SBQ 2423

General Components of Construction Costs

FARA DIVA MUSTAPADEPARTMENT OF QUANTITY 

SURVEYING FACULTY OF BUILTSURVEYING, FACULTY OF BUILT ENVIRONMENT

Page 2: Ocw Sbq 2423 Lecture 3

General components of constructionconstruction costs

Page 3: Ocw Sbq 2423 Lecture 3

Construction Development costsConstruction Development costs

• Construction development consists of 2 typesConstruction development consists of 2 types of development costs;

• Initial/Capital costs• Initial/Capital costs

• Maintenance and operations costs 

Page 4: Ocw Sbq 2423 Lecture 3

Initial/Capital CostsInitial/Capital Costs

• Land costs (land costs, stamp duty, lawyers’)• Site clearance & earthworks• Site clearance & earthworks• infrastructure B ildi k• Building works

• External works• Landscape works • Preliminaries

Page 5: Ocw Sbq 2423 Lecture 3

Initial/Capital Costs (cont’d)Initial/Capital Costs (cont d)

• Design risks & contingenciesDesign risks & contingencies 

• Professionals Fees & Lawyers Fees

d i i i• Administrations

• Marketing (depends on government/private project)

• Financial (for loan purposes)( p p )

• Contribution to Local Authorities

Page 6: Ocw Sbq 2423 Lecture 3

Maintenance and operations costsMaintenance and operations costs

• Insurance

• Tax (land/bldgs)

• Repair & replace

• Cleanings 

• Depreciations of fixed asset (built‐in, machineries)p ( , )

• Administration and managing costs (manager’s & staff’s salaries)

Page 7: Ocw Sbq 2423 Lecture 3

Components of building costsComponents of building costs

There are several construction items that make up the total pcosts of a building. The followings are some of the common items;

• Preliminaries• Preliminaries

• Earthworks – site clearance, demolotion

• Piling works

• Main building works (elemental)

• Infrastructure works• Infrastructure works

Page 8: Ocw Sbq 2423 Lecture 3

Components of building costs (cont’d)Components of building costs (cont d)

• Ancillary buildings y g

• Recreational facilities (parks, playgrounds, therapeutic park)

• PC and Provisional Costs)

• All other works not explicitly mentioned but deemed to be necessary in the overall execution and successfulnecessary in the overall execution and successful implementation of the contract 

Page 9: Ocw Sbq 2423 Lecture 3

Components of building costs (cont’d)Components of building costs (cont d)

• Within the building works it constitutes ofWithin the building works, it constitutes of several elements.  

• The following slide depicts the most common• The following slide depicts the most common building elements in any typical building.

Page 10: Ocw Sbq 2423 Lecture 3

Elemental Main buildings workElemental Main buildings work

I W k b l l t fl fi i hVII. Windows & external doors 

I. Work below lowest floor finish 

II. Frame VIII. Internal walls & partitions 

III. Upper floors IX. Internal doors 

X Internal wall finishesIV. Roof 

V. Stairs

X. Internal wall finishes 

XI. Internal floor finishes V. Stairs 

VI. External walls 

Page 11: Ocw Sbq 2423 Lecture 3

Elemental Main buildings work (cont’d)Elemental Main buildings work (cont d)

XII. Internal ceiling finishes 

XIII. External finishes 

XIV Fittings & furnishings

XVIII. Builder’s profit & attendance on services 

XIX Builder’s work in connection withXIV. Fittings & furnishings 

XV. Sanitary appliances 

XIX. Builder s work in connection with services 

XX. External works(within the b d f h )

XVI. Plumbing installation (water, soil, waste and vent) 

boundary of the premises) including retaining walls, roads & footpaths, car park, turfing, landscaping, fencing & gates, 

f d i f lXVII. Special installations including AC & ventilation, electrical, fire protection, lift & conveyor and communication 

surface water drainage, foul drainage etc. 

Page 12: Ocw Sbq 2423 Lecture 3

Final stage of estimating a construction project

• Once each of the construction items has beenOnce each of the construction items has been calculated, the next steps will be the filling in costs in tender documentcosts in tender document

• Prepare company’s profile

S b i d d• Submit tender document

Page 13: Ocw Sbq 2423 Lecture 3

Concluding RemarksConcluding Remarks

• All of the costs within the constructionAll of the costs within the construction developments need to be carefully prepared, plan and monitored in order to ensure successplan and monitored in order to ensure success execution of project.

Page 14: Ocw Sbq 2423 Lecture 3

Reference and further readingsReference and further readings

• Ahamad Abdullah – Anggaran Kos KerjaAhamad Abdullah  Anggaran Kos KerjaBangunan,2nd Edition, Pearson Prentice Hall, 20112011.

• Edition,Peurifoy,R.L and Oberlander, G.D. –Estimating Construction Costs 5th Edition McEstimating Construction Costs, 5th  Edition Mc‐Graw‐Hill, 2002.

P C M Ph b j K O i N• Popescu, C.M, Phaobunjong, K, Ovararin, N –Estimating Building Costs, Marcel DekkerInc20032003.