOOL markets committee

New Section III.F.1 - General

• Concepts that apply generally in the determination of NCPC Creditsa) Effective Offersb) Treatment of Self-Schedulesc) Treatment of Minimum Run Time Changes in a Subsequent

Operating Dayd) Supply Offers Applicable When Min Run Time Carries into Second

Operating Daye) Supply Offers Applicable When Committed Prior to Day-Ahead

Energy Marketf) Eligibility for NCPC Credits When Performing Auditsg) Coordinated External Transactions are Not Eligible for NCPC

3

Page 4: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.1 - Day-Ahead Energy Market NCPC Credits

• III.F.2.1.1 Eligibility

• III.F.2.1.2 Settlement Period

• III.F.2.1.3 Eligible Quantity

• III.F.2.1.4 Hourly Cost

• III.F.2.1.5 Hourly Revenue

• Calculation of the DA NCPC Credit– III.F.2.1.6 Fast Start Resources – calculated hourly– III.F.2.1.7 Non-Fast Start Resources – calculated for the settlement

period

4

Page 5: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.2 - Real-Time Energy Market NCPC Credits

• III.F.2.2.1 Eligibility

• III.F.2.2.2 Real-Time Commitment NCPC Credits– III.F.2.2.2.1 Settlement Period– III.F.2.2.2.2 Eligible Quantity– III.F.2.2.2.3 Hourly Cost

• III.F.2.2.3.1 Energy cost• III.F.2.2.3.2 Start-Up fee• III.F.2.2.3.3 No-Load fee

– III.F.2.2.2.4 Hourly Revenue• III.F.2.2.2.4.1 exclusion of EcoMin revenue if Self-Scheduled [exclusion of

EcoMin energy cost is addressed in F.1(b)]

5

Page 6: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.2 - Real-Time Energy Market NCPC Credits

• III.F.2.2.2 Real-Time Commitment NCPC Credits– III.F.2.2.2.5 Credit Calc for Non-Fast Start Resources

• (a) During Min Run Time period• (b) For Remainder of the settlement period

– III.F.2.2.2.6 Credit Calc for Fast Start Resources• Calculated hourly

6

Page 7: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.2 - Real-Time Energy Market NCPC Credits

• III.F.2.2.3 Real-Time Dispatch NCPC Credits– III.F.2.2.3.1 Settlement Period– III.F.2.2.3.2 Eligible Quantity

• III.F.2.2.3.2.1 For hourly costs• III.F.2.2.3.2.1 For hourly revenues

– III.F.2.2.3.3 Hourly Cost– III.F.2.2.3.4 Hourly Revenue– III.F.2.2.3.5 Credit Calculation

• Calculated hourly

7

Page 8: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.3 -Special Case NCPC Credit Calculations

• III.F.2.3.1. Day-Ahead External Transaction Import and Increment Offer NCPC Credits– For imports and increments at external nodes cleared out of rate in

Day-Ahead

• III.F.2.3.2. Day-Ahead External Transaction Export and Decrement Bid NCPC Credits– For exports and decrements at external nodes cleared out of rate in

Day-Ahead

• III.F.2.3.3. Real-Time External Transaction NCPC Credits (Import and Export)– For import and export transactions cleared out of rate in Real-Time

8

Page 9: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.3 -Special Case NCPC Credit Calculations

• III.F.2.3.4. Real-Time Posturing NCPC Credits for DARD Resources (pumps only) Postured for Reliability– For cost above bid price when postured to pump out of rate

• III.F.2.3.5. Real-Time Synchronous Condensing NCPC Credits– Never previously used, but could be needed during system restoration

• III.F.2.3.6. Cancelled Start NCPC Credits– For starts cancelled after Notification Time and before breaker close

• III.F.2.3.7. Hourly Shortfall NCPC Credits– For resources with Day-Ahead market schedule subsequently de-

committed or not dispatched by ISO during Real-Time

9

Page 10: October 8, 2013 | NEPOOL markets committee

New Section III.F.2.3 -Special Case NCPC Credit Calculations

• III.F.2.3.8. Real-Time Posturing NCPC Credits for Limited Energy Resources Postured for Reliability– For resources with daily lost opportunity for posturing event

• III.F.2.3.9. Real-Time Posturing NCPC Credits (Other Than Limited Energy Resources) Postured for Reliability– For resources with hourly lost opportunity costs for posturing event

• III.F.2.4. Apportionment of NCPC Credits– Assigns credits to hours for subsequent use in NCPC cost allocation

• III.F.2.5Credit Designation for Purposes of NCPC Cost Allocation– Associates credits to ISO requirement for NCPC cost allocation

10