‘‘We shape our buildings; thereafter they shape us’’Sir Winston Churchill
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLPPAGE 2
The OD Group was founded in 2004 by Jon Kearney to work within the construction industry alongside many of the professional bodies in the interiors market to deliver high quality interior projects across commercial, residential, and leisure sectors.
Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most exciting and challenging times has resulted in OD Projects gaining respect from not only the professional bodies that we work with but also our peers and the wider business community.
OD Projects is one of the Capital’s leading integrated design, project management and construction companies. With our partners we undertake various different projects in terms of scale and complexity for a diverse client base.
We provide the very best specialist expertise in all facets of the construction process, from project initiation to completion. Our talented and experienced team has been hand picked, trained and supported so that they can achieve the very best results. The team is made up of like-minded individuals who understand the importance of attention to detail and the essential need for a high quality end product. We do not consider ourselves to be builders or contractors, but craftsmen who can be proud of what we produce from conception to completion.
We genuinely enjoy working with a diverse range of companies from large multinationals to small privately owned businesses, taking care that each solution we design and implement reflects the individual needs of the client.
OD Projects enjoys a high level of repeat business from many of our clients; a testament indeed to the professionalism and dedication of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining high quality interior design and commercial acumen with best practice delivery in the market place.
The OD Management team is extremely passionate about what we do and supports all the staff within our business who enable us to deliver beyond our client’s expectations. What each client has in common, is a desire that their project is undertaken with complete attention to detail, is within budget, and delivered on time by a professional team. They also wish for the project, which can often be the cause of great stress within an organisation, to be as pleasurable an experience as possible.
At OD, we believe we can exceed all of our client’s needs and expectations.
FOREWORD
Steve CherryConstruction Director
Jon Kearney Managing Director
Greg PinchinCommercial Director
COMPANY
• ODProjectsclientlistincludesArsenalFC,ScottBrownrigg,AYH,andPrice&Myers.
• RecruitmentofCommercialDirector(Managing Surveyor of top fit out company)
• RecruitmentofConstructionDirector(BCO&FXQualityAwardWinner)
• AIBframeworkcontractor.
• ODProjectscurrentlyemploy25staff.
• AchieveBritishCouncilforofficescorporatememberstatus.
• Sign5yearleaseandfitoutMoorgateHQ.
• JonKearneyfinalistforG4_NewGenerationAwards–EntrepreneurshipAward.
• RollsRoyceFrameworkcontractor• GreenAppleAwardforDigitas
Saatchi&Saatchi
• InstututeofCharteredAccountants Frameworkcontractor
• AwardedVogue/CondenastHQfitout
• EducationsectorexpansionwithsuccessfulfitoutprojectsforPartnershipsForSchoolsandNorthHertsCollege
• Savillsapprovedcontractor
• Highendresidentialteamacknowledgedasleading contractor within sector
• AwardedrefurbishmentforRoyalAlbertHall
2004 2005 2006 2007 2008 2009 2010 2011 2012
InJanuaryJonKearneyfounds OD Projects.
• ClientbaseexpandedtoincludeRoyal&SunAlliance,O2,AIB,MorleyFund,andGISInterpublic.
• ConsultantsincludeGensler,Cushman&Wakefield,BarrGazetas,andLeslieClark.
• Royal&SunAllianceapproved contractor status.
• ODProjectscomplete£4million,107Leadenhall,fitout.
• ODProjectsachieveISO9001status.
• Forecastrecordturnoverofcirca£20minwithBusiness Plan.
• Officiallaunchofaftercareteam‘ZEROdEFECTS’.
• SuccessfulcompletionoffirstIrishprojectforMarcusEvansHQinDublin.
• NotableprojectwinsforclientssuchasFinchatton,BMBProperty,UnitedContinentalAirlines,SafestayandRoyalLondonAssetManagement.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley,LEEDsilvercertificationachievedforHarrisWilliamsfitoutinMayfair,SKAsilvercertificateachievedforParadigmHousinginHighWycombe.
• RebrandofOdwhichdefinesourfocusanddisciplined approach to achieving quality.
• OdappointedonSavillsEstateAgencyofficefitout framework
• Repeatbusinesslevelsat70%ofturnoverand growing
• NotableprojectwinsforDowJones,RoyalLondonAssetManagement,Fendi,NationalAustraliaGroupandBerkeleyGroupMarketing Suites
• Odcompletesitsfirsthotelrefurbishmentforlaunch of exciting new venture for Safestay in London
• Odworkingonover50000sqftofLondonssuperprimeresidentialprojectsinKnightsbridge,Kensington&Hampstead
• OdGroupformed,divisionsfocusedonCommercialFitout,SuperprimeResidentialandCommercialDesign&Build
• ODExpandofficespacetotakeanotherflooratSunStHQ
HISTORY
PAGE 4 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
OD HOLDINGS
OD INTERIORSOD PROJECTS OD SOLUTIONS
Specialising in interior fit out and construction to the professional construction industry.
WorkingcloselywithArchitects,ProjectManagers,QuantitySurveyorsanddirectforenduserclients.
Coveringall sectors includingCommercial,RetailandLeisure
Specialist high end residential refurbishment and construction company working closely with high net worth clients, developers and architects to deliver unique boutique interiors
Set up to cater for direct End User clients requiring a‘onestopshop’turnkeysolution.Workingwithinterior design and architecture companies Od are procurement specialist to take a client from concept to completion under one roof.
OD INTERIORS
Jon KearneyManaging Director
Steve CherryConstruction Director
Greg PinchinCommercial Director
Andy TorlotDirector
Graham CannDirector
Andrew WrightDirector
COMPANY
TURNOVER
182 8 10 12 14 164 60
(Turnover£mApril-April)
2011/2012
20 2422 26
2012/2013
Secured2013/2014 (Projected)
(Turnover£mApril-April)
OD Solutions
Secured
Secured OD Interiors
OD Projects
2013/2014 (Projected)
2 8 10 12 144 60
OD GROUP TURNOVER
Secured
Secured2014/2015 (Projected)
PAGE 6 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
MCM – INTRODUCTIONMCMArchitecturewasfoundedin1989andisoneofEurope’sleadingworkplacestrategyandarchitecturaldesignpractices.Wehaveastaffcomplimentof43talentedarchitects,designers,spaceplannersandtechnicians.
We have built our award winning reputation on listening to our clients’ business aspirations and designing imaginative solutions that inspire their people to perform and enjoy their work experience. Our clients are challenging,forwardthinkinganddemandingbusinessesofallsizesfrombluechipmultinationalstoentrepreneurialenterprises.Weareproudofthemanylong–termrelationshipswehavedevelopedwithkeyclientsoverthe years.
Asoneoftheleadingworkplacearchitects,wefirmlybelievethattheexplorationanddevelopmentofworkplacestrategiesisanintegralpartofthedesignprocess.Wecanofferourclientsawiderangeoftoolstooptimisetheefficiencyoftheirrealestate,reducecostsandmaximisespaceutilisation.Alignedtoefficiencyconsiderationsourclientsoftenadoptnewflexibleworkingmodelsandwehavefacilitatedanumber of successful change management procedures. The early involvement of our team not only delivers real estate benefits to developers, landlords, but also to occupiers and end-users seeking to maximise space efficiencies and return on investment.
Internationally,ourprimaryfocusistodeliverstrategicworkplacesolutionsanddesignexcellencetoourclientsregardlessoftheirofficelocation,andwearethereforeintheprocessofdevelopingourreachfurther.
We have a growing network of European alliance partners with established regional offices and the requisite knowledge of local regulations and code compliance to support the effective delivery of projects on the ground.
IntheUSA,wehaveastrongandveryactiveworkingalliancewithTedMoudisAssociates(TMA),whoarebasedinNewYorkandChicago,andcanassemblejointteamstosupportclientsbothsidesoftheAtlantic.
InSeptember2012weincorporatedourSingaporebusiness,MCMEastPteLtd,todeliverhighqualitydesignandprofessionalservicestoourclientsacrosstheASEANregion.
‘Without doubt MCM was absolutely the right choice for the project from strategic input and workplace consultancy, all the way through design and delivery’ Sean Monie, Director Savills
COMPANY
SERVICES
� Master planning
� Due diligence and building evaluation
� Design team leader
� Feasibilitystudies
� Condition surveys
� Leasesupport
� Development and base build monitoring
� Brief gathering
� Workplace strategy and change management
� Space planning
� ArchitecturalandinteriordesignthroughallRIBAworkstages
� Building refurbishment to the following standards:
� - Shell andCore -CatA - Cat B
� Building extensions
� Core reconfigurations and other major structural interventions
� Planning applications and local authority liaison
� Contract administration
� Post occupancy evaluation
� Furnitureaudits,selectionandprocurement
� Assistancewithartworkselection
� Computergeneratedimagery–animationandstills
� Graphicdesign � Signage and way finding
The scope of professional services that we offer in–house includes:
We also have associations with a number of other specialist consultancies and can offer the following additional services fully integrated into our overall offer:
� Catering design and specification
� Acoustics
� Fireengineering
� Measured surveys
� Specialistlighting–internalandexternal
� Externallandscaping–hardandsoft
� Audiovisualdesignandspecification
� Relocationmanagement
PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLPPAGE 8
DESIGN & BUILD: ODCONSTRUCTIVEDESIGN
PROJECTLIFECYCLE
STAGE 1 DESIGN•Feasibility–TestFits•ConceptDesign•DetailedDesign•TechnicalDesign•SpecialistDesign•ConstructionSupervision
STAGE 4 CONSTRUCTION•Settingupofsite&Logistics•Coordinationofworks•ConstructionProgrammemanagement•Reportingstructure•Financialcontrol•Close-out•ZerOdefects
STAGE 2 PRE CONSTRUCTION•InitialScopeofProject•Budgetsetting&development•Programmemanagement•TechnicalCoordination•Services&SystemsIntegration•ApprovalCoordination•Contractnegotiation
STAGE 3 PROCUREMENT•Identificationofpackages•LongleadItems•SpecialistPackages•Placingofallorders•Coordinationof
project deliverables
COMPANY
OD SOLUTIONS &MCMARCHITECTURE
PRE CONSTRUCTION CONSTRUCTIONDESIGN
COORDINATION COLLABORATION QUANTIFICATION EXECUTION COMPLETION
PROFESSIONAL ACCOUNTABLE RESPONSIBLE
STAGE 1 DESIGN•Feasibility–TestFits•ConceptDesign•DetailedDesign•TechnicalDesign•SpecialistDesign•ConstructionSupervision
SPECIALIST PARTNERS•IT&AV•FURNITURE
STAGE 2 PRE CONSTRUCTION•InitialScopeofProject•Budgetsetting&development•Programmemanagement•TechnicalCoordination•Services&SystemsIntegration•ApprovalCoordination•Contractnegotiation
PAGE 10 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
PROJECT PROFILES
› Project Manager: Murray Symonds
› QuantitySurveyor: Currie&Browns
› M&E: TB&A
› Duration: 8weeks
SIMPSON THATCHER BARTLETTCITYPOINT
• Stripout;• Newceilingsfittedthroughout;• Installationofanewkitchen;•Newlighting,wallandfloorcoverings;
• Newtimberflooring;• Finishesincludingceramictilesandcarpet;• Newstateoftheartequipmentwith
complimenting units.
Thefitoutofthekitchen/staffdiningareasconsistingoftheremovaloftheoldkitchenandinstallationofacomplete new updated catering facility. The works comprised
PAGE 12 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
PROJECT PROFILES
› Value £600,000
› Size: 7,000sqft
› Duration: 8weeks
CATBfitoutofoccupiedbuildingcomprising:
• NewBenedoubleglazedpartitions,
• Highspecbespokejoinerytoreceptionandmeetingrooms/boardroom,
• Modificationstomechanicalservicestosuitnewlayout,
• Highclassfinishesincludingstonefloortoreception,
• Supportareasincludingcommsroom,
• Bespokekitchen/breakoutarea.
MCCARTHY TETRAULTGRAYSINNROAD,WC1
PAGE 14 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
PROJECT PROFILES
› Procurement: Design&Build
› Architect: MCMArchitects
› Completion: 2009
› Size 175,000sqft
The client areas are designed on a highly serviced hotel principle. Clients and visitors from other offices are encouraged to drop in to use the facilities which comprise a variety of work and meeting settings again, supported by appropriate technology, including extensive wi-fi areas, tele-conferencing and video conferencing facilities. The project had a tight programme, where client decisions needed to be made quickly - the challenge to MCM was to provide timely information for these far reaching decisions.
The transformation was completed well within budget and on programme, reflectingand supporting AddleshawGoddard’sambitionsfortheirbusiness,andhassetanewbenchmarkforthe21stcenturylegal office.
ADDLESHAW GODDARDCHISWELLSTREET,LONDON
PAGE 16 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
PROJECT PROFILES
› Procurement: Design&Build
› Completion 2011
› Size 160,000sqft
Followingareviewofmovingtoanon-cellularworkingmodelandaddressingkeydriverssuchascommunication,interaction, team working, privacy, concentration and confidentiality, the decision was taken to move to open plan. Genericworkplacecomponentshavebeenused,whichstaffcanpersonaliseandjewelledcoloursinsimilartonesaredotted around, injecting life into the open plan area. The new environment has succeeded in making the workforce more efficient, effective and responsive, and it truly supports everyone’s individual needs.
PinsentMasons’aspirationstomakethisthebestnon-cellularworkingenvironmentinLondonarereflectedinwhatisatruly bespoke creative, yet practical fit-out.
Inordertosupportourclient’ssustainabilityinitiatives,MCMintroduceditssustainabilitycharteronthisproject,whichassists in understanding and quantifying the range of sustainable initiatives available and identifying those which the client wishes to embed in the process.
PINSENT MASONS30CROWNPLACE,LONDON,UK
PAGE 18 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
PROJECT PROFILES
› Procurement: Design&Build
› Size: 240,000sqft
› Completion: 2007
NORTON ROSE3MORELONDONRIVERSIDE,LONDON
The typical fee earning floors were specifically generic in layout to support effective and efficient churn with minimal disruption to support the client’s growing business.
Clientfacilitiesonthe9th floor, accessed by scenic lifts from the atrium, take full advantage of spectacular views and were designed to offer world class meeting, dining and entertaining spaces.
Atgroundfloorthereisstaffdining,includingacoffeeshop,retailoutlet,loungeareaforstaffpresentationsandinformal meetings, along with a large servery.
Inadditionalargetrainingfacilityandauditorium,allwithaudiovisualequipment,demonstratetheclient’scommitment to continuous professional development.
PAGE 20 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
CERTIFICATION
CERTIFICATION
Fit‐out Sustainability AssessmentThis is to certify that
Paradigm Housing GroupBuilding A1 Glory Park
High Wycombe Bucks HP10
has achieved the Ska rating of
Silver
Accredited Assessor
Pringle Brandon LLP
On behalf of
Paradigm Housing Group
Project Manager
Savills Commercial Ltd
Architect
Mansfield Monk
Contractor
OD Projects
Building Services Engineer
Capita Symonds
Certificate Reference
Glory Park, High Wycombe
Date
29/06/2010
This certificate has been produced using Ska Rating Offices version 1.0
SUSTAINABLE CREDENTIALS
PAGE 22 PREPARED BY OD SOLUTIONS FOR SCHULTE ROTH & ZABEL LLP
OD SOLUTIONS 1 SUN STREET LONDON EC2A 2EP
WHYOD&MCM?
InappointingODSolutionsandMCMArchitecture,potentialclientswillbetakingfulladvantage of the following key areas that we believe differentiate us from our competitors:
• NO LEARNING CURVE-AprovenunderstandingofLondon’sfit-outmarket,standardsandqualityexpectations.
•LOCAL&INTERNATIONAL–AdedicatedteamofprofessionalsbasedinbothLondonandSingapore
•DESIGN–Apartnershipwith“BESTINCLASS”leadinginteriordesign&architectpracticeMCMwithextensiveexperienceoffinancialclientsanduptodateknowledgeoftrendsandregulations.AdesignwithIntegrity
•COST CERTAINTY–commercialcompetitivenessandunderstandingofclients’valueaspirations
•COMMUNICATION–Openandhonestcommunication;wewon’tmakepromisesweknowwecan’tkeep
•COORDINATION–Athoroughunderstandingofalltheapprovalsprocessandassociatedrequirements
•DEDICATED–ProjectManager&SiteManagerassignedtoprojectforthedurationoftheproject
•QUALITY–Ateamwhocareabouttheendproduct,serviceanddelivery
•DETAIL-AdesignwithIntegrityandhighfinishedproduct–NotDesign&Dump
•EXPERIENCE-Anextensiveprovensub-contractorandsupplierbase
•ENGINEERED-Acohesiveapplicationofthebuildingenvironmentand“Inhouse”MEPcoordination
•TRANSPARENCY-Aclearlythoughtoutprocesswithinanopenandhonestculture